- Work Experience
1.
Akacan Holding Office
Address: Kyrenia, Cyprus Company: Taner’s Sons Design Studio (Cyprus)
2016
A high end office interiors refurbishment and expansion porject.
2.
Siemens, Wind Turbine Factory (Hull & Paull) Address: Alexandra Dock, Hull, UK & Paull, UK Company: Pringle Brandon Perkins + Will
2013 - 2015
A wind turbine production facility, which produces the biggest wind turbines to date, blades 75m long and the nacelles the size of two double decker busses.
3.
Discovery Enterprises Headquarters (London)
2015
Address: To be decided Company: Pringle Brandon Perkins + Will
Site feasibility and building space planning study. The building is expected hold 1160 eployees upon completion.
4.
Unilever, Office Expansion - COMPETITION (London)
2014
Address: 100 Victoria Embankment, London, EC4Y 0DY Company: Pringle Brandon Perkins + Will
A competition regarding the expansion of the Unilever office premises to a new floor (second floor). Status:
5.
TradeWeb Office (London)
Address: 1 Fore Street Avenue, London, EC2Y 9DT Company: Pringle Brandon Perkins + Will
2014
An office interior design project. Stage D report preparation.
6.
Galliard Homes, New Capital Quay (London)
Address: New Capital Quay, Greenwich, London, SE10 9FR Company: BUJ Architects LLP
2011 & 2012
Masterplanning project, consisting of 12 blocks of 980 flats and commercial units.
7.
The Heath Hall (London)
Address: 59 The Bishops Avenue, London, N2 0 BG Company: BUJ Architects LLP
2010
Grade II listed mansion formerly owned by William Park Lyle of Tate & Lyle. It ihas 15 bedrooms, indoor and outdoor swimming pools, a panic room, a tennis court and a cinema.
Deniz Kayımbaşıoğlu
5
4
3
2
1
A
b
B
C
c
Çift Kapaklı Buzdolabı 91x74x190
D
d
E
F
a
e
a. Floor plan. b. 3D representation, looking towards the reception. c. 3D representation, looking at the CEO office. d. 3D representation, looking towards the CEO desk. e. 3D representation, looking towards the executive meeting room.
1. Akacan Holding Office The project was to create a high end interiors for the entry floor of an office which houses the reception, CEO quarters, a meeting room, two managerial offices and an employe office. The building is located in Kyrenia, Cyprus.
Deniz Kayımbaşıoğlu
- Work Experience
5
4
3
1
2
ÇELİK KOLON HİZASI TAVA
991
626
A
L4 160
L4
L4
L4
L4
L4
L4
L4
L4
L4
L4
L4
L4
L4
13200
L1
L1
13337
L1
13711
L1
L2
L1
2732
6917
1944
L1 L1
5157 3
1036
3082
L1
160 50
4768
686
2732
3
1036
50 160
4612
4612
4612
4612
2 461
4612
4612
4612
4612
L1 52
1286
3082
3082
4962
52 3
52
1286
3
8145
52
L1
7701
L4
7256
3
L1
L4
L1 52
6864
3
L1
1536
L4
160 50
3
52
L1
L4
1786
160 50
L4
L4
L1
160 50
L4
L4
1535
3082
6917
L2
L1
L4
L1
50 160
6917
2007
1785
50 160
13524
L1
2070
1985
160 50
L2
50
L4
L2A
L4
L4
50
50
160 50 50
160 50
50
50
160 50
L1 160 160
160
50
50
50
50 160
L4
160
160 160
160 50
L4
160 50
L4
1986
2249
52
L4
L4
L4
L4
L4
1406
L4
L4
L4
L4
L4
L4
L4
L4
L4
985
1196
L4
1617
1828
2038
L4 L4
984
2093
L4
B 145
L1
2991
1
L1
1
2752
2768
2703
L1
160 50
L1
1
3856
160
42
1
160 50
50
4000
L3
4144
L4
L4
L4
L4
L4
796
L4
L1A
160 50
3712
42
L3
L1A
50
42
L3
L1A
160
3568
2719
1
3424
2736
42
SAHTE KIRIS L4
L1
160 50
3135
3279
L1
1
160 50
0 180
1
1
42
370
138
42
42
L4
160 50 50
1179
42
6
L3 1593
L3
2670
972
766
42 1
2687
352 559
L1
C
L3
L3 L3
L3
L5
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
D L1A
L1A
L1A
L1A
Çift Kapaklı Buzdolabı 91x74x190
L1A
L3
L3
L3
L3
L3
E
L3
L3
L3
L3
L3
L3
L3
L3
F
a FEATURE LIGHTING SCHEDULE
IMAGE
FEO Office – Furniture Schedule REFERENCE
FITTING
FINISH
DIMENSION
LOCATION
MANUFACTURER
IN-FINITY BY FLOS L1
LINEAR SUSPENDED LIGHT
BLACK MATT
FOR LENGTH AND WIDTH REFER TO REFLECTED CEILING PLANS
GENERAL
OR LIGHTING SUPPLIER IN CYPRUS
NOTE
SUSPENSION HEIGHTS TO BE AGREED ON SITE.
REVISION
Room CEO Office
Floor Level 1
Manufacturer Fritz Hansen
CEO Office LP GRAND
CHAMPAIGNE
880MM DIAMETER
CEO ROOM LOUNGE
LOUIS POULSEN
L2A
LP GRAND
BLACK
1480MM DIAMETER
CEO ROOM POOL TABLE
LOUIS POULSEN
Product Code
QUANTITIES TO BE DETERMIND BY M+E.
1
Walter Knoll
SUSPENSION HEIGHTS TO BE AGREED ON SITE. L2
Product Name Fri
Joco Stone
LED LAMP. QUANTITIES, LIGHT SOURCE AND DIMMABLE FEATURES TO BE DETERMINED BY M+E.
CEO Office
1
Muuto
Connect
A
Material Finish Fabric: Sunniva 242 Legs: Powder coated aluminium
Dimension s(mm)
Amount 2
Image
Contact W: http://www.mozaikdesign.com/ Mozaik Design E: banu@mozaikdesign.com T: +90 212 327 05 95
Table Top: Onice Champagne (.117) Steel Legs: Powdercoated black gloss
d: 960 h: 275
2
W: http://www.elgrecogallery.com/
Fabric: Remix 123
l: 920 w: 1170
1
El Greco Gallery Ltd. A: 87-91, Limassol Avenue, Nicosia, Cyprus E: elgreco@spidernet.com.cy T: +357 22 314 332 W: http://www.muuto.com/
SUSPENSION HEIGHTS TO BE AGREED ON SITE. QUANTITIES TO BE CONFIRMED BY M+E
1
B
l: 920 w: 1170
1
1
C
l: 920 w: 1170
3
1
E
l: 920 w: 920
2
l: 1900 w: 465 h: 650
1
The Cross Contemporary Store A: Zena Kanther 17A, Nicosia, Cyprus E: thecross@cytanet.com.cy T: +357 22 45 65 10
MODULAR L3
RECESSED SPOTLIGHT NAME: SMART LOTIS 48
WHITE TRIM
48MM
GENERAL
OR
QUANTITIES TO BE CONFIRMED BY M+E
LIGHTING SUPPLIER IN CYPRUS
MODULAR L4
SURFACE MOUNTED DRUM LIGHT LOTIS TUBED
BLACK WITH GOLD INSIDE
130MM HEIGHT 85MM DIAMETER
CEO ROOM
OR
QUANTITIES TO BE CONFIRMED BY M+E
LIGHTING SUPPLIER IN CYPRUS
CEO Office
L5
b
WALL LAMP: FOLD SURFACE 4200 4201 4202 4204 4205 4207
OFF WHITE MATT LACQUER
INDIVIDUAL ONES: 220MM WIDE 180MM HIGH
a. Ceiling plan. b. Lighting schedule. c. An excerpt from the furniture schedule.
STAIRCASE
VIBIA
QUANTITIES TO BE CONFIRMED BY M+E
c
1
Walter Knoll
Florence Knoll Credenza 4 Position
Top: Arabescato Satin Finish: Ebonized Oak
W: http://www.elgrecogallery.com/ El Greco Gallery Ltd. A: 87-91, Limassol Avenue, Nicosia, Cyprus E: elgreco@spidernet.com.cy T: +357 22 314 332
1 of 1
1. Akacan Holding Office
- Work Experience
Deniz Kayımbaşıoğlu
Service & Click Assembly Blade factory
a
b
c
d
a. Aerial view. b. Blade Factory and offices aerial view. c. Click Assembly and Service factory 3d representation. d. 75m long blade, produced by the factory, put on display at the Queen Victoria Square, Hull.
2. Siemens Wind Turbine Factory The factory complex is located at the Alexandra Dock, Hull. The design of the factory evolved in line with the design developments of the largest wind turbines in the world that were to be produced in this facility. The complex consists of a blade factory, which is used for creating 75m long blades and a Click Assembly and Service factory, which is used for assembling and servicing wind turbine components.
Deniz Kayımbaşıoğlu
- Work Experience
a
b
c
a. Site plan. b. Blade factory and office ground floor plan. c. Click assembly and service factory and office.
2. Siemens Wind Turbine Factory
- Work Experience
Deniz Kayımbaşıoğlu
P:\London\321063-001 Project Triton\Drawings 2013\Marketing Finished Layouts\DETAILS_WIP\WALL_TYPES\PB_321063-BLD_1_10.dwg
605 200
55
120
230
DOUBLE SIDED TAPE SEAL
100
50
135
SEAL
(RF6)ALBATROSS 150mm LAP AND SEAL
12x6 EXPANDABLE FOAM SEAL SEAL
4
DEWA-S-05 Scale: 1:10 @ A1
TR26 FM APPROVED BOARD 100mm; SEAL JOINTS WITH POLYBAND TAPE
FACADE PANEL
(G1)GALV J CHANNEL BUTT JOINTS SEAL WITH POLYBAND TAPE
3A
DEWA-P-12 Scale: 1:10 @ A1
300
(RF6)ALBATROSS 150mm LAP AND SEAL
165 260
125
(BW3)150mm LAP AND SEAL
4
1190
202
+11.000
3
DEWA-S-06 Scale: 1:10 @ A1
3
605 200
50
140
215
1200
275 125
50
2B
360
1200
2
DEXD-P-02 Scale: 1:10 @ A1
285
10
+7.138
6200 BETWEEN PFC'S ( DIM 'A' )
165
6000 DOOR / CLEAR OPENING WIDTH ( DIM 'B' ) LOOSE INSULATION
100
10
7138
6340 Clear Door opening height ( Dim 'H' )
225
70
1158 Headroom ( Dim 'HR' )
7498 Total height ( Dim 'TH' ) = (1.05 x H) + 840
+7.498
2A
2
DEXD-S-02
6200 BETWEEN PFC'S ( DIM 'A' )
Scale: 1:10 @ A1
DEXD-P-02 Scale: 1:10 @ A1
165
6000 DOOR / CLEAR OPENING WIDTH ( DIM 'B' )
100
10
225
1 ±0.000
Scale: 1:10 @ A1
2A 6532
200
406
306 300
Scale: 1:10 @ A1
1A
6532
6000
2. Siemens Wind Turbine Factory General Notes
1. 2.
DEXD-P-01
6000
Client
SIEMENS -
Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.
Project
EMEA (UK) Offshore Footprint #
© PRINGLE BRANDON PERKINS+WILL LTD
1
1A
DEXD-S-01
Blade and Service Factory Wall Types Detail Drawings above demonstrate details of the wall types used for the factory buildings with large shutters. Pre-cast concrete panels were used up to 4000mm of the building height while Eurobond sandwich pannels were placed to 4000mm and above. PB - 321063 - BLD-WALL-TP-02-3. 4.
Drawing Title
WALL TYPES - BLADE: EXTERIOR Details Scale
PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ
Revision
Date
1:10 @ A1 Company
Job Number
Status
RECORD DRAWINGS Drawing Number
Checked By
CR
Revision
Description
28/13/16
P:\London\321063-001 Project Triton\Drawings 2013\Marketing Finished Layouts\DETAILS_WIP\WALL_TYPES\PB_321063-BLD_1_10.dwg
Deniz Kayımbaşıoğlu
- Work Experience
P:\London\321063-001 Project Triton\Drawings 2013\Marketing Finished Layouts\DETAILS_WIP\WALL_TYPES\PB_321063-BOF_1_10.dwg
45
SEAL
205
200
50
(VF2)ALBATROSS
100
TR26 FM APPROVED BOARD 100mm SEAL JOINTS WITH POLYBAND TAPE
50
135
DOUBLE SIDED TAPE SEAL
PARAPET CAP SILVER SEAL
ADJUSTABLE VERTICAL SUPPORT SYSTEM FOR EUROBOND PANELS
1°
40 375
80
FOAM FILLER BED TOP & BOTTOM IN MASTIC (RF11)ALBATROSS TR26 FM APPROVED BOARD 100mm SEAL JOINTS WITH POLYBAND TAPE KEMPER LIQUID APPLIED ROOF
1170
Scale: 1:10 @ A1
INTERNAL PARAPET SHEET EUROCLAD 32/1000 REVERSE COL. ALBATROSS L = 1345mm GUN GRADE MASTIC SEAL
VCL
6
TYVEK VCL 100mm LAP AND SEAL WITH DOUBLE SIDED TAPE
DROF-S-17
290
7
12x6 EXPANDABLE FOAM SEAL
DROF-S-17 Scale: 1:10 @ A1
4B
DWIN-P-24
4A
DWIN-P-26
Scale: 1:10 @ A1
75
110
WALL LINING
OPERABLE WINDOW
5
DWIN-S-17 Scale: 1:10 @ A1
SPACER / SHIM
140
SEALANT & BACKER ROD BETWEEN WINDOW AND SILL
7
140
SUPPORT ANGLE AT MULLIONS
+8.600
75
60
30
203
SQUARE STEEL TUBE
Scale: 1:10 @ A1
Scale: 1:10 @ A1
1182
4
EPDM
DWIN-S-18
6
1200
FIRE STOP
5
310
480
480
145
DWIN-S-15 Scale: 1:10 @ A1
255
200
50
SILICONE SEALANT ON A FOAM ROD BACKING
165
1650
4
365
200
3
90
75
+5.920
FIXING BRACKET 50
605
605
50
15
75
20
25mm PIR BOARD
50
94
8600
+4.320
INTERNAL SPIGGOT SECTION
+3.520
200
SILVER RAL 9006
5
50 LINE OF MULLION CAP
110 TRANSOM LINE OF MULLION
581
3
200
1B
165O/ALL MULLION
DWIN-P-02 Scale: 1:10 @ A1
1200
365
2 2
DWIN-S-15 Scale: 1:10 @ A1
LINE OF MULLION
50
LINE OF MULLION CAP
+2,470
67
2187
365
EXPANDABLE FOAM, TYP
EXPANDABLE FOAM
INTERNAL SPIGGOT SECTION
50
CILL PRESSING
EPDM
50
SCHEDULED FINISH FLOOR
1
30
FOAM ROD, TYP
±0.000 30 480
500 CONCRETE FLOOR SLAB
PREFORMED REVEAL. FINISH TO MATCH ADJACENT JOINT. ON GRIDLINE
DEWA-S-01
1A
Scale: 1:10 @ A1
+3.520
500
589
1217
1195
1195
1224
590
1162
4B
±0.000
2. Siemens Wind Turbine Factory General Notes
1. 2.
Scale: 1:10 @ A1
±0.000 = +6.400 m AOD
50
4A
DWIN-P-03
590
1142
1142 50
50
1B
1142 50
±0.000
Client
SIEMENS -
Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.
590
1142 50
500
50
1A Project
EMEA (UK) Offshore Footprint -
© PRINGLE BRANDON PERKINS+WILL LTD
1
Blade Production Office Wall Types Detail Drawings above demonstrate details of the wall types used for the Blade factory, office building. This is a prefab building, using Eurobond Europanel PB - 321063 - BOF-WALL-TP-01-panels for the walls. 3. 4.
Drawing Title
WALL TYPES - BLADE: EXTERIOR Details Scale
PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ
Revision
Date
1:10 @ A1 Company
Job Number
Status
RECORD DRAWINGS Drawing Number
Checked By
CR
Revision
Description
28/38/16
P:\London\321063-001 Project Triton\Drawings 2013\Marketing Finished Layouts\DETAILS_WIP\WALL_TYPES\PB_321063-BOF_1_10.dwg
- Work Experience
Deniz Kayımbaşıoğlu
a CLICK ASSEMBLY, OFFICE BUILDING SANITARY SCHEDULE - REV 02 OWC-00 05
OWC-00 01 OWC-00 02 BC MALE WC AREA
BC MALE SHOWER AREA
DRAWING TAG
ITEM
OWC-00-01
BC Male WC Area
OWC-00-02
BC Male WC Area
BC Male Shower Area
Hand Dryer
OWC-00-04
BC Male WC Area
OWC-00-05
BC Male Changing Area
OWC-00-06
BC Female Changing Area
OWC-00-07
BC Female Changing Area
OWC-00-08 BC MALE CHANGING AREA OWC-00-09
BC Female WC & Shower Area
BC Female WC & Shower Area
GROUND FLOOR OWC-00-10
OWC-00-11
OWC-00-12
OWC-00 07
BC Female WC & Shower Area
OWC-00 10
OWC-00 19
Male Common WC Area
Male Common WC Area
OWC-00-13
Male Common WC Area
OWC-00-14
Male Common WC Area
OWC-00-15
Female Common WC Area
OWC-00-16
Female Common WC Area
OWC-00-17
BC FEMALE OWC-00 WC & SHOWER 08 AREA
OWC-00-18
Female Common WC Area
DDA WC
OWC-00 09
CLEANERS CUPBOARD
OWC-00 11
MALE COMMON WC AREA
QUANTITY
LS1S
Silver
4
Moda BTW
Vitreous China - White
4
WC Cubicles
Solid laminate access panel system
THIRSLINGTON
Oasis
TBC
4
Shower Tray
No shower tray. Floor to be tiled and gully/shower trap to be provided.
TBC
TBC
TBC
20
Shower Screen
Shower screen system integrating dividing screen and front door. Mixer shower kit. Waterless Urinal
OWC-00-19
Cleaners Cupboard
TBC
TBC
Frosted glass
20
TRITON
Nene Bar Mixer Shower
Satin Brushed
20 4
TWYFORD
Galerie Plan Waterless Urinal
Vitreous China - White
Urinal Access Panel Lockers
Solid laminate access panel system.
THIRSLINGTON
Sentry
TBC
4
BREEAM compliant changing lockers
TBC
TBC
TBC
224
Lockers
BREEAM compliant changing lockers
20
Hand Dryer
Silver Air Fury S1 high speed hand drier.
Satin deck mounted sensor tap to be used with premixed waster supply. Washbasin Viterous china under countertop vanity basin. Vanitory System Solid laminate vanitory system with Corian counter top. WC
Back to wall WC
TBC
TBC
TBC
LOVAIR
LS1S
Silver
2
LOVAIR
L991 CS
Satin Brushed
4
SPEC TAG
Concealed cistern & sensor flush
PAN-501
PAN-201
TWYFORD
Visit 460 Countertop
Vitreous China - White
4
PAN-101
Oasis
TBC
4
PAN-301
TWYFORD
Moda BTW
Vitreous China - White
2
Solid laminate access panel system
THIRSLINGTON
Oasis
TBC
2
Shower Tray
No shower tray. Floor to be tiled and gully/shower trap to be provided.
TBC
TBC
TBC
2
TBC
TBC
Frosted glass
2
Nene Bar Mixer Shower
Satin Brushed
2
Hand Dryer
Silver Air Fury S1 high speed hand drier.
LOVAIR
LS1S
Silver
2
Sensor Tap
Satin deck mounted sensor tap to be used with premixed waster supply.
LOVAIR
L991 CS
Satin Brushed
4
TWYFORD
Visit 460 Countertop
Vitreous China - White
4
PAN-101 PAN-301
Washbasin
Viterous china under countertop vanity basin. Vanitory System Solid laminate vanitory system with Corian counter top. Urinal Waterless Urinal Urinal Access Panel WC
Back to wall WC
WC Cubicles
Solid laminate access panel system
WC
Solid laminate access panel system.
Back to wall WC
WC Cubicles
Solid laminate access panel system
Sensor Tap
Satin deck mounted sensor tap to be used with premixed waster supply.
Washbasin
Viterous china under countertop vanity basin. Vanitory System Solid laminate vanitory system with Corian counter top. Hand Dryer
THIRSLINGTON
Oasis
TBC
4
TWYFORD
Galerie Plan Waterless Urinal
Vitreous China - White
3
Sentry
TBC
3
TWYFORD
Moda BTW
Vitreous China - White
3
THIRSLINGTON
Oasis
TBC
3
TWYFORD
Moda BTW
Vitreous China - White
2
THIRSLINGTON
Oasis
TBC
2
THIRSLINGTON
PAN-501
Corian Counter Top
PAN-201 Concealed cistern & sensor flush Concealed cistern & sensor flush PAN-101
L991 CS
Satin Brushed
2
Visit 460 Countertop
Vitreous China - White
2
PAN-101
THIRSLINGTON
Oasis
TBC
2
PAN-301
Corian Counter Top
Silver Air Fury S1 high speed hand drier. Full DDA Part M Compliant Toilet Pack
LOVAIR
LS1S
Silver
2
Tap
LOVAIR
L991 CS
Satin Brushed
1
Washbasin
Full DDA Part M Compliant Toilet Pack
TWYFORD
Doc M Rimless BTW Toilet Unit
Vitreous China - White
1
To incorporate all Part M required fittings.
WC
Full DDA Part M Compliant Toilet Pack
THIRSLINGTON
Visor Profile
TBC
1
To incorporate all Part M required fittings.
Hand Dryer
Full DDA Part M Compliant Toilet Pack
LOVAIR
LS1S
Silver
1
TWYFORD
SOLA bib tap lever SF2301
TBC
1
Sink
Cleaners sink
TWYFORD
FC1034
Vitreous China - White
1
Further info can be found in manufacturer's specs.
PAN-101
LOVAIR
Cleaners cupboard sink's tap
These will include: Benches, mirrors, door stops, coat hooks, wall mounted bins, undercounter bins, toilet brush and holders, toilet paper holders, soap dispensers, wall mounted/recessed towel dispensers, water saving aerators, urinal dividers, wall and door grab bars.
To incorporate all Part M required fittings.
TWYFORD
Tap
All the toilets to incorporate satin brush finished stainless steel ironmongery, fittings and accessories to fully equip toilet units as well as ensuring compliance with Building Regs Part M, BS 8300 and BREEAM requirements.
PAN-101
TRITON
Shower screen system integrating dividing screen and front door.
IMPORTANT NOTE: Concealed cistern & sensor flush
Mixer shower kit.
Shower Screen
Corian Counter Top
To incorporate all Part M required fittings.
PAN-301
To incorporate all Part M required fittings.
To incorporate legs, bearers and bucket grate.
3750
OWC-00 12
BC MALE WC AREA
BC MALE SHOWER AREA
3750
OWC-00 13
IRONMONGERY & FITTINGS
NOTES
PAN-101
THIRSLINGTON
WC Cubicles
Shower Kit
BC FEMALE CHANGING AREA
COLOUR & FINISH
LOVAIR
Sensor Tap
OWC-00 06
MODEL
TWYFORD
Urinal
Scale: 1:80 @ A1
MANUFACTURER
Silver Air Fury S1 high speed hand drier. Back to wall WC
WC
Shower Kit
OWC-00 04
DESCRIPTION
GROUND FLOOR
OWC-00-03
OWC-00 03
1
LOCATION
3750
1
BC MALE CHANGING AREA
3750 3750
OWC-00 14
3750 3750
OWC-00 18
3750
OWC-00 15
3750
DDA WC Turning Space 1500 x 1500
BC FEMALE CHANGING AREA
3750
BC FEMALE WC & SHOWER AREA
CLEANERS CUPBOARD
3750
DDA WC Turning Space 1500 x 1500
WC AREA
FEMALE COMMON WC AREA
b
2
9750
2
3750
7750
GROUND FLOOR
3750
OWC-00 17
3750
MALE COMMON WC AREA
OWC-00 FEMALE 16 COMMON
GROUND FLOOR
Scale: 1:80 @ A1
a. The previous blade production office design, room data sheets that explained purpose and contents of each room. b. Previous click assembly office design, sanitary schedule. General Notes
1. 2.
3. 4.
Client SIEMENS -
Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.
02
22-08-2014
01 20-06-2014 Revision Date
Graphic Improvement
CR
Graphic enhancements Description
CR
PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ
Project
EMEA (UK) Offshore Footprint EW Offshore - Alexandra Dock
Drawing Title
- Click Assembly, Office Building Sanitary Schedule Ground Floor
Scale
1:80 @ A1
Company
PB
-
Job Number
321063
Status
TENDER
-
Drawing Number
Checked By
CR
Revision
OF-SCHE-SY-01 02
22/57/14
p:\London\321063-001 project triton\drawings 2013\Finished Layouts\30-79_DETAILS\44_SANITARYWARE_TOILETS\PB-321063-OF-SCHE-SY-01.dwg
Deniz Kayımbaşıoğlu
- Work Experience
© PRINGLE BRANDON PERKINS+WILL LTD
2. Siemens Wind Turbine Factory
a
1
ELEVATION A-A
1
ELEVATION A-A
Scale: 1:30 @ A1
Scale: 1:30 @ A1
2
ELEVATION B-B
2
ELEVATION B-B
Scale: 1:30 @ A1
Scale: 1:30 @ A1
Elevation C-C
Elevation D-D
Elevation A-A Elevation C-C
Elevation D-D
Elevation A-A
Elevation B-B
3
ELEVATION C-C Scale: 1:30 @ A1
4
ELEVATION D-D Scale: 1:30 @ A1
Elevation B-B
Scale: 1:30 @ A1
4
ELEVATION D-D
Scale: 1:30 @ A1
Scale: 1:30 @ A1
2. Siemens Wind Turbine Factory General Notes
Client
SIEMENS -
- Click Assembly Office, Project Definition Office Toilets
OF-ENLG-00-03 Scale: 1:30 @ A1
SUSPENDED CEILING
Scale 02
22-08-2014
01
20-06-2014
Revision
Date
Minor amendments
CR
Graphic enhancements
CR
3. 4.
Status
Varies
Company
PB
Description
General Notes
Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.
EMEA (UK) Offshore Footprint EW Offshore - Alexandra Dock
Drawing Title
5 a. Previous blade production office, a page from the Stage D report prepaired. b. Previous click assembly office design, toilets, project definition drawing. 1. 2.
Project
TENDER
Job Number
Drawing Number
Checked By
CR
Revision
- 321063 - OF-PRJ-DEF-105 02
p:\London\321063-001 project triton\drawings 2013\Finished Layouts\80_PROJECT_DEFINITION_DRAWINGS\PB_321063-OF-PRJ-DEF-105.dwg
3. 4.
Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.
22/59/14
1. 2.
Client
SIEMENS -
Project
EMEA (UK) Offshore Footprint EW Offshore - Alexandra Dock
Drawing Title
- Click Assembly Office, Project Definition Office Toilets
Scale 02
22-08-2014
01
20-06-2014
Revision
Date
Minor amendments
CR
Graphic enhancements
CR
Description
Status
Varies
Company
PB
TENDER
Job Number
Drawing Number
Checked By
CR
Revision
- 321063 - OF-PRJ-DEF-105 02
22/59/14
p:\London\321063-001 project triton\drawings 2013\Finished Layouts\80_PROJECT_DEFINITION_DRAWINGS\PB_321063-OF-PRJ-DEF-105.dwg
- Work Experience
© PRINGLE BRANDON PERKINS+WILL LTD
ELEVATION C-C
OF-ENLG-00-03 SUSPENDED CEILING
Deniz Kayımbaşıoğlu
© PRINGLE BRANDON PERKINS+WILL LTD
b3
5
a
b
c
d
a. Site option 1. First Central, Park Royale, London. b. Site option 2. Ruskin Square, London c. Site option 3. Green Park, London d. Site option 4. Old Vinyl Factory, Hayes, London
3. Discovery Enterprises, London Headquarters Discovery Enterprises project to be situated in London was at its starting phase. For this project, PBP+W were asked to look into finding potential sites for the new Discovery Enterprises headquarters in London. Above were four sites that were identified to have potential and were studied to decide which would be the most suitable for the client’s requirements.
Deniz Kayımbaşıoğlu
- Work Experience
a
b
c
SOLID RECTANGULAR FLOORPLATE
RECTANGULAR FLOORPLATE WITH ATRIA
LINEAR FLOORPLATE
PARALLEL FLOORPLATE
U-SHAPED FLOORPLATE
d
a. Colour key. b. Adjacencies study. c. Building mass study. d. Building layout study.
3. Discovery Enterprises, London Headquarters
- Work Experience
Deniz Kayımbaşıoğlu
a
b
c
d
e
a. Colour key. b. Ground floor plan. c. First floor plan. d. Second floor plan. e. Third floor plan.
3. Discovery Enterprises, London Headquarters The plans displayed above was an initial layout study to display to the client, how to spaces they desired could be positioned in a parallel floorplate.
Deniz Kayımbaşıoğlu
- Work Experience
a
b
c
d
a. Antenna field calculation and set up. b. Vertical floorplate positioning option at potential site. c. Vertical floorplate with antenna field, obstruction testing. d. Site options overall suitability review.
3. Discovery Enterprises, London Headquarters
- Work Experience
Deniz Kayımbaşıoğlu
100 Victoria Embankment
a
b
c
d
a. Aerial view. b. View of the building accross the Themes River. c. View of the atrium. d. View of the existing office floors through the atrium.
4. Unilever, Office Expansion Originally constructed in 1929, Unilever House in 100 Victoria Embankment houses the companies Unilever, Royal Mail and Britows. The competition was for Unilever’s future expansion to the 2nd floor of the building. The competition was won and was to be developed further by the PBP+W.
Deniz Kayımbaşıoğlu
- Work Experience
a
b
c
4. Unilever, Office Expansion Layout Option a.
Layout Option b. This option was based on the existing layout This option provides maximum possible and was aimed at presenting the minimum in- amount of meeting spaces both for internal use tervention option. but mainly for facing the clientelle and external contacts. • 134 desk space • 1 meeting room, 20 people around a table • 6 meeting rooms, 6 people around a table • 1 meeting rooms, 8 people around a table • 1 meeting room, 3 people around a table • 26 meeting room, 12 people around a table • 1 board room, 20 people around a table • Touchdown zone for 58 people • 1 meeting room, 12 people around a table • Staff lounge for 34 people
- Work Experience
Layout Option c. This option was created to show the option of combining the meeting spaces together with the working areas. • • • •
164 desk space Collaboration area for 32 people 4 meeting rooms, 12 people around a table 8 meeting rooms, 6 people around a table
Deniz Kayımbaşıoğlu
2
7500
3
7500
4
7500
5
7500
6
7500
7
7500
8
7500
08
04
CP-4 PT-1 08 05 SK-1 8P MEETING ROOM
WELLNESS CP-4 ROOM PT-1 SK-1
CP-1 PT-1 SK-1 08
08
06
15500
08
08
03
BOARD ROOM
07
8P MEETING ROOM
CP-4 PT-1 SK-1
13
08
CP-3 PT-1 SK-1
14
HR
CP-3 PT-1 SK-1
DRAWING CATEGORY FINS FINISHES DRAWINGS TO BE READ IN CONJUNCTION WITH INTERIORS SCHEDULE AND SPECIFICATIONS
CP-4 PT-1 SK-1
CP-2
NOTE: REFER TO INTERIOR SCHEDULE FOR CODES AND DETAILS OF FINISHES
CP-2 PT-1 SK-1
VF-1 PT-1 SK-3
CP-2
08
CP-4 PT-1 SK-1
08
6P MEETING ROOM 08
08
DEALER WEB
PRE-ACTION SPRINKLER CABINET
CP-4 PT-1 SK-1
D
F
10
DEALER WEB
PT-1 SK-1
CORRIDOR
CP-1
9
7500
F
08
08
SYMBOL DESCRIPTION FLOOR FINISHES
VF-2 PT-1 SK-1 PT-2
11
COMMS ROOM
08
CARPET TYPE 1: TILE
CP-1
CP-1 PT-1 SK-1
12
PANTRY
15500
1
CARPET TYPE 2: TILE
CP-2
09
6P MEETING ROOM
CARPET TYPE 3: TILE
CP-3
02
INTERVIEW CP-4 ROOM PT-1 SK-1
CARPET TYPE 4: TILE
CP-4
CARPET TYPE 5: TILE
CP-5 CP-6
CARPET TYPE 6: AREA RUG
CP-6
D
CP-5
ST-1 PT-1 SK-1 08
CP-2
DR/FT
ST-1
NATURAL STONE FLOORING TYPE
VF-1
VINYL FLOORING TYPE 1PRE-BONDED ANTI-STATIC VINYL TILE
CR
ER DR
08
01
15
CORPORATE
RECEPTION CR
DR ER
VINYL FLOORING TYPE 2-VINYL ROLL SHEET-REFER TO FINISHES SCHEDULE
VF-2 VF-1
WALL FINISHES
C
C
FB-1
ACOUSTIC WALL PANELING TYPE 1
FB-2
ACOUSTIC WALL PANELING TYPE 2
GL-1
BACK PAINTED GLASS, LOW IRON
SK-1
CP-1 PT-1 SK-1
08
25
08
PHONE BOOTH 08
16
PHONE BOOTH
24
CP-2 15500
15500
BUSINESS
08
23
OFFICE
CP-3 PT-1 SK-1
CP-3 PT-1 SK-1
08
22
OFFICE
08
CP-3 PT-1 SK-1
21
OFFICE
CP-3 PT-1 SK-1
08
CP-1 PT-1 SK-1
20
OFFICE
08
19
08
BUSINESS
CP-3 PT-1 SK-1
18
SALES PRODUCT
CP-3 PT-1 SK-1
08
RECESSED, PAINTED SKIRTING
SK-3
VINYL SKIRTING
SK-4
S/S SKIRTING
BL-1
BLACK OUT BLINDS MOTORIZED, COLOUR TO MATCH EXISTING BLINDS
M-1
PRIVACY MANIFESTATION TYPE 1
M-2
PRIVACY MANIFESTATION TYPE 2
M-3
PRIVACY MANIFESTATION TYPE 3
M-4
PRIVACY MANIFESTATION TYPE 4
M-5
FEATURE GRAPHIC MANIFESTATION
PB-1
PINABLE BOARD TYPE 1
LQ-1
LACQUER PANELING
PT-1
GENERAL PAINT
PT-2
FEATURE COLOUR PAINT
17
FINANCE LEGAL
A
EXTENT OF FINISHES
A START POINT
a
7500
7500
1
7500
2
7500
3
4
7500
7500
5
7500
6
NOTE: 1. ALL FLOOR TRANSITIONS TO HAVE 5mm SS STRIP BETWEEN, E.G. CARPET-TIMBER, CARPET-CERAMIC TILE
7500
7
8
2. KEEP FINISHES IF NOT INDICATED OTHERWISE
9
790
790
790
370
600
370 600
370 600
370
600
SNACKS DISPLAY TBC
790
3. FLOOR BOXES - REFER TO ELECTRICAL DRAWINGS
PANTRY
850
12
850
08
INTEGRATED FRIDGE
100
TION LER T
700
1
Plan
2
1:50 @ A1
CONTINUOUS LINEAR LED LIGHT FITTING
3
1:20 @ A1
STAINLESS STEEL WORKTOP FINISH, PROVIDE 3MM RADIUS TO EDGE
700
SECTION
4
1:20 @ A1
BACKPAINTED GLASS SPLASHBACK
SECTION 1:20 @ A1
5
SECTION 1:20 @ A1
LAMINATE FACED DOORS AND MELAMINE FINISH INNER CARCASS WITH ADJUSTABLE SHELVES
790
S/S LINED EDGE TO WASTE / RECYCLING UNIT CUT OUT
SECTION
PANTRY EQUIPMENT: 600
COFFEE MACHINE
- 2x LARGE FRIDGE
- 2x UNDERCOUNTER FRIDGE
30
- 1x INTEGRATED DISHWASHER
850
SNACKS DISPLAY UNIT TBC
30
- 2x INTEGRATED MICROWAVES - 1x ZIP TAP OR VIVREAU WATER DISPENSER - 1X COFFEE MACHINE
NOTE: REFER TO M&E CONSULTANT INFORMATION FOR POWER REQUIREMENTS TO ALL PANTRY EQUIPMENT. 600
b
WASTE / RECYCLING POINT
5
ELEVATION 1:20 @ A1
600 WASTE / RECYCLING POINT
600 WASTE / RECYCLING POINT
600 INTEGRATED FRIDGE
600 ZIP EQUIPMENT
1200 DDA SINK 1200MM
PROVIDE CLEAR OPENING WHEN DOORS OPEN FOR DDA ACCESS. ALLOW FOR ACCESS PANEL TO THE BACK OF UNIT TO CONCEAL SERVICES
600 DISHWASHER
600 DISHWASHER
600 STORAGE (DRAWERS)
BRUSHED S/S RECESSED SKIRTING
600 X 2 MICROWAVE + CUPBOARD
600
600
FRIDGE
FRIDGE
LAMINATE FACED DOORS AND MELAMINE FINISH INEER CARCASS WITH ADJUSTABLE SHELF
VENTILATION GRILLES, S/S FINISH
5. TradeWeb Office The project was an interiors project for the TradeWeb office, located in Moorgate, London. The drawings shared are part of the stage D report prepared as part of 2 man team. a. Finishes plan. b. Enlarged drawing of the pantry.. Finishes plan.
Deniz Kayımbaşıoğlu
- Work Experience
550
800
800
400
900
500
900
400
Front Elevation
2
1:20 @ A1
CONTINUOUS LED LIGHT FITTING TIMBER VENEER WORK SURFACE CONTINUOUS LED LIGHT FITTING
CABLE MANAGEMENT ACCESS
TIMBER VENEER WORK SURFACE
TIMBER VENEER UPSTAND
CABLE MANAGEMENT ACCESS RUBBER FINISH INLAY CONTINUOUS LINEAR LED LIGHT FITTING TIMBER 300VENEER UPSTAND
300
300 WALNUT FINISH
300
WALNUT FINISH 300
650
550
800
01
800
WALNUT FINISH - SIGNAGE S/S
STONE FINISH
400
08
RECEPTION
550
3160
300
WALNUT FINISH
800
800
3160
800
WALNUT FINISH
200
3160
300
300
RUBBER FINISH INLAY
1000 300 400
500
900
400
1:20 @ A1
300
Back Elevation
3
1:20 @ A1
400
DR ER
2
Front Elevation
900
1080
3160
400
900
500
900
2
Front Elevation
2
900
500
400
Front Elevation 1:20 @ A1
1:20 @ A1
CR
Location Plan 1:50 @ A1
WALNUT FINISH
PC HOLDER FIXED TO UNDERSIDE OF DESK
FIXED POSITION LOCKABLE PEDESTAL, TIMBER VENEER FINISH
650
WALNUT FINISH
747
400
300
500
30
3
1:20 @ A1
4
Enlarged Plan 300
3
Back Elevation
1000
PC HOLDER FIXED TO UNDERSIDE OF DESK 3160
900
400
1:20 @ A1
3
Back Elevation 1:20 @ A1
1:20 @ A1
PC HOLDER FIXED TO UNDERSIDE OF DESK
FIXED POSITION LOCKABLE PEDESTAL, TIMBER VENEER FINISH
CABLE TRAY UNDER WORKTOP, BEHIND ACCESSIBLE PANEL
300
Project
TRADE WEB
CONTINUOUS LED LIGHT FITTING
MOORGATE EXCHANGE LEVEL 08 Drawing Title
Scale Status Checked By PC HOLDER FIXED TO UNDERSIDE OF D 1:50 & 1:20 & A1 FOR TENDER AR FIXED POSITION LOCKABLE Company Job Number Drawing Number Revision CABLE TRAY UNDER WORKTOP, BEHIN PEDESTAL, TIMBER VENEER 300 ACCESSIBLE PANEL PBPW - 324301 - A-DJOI-08-01 T FINISH
PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ
TENDER ISSUE
30
Revision
Date
AR
PC HOLDER FIXED TO UNDERSIDE OF DESK T +44 (0)20 7466 1000
Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ
CABLE TRAY UNDER WORKTOP, BEHIND ACCESSIBLE PANEL
Description
300
FIXED POSITION LOCKABLE PEDESTAL VENEER FINISH
JOINERY DRAWING CONTINUOUS LED LIGHT RECEPTION DESK FITTING
FIXED POSITION LOCKABLE PEDESTAL TIMBER VENEER FINISH T
WALNUT FINISH
3160
300
Client
FIXED POSITION LOCKABLE PEDESTAL TIMBER VENEER FINISH
1000
30 300
1080 PULL-OUT PRINTER DRAWER
© PRINGLE BRANDON PERKINS+WILL LTD
a
Back Elevation
128
747
900
WALNUT FINISH - SIGNAGE S/S
STONE FINISH
400
STONE FINISH 128
300
1080
3160
WALNUT FINISH - SIGNAGE S/S
200
300
400
300 1000 300
WALNUT FINISH
400
200
WALNUT FINISH - SIGNAGE S/S
CONTINUOUS LINE
30
CONTINUOUS LINEAR LED LIGHT FITTING
650
650
650
WALNUT FINISH
STONE FINISH
400
CONTINUOUS LED LIGHT FITTING
CABLE TRAY UNDER WORKTOP, BEHIND ACCESSIBLE PANEL
300
CONTINUOUS LINEAR LED LIGHT FITTING
FIXED POSITION LOCKABLE PEDESTAL TIMBER VENEER FINISH
3/33/14
1
WALNUT FINISH
650
P:\London\324301 TradeWeb - Moorgate Exchange\Drawings 2013\Finished Drawings\PBPW-324301-A-DJOI-08-01.dwg
WALNUT FINISH 650
650
30
400
300
900
500
900
30
4
Enlarged Plan
400
128 128
30 PC HOLDER FIXED TO UNDERSIDE OF DESK
PULL-OUT PRINTER DRAWER
400
Client
TRADE WEB
Revision
Date
Project
MOORGATE EXCHANGE LEVEL 08 Drawing Title
JOINERY DRAWING RECEPTION DESK Scale
AR
Description
PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ
1:50 & 1:20 & A1 Company
Job Number
Status
FOR TENDER Drawing Number
PBPW - 324301 - A-DJOI-08-01
Checked By
AR
Revision
T
Enlarged Plan
900
500
900
400
4
747
400
74
900
500
30 PC HOLDER FIXED TO UNDERSIDE OF DESK
30
Enlarged Plan
PULL-OUT PRINTER DRAWER
PULL-OUT
1:20 @ A1
1:20 @ A1
Client Client
TRADE WEB
Project
TRADE WEB
MOORGATE EXCHANGE LEVEL 08 Drawing Title
JOINERY DRAWING RECEPTION DESK
3/33/14 TENDER ISSUE
T
P:\London\324301 TradeWeb - Moorgate Exchange\Drawings 2013\Finished Drawings\PBPW-324301-A-DJOI-08-01.dwg
Revision
128
747
PC HOLDER FIXED TO UNDERSIDE OF DESK
© PRINGLE BRANDON PERKINS+WILL LTD
4
awing indicates design intent only. e contractor is responsible for taking and heduling all dimensions on site. not scale from drawings. port all discrepencies to the architect before TENDER ISSUE T oceeding.
747
30
1:20 @ A1
otes
300
400
128
Date
Description
AR
PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREETTLONDON EC2A 4QJ T +44 (0)20 7466 1000 Revision Date Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ
Scale TENDER ISSUE 1:50 Description
& 1:20 & A1
Company
Job Number
Status
AR TENDER FOR Drawing Number
© PRINGLE BRANDON PERKINS+WILL LTD
400
747
400
747
PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONH Checked By T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill
PBPW - 324301 - A-DJOI-08-01
AR
Revision
T
-324301-A-DJOI-08-01.dwg
128
3/33/14
P:\London\324301 TradeWeb - Moorgate Exchange\Drawings 2013\Finished Drawings\PBPW-324301-A-DJOI-08-01.dwg
b
5. TradeWeb Office a. Bespoke reception desk, joinery drawing. b. Door types drawing for single glazed partition with framed pivot door.
- Work Experience
Deniz Kayımbaşıoğlu
a
b
c
d
a. Aerial view. b. A view from the Themes River, looking towards the A block. c. A typical flat interior, showing the kitchen and the dining area. d. A view looking towards blocks E, F and G.
6. New Capital Quay New Capital Quay is a masterplanning project located just to the south of the Thames river, surrounded by it. The project was originally started by the Broadway Malyan Architects and was eventually handed to the BUJ Architects. It is 10 minutes walk from Greenwich Town Centre and the Maritime Museum. The project consists of 980 flats with commercial spaces. There is a Waitrose on site as well as bars, restaurants and a proposed museum.
Deniz Kayımbaşıoğlu
- Work Experience
b
b
Block B
Block C
Block D
Block A
Block Ε Block H Blocks F & G
c
c
a
b
c a. Site plan. b. b:b North elevation. c. c:c South elevation.
6. New Capital Quay
- Work Experience
Deniz Kayımbaşıoğlu
71 71
1
32
2
450
16 32 60
12
60
16
450
460 460
495
3 888
325
150
3 888
325
150
1213 1314 14 15
Flat Type F03, F14,
150 1170
1516
285
1170
16 17 1718
285
200
16
Type SR08m Flat Type F03, F14, Type SR08m
Flat Type E08, G21
800
7
16
495
Type SR08 Flat Type E08, G21 Type SR08
600
800
3
7
320 320
150
1819 1920
5273 455 5273 455
365 365
10
1112
1125
600
1200
3
17
750
9
5 265
1125
17
1
750
9
10
9
1011
16
16
10
89
1
16
16
67 78
703
16 16 16
16
16
56 703
Layout to be confirmed Eng. Layoutby toM&E be confirmed by M&E Eng.
600
1141
4
4
8
1200
100
8
1
750
750 750 600 600 600 200 600
100
2
1
1200
2
1141
1491
4
4
1491
2
600
1 views 2 3
750 1200
16
32
1000
541
14
156
1 4views 3
300
14
32 60
1000
120 300 150 120 150
4
156
60
21
541
300
45
550
21
5 265
4
550
278
300
278
3
3
2021 21
120
18
450
13 25
450
5 273
150 300 120 541 150 300 120
455
5 273
455
18
888 3
320
365
320
25 13 150 888 3
460 460
5265 18
1141 4
18
5265
1141 4
150
3 800 1000 3 800 1000
6
600
13
1500
16
16
16
13 680
Notes
Kitchen
279 279
680
6
18
16
1500
1500
17
14
800 700 800 700
16
16 16
14
600
600
600 600
400 800 800 959 959 1500
12 12
17
400
750
680 800680 800
16
16
25 13 365
600
600 750
16
600 800 800 1000 1000
16
16
9
16
680
6
541
600
600
1500
17
6
13 25
600
600 600
600
14
9 17
16
16
16
16 16
150
18
14
7
16
680
19
21 21
680 800 800
16
600
600 600
16
16
16 16
150
150
9
12
20 19
16
7
680
480 150
9
12
15
800 800 680 680 400 400
750
15 20
1500
1500
1000
480
600
600 750
1000
1500
19 19
16
16
320 320
1000
16
10 750 11600 10 750 11600
11 10 11 10
1000
11
700 800700 900800 900
11
a
11
11
800
800 800 800 800
1000 1000
800
11
600
120
11
1
All dimensions are in millimeters.
2
Dimensions are not to be scaled directly from this drawing.
3
All dimensions are to be checked on site and the Architect is to be informed of any discrepancies before construction commences.
4
All references to drawings refer to the current revision of that drawing.
5
Structural and services information shown is indicative only. Refer to Consultants drawings for details and setting out.
164
164
K2
K1 A
Kitchen storage requirements - 4p. 2.1 cu.m. Extract from 'Standards and Quailty in Development'.
B
C
D
E
F
G
J1
J2
H
100 900 1000
528
600 700
900
900
1350
1850
1850
450
500 1350
600
1345
1850
450
723
500
900 700 600
1600
600
1200
300
300
600
1200
500 100
725
300
600
Description
Date
By
Chk
450
3 600
A Rev
600
1850
views 2
600
1
300
300
600
30 - 33 Monck Street
Tel: 020 7227 6900 Fax: 020 7227 6901 e-mail: buj@buj.co.uk
900 1000
150
SW1P 2AP
600
600
1350
London
Job title
Greenwich Reach Block F - Social Rented Flats Drawing title
529
b
1200
Kitchen Schedule 4 of 4 Wheelchair Accessible Flats Flat Type F12-3 Drawn by
Date
jj
October 2008 1:50 @ A2
Checked
Date
Job No.
CI/SfB Ref.
1039
(--)
Scale @ A2
Issued for
TENDER Project Status
C
Drawing No.
Revision
F593 A
6. New Capital Quay a. DDA bathroom type drawing. b. A kitchen type drawing of Block G.
Deniz Kayımbaşıoğlu
- Work Experience
Substation vent
FS
Slab edge
Garden
19
18
17
16
15
14
13
12
Ground Floor FFL +6.300
11
7800
Half Landing FFL +4.637
Substation vent
20
21
22
28
28
23
24
25
27
Ground Floor FFL +6.300
26
Slab edge
Ground Floor FFL +6.300
2.68°
7800
Lounge / Dining Lounge / Dining Kitchen Type A06
Kitchen Type A12
Stair Type 12 dwg A511
06
05
04
Lounge / Dining
01
02
Lounge / Dining
03
Cloakroom CR-02
2.68°
FS
FS
FS
FS
FS
FS
Cloakroom CR-12
W/M
09
08
07
Kitchen Type A10 Kitchen Type A08
Kitchen Type A04
Lounge / Dining
Cup'bd
Cloakroom CR-08
Cloakroom CR-06
Cloakroom CR-10
Lounge / Dining 11
Hall
Cup'bd
Cup'bd
Stair Type 10 dwg A509
14
7800
7800
Hall
Hall
10
Cup'bd
13
Cup'bd
Kitchen Type A02
01
Hall
12
12
11
13
09
10
Cup'bd
10
01
02
03
04
05
06
07
08
09
02
03
04
05
06
07
08
09
14
Stair Type 08 dwg A507
Hall
11
13 10
11
12
09
09
08
02
06
08
Stair Type 06 dwg A505
07 06
01
05
04
04
03
03
05
04
03
02
01
FS
02
06
07 01
FS
Stair Type 04 dwg A503
Hall
01
05
02
08
03
07
04
03
05
04
Notes Hall
01
02
03
FS
Cloakroom CR-11
06
Cloakroom CR-01
Stair Type 11 dwg A510
05
Cloakroom CR-09
Cup'bd
02
CR-04 06
01
07
GROUND FLOOR
Stair Type 02 dwg A501
08
04
07
06
05
04
Stair Type 05 dwg A504
01
02
03
04
05 06 07
Cloakroom CR-05
Hall
03
S
Cup'bd
Lounge / Dining
2 Dimensions are
07
Hall 02
Stair Type 07 dwg A506
2200
01
Cup'bd
01
1975
02
Hall
1 All dimensions
F
Stair Type 09 dwg A508
08
Cup'bd
06
LIFT SHAFT 02
Cloakroom CR-07
Cup'bd
05
600
Cup'bd
2365 2015
1950
01
02
03
04
06
Kitchen Type A11
Cup'bd
3 All dimensions informed of any
1900
05
Study
2734 FS
600
600
600
Kitchen Type A07
600
07
06
08
600
Lounge / Dining
Kitchen
Cloakroom CR-03
Stair Type 01 dwg A500
350
Lounge / Dining
600
05
7800
04
2901
7800
03
2600
LIFT SHAFT 01
Hall Stair Type 03 dwg A502
Hall
Kitchen Type A09
Kitchen Type A05
4 All references t drawing.
5 Structural and Consultants dra
600
Notes
Lounge / Dining
2670
2900
600 600
FS
600
1901 2670
2900
Flat Type - A19, A19-1 Number of Flats =10
Flat Type - A20, A20-1 Number of Flats = 9 600
2150
Flat Type - A18 Number of Flats = 9
1750
1750
1920
Flat Type - A17 Number of Flats = 10
2150
2905
2680
3220
2905
2605
2305
1750
1750 2150
1920
2150
2905
2680
FS
600
600
350
600
600 2150
7800
2150
Flat Type - A16 Number of Flats =11
7800
Flat Type - A15 Number of Flats =11
7800
b
Flat Type - A14 Number of Flats = 10
600
600
2345
600 1600
Flat Type - A14 Number of Flats = 10
2200
Flat Type - A16 Number of Flats =11
2015
600
2901
Flat Type - A15 Number of Flats =11 350
1950
600
Flat Type - A13 Number of Flats = 10
2600
1671
Flat Type - A17 Number of Flats = 10
Flat Type - A18 Number of Flats = 9
1975
600
1900
Flat Type - A19, A19-1 Number of Flats =10
Flat Type - A20, A20-1 Number of Flats = 9
2734
600
drawing.
5 Structural and Consultants dra 2670
2900
1750
1750
600
2150
1920
2150
2905
3220
2680
2305
2605
2905
600 2150
2150
Notes
Each kitc 2 Dimensions are integrated 3 All dimensions recycling informed of any 10 cot 4 Alllitre references
1 All dimensions
1901
2600
600
600
2365
Flat Type - A12 Number of Flats = 1
Each kitc integrated recycling 10 litre co
600
600
600
600
600
600
600
4 All references t drawing.
5 Structural and Consultants dra
1671
2600
600
7800
Flat Type - A13 Number of Flats = 10
600
600
7800
Flat Type - A12 Number of Flats = 1
2734
600
2345
600 1600
a
600
600
600
2 Dimensions are
3 All dimensions informed of any
1900
7800
600
3220
2905
2605
FS
1975
2901
600
Dining
1 All dimensions
2200
Lounge
7800
2150
2305
600
2365 2015
1950
2600
Lounge / Dining
7800
2150
Lounge Kitchen Type A01
600
600
600
600
600
600
600
2345
600 600
600
1600
1671 1901
2600
600
550 600
Flat Type - A18 Number of Flats = 9
550
51 19
600
600
98
26
550
98
26
51 19
95
26
325
2370
550
360
2620
819
1740 600
19 51
26
Flat Type - A24-3 Number of Flats = 1
98
26
Flat Type - A25 Number of Flats = 1
98
26
600
819
2500
1790
1510
371
600
600
Flat Type - A24-1, A24-2 Number of Flats = 5 95
51
Flat Type - A24 Number of Flats = 3
19
Flat Type - A23 Number of Flats = 9
58
Flat Type - A22 Number of Flats = 9
28
Flat Type - A21, A21-1, A21-2 Number of Flats = 9
1450
0
0 60
819
0 60
60
2089
3526
609
3776
600
Flat Type - A20, A20-1 Number of Flats = 9 1740
819
2500
1790
1510
600
371
600
58
600
600
28
600
600 3426
Flat Type - A19, A19-1 Number of Flats =10
Each kitc integrated recycling 10 litre co
1450
Flat Type - A17 Number of Flats = 10
819
Flat Type - A16 Number of Flats =11
609
Flat Type - A15 Number of Flats =11
819
360
0 60
Flat Type - A14 Number of Flats = 10
0
3526
60
Flat Type - A13 Number of Flats = 10
3776
0 60
Flat Type - A12 Number of Flats = 1
325
2370
3426
2620 2089
Flat Type - A22 Number of Flats = 9
600
600
Flat Type - A23 Number of Flats = 9
600 360
Flat Type - A24 Number of Flats = 3
Flat Type - A24-1, A24-2 Number of Flats = 5
Flat Type - A24-3 Number of Flats = 1
Flat Type - A25 Number of Flats = 1
550
325
550
819
Flat Type - A21, A21-1, A21-2 Number of Flats = 9 3776
1740
819
2500
A
600
95
51
26
600
26
3825
2370
3525
3426
Note rega
Rev
51
98
26
19
600
98
19
58
28
600
600
600
1510
1790
600
2620 2089
Flat Type - A24-1, A24-2 Number of Flats = 5
900
600
Rev
Job title 2105
Greenw
198
185
385
1600
Note rega
600
3525
176 176
3600
185
Flat Type - A31 Number of Flats = 1
Block A Kitchen 2 of 2 1039
Flat Type - A32 Number of Flats = 1
600
Job No.
2905
198
595
292
600
600
3825
3525
385
600
600
Flat Type - A30 Number of Flats = 1
2935
4309
3050
Drawn by
2905
1785
526
2085
3934
DK
600
900
Flat Type - A31 Number of Flats = 1
600
900
Greenw
Drawing title
400
600
600
600
3794
600
Job Job title No.
1039
600
2306
2651
2351
3686
600
Flat Type - A32 Number of Flats = 1
2105
Flat Type - A30 Number of Flats = 1
2105
Flat Type - A29 Number of Flats = 1
600
Flat Type - A28 Number of Flats = 1
600
Checked
600
2605
600
2105
2105
600
2306
185
71
Drawn by Note rega
Rev
Checked Drawing title
400
1834 724
Block A Kitchen Job title 2 of 2 Greenw A DK
3610
2351
2651
600 900
526
Flat Type - A29 Number of Flats = 1
3794
388
Flat Type - A28 Number of Flats = 1
3686
595
1600 2605
600
Flat Type - A27 Number of Flats = 1
1600
2905
3600
2935
3934
600
292
600
600 185
71
a. Sketch for a flat layout of the A block. Flat Type - A26 Flat Type - A27 b. Ground floor A block. Number of Flats = 1 plan of the Number of Flats = 1 c. Interiors of a typical flat.
600
600
600
600
600
724
Drawing title
600
900
388
1834
600
600
2905
1785
2306
3794
4309
600
2085
3686
3050
2351
2651
2605
600
600
Flat Type - A25 Number of Flats = 1
600 900
400
c
Flat Type - A24-3 Number of Flats = 1 3825
600
600
Flat Type - A26 Number of Flats = 1
A
2905
1785
3610
Flat Type - A24 Number of Flats = 3
2105
Flat Type - A23 Number of Flats = 9
600
600
600
3050
600
Flat Type - A22 Number of Flats = 9
4309
600
600
Flat Type - A21, A21-1, A21-2 Number of Flats = 9
2085
198
185
385
600
371
3610
1450
819
0
0
60
609
0
60
60
3526
724
185
71
3600 595
1834
292
176
388
2905
2935
3934
Block A Kitchen 2 of 2 Drawn by
526
DK Checked
Flat Type - A26 Number of Flats = 1
Flat Type - A27 Number of Flats = 1
Flat Type - A28 Number of Flats = 1
Flat Type - A29 Number of Flats = 1
Flat Type - A30 Number of Flats = 1
Flat Type - A31 Number of Flats = 1
Flat Type - A32 Number of Flats = 1
6. New Capital Quay
- Work Experience
Deniz Kayımbaşıoğlu
Job No.
1039
Garage Gazebo
Annex
Main house
a
b
c
d
a. Aerial view. b. View of the mantion through the site entrance. c. Interiors of the drawing room. d. View of the mantion through the gazebo.
7. The Heath Hall Heath Hall, or East Weald as it was originally called is a Grade II listed mansion located on the Bishops Avenue, Hampstead, London. It was designed by architects Victor Ashley and F. Winton Newman. It was made in 1910 and was originally owned by the son of sugar giant Tate & Lyle’s Lyle. It was then used as a house for the blind After the World War II, then in 1950, it was sold to the Bank of China and finally in 2001 to our client. The mansion is formed of 15 bedrooms, a panic room, a library, indoor and outdoor swimming pools, a gym, a cinema room, a sauna and a steam room and a comercial and a residential kitchens.
Deniz Kayımbaşıoğlu
- Work Experience
PLANT ROOM
PROPOSED PERGOLA
PROPOSED PERGOLA
GAZEBO
PROPOSED BEDS
CHILLERS
PROPOSED BEDS
BIN
Up
PROPOSED BEDS
PROPOSED BEDS
Hatch 1
Up
PROPOSED REFLECTED POOL
PROPOSED LAWN GARAGE
PROPOSED LAWN
Down
Down
REMODELLED EAST TERRACE
Down THE SUN ROOM G10
THE WINE CELLAR AG04 STAFF ROOM AG08
CUP'D
THE FAMILY ROOM G06
THE KITCHEN AG05
THE SNOOKER ROOM G11
AG07
WC3 AG09
STEAM ROOM AG10
WC1 AG13
THE GYM AG02
WC2 AG12
SAUNA AG11
EXISTING STAIRS G08
AG06
CLOAKROOM G09
ELECT CUP'D
COURT YARD
ENTRANCE HALL AG03
THE LIBRARY G13
ENTRANCE HALL G02
THE KITCHEN G05
VERANDA ROOM G12
ELECT CUP'D
D
STUDY G03
JACUZZI SWIMMING POOL AG01
THE DINING ROOM G04
ENTRANCE LOBBY G01
THE DRAWING ROOM G14 CLOAKROOM G16
BAR AREA G15
NEW JOINERY
a
b
c
7. The Heath Hall a. Site plan. b. East elevation. c. West elevation.
- Work Experience
Deniz Kayımbaşıoğlu
a Notes
Dimensions are not to be scaled directly from this drawing.
3
All dimensions are to be checked on site and the Architect is to be informed of any discrepancies before construction commences.
4
All references to drawings refer to the current revision of that drawing.
30
All dimensions are in millimeters.
2
4 5
Structural and services information shown is indicative only. Refer to Consultants drawings for details and setting out.
Void
Section A'
Void
3645
Polished timber gates, to match main entrance doors in detail, profiles, etc.
192
6
6mm thick ms plate to support lamp
Mild steel gates painted black
Brick and tile posts constructed to match brick coursing/creasing on main house using bricks to match
20
4 x 30mm ms flat framing on all 4 sides
Lead canopy
3380
214
Lead finial
Opaque glass panels with bronzed metal framing - illuminated from within
1
30
Stone plinth to match main house
Lamp stand to be galvanised and polyester powder coated black
Notes
650
Section B scale 1:5
900
650
4600
650
900
650
3mm clear border around text Solid black text
105
1525
1199
"OPAL" obscure film
220
Rev
Description
Date
Rev
London
30 130
B
Job title
DK Checked
30 170
b
Lamp stand elevation 1:20
rc
Section C scale 1:5
c
Checked
e-mail: buj@buj.co.uk
Job title
Drawn by
Front Entrance Lamp Stands Sheet 2 Drawn by
Scale @ A3
Date
05.11.10
1:5 @ A3 Issued for
Date
date
CONSTRUCTION
Job No.
CI/SfB Ref.
Project Status
909
(--)
C
Drawing No.
Scale @ A3
Date
09.10
1:10 & 1:5 Issued for
Date
TENDER
Job No.
CI/SfB Ref.
Project Status
909
(--)
C
Drawing No.
Revision
112 -
Revision
253 -
a. Planning application drawing for the new external pipes. b. Lamp stand design for the mansion entrance. c. Light box design for the site entrance.
7. The Heath Hall
Deniz Kayımbaşıoğlu
Chk
Drawing title
Drawing title
New Portland Stone plinth
By
Tel: 020 7227 6900 Fax: 020 7227 6901
East Weald The Bishops Avenue
initial
A
Date
30 - 33 Monck Street London
Bespoke Gate Lantern Text
East Weald 59 The Bishops Avenue
15
Description
SW1P 2AP
Fax: 020 7227 6901 e-mail: buj@buj.co.uk
SW1P 2AP
B
Chk
Tel: 020 7227 6900
30 - 33 Monck Street
Detail 1
By
60mm diameter ms circular bar collar to which the 4 legs are welded at the top
- Work Experience
Elevation AA
Elevation BB
B
B
A
A
Sanderson 47-7P Sanderson 47-8P Sanderson 47-9P Sanderson 47-10M Sanderson 47-11M
a
Silver
Colour Key
Key Plan
Elevation CC
a. Ground floor colours of annex corridor.
7. The Heath Hall
- Work Experience
Deniz Kayımbaşıoğlu
- Education
1.
Convergent Sonics: The Shifting Aural Focus University for the Creative Arts, Canterbury
2016
The MA graduation project. Interactive sound installation aimed at creating different acoustic environments for the visitors. Achieved: Distinction Blog: http://denizkayimbasioglu.tumblr.com
2.
Modular Acoustics Panels
2015
University of the West of England, Larnaca
Final PgC project. User interactive modular acoustic panel design. Achieved: Merit
3.
Portable Removable Partitions
2015
University of the West of England, Larnaca
Initial PgC project. Designed to be assembled and disassembled by employees of the office. Affordable parition solution for offices. Achieved: Merit
4.
Textile Museum (Lille)
Address: 4-14 Rue Charles Quint, 59000 Lille, France University of Kent
2010 - 2011
Final year, university project. Textile museum, formed of a permanent exhibition space, a temporary exhibition space, 8 workshops and 2 accommodation units.
Deniz Kayımbaşıoğlu
- Education
a
b
c
d
a. Aerial view. b. A view, looking towards structure type 1. c. An image demonstrating user interaction. d. A view, looking towards structure type 2.
1. Convergent Sonics: The Shifting Aural Focus An interactive sound installation designed and aimed at highlighting importance of form and material in altering acoustics and experience of sound in a space. In parallel with that, it draws focus on multi-sensory experience of architecture. The installation is formed of 6 parabolic dishes (sound mirrors) attached to 5 light timber frame structures, that are strategically positioned in order to create different acoustic environments. The first position (figure a) is intended to be a stand-alone experience where while a user is interacting with a sound mirror, their voice is amplified. The second position (figure c) is formed of two mirrors facing each other in order to create a ‘space inside a space’. The close relation of the two dishes create a semi isolated zone for the visitors which make them feel as if they are in a separate environment. This happens due to the sound dispersing properties of the back of the dishes as well as the magnitude of the amplification of their voice as they speak due to two mirrors functioning together, resulting in a disorienting experience. - Education
Deniz Kayımbaşıoğlu
a
b
+1626 Average female height +1504 Average female ear level
c
d
1. Convergent Sonics: The Shifting Aural Focus a. Structure tye 1, plan. b. Front elevation. c. Side elevation. d. Isometric drawing.
Deniz Kayımbaşıoğlu
- Education
a
1. Convergent Sonics: The Shifting Aural Focus a. Structure type 1, exploded diagram.
- Education
Deniz Kayımbaşıoğlu
a
b
+1626 Average female height +1504 Average female ear level
c
1. Convergent Sonics: The Shifting Aural Focus a. Structure tye 2, plan. b. Isometric. c. Elevation.
Deniz Kayımbaşıoğlu
- Education
a
1. Convergent Sonics: The Shifting Aural Focus a. Structure type 2, exploded diagram.
- Education
Deniz Kayımbaşıoğlu
a a. Structure tye 1 construction process.
1. Convergent Sonics: The Shifting Aural Focus
Deniz Kayımbaşıoğlu
- Education
a a. Construction process of a parabolic dish and attaching it to the structure type 1.
1. Convergent Sonics: The Shifting Aural Focus
- Education
Deniz Kayımbaşıoğlu
Soundscape Speakers 2 Sensor 4
Sensor 5
Sensor 6
Speakers 4
Speakers 5
Speakers 3
Speakers 6
Focal Point
Speakers 2 Sensor 3
Speakers 1
Sensor 1
Sensor 2
a
Soundscape Speakers 1
Sensor trigger
Sound travel route
Sensor trigger
Sound travel route
b
c
Sound travel route Sound travel route Focal point
Focal point Sensor trigger
Sensor trigger
b
c
1. Convergent Sonics: The Shifting Aural Focus Project Next Step The further step the project could have been taken to was to form a soundscape using speakers with the help of 6 sets of stereo speakers. The installation would be triggered with the presence of the visitors and different animal sounds that belongs to the Kent county nature would create the illusion of moving around in the exhibition space. a. Setting up diagram showing the positions of ultrasonic sensors which would detect visitors presence to trigger speakers connected with the help of an Arduino board. b., c. Diagrams demonstrate how the user interaction effects the installation. Deniz Kayımbaşıoğlu
- Education
a
b
c
d
a. Velcro pieces positioned on the wall for panels. b. A image demonstrating how the panels would fit onto the velcro. c. Panels positioned on to the velcros. d. Physical model representation of the panels.
2. Modular Acoustic Panels The concept given for this module was “innovation in design realisation”. For my project The origami acoustic panels were designed to be modular and can be assembled and disassembled by the user; making it playful and user interactive. The panels were to be constructed by 100% wool felt, totally recyclable. They would be attached to the wall with velcro, which can be used with good quality felt witout any repercussions.
- Education
Deniz Kayımbaşıoğlu
Cover Page Cover Page
Page 1 Page 1
Page 2 Please follow the folding instructions below:
FOLDING FOLDING INSTRUCTIONS INSTRUCTIONS KEY: KEY: FoldFold the the piece piece towards towards the the direction direction the the arrow arrow is showing is showing fromfrom where where the the dashed dashed line line passes. passes. FoldFold overover to the to the direction direction shown. shown. FoldFold intointo the the pocket. pocket. FoldFold to the to the other other faceface of the of the origami. origami. Make Make a crease a crease fromfrom where where the the dotted dotted line line passes. passes. Shows Shows the the frontfront andand the the back back of of the the model. model. Pull Pull the the pieces pieces fromfrom the the flapsflaps held. held. PushPush in. in.
a
b
1
Page 4 Page 4
Page 3
1
c
2
Back Back
Please follow folding instructions below: Please follow the the folding instructions below:
d
3
e
4
4
f
a. Cover page of the instruction manual of how to put the origami panels together. b. Page 1. c. Page 2. d. Page 3. e. Page 4. f. Back page.
2. Modular Acoustic Panels
Deniz Kayımbaşıoğlu
- Education
E
G
G
F
Kitchenette Printing Open Plan Office
Open Plan Office Break Out Meeting Rm 4
Meeting Rm 3 b
Meeting PB1 Admin 1 Rm 1
A
F Meeting Admin 2 Rm 2
140
D
80
A
110
D
E
60
PB2 a
d
c
e
f
a. The example office design that would use the portable removable partitions. b. System detail. c. Indicative dimensions for the panels. d., e., f. Physical model representation of the partition system.
3. Portable Removable Partitions What was expected for this module was to design ‘a game or a puzzle’ with particular focus on using the laser cutting technology. Project above demonstrates a portable removable partition system, fitted into a grid and can be assembled and disassembled by two people easily. The idea was to create an affordable solution for companies to form their own office spaces according to their needs. To portray the way these panels work, an office space was designed (for Coca Cola Enterprises) that would exclusively use these panels. The grid system for the panels would be inserted in between raised flooring and suspended ceiling systems.
- Education
Deniz Kayımbaşıoğlu
a
b
c
d
e
f
g
a. Elevation AA. b. Elevation BB. c. Elevation CC. d. Elevation GG. e. Elevation DD. f. Elevation EE. g. Elevation FF.
3. Portable Removable Partitions
Deniz Kayımbaşıoğlu
- Education
a
b
c
d
a. Site plan b. 3D representation, looking towards the courtyard. c. Pre-cast concrete facade panel design. d., e., f. 3D representation, aerial view of the project, looking towards the back of the building.
4. Textile Museum The project is a textile museum located in Lille, France. The site was located right next to the Wazemmes Market and the Gambetto underground station in a working class residential area. The site at the time was occupied with an abandonned supermarket. There is a permanent, a temporary exhibition space, a textile production museum, a cafe, a gift shop, 6 small and 8 large workshops, a lecture theatre, 4 seminar rooms, administration area, a library and a textile archive. The inspiration for this project came from the old pentagonal citadel with a fortress built by the French when they occupied Lille in 1667. Upon arrival to the building designed, people enter a courtyard which both serves as a meeting point and also a relaxing stop for people to rest and spend time at. There is also a cafe available both for the museum visitors and the outside. - Education
Deniz Kayımbaşıoğlu
a
b
4. Textile Museum a. Historical and touristic locations. b. Sun study for the site.
Deniz Kayımbaşıoğlu
- Education
a
b
d
e
4. Textile Museum a. Ground Floor 1 Plant room 2 Staff entrance 3 Staff area 4 Museum storage 5 Permanent exhibition area 6 Temporary exhibition area 7 Visitor entrance 8 Visitor WCs 9 Shop 10 Cafe staff area & kitchen 11 Cafe 12 Flats access - Education
b. First Floor 13 Library 14 Museum archive 15 Cafe staff area 16 Outdoor cafe area c. Second Floor 17 Storage 18 Lecture theatre 19 Seminar rooms 20 Small workshops 21 Public WCs 22 Textile production museum
c
23 Admin 24 Large workshops d. Third Floor 25 One bedroom flat, Level 1 26 Two bedroom flat, Level 1 e. Fourth Floor 27 One befroom flat, Level 2 28 Two bedroom flat, Level 2
Deniz Kayımbaşıoğlu
a
b
c
e
d
f
a. East elevation. b. South elevation. c. West elevation. d. Key plan, ground floor of the building. e. Section A. f. Section B.
4. Textile Museum
Deniz Kayımbaşıoğlu
- Education
- Hand Sketches
Deniz Kayımbaşıoğlu