architecture + design abhirup dutta 2014
2
studio mumbai architects internship
ongoing since July 2014
work experience and responsibilities Through my internship with Studio Mumbai I was exposed to a number of valuable experiences. I was also given the opportunity to be a part of ongoing projects. Textile Studio, Dehradun Drawings 3D Models Costing Mockups for Site Model Onomichi Project Site Drawing Context Model Site Model Mockup Chennai House Design Development Drawings Model Process Book Carrimjee House on Hill Drawings for Servant Quarters Documnetation of Building process through Timelapse, Photographs and Report Castalagno Project, Lugano Compilation of Base Files Site Model CCA Exhibition Furniture Drawings Furniture Mockups Swiss Embassy Book Shelf Presentation Mockup Museum Project Trees for Model Final Boards Diagrams
Brugges Trinneal Compilation of Base Files Presentation Kochi Binneale Compilation of Base Files Correspondence Handled Studio mail and all correspondences Publications, Communications, Visa and Tickets, Enquiries, Studio Visits For Ar. Bijoy Jain Schedule, Tickets, Attending meetings, Organizing documents and base compilations
3
4
DEHRADUN TEXTILE STUDIO
1. Foundation
The site is located on the outskirts of Dehradun, nestled in the lower foothills of the Himalayas. The heavily contoured site originally consisted of agricultural terraces and mango groves. An existing water system comprising of streams and water channels which originate at the top of the hill runs through the site, until it meets the river below. The site is suggestive of a fundamental diagonal force, based on which the lay of the various buildings and farms in the design have been addressed. A. Civil Work A. Civil -Stone Work Work: above 4’ Height
A. Civil Work -Stone Work: Floor Level to 4’ Height
2. Masonry till 4' A
Item
A. Civil Work -Stone Work: above 4’ Height
Bhilwada Stone
Unit
30
Stone
Rate
Amount
800.00
24,000.00
Brass.
3,500.00
1,57,500.00
Bajari (sand)
16.000
Brass.
2,000.00
32,000.00
Lime
192.000
Bags.
140.00
26,880.00
Bamboo
20.000
Nos.
120.00
2,400.00
Silk rope
1.000
Kgs.
800.00
12.000
Ltr.
80.00
6.000
Kgs.
100.00
4. Bhilwada Stonework
Kadu Oil A. Civil Work Chandras Stone Powder Frames -Bhilwada
C
800.00 960.00 600.00
Total
Item
A
Cu.ft
45.000
Foundation Work Civil Work Excavation & Stone work A Rear Side Wall Labor charges for bamboo fitting B Gallery Wall: Floor to 4’ Height
4218’ 9” 1.00 11.000 37’ 4” 1.00 136’ 6” -3.00
less Opening
-1.00
C Front Side Plinth
2,45,140.00
D2 Running Wall Unit RateArea(sq.ft)Qty(cu.ft) Amount Nos. Quantity Height Length Thickness
less Door
Cu.ft. 1’ 6” labors.
30.00 4.000 200.00
1’ 6”
2.000
1’ 6” Total 4.000 incl labor 1’ 6”D1 20.000 D1 1’ 6” 119.000
1.00 D1100’ 6”
A. Civil WorkCost Material -Bhilwada Stone Beams Item Calculation Material Stone Work: Floor to 4’ height
5. Stone Roof Beams A
Stone Civil Work Sand Bhilwada Stone Openings Lime D1 Door Frame
Labour Cost
Quantity
-178.500
6
1314.233
Amount
2,000.00
Bags.8’
30’ 7”
819.000 3,73,902.50 -90.000
Qty per item Qty(cu.ft) 3,500.00 68,250.00
Brass.
106.000 5’6” 3.00 1.00
Rate
Height Brass.
5.500
11,000.00
140.00 5.930 Total 20.696
8’
14,840.00 17.800 94,090.00 20.696 38.496
Item
A. Civil Work Stone Work: Floor to 4’ height -Bhilwada Labour till 4’Stone height Lintel -Bhilwada Stone Columns
Unit
Nos. Width 19.500
1,26,562.50 342.420 2,200.00
421.313 Total
D2 Gallery Opening Frame
Excerpts from stepwise Costing Book - Gallery Block 3. Wall above 4'
Quantity
Foundation Work
Material Calculation Labor Cost
Jobs Completed: Work: above 4’ Height CAD-Stone Drawings for Gallery Roofing Options CAD Drawing updates Created and composed Stepwise costing document for all the Blocks
B
Material Cost
Quantity
Unit
1315.297
Rate
Cu.ft.
Amount
30.00
39,458.91
Total incl Labor
1,33,548.91
B 9
A
6 Stone Beam A3
3
Material Calculation
4
Nos. A
7
Stone Beam A2 Breadth Depth
Length
Stone Beam A1
Bhilwara Stone Lintels
2
A Front Side B Back Side
1
Area(sq.ft)Qty(cu.ft)
Civil Work
Bhilwara Stone Columns
1.00
33’ 6”
1.667
0’ 5”
1.00
33’ 9”
1.667
0’ 5”
4.00
0’ 9” Stone 1’ Beam 6” 8.000
22.896 23.067 36.000 Total
81.963 12
A. Civil Work -Bhilwada Stone Slab
5
6. Stone Roof Slabs Material Calculation
Material Calculation
8
Material Calculation A
Civil Work
A
Gallery Wall to 4’ Height Civil Work less Door Gallery Wall to 4’ Height less Door Opening less less Opening
-10.00 -1.00
less Spouts
4'-621"
Total
1.00
136’ 6”
-3.00 -1.00 Quantity
Material Lime Cost
LaborItem Cost
Stone Work: above 4’ height
Excerpts from CAD Drawings for Gallery
119.000 20.000 0.840 119.000
Item Labor Cost Stone
StoneItem Work: above 4’ height Sand StoneLabor Work:above above4’4’height height Lime
Labor above 4’ height
Labor Cost
Nos.
-10.00
1’ 6”
4’
1’ 6”
Bhilwara Stone Beams
6.00 16.00
0.840
Quantity 30.000
Unit Brass.
Rate Total 3,500.00
8.500 30.000 161.000 8.500
Brass. Brass. Bags. Brass.
2,000.00 3,500.00 140.00 2,000.00
161.000
Bags.
Quantity
Quantity
Unit
Unit
3,500.00
Unit Brass.
Rate 2,000.00
161.000
2003.906
Cu.ft.
Bags.
-
-
40.590 78.950
4.00
-
-
0’ 7”
30.975
71.863
-
-
0’ 4”
23”
26.730
Total
218.133
13
-90.000 2,285.010 -178’ 6” -90.000 -12.604 -178’ 6” Stone Slab S4
Stone Slab S3
Stone Slab S2
Stone Slab S1
-12.604
Amount
Rate
Brass.
2003.906
0’ 7”
4.00
-90.000
2,003.906 1,05,000.00
17,000.00 1,05,000.00 22,540.00 17,000.00
1,44,540.00 22,540.00
Rate Total Amount
Quantity 8.500
Area(sq.ft)Qty(cu.ft)
0’ 5”
0’ 10”
Bhilwara Stone Beam A2
2,003.906
Total 140.00
30.000
Depth
1.000
13”
Bhilwara Stone Beam A3
Rate119.000 Amount-178’ 6”
1’ 6”
Breadth
16’ 6”
2,285.010 20.000
Unit 1’ 6”
Length
Civil Work
Bhilwara Stone Beam A1
Running Wall Total 0.840 2,003.906 Nos. Area(sq.ft)Qty(cu.ft) -10.00Length Thickness1’ Height 6” -12.604
Opening Item less Material Cost
lessabove Spouts4’ height StoneItem Work: StoneStone Work: above 4’ height
20.000
4’
1’ 6” 6” 1’
Material less Cost Door
Sand Stone Lime Sand
4'-621"
1’ 6” 6” 1’ 1’ 6” 6” 1’
136’ 6”
Civil Work Gallery Wall to 4’ Height
6'-5"
Running Wall Nos. Height Area(sq.ft)Qty(cu.ft) Length Thickness Running Wall Nos. Height Area(sq.ft)Qty(cu.ft) Length Thickness 1.00 136’ 6” 1’ 6” 4’ 2,285.010 -3.00 1.00 -1.00 -3.00
Materialless Calculation Spouts A
A
100.00
140.00
B. Wood work -Wooden Beam Material Calculation -Wooden Post
7. Timber Work A
1,44,540.00
Amount
1,05,000.00
Amount 17,000.00 2,00,390.60 22,540.00
Total100.00 incl labor Cu.ft. Total
3,44,930.60 1,44,540.00 2,00,390.60
Total incl labor
3,44,930.60
Nos.
Length
Breadth
Depth
Area(sq.ft)Qty(cu.ft)
Civil Work
Bhilwadra Stone Slab S1
1.00
0’ 2” 211.360
Bhilwada Stone Slab S2
1.00
0’ 2”
71’ 3”
135.270 45.600
Bhilwada Stone Slab S3
16.00
5.000
2’ 6”
0’ 2”
25.000
Bhilwada Stone Slab S4
8.00
4’ 2”
2’ 2”
0’ 2”
8.986
5.751
Total
45.600
16.000
Beam Post
14
ONOMICHI PROJECT The city of Onomichi is often regarded as a retreat from the bustling city living in major cities of Japan. The project as a cultural project and a part of Discoverlink Setouchi initiative attempts to be more than just a physical site for hospitality and community programs. It uses emotions and aesthetic values specifically framed and captured for the wider audience. Jobs Completed: CAD Drawings for Site Plan Context Model Mockup Site Model Mockup
CCA EXHIBITION
Jobs Completed: Furniture Drawings Furniture Mockup Test Pencil Drafting of Copper House II
LUGANO PROJECT
A Residential Project situated in Lugano. Jobs Completed: File Compilation Site Model Coordination
EMBASSY BOOK SHELF
Jobs Completed: Concept Drawings Mockup Coordination
5
6
CHENNAI HOUSE The spirit of the house revolves around circumambulation, the water irrigation system, the house being a breathing pavilion in a garden which traverses through past, present and future. The main wings of the house are made of series of granite walls - a stone which is local to Chennai. In a sense, these walls may have always existed as ruins. We occupy this space and build the rooms with lighter materials such as brick/ timber/ corrugated roof sheets and glass. The materials are chosen so that they remain efficient and effective in terms of economy, speed with which they can be built, ease of maintenance, and materials which are responsive to the climate. Jobs Completed: Design Development Concept drawings Model Coordination Process Book
7
CARRIMJEE HOUSE ON HILL The Staff Quarters for Carrimjee House on Hill will be made using Pressed Lime Bricks and Ladi Kam for roofing. The demonstration will become a prototype for future reference.
4'
7'
Job in Progress: CAD Drawings for Staff Quarters 3D Model Documentation Time Lapse Movie
2'-2" 8'-11"
3'
6' 4'
2'-2"
6'
4'-4"
6'
5'-3"
4'-4"
2'
5'-10"
5'
2'-8"
3'-9"
2'-7"
3'-5" 22'-6"
23'-3"
3'
5' 10'
4'-1"
10'
10'
10'
12'-4"
3'
5'-8"
9'-10"
3'
561/63 N.M. Joshi Marg Byculla West Mumbai 400 011 India
5'-3"
6'-6"
t +91 22 65 777 560 f +91 22 23 021 973
33'
16'-4"
Carrimjee Residence Date: October 31, 2014 Project Code: CMJ Scale: 3 16 "=1'0"
Site Plan
A105