Primitivism and the Vernacular
Model Booklet David Masters
Initial Modelling......................................... Precedent Research (Construction)......... Framework Modelling................................ Final Models................................................
This year long project has been constructed through a series of massing and constructional models as the approach tackles scale and orientation. The best way to visualise a project is through the scale model.
Initial Massing
Precedent Model
Tower internal construction
Factory frame iteration
Final 1:200 Model
Final 1:50 Factory Model
Initial Site Massing
1:200 Site Massing
1:1000 Site Development
The Stone Tower Precedent
Broch of Mousa
1:1000 Massing Iterations
1:100 Model
Factory Frame Iteration
1:500 Site Models
Tower Glu Lam Structure 1:20
The Final 1:200 Model
The 1:50 Folk Factory Model
The creation of the Folk Theatre project through models.