contents
TMM-6 ENGINEER VEHICLES
Heavy Bridge-Building System
Mission
The bridgelayer provides its crew with protection against radioactive fallout for crossing contaminated terrain. Also, it is equipped with communications means. The bridge organic to TMM-6 is environment-friendly since it is emplaced without damming river, moving ground and disturbing river bottom.
The TMM-6 heavy bridge-building system is designed to lay multi-section bridge crossings across gaps up to 100m wide and 5m deep to provide mobility to wheeled and tracked vehicles weighing up to 60 tonnes.
Features TMM-6 includes two bridgelayers, four carriers and six bridge sections. The bridgelayer is derived from an enhanced-mobility 8x8 truck and mounts equipment and hydraulically-driven mechanisms to carry and lay bridge sections.
62
R
O
S
O
B
O
R
O
Basic specifications Total crew (per vehicle) Bridge specifications: lifting capacity, t length of 1/6 bridge section(s), m track width, m roadway width, m 102m bridge deployment time, min Throughput, veh/h Speed, km/h: max road vehicles across bridge Fuel endurance, km
N
contents
E
X
P
O
R
T
12 (2) 60 17/102 1.48 4.0 max 50 400 70 20 1,000