work experience and responsibilities Through my internship with Studio Mumbai I was exposed to a number of valuable experiences. I was also given the opportunity to be a part of ongoing projects. Textile Studio, Dehradun Drawings 3D Models Costing Mockups for Site Model Onomichi Project Site Drawing Context Model Site Model Mockup Chennai House Design Development Drawings Model Process Book Carrimjee House on Hill Drawings for Servant Quarters Documnetation of Building process through Timelapse, Photographs and Report Castalagno Project, Lugano Compilation of Base Files Site Model CCA Exhibition Furniture Drawings Furniture Mockups Swiss Embassy Book Shelf Presentation Mockup Museum Project Trees for Model Final Boards Diagrams

Brugges Trinneal Compilation of Base Files Presentation Kochi Binneale Compilation of Base Files Correspondence Handled Studio mail and all correspondences Publications, Communications, Visa and Tickets, Enquiries, Studio Visits For Ar. Bijoy Jain Schedule, Tickets, Attending meetings, Organizing documents and base compilations

3


4

DEHRADUN TEXTILE STUDIO

1. Foundation

The site is located on the outskirts of Dehradun, nestled in the lower foothills of the Himalayas. The heavily contoured site originally consisted of agricultural terraces and mango groves. An existing water system comprising of streams and water channels which originate at the top of the hill runs through the site, until it meets the river below. The site is suggestive of a fundamental diagonal force, based on which the lay of the various buildings and farms in the design have been addressed. A. Civil Work A. Civil -Stone Work Work: above 4’ Height

A. Civil Work -Stone Work: Floor Level to 4’ Height

2. Masonry till 4' A

Item

A. Civil Work -Stone Work: above 4’ Height

Bhilwada Stone

Unit

30

Stone

Rate

Amount

800.00

24,000.00

Brass.

3,500.00

1,57,500.00

Bajari (sand)

16.000

Brass.

2,000.00

32,000.00

Lime

192.000

Bags.

140.00

26,880.00

Bamboo

20.000

Nos.

120.00

2,400.00

Silk rope

1.000

Kgs.

800.00

12.000

Ltr.

80.00

6.000

Kgs.

100.00

4. Bhilwada Stonework

Kadu Oil A. Civil Work Chandras Stone Powder Frames -Bhilwada

C

800.00 960.00 600.00

Total

Item

A

Cu.ft

45.000

Foundation Work Civil Work Excavation & Stone work A Rear Side Wall Labor charges for bamboo fitting B Gallery Wall: Floor to 4’ Height

4218’ 9” 1.00 11.000 37’ 4” 1.00 136’ 6” -3.00

less Opening

-1.00

C Front Side Plinth

2,45,140.00

D2 Running Wall Unit RateArea(sq.ft)Qty(cu.ft) Amount Nos. Quantity Height Length Thickness

less Door

Cu.ft. 1’ 6” labors.

30.00 4.000 200.00

1’ 6”

2.000

1’ 6” Total 4.000 incl labor 1’ 6”D1 20.000 D1 1’ 6” 119.000

1.00 D1100’ 6”

A. Civil WorkCost Material -Bhilwada Stone Beams Item Calculation Material Stone Work: Floor to 4’ height

5. Stone Roof Beams A

Stone Civil Work Sand Bhilwada Stone Openings Lime D1 Door Frame

Labour Cost

Quantity

-178.500

6

1314.233

Amount

2,000.00

Bags.8’

30’ 7”

819.000 3,73,902.50 -90.000

Qty per item Qty(cu.ft) 3,500.00 68,250.00

Brass.

106.000 5’6” 3.00 1.00

Rate

Height Brass.

5.500

11,000.00

140.00 5.930 Total 20.696

8’

14,840.00 17.800 94,090.00 20.696 38.496

Item

A. Civil Work Stone Work: Floor to 4’ height -Bhilwada Labour till 4’Stone height Lintel -Bhilwada Stone Columns

Unit

Nos. Width 19.500

1,26,562.50 342.420 2,200.00

421.313 Total

D2 Gallery Opening Frame

Excerpts from stepwise Costing Book - Gallery Block 3. Wall above 4'

Quantity

Foundation Work

Material Calculation Labor Cost

Jobs Completed: Work: above 4’ Height CAD-Stone Drawings for Gallery Roofing Options CAD Drawing updates Created and composed Stepwise costing document for all the Blocks

B

Material Cost

Quantity

Unit

1315.297

Rate

Cu.ft.

Amount

30.00

39,458.91

Total incl Labor

1,33,548.91

B 9

A

6 Stone Beam A3

3

Material Calculation

4

Nos. A

7

Stone Beam A2 Breadth Depth

Length

Stone Beam A1

Bhilwara Stone Lintels

2

A Front Side B Back Side

1

Area(sq.ft)Qty(cu.ft)

Civil Work

Bhilwara Stone Columns

1.00

33’ 6”

1.667

0’ 5”

1.00

33’ 9”

1.667

0’ 5”

4.00

0’ 9” Stone 1’ Beam 6” 8.000

22.896 23.067 36.000 Total

81.963 12

A. Civil Work -Bhilwada Stone Slab

5

6. Stone Roof Slabs Material Calculation

Material Calculation

8

Material Calculation A

Civil Work

A

Gallery Wall to 4’ Height Civil Work less Door Gallery Wall to 4’ Height less Door Opening less less Opening

-10.00 -1.00

less Spouts

4'-621"

Total

1.00

136’ 6”

-3.00 -1.00 Quantity

Material Lime Cost

LaborItem Cost

Stone Work: above 4’ height

Excerpts from CAD Drawings for Gallery

119.000 20.000 0.840 119.000

Item Labor Cost Stone

StoneItem Work: above 4’ height Sand StoneLabor Work:above above4’4’height height Lime

Labor above 4’ height

Labor Cost

Nos.

-10.00

1’ 6”

4’

1’ 6”

Bhilwara Stone Beams

6.00 16.00

0.840

Quantity 30.000

Unit Brass.

Rate Total 3,500.00

8.500 30.000 161.000 8.500

Brass. Brass. Bags. Brass.

2,000.00 3,500.00 140.00 2,000.00

161.000

Bags.

Quantity

Quantity

Unit

Unit

3,500.00

Unit Brass.

Rate 2,000.00

161.000

2003.906

Cu.ft.

Bags.

-

-

40.590 78.950

4.00

-

-

0’ 7”

30.975

71.863

-

-

0’ 4”

23”

26.730

Total

218.133

13

-90.000 2,285.010 -178’ 6” -90.000 -12.604 -178’ 6” Stone Slab S4

Stone Slab S3

Stone Slab S2

Stone Slab S1

-12.604

Amount

Rate

Brass.

2003.906

0’ 7”

4.00

-90.000

2,003.906 1,05,000.00

17,000.00 1,05,000.00 22,540.00 17,000.00

1,44,540.00 22,540.00

Rate Total Amount

Quantity 8.500

Area(sq.ft)Qty(cu.ft)

0’ 5”

0’ 10”

Bhilwara Stone Beam A2

2,003.906

Total 140.00

30.000

Depth

1.000

13”

Bhilwara Stone Beam A3

Rate119.000 Amount-178’ 6”

1’ 6”

Breadth

16’ 6”

2,285.010 20.000

Unit 1’ 6”

Length

Civil Work

Bhilwara Stone Beam A1

Running Wall Total 0.840 2,003.906 Nos. Area(sq.ft)Qty(cu.ft) -10.00Length Thickness1’ Height 6” -12.604

Opening Item less Material Cost

lessabove Spouts4’ height StoneItem Work: StoneStone Work: above 4’ height

20.000

4’

1’ 6” 6” 1’

Material less Cost Door

Sand Stone Lime Sand

4'-621"

1’ 6” 6” 1’ 1’ 6” 6” 1’

136’ 6”

Civil Work Gallery Wall to 4’ Height

6'-5"

Running Wall Nos. Height Area(sq.ft)Qty(cu.ft) Length Thickness Running Wall Nos. Height Area(sq.ft)Qty(cu.ft) Length Thickness 1.00 136’ 6” 1’ 6” 4’ 2,285.010 -3.00 1.00 -1.00 -3.00

Materialless Calculation Spouts A

A

100.00

140.00

B. Wood work -Wooden Beam Material Calculation -Wooden Post

7. Timber Work A

1,44,540.00

Amount

1,05,000.00

Amount 17,000.00 2,00,390.60 22,540.00

Total100.00 incl labor Cu.ft. Total

3,44,930.60 1,44,540.00 2,00,390.60

Total incl labor

3,44,930.60

Nos.

Length

Breadth

Depth

Area(sq.ft)Qty(cu.ft)

Civil Work

Bhilwadra Stone Slab S1

1.00

0’ 2” 211.360

Bhilwada Stone Slab S2

1.00

0’ 2”

71’ 3”

135.270 45.600

Bhilwada Stone Slab S3

16.00

5.000

2’ 6”

0’ 2”

25.000

Bhilwada Stone Slab S4

8.00

4’ 2”

2’ 2”

0’ 2”

8.986

5.751

Total

45.600

16.000

Beam Post

14


ONOMICHI PROJECT The city of Onomichi is often regarded as a retreat from the bustling city living in major cities of Japan. The project as a cultural project and a part of Discoverlink Setouchi initiative attempts to be more than just a physical site for hospitality and community programs. It uses emotions and aesthetic values specifically framed and captured for the wider audience. Jobs Completed: CAD Drawings for Site Plan Context Model Mockup Site Model Mockup

CCA EXHIBITION

Jobs Completed: Furniture Drawings Furniture Mockup Test Pencil Drafting of Copper House II

LUGANO PROJECT

A Residential Project situated in Lugano. Jobs Completed: File Compilation Site Model Coordination

EMBASSY BOOK SHELF

Jobs Completed: Concept Drawings Mockup Coordination

5


6

CHENNAI HOUSE The spirit of the house revolves around circumambulation, the water irrigation system, the house being a breathing pavilion in a garden which traverses through past, present and future. The main wings of the house are made of series of granite walls - a stone which is local to Chennai. In a sense, these walls may have always existed as ruins. We occupy this space and build the rooms with lighter materials such as brick/ timber/ corrugated roof sheets and glass. The materials are chosen so that they remain efficient and effective in terms of economy, speed with which they can be built, ease of maintenance, and materials which are responsive to the climate. Jobs Completed: Design Development Concept drawings Model Coordination Process Book


7

CARRIMJEE HOUSE ON HILL The Staff Quarters for Carrimjee House on Hill will be made using Pressed Lime Bricks and Ladi Kam for roofing. The demonstration will become a prototype for future reference.

4'

7'

Job in Progress: CAD Drawings for Staff Quarters 3D Model Documentation Time Lapse Movie

2'-2" 8'-11"

3'

6' 4'

2'-2"

6'

4'-4"

6'

5'-3"

4'-4"

2'

5'-10"

5'

2'-8"

3'-9"

2'-7"

3'-5" 22'-6"

23'-3"

3'

5' 10'

4'-1"

10'

10'

10'

12'-4"

3'

5'-8"

9'-10"

3'

561/63 N.M. Joshi Marg Byculla West Mumbai 400 011 India

5'-3"

6'-6"

t +91 22 65 777 560 f +91 22 23 021 973

33'

16'-4"

Carrimjee Residence Date: October 31, 2014 Project Code: CMJ Scale: 3 16 "=1'0"