AA MSc + MArch Sustainanble Environmental Design 2016-17 Architectural Association School of Architecture Graduate School Term 2 Design Research : Refurbishing the City - Part 2
Peckham Student Living Artem Oslamovskyi TingTing Gao Deep Gala Naitik Patel
PECKHAM STUDENT LIVING Term 2 Project
1
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
Authorship Declaration Form
Term 2 Project : Peckham Student Living
TITLE
PECKHAM STUDENT LIVING
NUMBER OF WORDS
13,996 WORDS
STUDENT NAME(S):
DEEP GALA TINGTING GAO ARTEM OSLAMOVSKYI NAITIK PATEL
DECLARATION: “I certify that the contents of this document are entirely my own work and that any quotation or paraphrase from the published or unpublished work of others is duly acknowledged.” Signature(s):
Date: March 23rd, 2017
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
TABLE OF CONTENTS
ACKNOWLEDGMENTS
1
INTRODUCTION AND SUMMARY
2
CHAPTER 1 OVERVIEW 1.1 Location 1.2 Weather Data 1.3 Historical Study 1.4 Policy 1.5 Urban Analysis 1.6 Context Analysis 1.7 Site Observations 1.8 Spot measurement
3
CHAPTER 2 CASE STUDY 2.1 Units Examples 2.2 Schedule &Consumption 2.3 Case Study Summary
15
CHAPTER 3 DESIGN PROPOSAL 3.1 Environmental Matrix 3.2 Strategy 3.3 Room Typology 3.4 Room Orientation 3.5 Proposal 3.6 Accommodation zoning 3.7 Proposal of Courtyard 3.8 Plan & Elevation & Section 3.9 Room Material 3.10 Visualization
25
CHAPTER 4 DAYLIGHT STUDY 4.1 Daylight Strategy 4.2 Communal Space 4.3 Unit 1 4.4 Unit 2 4.5 Unit 3 4.6 Unit 4
43
AA - SED | Msc + MArch 2016 - 2017
CHAPTER 5 SOLAR STUDY 5.1 Winter Solar Gains 5.2 Summer Solar Gains 5.3 Roof Slopes Study
51
CHAPTER 6 THERMAL STUDY 6.1 Annual Thermal Analysis of Room 6.2 Thermal Analysis of Room – Summer 6.3 Thermal Analysis of Room – Winter 6.4 Annual Thermal Analysis of Common Space 6.5 Thermal Analysis of Room during Vacation – Winter 6.6 Future Annual Thermal Analysis
57
CHAPTER 7 ENERGY STRATEGY 7.1 Total Energy Consumption 7.2 Renewable Strategy
71
CHAPTER 8 PUBLIC PROGRAM 8.1 Proposal of Public Program 8.2 Daylight Factor of Public Program
77
CHAPTER 9 OUTDOOR STUDY 9.1 Site Plan 9.2 Shadow Study 9.3 Wind Study 9.4 UTCI
81
CHAPTER 10 CONCLUS ION
87
REFERENCES
APPENDICES Appendix A Software Simulation Appendix B Site Study: Comments & Condition Appendix C Case Study Appendix D Student Interview Appendix E Appliances Calculation Appendix F Wind Study Appendix G Mint Sheet Appendix H Schedules of Thermal Simulation Appendix I Electricity Policy
PECKHAM STUDENT LIVING Term 2 Project
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
ACKNOWLEDGMENTS
This report was developed with a great team work spirit and we learnt as much as possible through the different tasks distributed among the members. All the efforts in this report wouldn’t have been possible without the help of AA School of Architecture professors Simos Yannas and Paula Cadima, who has provided all the needed information, tutorials and supervision along the process to accomplish this report. We are also grateful for the rest of the lecturers in Sustainable Environmental Design program who never hesitated to support us while learning the different softwares used in this report, and has always dedicated extra time to do so. Special thanks to the occupants of Chapter Living, Woodlane Studio, Victoria Paul St East and UCL Prankerd House for their continuous help and their honest feedback on the building in different aspects. We would like to express our gratitude to our families for their constant support to each one of us everyday while studying outside our home countries.
AA - SED | Msc + MArch 2016 - 2017
1
PECKHAM STUDENT LIVING Term 2 Project
INTRODUCTION
This report is the term 2 project of the MSc+March Sustainable Environmental Design Program for 2016-2018. It is a base for practicing the knowledge learnt in the program in design. The project brief asked the students to form a design project of mixed use residential development in a site of 4400sqm area located besides the Peckham Library. This report begins with a general overview of the site, including its location, weather data, historical background and so on. It comes out with the conclusion to offer student accommodation on the site. Then a deep study on student accommodation is presented, followed by the design brief. As it is concluded from the Term 1 project as well as the case study and interview with occupants from different student accommodations in London, that overheating could become a major issue in student accommodation, which the proposal focuses on. The proposal also takes students requirements, both physical and psychological, context, neighbor and climate change into consideration. Both simulations of daylighting and thermal were taken to define the detail design and predict the different possible scenarios. The window size for students’ room and communal space is based on the criteria of enough daylighting while avoiding the overheating issue. Different strategies are applied to fit different needs for different functions. The energy consumption is calculated to compare with that of common student accommodation in London. Solar PV is equipped as renewable energy to enhance the sustainability of the project. In terms of the site plan, the layout is decided by the studies of outdoor space, context and the comments of neighbor. The proposal offers central courtyard in accommodation part to encourage students to use communal spaces indoor as well as the outdoor space which is assumed to be the main space for the occupants to communicate and hold activities. As for the relationship between the site and the Peckham library, the public program is set to perform as the transition between public and private space, in addition to the extension of the Peckham Library. Due to the sense of landmark of Peckham Library, the proposal introduces the library as a part of the site instead of building something against it. As an essential part in the proposal, outdoor studies, including shadow, wind and UTCI, were done to simulate the comfort level when people have outdoor activities. Work was split reasonably between the team members to ensure everyone has a clear understanding of the project and get necessary knowledge and skills during the entire process. This project provides a strong foundation for design in the future terms. It is a mix of research, investigation, design and simulation that helps each team member learn how to take sustainability into account while design a project. It especially highlights the understanding of the overheating issue as well as the solution.
2
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 1
CHAPTER 1 OVERVIEW
AA - SED | Msc + MArch 2016 - 2017
3
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 1 1.1 Location
Fig. 1.1.1. Location of site in south-east of london. (Source: Google Maps)
Eagle Wharf Site
LOCATION
The site is located (51.4743° N, 0.0692° W) in Peckham, in a densely populated residential and commercial context. The site (Fig. 1.1.1) is in south-east of london and falls under the Sourthwark borough. It is very well connected with major transport facilities, nearest underground station being Peckham Rye and it also has various bus stops in the vicinity. The site (Fig. 1.1.2) is easily identified as it sits right next to a landmark building called Peckham library. For the purpose of collecting weather data, the London central weather station was selected. 4
N
Fig. 1.1.2. Perspective view showing site and site context.
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 1 1.2 Weather Data
Peckham Climate History
Peckham Climate Future
m/s 10
5
Wh/m2
°C 35.0
0
1800.0
30.0
1600.0
25.0
1400.0
20.0
1200.0
15.0
1000.0
10.0
800.0
5.0
600.0
0.0
400.0
-5.0
200.0
-10.0
0.0 Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Fig.1.2.1 Peckhame climate chart history & future
Diffuse Horizontal Solar Radiation (Average Hourly)
Global Horizontal Solar Radiation (Average Hourly)
Comfort Band (Based on EN15251)
The historical and future weather data was taken from Meteonorm software. The London Central weather station was selected. London has a temperate oceanic climate, with regular but generally light precipitation throughout the year. (https://en.wikipedia.org/wiki/Climate_of_London).
Maximum & Minimum Temperature (Hourly)
Wind Speed (Average Hourly)
Dry Bulb Temperature (Average Hourly)
CLIMATE CHART OF HISTORY AND FUTURE
History
Future
Average Wind Speed
3.55 m/s
3.19 m/s
Average Temperature
11.98°C
12.0°C
111.33wh/m²
108.94wh/m²
Average Hourly Solar Radiation
AA - SED | Msc + MArch 2016 - 2017
It can be seen from Fig.1.2.1, the average temperature in Peckham doesn’t show much difference in historical and future weather data. In order to simulate the future scenario, the epw file for future was manually edited according to “UK Climate Projection, 2002”. The temperature is assumed to rise 2 degrees in the future. Therefore, overheating may become the major issue in the future instead of heating problem. In addition, it is noticed that the solar radiation would decrease in the future. Simulations for this project are based on the historical weather data in the epw file of Peckham now and the edited future one.
5
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 1 1.3 Historical Study
A branch opened
HISTORICAL STUDY
It should be noted that the grass slope next to the site was surrey canal built in early 19th century for timber import and the Whitten Timer Yard on the north was established following the development of the canal. Nonetheless, the Surrey Docks were in decline and canal was eventually disused and filled to be a green walk (https://en.wikipedia.org/wiki/Grand_Surrey_Canal). About the surrounding buildings, it was listed on the heritage statement by AB Heritage Archaeological Consultancy, 2016 that 58 Peckham High Street and 91 & 93 Peckham High Street which is the west end of the shard terrace were built during 18th to 19th century. They were both original flats. Later, shops were built in front due to the development of commercial centre of rye lane Peckham conservation area which is the blue area in the Fig.1.3.1. Most buildings in this area were constructed between the early – 19th and 20th century with a wide range of construction materials and architectural styles. Since then, this area was famous for various shops and services (Southwark Council, 2011).
Surrey Canal 1700
1800 58 Peckham High Street
Canal closed drained filled to be green walk
1835
1900
1960s
1970s
Shop remodelled Shards Terrace shop fronts
Majority of The Rye Lane Peckham Conservation Area constructed The Kentish Drovers public house
Fig.1.3.1 Timeline (After Source: Carl Turner design statement, 2016)
AA - SED | Msc + MArch 2016 - 2017
Peckham Library built
Development of a residential and industrial nature
Shards Terrace built
In 2000, the Peckham Library was built and won the Stirling Prize for Architecture in 2000, which made it the landmark of Peckham. The Sweeping views from library allows residents of Peckham to know that they are in London. With Peckhame square, this part becomes the centre of Peckham which the people living in Peckham attach a lot of importance to (Appendix B Site Study: Comments & Condition).
6
1826
Dock in decline Canal disused
58 Peckham High Street shop built in front
The Kentish Drovers public house,is right next to the Peckham canopy, constructed during the late – 19th century, following the widening of Peckham High Street during the c. 1870s. It changed from Former London and South Western bank to a public house with a pub (Southwark Council, 2011) (Fig.1.3.1).
During the design process, the history elements are essential to be taken into consideration to embed the building within its current and historic context. For example, the material palette should emphasize the building’s civic nature and respond to Peckham Library and the wider Square.
Whitten Timber Yard established
Changed to bar
2000
CHAPTER 1 1.4 Council Policy
PECKHAM STUDENT LIVING Term 2 Project
LEISURE & COMMUNITY USES AROUND PECHKHAM SQUARE AND WHARF TO INCREASE VITALITY.
ENHANCEMENT OF OPEN SPACES & PUBLIC REALM. LINKING THEM TOGETHER WITH BUILDINGS WITHIN A DESIGN STRATEGY FOR THE AREA.
COUNCIL POLICY IMPROVEMENT AND ENHANCEMENT OF RYE LANE AND PECKHAM HIGH STREET PEDESTRIAN LINKS AND ACTIVE FRONTAGE. (Fig. 1.4.2)
TO ENABLE PUBLIC TRANSPORT ACCESSIBILITY ZONE INTENSIFICATION AROUND PECKHAM RYE RAILWAY STATION AND TH BUS INTERCHANGE. (Fig. 1.4.3)
Fig. 1.4.1. Peckham action area plan. (Source: southwark council)
In addition to general needs housing, there are a number of other housing types that cater for the specific needs of certain members of the community.These types of housing include • Sheltered housing • Supported housing • Student accommodation. These specialist housing types can be both self-contained, such as flats, and non self-contained, such as hostels, houses in multiple occupation and cluster flats. In non self-contained accommodation facilities such as kitchens, bathrooms and lounges are usually shared. In most cases these types of housing are designed to meet the specific needs of the user group they are intended to accommodate and therefore do not meet general needs housing because they are not necessarily permanent housing and are only available to a specific user group. Student housing is not considered to be affordable housing (Fig.1.4.1).
1. By 2011 there will be a 12% growth in people over 85 years of age. 2. Nearly 20,000 households in Southwark contain one or more persons with a special need. 3. Of the 54.1% of households living in social rented housing, 61.8% contain a disabled person. 4. 22.6% of social rented housing contains a frail elderly person. 5. In March 2004, Southwark was providing temporary accommodation for over 900 homeless households.
Fig. 1.4.2. Photograph showing Peckham high street. (Source: Google maps)
Fig. 1.4.3. Photograph showing Rye Lane. (Source: Google maps)
AA - SED | Msc + MArch 2016 - 2017
6.There are approximately 24,000 students in the borough.
7
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 1 1.5 Urban Analysis
-
500 M Radius Site for Development Trees Greenspace Roads
Fig 1.5.1. Lanscape Features and Greenery on the site .
URBAN ANALYSIS
-
Residential From the site information received from Carl Turner’s Proposal (Carl Tuner Architects, 2016) and Digimap (https://digimap.edina.ac.uk/), we were able to map out the site conditions with a radius of 500m around the site. As we can see (Fig 1.5.1) the basic road networks have been mapped. Peckham Road runs from east to west is situated toward south of the site. This road is a primary road which is a major transportation route. The landscaped spaces are allocated around the site and towards north of the site where most of the residential buildings are situated (Fig 1.5.2) in order to have a peaceful surrounding. In (Fig 1.5.2), all the public, commercial and mixed use spaces are situated along the Peckham Road making it a medium density zone. Public parkings have been allotted around these medium density zones. A lot of public schools and colleges are located in the vicinity which shows that high student crowd add up to the local population number.
Mixed - Use Commercial Public Parking
500 M Radius
Site for Development Trees Greenspace Roads
As can be seen, the location of the proposed site is situated in a well-connected zone. Fig 1.5.2. Building Functions and Typologies. 8
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 1 1.5 Site Analysis
-
Bus Route Bus Stop 500 M Radius
Parking Site for Development Trees Greenspace Roads
Fig 1.5.3. Public Bus Movement on the site.
-
Cycle Route on Road Dedicated Cycle Route Pedestrian Path 500 M Radius
Parking Site for Development Trees Greenspace Roads
In (Fig. 1.5.3.), we can observe that the proposed site is situated around 20 public bus stops within 500m radius. Out of these bus stops 3 are located within 50m distance from the site. It shows that our site is well connected by public bus network. In (Fig. 1.5.4.), we can observe that the north – south cycling route runs along our site which shows users are encouraged to use cycles in Peckham allowing to control the noise pollution and traffic movement and thus promoting a healthy environment. Pedestrians have been given easy access around Peckham square.
Fig 1.5.4. Pedestrian and Cyclist Movement on the site. AA - SED | Msc + MArch 2016 - 2017
9
CHAPTER 1 1. 6. Site Context
PECKHAM STUDENT LIVING Term 2 Project
Lisford Street
P
Goldsmith Road To Burgess Park Jocelin Street
C Construction Site D
P P
Main Cycling Route Peckham Hill Street Peckham Library Bus Stops Main Pedestrian Routes
P
SITE CONTEXT The Fig. 1.6.1. shows the main access routes of bicycle and predestrians around the site. The cycling route directly connects the peckham rye station to the Burges park in north of the site. It was also observed that a lot of cyclists go through the surrey canal walk on a day to day basis.
Peckham High Street
P
The Peckham platform which is a very popular space which is situated right outside the Peckham library and fall at the junction of the above mentioned access routes thus making it a very imoprtant point of connection with the site. There are three major bus stops located just outside the site which make the site under readily availble public transport zone as described in the council policy.
10
To Peckham Rye Overground Station
Fig. 1.6.1. Transport and access.
AA - SED | Msc + MArch 2016 - 2017
N B
CHAPTER 1 1. 6. Site Context
PECKHAM STUDENT LIVING Term 2 Project
Whitten Timber Yard To Burgess Park
Oliver Goldsmith Estate
C Surrey Canal Walk
Eagle Wharf Site Construction D Peckham Library
P
Peckham Pulse Centre
$ Peckham Library Bus Stops
P
Peckham Square
Shard’s Terrace
SITE CONTEXT
$ Kentish Drovers
Peckham Square Canopy
The Fig. 1.6.2 shows array of public and commercial activities happening around the site. As it is situated in the urban center of soutwark borough and falling under peckham action area plan, the site is surrounded by densely populated housing.
P To Peckham Rye Overground Station
B
Jones & Higgins
N
There are a wide variety of pubs and restaurants on the Peckham high street with historical background and context thereby the frontages of shops require architectural renovation as also described in the council policy. The Peckham Pulse center (indoor sports building) and peckham square makes the site a very attractive area in the morning and evening for various recreational activities.
Fig. 1.6.2. Buildings and facilities.
AA - SED | Msc + MArch 2016 - 2017
11
CHAPTER 1 1. 7. Context Observations
PECKHAM STUDENT LIVING Term 2 Project
6
1
2
3
4
5
6
Construction Site
3 2
5
1
4 N
Key-plan
CONTEXT OBSERVATIONS It can be seen from the Fig.1.7.1 that there is a nice green walk on the west of the site. It is welcomed to bring the green of Surrey Canal Walk into Peckham. The building heights in the context largely vary from two to four storeys. Peckham Pulse and Peckham Library at the northern end of the conservation area are taller buildings at a height of four storeys. There is a wide range of architectural styles and construction materials in the surrounding. Fig.1.7.2 summarizes the main material in the surrounding constructions. As the Peckham Library is regarded as the landmark and the Peckham library square is a key civic space within Peckham town center, the proposal should emphasize the building’s civic nature and respond to Peckham Library and the Victorian villas along Peckham Hill Street in aspects of scale and material.
Fig. 1.7.1. Site photos.
It is summarized from the interview of neighbor and comments of the Peckham Library that the main concern of the site includes 1. Security issue because of the lack of lighting and natural supervision. 2. Conflict points of cyclists and pedestrians 3. Lack of cafĂŠ and space in Peckham Library. (Appendix B Site Study: Comments & Interview) 12
Zinc Cladding
Brickwork
Fig. 1.7.2. Context materials palette.
AA - SED | Msc + MArch 2016 - 2017
Stone Pavment
Wood Decking
Glazing
Structural Steel
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 1 1.8 Spot Measurement
20.01 Temperature °C 15.5
2.5
15.0 14.5
1.8 1.2 0.8
13.5
13.3
2.0
> +46
B
12.5
Extrem heat stress
+32~+38
0.5
13.0
68.5dB
+38~+46
2
1.0
0.7
35% - 45%
UTCI Thermal Scale
1
1.5
14.1
14.0
13.0
16100 Lux
Wind Speed m/s
A
0
+26~+32
3
+9~+26
No thermal stress
4
7
+9~0
6 5
8
0~-13 -13~-27 -27~-40 < -40
G O L D S M I T
Extrem cold stress
H
1
2
8
3
Fig. 1.8.3 UTCI calculation (After Source: Carl Turner design statement, 2016)
Fig. 1.8.1 Spot measurement in Elevation A (After Source: Carl Turner design statement, 2016)
Temperature
°C
Wind Speed m/s
15.6
15.5
2.5
15.0
2.0
14.5
1.1
14.0
0.7
13.5
13.3
1.5
1.1
1.0
13.7 0.4 13.0
13.0 LIBRARY
0.5 0
UTCI & OBSERVATION
Spot measurement was taken both under the sunshine and the shadow in 20th January which was a sunny day. There is a long green walk on the west of site while on the east side is the main road, so spot measurements were taken along the west end and near the main road to compare the UTCI in different conditions. Additionally, the narrow lane at the back of the library is shaded by the library all the time, so another spot was measured there. One spot at the entrance of the library was also taken into account, as it is under the huge overhang. The UTCI calculation in Fig. 1.8.3 demonstrates that there is no thermal stress outside. The data in Fig. 1.8.1 and Fig. 1.8.2 illustrates that the temperature difference can reach up to 3.5 degrees.
4
5
6
7
Fig. 1.8.2 Spot measurement in Elevation B (After Source: Carl Turner design statement, 2016)
AA - SED | Msc + MArch 2016 - 2017
It was observed that the grass in the shadow was with frost while that in the sunlight wasn’t which was really interesting. The site was quiet and pleasant with the chirping of the birds. The park cleaner said that during the day there were many pedestrians and cyclists, but in the evening, this place was empty which triggers safety issue.
13
PECKHAM STUDENT LIVING Term 2 Project
14
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 2
CHAPTER 2 CASE STUDY
AA - SED | Msc + MArch 2016 - 2017
15
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 2 2.1 Unit Examples
SCAPE STUDENT ACCOMODATION
Address London Shoreditch N1 6DX
Architects Ab Rogers Design
Total occupants 600
Room type Standard studio (2 kinds) Medium studio (4 kinds) Large studio (2 kinds)
Amenities
Study room
Gym
Restaurant
Cinema
Kitchen
Roof terrace
Bar
Deli
Reception
Comments Good 1. Perfect in terms of facilities, hygiene, kindness and quality of the service and design (Fig.2.1.1) 2. Near the underground 3. Amenities in good quality and really offer a lot for occupants 4. The rooms are smartly arranged with great views, as everything needed is to be found in them.(Fig.2.1.2) 5. Building is quiet Bad 1. Materials were quite cheap as wooden pieces fell out from the bookshelf. 2. The room is assembled with glue and silicone which make allow the furniture to break easily 3. Safety issue with bikes being stolen out of the locked
18
Fig. 2.1.1 Photos of SCAPE student accomodation (Source:https://www.scape.com/en-uk/student-accommodation/london-shoreditch)
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 2 2.1 Unit Examples
Small Studio Standard 14.65sqm 1
2 2 1
Medium Studio with Windowseat 13.80sqm 3
4 4 3
Large Studio with accessible Windowseat 30.20sqm
5
6
66
55
Fig. 2.1.2 Different room type in SCAPE student accomodation (Source:https://www.scape.com/en-uk/student-accommodation/london-shoreditch)
AA - SED | Msc + MArch 2016 - 2017
19
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 2 2.1 Unit Examples
CHAPTER STUDENT ACCOMODATION Address London King’s Cross N1 9JP
Architects Tigg + Coll Architects (Refurbished) Total occupants 900
Room type Bronze twin studio Bronze studio Silver studio Gold studio Platinum studio
Amenities
Exercise studio
Study space
Game area
Screening room
Social space
Courtyard
Outdoor seating
Laundry
Mail boxes
Comments 1. It’s a nice place for students with all the amenities.(Fig.2.1.3) 2. Good acoustics 3. Double glazing with proper insulation for vent panel 4. The room is satisfactory, but the corridor is always stinky without natural ventilation(Fig. 2.1.4) 5. There are only 2 lifts which is far from enough for so many occupants
16
Fig. 2.1.3 Photos of Chapter student accomodation (Source: https://www.chapter-living.com/properties/kings-cross/)
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 2 2.1 Unit Examples
Material
28.01 Walls - Gypsum Board
Flooring - Wood Parquet Ceiling - Gypsum (Olive Green Color)
Window - Double Glazed (Full height) 1
2
15:30
Kitchenette and Wardrobe Sunmica laminate (white color ) 3 Bronze Studio 16 sq.m
1
2 3
4
5
Kitchen Appliances
Silver Studio 18 sq.m
- Microwave - Mini Refrigirator - 2 induction hob - Toaster - Electric Kettle
4
5
Fig.2.1.4 Field work in CHAPTER student accomodation
AA - SED | Msc + MArch 2016 - 2017
17
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 2 2.2 Schedule &Consumption
1200
1000
800
600 CHAPTER WOODLANE STUDIO VICTORIA PAUL ST EAST
400
200
UCL PRANKERD HOUSE (COUPLE) UCL PRANKERD HOUSE (SINGLE)
0
6
7
8
9
10
11
12
STUDENTS’ WEEKDAY SCHEDULE & CONSUMPTION
Due to the lack of specific guides for student accommodation, some precedents in London were studied including some compact residential one (Appendix C. Case Study). It demonstrates the main character of student accommodation including room types and amenities. The comments and interviews of the occupants show the main concern. For example, students complained about the noise and the inefficiency of the extract fan in the bathroom, also the dark and stuffy corridor. We even go further to get detail schedules of students (Appendix D. Student Interview). Combined with the interview from the last term project UCL Prankerd House, there is information on 5 Students’ schedule and accommodation, 3 of them have kitchenette and others don’t. Fig. 2.2.1 Weekday schedule & hourly energy consumption
20
AA - SED | Msc + MArch 2016 - 2017
13
14
15
16
17
18
19
20
21
22
23
0
1
2
3
4
5
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 2 2.2 Schedule &Consumption
1200
1000
800
600 CHAPTER 400
WOODLANE STUDIO VICTORIA PAUL ST EAST
200
UCL PRANKERD HOUSE (COUPLE) 0
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
0
1
2
3
UCL PRANKERD HOUSE (SINGLE)
4 5
STUDENTSâ&#x20AC;&#x2122; WEEKEND SCHEDULE & CONSUMPTION
Both weekday and weekend are taken into account to get a more precise result. Fig.2.2.1 and Fig.2.2.2 illustrate the hourly consumption of each room. These students, from different countries can have really different lifestyle. Some of them may cook dinner for an hour or even more, but some they would only spend less than 10 minutes. Occupants from UCL Prankerd house shared similar schedules as they come from the same country and faculty. All the schedules are considered to be reasonable. During the weekday, most consumption happens after students go back to cook dinner and work in the room while during the weekend, more activities happen during daytime when students would spend more time in the room. It was noticed from the interview that the student from Chapter living, open his window all daylong. He complained about the overheating when he cooks dinner with some friends. The student from Woodline said she barely use heater in winter cause the room is always warm enough
Fig. 2.2.1 Weekend schedule & hourly energy consumption
AA - SED | Msc + MArch 2016 - 2017
21
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 2 2.3 Case Study Summary
Table 2.3.1 Energy comsunption
CONSUMPTION SUMMARY
The consumption by kitchen appliances and others is calculated separately to get average daily consumption for single and double room, because two of the cases do not have kitchenette. As for double rooms, through the interview, some of them would always cook together, but some separately. Therefore, it is assumed that the kitchenette consumption for double room is that for single one multiplied by 1.5. Exact power and schedules for all the appliance are listed in Appendix E. Appliances calculation. From Table.2.3.1, it’s noticeable that the daily consumption of kitchen accounts for about 50% of the total consumption. As can be told from the power density, the appliances can generate a lot heat. Additionally, from the last term’s project, it is concluded that the communal kitchen would cause overheating problem in some degree. Hence, the overheating could become a potential issue for student accommodation. All the numbers got from case study would be used for the further simulation step. Except for these students, some classmates who live in student accommodation were also interviewed to get more general idea about student accommodation. It should be noticed that most of them said they prefer to have their own kitchenette in their room.
22
Single Room
Double Room
Average Appliances Consumption (Exclude Kitchen)
1594.2 w.h
2575.7 w.h
Average Appliances Consumption (Kitchen)
1842.9 w.h
2764.4 w.h (Single room*1.5)
Average Total Consumption
3437.1 w.h
5340 w.h
Average Power Density
6.99 w/m²
10.32 w/m²
Average Metabolism
1559.2 w.h
3014.2 w.h
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 2 2.3 Case Study Summary
MATERIAL & APPLIANCES & FURNITURE SUMMARY
Summarized from the case study, the common appliances in student room include a mini refrigerator, a kettle, a microwave, two hobs, an extractor fan in kitchenette and 2-3 lights, desk lamp, laptop, mobile phone and heaters in the room (Fig.2.3.2).
Window: double glazing Average Height: 2m Average Area: 3.6m² operable area: 2.2m² Wind to floor ratio: 21.2%
Window Frame: Aluminum
Wall & Ceiling: gypsum Average Height: 2.68m
Floor: Wood Average area: 15.2m²
Wardrobe: Wood(White)
Fig.2.3.2 Typical room summary
AA - SED | Msc + MArch 2016 - 2017
As for materials, most of them have wooden floor or wood effect floor. Although in some student accommodation, they have carpet for flooring, occupants complained that it is difficult to clean and it’s old and dirty. Therefore, the wood would be the ideal material for flooring. It needs to be pointed out that most of student accommodations use aluminum for window frame. Nevertheless, as aluminum does not performs well thermally, it would be better to change it for wood or vinyl. Fig.2.3.2 illustrates the common condition of student accommodation which is compared as base case in the following steps.
23
PECKHAM STUDENT LIVING Term 2 Project
24
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3
CHAPTER 3 DESIGN BRIEF
AA - SED | Msc + MArch 2016 - 2017
25
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3.1 Environmental Matrix
1200 1050 900
450 300
ENVIRONMENTAL Daylight
In the student accommodation, the most important function to consider are the student’s studio rooms because it covers more than 50% area of the whole student accommodation. We can observe (Fig. 3.1.1) that daylight, ventilation, views out, security, privacy and glare control are critical which means that these strategies have to be given primary importance while designing. Other strategies like close control thermal range and acoustic isolation have been given secondary importance which means that I can be tested after the critical strategies have achieved the required results.
Natural Ventilation Solar Access Views Out Acoustic Isolation Close Control Thermal Comfort Range
The common study rooms and the common rooms they cover more than 30% area of the accommodation. In this case, daylight, natural ventilation and close control thermal range requires high consideration leaving out others to be given importance after the above strategies have achieved the required results. The public theatre and gallery cover an area more than 1200 sq.m. Daylight, security and close control thermal range are considered to be critical Most of the public space is being occupied by the theatre and the gallery. In this case, daylight, close control thermal range and security are to given critical importance. Daylight in public café also have been given critical importance. This environmental matrix provides us a base where detailed analysis is needed and thus this information can be used to manage time.
26
Individual Controls
OTHER Critical
Desirable
Privacy
Not Important
Security
Not Desirable
Glare Control
Fig 3.1.1. Environmental Matrix Chart.
AA - SED | Msc + MArch 2016 - 2017
Public Cafe
Receptions
Laundry Rooms
Gym
Study Rooms
Public Theatre/ Gallery
The Environmental Matrix employs a weighting scheme to indicate relative importance of impacts. In this matrix, key environmental sustainability strategies have been identified which associates to different functions of the building. Every functions have a designated floor area which then also helps to define the strategies requirements for the respective functions. The matrix is differentiated into 4 categories depending on their importance – critical, desirable, not important and not desirable.
Common Rooms
ENVIRONMENTAL MATRIX
Common Kitchens
150 Room Units
Area (m2)
750 600
CHAPTER 3 3. 2. Strategy
PECKHAM STUDENT LIVING Term 2 Project
BURGES PARK
REPOSE
PRIVATE
STUDENT HOUSING PUBLIC TRANSPORT
CYCLE
ACCESS SURREY CANAL WALK
MULTIFUNCTIONAL
EXTENSION
PUBLIC PROGRAM
LANDSCAPE
PEDESTRIAN
ACCESS
INTEGRATED
STRATEGY PECKHAM RYE STATION
LIBRARY
SQUARE
PECKHAM
Regarding to site overview and urban study, student accommodation surely suits to the urban context as the neighborhood is filled with schools and colleges. Due to good accessibility by public transport and closeness to the Peckham public center formed by library, public square and multi-functional canopy, the public program was introduced. The Fig. 3.2.1 illustrates the stratergy that was a base for our proposal. It was assumed that for both: student housing and public program, the accessibility by public transportation, bicycle as well as by walking is necessary to provide. The Public Program needs to be integrated into the existing greenery axes from the Burgess Park and extend the functions of the Peckham Library and Peckham Square.
CANOPY
Student accommodation was assumed to keep distance from the Peckham center and visually be separated from the Public program for privacy and security reasons.
Fig.3.2.1 Strategy
AA - SED | Msc + MArch 2016 - 2017
27
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3.3 Room Typology
Corridor
Proposed plan
Living Space Bathroom Kitchen Conventional plan
ROOM TYPOLOGY
Fig.3.3.1 compares the conventional room plan of student accommodation and the proposed one. As summarized from the case study, students complied about the mechanically ventilated bathroom due to the noise and the inefficiency. There is same complaint about the kitchen. Kitchen and the bathroom are usually put next to the corridor which makes them dark and smelly. Although in this way, it can achieve higher density and less exposure, in order to offer a more pleasant living condition for students, kitchen and bathroom are naturally ventilated in this proposal, which simultaneously increase the daylit area because of less depth. 28
Advantage
Advantage
Daylit Bathroom & Kitchen
Less Exposed
Increase Daylit Area
Higher Density
Naturally Ventilated Bathroom& Kitchen
Fig.3.3.1 Conventional & Proposed Room Typology
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3.4 Room Orientation Study
Double Room Without Kitchenette
Couple Room With Kitchenette
20%
Single Room With Kitchenette
10%
70%
ORIENTATION STUDY OF THE ROOM
The proposed student accommodation consists of three different room units: double room without kitchenette, couple room with kitchenette and single. From the case studies, we learnt that the single rooms are in more demand than the other rooms. So for the proposed student accommodation single rooms account for 70% of the total rooms, whereas double room without kitchenette account for 20% and couple room account for 10% of the total rooms. The single room occupies an area of 12 sq.m whereas the couple room with kitchenette occupies an area of 15.4 sq.m and the double room without kitchenette occupies an area of 18 sq.m which is the largest. 18
sq.m
2.9 sq.m
15.4 sq.m
2.4 Kwh
Window U-value = 1.4 W/m2-k Ext. Wall U-value = 0.197 W/m2-k
3°C
N
14.1°C
15°C
22.9°C
15°C
N
22.1°C
W
N
18°C
14.1°C
23.1°C
25.9°C
18.8°C
N
25.2°C
W
23.3°C (natural vent. of 7ach is provided for 10 hours a day in summer)
18°C
N
14.4°C
26.1°C
26.9°C
14.3°C
W
15°C
E
S
The next step would be to find out the suitable orientation for the different rooms based on the internal gains and the external gains. The values have been achieved through mint sheet (Appendix G Mint Sheet). We can observe that (Fig. 3.4.1) in the case of double room without kitchenette where the internal gains are low (appliances: 2.4 kwh), it would be preferably oriented towards south so that it receives plenty solar gains in order to achieve a higher temperature of 15°C than facing other direction during cold days when the outside temperature is 3°C. During days when its 15°C outside there might be a chance of overheating but with the help of ventilation and low internal gains, the operative temperature can become 23.3°. Thus the double room without kitchenette would be suitable to orient towards south.
3.4 Kwh
3°C
E
S
2 sq.m
Window U-value = 1.4 W/m2-k Ext. Wall U-value = 0.197 W/m2-k
17.9°C
W
15°C
E
S
(natural vent. of 7ach is provided for 10 hours a day in summer)
3°C
E
S
12
sq.m
4.5 Kwh
Window U-value = 1.4 W/m2-k Ext. Wall U-value = 0.197 W/m2-k
14°C
W
2.9 sq.m
E
S
15.1°C
N
25.2°C
W
26.4°C
E
S
(natural vent. of 7ach is provided for 10 hours a day in summer) Fig 3.4.1. Room Orientation Study.
AA - SED | Msc + MArch 2016 - 2017
27.4°C
14.4°C
27.1°C
In case of couple room with kitchenette where the internal gains are high (appliances: 4.5 kwh), it would be suitable to orient itself towards north in order to receive less solar gains to prevent overheating in summer. During cold days when the outside temperature is 3°C, the internal temperature would be 17.9°C which is lowest as compared to other directions but when the outside temperature is 15°C, the internal temperature is 25.2°C which is low compared to other direction thus it wouldn’t overheat. In case of single rooms with kitchenette the internal gains from the appliances is 3.4kwh. As the other rooms have been the orientated towards north and south, the single rooms can be oriented towards east and west as the building blocks have the longer side oriented towards east and west which can occupy all the single rooms which are large in number compared to other rooms and thus will help to simplify the design. During cold days when the outside temperature is 3°C, the internal temperature can be around 14.4°C and when the temperature outside is 15°C, the internal temperature cam be between 26 to 27°C. In conclusion, the three room are orientated towards different direction based on the internal gains and design solutions.
29
CHAPTER 3 3. 5 Proposal
PECKHAM STUDENT LIVING Term 2 Project
N Private Housing
N
C
Student Accomodation Construction Site
Peckham Library
Public Program
Surrey Canal Walk
Main Cycling Route
Main Pedestrian Routes
Peckham Square
Fig. 3.5.1. Context.
Fig. 3.5.2. Program.
PROPOSAL
N Multifunctional Theatre Space
The Fig. 3.5.1. demonstrates that the considered area surrounded by public facilities on the south and south-west, while the private housing located on the north. There are major pedestrian and cyclist axes that pass from the south to north direction near the western border of the site. The closest public transport subject is a bus stop on the east from the site.
Lighting Wells New Hill
3.5m
The program (Fig. 3.5.2.) consist of two main zones: accommodation which locates in the northern quiet part of the site close to existing private houses and the public program in the south to supplement the Peckham Library and Peckham Square. Landscape strategy (Fig. 3.5.3.) is based on continuation of the rhythm of existing rises by adding a dominant hill of the 3.5 meters height covered with grass. This mound considerates public enclosed spaces (Fig. 3.5.4.) such as cafe and multipurpose theatre. To provide uniform diffuse daylight, as well as for natural ventilation proposes, the north oriented lighting wells were established.
30
N
Cafe
2.5m 1.5m
Fig. 3.5.4. Public facilities.
Fig. 3.5.3. Landscape.
AA - SED | Msc + MArch 2016 - 2017
CHAPTER 3 3. 5 Proposal
PECKHAM STUDENT LIVING Term 2 Project
Average Eave Hight
Facade Projection East Block East Block
15m
9m West Block West Block
Previliant Wind
17m
N
10m
N
9m
Fig. 3.5.5. Accommodation massing.
Fig. 3.5.6. Wind protection.
PROPOSAL
Window Sill
2m
East Block
East Block
Roof Eave Axe Courtyard
West Block
West Block South Block
South Block
Pedestrian Transit
N
Fig. 3.5.7. Transit and access.
N
The student accommodation houses (Fig. 3.5.5.) have the north to south long axes as the previous study defined that the west and east orientations is the most appropriative for the most of the rooms. The blocks location determined by the privacy consideration and the height set to be similar with existing surrounding. To create windproof, private area between the buildings (Fig. 3.5.6.), the west block was extended (appendix F. Wind Study) in the east direction. As was mentioned the nearest public transport stop locates near the eastern border of the site and main pedestrian axes in the west. To provide the access to the bus stop for the occupants as well as to link it with the walking axes, the west block was divided (Fig. 3.5.7.). The courtyard was drowned in to the ground for a 2 meters to provide community space and to extend the area of the blocks within the established height. The entrances to the student houses oriented inside the yard for a privacy and security reasons. To minimize the overshadow and to prove the view for the existing private houses, the heights (Fig. 3.5.8.) of the East and South Blocks was decreased and East block mass was carved. The roof was sloped in order to increase the solar gains for further photovoltaic panels as well as for aesthetic proposes.
Fig. 3.5.8. Slopes.
AA - SED | Msc + MArch 2016 - 2017
31
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3. 6 Accommodation Zoning
West Block East Block
8.65m 4.65m 3m 3m
14.65m
-2m 11.10m 4.65m 3m 3m 3m 3m
South Block
4.60m 3m 3m 3m
N
Key-plan
Fig. 3.6.2. Perspective view showing functional distribution of floors.
Fig. 3.6.1. Perspective view showing division of floor heights and total building heights.
ACCOMODATION ZONING
The strategy for zoning in accomodation blocks was to first divide each floor by 3m in height (floor finish to floor finish level) and then dividing the floors by functional attributes. As shown in Fig. 3.6.1, the west block is 14.65m high, the south block and east block, 11.10m and 8.65m high respectively. The functions broadly allocated to each levels is determined by the use of the spaces inside each block. (Fig.3.6.2) The sub-ground levels have communal spaces together with utlitiy areas such as gym, laundry room etc., which do not require immidiate or strong use of daylighting as defined earlier in environmetal matrix. The majority of typical floors above sub-ground level are populated with living units, while the top floors in each block has living units along with common study areas and balconies.
Communal + utilitiy spaces
Communal spaces
Living spaces
Living + Communal spaces
Single Room Blocks
Single Room Blocks Couple and shared room blocks
Fig. 3.6.3 shows defning of room typology in each block. The west and east blocks have single occupancy rooms with kitchenettes while the south block has couple rooms (north facing) and double-bed shared rooms (south facing) with and without kitchenette respectively. The divison of room typology was based upon the room orientation study as it was observed that rooms with high internal gains could be oriented with windows facing east and west while rooms with low internal gains can have windows faing towards south as seen indicatively in design of built form in Fig. 3.6.4
32
Fig. 3.6.3. Perspective view showing division of room typology in accommodation blocks.
AA - SED | Msc + MArch 2016 - 2017
Fig. 3.6.4. Perspective view of proposed built form of accommodation blocks.
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3.7 Proposal of Courtyard
Playground
-
Bicycle Parking Gathering Space
Buffer Space
N
Fig. 3.7.1 Proposal of Courtyard Spaces
Sythetic Ground
PROPOSAL OF COURTYARD Paver Blocks
The courtyard is designed as the main area for all the occupants to gather together to make friends and have outdoor activities. The entrances of each block are linked to define the area. The space next to the main pedestrian route is set to be the buffer space between public pedestrian route and more private zone. The central area is the main zone for students to have group activities, studies and communication. The back of the courtyard offers bicycle parking area (Fig. 3.7.1.)
Greenary
Wooden Pavement
At the north corner, there is a playground for students to have sports activities. In this way, the sports activities wonâ&#x20AC;&#x2122;t conflict with the pedestrian. Steps with seats are next to the playground for rest and watching the sports activities as well as continuing the axis to link the accommodation part with the future residential development (the Whitten Timer Yard will be demolished to be a residence in the future).
N
Fig. 3.7.2 Proposal of Courtyard Pavement
AA - SED | Msc + MArch 2016 - 2017
The pavement includes greenery, wooden pavement (platform for activities), common paver block and synthetic playground to define different functions of different zones (Fig. 3.7.2)
33
PECKHAM STUDENT LIVING Term 2 Project
SUB-GROUND FLOOR PLAN
CHAPTER 3 3.8 Plan & Elevation & Section
GROUND FLOOR PLAN
Gym
Single Rooms
Toilets
Double-Bed Shared Rooms
Laundry room
Double-Bed Couple Rooms
Staircase + Lift
Common Kitchen + Dining
Reception + Waiting
Residentâ&#x20AC;&#x2122;s Lounge
Lounge / Common room Cinema / Tv Room Administrative office
FLOOR PLANS - ACCOMODATION
The Sub-Ground Floors (Fig. 3.8.1) of all the blocks are composed of utilities and facilities such as Gym, Lounge room, laundry rooms, Reception and waiting, cinema room and games room. The strategy to plan the sub-ground floor was to divide spaces according to the environmental matrix formed to study the areas which require immediate attention to environmental factors such as daylight, ventilation and thermal comfort. The Typical floor plans (Fig 3.8.2.) has three types of rooms divided even on the floor namely - Single Rooms(with kitchenette), Double-Bed Shared rooms(without kitchentte) and Double-Bed Couple rooms. There are a total of 46 Single shared rooms combined in west and east blocks, 15 Double-bed Shared rooms and 8 Double-Bed couple rooms combined in south block. The floors are centrally divided by the staircase in order to shorten the length of the corridor to a maximum of 19m. This is also helps in poviding daylit corridors which are around 50% more than 2% daylight factor as found during simulations (refer daylight studies). The daylight corridors have a positive pychological effect on the occupants and also helps in decreasing increasing consumption as noted in case studies and interviews. 34
Fig. 3.8.1. Sub-Ground Level Floor Plan
Fig. 3.8.2. Typical Floor Plan
N 0m
AA - SED | Msc + MArch 2016 - 2017
5m
10m
15m
20m
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3.8 Plan & Elevation & Section
TOP FLOOR PLAN Single Rooms Double-Bed Shared Rooms Common Study Area Common Kitchen + Dining Balcony Store / Mechanical room
FLOOR PLANS - ACCOMODATION
Fig. 3.8.3. Top Floors Plan
The Top Floor Plan (Fig 3.8.3) is composed of a mix of living units, study areas, balconies and common kitchen+dining. The idea was to provide common areas such as quite study spcaces on top floor utlising the ineefficient area under the sloping roofs and to keep all the noisy activites on the floors below. Also the study spaces can make use of the skylights in sloping roof (Fig 3.8.4) to have diffused and even daylight spread out on study table levels.
Fig. 3.8.4. Roof Plan
N 0m
5m
10m
15m
20m
AA - SED | Msc + MArch 2016 - 2017
35
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3.8 Plan & Elevation & Section
0m
1m
2m
3m
4m
5m
West Block
East Block
D A
Ground Level
Fig. 3.8.4 Elevation B
-2m
E B
South Block
C
N F
Key-plan
Ground Level
Fig. 3.8.5Elevation C
-2m
ELEVATIONS
The proposed materials in elevations for student Accommodation blocks are kept in consideration with that of the context materials. The Fig. 3.8.4, Fig.3.8.5, Fig.3.8.6 reflects materials used in the elevations facing the courtyard. Bricks are used as wall cladding materials and matching coloured roof tiles for sloped roof. This forms a continuity in elevations in the courtyard and provides a more psychological feeling of a small yet homely feeling for students living in there. The facades are punctured by windows and balconies and centralised staircase which has a glazed faced to provide good amount of dalight in corridors (refer daylight simulations) as it was found during the interviews that most student accommodations lack appropriate daylit corridors. A large portion of walls are left blank intentionally in elevations (refer daylight studies) as they house common spaces such as residentâ&#x20AC;&#x2122;s lounge and common kitchen/ dining on typical floors and cinema room,store rooms and other utility spaces on sub-ground floors, which either do not require strong daylighting functionally or can cause glare issues if provided with windows.
36
Ground Level -2m Fig. 3.8.6Elevation A
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3.8 Plan & Elevation & Section
0m
1m
2m
3m
4m
5m
West Block
Ground Level -2m
East Block
D A
Fig. 3.8.7. Elevation E
E B
South Block
C
N F
Key-plan
Ground Level -2m
Fig. 3.8.8. Elevation F
ELEVATIONS
The propsed materials for elevations facing the neighbourhood and library is Zinc cladding panels to keep in context with library which is a landmark in itself. Therefore the building blocks along with brick cladding facing courtyard and Zinc cladding outside, are seen as an â&#x20AC;&#x2DC; integration and not an addition â&#x20AC;&#x2122; in the surrounding urban context of the site.
Ground Level -2m
The large glazed walls seen in the Fig. 3.8.7, Fig. 3.8.8, Fig. 3.8.9 are a result of daylight studies and thermal studies in communal spaces which is why the glazed wall is broken by horizontal bands of wall 0.75m high. The result of which is maxmum thermal and visual comfort in those particular common spaces.It is to noted that the proportions rooms and of window sizes have been decided also keeping into considerations the brick sizes to minimize wastage of bricks formed by cutting at junctions of windows.
Fig. 3.8.9 Elevation D
AA - SED | Msc + MArch 2016 - 2017
37
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3.8 Plan & Elevation & Section
-
Accomodation site
Y
West Block
West block
Neighbourhood Houses
Central Courtyard
East block
East Block
X
X
South Block Key-plan
N
Y
Fig. 3.8.10. Section XX Single-Bed Rooms
Reception
Study areas
Double-Bed / Couple Rooms
SECTIONS Central Courtyard
The Fig. 3.8.10 shows a section through the accomodation blocks and the central courtyard. The section shows the realtionship of height of buildings with neighbourhood houses and the central courtyard which acts as a point of entry to the buildings and is also used to various outdoor activities. The east block is lowest in height keeping in mind not to overshadow the neighbourhood houses while also allowing sunlight to the courtyard in winter when the sun angle is quite low. The west and the east accomodation blocks provide a sense of privacy to the courtyard while also linking public access to through site. Although the courtyard is overshadowed by the two buildings it provides plenty of oppurnities to seek outdoor activites during spring and summer when there is ample of sunlight.
Games area + Bicycle Parking
The Fig. 3.8.11 shows a section through south block and thought the courtyard highlighting various levels happening thought the site. The north-east corner of the site has outdoor games area such as halfcourt for basketball which is directly accessible through the games room situated in east block. The courtyard also has deciduous tress which provides a shaded sitting area below its canopy during afternoon in summer.
38
East block
South Block Pedestrian access
Fig. 3.8.11. Section YY
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 3 3. 9 Material Composition
TOP
BOTTOM HUNG WINDOWS EPOXY/ POLYURETHANE RESIN FLOORING (5mm)
CEMENT SCREED (35mm) 250mm FLOOR SLAB INSULATION (30mm)
CONCRETE (180mm) BOTTOM
MATERIAL COMPOSITION TOP HUNG OPERABLE WINDOWS
The Fig. 3.9.1 shows defines the proposed material layout for all typical living units used in the design. To keep in the mind the required approximate air changes per hour both in room and the bathroom operable windows such as bottom hung and top hung awning windows were proposed in design. The windows open upto 10% to facilitate ventilation inside the room due to stack height of top hung double level windows. External walls are 450mm wide and has two layers of bricks both interior and exterior along with insulation and air cavity to create a good thermal mass (u-values defined in thermal simulations). As for the internal walls, they are one brick wide which provides enough mass to create both thermal and acoustic insulation between rooms.
450mm EXTERNAL WALL IN
OUT
BRICKS (230mm)
INSULATION (100mm)
AIR GAP (50mm)
BRICKS (100mm)
The floors are 250mm thick concrete slabs proposed with expoxy coating as flooring for aesthetic purpose and also being low in maintainance. The ceiling is kept as smooth exposed concrete as it is known to have good light reflectance properties. All furniture inside the rooms are proposed to be plain white corian surfaces as found in case studies( see Appendix. C) as light reflectance is affected a lot by the type of surfaces in a room and also because it was more preffered by occupants during the interviews.
IN
OUT
250mm INTERNAL WALL
Fig. 3.9.1. Exploded view of a single room
PLASTER+ PAINT
BRICKS (230mm)
PLASTER+ PAINT
AA - SED | Msc + MArch 2016 - 2017
Kitchen cooking appliances are minimal in kitchenette and is just one electric based hot plate (with two hobs) and a kettle for heating water (refer case studies for more details).
39
CHAPTER 3 3. 10. Visualisations
PECKHAM STUDENT LIVING Term 2 Project
Fig. 3.10.1 View from Surrey Canal Walk.
AA - SED | Msc + MArch 2016 - 2017
41
CHAPTER 3 3. 10. Visualization
PECKHAM STUDENT LIVING Term 2 Project
Fig. 3.10.2Courtyard. 40
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
42
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 4
CHAPTER 4 DAYLIGHT STUDY
AA - SED | Msc + MArch 2016 - 2017
43
CHAPTER 4 4. 1. Daylight Strategy
PECKHAM STUDENT LIVING Term 2 Project
N
West Block
Unit 1
West Block
W
Unit 2
N
Unit 1
Communal Space
E Communal Space
East Block
S
E
W
South Block
W
N
N
Unit 3
S
W
East Block
S
Unit 2
N S
E
Unit 4
Key-plan
E
DAYLIGHT STRATEGY Regarding to occupants interview (Appendix D. Student Interviews) as well as common knowledge, daylit environment is preferred by occupants. Furthermore, it proves health, wellbeing, productivity outcomes increases and reduces the energy consumption. The daylight strategy grounds on the determination of the passive daylit zones regarding to the function of the space and minimization of the glazing area in the rooms with the highest internal heat gains such as living units in order to prevent the overheating issue during the summer sunny weather. At the start, the basic simulation (Appendix A. Software Simulations) was run. Fig 4.1.1. demonstrates the Daylight Factor on the exterior wall surfaces layered by the zones of glazing, obtained results ranged from 35% to 70%. As it was expected, the sub-ground surfaces receive the less daylight and it was assumed that this floors could be populated with the communal spaces that do not require strong daylighting but required good accessibility, glazing of this areas was applied for natural ventilation, visual connection with courtyard and aesthetic purposes. The communal spaces that will used on a regular basis, studying areas, student common lounge, dining rooms and the area of the desks and kitchenette (where applicable) in the living rooms are considered as passive zones and those that requires good access to daylight. Among the passive zone, the areas with the less daylight were selected for further study. The criteria for the passive daylight zones was determined by the BREEM New Construction 2016 technical manual and consist of the Daylight Factor average of 2% covered the 80% of the area. 44
N
W
S
E
East Block Unit 3
N
Unit 4
E
Selected Areas
Circulation Space Glazing
Living Units Glazing
Common Kitchen Galzing
Communal Space Glazing Fig. 4.1.1. Daylight Factor on the exterior surfaces.
AA - SED | Msc + MArch 2016 - 2017
S 35% DF
40%
W 45%
50%
55%
60%
65%
CHAPTER 4 4. 2. Communal Space
PECKHAM STUDENT LIVING Term 2 Project
N
>20%
15%
West Block
W
10%
N
E Communal Space
5%
East Block
S
E
W
2% South Block
W
N
>1%
S
DF
N S
Key-plan
E
Passive Zone Space Area sq./m. Window Area
sq./m.
27
Window to Floor Ratio
33%
Offset From the Floor
0.75
Daylight Factor Average
3.1
Daylight Factor >2%
COMMUNAL SPACE
83
47%
The communal space of the ground floor in the West Block was selected for daylight study as it window surfaces have the less Daylight Factor. The circulation space of the floor was tested as well. The area of the working desks and lounge sofa was considered as passive zone with the height of the window estimated as 1.5 meters and area of the glazing in within that that is around 16 meters. Due to simulation result (Fig. 4.2.1.) the average Daylight Factor within the passive zone estimates 4.7%, and the 86% of the space receive the demanded daylight. It is important to mention that the light evenly distributed and exclude preconditions for the glaring effect. For the whole common area of the floor, including the corridor and the stairs, the average Daylight Factor is 3.1, that is reasonable considering that most of the area is a transit space.
4.7% 86%
Fig 4.2.1. Communal Space.
AA - SED | Msc + MArch 2016 - 2017 45
CHAPTER 4 4. 3. Unit 1
PECKHAM STUDENT LIVING Term 2 Project
Unit 1
Unit 1
>20%
West Block
15%
East Block
10%
5% South Block 2%
>1%
DF
N
UNIT 1
Passive Zone Glazing Visible Transmittance
The living unit 1 represents the single bedroom with kitchenette (Fig. 4.3.1.), that locates in the West Block, which has best daylight potential. Due to the minimum obstructions the area of the windows was estimated as only 2 sq/m.. The window to floor ratio estimates 22% that is very usual for local housing and match the typical student accommodation bedroom. Compact floor layout allow to keep the area of the window 45% smaller comparing to an average (Appendix C. Case Study) in the case study. It reduces solar heat gains in the summer as well as heat loss in the winter. To compensate the minimized area inside bedrooms, the extensive communal program provided on each floor. The simulation (Appendix A. Software Simulations) shows that within the passive zone the average daylight factor estimates 3.8% and the 83% of the area receive the required daylight what guarantee good quality of the daylight on the surface of the working desk and kitchenette. The window in the bathroom allow it to be daylited with an average Daylight Factor of 1.8% that allow to use it use during the most of the daytime without addition artificial lighting. 46
0.65
Room Area sq./m.
9
2.3
Window Area sq./m.
2
0.4
Window to Floor Ratio
22%
17%
Offset From the Floor
0.75
1.5
Daylight Factor Average
3.8%
2%
1.8%
Daylight Factor >2%
83%
30%
28%
Fig. 4.3.1. Living unit 1.
AA - SED | Msc + MArch 2016 - 2017
CHAPTER 4 4. 4. Unit 2
PECKHAM STUDENT LIVING Term 2 Project
UNIT 2
Unit 2
>20%
West Block
Unit 2
15%
10%
East Block
5% South Block 2%
N DF
>1%
Passive Zone Glazing Visible Transmittance
0.65
UNIT 2
Room Area sq./m.
9
2.3
2.2
0.4
Window to Floor Ratio
25%
17%
Offset From the Floor
0.75
1.5
Window Area sq./m.
Daylight Factor Average
3.9%
2%
1.5%
Daylight Factor >2%
84%
31%
23%
The living unit 2 represents the single bedroom with kitchenette (Fig. 4.4.1.), located in the East Block that in average receives the less daylight. In order to achieve the necessary criteria the area of the windows was increased comparing to the West Block single bedrooms and estimates 2.2 sq./m.. Window to floor ratio increased to 25% but still could be considered as a common. Simulation (Appendix A. Software Simulations) indicates that within the passive zone the 84% of the area is covered with a Daylight Factor of 2% or more. The bathroom hasnâ&#x20AC;&#x2122;t been considered as a passive zone, and the size of the window remain the similar with other blocks as it provide the necessary natural ventilation, also unified bathroom window could provide visual unity of the complex as well as simplify the construction. The average Daylight Factor inside this area is 1.5%.
Fig. 4.4.1. Living unit 2.
AA - SED | Msc + MArch 2016 - 2017
47
CHAPTER 4 4. 5. Unit 3
PECKHAM STUDENT LIVING Term 2 Project
Unit 3
>20%
West Block
15%
East Block
10%
5% South Block 2% Unit 3 >1%
DF
N
Passive Zone Glazing Visible Transmittance
UNIT 3 The living unit 3 is a double bedroom with kitchenette for couples (Fig. 4.5.1.), that locates in the South Block, due to the highest power density among other spaces it oriented to the north. The area of the windows estimates 2.9 meters. The window to floor ratio is 24%. The passive zone The simulation (Appendix A. Software Simulations) shows that within the passive zone cover the working desk for both occupants and the kitchenette. The simulation showed that the 80% of itâ&#x20AC;&#x2122;s area achieve 2% or more Daylight Factor. The window in the bathroom allow it to be daylited with an average Daylight Factor of 2.1%. 48
0.65
Room Area sq./m.
12
2.3
Window Area sq./m.
2.9
0.4
Window to Floor Ratio
24%
17%
Offset From the Floor
0.75
1.5
Daylight Factor Average
3.4%
2.3%
2.1%
Daylight Factor >2%
80%
45%
31%
Fig. 4.5.1. Living unit 3.
AA - SED | Msc + MArch 2016 - 2017
CHAPTER 4 4. 6. Unit 4
PECKHAM STUDENT LIVING Term 2 Project
Unit 4
>20%
West Block
15%
10%
East Block
5% South Block 2%
N
>1%
DF
Unit 4
Passive Zone Glazing Visible Transmittance
0.65
Room Area sq./m.
15
Window Area sq./m.
2.9
2.3
UNIT 4
0.4
Window to Floor Ratio
24%
17%
Offset From the Floor
0.75
1.5
Daylight Factor Average
4.5%
2.5%
2.3%
Daylight Factor >2%
83%
47%
35%
The living unit 3 is a shared double bedroom without the kitchenette (Fig. 4.6.1.), that locates in the South Block, the internal heat gains is the less among the living units. The Windows oriented to the South as this room didnâ&#x20AC;&#x2122;t assumed to be overheated in the summer. The area of the windows is the same with the couple bedroom and estimates 2.9 meters . The window to floor ratio is 19% and the passive zone cover working desks and students beds. The simulation (Appendix A. Software Simulations) demonstrates that within the passive zone the 83% of the area is covered with a Daylight Factor of 2% or more. The window in the bathroom allow it to be daylited with an average Daylight Factor of 2.3%.
Fig. 4.6.1. Living unit 4.
AA - SED | Msc + MArch 2016 - 2017
49
PECKHAM STUDENT LIVING Term 2 Project
50
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 5
CHAPTER 5 SOLAR STUDY
AA - SED | Msc + MArch 2016 - 2017
51
CHAPTER 5 5. 1 Winter solar gains
PECKHAM STUDENT LIVING Term 2 Project
West Block N
West Block
W
N
E
East Block
S
E
W
N
South Block
W
N
E
S
W
East Block
S
N S E
N
W
S
E
East Block
WINTER SOLAR RADIATION GAINS The solar study was performed to define the distribution of the solar gain on the different exterior surfaces. To identify the potential thermal stress in the indoor spaces and study them in the further thermal study the glazing area was displayed. To define the differences of the solar gains during the cold months, the initial simulation (Appendix A. Software Simulations) was run. The resulted diagram (Fig. 5.1.1.) demonstrates that for the all vertical surfaces the amount of the receiving energy is evenly low and is within the 0.3-0.7 kWh/sq.m. range. Due to resulting similarity, the winter solar gains assumed to not be considered in determination of the spaces to be tested in further thermal study. The period for the simulation was set from 8 December 01 AM to 14 December 12 PM. 52
N
E
Selected Areas
Circulation Space Glazing
Living Units Glazing
Common Kitchen Galzing
Communal Space Glazing Fig. 5.1.1. Winter solar gains.
AA - SED | Msc + MArch 2016 - 2017
S >0.3 kWh/sq.m./day
0.5
W 1
1.5
2
2.5
3
CHAPTER 5 5. 2 Summer solar gains
PECKHAM STUDENT LIVING Term 2 Project
SUMMER SOLAR RADIATION RATE West Block -
Single Room
N
Single Room
N
West Block W
E
East Block
S
N
E
S
East Block
W
W
E Communal Space
South Block
W
N
Communal Space
S
Shared Room
Double Room
N
S
Key-plan
N
W
East Block
S
E
Double Room
N
Shared Room
E
Selected Areas
Circulation Space Glazing
Living Units Glazing
Common Kitchen Galzing
Communal Space Glazing
E
S >0.3
0.5
W 1
1.5
2
kWh/sq.m./day
Fig. 5.2.1. Summer solar gains.
AA - SED | Msc + MArch 2016 - 2017
2.5
WINTER SOLAR RADIATION GAINS 3
The Fig. 5.2.1. illustrates the daily solar radiation gains in a typical summer week. The mesh reveals noticeable differences in the distribution of the solar energy from the 0.5 kWh/sq.m. to almost 3 kWh/sq.m.. Within the different living unit types the most radiated were identified for further thermal study. 53
CHAPTER 5 5. 3 Roof slopes study
PECKHAM STUDENT LIVING Term 2 Project
1200 kWh
West Block
987 kWh 1000 kWh East Block
960 kWh 40
970 kWh
900 kWh
880kWh 30 800 kWh South Block
700 kWh
N
600 kWh Key-plan
WINTER SOLAR RADIATION RATE
Simulation Results
500 kWh
90% Available Solar Radiation Assuming that photovoltaic panels are the most feasible source of renewable energy due to economic reasons and urban context, the roof slopes were studied precisely. To define the interrelation between the angle of the roof slope and the amount of the receiving solar energy, the series of the annual simulations were performed. For each slope angle in each block, the amount of energy was calculated and compared in the diagrams, all the surrounding context was carefully modeled and considered. The angle is shown in degrees and the energy in kWh/sq.m. Fig. 5.3.1. and Fig. 5.3.2. illustrate the results for the West and East Blocks were 40 degrees and 30 degrees for the west oriented and east oriented slopes respectively, which were determined as the optimum in aspects of solar radiation and internal typological volume. 54
Highest Solar Radiation Gains
400 kWh
Optimal Angle 0 0
Fig. 5.3.1. West Block.
AA - SED | Msc + MArch 2016 - 2017
10 14
20
30 32
40
50
60 57
70
80
90
CHAPTER 5 5. 3 Roof slopes study
PECKHAM STUDENT LIVING Term 2 Project
1200 kWh
1200 kWh
1050 kWh 40 1074 kWh 1000 kWh
1000 kWh 961 kWh
926 kWh 900 kWh 901 kWh
900 kWh
865 kWh 14
837 kWh 40
800 kWh
800 kWh 821 kWh 30
700 kWh
700 kWh
600 kWh
600 kWh
500 kWh
500 kWh
WINTER SOLAR RADIATION RATE
400 kWh
400 kWh
0 0
10 7
Fig. 5.3.2. East Block.
20
30
27
40 40
50
60
70
80
90
0 0
10 4
20 14
30 31
40
50
60
70
80
90
For the roof of South Block (Fig. 5.3.3.) the 14 degrees and 40 degrees angles in north and south slopes accordingly were the most efficient. In conclusion, the 3 types of the slopes were established: 40 for the west and south orientation, 30 for the east and 14 for the north. Selected angles allow more than 90% solar gains, comparing to the maximum .
59
Fig. 5.3.3. South Block.
AA - SED | Msc + MArch 2016 - 2017
55
PECKHAM STUDENT LIVING Term 2 Project
56
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6
CHAPTER 6 THERMAL STUDY
AA - SED | Msc + MArch 2016 - 2017
57
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.1 Annual Thermal Analysis of Room
N
ANNUAL THERMAL ANALYSIS FOR ROOM UNITS From the previous project of UCL Prankerd House (Student Accommodation), occupant’s interview and the basic knowledge we found that the room units used to overheat. In the Prankerd House the students used to open the window for natural ventilation during winter period because of overheating. Looking at those issues we have proposed additional changes to the room.
W
N
E
East Block
S
E
W
South Block
W
N
NORTH COUPLE S
S
SOUTH DOUBLE
Area of the room = 15 sq.m No. of occupants = 2 Total Glazing Areas = 2.9 sq.m
E
For this annual thermal simulation of the student units, schedules have been defined below: A] SINGLE ROOM EAST
C] COUPLE ROOM NORTH WITH KITCHEN 3.4 kWh
1.4 W/m2-K 0.197 W/m2-K
1.0 kWh
Students go away for an Easter break during the month of April (Fig. 6.1.2) (Appendix H Schedules of Thermal). During Christmas Break, very few students go away which can provide a diverse schedule. Thus no vacation is provided in the occupation schedule.
1.19 kWh
1.4 W/m2-K 0.197 W/m2-K
4.5 kWh 2.0 kWh 0.8 kWh
Schedules
Daily heat gains
Student spend most of daytime in university, schedule generated according to occupants interview. Appliances schedule defined by occupants interview and room review.
0.1 ach infiltration
Windows starting opening (36% of the area is openable) at temperature of 21°C and closing at 19°C. During Summer windows are kept open during the day between 8am to 9pm which allows natural ventilation and generates 7ach. During the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach. During Winter windows are kept open during the cooking hours 9am to 10am and 9pm to 11pm which allows natural ventilation and removes odour and generates 6ach and during the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach.
Area of the room = 9 sq.m No. of occupants = 1 Total Glazing Areas = 2 sq.m Fig 6.1.1. Room Typologies and Key plan.
58
2.5 kWh 2.0 kWh 1.98 kWh
Daily heat gains
These rooms have double glazed window with a U- Value of 1.4 W/m2k (Fig. 6.1.1). The walls are 450mm thick with a U-Value of 0.197 W/m2k (Fig. 6.1.1). All the rooms have an infiltration rate of 0.1ach.
In the student occupation schedule, the students are in the college/universities between 10am to 8pm during the weekdays and return back home. During weekends, the behaviour of the students are similar but instead of going to college they are usually visiting some places or studying in the common rooms (Appendix H Schedules of Thermal).
1.4 W/m2-K 0.197 W/m2-K
West Block
For the simulation three different rooms have been considered: A) Single Room with kitchenette facing East B) Double Room without kitchenette facing south C) Couple Room with kitchenette facing North These rooms are selected because from the Solar Studies (Chap. 5) we found that the exterior surfaces of these rooms were under thermal stress.
B] DOUBLE ROOM SOUTH WITHOUT KITCHEN
EAST SINGLE
AA - SED | Msc + MArch 2016 - 2017
Daily heat gains
0.1 ach infiltration
Area of the room = 12 sq.m No. of occupants = 2 Total Glazing Areas = 2.9 sq.m
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.1 Annual Thermal Analysis of Room
30 C 29 C 28 C 27 C 26 C 25 C 24 C 23 C 22 C 21 C 20 C 19 C 18 C 17 C 16 C 15 C 14 C 13 C 12 C 11 C 10 C 9C 8C 7C 6C 5C 4C 3C 2C 1C 0C -1 C
Sky Conditions Statistic for London Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Totl.
20.84 C 20.69 C 20.14 C
December
November
October
September
August
July
June
May
April
March
February
January
2.0 kWh 1.8 kWh 1.6 kWh 1.4 kWh 1.2 kWh 1.0 kWh 0.8 kWh 0.6 kWh 0.4 kWh 0.2 kWh 0.0 kWh
Operative Temp Couple Room North
Transmitted Solar Radiation Couple Room North
Operative Temperature Single Room East
Transmitted Solar Radiation Single Room East
Ventilation Air Rate Change
Operative Temperature Double Room South
Transmitted Solar Radiation Double Room South
Student Easter Break
Fig 6.1.2. Annual Thermal Simulation for Room Units. AA - SED | Msc + MArch 2016 - 2017
28
26
27
33
29
31
36
32 38
31
27
31
44
44
43
41
39
38
43
43
45 37
47
45
42
31
28
31
32
28
33
26
21
23 25
22
28
27
The graph (Fig. 6.1.2) illustrates the efficiency of the different rooms throughout the year. The average outside temperature is 11.97°C and the average temperature of 11.97 C A) Single Room with kitchenette facing East – 20.69°C B) Double Room without kitchenette facing South – 20.14°C C) Couple Room with kitchenette facing north – 20.84°C
10 ach 8 ach 6 ach 4 ach 2 ach 0 ach
Outside Temperature
25
In case of double room without kitchenette facing south, internal heat gains are less as compared to others but has high solar gains. Due to this factor, the internal temperature doesn’t over heat much making the room comfortable throughout the year with necessary ventilation. In case of summer when the outside temperature is higher than the comfort band, the room tends to overheat a little. In case of single room with kitchenette facing east, internal heat gains are higher than the double room but has less solar gains. The internal temperature doesn’t overheat much making the room comfortable throughout the year with necessary ventilation. In case of summer when the outside temperature is higher than the comfort band, the room tends to overheat a little. In case of couple room with kitchenette facing north, internal heat gains are higher than all the rooms but has very minimum solar gains. In case of summer when the outside temperature is higher than the comfort band, the room tends to overheat a little. But with the help of necessary ventilation the room temperature can be brought down to the comfort band. No. of hours the outdoor temperature above comfort band annually = 79 Hours Out of those hours the temperature of the space above comfort band Single Room = 57 Hours Double Room = 55 Hours Couple Room = 48 Hours During April when the students have gone for a vacation, the internal gains of all the rooms are almost zero except for the rooms where refrigerator have to be kept running throughout. During that period, the internal temperature of the south double room rises cause of high solar gains due to its orientation. But the internal temperature of the north couple room drops down due to its north orientation receiving minimum solar gains. But if window shutters are applied during that period then the temperature of all rooms could be less affected. From the graph we can observe that all the rooms are most of the time in comfort band throughout the year without any additional heating or cooling supply thus making it free running.
59
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.2 Thermal Analysis of Room - Summer
N
B] DOUBLE ROOM SOUTH WITHOUT KITCHEN
EAST SINGLE
1.4 W/m2-K 0.197 W/m2-K
West Block W
2.5 kWh 2.0 kWh 1.83 kWh
N
E
Daily heat gains East Block
S
THERMAL ANALYSIS OF ROOM UNITS - SUMMER WEEK
0.1 ach infiltration
South Block
W
N
In this simulation we are looking at the thermal analysis of all the rooms during a summer period [ 22nd June - 28th June]
NORTH COUPLE S
For the simulation three different rooms have been considered: A) Single Room with kitchenette facing East B) Double Room without kitchenette facing South C) Couple Room with kitchenette facing North
E
W
S
SOUTH DOUBLE
Area of the room = 15 sq.m No. of occupants = 2 Total Glazing Areas = 2.9 sq.m
E
These rooms are selected because from the Solar Studies (Chap. 5) we found that the exterior surfaces of these rooms were under thermal stress.
A] SINGLE ROOM EAST
These rooms have double glazed window with a U- Value of 1.4 W/m2k (Fig. 6.2.1). The walls are 450mm thick with a U-Value of 0.197 W/m2k (Fig. 6.2.1). All the rooms have an infiltration rate of 0.1ach.
1.4 W/m2-K 0.197 W/m2-K
C] COUPLE ROOM NORTH WITH KITCHEN 3.4 kWh 1.0 kWh
For this weekly thermal simulation of the student units, schedules have been defined below: In the student occupation schedule, the students are in the college/universities between 10am to 8pm during the weekdays and return back home. During weekends, the behaviour of the students are similar but instead of going to college they are usually visiting some places or studying in the common rooms (Appendix H Schedules of Thermal).
1.6 kWh
Daily heat gains
0.1 ach infiltration
Schedules Student spend most of daytime in university, schedule generated according to occupants interview.
1.4 W/m2-K 0.197 W/m2-K
4.5 kWh 2.0 kWh
1.36 kWh
Daily heat gains 0.1 ach infiltration
Appliances schedule defined by occupants interview and room review. Windows starting opening (36% of the area is openable) at temperature of 21°C and closing at 19°C. During Summer windows are kept open during the day between 8am to 9pm which allows natural ventilation and generates 7ach. During the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach.
60
Area of the room = 9 sq.m No. of occupants = 1 Total Glazing Areas = 2 sq.m Fig 6.2.1. Room Typologies and Key plan. AA - SED | Msc + MArch 2016 - 2017
Area of the room = 12 sq.m No. of occupants = 2 Total Glazing Areas = 2.9 sq.m
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.2 Thermal Analysis of Room - Summer
2.5 m/s
2.0 m/s
2.2 m/s
2.7 m/s
3.6 m/s
2.7m/s
4.1 m/s
30 C 29 C 28 C 27 C 26 C 25 C 24 C 23 C 22 C 21 C 20 C 19 C 18 C 17 C 16 C 15 C 14 C 13 C 12 C 11 C 10 C 9C 8C 7C 6C 5C 4C 3C 2C 1C 0C -1 C
18.70 C
00:00
18:00
12:00
Tu 28/06/16
06:00
00:00
18:00
12:00
Mo 27/06/16
06:00
00:00
18:00
12:00
Su 26/06/16
06:00
00:00
18:00
12:00
Sa 25/06/16
06:00
00:00
18:00
12:00
Fr 24/06/16
06:00
00:00
18:00
06:00
12:00
Th 23/06/16
00:00
18:00
12:00
06:00
20 ach 18 ach 16 ach 14 ach 12 ach 10 ach 8 ach 6 ach 4 ach 2 ach 0 ach
We 22/06/16
00:00
2.0 kWh 1.8 kWh 1.6 kWh 1.4 kWh 1.2 kWh 1.0 kWh 0.8 kWh 0.6 kWh 0.4 kWh 0.2 kWh 0.0 kWh
24.54 C 24.07 C 23.75 C
Outside Temperature
Operative Temp Couple Room North
Transmitted Solar Radiation Couple Room North
Operative Temperature Single Room East
Transmitted Solar Radiation Single Room East
Ventilation Air Rate Change
Operative Temperature Double Room South
Transmitted Solar Radiation Double Room South
Student Occupancy Period
Fig 6.2.2. Thermal Simulation for Room Units during Summer Week. AA - SED | Msc + MArch 2016 - 2017
The graph (Fig. 6.2.2) illustrates the efficiency of the different rooms during a summer week where the outside temperature ranges between 14°C to 24°C. The average outside temperature is 18.70°C and the average temperature of A) B) C)
Single Room with kitchenette facing East – 24.07°C Double Room without kitchenette facing South – 23.75°C Couple Room with kitchenette facing north – 24.54°C
In case of double room without kitchenette facing south, internal heat gains are less as compared to others but has high solar gains. Due to this factor, the internal temperature doesn’t over heat much making the room comfortable. The internal temperature is lower than all other rooms. In case of single room with kitchenette facing east, internal heat gains are higher than the double room but has less solar gains. The internal temperature doesn’t overheat much making the room comfortable throughout the year with necessary ventilation. In case of couple room with kitchenette facing north, internal heat gains are higher than all the rooms but has very minimum solar gains. But with the help of necessary ventilation the room temperature can be brought down to the comfort band. The internal temperature is higher than all other rooms. From the graph we can observe that all the rooms do not overheat at any point during the week. The rooms are most of the time in comfort band during the week without any additional heating or cooling supply thus making it free running.
61
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.3 Thermal Analysis of Room - Winter
N
B] DOUBLE ROOM SOUTH WITHOUT KITCHEN
EAST SINGLE
1.4 W/m2-K 0.197 W/m2-K
West Block W
2.5 kWh 2.0 kWh
N
0.388 kWh
E
Daily heat gains East Block
S
THERMAL ANALYSIS OF ROOM UNITS - WINTER
0.1 ach infiltration
South Block
W
N
In this simulation we are looking at the thermal analysis of all the rooms during a winter period [ 16th December - 22nd December]
NORTH COUPLE
For the simulation three different rooms have been considered: A) Single Room with kitchenette facing East B) Double Room without kitchenette facing South C) Couple Room with kitchenette facing North
E
W
S
S
SOUTH DOUBLE
Area of the room = 15 sq.m No. of occupants = 2 Total Glazing Areas = 2.9 sq.m
E
These rooms are selected because from the Solar Studies (Chap. 5) we found that the exterior surfaces of these rooms were under thermal stress. These rooms have double glazed window with a U- Value of 1.4 W/m2k (Fig. 6.3.1). The walls are 450mm thick with a U-Value of 0.197 W/m2k (Fig. 6.3.1). All the rooms have an infiltration rate of 0.1ach. For this weekly thermal simulation of the student units, schedules have been defined below:
C] COUPLE ROOM NORTH WITH KITCHEN
A] SINGLE ROOM EAST 3.4 kWh
1.4 W/m2-K 0.197 W/m2-K
1.0 kWh
In the student occupation schedule, the students are in the college/universities between 10am to 8pm during the weekdays and return back home. During weekends, the behaviour of the students are similar but instead of going to college they are usually visiting some places or studying in the common rooms (Appendix H Schedules of Thermal).
0.12 kWh
0.1 ach infiltration
Student spend most of daytime in university, schedule generated according to occupants interview.
4.5 kWh 2.0 kWh
Daily heat gains
Schedules
1.4 W/m2-K 0.197 W/m2-K
0.09 kWh
Daily heat gains 0.1 ach infiltration
Appliances schedule defined by occupants interview and room review. Windows starting opening (36% of the area is openable) at temperature of 21°C and closing at 19°C. During Winter windows are kept open during the cooking hours 9am to 10am and 9pm to 11pm which allows natural ventilation and removes odour and generates 6ach and during the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach.
62
Area of the room = 9 sq.m No. of occupants = 1 Total Glazing Areas = 2 sq.m Fig 6.3.1. Room Typologies and Key plan. AA - SED | Msc + MArch 2016 - 2017
Area of the room = 12 sq.m No. of occupants = 2 Total Glazing Areas = 2.9 sq.m
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.3 Thermal Analysis of Room - Winter
5.5 m/s
3.3 m/s
2.7 m/s
2.5 m/s
1.3 m/s
2.7 m/s
4.1 m/s
30 C 29 C 28 C 27 C 26 C 25 C 24 C 23 C 22 C 21 C 20 C 19 C 18 C 17 C 16 C 15 C 14 C 13 C 12 C 11 C 10 C 9C 8C 7C 6C 5C 4C 3C 2C 1C 0C -1 C
09.05 C
00:00
18:00
12:00
Th 22/12/16
06:00
00:00
18:00
12:00
We 21/12/16
06:00
00:00
18:00
12:00
Tu 20/12/16
06:00
00:00
18:00
12:00
Mo 19/12/16
06:00
00:00
18:00
12:00
Su 18/12/16
06:00
00:00
18:00
06:00
12:00
Sa 17/12/16
00:00
18:00
12:00
06:00
20 ach 18 ach 16 ach 14 ach 12 ach 10 ach 8 ach 6 ach 4 ach 2 ach 0 ach
Fr 16/12/16
00:00
2.0 kWh 1.8 kWh 1.6 kWh 1.4 kWh 1.2 kWh 1.0 kWh 0.8 kWh 0.6 kWh 0.4 kWh 0.2 kWh 0.0 kWh
20.48 C 19.77 C 19.18 C
Outside Temperature
Operative Temp Couple Room North
Transmitted Solar Radiation Couple Room North
Operative Temperature Single Room East
Transmitted Solar Radiation Single Room East
Ventilation Air Rate Change
Operative Temperature Double Room South
Transmitted Solar Radiation Double Room South
Student Occupancy Period
Fig 6.3.2. Thermal Simulation for Room Units during Winter Week. AA - SED | Msc + MArch 2016 - 2017
The graph (Fig. 6.3.2) illustrates the efficiency of the different rooms during a winter week where the outside temperature ranges between 1°C to 14°C. The average outside temperature is 9.05°C and the average temperature of A) B) C)
Single Room with kitchenette facing East – 19.77°C Double Room without kitchenette facing South – 19.18°C Couple Room with kitchenette facing north – 20.48°C
During the winter season, the solar gains are comparatively low. So in order to achieve a comfortable temperature the rooms need to be well insulated to prevent heat loss. In case of double room without kitchenette facing south, internal heat gains are less as compared to others but because of well insulated walls and south orientation, the room is in comfort band during the week. In case of single room with kitchenette facing east, internal heat gains are higher than the double room. Because of moderate internal gains and well insulated walls, the room is in comfort band during the week. In case of couple room with kitchenette facing north, internal heat gains are higher than all the rooms. Thus it achieves a temperature in comfort band which doesn’t overheat. From the graph we can observe that all the rooms neither overheats nor it drops lower than the comfort band at any point during the week. The rooms are most of the time in comfort band during the week without any additional heating or cooling supply thus making it free running.
63
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.4 Annual Thermal Analysis of Common Space
N
West Block
N
ANNUAL THERMAL ANALYSIS FOR COMMUNAL SPACES W
E
East Block
COMMON SPACE
From the previous project of UCL Prankerd House (Student Accommodation), occupant’s interview and the basic knowledge we found that the common space used to overheat. It was because of high occupancy density and very little natural ventilation.
S
For the simulation common space in the west block has been considered
E
W
South Block
W
N
This common space is selected because from the Solar Studies (Chap. 5) we found that the exterior surfaces of the common space was under thermal stress.
S
S
The room has double glazed window with a U- Value of 1.4 W/m2k (Fig. 6.4.1). The walls are 450mm thick with a U-Value of 0.197 W/m2k (Fig. 6.4.1). It has an infiltration rate of 0.1ach.
E
For this annual thermal simulation of the student units, schedules have been defined below:
A] COMMON SPACE
In the student occupation schedule, the common space usually gets crowded during the evening period after the college hours post 5pm. However, some students do occupy the space during the afternoon hours. During weekends, the common spaces are usually crowded from afternoon to night. (Appendix H Schedules of Thermal).
7.0 kWh
3.8 kWh 0.5 kWh/m2
For the appliances schedule (Fig. 6.4.2) (Appendix H Schedules of Thermal) students use laptops, speakers, chargers and video game consoles in the common space.
Daily heat gains
Schedules 0.1 ach infiltration
Appliances schedule defined by occupants interview and room review. 1.4 W/m2-K 0.197 W/m2-K
Windows starting opening (36% of the area is openable) at temperature of 21°C and closing at 19°C. During Summer windows are kept open during the day between 8am to 9pm which allows natural ventilation and generates 10ach. During the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach. During Winter windows are kept open during the evening hours 5pm to 9pm which allows natural ventilation and removes odour and generates 2ach and during the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach. 64
Area of the room = 40.8 sq.m No. of occupants = 10 Total Glazing Areas = 16.5 sq.m Fig 6.4.1. Common Space Features and Key plan. AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.4 Annual Thermal Analysis of Common Space
30 C 29 C 28 C 27 C 26 C 25 C 24 C 23 C 22 C 22.28 C 21 C 20 C 19 C 18 C 17 C 16 C 15 C 14 C 13 C 12 C 11 C 10 C 11.97 C 9C 8C 7C 6C 5C 4C 3C 2C 1C 0C -1 C
Sky Conditions Statistic for London Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Totl. 25
28
26
27
33
29
31
36
32 38
31
27
31
44
44
43
41
39
38
43
43
45 37
47
45
42
31
28
31
32
28
33
26
21
23 25
22
28
27
10 ach 8 ach 6 ach 4 ach 2 ach 0 ach
Outside Temperature Operative Temperature Common Space
Transmitted Solar Radiation Common Space
Ventilation Air Rate Change
Operative Temperature Study Room
Transmitted Solar Radiation Study Room
Student Easter Break
Fig 6.4.2. Annual Thermal Simulation of Common Space. AA - SED | Msc + MArch 2016 - 2017
December
November
October
September
August
July
June
May
April
March
February
January
2.0 kWh/m2 1.8 kWh/m2 1.6 kWh/m2 1.4 kWh/m2 1.2 kWh/m2 1.0 kWh/m2 0.8 kWh/m2 0.6 kWh/m2 0.4 kWh/m2 0.2 kWh/m2 0.0 kWh/m2
The graph (Fig. 6.4.2) illustrates the efficiency of the common room throughout the year. The average outside temperature is 11.97°C and the average temperature of the common room is 22.28°C. In case of common room, internal heat gains are high but has moderate solar gains. In case of summer when the outside temperature is higher than the comfort band, the common room tends to overheat a little. But with help of ventilation the temperature of the common room appears to be in comfort band most of the times. The temperature can be even more controlled if window shutters are applied. In case of winter, the internal temperature tends to be in comfort zone without any additional heating. No. of hours the outdoor temperature above comfort band annually = 79 Hours Out of those hours the temperature of the space above comfort band Common Room = 73 Hours During April when the students have gone for a vacation, the internal gains of the common room is almost zero. During that period, the internal temperature of the common room slightly drops down because of the drop in the external temperature. From the graph we can observe that the common room is most of the time in comfort band throughout the year without any additional heating or cooling supply thus making it free running.
65
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.5 Thermal Analysis of Room during Vacation - Winter
N
THERMAL ANALYSIS OF ROOM UNITS - WINTER INCASE OF SHORT VACATION. In this simulation, we have considered a case when students go away for a weekend and find out what would happen to the internal room temperature and how it would change when the students come back and start operating it. This simulation is a thermal analysis of all the rooms during a winter period [ 16th December - 22nd December]. The students would be away from 16th December to 18th December. This simulation has been applied for a winter week and not for a summer week because the room units free running during winter (Fig. 6.3.2) which depends on the internal gains and external gains in order to heat the rooms, so it would be interesting in analysing the condition when the students are away thus reducing internal gains and what effects it would have on the rooms.
B] DOUBLE ROOM SOUTH WITHOUT KITCHEN
EAST SINGLE
1.4 W/m2-K 0.197 W/m2-K
West Block W
2.5 kWh 2.0 kWh
N
0.388 kWh
E
Daily heat gains East Block
S
0.1 ach infiltration
South Block
W
N
NORTH COUPLE S
For the simulation three different rooms have been considered: A) Single Room with kitchenette facing East B) Double Room without kitchenette facing South C) Couple Room with kitchenette facing North
E
W
S
SOUTH DOUBLE
Area of the room = 15 sq.m No. of occupants = 2 Total Glazing Areas = 2.9 sq.m
E
These rooms are selected because from the Solar Studies (Chap. 5) we found that the exterior surfaces of these rooms were under thermal stress.
A] SINGLE ROOM EAST
These rooms have double glazed window with a U- Value of 1.4 W/m2k (Fig. 6.5.1). The walls are 450mm thick with a U-Value of 0.197 W/m2k (Fig. 6.5.1). All the rooms have an infiltration rate of 0.1ach.
1.4 W/m2-K 0.197 W/m2-K
C] COUPLE ROOM NORTH WITH KITCHEN 3.4 kWh 1.0 kWh
For this weekly thermal simulation of the student units, schedules have been defined below: In the student occupation schedule, the students are in the college/universities between 10am to 8pm during the weekdays and return back home (Appendix H Schedules of Thermal).
0.12 kWh
0.1 ach infiltration
Student spend most of daytime in university, schedule generated according to occupants interview.
4.5 kWh 2.0 kWh
Daily heat gains
Schedules
1.4 W/m2-K 0.197 W/m2-K
0.09 kWh
Daily heat gains 0.1 ach infiltration
Appliances schedule defined by occupants interview and room review. Windows starting opening (36% of the area is openable) at temperature of 21°C and closing at 19°C. During Winter windows are kept open during the cooking hours 9am to 10am and 9pm to 11pm which allows natural ventilation and removes odour and generates 6ach and during the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach.
Area of the room = 9 sq.m No. of occupants = 1 Total Glazing Areas = 2 sq.m Fig 6.5.1. Room Typologies and Key plan.
66
AA - SED | Msc + MArch 2016 - 2017
Area of the room = 12 sq.m No. of occupants = 2 Total Glazing Areas = 2.9 sq.m
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.5 Thermal Analysis of Room during Vacation - Winter
5.5 m/s
3.3 m/s
2.7 m/s
2.5 m/s
1.3 m/s
2.7 m/s
4.1 m/s
30 C 29 C 28 C 27 C 26 C 25 C 24 C 23 C 22 C 21 C 20 C 19 C 18 C 17 C 16 C 15 C 14 C 13 C 12 C 11 C 10 C 9C 8C 7C 6C 5C 4C 3C 2C 1C 0C -1 C
09.05 C
00:00
18:00
12:00
Th 22/12/16
06:00
00:00
18:00
12:00
We 21/12/16
06:00
00:00
18:00
12:00
Tu 20/12/16
06:00
00:00
18:00
12:00
Mo 19/12/16
06:00
00:00
18:00
12:00
Su 18/12/16
06:00
00:00
18:00
06:00
12:00
Sa 17/12/16
00:00
18:00
12:00
06:00
20 ach 18 ach 16 ach 14 ach 12 ach 10 ach 8 ach 6 ach 4 ach 2 ach 0 ach
Fr 16/12/16
00:00
2.0 kWh 1.8 kWh 1.6 kWh 1.4 kWh 1.2 kWh 1.0 kWh 0.8 kWh 0.6 kWh 0.4 kWh 0.2 kWh 0.0 kWh
19.51 C 19.36 C 19.30 C
Outside Temperature
Operative Temp Couple Room North
Transmitted Solar Radiation Couple Room North
Operative Temperature Single Room East
Transmitted Solar Radiation Single Room East
Ventilation Air Rate Change
Operative Temperature Double Room South
Transmitted Solar Radiation Double Room South
Student Occupancy Period
The graph (Fig. 6.5.2) illustrates the efficiency of the different rooms during a winter week when the students are away during the weekend. The outside temperature ranges between 1°C to 14°C. The average outside temperature is 9.05°C and the average temperature of A) B) C)
Single Room with kitchenette facing East – 19.30°C Double Room without kitchenette facing South – 19.36°C Couple Room with kitchenette facing north – 19.51°C
During the winter season, the solar gains are comparatively low. So in order to achieve a comfortable temperature the rooms need to be well insulated to prevent heat loss. When the students are away, the internal heat gains are very minimum. From the graph we can understand that in spite of low internal gains, the rooms are still in comfort band because of good insulation which prevents heat loss. When the students are away the temperature of the rooms drop to 18.5°C. But as soon as the students are back, the internal temperature rises to 21°C. From the graph we can observe that all the rooms neither overheats nor it drops lower than the comfort band at any point during the week when the students were away. The rooms are most of the time in comfort band during the week without any additional heating or cooling supply thus making it free running.
Fig 6.5.2. Thermal Simulation of Room Units when students are away.
AA - SED | Msc + MArch 2016 - 2017
67
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.6 Future Annual Thermal Analysis of Room and Common Space
N
FUTURE ANNUAL THERMAL ANALYSIS FOR ROOMS AND COMMUNAL SPACES A future thermal analysis of the rooms and the common space has been tested. In this future scenario, the outside temperature has risen high by 2°C. This scenario has been tested in order to find out overheating issues in the future when the temperature rises. The common space and the couple room with kitchenette facing North has been considered for the simulation because of high internal gains these rooms have the tendency to heat up. These rooms have double glazed window with a U- Value of 1.4 W/m2k (Fig. 6.6.1). The walls are 450mm thick with a U-Value of 0.197 W/m2k (Fig. 6.6.1). All the rooms have an infiltration rate of 0.1ach. For this annual thermal simulation of the student units, schedules have been defined below: In the student occupation schedule, the students are in the college/universities between 10am to 8pm during the weekdays and return back home. During weekends, the behaviour of the students are similar but instead of going to college they are usually visiting some places or studying in the common rooms (Appendix H Schedules of Thermal). In the student occupation schedule, the common space usually gets crowded during the evening period after the college hours post 5pm. However, some students do occupy the space during the afternoon hours. During weekends, the common spaces are usually crowded from afternoon to night. (Appendix H Schedules of Thermal).
B] COUPLE ROOM NORTH WITH KITCHEN 1.4 W/m2-K 0.197 W/m2-K
West Block W
N
E
2.0 kWh 0.31 kWh/m2
East Block
COMMON SPACE
Daily heat gains
S
E
W
0.1 ach infiltration
South Block
W
N S
NORTH COUPLE S
Area of the room = 12 sq.m No. of occupants = 2 Total Glazing Areas = 2.9 sq.m
E Fig 6.6.1. Common Space Features, Room Typology and Key plan.
A] COMMON SPACE
Students go away for an Easter break during the month of April (Fig. 6.6.2) (Appendix H Schedules of Thermal). During Christmas Break, very few students go away which can provide a diverse schedule. Thus no vacation is provided in the occupation schedule.
Daily heat gains
Student spend most of daytime in university, schedule generated according to occupants interview.
0.1 ach infiltration
Appliances schedule defined by occupants interview and room review. 1.4 W/m2-K 0.197 W/m2-K
Windows starting opening (36% of the area is openable) at temperature of 21°C and closing at 19°C.
68
7.0 kWh
3.8 kWh 0.5 kWh/m2
Schedules
Room Unit :During Summer windows are kept open during the day between 8am to 9pm which allows natural ventilation and generates 7ach. During the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach. During Winter windows are kept open during the cooking hours 9am to 10am and 9pm to 11pm which allows natural ventilation and removes odour and generates 6ach and during the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach.
4.5 kWh
Common Space :During Summer windows are kept open during the day between 8am to 9pm which allows natural ventilation and generates 10ach. During the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach. During Winter windows are kept open during the evening hours 5pm to 9pm which allows natural ventilation and removes odour and generates 2ach and during the night windows are kept slightly open allowing fresh air to enter and generates 0.8ach.
AA - SED | Msc + MArch 2016 - 2017
Area of the room = 40.8 sq.m No. of occupants = 10 Total Glazing Areas = 16.5 sq.m
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 6 6.6 Future Annual Thermal Analysis of Room and Common Space
32 C 31 C 30 C 29 C Sky Conditions Statistic for London 28 C 27 C Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Totl. 26 C 25 C 24 C 23 C 23.08 C 25 28 26 27 33 29 31 36 32 38 31 27 31 22 C 21.47 C 21 C 20 C 19 C 44 44 43 41 39 38 43 43 45 37 47 45 42 18 C 17 C 16 C 15 C 31 28 31 32 28 33 26 21 23 25 22 28 27 14 C 13.80 C 13 C 12 C 11 C The graph (Fig. 6.6.2) illustrates the efficiency of the common space and the 10 C couple room facing north for the future scenario. The average outside 9C 8C temperature has risen from 11.97°C to 13.80°C and the average temperature 7C of 6C 5C A) Common Space – 23.08°C 4C B) Couple Room with kitchenette facing north – 21.47°C 3C 2C 1C In case of couple room with kitchenette facing north, internal heat gains are 0C -1 C higher than all the rooms but has very minimum solar gains. In case of summer 10 ach 8 ach 6 ach 4 ach 2 ach 0 ach
Outside Temperature
December
November
October
September
August
July
June
May
April
March
February
January
2.0 kWh/m2 1.8 kWh/m2 1.6 kWh/m2 1.4 kWh/m2 1.2 kWh/m2 1.0 kWh/m2 0.8 kWh/m2 0.6 kWh/m2 0.4 kWh/m2 0.2 kWh/m2 0.0 kWh/m2
Ventilation Air Rate Change Couple Room
Operative Temperature Common Space
Transmitted Solar Radiation Common Space
Ventilation Air Rate Change Common Space
Operative Temperature Couple Room North
Transmitted Solar Radiation Couple Room North
Student Easter Break
Fig 6.6.2. Future Annual Thermal Simulation of Common Space and Room Units AA - SED | Msc + MArch 2016 - 2017
when the outside temperature is higher than the comfort band, the room tends to overheat a little. Looking at the future scenario, we can propose to add window shutters to control the internal temperature when the temperature rises in the future. During the winter period the internal temperature of the room tends to be in comfort zone without any additional heating.
In case of common room, the internal heat gains are high and receives moderate solar gains. When the outside temperature is higher than the comfort zone, the internal temperature of the common space tends to overheat. Looking at the future scenario, we can propose to add window shutters to control the internal temperature when the temperature rises in the future. During the winter period the internal temperature of the room tends to be in comfort zone without any additional heating. No. of hours the outdoor temperature above comfort band annually = 134 Hours Out of those hours the temperature of the space above comfort band Couple Room = 109 Hours Common Room = 129 Hours During April when the students have gone for a vacation, the internal gains of the room and common space are almost zero except for the rooms where refrigerator have to be kept running throughout. During that period, the internal temperature of the north couple room drops down due to its north orientation receiving minimum solar gains. But if window shutters are applied during that period then the temperature of all rooms could be less affected. From the graph we can observe that in future when the outside temperature rises, the room and the common space tends to overheat when the outside temperature rises above comfort zone. So it would be important that the application of window shutter can be proposed in order control the internal temperature. During winter, the operative temperature of these rooms are most of the time in comfort zone hence reducing the use of any additional heating supply. 69
PECKHAM STUDENT LIVING Term 2 Project
70
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 7
CHAPTER 7 ENERGY STRATEGY
AA - SED | Msc + MArch 2016 - 2017
71
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 7 7.1 Total Energy Consumption
Summer 24hr Schedule 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
per day 3.4 Kwh x
7
=
Equipments
1047.2 Kwh
x
48 units
Mechanical Ventilation
per day 4.5 Kwh x
7
=
1386 Kwh
x
6 units
per day 2.5 Kwh x
7
=
770 Kwh
x
12 units
per day 4.1 Kwh x
7
=
1262.8 Kwh
x
7units
Mechanical Ventilation Lighting SINGLE ROOM [kitchen]
Winter 24hr Schedule 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
23.8 Kwh per week
Refrigerator Cooking Appliances
44 weeks x (8 weeks for vacation during major breaks)
=
50,265.6 Kwh/a
Annual Appliances Consumption Annual Lighting Consumption Annual Heating Consumption
Lighting 100kwh/m2
COUPLE ROOM [kitchen]
80kwh/m2
31.5 Kwh per week
Refrigerator Cooking Appliances Equipments
44 weeks x (8 weeks for vacation during major breaks)
=
8,316 Kwh/a
60kwh/m2 40kwh/m2
Mechanical Ventilation Lighting
20kwh/m2
DOUBLE ROOM
0kwh/m2 UCL Prankerd House 82kwh/m2
Chapter Living 72kwh/m2
Victoria Paul St East 67kwh/m2
Refrigerator Cooking Appliances Equipments
Peckham Student Living 51kwh/m2
Fig 7.1.1. Total Annual Energy Comparison Chart
TOTAL ENERGY CONSUMPTION
Mechanical Ventilation Lighting COMMONROOM
Refrigerator
From the thermal analysis (Chap. 6) we can have concluded that the common rooms and the room are free running and they do not require any additional heating requirements. Thus heating would be required if needed in other spaces like reception, offices and gym. The difference between energy consumption of different cases is show in (Fig. 7.1.1.) As the UCL Prankerd House is an old building with weak air tightness. The heating consumption is the highest there. As for Chapter Living, the room have poor daylighting condition which results in the artificial daylighting all day long.
72
Mechanical Ventilation Lighting OTHER ROOMS
44 weeks x (8 weeks for vacation during major breaks)
=
28.7 Kwh per week
Refrigerator Cooking Appliances Equipments Heating (if needed)
9,240 Kwh/a
44 weeks x (8 weeks for vacation during major breaks)
Cooking Appliances Equipments
From the (Fig. 7.1.2) we can observe that the Entire student accommodation consumes 142.36 Mwh annually / 51.02kwh per.m2 annually. The consumption is for a period of 44 weeks because the student accommodation usually has a contract of 50 weeks out of which 6 weeks are considered to be the period when the students are not occupying during major holiday seasons.
17.5 Kwh per week
=
8,839.6 Kwh/a
common laundry lifts reception kitchen + + + + 216.54 Kwh 283.53 Kwh 10.22 Kwh 37.17 Kwh 86.52 Kwh x x x x x 1 3 3 3 3 gym
1468.8 Kwh x 44 weeks (per week)
+ 2100 Kwh = heating
65,707.2 Kwh/a
TOTAL =
142.36 Mwh/a
(total area = 2790 sq.m) TOTAL per sq.m = Fig 7.1.2. Total Energy Consumption Chart.
AA - SED | Msc + MArch 2016 - 2017
51.02 kwh/a
CHAPTER 7 7.2. Renewable Strategy
PECKHAM STUDENT LIVING Term 2 Project
17230 kWh
2100 kWh 18240 kWh
16680 kWh
13850 kWh
17920 kWh
3750 kWh
14810 kWh
3.300 kWh
18240 kWh
Annual electricity generation of the surface
Type 1
Type 2
1990 mm
1640 mm
Photovoltaic panels zones Panels of type 1 Panels of type 2
990 mm 990 mm Total - 70 panels
Total - 265 panels
STRATEGY
PV panels showed in Fig.7.2.1 are consumed as the most common size. The green color represent for type 1 PV panel which is 70 in total, while type 2 is in blue color with 265 in total. The efficiency of the PV panel is assumed as 20%. The surface covered by PV panels is illustrated in Fig 7.2.1. The angle of the slope roof is defined according to the solar study. Additional wall surface is also equipped with PV panel to enhance the generation. (http://brightstarsolar.net/2014/02/common-sizes-of-solar-panels/). The calculation shows the Total Annualy Electricity Generated would be 107.88 mWh while the total annual electricity consumption 142.36 mWh, which mean 75.8% of the energy consumption can be covered. Commonly, it would cost 190 pounds to 290 pounds per square meter. Therefore the total cost in the proposal would be around 135,000 pounds. (http://www.theecoexperts.co.uk/how-much-do-solar-panelscost-uk)
Fig. 7.2.1. PV strategy.
AA - SED | Msc + MArch 2016 - 2017
73
CHAPTER 7 7.2. Renewable Strategy
PECKHAM STUDENT LIVING Term 2 Project
-8,190 kWh
-10,400 kWh
-11,890 kWh
October
November
December
+70 kWh July
+6,630 kWh
+790 kWh June
September
+170 kWh May
+1,080 kWh
+11,530 kWh April
August
-3,510 kWh
Energy generation
March
-11,690 kWh
Energy consumption (pick hours) 27,240 kWh
-9,020 kWh
ENERGY BALANCE
107,880 kWh 20,000kWh Energy consumption (off-pick hours) 7,240 kWh
Fig. 7.2.2. Annual energy balance.
15,000 kWh
10,000 kWh
Energy Balance
0 kWh
January
Detailed monthly results are illustrated in Fig.7.2.3 in order to compare the cost of buying energy from the grid and installing another PV panel. It need to be noted that the vacation period is also taken into consideration as summarized from the interview with occupants (Appendix D Students Interview). In conclusion, total annual cost of annual grid electricity is 5,060 GBP.
5,000 kWh
Fabruary
Fig. 7.2.2 demonstrate the relationship between energy consumption and generation. Both peak time and off peak time is taken into account to get a more precise result. Off-Peak period in London area is 7 hours per day from 11PM to 07AM. Prices for a 100% renewable energy from the grid in London is 16.2 and 8.9 pences for pick and off-pick hours respectively.(Appendix I Electricity Policy).
Energy generation Energy consumption Fig. 7.2.3 Monthly energy balance.
74
AA - SED | Msc + MArch 2016 - 2017
CHAPTER 7
PECKHAM STUDENT LIVING Term 2 Project
AA - SED | Msc + MArch 2016 - 2017
75
PECKHAM STUDENT LIVING Term 2 Project
76
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 8
CHAPTER 8 PUBLIC PROGRAM
AA - SED | Msc + MArch 2016 - 2017
77
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 8 8.1 Proposal of Public Program
Linkage to main road
Cafe Muntifunction space entrance
N
Fig. 8.1.1 Proposal of Steps and Café
PROPOSAL OF PUBLIC PROGRAM
Fig.8.1.1 shows the detail of the ground part of public program. The steps face the main road to attract people from outside to use the space. The whole grass slop performs as the continuation of the green walk and introduces the Peckham Library into our site. It activate the backside of the Peckham Library which solve the safety problem mentioned by the cleaner on site visit. The Café, as the extension of the library, offers people in the library a place to take a break for coffee. The plan of the café shows that the café is mainly separated as indoor and semi-outdoor parts. The underground part goes reasonable depth (Appendix B Site Study: Comments & Condition) to achieve goal of response to the Peckham library. Different scenarios are showed in Fig.8.1.2 to suggest how the multifunction space may be used. The inner circle is sliding foldable door. When it is fully opened. The whole space can be used as gallery or theater or lecture hall according to the need. According to the new concept of theater performance which appeal to involving audiance. When it is closed, it creates 2 different kind of space, the inner space is daylit by the light well while the outer circle is artificially lit for exhibition. The movable seats (Fig.8.1.2) are offered to cater the need of more flexible usage.
78
Muntifunction space
Gallery
Theater
Theater & Gallery
Movable Seats
Daylit area
Fig. 8.1.2 Proposal of Multifunction Space
AA - SED | Msc + MArch 2016 - 2017
Artificial-lit area
Auxiliary area
N
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 8 8.2 Daylight Factor of Public Program
>1%
2%
5%
10%
15%
>20%
DF
Caffe Multifunction space
N
Windows Area
sqm
95.5
526
39.8
61.1
Window to Floor Ratio
41.7%
11.6%
Offset From the Floor
0.75
0.75
Daylight Factor Average
3.3%
4.1%
Daylight Factor >2%
81.5%
91.2%
Window Area
sqm
Fig. 8.2.1 Simulation of Daylight Factor for public program
AA - SED | Msc + MArch 2016 - 2017
DAYLIGHT FACTOR OF PUBLIC PROGRAM
As can be seen from the simulation of daylight factor (Fig.8.2.1) for public program, the result is quite good. The average daylight factor in cafe is 3.3% and the daylight factor of 81.5% area is more than 2%. In the underground multifunction space, average daylight factor of the daylit part is 4.1% and the area with more than 2% daylight factor accounts for 91.2%. It is noticable that the light is spread softly.
79
PECKHAM STUDENT LIVING Term 2 Project
80
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 9
CHAPTER 9 OUTDOOR STUDY
AA - SED | Msc + MArch 2016 - 2017
81
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 9 9. 1 Site Plan
Wood Pavement
SITE PLAN
Concrete Pavement
The proposed site plan incorporated with student accomodation blocks and the multipurpose theatre with cafe as public program is developed as described in the degin brief and proposal. A pedestrian access route to the bicyle and jogging track is linked from the accomodation plaza by a timber finish walkway (Fig. 9.1.2) to merge with the existing context materials of grass and trees. The pedestrian access link starts/ends beside the exiting bus on the main street in the east. The cafe in front of the library is linked with existing hardscape found around the library at the peckham platform. The cafe and multifunction theatre space also has a direct access from the main street in the east. Amphitheatre like decking steps are developed on the green mound over the multipurpose theatre to attract people to enter the site from the main street. The green landscape is extended into the site thus merging the clear outline of the site with the surrey canal walk landscape integrating it into one common landscape as seen in 3D visualisations. Other materials used for outdoor walkways and courtyard are show in the figure 9.1.2
82
Stone Pavement
N 0m
5m 10m
15m 20m
Fig. 9.1.2. Pavement Material
Fig. 9.1.1. Proposed site plan with outdoor spaces
AA - SED | Msc + MArch 2016 - 2017
CHAPTER 9
PECKHAM STUDENT LIVING Term 2 Project
Fig. 9.2.1. View from the top floor of the Peckham Library.
AA - SED | Msc + MArch 2016 - 2017
83
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 9 9. 3 Wind Study
m/s 8 7
WIND STUDY
It was observed (Fig. 9.3.1.) that the wind flow around the buildings was diverted towards the surrounding landscapes as the proposed public programme merges with existing landscape to form a continuity. The accelerated winds from neighbourhood housing community in the south west and west are slowed down as it hits the south block of student accomodation. Thereby, protecting the courtyard from extreme wind conditions but not stopping the flow completely through the courtyard. During summer this flow of light breeze through the courtyard could be seen as a welcome change for outdoor activities when the surfaces are heated and the mean radiant temperatures can cause discomfort. Therefore the design and placement of the student accomodation blocks works in favour of the windflow. This allows good opportunity to use outdoor spaces such as the green mound above multipurpose theatre and the courtyard without causing any wind turbulance.
6 5 4 3 2 1 0
N
VELOCITY Fig. 9.3.1. Wind flow analysis in site with insertion of proposed buildings
84
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 9 9. 4 Shadow Study
12
DECEMBER
06
JUNE
N
SHADOW STUDY
As seen in Fig. 9.4.1 the shadows casted by the accommodation blocks and the library are very long and overshadow the outdoor spaces during December. But as not many people prefer to use the outdoor spaces during December in London, the occupants have a choice to use the Peckham square platform during sunshine hours or the surrey canal landscape also. While during the summer (Fig. 9.4.2) there are plenty of surfaces exposed to the sunlight and thus the occupants and even the outside pedestrians are encouraged to the use the courtyard and the green mound above the theatre where if they feel discomfort due to extreme solar radiation, they have the option to use the shadowed areas around the proposed building blocks and near library also. It can also be seen in the perceptive view that the placement of accommodation blocks the site have not overshadowed the neighboring houses thus the design considerations height of the blocks are working in favor of the built environment. Fig. 9.4.1. Shadow range projection on site during December.
Fig. 9.4.2. Shadow range projection on site during June.
AA - SED | Msc + MArch 2016 - 2017
85
EAGLE WHARF PECKHAM Term 2 Project
CHAPTER 9 9.4 UTCI
Typical cold week Jan 20 - Jan 26
Typical hot week June 29 - July 05
Mild season week May 14 - May20
-
Comfortale Area 1.8%
Comfortale Area 20.3%
Comfortale Area 72.5%
Comfortale Area 67.3%
Comfortale Area 74.6%
I UTCI
It is assumed that the outdoor space is mostly use during the mild period of the year. Thus a week of May was chosen to be simulated to see the UTCI as well as the typical hot and cold week. As it can be told from the Fig.9.4.1, after the proposal, the comfort area in typical hot week is dramatically increased. In the typical cold week and the mild week in May, there are not much big changes but the percentage of comfort area still increases a little bit. 86
Comfortale Area 8.3% Fig. 9.4.1 UTCI before and after
AA - SED | Msc + MArch 2016 - 2017
Condition
3 2 1 0 -1 -2 -3
PECKHAM STUDENT LIVING Term 2 Project
CHAPTER 10
CHAPTER 10 CONCLUSION
AA - SED | Msc + MArch 2016 - 2017
87
PECKHAM STUDENT LIVING Term 2 Project
CONCLUSION
This report presents a student accommodation design beside the Peckham Library with a specific research question about the overheating issue. It is concluded from the site analysis that a student accommodation could be an appropriate proposal for the site. Through the study of the comments from the neighbor and the user of Peckham Library, a public program which can activate the negative part to the back of library, simultaneously, make up the existing problem of the library and neighbor, is indispensable. In the aspect of the scale and material, the proposal totally respects the surrounding buildings to embed itself within its current and historic context. Student accommodation Student accommodation is mainly divided into two parts: living units and communal space, including the indoors and outdoors. Different room types were offered to cater the need of different students. Based on deeply studied case study in London and interview with students from different student accommodations combined with the conclusion from term 1 project, overheating issue is defined as the major problem in student accommodation. Due to the lack of specific guide for student accommodation, the average energy consumption and the schedule of students from case study were used for simulation steps. The difference of the internal heat gain between different room types, together with Mint calculation decided the main orientation of different rooms. The conventional room plan of student accommodation was improved to provide better living condition for students. As for indoor communal space, according to the different needs of daylighting, they were placed in different level and orientation. The psychological factor of students was also taken into consideration, as most students mentioned in the interview that itâ&#x20AC;&#x2122;s difficult to make friends in the huge block, which worsens the homesick. Hence, a group of blocks with small scale are proposed to enhance the sense of home and scale down the huge group of people in one block to make it easier to make friends. Additionally, it responded to the context.
From the thermal analysis, we can conclude that the most important spaces like the studios and the common spaces are free running throughout the year. Additional heating is required for the spaces like gym, reception and offices. For the future scenario we found that the common room and the north couple studio with high internal heat gains over heat during the summer period when the outdoor temperature rises above the comfort zone. For this situation in future it is highly recommended to use window shutters to prevent additional solar gains to enter. During the winter period in the future, these spaces are in the comfort band without the use of any additional heating devices. The courtyard was designed to be the main outdoor space for occupants to make friends. It enclosed to be protected from the undesirable wind and form a respectively private space. The courtyard was divided by the pedestrian connection to define the different function zones. Renewable energy like solar PV is equipped which was an important element to determine the roof angle. It is calculated that 75.8% of the energy consumption can be covered by the energy generated through PV panel. Public program Public program is consist of the cafĂŠ and underground multifunction space which combined with the grass slope to maximize the landscape and enhance the setting of the Stirling Prize winning Peckham Library. In addition, it works as the extension of the library where some function and space is missed. The daylighting of underground space is offered by light well. Sliding foldable door is set to divide the space with different daylight needs and cater the needs of flexibility. Outdoor study including shadow, wind and UTCI were done to confirm the comfort level, especially during the mild season which assumed to be the main period when people would like to have outdoor activities.
In order to avoid overheating, daylight factor was simulated to define the minimum window to floor ratio while keeping the criteria that the Daylight Factor of more than 80% of the daylit area can exceed 2%.
88
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
REFERENCE
Book Reinhart, C. (2014). Daylighting Handbook I. United States : Christoph Reinhart
Website https://platform.carbonculture.net/places/prankerd-house/1178/(Energy consumption of UCL Prankerd House)
Yannas, S. (1994). Solar Energy and Housing Design. Volume 1: Principles, Objectives, Guidelines. London: AA Publications.
http://www.southwark.gov.uk/ (Documents of site)
Chartered Institute of Building Service Engineers (CIBSE). (2007 January). Environmental Design- CIBSE guide A. Norwich, Norfolk, Great Britain: Page Bros. (Norwich) Ltd. Journal Tom, R., 2013. Stirling Prize revisited - is Peckham Library still a winner?. The Architectsâ&#x20AC;&#x2122; Journal [online]. [viewed 02 February 2016]. Available from: https://www.architectsjournal.co.uk/buildings/stirling-prize-revisited-is-peckha m-library-still-a-winner/8653504.article Ella, B., 2016. Anger as Carl Turner prepares to demolish Peckham Arch. The Architectsâ&#x20AC;&#x2122; Journal [online]. [viewed 02 February 2016]. Available from: https://www.architectsjournal.co.uk/anger-as-carl-turner-prepares-to-demolis h-peckham-arch/10009140.article
https://www.gov.uk/feed-in-tariffs/overview(Documents of electricity policy) https://digimap.edina.ac.uk/ (Site analysis) http://brightstarsolar.net/2014/02/common-sizes-of-solar-panels/ (PV Panel Calculation) http://www.theecoexperts.co.uk/how-much-do-solar-panels-cost-uk (Cost of PV Panel) Lecture Harries, A. Lecture Renewable Energy Technologies, 21 Feburary 2016. AA SED, London.
Documents Carl Turner Architects, Design, Access and Heritage Statement of Mountview Academy of Theatre Arts, 2016. Carl Turner Architects, Peckham High Street Design & Access Statement, 2016. Carl Turner Architects, Noise Impact Assessment, 2016 Carl Turner Architects, Existing Elevation, 2016 AB Heritage, 71-79 & 89-93 Peckham High Street, Southwark, London, Heritage Statement, 2016 AB Heritage, 71-79 & 89-93 Peckham High Street, Southwark, London, Historic Environment Desk Based Assessment, 2016 Friends Of Burgess Park, Neighbour Consultation Replies, 2016 Arndale Court Headingley Leeds, Underground Condition, 2015 Archaeology South East, Archaeology Of Site, 2016 Motion, Public Transport Near Site, 2016 AB Heritage, Conservation Area, 2016
AA - SED | Msc + MArch 2016 - 2017
89
PECKHAM STUDENT LIVING Term 2 Project
PERSONAL STATEMENT
Artem Oslamovskyi
Tingting Gao
Deep Gala
Naitik Patel
The Peckham Student Living has been a very interesting project that provide me an exciting experience both for the interesting context of the site, complexity of the proposal and the studying process itself. Our team worked as a single organism during the term and the process was pleasing for me. As it was a team studies we equally spread the project objectives among members. This process took naturally and I am happy with my task within the project.
For the primary study of the site, I mainly worked on the history of our site, comments from the neighbor and comments about Peckham Library which is an essential element we need to take into consideration. Through all the study, I was clear about the importance of our site for the neighbor as well as the existing problem. As we are required to take climate change into account, I got the weather data for Peckham history and future to conclude the potential issue. I also did the UTCI calculation for spot measurement and summarized our second site visit.
I would like to start by thanking all the tutors and lecturers for providing useful knowledge which helped us to develop a strong sense stratagem towards sustainability and towards this project. After reviewing the term 1 project UCL Prankerd House which provided us a great input for the current design project. Going in detail with the study helped us to understand various issues, policies which were involved while designing.
The term 2 learning outcome was concluded with integration of environmental design strategies learnt during the term 1 into architectural design proposal. By delving into more in-depth knowledge obtained during this term through various lectures and tutorials we were able to arrive at a design outcome. It was a very interesting experience for me as it involved intense team work and discussions. I would like to thank my team mates for being very helpful to me throughout the term.
In the beginning of the term, I worked on the site context analysis, preparing the 3D model, graphical schemes and giving the overview of the neighborhoods dignities and points of concern. For those proposes I used digimaps.ac.uk, google.maps and openstreetmap.org as a source of information and McNeel Rhino, Adobe Illustrator, Adobe Photoshop as presentational tools. After that, I optimized 3D model for the wind, solar and daylighting studies that performed further. During the mid-term I worked on the design brief, creating the presentational schemes and infographic. As a part of the team, I participated in discussion related to the project and solving the problems during the process. In digital simulations, I performed the solar study of the whole building, and daylight study of the living units, including the determination of the strategy and explanation of the results. For both simulations, I created optimized scripts that simplified the working process, also I performed the series of simulations using Galapagos component in Grasshopper plugin, which allowed us to define the optimal variables for the roof geometry. At the end of the term I worked on visualizations, performing the renders in V-ray for Rhino and postproduction in Photoshop. In the energy strategy part, I calculated the PVs energy generation values, studied the pricing policies of the electrical grid companies and performed the energy balance diagrams.
2 90
With all the information, we decided to do student accommodation which was the same building type we did case study for term 1. Without specific guide for student accommodation, I summarize the main character of famous modern student accommodation precedent in London, as well as the comments from the occupants to get a comprehensive view about student accommodation. Going in detail, I did interviews with many classmates who live in student accommodation to get the schedule and energy consumption. The calculation offered the number that would be used for simulation. Such a deep study of occupants dramatically enhanced my understanding of student accommodation and clearly defined overheating as the main issue of student accommodation which became our main research question in this project. In design process, I helped design the plan of different rooms and the organization of the whole proposal. I went in detail with the design of the public program to offer possibility for different functions. In terms of the technical work, I focused on the daylight factor simulation for communal space in accommodation part and the public program. Thanks to the practices, I am able to manipulate the simulation now. The project is a good preparation for the final dissertation. It helps me to practice how to use all the software to help with the design, which was the main confusion at the beginning. Our team worked well with each other with great team spirit. We learnt a lot from each other including how to deal with all the information, design strategy and updated concept of different things. We worked together to conquer the challenge step by step to successfully complete the project. What’s more, I learnt not only about professional knowledge, but also the different cultures and life experience. Especially through the interview with classmates, I realized how huge difference in lifestyle it can be in students come from different culture background.
I found the approach of the project brief quite interesting. It was also helpful that all the groups in the class had a same site and had to design something different depending on the various contexts. It not only created competition amongst all the groups but also provided different strategies which derived by every group based on similar site context. Having UCL Prankerd House measured as our previous term project, it did provide us with a lot of data and inferences based on issues found earlier. It provided us with a base case for number of calculations and strategies. The design approach was very interesting. The basic massing of the proposal was kept simple and was based on the performance of the living units. It was like an ‘Inside Out’ Strategy. And this strategy was the key factor to this project. All the design strategies were represented very clearly and graphically through various illustrations. For the last term project, I had no opportunity to work on thermal analysis. Thus, for this project I had a chance to simulate the thermal analysis. I wasn’t able to grasp it in the beginning but with the help of the tutors and my teammates, I was able to perform the simulations without much difficulties. I was also able to map out the urban conditions of our site representing various site parameters. Creating the Environmental Matrix was definitely helpful in order to focus on key issues. The orientation of the room based on the internal gains was used to define room typologies and a base for simulation. This term we had a chance to work with new member. It was really a beneficial as we produced more amount of work than last term. I would like to see this project guide me during the design dissertation phase. This project and this semester has improved my confidence regarding the academic work and my personal understanding regarding sustainability.
AA - SED | Msc + MArch 2016 - 2017
The technical studies I focused on during this was refining architectural design through trial and error of simulation based testing of daylight and solar studies. I was integrally involved with Artem Oslamvosky when he performed daylight and solar study simulations to directly adopt the design decisions formed by the studies. Planning and designing the accommodation blocks and units took up my major second half of the term, trying to learn thermal studies with deep gala along the way. I was particularly interested in designing the building architecturally keeping in mind the smallest changes in room area or window to floor ratio could radically alter the outcome of thermal and daylighting comfort. Furthermore I was involved in detail modelling of the building blocks which was used for simulations and presentations. This process allowed me to be involved with all the team members during all the design stages. For further technical studies I would like to study in detail about thermal comfort as in term 1 i was responsible to daylighting studies.
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX A
-
m/s 8 7 6
WIND STUDY
5 4
In the existing site conditions it can be observerd from the figure that the accelerated winds from the west through the neighbourhood spreads out to the open area around the library and the deatched house creating a lot of turbulence and possibility of dicomfort situations due to the drop in temperature resulting from the turbulent winds. Therefore while proposing buildings on site one must consider the wind factor and to protect the pedestrians and building occupants from sudden gusts of winds. Also orienting the buildings on north-south axis could create pressure differences on windows facing west and east thus providing opportunities for natural ventilation through cross ventilating in the buildings.
3 2 1 0
N
VELOCITY
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX A
12
DECEMBER
06
JUNE
N
SHADOW STUDY
The shadow range casted on exiting site shows that during winter the north and north east corner of the site is not overshadowed thus providing possiblities for placing outdoor activities or a building block the that corner. Also during the summer it is seen that the north-east corner becomes a shadowed surface providing opportunities for using outdoor activities such as sports and games that causes internal body heat gains thus using the corner as a place of relief from extreme solar radiation also. The site conditions are quite challenging and favourable at the same time to consider design options exploring different orientations.
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX A Wind Simulations
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX A
THERMAL STUDY
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX A
UTCI COMPUTATION
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX A
ROOF SLOPES STUDY DEFINITION
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX A
DAYLIGHT FACTOR GRASSHOPPER DEFINITION
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX B
Underground Condition
DO NOT SCALE: CONTRACTOR TO CHECK ALL DIMENSIONS AND REPORT ANY OMISSIONS OR ERRORS
!"# /0"'45/"
$%&"'()*+,& -%$."/0'()*+1 /0%,"/'4%,&4 ()*+,&2%/")'/%.-" 4*+)8"4 46
&"$*-5/5*, 35--'$%/")5%-
1%/02%#4 (%4'$5()%/5*, 5,0%-%/5*,'7'5,("4/5*,
1*/",/5%-'3+/+)" &";"-*1$",/
()*+,&2%/")'3-*2 -"%805,(
1"8!0%$ -5.)%)#
)"8"1/*)4 )6
3+/+)"'45/"'+4")4
):
()*+,&2%/")'5, 4"8*,&%)#'%9+53")
45/"'.*+,&%)#
)6
5,35--"& 8%,%-
46
):
REV ARNDALE COURT HEADINGLEY LEEDS LS6 2UJ
Client:
LONDON BOROUGH OF SOUTHWARK
Project: A092988
EAGLE WHARF
Drawing Title:
CONCEPTUAL SITE MODEL
A3
N.T.S Project No.
Drawn
Date
CM
27.08.15
Office
Type
A092988 LND N
TEL: +44 (0)113 278 7111 FAX: +44 (0)113 275 0623 e-mail: enviro@wyg.com
BY CHK APP
DESCRIPTION Scale @
Checked
Date
Drawing No.
04
Approved
DATE Date
Revision
C WYG Group Ltd.
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX B
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX B
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX B
NEIGHBOUR CONSULTATION REPLIES
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX C
UNIT EXAMPLES Chapter student accomodation
1
2
3
1
2 3
Bronze Twin Studio 16 sq.m
4
5
4
6 5 6
Gold Studio 24sq.m
7
8
9 8
7 9
Platinum Studio 25-29 sq.m
Source: https://www.chapter-living.com/properties/kings-cross/
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX C
UNIT EXAMPLES Riverlight residential Address London Vauxhall SW8 5DA Architects Rogers Stirk Harbour + Partners Total apartments 806 Room Type 1 Bedroom suite 1 Bedroom 2 Bedroom 3 Bedroom Penthouse Amenities
Concierge
Fitness suite
Swimming pool
Spa
Café
Residents Lounge
Gallery
Restaurant
Bar
Retail unit
Office space
Crèche
Cinema
Digital entertainment
Health care
Supermarket
Energy System Centralised energy system - Combination of a gas fired Combined Heat and Power Engines (CHP), Gas Fired Boilers and Ground Source Heat Pumps (GSHP)
Comments 1. Good river view 2. Energy efficient with low bill 3. All lights would automatically on with the least level you need 4. It’s convinient to have all the amenities just in the basement AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX C
1 Bedroom suite 40.80sqm Material Wall & Ceiling - Gypsum Flooring - Wood Parquet 1
Balcony - Engineered Wood Window - Double Glazed (Full height) 2
Bathroom Finishing - Tile 3
1
2
3
Source: http://www.riverlightnineelms.com/
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX D
STUDENT INTERVIEW
Occupant 01 (UCL Prankerd House Room East)
Occupant 02(UCL Prankerd House Room West)
Occupant's Nationality: Chinese
Occupant's Nationality: Chinese
Program: UCL MSc Civil Engineering
Program: UCL MSc Graphic and Media Design
Date & Location: 19/10/2016 7:00 pm, UCL Prankerd House, Kitchen
Date & Location: 23/10/2016 15:00 pm, through Wechat
Question
Answer
Question
Answer
For how long have been living here?
Just this year, I was living in Nottingham
For how long have been living here?
I just moved in this September. I think most of us are new students here.
Does your room get sunlight?
Yes, in the morning the sun shines straight into my window, this is for
Does your room get sunlight?
Yes, there is sunlight around the noon.
about one hour from 8:00 to 9:00 am.
Is the daylight good enough without the help of artificial light?
No, I always have to turn on the light, especially when it’s cloudy or rainy
How would you rate the daylighting in your room?
It’s ok, but I always need to keep the lights in the bathroom and the
which is always
entrance. There is always dark there.
Do you like the organization of your room?
Yes, I think nothing need to be changed.
Do you feel a little bit cold while staying in this dorm?
No, even without heat, the room is quite warm
How would you rate the air quality?
Ventilation and air quality in the room is good. But I think the bathroom
Is your room humid?
Humid? No, it's quite dry and I use humidifier.
Is there anything that annoys you about your room?
The extractor fan in the bathroom keeps on for at least 20 mints which is
Is there any humidity problems
No, there is dry, and I use humidifier every day for about 8 hours
really noisy. Also, it can’t remove the smell efficiently.
Are you satisfied with your heating system?
I’m satisfied with the heating system. I start to use it from 03/10
Do you like organization of room?
Yes, I can show you my room if you want
Is there anything that annoys you about your room?
The blanket. It’s difficult to clean it and you can’t remove it.
How would you rate the air quality?
It is ok, we have two windows rooms.
How long are you home during weekdays?
I go to school at 10 and usually go back at 18
The toilet has an AC but it takes a while for the smell to be removed
What about weekends? Do you usually stay in your room?
I usually hang out with my girlfriend in the afternoon. And I would go back
have some problems.
While sitting in room, can you hear the other people in other rooms?
No, I can't hear any noise from my neighbors
Is there any cracks in the walls, problems with the flooring?
The carpet was already dirty when I moved in, I tried to clean it but it's
What do you usually wear inside your room?
A shirt with a jacket I think, I find London really cold
really difficult.
Do you usually have guests?
No, not really
5-6 hours except sleeping hours. In the morning I stay home, then go to
Is the electrical lighting you get in your room enough?
Yes, I almost keep it on whenever I’m in the room.
class in afternoon.
How do you charge your mobile in your room?
I leave it to charge for the whole night
What about weekends?
Usually I go out one day and the other I stay in room
How often do you cook?
I cook almost twice a day, I like to cook for myself. I share the housework
Are you allowed to have guests to stay with you?
Yes, a guest can stay for three nights but you have to tell the staff about
How long are you home during weekdays?
late maybe 9 at night
with my girlfriend
it
Do you prefer to have your own kitchenette?
Yes, but it needs to be guaranteed that the smell can be removed
Is there any communal zones? Games room?
No, we just have the laundry room and each floor has its own kitchen
How often do you cook?
I cook everyday but we just boil the vegetables because we work out and
What devices do you use in the kitchen?
All the device I think, I love to cook
we cannot eat any food that is full of fats and oil
Are the systems here controlled manually or by sensor?
I don’t know, I think it’s manual.
I use the oven, the special Chinese cooking device and the microwave
What about the lighting of the staircase?
I have no idea, but it’s always on even during the daytime.
for heating the juice and also the kettle
How do you pay for this accommodation? is everything included
It's all included, all the utility bills. We pay in three installments covering
Of course! But we don’t pay a lot, it’s acceptable to use communal
in your payments?
228 GBP a week.
There is a courtyard behind your housing, do you go there?
No, I barely go there.
What devices do you use in the kitchen?
Do you prefer to have your own kitchenette?
kitchen. How do you charge your mobile in your room?
I charged and when it's full, I unplug the charger
Are the systems here controlled manually or by sensors?
Manually, but the corridors (pathways) and lit with sensors when we walk
What about the lighting of the staircase?
I don't know but there is always light there
Is the electrical lighting enough?
Yes, enough
Do you know how much is the bill?
No, it’s all included in the installments.
There is a courtyard behind your housing, do you use this place?
No, I only pass through it when I need to but I don't stay there because
efficiently.
it's so cold
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX D
STUDENT INTERVIEW
Occupant 03 (VICTORIA PAUL ST EAST)
Occupant 04 (CHAPTER student accommodation)
Occupant's Nationality: Indian
Occupant's Nationality: Indian
Program: AA SED
Program: AA SED
Date & Location: 03/02/2016 2:00 pm, AA SED Studio
Date & Location: 03/02/2016 4:00 pm, AA SED Studio
Question
Answer
Question
Answer
For how long have been living there?
Since September.
For how long have been living there?
Since September.
How would you rate the daylighting in your room?
It’s not good, I always need to keep light on, even in the morning.
How would you rate the daylighting in your room?
It’s quiet good, the only problem is the entrance part with kitchenette and
Is your room humid?
No, it's fine
Is there anything that annoys you about your room?
The daylighting needs to be improved. It’s always dark inside.
Is your room humid?
No, it's fine
Do you like organization of room?
Yes
Is there anything that annoys you about your room?
Just sometimes the room is overheated when I have 3 or 4 friends in the
Are you satisfied with the air quality?
Yes, the air quality is good.
How would you rate the ventilation in your room?
It is good, but sometimes when I’m cooking I need to open the window,
bathroom of the room
room, cooking and playing. Is there anything that annoys you about your accommodation?
There are only 2 elevators, which is not enough for so many people.
otherwise the smell can’t be removed efficiently by the exhaust.
Also, there are some problem of the corridor. It’s always stuffy and dark.
Is there any problems with the interior material?
No, I love the wooden effect sheet of the flooring.
Other occupants always put their rubbish there.
How long are you home during weekdays?
I leave at 11 in the morning and go back at 8 in the evening.
Do you like organization of room?
Not really, I want to change the position of my bed.
What about weekends?
It’s almost the same with weekday.
Are you satisfied with the air quality?
Yes, the air quality is good.
Are you allowed to have guests?
Yes, sometimes I invite my friends to have fun.
How would you rate the ventilation in your room?
It is good, but sometimes when I’m cooking I need to open the window,
Is there any communal zones?
Yes, they offer all kinds of communal space, including games room, gym
otherwise the smell can’t be removed efficiently by the exhaust.
room and so on, but I barely use them and it’s not daylit.
Is there any problems with the interior material?
No, I like the color of ceiling in my room (olive green).
There is a courtyard in your accommodation, do you use it frequently?
Yes, it’s a nice place for party. We have many activities there.
How long are you home during weekdays?
I leave at 10 in the morning and go back at 8 in the evening.
How often do you cook?
I cook dinner almost every day. I usually cook curry, so it will take about
What about weekends?
I’ll get up later and stay in the room in the morning. Sometimes I hang out in the afternoon.
half an hour for it. What devices do you use in the kitchen?
I usually use the oven, kettle and hob.
Are you allowed to have guests ?
Yes, my friends usually come 2-3 times a week.
What do you think of your kitchenette?
It’s important. I’m vegetarian, so it would be difficult for me to share
Is there any communal zones?
Yes, we have everything. I usually go to the gym and cinema room.
kitchen with others.
Is the communal space daylit?
No, most of them are at the corner, so it needs artificial lit.
How do you charge your mobile in your room?
I charge it when I’m sleep
How often do you cook?
I love cooking, I spend an hour cooking every day averagely.
Are the systems here controlled manually or by sensors?
I think it’s controlled by sensors.
What devices do you use in the kitchen?
I usually need to use all the appliance for cooking.
Is the electrical lighting enough?
Yes, enough
What do you think of your kitchenette?
It’s good, but it’s not daylit and the mechanical ventilation system is not
How often do you use heater?
I almost use it every day in winter.
Do you know how much is the bill?
No, it’s all included
How do you charge your mobile in your room?
I charge it when I’m sleep
Do you know other occupants in your accomodation?
Yes, but most of them are my friends from India. I knew them before I
Are the systems here controlled manually or by sensors?
I think it’s controlled by sensors.
came here.
Is the electrical lighting enough?
Yes, enough
How often do you use heater?
I barely use it. Even when I use it, it’s only for 20 mints.
Do you know how much is the bill?
No, it’s all included
Do you know other occupants in your accomodation?
Not really, I usually play with my friend. It’s difficult to make friends here.
efficient enough to remove the smell quikly.
It’s such a big block with so many students.
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX D
STUDENT INTERVIEW
Occupant 05 (WOODLANE STUDIO) Occupant's Nationality: Egypt Program: AA SED Date & Location: 05/02/2016 1:00 pm, AA SED Studio Question
Answer
For how long have been living there?
Since September.
How would you rate the daylighting in your room?
It’s good. I have full height glazing.
Is your room humid?
No, it's fine
Is there anything that annoys you about your room?
I think there are some mechanical ventilation system which is on all day long. It makes some noise.
Is there anything that annoys you about your accommodation?
No, not really
Do you like organization of room?
Yes
Are you satisfied with the air quality?
Yes, the air quality is good.
How would you rate the ventilation in your room?
It’s fine with the 24h mechanical ventilation system, but I prefer to naturally ventilate every space.
Is there any problems with the interior material?
No, I love the interior design of my room.
How long are you home during weekdays?
I leave at 10 in the morning and go back at 7 in the evening.
What about weekends?
I’ll get up early in the morning and go out for a couple of hours. After I come back, I’ll cook and leave room to study in the communal space.
Are you allowed to have guests to stay with you?
Yes, but I barely invite my friends. We usually hang out.
Is there any communal zones?
Yes, I’m satisfied with these communal spaces. I use the study room during the weekend to work.
Is the communal space daylit?
The daylight in study room is ok, but I don’t know about other communal space.
How often do you cook?
I cook once a day for dinner, I eat oaks for breakfast.
What devices do you use in the kitchen?
I use microwave and kettle for breakfast and plus hobs for dinner
What do you think of your kitchenette?
It’s good, I love it.
How do you charge your mobile in your room?
I charge it when I ran out of the battery, not necessarily in the evening
Are the systems here controlled manually or by sensors?
I think it’s controlled by sensors.
Is the electrical lighting enough?
Yes, enough
How often do you use heater?
I barely use it. It’s quite warm for me in the room.
Do you know how much is the bill?
No, it’s all included
Do you know other occupants in your accomodation?
I know 2 other students here. I spend a lot of time in school, so actually I don’t make many friends here.
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX D
ROOM room area(sqm) room height(m)
window area (sqm)
WINDOW window height (m) operable area
window to floor ratio(%)
UCL PRANKERD HOUSE (single)
15.2
2.7
4
1.6
1.76
30.53435115
UCL PRANKERD HOUSE (couple)
15.2
2.7
4
1.6
1.76
30.53435115
VICTORIA PAUL ST EAST
18
2.8
3
2
4
18.86792453
CHAPTER
18
2.6
2.6
2.6
0.3
16.35220126
WOODLANE STUDIO
20
2.6
4.4
2.2
3.3
24.58100559
AVERAGE
17.28
2.68
3.6
2
2.224
24.17396673
AA - SED | Msc + MArch 2016 - 2017
APPLIANCE appliance Humidifier Desk lamp Laptop Mobile phone Hairdrier Ipad Lights*2 Heater Kettle Humidifier Desk lamp Laptop*2 Mobile phone*2 Lights*2 Heater e-toothbrush Exhaust Fan Microwave Kettle Toaster Hob*2 Mini refrigirator Desk lamp Laptop Mobile phone Lights*2 Heater Exhaust Fan Microwave Kettle Mini refrigirator Hob*2 Mobile phone Laptop*2 Monitor Lights*3 Heater Extractor Microwave Kettle Oven Mini refrigirator Hob*2 Mobile phone Laptop Hairdrier Lights*4 spotlight Heater Exhaust Fan Microwave Kettle Mini refrigirator Hob*2 Desk lamp Laptop Mobile phone Lights*2.6 Heater
wall
floor
ceiling
gypsun (white)
Carpet(blue)
Perforated Plasterboard
gypsun (white)
Carpet(blue)
gypsun (white)
MATERIAL window frame
window
wardrobe
aluminum
double glazing
Wood(yellow)
Perforated Plasterboard
aluminum
double glazing
Wood(yellow)
wooden sheet
gypsum (white)
aluminum
double glazing
wood(white)
gypsun (white)
Wood Parquet
gypsum (Olive Green)
aluminum
double glazing
Sunmica laminate (white)
gypsun (white)
Amtico Vinyl (wood effect)
gypsum (white)
aluminum
double glazing
wood(white)
gypsun (white)
wood
gypsum (white)
aluminum
double glazing
wood(white)
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX E
APPLIANCES CONSUMPTION
UCL PRANKERD HOUSE Kitchen Appliances Calculations Area of kitchen = 22.8 m2 ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Appliance Fan Microwave Rice cooker1 Rice cooker2 Kettle Toasters Blender Stewpot Oven Freezer1 Freezer2 Hob(electric), small Hob(electric), big Lighting Fixtures (LED) Heater (1500*600 mm)
Quantity (No.) 1 3 2 1 2 2 1 1 2 1 2 4 4 2 1
Power (watt) 9 1200 350 500 350 900 500 120 1700 25 25 1000 1600 36 1200
Total
9515
Appliances Total Power
8279
w.hr exclding lighting
28999.6
Usage per day (hr) 1 0.083 1 0 0.25 0.016 0.016 4 1.5 24 24 1.5 1.5 6 4
w.hr 9 298.8 700 0 175 28.8 8 480 5100 600 1200 6000 9600 432 4800
hr/24 0.041666667 0.003458333 0.041666667 0 0.010416667 0.000666667 0.000666667 0.166666667 0.0625 1 1 0.0625 0.0625 0.25 0.166666667
29431.6
Power Density (watt/m2) 0.016447368 0.546052632 1.279239766 0 0.319809942 0.052631579 0.014619883 0.877192982 9.320175439 1.096491228 2.192982456 10.96491228 17.54385965 0.789473684 8.771929825
Notes Assumed as each one is used for 5 mints a day
Assumed to be used 15 mints a day as an average Assumed to work for 1 min at least a day each Assumed to work for 1 min at least a day each
53.78581871
Room East Calculations Area of room = 15.2 m2 ID 1
Appliance Humidifier
Quantity (No.) 1
Power (watt) 100
Usage per day (hr) 6
w.hr 600
hr/24 0.25
Power Density (watt/m2) 1.644736842
2
Speaker
1
5
0.5
2.5
0.020833333
0.00685307
3
Laptop
1
165
8
1320
0.333333333
3.618421053
4
Desk lamp
1
5
0
0
0
0
5
Mobile phone
1
5
8
40
0.333333333
0.109649123
6
ipad
1
10
0.016
0.16
0.000666667
0.000438596
7
Hairdryer
1
2000
0.16
320
0.006666667
0.877192982
8
Lighting Fixtures (LED)
2
18
6
216
0.25
0.592105263
9
Heater (900*600 mm)
0
700
5
0
0.208333333
Total
2498.66
3008
Appliances Total Power
2290
w.hr exclding lighting
2282.66
Notes
Assumed to be used for 10 mints a day
0 6.84939693
Room West Calculations Area of room = 15.2 m2 ID 1
Appliance Humidifier
Quantity (No.) 1
Power (watt) 100
Usage per day (hr) 10
w.hr 1000
hr/24 0.416666667
Power Density (watt/m2) 2.74122807
2
Laptop
2
45
5
450
0.208333333
1.233552632
Notes
3
Desk lamp
1
30
9
270
0.375
0.740131579
4
Mobil phone
2
5
8
80
0.333333333
0.219298246
5
e-toothbrush
1
10
0.6
6
0.025
0.016447368
Assumed to be charged for 8 hours a week
6
Kettle
1
2200
0.16
352
0.006666667
0.964912281
Assumed to be used for 10 mints a day
7
Lighting Fixtures (LED)
2
18
10
360
0.416666667
0.986842105
8
Heater (900*600 mm)
0
700
10
0
0.416666667
Total
3108
Appliances Total Power
2390
w.hr exclding lighting
2158
2518
AA - SED | Msc + MArch 2016 - 2017
0 6.902412281
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX E
APPLIANCES CONSUMPTION
VOCTORIA PAUL ST EAST VICTORIA PAUL ST EAST Area of room = 18 m2 ID 1 2 3 4 5 6 7 8 9 10 11
Appliance Exhaust Fan Microwave Kettle Toasters
Quantity (No.) 1 1 1 1 1
Power (watt) 5 1200 3000 900 5
Usage per day (hr) 24 0 0.167 0 8
w.hr 120 0 501 0 40
hr/24 1 0 0.006958333 0 0.333333333
Power Density (watt/m2) 0.277777778 0 1.159722222 0 0.092592593
Desk lamp
1 1
25 20
24 2
600 40
1 0.083333333
1.388888889 0.092592593
Laptop Hob(induction), small Lighting Fixtures (LED) Heater (700*600 mm)
1
194
3
582
0.125
1.347222222
1 2 0
1500 5 1200
1 6 10
1500 60 0
0.041666667 0.25 0.416666667
3.472222222 0.138888889 0
Mobile phone mini refrigirator
Total
8054
Appliances Total Power
6849
w.hr exclding lighting
3383
3443
Notes Barely used Assumed to be used 10 mints a day as an average Barely used
7.969907407
CHAPTER CHAPTER Area of room = 18 m2 ID 1 2 3 4 5 6 7 8 9 10
Appliance Exhaust Fan Microwave Kettle
Quantity (No.) 1 1 1 1
Power (watt) 5 1200 3000 5
Usage per day (hr) 6 0.083 0.083 8
w.hr 30 99.6 249 40
hr/24 0.25 0.003458333 0.003458333 0.333333333
Power Density (watt/m2) 0.069444444 0.230555556 0.576388889 0.092592593
monitor
1 1
25 19
24 4
600 76
1 0.166666667
1.388888889 0.175925926
Laptop Hob(induction), small Lighting Fixtures (LED) Heater (700*600 mm)
2
165
4
1320
0.166666667
3.055555556
2 3 1
1500 18 1200
0.333 6 0
999 324 0
0.013875 0.25 0
2.3125 0.75 0
Mobile phone mini refrigirator
Total
3737.6
7137
Appliances Total Power
5919
w.hr exclding lighting
3413.6
Notes Assumed as each one is used for 5 mints a day Assumed to be used 5 mints a day
once for every 3 days Barely used
8.651851852
WOODLANE STUDIO WOODLANE STUDIO Area of room = 20 m2 ID 1 2 3 4 5 6
Appliance extracator Microwave Kettle Mobile phone mini refrigirator
Quantity (No.) 1 1 1 1
Power (watt) 20 1200 3000 5
Usage per day (hr) 0.167 0.1 0.083 8
w.hr 3.34 120 249 40
hr/24 0.006958333 0.004166667 0.003458333 0.333333333
Power Density (watt/m2) 0.006958333 0.25 0.51875 0.083333333
1 1
25 150
24 3
600 450
1 0.125
1.25 0.9375
Laptop
7
spotlight
1
5
3
15
0.125
0.03125
8
Hairdryer Oven Hob(electric), small2 Lighting Fixtures (LED2B2S) Heater (700*600 mm)
1
2000
0.04
80
0.001666667
0.166666667
1 1 2 1
1700 1500 18 1200
0.083 0.167 6 0
141.1 250.5 216 0
0.003458333 0.006958333 0.25 0
0.293958333 0.521875 0.45 0
9 10 11 12
Total
10823
Appliances Total Power
9605
w.hr exclding lighting
1948.94
2164.94
4.510291667
AA - SED | Msc + MArch 2016 - 2017
Notes be used for 10 mints a day be used twice each for 3 mints a day be used twice each for 2. 5 mints a day
be used for once every two days for 5min be used for 5 mints a day be used for 10 mints a day Barely used
PECKHAM STUDENT LIVING Term 2 Project
APPLIANCES SCHEDULE WEEKDAY
APPENDIX E
0
1
2
3
4
5
6
100
100
100
100
100
100
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
165
165
165
165
165
165
10
10
10
10
167 10
10
UCL ROOM EAST 15.2 Humidifier
2.5
Speaker
165
Laptop
165
Desk lamp
5
Mobile phone
5
5
5
5
5
5
5
ipad
167
Hairdryer Lighting Fixtures (LED) Heater (900*600 mm) Total w.h
10 700 175
700 105
105
105
105
0
1
2
3
100
100
100
100
105
700 105
700 5
700 5
169.5
0
0
0
165
0
0
0
0
175
175
175
175
342
175
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
100
100
100
100
100
100 90 30
90 30
90 30 10 6
90 30 10 6
36 700 156
36 700 172
36 700 172
Daily Consumption 2366.5
UCL ROOM WEST 15.2 Humidifier
30
30
30
90 30
36
36
36
183 36
Laptop
30
Desk lamp
10 6
Mobil phone e-toothbrush
10 6
10 6
10 6
10 6
10 6
10 6
10 6
Kettle Lighting Fixtures (LED) Heater (900*600 mm) Total w.h
6 183
6
116
700 116
700 116
700 289
36 700 172
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
25 20 165
25 20 165
700 116
700 116
116
116
116
0
1
2
3
5
5
5
5
66
0
0
66
0
0
0
0
66
339
36 700 156
Daily Consumption 2582
VICTORIA PAUL ST EAST Exhaust Fan Microwave
250
Kettle
250
Toasters
5 25
Mobile phone mini refrigirator
5 25
5 25
5 25
5 25
5 25
5 25
5 25
5 25
25
25
10
10
10
45 30
290 280
40 30
30 30
30 30
30 30
30 30
30 30
30 30
30 30
30 30
30 30
30 30
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
5
5
5
5
25 19
25 19
25 19 330
25 19 330
1000 54
54
54
54
25
25
25
25
25
25
25
25
25
25
25
Desk lamp Laptop Hob(induction), small Lighting Fixtures (LED)
1200 1200 1200 1200 1200 1200 1200 1200 35 35 35 35 35 35 35 35 30 30 30 30 30 30 30 30
Heater (700*600 mm) Total w.h kitchen w.h
0
1
5
5
2
3
4
5
6
7
1500 10
10 10 1200 1200 1790 225 225 1780 30 30
Daily Consumption 3195 2720
CHAPTER Exhaust Fan
100 250
Microwave Kettle
5 25
5 25
Laptop Hob(induction), small
330
330
Lighting Fixtures (LED)
54
54
419 30
419 30
30 25
30 25
30 25
30 25
30 25
30 25
375 375
25 25
25 25
25 25
25 25
25 25
25 25
25 25
25 25
25 25
25 25
25 25
1103 1030
103 30
433 30
433 30
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
25 150 5
25 150 5
25 150 5
25
141.67 250 36
36
36
36
641.01 605.01
216 25
216 25
216 25
Mobile phone mini refrigirator
5 25
5 25
5 25
5 25
5 25
5 25
25
25
25
25
25
25
25
25
25
25
25
25
monitor
Heater (700*600 mm) Total w.h kitchen w.h
Daily Consumption 3740 1980
WOODLANE STUDIO
3.34 60 125
extractor
60 125
Microwave Kettle
5 25
Mobile phone mini refrigirator
5 25
5 25
5 25
5 25
5 25
5 25
5 25
25
25
25
25
25
25
25
25
25
25
25
25
Laptop spotlight
83
Hairdryer Oven Hob(electric), small2 Lighting Fixtures (LED2B2S) Heater (700*600 mm) Total w.h kitchen w.h
30 25
30 25
30 25
30 25
30 25
30 25
AA - SED | Msc + MArch 2016 - 2017
30 25
30 25
108 25
210 210
25 25
25 25
25 25
25 25
25 25
25 25
25 25
25 25
25 25
25 25
Daily Consumption 2097.01 1365.01
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX E
0
1
2
3
4
5
6
7
8
100
100
100
100
100
100
9
10
11
12
13
2.5 165
2.5 165
14
15
16
17
18
19
20
APPLIANCES SCHEDULE WEEKEND
21
22
23
165 165
165
165
36
36
167 36
36
UCL ROOM EAST 15.2 Humidifier Speaker Laptop
165
165
Desk lamp
5
Mobile phone
5
5
5
5
5
5
5
5
5
ipad
167
Hairdryer Lighting Fixtures (LED) Heater (900*600 mm) Total w.h
36 700 201
36 700 201
105
105
105
0
1
2
3
100
100
100
105
700 105
700 105
700 5
5
5
5
334.5
167.5
0
0
0
0
0
0
201 201
368
201
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
100
100
100
100
100
100 30
30
90 30
90 30
90 30
90 30
183 36
36
36 700 156
36 700 156
Daily Consumption 2525
UCL ROOM WEST Humidifier Laptop Desk lamp
10 6
Mobil phone e-toothbrush
100 100
90 30 6
10 6
10 6
10 6
10 6
10 6
10 6
10 6
10 6
10 6
10 6
116
116
249
66
0
0
0
0
0
0
183 36 36 700 700 339 156
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
25 20 165
25 20 165
Kettle Lighting Fixtures (LED) Heater (900*600 mm) Total w.h
36 700 162
700 116
116
116
116
0
1
2
3
5
5
5
5
116
700 116
700 116
700 700 116 116
4
5
6
7
8
5
5
5
5
5
Daily Consumption 2560
VICTORIA PAUL ST EAST Exhaust Fan Microwave
250
Kettle
250
Toasters Mobile phone mini refrigirator
5 25
5 25
5 25
5 25
5 25
5 25
5 25
5 25
5 25
25
25
10
10
10
45 30
290 280
40 30
30 30
30 30
30 30
30 30
30 30
30 30
30 30
30 30
30 30
30 30
10 10 1200 1200 290 225 225 280 30 30
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
5
5
5
5
5
5
25 25 25 25 25 25 25 25 19 19 19 19 19 19 19 19 330 330 330 330 330 330 330 330 400 400 54 54 54 54 54 54
25 19 330
25 19 330
54
54
779 379 428 428 428 428 833 433 430 30 25 25 25 25 430 30
433 30
433 30
25
25
25
25
25
25
25
25
25
25
25
Desk lamp Laptop Hob(induction), small Lighting Fixtures (LED) Heater (700*600 mm) Total w.h Kitchen Total w.h
1200 1200 1200 1200 1200 1200 1200 1200 35 35 35 35 35 35 35 35 30 30 30 30 30 30 30 30 0
1
2
3
4
5
6
7
10
Daily Consumption 1695 1220
CHAPTER Exhaust Fan Microwave
250
Kettle Mobile phone mini refrigirator monitor Laptop Hob(induction), small Lighting Fixtures (LED)
25 19 330
25 19 330
54
54
428 25
428 25
5 25
5 25
5 25
5 25
5 25
5 25
5 25
5 25
5 25
25 19 330
25 19 330
25 19 330
Heater (700*600 mm) Total w.h Kitchen Total w.h
0
1
30 25
30 25 2
30 25 3
30 25 4
30 25 5
30 25 6
30 25 7
8
30 25 9
30 25
624 275 10
11
374 25 12
374 25 13
14
15
16
17
18
19
20
21
22
Daily Consumption 7500 1680
23
WOODLANE STUDIO
60 125
Kettle Mobile phone mini refrigirator
AVERAGE CONSUMPTION FOR SINGLE ROOM
3.34
extractor Microwave
5 25
5 25
5 25
5 25
5 25
5 25
5 25
25
125 25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
125 5 25
DAILY CONSUMPTION
Laptop
5
spotlight
83
Hairdryer Oven
250
Hob(electric), small2
36
Lighting Fixtures (LED2B2S) Heater (700*600 mm) Total w.h Kitchen Total w.h
30 25
30 25
30 25
30 25
30 25
30 25
30 25
150 150
25 108 25 25
403.34 403.34
25 25
25 25
25 25
85 85
25 25
25 25
25 25
25 25
25 25
25 25
25 25
25 25
196 150
KITCHEN CONSUMPTION
Weekday Weekend Average Weekday Weekend Average
Daily Consumption 1452.34 1288.34
AA - SED | Msc + MArch 2016 - 2017
UCL PRANKERD HOUSE (Single)
2366.5
2525
2411.8
UCL PRANKERD HOUSE (Couple)
2582
2560
2575.7
VICTORIA PAUL ST EAST
3195
1695
2766.4
2720
1220
2291.4
CHAPTER
3740
7500
4814.3
1980
1680
1894.3
WOODLANE STUDIO
2097.3
1452.7
1913.1
1365.0
1288.3
1343.1
AVERAGE SINGLE ROOM
3355.1
3642.2
3437.1
2021.7
1396.1
1842.9
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX F
VENTILATION ANALYSIS
OPTIVENT 2.0
OPTIVENT 2.0
A Natural Ventilation Steady-State Calculation Tool for the Early Design Stage of Buildings.
A Natural Ventilation Steady-State Calculation Tool for the Early Design Stage of Buildings.
Project Data:
Natural ventilation strategy:
Project Data:
Natural ventilation strategy:
Project Name: PECKHAM UNIT BASE CASE Version: Run 1 Date: 2017-02-10 Consultant: NAITIK
Single sided ventilation
Project Name: PECKHAM UNIT BASE CASE Version: Run 1 Date: 2017-02-10 Consultant: NAITIK
Single sided ventilation
Location Data:
Building Data:
Latitude (decimal degrees): 51.5 Month: July Hour: 13 Prevailing mean outdoor temperature (°C): 20.0 Meteorological Wind Speed (m/s): 4 Terrain data: 1 SW Inlet (surface) Azimuth:
Cell - Floor area (m²): Cell - Volume (m³): Outdoor temperature (°C): Indoor temperature (°C) To - Ti (°C):
Construction Data:
Cell - Heat Gains:
Glazing:
Number of people: occupant gains (W/m²): Equipment gains (W/m²): Lighting gains (W/m²): Total internal gains (W/m²): Total Solar Gains (W/m²) Cell 1: Total heat generated (kW) Cell 1:
Solar Transmittance Factor (0-1): Shading Proportion (%):
0.5 0
Wall Surface Absorptance (0-1): U-Value (W/m²·K): Ext. Surf. Transmittance (W/m²·K):
0.6 0.3 4.0
Roof Surface Absorptance (0-1): U-Value (W/m²·K): Ext. Surf. Transmittance (W/m²·K)
14 39.2 21 27 6
Apertures Data: 1 5.43 10 0 15.43 0.96 0.23
Inlet 1: Outlet 1:
Effective Area (m²)
Height Zn (m)
1.02 1.02
1.7 2
Airflow Rate (m³/s) B B+W 0.11 0.34 0.11 0.34
Location Data:
Building Data:
Latitude (decimal degrees): 51.5 Month: July Hour: 13 Prevailing mean outdoor temperature (°C): 20.0 Meteorological Wind Speed (m/s): 4 Terrain data: 1 Inlet (surface) Azimuth: SW
Cell - Floor area (m²): Cell - Volume (m³): Outdoor temperature (°C): Indoor temperature (°C) To - Ti (°C):
Construction Data:
Cell - Heat Gains:
Glazing:
Number of people: occupant gains (W/m²): Equipment gains (W/m²): Lighting gains (W/m²): Total internal gains (W/m²): Total Solar Gains (W/m²) Cell 1: Total heat generated (kW) Cell 1:
Solar Transmittance Factor (0-1): Shading Proportion (%):
0.5 0
Wall Surface Absorptance (0-1): U-Value (W/m²·K): Ext. Surf. Transmittance (W/m²·K):
0.6 0.3 4.0
Roof 0.6 0.2 4.0
Surface Absorptance (0-1): U-Value (W/m²·K): Ext. Surf. Transmittance (W/m²·K)
Buoyancy driven
Buoyancy driven
Buoyancy + Wind driven
Buoyancy + Wind driven
AA - SED | Msc + MArch 2016 - 2017
0.6 0.2 4.0
11 30.8 21 27 6
Apertures Data: 1 6.91 10 0 16.91 -3.11 0.15
Inlet 1: Outlet 1:
Effective Area (m²)
Height Zn (m)
1.32 1.32
1.7 2
Airflow Rate (m³/s) B B+W 0.15 0.44 0.15 0.44
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX G
MINT SHEET
MINT SHEET SOUTH ROOM
MINT SHEET NORTH ROOM
MINT SHEET EAST ROOM
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX H
THERMAL SCHEDULES
STUDENT OCCUPANCY FOR SINGLE ROOM
EQUIPMENT SCHEDULE FOR SINGLE ROOM WITH KITCHEN
STUDENT OCCUPANCY FOR DOUBLE ROOM
VENTILATION FOR SUMMER PERIOD
AA - SED | Msc + MArch 2016 - 2017
EQUIPMENT SCHEDULE FOR DOUBLE ROOM WITHOUT KITCHEN
VENTILATION FOR WINTER PERIOD
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX I
ELECTRICITY POLICY
AA - SED | Msc + MArch 2016 - 2017
PECKHAM STUDENT LIVING Term 2 Project
APPENDIX I
AA - SED | Msc + MArch 2016 - 2017