1 minute read

TMM-6Heavy Bridge-Building System

Heavy Bridge-Building System

Mission

Advertisement

The TMM-6 heavy bridge-building system is designed to lay multi-section bridge crossings across gaps up to 100m wide and 5m deep to provide mobility to wheeled and tracked vehicles weighing up to 60 tonnes. Features

TMM-6 includes two bridgelayers, four carriers and six bridge sections. The bridgelayer is derived from an enhanced-mobility 8x8 truck and mounts equipment and hydraulically-driven mechanisms to carry and lay bridge sections.

The bridgelayer provides its crew with protection against radioactive fallout for crossing contaminated terrain. Also, it is equipped with communications means.

The bridge organic to TMM-6 is environment-friendly since it is emplaced without damming river, moving ground and disturbing river bottom.

Basic specifications

Total crew (per vehicle) 12 (2) Bridge specifications: lifting capacity, t 60 length of 1/6 bridge section(s), m 17/102 track width, m 1.48 roadway width, m 4.0 102m bridge deployment time, min max 50 Throughput, veh/h 400 Speed, km/h: max road 70 vehicles across bridge 20 Fuel endurance, km 1,000

LAND FORCES WEAPONS

This article is from: