Welcome to DeepOcean’s 2013 Photobook – a collection of images that reflect the diversity of operations performed by our people around the world. Thank you to all employees who contributed to this album.
JAN
Sunbeam from the Volstad Surveyor.
The Gullfaks Field where DeepOcean performed IRM works for Statoil.
FEB
Sunset from Volstad Surveyor.
Aurora captured in Northern Norway.
MAR
DeepOcean announces a Long Term Charter of the Havila Phoenix vessel creating the Ultimate Trenching Spread.
DeepOcean Constructor ROVs join the fleet.
APR
First Wet Dip of new Constructor ROV.
Volstad Surveyor during a mobilisation.
T3200 returns to Teesside from Singapore ahead of a major upgrade.
MAY
A new Constructor ROV performing works on the H7 Platform removal decommissioning project in Norway.
Edda Flora in Bergen.
JUN
AMP500 is mobilised onboard the Maersk Assister for the Stella Project.
Maersk Responder mobilises for the Snorre PRM project.
DeepOcean performs Umbilical Trenching for BP's Andrew Area Development with PT-1.
DeepOcean provides Trenching Services using the AMP 500 Plough and later performs backfill ploughing in a second offshore campaign.
JUL
The Rem Ocean is launched. DeepOcean's new IRM vessel will join the fleet in 2014.
M
PCP2 Cable Loading Trials are performed at TOB for Western Link project.
M
Supporter ROV's being tested in Norway.
DeepOcean collects an umbilical for installation on the Snorre PRM project.
AUG
DeepOcean completes installation of 80 Cables on BARD Offshore Wind Farm.
DeepOcean's Employer Branding photo's highlight the strength and quality of the DeepOcean name.
Edda Fonn inspecting a Wind Turbine.
TOB From NW bridge during mobilisation 2 for Snorre Project.
SEP
Edda Fonn working at Aasgard C.
The Deep Endeavour arrives in Brazil.
The Northern Wave mobilises for the Snorre project.
North Sea Sunset during backfilling operations on the Stella Project 10� Gas Export Pipeline.
OCT
The Deep Endeavour working at the P-27 platform in Brazil.
Johan Rokstad, Managing Director of Østensjø Rederi AS and Mads Bårdsen, President of DeepOcean AS.
DeepOcean announces new SURF Vessel.
The back deck of the Volantis performing works in China.
DeepOcean receives Key Supplier Safety Award from BP - Karl Magnus Minge, DeepOcean Project Director and Trevor Garlick, Head of BP's North Sea Operations.
Edda Flora in Transit between operations.
NOV
Sunset on the River Tees with the Maersk Recorder, taken from the Northern Wave.
The Keel Laying Ceremony is held for the Deep Helder vessel.
PT-1 trencher being deployed from the Northern Wave taken from the Maersk Responder.
DEC
DeepOcean’s two new UHD ROVs arrive at Teesside.
Christmas Card 2013.