2023_Architectural_Portfolio_Odyssey

Page 1

PORTFOLIO
Darnel Myers
darnel.myers@hotmail.com
Collection of Architectural work 2023
2 I 30

darnel MYERS

darnel.myers@hotmail.com

( More than just an Architect )

I would like to take this opportunity to introduce myself as Darnel a qualified enthusiastic young professional from Trinidad and Tobago located in the Caribbean. I have completed my Masters in Architecture at Anhalt University of Applied Science in Germany (Bauhaus). Prior to this, I completed my Bachelors of Arts Degree in Architecture at the University of Technology in Jamaica.

Thus far I have worked as an Architectural Engineering,Technician Engineer, Assistant Project Manager, Architectural Designer and Landscape Architect; through these tenures I was assigned design, management and construction responsibilities for multiple projects disciplines. These opportunities have equipped me with strong organisation skills, accurate oral communication and good interpersonal skills.

Currently I have personally embarked on developing my Master thesis project regarding Wasted Plastic as an Architectural Material for Catastrophe relief Architecture in Tropical and Mediterranean climates. I am actively building a wealth of Mentors and professional advisors while personally developing my ideas towards physical architectural product development.

I honestly prefer to be a part of a dynamic ambitious group instead of the star player of a team. I approach my work openly and meticulously, combining all my previous experiences. This allows me to have new questions and constructive perspectives for projects and the office Atmosphere.

Lastly my interest outside of Architecture constantly pushes me to learn, grow and view the world from a wider perspective. I am passionate about being physically and mentally active. This can be as simple as a walk with the dog or as daring as cliff diving.

3 I 30

SKILL SET

BIM (REVIT)

BIM (ARCHICAD)

VECTORWORKS

AUTOCAD

RHINOCEROS

SKETCHUP

ADOBE SUITE

LUMION

MICROSOFT OFFICE

HAND CRAFT MODEL MAKING

PUBLIC SPEAKING

4 I 30

WORK EXPERIENCE

BJOERNSEN BERATENDE INGENIEUR GMBH

ARCHITECTURAL PROJECT ENGINEER

Working within a Team or Engineers and Architects where I was responsible for designing and planning (LP2-LP5) phases of Industrial and residential buildings.

BRANDENFELS LANDSCAPE AND ENVIRONMENT

LANDSCAPE ARCHITECT / FACILITY MANAGEMENT

Working within a Team where I was responsible for designing and planning (LP2-LP5) indoor and outdoor public / private spaces. Valued at $500 Thousand (EU) projects and upward.

URBAN DEVELOPMENT CORPORATION OF TRINIDAD & TOBAGO LIMITED

INTERN JUNIOR ARCHITECT/DESIGNER

Assisting a dynamic Design department with Tourism and Institutional Building designs for $30 million (TT) projects and upward, within the largest governmental Urban Development Company throughout the country.

JALANDY DESIGNS LTD

JUNIOR ARCHITECT

Supporting the Senior Architect with design and project management for Luxurious Residential buildings valued at minimum $3 million (TT).

5 I 30

Pump Station Loerick - Pumpwerk Lörick

6 I 30 1 1 2 2 +32,80 +32,80 +32,80 +32,80 4,695 60 4,60 60 4,60 60 4,60 60 4,695 +32,80 27,60 +32,80 195 9,81 195 40 195 5,00 4,00 195 40 195 9,81 195 195 7,81 195 40 3,195 3,00 1,00 3,00 1,00 3,195 40 195 7,81 195 8,95 60 8,10 60 9,35 13,60 14,00 +31,51 +31,51 +32,80 +35,44 +35,44 +35,76 +35,76 +32,80 +32,80 45 2, 26 90 1, 13 1 ,13 2 ,2690 45 45 92,26 0 1,43 5 1,32 23 1,32 23 25,59 735 545 73 5 54 5 1,02 1,02 +35,76 +35,76 2,90 2,90 1,42 585 50 195 1,40
- Industrial Architecture Kategorie - Bauwerksplanung Year - 2022
Category

This Pumping Station is a diagonally cut cylinder. To soften the technical building typology, the Architecture team created a museum concept. All the walking pathways of the Pump Station would be similar to the experience of walking through a museum, by which the machinery is the Artefacts.

7 I 30
Zulauf DN2600 Ablauf DN2600 Betrieb DN 1600 DN 2000 DN 1200 Drucktür Kranbahn Tragfähigkeit 6,3 t Trafo 2 Schussrinne DN 2000 25,59 41,92 60 4,05 4,05 60 7,55 403,52 29,52 31,95 80 6,22 359835 8,00 8,00 19 5 49 5 1,23 20 42,22 43,02 43,02 43,44 26,97 26,92 Reihenabdeckung 4,30 x 1,10 m 46,96 40,55 Profilbeton Gefälle 2,2% 50701,70 46,60 27,00 30 50 30 26,92 26,72 50,52 38,30 41,49 34,13 32,80 Gefälle 2% 25,74 42,72 32,45 Pfosten Riegel Fassade Falttor 26,52 26,72 36,50 41,00 37,80 20 3,14 30 4,42 5 19 5 30 4,00 5,00 35 5,53 40 1,62 80 29,65 50,52 32,80 OKFF 43,44 43,33 43,42 24,10 31,47 31,12 44,47 32,80 39,45 40,78 42,11 38,12 35,46 6,57 1,33 8,69 4,87 4,15 5 6,18 5,49 5 8,70 Gefälle 2% Gefälle 2% 504,0050 7,55 195 304,0030 8,345 1,10 35,76 17,71 5 7,90 36,79 34,20 25,24 25,04 25,60 25,15 24,90 2,72 72 24,10 UK BPL-Pumpwerk 22,50 31,90 32,40 31,90 32,40 19,50

House S8 - Haus S8

8 I 30
Category - Residential Housing Kategorie - Einfamilienhaus Year - 2022 EG 0,00 m OG 2,85 m A B C Dach UK 5,37 m First 7,40 m EG 0,00 m OG 2,85 m 1 2 3 4 Dach UK 5,37 m First 7,40 m

This Sustainable Timber house was designed in office for a small family who emphasised on a rapid move in deadline. We proposed a simple form for efficiency and timber as the primary building material to allow quick factory construction and minimal physical labour for site assembly.

9 I 30
430 860 1200 400 300 300 300 300 2500 1200 130 800 1000 430 860 750 250 1200 300300300300300300300300100 2500 2520 430 130 150 150 100 300 300 300 300 300 300 300 300 Blattgröße: 420 594 mm Plannummer Auftraggeber Blattgröße: 420 594 mm N:\bwr2133730\03_Pl\11_BIM\06_Revit\04_Ausfue\01_Arch\ARCH_LP05_BWR_Zentraldatei_01_a.alvaradoY3XG9.rvt 28.10.2022 10:57:49 A.5.4.20 27.07.202227.07.202227.07.2022 Ausführungsplanung Haus S8 Steinberg 8, 82069 Hohenschäftlarn Alexandra Baumgartner, Mark Wright 82152 Planegg, 85622 Feldkirchen Georgenstraße 11, Zepelinstraße 14 750 1230 1290 1000 450 900 5 885 900 745 5 75 1650 2520 1320 1200 10 1790 310 2550 140 300 150 600 150 1518 50 470 860 430 430 150 745 5 2020 120 75 1200 2400 2520 mm N:\bwr2133730\03_Pl\11_BIM\06_Revit\04_Ausfue\01_Arch\ARCH_LP05_BWR_Zentraldatei_01_a.alvaradoY3XG9.rvt 10:57:37 Ansicht 02 Ansicht 03

Pump Station Oelde - Pumpwerk Oelde

10 I 30
Category - Industrial Architecture Kategorie - Bauwerksplanung Year - 2022 GOK +72,93 +79,51 +77,28 +77,28 +79,51 GOK +72,93 OK FFB =±0,00 = +72,93 +79,51 +77,28 +72,93 GOK +72,93 +79,51

A small Pump Station that required renovation. I was responsible for the redesign of the building layout with coordinating with structural and Technical Engineers to have a complete bWuilding package.

11 I 30 +72,66 Befestigungsrahmen 80 Betonverbundpflaster 30 Ausgleichsschicht Schottertragschicht BK 3,2 0/32 Frostschutzschicht BK 3,2 0/34 Aufbau Pflasterflächen (von Oben nach Unten) WU Stahlbeton Stahltür Stahl-Eckzarge 4-seitig 2% WU Stahlbeton2 3 105 4065 OK FFB EG +72,93 +72,91 Schachtabdeckung, Klasse A flächenbündig, begehbar +71,93 +72,46 5 20 240 10 200 2335 +72,66 +72,91 250 +72,93 100 2080 +72,83 Doppelboden h= 1,00 m 20 Polystyroldämmung EPS 032 Mauerwerk 380 140 240 240 Aussenwandaufbau (von Aussen nach Innen) Ortbetonsturz 500 x 240 Regenschutz Stahltür Stahl-Eckzarge 4-seitig Befestigungsrahmen 20 240 10020 +75,19 Klinkerriemchen Unterputz Kalk-Zement-Leichtputz 4065 Innenputz Kalk- 20 Wärmeleitfähigkeit 0,032 W/mK 0 240 20 Dachaufbau (von Oben nach Unten) Aluminium-Profiltafel Wärmedämmung 120 Dampfsperre 120 Tragschale Stahl-Trapezprofil HEA Träger - Abdeckung auf Stützprofil 20 60 12 20 Ringbalken 240 x 340 360 +78,52 +78,86 +79,42 Stahlprofil gekantet 20 100 120 120 300 110 Befestigung mittels Schraubverbindung 20 Polystyroldämmung EPS 032 Mauerwerk 240 Aussenwandaufbau (von Aussen nach Innen) Klinkerriemchen Unterputz Kalk-Zement-Leichtputz 0 +79,52 300 MF- Rollfilz weich komprimierbar oder gleichwertig Wärmeleitfähigkeit 0,035 W mK Wärmeleitfähigkeit 0,032 W/mK 80 240 2 0 20 6 1 0 120 20 50 110 Traufwinkel 40/20/2 Aluminium Ringbalken 240 x 410 +76,83 Regenfallrohr verzinkt Befestigung mittels Schraubverbindung +77,26 +77,19 20 Aussenwandaufbau (von Aussen nach Innen) Klinkerriemchen Unterputz Kalk-Zement-Leichtputz 20 Polystyroldämmung EPS 032 100 Stahlbeton 240 +76,43 Dachaufbau (von Oben nach Unten) Aluminium-Profiltafel Wärmedämmung 120 Dampfsperre 120 Tragschale Stahl-Trapezprofil 200 HEA Träger - Abdeckung auf Stützprofil MF- Rollfilz weich komprimierbar oder gleichwertig Wärmeleitfähigkeit 0,035 W mK Wärmeleitfähigkeit 0,032 W/mK 240 10020 120 240 360 20 60 120 120 320 Stahlbeton +77,35 Halfenschiene HTU - 60/22/6 Stützprofil 20 Klinkerriemchen Unterputz Kalk-Zement-Leichtputz Aussenwandaufbau (von Aussen nach Innen) Polystyroldämmung EPS 032 20 100 1 0 70 Stahlbeton 240 Dachaufbau (von Oben nach Unten) Aluminium-Profiltafel Wärmedämmung 120 Dampfsperre 120 Tragschale Stahl-Trapezprofil - Abdeckung auf Stützprofil MF- Rollfilz weich komprimierbar oder gleichwertig Wärmeleitfähigkeit 0,035 W mK Wärmeleitfähigkeit 0,032 W/mK Sperrschicht Glasvliesbitumanbahn WU-Stahlbeton 380 +72,58 +72,83 1300 300 1000 Aussenwandaufbau (von Aussen nach Innen) Klinkerriemchen Unterputz Kalk- -Leichtputz Polystyroldämmung EPS 032 Innenputz Kalk+73,23 besichtetes Fugenblech Leistungsgrenze Dämmung Dichtung +71,93 20 100 240 20 5 Sperrschicht Glasvliesbitumanbahn 600 120 +0,30 -0,65 -1,00 OK FFB EG +72,93 Wärmeleitfähigkeit 0,032 W/mK Blattgröße: 1189 841 mm Björnsen Beratende Ingenieure GmbH Maria Trost 3, 56070 Koblenz, -Projekt: Planbezeichnung: Lagebezug: Höhenbezug: ETRS89.UTM-32N (EPSG DHHN2016 (EPSG Quelle Hintergrundkarte: DKT10 www.geoportal.nrw dl-de/by- -0 www.govdats.de/dl Land NRW (2018) Vermessung: Datengrundlage: Die dargestellten Versorgungsleitungen sind aus Anmerkung: gestellten Plänen übernommen worden. Die genaue Lage der Leitungen ist in der Örtlichkeit Die Eintragungen haben keinen Anspruch auf Vollständigkeit. Der Auftragnehmer hat sich vor Baubeginn bei Versorgungsleitungen zu informieren. vom Auftraggeber zur Quelle DB-Strecken: von der Deutschen Bahn P:\pwo1829221\03_Pl\11_BIM\06_Revit\04_Ausfue\01_Bautechnik\02_lo kale_Arbeitskopien\ING_LP05_PWO_Zentraldatei_01_a.alvaradoY3XG Neubau einer Pumpstation in Los 2: Druckrohrleitung Letter Details Schmutzwasserpumpwerk STADT OELDE Fachdienst Tiefbau und Umwelt Ratsstiege 1 59302 Oelde Detail 5 Eingangstür/Außenwand Detail 1 Eingangstür/Kopfpunkt Außenwand Detail 2 Dach/ First Detail 3 Dach/Traufe Detail 4 Dach/Ortgang Detail 6 Aufbau Pflasterflächen Detail 7 Sockeldämmung OK Fertig OK Roh UK Fertig UK Roh WD Wanddurchbruch WD Wanddurchbruch Stahlbeton Sauberkeitsschicht Mauerwerk OK FFB Draufsicht DD Deckendurchbruch Trockenwetterpumpe (Q= 11,3 l/S, H= 53,90 m) Regenwetterpumpe (Q= 49,10 l/S, H= 57,19 m) Rohrleitungsmaterial V4A, Wst.-Nr. 1.4571 Alle Rohrnennweiten gehen aus dem Verfahrensschema gem: Anlage A-3-1 hervor DD Deckendurchbruch BD Bodendurchbruch Stürze über Öffnungen Flachstürze Ortbetonstürze Material C25/30, XC1, W0 Querschnitt h/b = 50 24 cm Auflagertiefe: 25 cm Kalksandstein-Flachstürze Auflagertiefe bauaufsichtlicher Typenstatik Zeichenerklärung Erdungsanlage Blitzschutz Fangleitung Erdung Ringerder Stahl niro Erdung Ableitung Aluminiu Stahl nach
UG OK FFB -6,08 B +72,83 Aggregat Raum Transformator Saugraum +76,43 Dachneigung 15° +72,93 +66,25 Detail GOK +72,93 A 0,70/0,15 m UK OKFB +0,10 +71,93 +72,83 +72,93 Schalldämpfer DD 0,80/0,80 m flächenbündig, begehbar 0,10 m Schwelle +67,10 U-Profil 200 Keil +59,80 +59,80 Detail +72,66 -lagig PE+72,00 Einbindung den Mergel Einbindung in den Mergel +72,00 +65,85 4 Pumpenraum Treppe 1,00/1,80-- (KS-)Flachsturz -1,26 EG OK FFB 0,00 +76,43 B +72,83 +66,85 +66,75 +72,93 Sauberkeitsschicht, 10cm Treppe ausklappbar Detail 3 32 Stg. 19/ 26 GOK +72,93 +66,95 Pumpenfundamente BD 1,00/1,60 m +70,75 A WD 1,095/0,77 m WD ⌀ 0,15 m Achse = OKFB +0,60 +66,75 +72,93 Stahlbeton-Unterzug Spundwand TKL 606N L=13,20m U-Profil 200 Keil Anker L= 23,00m +73,00 U-Profil 200 + Keil +73,00 incl. Kernbohrung durch Versorger WSG 1,08/0,755 m +70,75 -1,02 1,12 Einbindung in den Mergel Spundwand TKL 606N L=13,20m Einbindung in den Mergel

Office Building Courtyard Münster

Category - Landscape Architecture Kategorie - Landschaftsarchitektur Year - 2020

12 I 30 Rinne 17 18 angenommen, nicht aufgemessen Zufahrt Planung Repräsentative Bepflanzung Acht-straße Trafostation Mülleimer Winkelstütze Müllbehälter Rinne Rinne Planung 8.83 5 Bereich Zugang Glasfassade EG 16 13 14 5.00 2.55 4.30 2.55 5.00 2.55 4.30 Stellplätze für 2 Lastenfahrräder 1.30 2.50 U-straße V-Straße Drehflügeltor Stahltor Sitzelemente Schacht Planung Raucherbereich Überdachung Neuer Ablauf Position Fluchtweg 35 36 37 Barrierefreier Eingang 19 20 21 22 23 24 25 26 27 28 29 30 31 32 46 47 48 49 38 39 40 41 42 6.00 6.00 1.88 Mülleimer Überdachte Behindertenstellplätze 3.47 nachträglich eingemessenes Fenster 2.92 nachträglich eingemessenes Fenster 3 4 5 6 8 9 10 1 2 15 Rasenfugenpflaster Längstugenstein Rasenfugenpflaster Längstugenstein Cuba Nova Münster Spalier Gehölze Photinia Fassadenbegrünung 1.30 2 FahrräderStellplätze 8 Lastenfahrräder Kommunikationszone 1.30 43 44 45 33 34 Behindertenleitsystem 3.50 5.00 Drehflügeltor Schiebetor 1.26 Bauabschnitt A Neubau OKFF-EG=60,55 OKFF-EG=60,55 bestehende Gebäude OKFF-EG=60,55 Rigole Amberbaum Mastleuchte mit Blendschutz Blendschutz Ablauf Planung Neubau OKFF-EG=49,64 11 12 6.00 5.00 3.50 5.00 2.55 5.00 2.55 6.00 1.91 Böschung 2.42 Photinia Hecke

Working as a Landscape Architect, I was Project Leader for this office building project. I was tasked to develop the project through German HOAI phases also collaboration with the Architect and Client. The focus of this project was efficient parking spaces while creating a greener atmosphere.

13 I 30 angenommen, aufgemessenangenommen, Rigole 401,99 Rinne Repräsentative Bepflanzung Acht-straße Achtermannstraße Rinne Planung U-straße V-Straße Fluchtweg 35 36 19 20 22 23 38 39 40 41 42 nachträglich eingemessenes Fenster nachträglich eingemessenes Fenster Längstugenstein Drehflügeltor OKFF-EG=60,55 OKFF-EG=60,55 bestehende Gebäude OKFF-EG=60,55 Rigole Neubau OKFF-EG=49,64 Böschung

Tiroler Street-Frankfurt Germany

14 I 30
Category - Landscape Architecture Kategorie - Landschaftsarchitektur Year - 2020 Neubau 10 8 6 EFH EG=97,15 EFH UG=93,90 F F F SD F F STZ STZ 93.25 93.37 93.49 48.04 m 50.01 m 1:400 1:417 400 400 400 DN DN UnitymediaEntwässerungTiefgarageüber Verdunstungsrinnen RW3 RW8 Medientrasse Stadtwerke Medientrasse Stadtwerke ÜS 1,0% DN100 DN70 DN100 DN100 DN100 DN100 DN100 DN100 DN100 DN125 DN100 DN125 DN40 SW5 93,3796.92 BWT 5m³/h50KW DN32 SW5a Fahrradraum Leerrohr Straße Enthärtung Leerrohr Leerrohr Heizkreisverteiler Leerrohr egenwasserSchachtaufsatzrohr DN100 DN100 DN100 DN125 Entlüftungshaube

A private building site where the Landscape Architecture teamW was tasked to assist the building Architect with a external design proposal,considering the underground parking.

Kiestraufe im unterbauten Bereich

Rasenplatten / Rasengittersteine, unterbaut Befestigungsarten und Bauweisen für die Nutzungskategorie NFw

Gesamtaufbau: 84cm

Vegetation

Rasenplatten / Rasengittersteine verfüllt mit Rasensubtsrat R

Bettung 2/5

Hartgestein-Schotter 0/45 EV2 min. 120 mPA

Filtervlies FIL 300

Perl Lava 2/16

EV2 min. 100 mPA

Bautenschutz-und Dränelement FKD 60BU verfüllt mit Perl 2/16

Schutz-, Trenn- und Gleitlage

SGL 500

PE- Trenn - und Gleitfolie TGF 0/2

Beton - Unterkonstruktion

Tiefbordstein, Beton, 10/20/6 cm

10 cm Grobkies K 16/32, gewaschen

Betonfundament C 12/15,Stärke 20cm, mit Rückenstützen gem. DIN 18318

27 cm Hartgestein-Schotter 0/45

Optigrün Filtervlies FIL 300

Vlieskaschierte Noppenbahn

36 cm Perl Lava 2/16

Bautenschutz-und Dränelement FKD 60BO, gefüllt mit Perl 8/16

Schutz-, Trenn- und Gleitlage SGL 500

PE- Trenn und Gleitfolie TGF 0/2

Beton Unterkonstruktion

15 I 30
RD4
RD7
Fassade, schematisch Neubau 10 8 OKFF-EG=97,15 OKFF-TG=93,90 OKFF=97,17 OKFF=97,08 6 OKFF=97,16 RD1 RD8 RD12 RD9 RD10 RD6 RD7 RD13 RD11 RD5 RD2 2.34 3.13 6.51 5,0% 3,9% 2,0% 2,5% 2,5% 2,5% 2,5% 2,5% 2,5% 2,0% 2,5% 2,5% 2,5% 3.78 RD3 2,5% 2,4% 2,4% RD13 2,0% RD13 RD13 2.15 RD4 2,5% 2,0% 4,5% 97,08 2,0% 97,08 4,5% 2.00 1.39 1.31 1.50 1.50 1.16 1.50 1.17 1.50 0.40 1.50 1.50 1.77 2.00 0.80 1.10 1.10 1.00 97,12 96,86 97,12 96,70 96,71 97,17 96,80 97,07 97,05 97,04 97,15 OKRD 96,30 97,15 97,12 97,10 97,10 97,15 97,15 97,10 97,13 97,15 97,15 97.10 97,07 96,71 96,76 97,10 97,12 96,70 96,70 97,10 96,93 OKRD 96,30 96,91 96,75 96,75 97,13 96,99 OKM 97,76 97,00 96,60 97,05 OKRD 96,55 97,18 97,15 97,10 97,22 OKRD 97,00 97,07 97,10 97,20 97,12 97,18 97,22 97,03 OKRD 98,05 OKRD 98,85 OKRD 96,65 96,70 97,20 97,17 97,12 97,10 97,06 97,01 96,91 96,90 96,90 96,90 97,20 97,18 97,20 97,10 OK TB. 97,20 OK TB. 97,20 96,88 96,86 97,27 97,24 97,19 97,19 97,12 97,12 97,19 96,73 97,07 97,17 97,20 97,06 97,22 9714 97,19 97,06 97,15 96,96 97,02 96,94 97,06 96,97 97,15 97,06 96,91 96,96 96,96 96,98 96,98 96,93 97,20 97,10 97,10 97,10 97,10 97,10 97,10 97,10 97,10 97,10

House Fortune - Single Family Home

16 I 30 DN UP D REF.OVEN 7 6 5 4 3 2 1 0 8 7 6 5 4 3 2 1 DW Foyer 1 Lounge 4 Car Port 15 Alfresco 16 8" thick Retaining wall UP 1 2 Powd. Room 3 35 SF 3 E.F Smoke Detector 2kg Dry Chemical Fire Extinguisher Basement Storage Slab Kitchen 2 Laundry Room 42SF 18" conc box drain 18" conc block box drain wall 36" wide existing conc storm street drain 18" conc slipper drain 18" conc slipper drain Electrical Pole and Meter Position at Main Driveway Entrance 2 4 5 E C B A A-200 A 21' 4" 12' 6" 92 206 21' 4" B A-201 4" Ø Rain Water Down Pipe and Catch Box to Main Drain 12' 6" 4" Ø. DownPipe 4" P.V.C Guttering 4" P.V.C Guttering 4" Ø DownPipe 26 G Corr. Galvanise On 4" Z Purlins, On Steel Rafter 26 G Valley Guttering 12 "Hip Ridge Cap 26 G. Ridge Cap 26 G Ridge Cap D 3 26 G corr. galvanise on 4" z purlins, on steel rafter 8862' - 4" 2' 4" Building Outline Roof Eave Size
Category - Residential Housing Kategorie - Einfamilienhaus
- 2016
Year

5

17 I 30 Ground Floor 0' - 0" First Floor 9' - 4" Parking Level -1' - 6" Roof 17' - 8"
06 RingBeam 17' - 4" 2"x 6" I beam 2"x4" Z-purlin 26 G corr. galvanise 4" Ø PVC guttering 2" steel plate 4"Ø galvanize iron pipe into ring beam to recieve roof rafters 5/8" Ø nut and bolt fascia 4" x12" capping beam with 4 nos 1/2"Ø H.T steel bars and 3/8"Ø stirrups @ 6" c/c 20G decking pan with 4000 psi concrete 4"x8"x16" clay blocks with 1/2" plastering on both sides 36" x 24" window casement 6x6 10G brc First Floor Finish 6"x12" floor beam with 6 nos 5/8" Ø H.T. rebars and 3/8"Ø steel stirrups 5/8"Ø H.T Bars 6x6 10G brc bars 6" x 8" x 16" conc blocks rubble fill 5/8"Ø H.T. steel bars Bedroom 3 11 Lounge 4 Ground Floor and finish 08 " 70 " 94 " 36 " 10 " Structural Floor 6"x12" ring beam with 4 nos 1/2"Ø H.T steel bars with 3/8" Ø stirrups @ 6" crs 12"x14" tie beam with 4 nos 5/8" Ø bars 3/8" Ø stirrups @ 8" c/c 2"x6" intermediate I-Beam 36"x36"x12" foundation pad reinf with 5/8" Ø H.T.bars @ 6"crs. both ways
My first individual project as a Junior Project Architect. I developed the formal design and structural drawings required for building approval and construction.

H - Kitchen Renovation

18 I 30
Category - Project Management Kategorie - Projektleitung Year - 2016

As a team we were tasked with the renovation of a single family kitchen. For this project I assisted in the design phase however focused more on the timely completion of the project construction.

19 I 30
20 I 30

Master ThesisValue In Material Substitution

Category - Residential Housing

Type - Plastic Waste Material Substitution

Year - 2019

I have embarked on a Thesis project that focuses on innovative ways for the Built Environment to prepare and utilize recycled plastic waste material into residential housing. The Architype, has high value in accessibility, durability and affordability. It will be done by collecting and sorting plastic waste from the local landfill. The waste is then sent to a production factory where the process of Shredding, Extrusion, Injection and Compression takes place.

To achieve assembly I have simplified the housing construction to a catalogue of building elements. These elements similarly to timber joinery can be smartly arranged to mimic traditional building elements or dear to be something more.

The Character of the building is emphasized by it elements. It creates a new typology of housing one that can be generated from monetized waste collection. The unusual aesthetic of the house comes from the up-cycled plastic material and its countless formal arrangement.

A project where the first phase will start as disaster relief housing / low income housing but has the potential to grow into bespoke housing.

21 I 30

RECYCLED PLASTIC + MODEL PROTOTYPE + ASSEMBLY

HOUSE HOLD WASTED PLASTIC RECYCLED INTO PLASTIC BRICK PROTOTYPES

22 I 30
23 I 30 20 20 100 60 100 100 80 8 0 0 0 0 0 P-01 P-02 P-03 P-04 P-05 P-06 P-07

PLASTIC PUZZLE HOUSE + WEATHER PROTECTION DETAIL

RESIN USED TO CONNECT

PROPANE BURNER USED TO SEAL CONNECTION

TABLE SAW USED FOR WORKABILITY OF MATERIAL

24 I 30
25 I 30

LUCKHARDT VILLA +PAVILION

26 I 30
Category - Modernity Case Study Kategorie - Case Study Year 2018

Bauhaus Houses Investigation of structure and aesthetic scenery while building a 1:1 pavilion of our discoveries with a given material such as PVC pipes.

27 I 30

La Flauta - Costa Rica - Bachelor Thesis

28 I 30
Category -Civic Building concert Hall Kategorie- Öffentliches Gebäude Year- 2015

Tasked to design an urban Concert Hall to stimulate city interaction, through Indoor and Outdoor performances located in the heart of San José.

29 I 30
YOU DANKESCHÖN
THANK

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.