” “ „ ”
” • ƒ ” ƒ – ƒ ƒ “
BRUSSA AND VALLEVECCHIA ADRIATIC PROMENADE AGRICULTURAL LAND AROUND THE LAGOON
RICU AG
TOUR
13%
2013 2014
2015
6,082,455
5,253,057
3rd JESOLO
2012
1st
BIBIONE
0
2nd
CAVALLINO TREPORTI
1,000,000
5,335,390
TOURIST RANK 2015
11.693 5,636,340
2,000,000
5,335,390
6,073,620
5,962,170
3,000,000
3000
2000
2011
2011
2500
1500
INDUSTRY 199 1991 2001 2011
1000
500
0
1991 2001 2011
1991 2001 2011
Source: ISTAT 2011
FARMS 1982-2010
LIVESTOCK HOLDINGS 1982-2010
1200
800
1000
600 0
10 KM
4,000,000
200
7.5
5,000,000
400
5
6,000,000
199
EMPLOYEES
FLOOD RISK
51%
AGRICULTURE
NUMBER OF TOURISTS
BIBIONE
1982
2.5
SAN MICHELE
13%
2000 1990
0
MALAFESTA BEVAZZANA
2010 2000 1990 1982
2.5
2.5
0%
3%
NORTH
NORTH
MARINELLA
CESAROLO
2010
VILLA DE BUOI
13%
SAN GIORGIO
7%
SYNTHESIS OF ROAD NETWORKS AND RAILWAY
SYNTHESIS OF CONNECTIONS AND RESOUCES
FLOOD RISK
VENETO VILLAS
20% BIBIONE
2000 1990 1982
CYCLE PATHS AND FOOT PATHS FOOT PATHS
SAN MICHELE
BEVAZZANA
2010
PATHS
"THE LIGHTHOUSE AND THE PINE FOREST" ITINERARY
M
PRIMARY SECTOR
THIRD BASIN AND "I CASONI"
20% CESAROLO
3%
0
2.5
5
7.5
10 KM
LAND USE
ALONG THE TAGLIAMENTO
MALAFESTA 6%
PR O VI
F O R E C A S T
THE CESAROLO RING
IS
MARINELLA
SAN GIORGIO
RAILROAD
RESIDENTIAL AREAS
Cycling tourism routes from Bibione
WEAK LOCAL CONNECTION
22%
STATE ROAD
NO TRAIN STATION
RA LTU L
D ROA IAL NC
HIGHWAY
WELL CONNECTED
RESOU
Economic analysis
Existing network
ES RC
2010 2000 1990 1982 2010 2000 1990 1982 1,000
2,000
3,000
4,000
5,000
6,000
Source: ISTAT 2011
7,000
SAN MICHELE AL TAGLIAMENTO Inland Master plan
Intermodality master plan
1
2
7 4
This area is divided into four parts: 1) Camping area;
5
3) Car parking, surrounded by playgrounds and a park;
6
P
TOURISM
P P
CULTURE
P
SOCIALIZATION
PHYSICAL BENEFITS
New road Bus routes to: Treviso Caorle
NEW ATTRACTIONS
Â? Â Â? Â? Â? Â Â Â? Â
     Â
 Â
GREENgarden
HORTICULTURAL THERAPY GARDEN
IMPROVED IMMUNE RESPONSE IMPROVED FINE AND GROSS MOTOR SKILLS DECREASED HEART RIDE PROMOTED GENERAL HEALTH
Latisana Local connections Touristic port
HIGHWAY EXIT
Bus station TOLL BOOTH
2min
INFORMATION
Bus stop
Historic center
3min
Veneto villa
HISTORIC CENTER
HIGHWAY EXIT
15min
Bike sharing station with 10 bikes
VENETO VILLA Veneto villa
15min
Bike sharing station with 5 bikes
10min
Culture heritage route Rows of trees
HISTORIC CENTER 2min
5min
3
Cyclo-foot paths
5min 2min
VENETO VILLA
VENETO VILLA
15min VENETO VILLA
15min
Tagliamento River park
SAN MICHELE AL TAGLIAMENTO inner city HIGHWAY EXIT
10min
HISTORIC CENTER
5min
Sporting center
10min 5min
VENETO VILLA 2min
5min
Playground
Veneto villa
4
5
Rest stop TAGLIAMENTO RIVER PARK
15min
Therapeutic garden
VENETO VILLA PICNIC
RECREATION
FITNESS EQUIPMENT
Camping area
Veneto villa
Didactic farm
“GIRO AL TAGLIAMENTO� CYCLING PATH
Car parking
DIDACTIC FARMS 8min
Veneto villa 5min
FARMING LABORATORY
DIDACTIC FARM
NATURE AND ITS PRODUCTS
8min
5min
HORSE RIDING
6
7
“GIRO AL TAGLIAMENTO� CYCLING PATH
RIVER PARK
Bus info-point
10min
3min 10min
5min
15min AGRITOURSIM
10min
AGRITOURISM
5min 8min 15min
20min
15min
EQUIPPED AREA
FISHING VALLEY
5min 5min 10min
EQUIPPED AREA 5min
EQUIPPED AREA 15min
TERME
ENTERTAINMENT
PLAYGROUND
CAMPING
NORTH
1
0
1 km
NORTH
1
ADRIATIC SEA
0
1 km
Â? Â Â? Â? Â? Â Â Â?
       Â
Â
REVELLINO AND DUNES RESTORATION
AMMOPHILA LITORALIS
CAKILE MARITIMA
4
THE DUNES RESTORATION WILL BE IMPLEMENTED THROUGH THE REPOPULATION OF VEGETAL SPECIES, TYPICAL OF THIS ECOSYSTEM. LIKE A WIND BARRIER, FLORA STOPS SEDIMENT MOVED BY AIR AND ALLOWS FOR THE NATURAL GROWTH OF DUNES. IN ADDITION, AREAS WITH GROWING DUNES SHOULD BE CLOSED TO THE PUBLIC, TO AVOID INTERFERENCE WITH THE PROCESS.
AGROPYRON JUNCEUM
WOODEN WALKWAY
COSI' LE DUNE.
PHASE 3 PHASE 2 PHASE 1
WIND DIRECTION WOODEN WALKWAY
SAN MICHELE AL TAGLIAMENTO Coast Master plan “Shuttle boat� route New connecting bridge (only for cyclists and pedestrians) Intermodal node area Terminal Touristic port Terminal area New terminal parking area New parking area Coast restoration “Revellino� restoration Dunes ecosystem restoration Beach nourishment (groines construction)
1
Reef balls
4
1
SEA CURRENT
SEA CONNECTIONS CONCEPT
2
NORTH
A
1
A
1
P A1 B
B1
P 2%
SECTION A- A1
SECTION B- B1 120 210
THE PORT IS EQUIPPED WITH 400 BOAT SPACES AND WITH A NEW PARKING AREA AVAILABLE FOR BOTH RESIDENTS AND TOURISTS. A NEW BRIDGE FOR CYCLISTS AND PEDESTRIANS WILL CONNECT THE INLANDS WITH THE COAST.
210 90
THE EXISTING PORT AREA WILL BE ENHANCED: A “SHUTTLE BOAT� WILL LINK THE BIBIONE BEACH WITH THE OTHER MUNICIPALITIES IN THE METROPOLITAN AREA OF VENICE. TOURISTS WHO WANT TO VISIT BIBIONE CAN EASILY COME
90 210
120 210
TOURISTIC PORT +“SHUTTLE BOAT�
3
BUS STATION
CAR ROUTE BUS ROUTE ROWS OF TREES CYCLE AND FOOT PATHS
0
1 km
�   � � € ‚ � ƒ„ …
 � ��� �  �
Scenario 3 selection frequency
High
Scenario 1 selection frequency
High
Low
Low
0
55
110
220
330
440 Kilometers
Âą
Scenario 2 selection frequency
High
Low
0
55
110
220
330
440 Kilometers
0
55
110
220
330
440 Kilometers
Âą
Âą
freelance commissions � † ‡ ‡ ˆ � �   � ‚ ƒ ‚
 Â