1.

Akacan Holding Office

Address: Kyrenia, Cyprus Company: Taner’s Sons Design Studio (Cyprus)

2016

A high end office interiors refurbishment and expansion porject.

2.

Siemens, Wind Turbine Factory (Hull & Paull) Address: Alexandra Dock, Hull, UK & Paull, UK Company: Pringle Brandon Perkins + Will

2013 - 2015

A wind turbine production facility, which produces the biggest wind turbines to date, blades 75m long and the nacelles the size of two double decker busses.

3.

Discovery Enterprises Headquarters (London)

2015

Address: To be decided Company: Pringle Brandon Perkins + Will

Site feasibility and building space planning study. The building is expected hold 1160 eployees upon completion.

4.

Unilever, Office Expansion - COMPETITION (London)

2014

Address: 100 Victoria Embankment, London, EC4Y 0DY Company: Pringle Brandon Perkins + Will

A competition regarding the expansion of the Unilever office premises to a new floor (second floor). Status:

5.

TradeWeb Office (London)

Address: 1 Fore Street Avenue, London, EC2Y 9DT Company: Pringle Brandon Perkins + Will

2014

An office interior design project. Stage D report preparation.

6.

Galliard Homes, New Capital Quay (London)

Address: New Capital Quay, Greenwich, London, SE10 9FR Company: BUJ Architects LLP

2011 & 2012

Masterplanning project, consisting of 12 blocks of 980 flats and commercial units.

7.

The Heath Hall (London)

Address: 59 The Bishops Avenue, London, N2 0 BG Company: BUJ Architects LLP

2010

Grade II listed mansion formerly owned by William Park Lyle of Tate & Lyle. It ihas 15 bedrooms, indoor and outdoor swimming pools, a panic room, a tennis court and a cinema.

Deniz Kayımbaşıoğlu


5

4

3

2

1

A

b

B

C

c

Çift Kapaklı Buzdolabı 91x74x190

D

d

E

F

a

e

a. Floor plan. b. 3D representation, looking towards the reception. c. 3D representation, looking at the CEO office. d. 3D representation, looking towards the CEO desk. e. 3D representation, looking towards the executive meeting room.

1. Akacan Holding Office The project was to create a high end interiors for the entry floor of an office which houses the reception, CEO quarters, a meeting room, two managerial offices and an employe office. The building is located in Kyrenia, Cyprus.

Deniz Kayımbaşıoğlu

- Work Experience


5

4

3

1

2

ÇELİK KOLON HİZASI TAVA

991

626

A

L4 160

L4

L4

L4

L4

L4

L4

L4

L4

L4

L4

L4

L4

L4

13200

L1

L1

13337

L1

13711

L1

L2

L1

2732

6917

1944

L1 L1

5157 3

1036

3082

L1

160 50

4768

686

2732

3

1036

50 160

4612

4612

4612

4612

2 461

4612

4612

4612

4612

L1 52

1286

3082

3082

4962

52 3

52

1286

3

8145

52

L1

7701

L4

7256

3

L1

L4

L1 52

6864

3

L1

1536

L4

160 50

3

52

L1

L4

1786

160 50

L4

L4

L1

160 50

L4

L4

1535

3082

6917

L2

L1

L4

L1

50 160

6917

2007

1785

50 160

13524

L1

2070

1985

160 50

L2

50

L4

L2A

L4

L4

50

50

160 50 50

160 50

50

50

160 50

L1 160 160

160

50

50

50

50 160

L4

160

160 160

160 50

L4

160 50

L4

1986

2249

52

L4

L4

L4

L4

L4

1406

L4

L4

L4

L4

L4

L4

L4

L4

L4

985

1196

L4

1617

1828

2038

L4 L4

984

2093

L4

B 145

L1

2991

1

L1

1

2752

2768

2703

L1

160 50

L1

1

3856

160

42

1

160 50

50

4000

L3

4144

L4

L4

L4

L4

L4

796

L4

L1A

160 50

3712

42

L3

L1A

50

42

L3

L1A

160

3568

2719

1

3424

2736

42

SAHTE KIRIS L4

L1

160 50

3135

3279

L1

1

160 50

0 180

1

1

42

370

138

42

42

L4

160 50 50

1179

42

6

L3 1593

L3

2670

972

766

42 1

2687

352 559

L1

C

L3

L3 L3

L3

L5

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

D L1A

L1A

L1A

L1A

Çift Kapaklı Buzdolabı 91x74x190

L1A

L3

L3

L3

L3

L3

E

L3

L3

L3

L3

L3

L3

L3

L3

F

a FEATURE LIGHTING SCHEDULE

IMAGE

FEO Office – Furniture Schedule REFERENCE

FITTING

FINISH

DIMENSION

LOCATION

MANUFACTURER

IN-FINITY BY FLOS L1

LINEAR SUSPENDED LIGHT

BLACK MATT

FOR LENGTH AND WIDTH REFER TO REFLECTED CEILING PLANS

GENERAL

OR LIGHTING SUPPLIER IN CYPRUS

NOTE

SUSPENSION HEIGHTS TO BE AGREED ON SITE.

REVISION

Room CEO Office

Floor Level 1

Manufacturer Fritz Hansen

CEO Office LP GRAND

CHAMPAIGNE

880MM DIAMETER

CEO ROOM LOUNGE

LOUIS POULSEN

L2A

LP GRAND

BLACK

1480MM DIAMETER

CEO ROOM POOL TABLE

LOUIS POULSEN

Product Code

QUANTITIES TO BE DETERMIND BY M+E.

1

Walter Knoll

SUSPENSION HEIGHTS TO BE AGREED ON SITE. L2

Product Name Fri

Joco Stone

LED LAMP. QUANTITIES, LIGHT SOURCE AND DIMMABLE FEATURES TO BE DETERMINED BY M+E.

CEO Office

1

Muuto

Connect

A

Material Finish Fabric: Sunniva 242 Legs: Powder coated aluminium

Dimension s(mm)

Amount 2

Image

Contact W: http://www.mozaikdesign.com/ Mozaik Design E: banu@mozaikdesign.com T: +90 212 327 05 95

Table Top: Onice Champagne (.117) Steel Legs: Powdercoated black gloss

d: 960 h: 275

2

W: http://www.elgrecogallery.com/

Fabric: Remix 123

l: 920 w: 1170

1

El Greco Gallery Ltd. A: 87-91, Limassol Avenue, Nicosia, Cyprus E: elgreco@spidernet.com.cy T: +357 22 314 332 W: http://www.muuto.com/

SUSPENSION HEIGHTS TO BE AGREED ON SITE. QUANTITIES TO BE CONFIRMED BY M+E

1

B

l: 920 w: 1170

1

1

C

l: 920 w: 1170

3

1

E

l: 920 w: 920

2

l: 1900 w: 465 h: 650

1

The Cross Contemporary Store A: Zena Kanther 17A, Nicosia, Cyprus E: thecross@cytanet.com.cy T: +357 22 45 65 10

MODULAR L3

RECESSED SPOTLIGHT NAME: SMART LOTIS 48

WHITE TRIM

48MM

GENERAL

OR

QUANTITIES TO BE CONFIRMED BY M+E

LIGHTING SUPPLIER IN CYPRUS

MODULAR L4

SURFACE MOUNTED DRUM LIGHT LOTIS TUBED

BLACK WITH GOLD INSIDE

130MM HEIGHT 85MM DIAMETER

CEO ROOM

OR

QUANTITIES TO BE CONFIRMED BY M+E

LIGHTING SUPPLIER IN CYPRUS

CEO Office

L5

b

WALL LAMP: FOLD SURFACE 4200 4201 4202 4204 4205 4207

OFF WHITE MATT LACQUER

INDIVIDUAL ONES: 220MM WIDE 180MM HIGH

a. Ceiling plan. b. Lighting schedule. c. An excerpt from the furniture schedule.

STAIRCASE

VIBIA

QUANTITIES TO BE CONFIRMED BY M+E

c

1

Walter Knoll

Florence Knoll Credenza 4 Position

Top: Arabescato Satin Finish: Ebonized Oak

W: http://www.elgrecogallery.com/ El Greco Gallery Ltd. A: 87-91, Limassol Avenue, Nicosia, Cyprus E: elgreco@spidernet.com.cy T: +357 22 314 332

1 of 1

1. Akacan Holding Office

- Work Experience

Deniz Kayımbaşıoğlu


Service & Click Assembly Blade factory

a

b

c

d

a. Aerial view. b. Blade Factory and offices aerial view. c. Click Assembly and Service factory 3d representation. d. 75m long blade, produced by the factory, put on display at the Queen Victoria Square, Hull.

2. Siemens Wind Turbine Factory The factory complex is located at the Alexandra Dock, Hull. The design of the factory evolved in line with the design developments of the largest wind turbines in the world that were to be produced in this facility. The complex consists of a blade factory, which is used for creating 75m long blades and a Click Assembly and Service factory, which is used for assembling and servicing wind turbine components.

Deniz Kayımbaşıoğlu

- Work Experience


a

b

c

a. Site plan. b. Blade factory and office ground floor plan. c. Click assembly and service factory and office.

2. Siemens Wind Turbine Factory

- Work Experience

Deniz Kayımbaşıoğlu


P:\London\321063-001 Project Triton\Drawings 2013\Marketing Finished Layouts\DETAILS_WIP\WALL_TYPES\PB_321063-BLD_1_10.dwg

605 200

55

120

230

DOUBLE SIDED TAPE SEAL

100

50

135

SEAL

(RF6)ALBATROSS 150mm LAP AND SEAL

12x6 EXPANDABLE FOAM SEAL SEAL

4

DEWA-S-05 Scale: 1:10 @ A1

TR26 FM APPROVED BOARD 100mm; SEAL JOINTS WITH POLYBAND TAPE

FACADE PANEL

(G1)GALV J CHANNEL BUTT JOINTS SEAL WITH POLYBAND TAPE

3A

DEWA-P-12 Scale: 1:10 @ A1

300

(RF6)ALBATROSS 150mm LAP AND SEAL

165 260

125

(BW3)150mm LAP AND SEAL

4

1190

202

+11.000

3

DEWA-S-06 Scale: 1:10 @ A1

3

605 200

50

140

215

1200

275 125

50

2B

360

1200

2

DEXD-P-02 Scale: 1:10 @ A1

285

10

+7.138

6200 BETWEEN PFC'S ( DIM 'A' )

165

6000 DOOR / CLEAR OPENING WIDTH ( DIM 'B' ) LOOSE INSULATION

100

10

7138

6340 Clear Door opening height ( Dim 'H' )

225

70

1158 Headroom ( Dim 'HR' )

7498 Total height ( Dim 'TH' ) = (1.05 x H) + 840

+7.498

2A

2

DEXD-S-02

6200 BETWEEN PFC'S ( DIM 'A' )

Scale: 1:10 @ A1

DEXD-P-02 Scale: 1:10 @ A1

165

6000 DOOR / CLEAR OPENING WIDTH ( DIM 'B' )

100

10

225

1 ±0.000

Scale: 1:10 @ A1

2A 6532

200

406

306 300

Scale: 1:10 @ A1

1A

6532

6000

2. Siemens Wind Turbine Factory General Notes

1. 2.

DEXD-P-01

6000

Client

SIEMENS -

Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.

Project

EMEA (UK) Offshore Footprint #

© PRINGLE BRANDON PERKINS+WILL LTD

1

1A

DEXD-S-01

Blade and Service Factory Wall Types Detail Drawings above demonstrate details of the wall types used for the factory buildings with large shutters. Pre-cast concrete panels were used up to 4000mm of the building height while Eurobond sandwich pannels were placed to 4000mm and above. PB - 321063 - BLD-WALL-TP-02-3. 4.

Drawing Title

WALL TYPES - BLADE: EXTERIOR Details Scale

PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ

Revision

Date

1:10 @ A1 Company

Job Number

Status

RECORD DRAWINGS Drawing Number

Checked By

CR

Revision

Description

28/13/16

P:\London\321063-001 Project Triton\Drawings 2013\Marketing Finished Layouts\DETAILS_WIP\WALL_TYPES\PB_321063-BLD_1_10.dwg

Deniz Kayımbaşıoğlu

- Work Experience


P:\London\321063-001 Project Triton\Drawings 2013\Marketing Finished Layouts\DETAILS_WIP\WALL_TYPES\PB_321063-BOF_1_10.dwg

45

SEAL

205

200

50

(VF2)ALBATROSS

100

TR26 FM APPROVED BOARD 100mm SEAL JOINTS WITH POLYBAND TAPE

50

135

DOUBLE SIDED TAPE SEAL

PARAPET CAP SILVER SEAL

ADJUSTABLE VERTICAL SUPPORT SYSTEM FOR EUROBOND PANELS

40 375

80

FOAM FILLER BED TOP & BOTTOM IN MASTIC (RF11)ALBATROSS TR26 FM APPROVED BOARD 100mm SEAL JOINTS WITH POLYBAND TAPE KEMPER LIQUID APPLIED ROOF

1170

Scale: 1:10 @ A1

INTERNAL PARAPET SHEET EUROCLAD 32/1000 REVERSE COL. ALBATROSS L = 1345mm GUN GRADE MASTIC SEAL

VCL

6

TYVEK VCL 100mm LAP AND SEAL WITH DOUBLE SIDED TAPE

DROF-S-17

290

7

12x6 EXPANDABLE FOAM SEAL

DROF-S-17 Scale: 1:10 @ A1

4B

DWIN-P-24

4A

DWIN-P-26

Scale: 1:10 @ A1

75

110

WALL LINING

OPERABLE WINDOW

5

DWIN-S-17 Scale: 1:10 @ A1

SPACER / SHIM

140

SEALANT & BACKER ROD BETWEEN WINDOW AND SILL

7

140

SUPPORT ANGLE AT MULLIONS

+8.600

75

60

30

203

SQUARE STEEL TUBE

Scale: 1:10 @ A1

Scale: 1:10 @ A1

1182

4

EPDM

DWIN-S-18

6

1200

FIRE STOP

5

310

480

480

145

DWIN-S-15 Scale: 1:10 @ A1

255

200

50

SILICONE SEALANT ON A FOAM ROD BACKING

165

1650

4

365

200

3

90

75

+5.920

FIXING BRACKET 50

605

605

50

15

75

20

25mm PIR BOARD

50

94

8600

+4.320

INTERNAL SPIGGOT SECTION

+3.520

200

SILVER RAL 9006

5

50 LINE OF MULLION CAP

110 TRANSOM LINE OF MULLION

581

3

200

1B

165O/ALL MULLION

DWIN-P-02 Scale: 1:10 @ A1

1200

365

2 2

DWIN-S-15 Scale: 1:10 @ A1

LINE OF MULLION

50

LINE OF MULLION CAP

+2,470

67

2187

365

EXPANDABLE FOAM, TYP

EXPANDABLE FOAM

INTERNAL SPIGGOT SECTION

50

CILL PRESSING

EPDM

50

SCHEDULED FINISH FLOOR

1

30

FOAM ROD, TYP

±0.000 30 480

500 CONCRETE FLOOR SLAB

PREFORMED REVEAL. FINISH TO MATCH ADJACENT JOINT. ON GRIDLINE

DEWA-S-01

1A

Scale: 1:10 @ A1

+3.520

500

589

1217

1195

1195

1224

590

1162

4B

±0.000

2. Siemens Wind Turbine Factory General Notes

1. 2.

Scale: 1:10 @ A1

±0.000 = +6.400 m AOD

50

4A

DWIN-P-03

590

1142

1142 50

50

1B

1142 50

±0.000

Client

SIEMENS -

Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.

590

1142 50

500

50

1A Project

EMEA (UK) Offshore Footprint -

© PRINGLE BRANDON PERKINS+WILL LTD

1

Blade Production Office Wall Types Detail Drawings above demonstrate details of the wall types used for the Blade factory, office building. This is a prefab building, using Eurobond Europanel PB - 321063 - BOF-WALL-TP-01-panels for the walls. 3. 4.

Drawing Title

WALL TYPES - BLADE: EXTERIOR Details Scale

PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ

Revision

Date

1:10 @ A1 Company

Job Number

Status

RECORD DRAWINGS Drawing Number

Checked By

CR

Revision

Description

28/38/16

P:\London\321063-001 Project Triton\Drawings 2013\Marketing Finished Layouts\DETAILS_WIP\WALL_TYPES\PB_321063-BOF_1_10.dwg

- Work Experience

Deniz Kayımbaşıoğlu


a CLICK ASSEMBLY, OFFICE BUILDING SANITARY SCHEDULE - REV 02 OWC-00 05

OWC-00 01 OWC-00 02 BC MALE WC AREA

BC MALE SHOWER AREA

DRAWING TAG

ITEM

OWC-00-01

BC Male WC Area

OWC-00-02

BC Male WC Area

BC Male Shower Area

Hand Dryer

OWC-00-04

BC Male WC Area

OWC-00-05

BC Male Changing Area

OWC-00-06

BC Female Changing Area

OWC-00-07

BC Female Changing Area

OWC-00-08 BC MALE CHANGING AREA OWC-00-09

BC Female WC & Shower Area

BC Female WC & Shower Area

GROUND FLOOR OWC-00-10

OWC-00-11

OWC-00-12

OWC-00 07

BC Female WC & Shower Area

OWC-00 10

OWC-00 19

Male Common WC Area

Male Common WC Area

OWC-00-13

Male Common WC Area

OWC-00-14

Male Common WC Area

OWC-00-15

Female Common WC Area

OWC-00-16

Female Common WC Area

OWC-00-17

BC FEMALE OWC-00 WC & SHOWER 08 AREA

OWC-00-18

Female Common WC Area

DDA WC

OWC-00 09

CLEANERS CUPBOARD

OWC-00 11

MALE COMMON WC AREA

QUANTITY

LS1S

Silver

4

Moda BTW

Vitreous China - White

4

WC Cubicles

Solid laminate access panel system

THIRSLINGTON

Oasis

TBC

4

Shower Tray

No shower tray. Floor to be tiled and gully/shower trap to be provided.

TBC

TBC

TBC

20

Shower Screen

Shower screen system integrating dividing screen and front door. Mixer shower kit. Waterless Urinal

OWC-00-19

Cleaners Cupboard

TBC

TBC

Frosted glass

20

TRITON

Nene Bar Mixer Shower

Satin Brushed

20 4

TWYFORD

Galerie Plan Waterless Urinal

Vitreous China - White

Urinal Access Panel Lockers

Solid laminate access panel system.

THIRSLINGTON

Sentry

TBC

4

BREEAM compliant changing lockers

TBC

TBC

TBC

224

Lockers

BREEAM compliant changing lockers

20

Hand Dryer

Silver Air Fury S1 high speed hand drier.

Satin deck mounted sensor tap to be used with premixed waster supply. Washbasin Viterous china under countertop vanity basin. Vanitory System Solid laminate vanitory system with Corian counter top. WC

Back to wall WC

TBC

TBC

TBC

LOVAIR

LS1S

Silver

2

LOVAIR

L991 CS

Satin Brushed

4

SPEC TAG

Concealed cistern & sensor flush

PAN-501

PAN-201

TWYFORD

Visit 460 Countertop

Vitreous China - White

4

PAN-101

Oasis

TBC

4

PAN-301

TWYFORD

Moda BTW

Vitreous China - White

2

Solid laminate access panel system

THIRSLINGTON

Oasis

TBC

2

Shower Tray

No shower tray. Floor to be tiled and gully/shower trap to be provided.

TBC

TBC

TBC

2

TBC

TBC

Frosted glass

2

Nene Bar Mixer Shower

Satin Brushed

2

Hand Dryer

Silver Air Fury S1 high speed hand drier.

LOVAIR

LS1S

Silver

2

Sensor Tap

Satin deck mounted sensor tap to be used with premixed waster supply.

LOVAIR

L991 CS

Satin Brushed

4

TWYFORD

Visit 460 Countertop

Vitreous China - White

4

PAN-101 PAN-301

Washbasin

Viterous china under countertop vanity basin. Vanitory System Solid laminate vanitory system with Corian counter top. Urinal Waterless Urinal Urinal Access Panel WC

Back to wall WC

WC Cubicles

Solid laminate access panel system

WC

Solid laminate access panel system.

Back to wall WC

WC Cubicles

Solid laminate access panel system

Sensor Tap

Satin deck mounted sensor tap to be used with premixed waster supply.

Washbasin

Viterous china under countertop vanity basin. Vanitory System Solid laminate vanitory system with Corian counter top. Hand Dryer

THIRSLINGTON

Oasis

TBC

4

TWYFORD

Galerie Plan Waterless Urinal

Vitreous China - White

3

Sentry

TBC

3

TWYFORD

Moda BTW

Vitreous China - White

3

THIRSLINGTON

Oasis

TBC

3

TWYFORD

Moda BTW

Vitreous China - White

2

THIRSLINGTON

Oasis

TBC

2

THIRSLINGTON

PAN-501

Corian Counter Top

PAN-201 Concealed cistern & sensor flush Concealed cistern & sensor flush PAN-101

L991 CS

Satin Brushed

2

Visit 460 Countertop

Vitreous China - White

2

PAN-101

THIRSLINGTON

Oasis

TBC

2

PAN-301

Corian Counter Top

Silver Air Fury S1 high speed hand drier. Full DDA Part M Compliant Toilet Pack

LOVAIR

LS1S

Silver

2

Tap

LOVAIR

L991 CS

Satin Brushed

1

Washbasin

Full DDA Part M Compliant Toilet Pack

TWYFORD

Doc M Rimless BTW Toilet Unit

Vitreous China - White

1

To incorporate all Part M required fittings.

WC

Full DDA Part M Compliant Toilet Pack

THIRSLINGTON

Visor Profile

TBC

1

To incorporate all Part M required fittings.

Hand Dryer

Full DDA Part M Compliant Toilet Pack

LOVAIR

LS1S

Silver

1

TWYFORD

SOLA bib tap lever SF2301

TBC

1

Sink

Cleaners sink

TWYFORD

FC1034

Vitreous China - White

1

Further info can be found in manufacturer's specs.

PAN-101

LOVAIR

Cleaners cupboard sink's tap

These will include: Benches, mirrors, door stops, coat hooks, wall mounted bins, undercounter bins, toilet brush and holders, toilet paper holders, soap dispensers, wall mounted/recessed towel dispensers, water saving aerators, urinal dividers, wall and door grab bars.

To incorporate all Part M required fittings.

TWYFORD

Tap

All the toilets to incorporate satin brush finished stainless steel ironmongery, fittings and accessories to fully equip toilet units as well as ensuring compliance with Building Regs Part M, BS 8300 and BREEAM requirements.

PAN-101

TRITON

Shower screen system integrating dividing screen and front door.

IMPORTANT NOTE: Concealed cistern & sensor flush

Mixer shower kit.

Shower Screen

Corian Counter Top

To incorporate all Part M required fittings.

PAN-301

To incorporate all Part M required fittings.

To incorporate legs, bearers and bucket grate.

3750

OWC-00 12

BC MALE WC AREA

BC MALE SHOWER AREA

3750

OWC-00 13

IRONMONGERY & FITTINGS

NOTES

PAN-101

THIRSLINGTON

WC Cubicles

Shower Kit

BC FEMALE CHANGING AREA

COLOUR & FINISH

LOVAIR

Sensor Tap

OWC-00 06

MODEL

TWYFORD

Urinal

Scale: 1:80 @ A1

MANUFACTURER

Silver Air Fury S1 high speed hand drier. Back to wall WC

WC

Shower Kit

OWC-00 04

DESCRIPTION

GROUND FLOOR

OWC-00-03

OWC-00 03

1

LOCATION

3750

1

BC MALE CHANGING AREA

3750 3750

OWC-00 14

3750 3750

OWC-00 18

3750

OWC-00 15

3750

DDA WC Turning Space 1500 x 1500

BC FEMALE CHANGING AREA

3750

BC FEMALE WC & SHOWER AREA

CLEANERS CUPBOARD

3750

DDA WC Turning Space 1500 x 1500

WC AREA

FEMALE COMMON WC AREA

b

2

9750

2

3750

7750

GROUND FLOOR

3750

OWC-00 17

3750

MALE COMMON WC AREA

OWC-00 FEMALE 16 COMMON

GROUND FLOOR

Scale: 1:80 @ A1

a. The previous blade production office design, room data sheets that explained purpose and contents of each room. b. Previous click assembly office design, sanitary schedule. General Notes

1. 2.

3. 4.

Client SIEMENS -

Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.

02

22-08-2014

01 20-06-2014 Revision Date

Graphic Improvement

CR

Graphic enhancements Description

CR

PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ

Project

EMEA (UK) Offshore Footprint EW Offshore - Alexandra Dock

Drawing Title

- Click Assembly, Office Building Sanitary Schedule Ground Floor

Scale

1:80 @ A1

Company

PB

-

Job Number

321063

Status

TENDER

-

Drawing Number

Checked By

CR

Revision

OF-SCHE-SY-01 02

22/57/14

p:\London\321063-001 project triton\drawings 2013\Finished Layouts\30-79_DETAILS\44_SANITARYWARE_TOILETS\PB-321063-OF-SCHE-SY-01.dwg

Deniz Kayımbaşıoğlu

- Work Experience

© PRINGLE BRANDON PERKINS+WILL LTD

2. Siemens Wind Turbine Factory


a

1

ELEVATION A-A

1

ELEVATION A-A

Scale: 1:30 @ A1

Scale: 1:30 @ A1

2

ELEVATION B-B

2

ELEVATION B-B

Scale: 1:30 @ A1

Scale: 1:30 @ A1

Elevation C-C

Elevation D-D

Elevation A-A Elevation C-C

Elevation D-D

Elevation A-A

Elevation B-B

3

ELEVATION C-C Scale: 1:30 @ A1

4

ELEVATION D-D Scale: 1:30 @ A1

Elevation B-B

Scale: 1:30 @ A1

4

ELEVATION D-D

Scale: 1:30 @ A1

Scale: 1:30 @ A1

2. Siemens Wind Turbine Factory General Notes

Client

SIEMENS -

- Click Assembly Office, Project Definition Office Toilets

OF-ENLG-00-03 Scale: 1:30 @ A1

SUSPENDED CEILING

Scale 02

22-08-2014

01

20-06-2014

Revision

Date

Minor amendments

CR

Graphic enhancements

CR

3. 4.

Status

Varies

Company

PB

Description

General Notes

Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.

EMEA (UK) Offshore Footprint EW Offshore - Alexandra Dock

Drawing Title

5 a. Previous blade production office, a page from the Stage D report prepaired. b. Previous click assembly office design, toilets, project definition drawing. 1. 2.

Project

TENDER

Job Number

Drawing Number

Checked By

CR

Revision

- 321063 - OF-PRJ-DEF-105 02

p:\London\321063-001 project triton\drawings 2013\Finished Layouts\80_PROJECT_DEFINITION_DRAWINGS\PB_321063-OF-PRJ-DEF-105.dwg

3. 4.

Drawing indicates design intent only. The contractor is responsible for taking and scheduling all dimensions on site. Do not scale from drawings. Report all discrepencies to the architect before proceeding.

22/59/14

1. 2.

Client

SIEMENS -

Project

EMEA (UK) Offshore Footprint EW Offshore - Alexandra Dock

Drawing Title

- Click Assembly Office, Project Definition Office Toilets

Scale 02

22-08-2014

01

20-06-2014

Revision

Date

Minor amendments

CR

Graphic enhancements

CR

Description

Status

Varies

Company

PB

TENDER

Job Number

Drawing Number

Checked By

CR

Revision

- 321063 - OF-PRJ-DEF-105 02

22/59/14

p:\London\321063-001 project triton\drawings 2013\Finished Layouts\80_PROJECT_DEFINITION_DRAWINGS\PB_321063-OF-PRJ-DEF-105.dwg

- Work Experience

© PRINGLE BRANDON PERKINS+WILL LTD

ELEVATION C-C

OF-ENLG-00-03 SUSPENDED CEILING

Deniz Kayımbaşıoğlu

© PRINGLE BRANDON PERKINS+WILL LTD

b3

5


a

b

c

d

a. Site option 1. First Central, Park Royale, London. b. Site option 2. Ruskin Square, London c. Site option 3. Green Park, London d. Site option 4. Old Vinyl Factory, Hayes, London

3. Discovery Enterprises, London Headquarters Discovery Enterprises project to be situated in London was at its starting phase. For this project, PBP+W were asked to look into finding potential sites for the new Discovery Enterprises headquarters in London. Above were four sites that were identified to have potential and were studied to decide which would be the most suitable for the client’s requirements.

Deniz Kayımbaşıoğlu

- Work Experience


a

b

c

SOLID RECTANGULAR FLOORPLATE

RECTANGULAR FLOORPLATE WITH ATRIA

LINEAR FLOORPLATE

PARALLEL FLOORPLATE

U-SHAPED FLOORPLATE

d

a. Colour key. b. Adjacencies study. c. Building mass study. d. Building layout study.

3. Discovery Enterprises, London Headquarters

- Work Experience

Deniz Kayımbaşıoğlu


a

b

c

d

e

a. Colour key. b. Ground floor plan. c. First floor plan. d. Second floor plan. e. Third floor plan.

3. Discovery Enterprises, London Headquarters The plans displayed above was an initial layout study to display to the client, how to spaces they desired could be positioned in a parallel floorplate.

Deniz Kayımbaşıoğlu

- Work Experience


a

b

c

d

a. Antenna field calculation and set up. b. Vertical floorplate positioning option at potential site. c. Vertical floorplate with antenna field, obstruction testing. d. Site options overall suitability review.

3. Discovery Enterprises, London Headquarters

- Work Experience

Deniz Kayımbaşıoğlu


100 Victoria Embankment

a

b

c

d

a. Aerial view. b. View of the building accross the Themes River. c. View of the atrium. d. View of the existing office floors through the atrium.

4. Unilever, Office Expansion Originally constructed in 1929, Unilever House in 100 Victoria Embankment houses the companies Unilever, Royal Mail and Britows. The competition was for Unilever’s future expansion to the 2nd floor of the building. The competition was won and was to be developed further by the PBP+W.

Deniz Kayımbaşıoğlu

- Work Experience


a

b

c

4. Unilever, Office Expansion Layout Option a.

Layout Option b. This option was based on the existing layout This option provides maximum possible and was aimed at presenting the minimum in- amount of meeting spaces both for internal use tervention option. but mainly for facing the clientelle and external contacts. • 134 desk space • 1 meeting room, 20 people around a table • 6 meeting rooms, 6 people around a table • 1 meeting rooms, 8 people around a table • 1 meeting room, 3 people around a table • 26 meeting room, 12 people around a table • 1 board room, 20 people around a table • Touchdown zone for 58 people • 1 meeting room, 12 people around a table • Staff lounge for 34 people

- Work Experience

Layout Option c. This option was created to show the option of combining the meeting spaces together with the working areas. • • • •

164 desk space Collaboration area for 32 people 4 meeting rooms, 12 people around a table 8 meeting rooms, 6 people around a table

Deniz Kayımbaşıoğlu


2

7500

3

7500

4

7500

5

7500

6

7500

7

7500

8

7500

08

04

CP-4 PT-1 08 05 SK-1 8P MEETING ROOM

WELLNESS CP-4 ROOM PT-1 SK-1

CP-1 PT-1 SK-1 08

08

06

15500

08

08

03

BOARD ROOM

07

8P MEETING ROOM

CP-4 PT-1 SK-1

13

08

CP-3 PT-1 SK-1

14

HR

CP-3 PT-1 SK-1

DRAWING CATEGORY FINS FINISHES DRAWINGS TO BE READ IN CONJUNCTION WITH INTERIORS SCHEDULE AND SPECIFICATIONS

CP-4 PT-1 SK-1

CP-2

NOTE: REFER TO INTERIOR SCHEDULE FOR CODES AND DETAILS OF FINISHES

CP-2 PT-1 SK-1

VF-1 PT-1 SK-3

CP-2

08

CP-4 PT-1 SK-1

08

6P MEETING ROOM 08

08

DEALER WEB

PRE-ACTION SPRINKLER CABINET

CP-4 PT-1 SK-1

D

F

10

DEALER WEB

PT-1 SK-1

CORRIDOR

CP-1

9

7500

F

08

08

SYMBOL DESCRIPTION FLOOR FINISHES

VF-2 PT-1 SK-1 PT-2

11

COMMS ROOM

08

CARPET TYPE 1: TILE

CP-1

CP-1 PT-1 SK-1

12

PANTRY

15500

1

CARPET TYPE 2: TILE

CP-2

09

6P MEETING ROOM

CARPET TYPE 3: TILE

CP-3

02

INTERVIEW CP-4 ROOM PT-1 SK-1

CARPET TYPE 4: TILE

CP-4

CARPET TYPE 5: TILE

CP-5 CP-6

CARPET TYPE 6: AREA RUG

CP-6

D

CP-5

ST-1 PT-1 SK-1 08

CP-2

DR/FT

ST-1

NATURAL STONE FLOORING TYPE

VF-1

VINYL FLOORING TYPE 1PRE-BONDED ANTI-STATIC VINYL TILE

CR

ER DR

08

01

15

CORPORATE

RECEPTION CR

DR ER

VINYL FLOORING TYPE 2-VINYL ROLL SHEET-REFER TO FINISHES SCHEDULE

VF-2 VF-1

WALL FINISHES

C

C

FB-1

ACOUSTIC WALL PANELING TYPE 1

FB-2

ACOUSTIC WALL PANELING TYPE 2

GL-1

BACK PAINTED GLASS, LOW IRON

SK-1

CP-1 PT-1 SK-1

08

25

08

PHONE BOOTH 08

16

PHONE BOOTH

24

CP-2 15500

15500

BUSINESS

08

23

OFFICE

CP-3 PT-1 SK-1

CP-3 PT-1 SK-1

08

22

OFFICE

08

CP-3 PT-1 SK-1

21

OFFICE

CP-3 PT-1 SK-1

08

CP-1 PT-1 SK-1

20

OFFICE

08

19

08

BUSINESS

CP-3 PT-1 SK-1

18

SALES PRODUCT

CP-3 PT-1 SK-1

08

RECESSED, PAINTED SKIRTING

SK-3

VINYL SKIRTING

SK-4

S/S SKIRTING

BL-1

BLACK OUT BLINDS MOTORIZED, COLOUR TO MATCH EXISTING BLINDS

M-1

PRIVACY MANIFESTATION TYPE 1

M-2

PRIVACY MANIFESTATION TYPE 2

M-3

PRIVACY MANIFESTATION TYPE 3

M-4

PRIVACY MANIFESTATION TYPE 4

M-5

FEATURE GRAPHIC MANIFESTATION

PB-1

PINABLE BOARD TYPE 1

LQ-1

LACQUER PANELING

PT-1

GENERAL PAINT

PT-2

FEATURE COLOUR PAINT

17

FINANCE LEGAL

A

EXTENT OF FINISHES

A START POINT

a

7500

7500

1

7500

2

7500

3

4

7500

7500

5

7500

6

NOTE: 1. ALL FLOOR TRANSITIONS TO HAVE 5mm SS STRIP BETWEEN, E.G. CARPET-TIMBER, CARPET-CERAMIC TILE

7500

7

8

2. KEEP FINISHES IF NOT INDICATED OTHERWISE

9

790

790

790

370

600

370 600

370 600

370

600

SNACKS DISPLAY TBC

790

3. FLOOR BOXES - REFER TO ELECTRICAL DRAWINGS

PANTRY

850

12

850

08

INTEGRATED FRIDGE

100

TION LER T

700

1

Plan

2

1:50 @ A1

CONTINUOUS LINEAR LED LIGHT FITTING

3

1:20 @ A1

STAINLESS STEEL WORKTOP FINISH, PROVIDE 3MM RADIUS TO EDGE

700

SECTION

4

1:20 @ A1

BACKPAINTED GLASS SPLASHBACK

SECTION 1:20 @ A1

5

SECTION 1:20 @ A1

LAMINATE FACED DOORS AND MELAMINE FINISH INNER CARCASS WITH ADJUSTABLE SHELVES

790

S/S LINED EDGE TO WASTE / RECYCLING UNIT CUT OUT

SECTION

PANTRY EQUIPMENT: 600

COFFEE MACHINE

- 2x LARGE FRIDGE

- 2x UNDERCOUNTER FRIDGE

30

- 1x INTEGRATED DISHWASHER

850

SNACKS DISPLAY UNIT TBC

30

- 2x INTEGRATED MICROWAVES - 1x ZIP TAP OR VIVREAU WATER DISPENSER - 1X COFFEE MACHINE

NOTE: REFER TO M&E CONSULTANT INFORMATION FOR POWER REQUIREMENTS TO ALL PANTRY EQUIPMENT. 600

b

WASTE / RECYCLING POINT

5

ELEVATION 1:20 @ A1

600 WASTE / RECYCLING POINT

600 WASTE / RECYCLING POINT

600 INTEGRATED FRIDGE

600 ZIP EQUIPMENT

1200 DDA SINK 1200MM

PROVIDE CLEAR OPENING WHEN DOORS OPEN FOR DDA ACCESS. ALLOW FOR ACCESS PANEL TO THE BACK OF UNIT TO CONCEAL SERVICES

600 DISHWASHER

600 DISHWASHER

600 STORAGE (DRAWERS)

BRUSHED S/S RECESSED SKIRTING

600 X 2 MICROWAVE + CUPBOARD

600

600

FRIDGE

FRIDGE

LAMINATE FACED DOORS AND MELAMINE FINISH INEER CARCASS WITH ADJUSTABLE SHELF

VENTILATION GRILLES, S/S FINISH

5. TradeWeb Office The project was an interiors project for the TradeWeb office, located in Moorgate, London. The drawings shared are part of the stage D report prepared as part of 2 man team. a. Finishes plan. b. Enlarged drawing of the pantry.. Finishes plan.

Deniz Kayımbaşıoğlu

- Work Experience


550

800

800

400

900

500

900

400

Front Elevation

2

1:20 @ A1

CONTINUOUS LED LIGHT FITTING TIMBER VENEER WORK SURFACE CONTINUOUS LED LIGHT FITTING

CABLE MANAGEMENT ACCESS

TIMBER VENEER WORK SURFACE

TIMBER VENEER UPSTAND

CABLE MANAGEMENT ACCESS RUBBER FINISH INLAY CONTINUOUS LINEAR LED LIGHT FITTING TIMBER 300VENEER UPSTAND

300

300 WALNUT FINISH

300

WALNUT FINISH 300

650

550

800

01

800

WALNUT FINISH - SIGNAGE S/S

STONE FINISH

400

08

RECEPTION

550

3160

300

WALNUT FINISH

800

800

3160

800

WALNUT FINISH

200

3160

300

300

RUBBER FINISH INLAY

1000 300 400

500

900

400

1:20 @ A1

300

Back Elevation

3

1:20 @ A1

400

DR ER

2

Front Elevation

900

1080

3160

400

900

500

900

2

Front Elevation

2

900

500

400

Front Elevation 1:20 @ A1

1:20 @ A1

CR

Location Plan 1:50 @ A1

WALNUT FINISH

PC HOLDER FIXED TO UNDERSIDE OF DESK

FIXED POSITION LOCKABLE PEDESTAL, TIMBER VENEER FINISH

650

WALNUT FINISH

747

400

300

500

30

3

1:20 @ A1

4

Enlarged Plan 300

3

Back Elevation

1000

PC HOLDER FIXED TO UNDERSIDE OF DESK 3160

900

400

1:20 @ A1

3

Back Elevation 1:20 @ A1

1:20 @ A1

PC HOLDER FIXED TO UNDERSIDE OF DESK

FIXED POSITION LOCKABLE PEDESTAL, TIMBER VENEER FINISH

CABLE TRAY UNDER WORKTOP, BEHIND ACCESSIBLE PANEL

300

Project

TRADE WEB

CONTINUOUS LED LIGHT FITTING

MOORGATE EXCHANGE LEVEL 08 Drawing Title

Scale Status Checked By PC HOLDER FIXED TO UNDERSIDE OF D 1:50 & 1:20 & A1 FOR TENDER AR FIXED POSITION LOCKABLE Company Job Number Drawing Number Revision CABLE TRAY UNDER WORKTOP, BEHIN PEDESTAL, TIMBER VENEER 300 ACCESSIBLE PANEL PBPW - 324301 - A-DJOI-08-01 T FINISH

PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ

TENDER ISSUE

30

Revision

Date

AR

PC HOLDER FIXED TO UNDERSIDE OF DESK T +44 (0)20 7466 1000

Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ

CABLE TRAY UNDER WORKTOP, BEHIND ACCESSIBLE PANEL

Description

300

FIXED POSITION LOCKABLE PEDESTAL VENEER FINISH

JOINERY DRAWING CONTINUOUS LED LIGHT RECEPTION DESK FITTING

FIXED POSITION LOCKABLE PEDESTAL TIMBER VENEER FINISH T

WALNUT FINISH

3160

300

Client

FIXED POSITION LOCKABLE PEDESTAL TIMBER VENEER FINISH

1000

30 300

1080 PULL-OUT PRINTER DRAWER

© PRINGLE BRANDON PERKINS+WILL LTD

a

Back Elevation

128

747

900

WALNUT FINISH - SIGNAGE S/S

STONE FINISH

400

STONE FINISH 128

300

1080

3160

WALNUT FINISH - SIGNAGE S/S

200

300

400

300 1000 300

WALNUT FINISH

400

200

WALNUT FINISH - SIGNAGE S/S

CONTINUOUS LINE

30

CONTINUOUS LINEAR LED LIGHT FITTING

650

650

650

WALNUT FINISH

STONE FINISH

400

CONTINUOUS LED LIGHT FITTING

CABLE TRAY UNDER WORKTOP, BEHIND ACCESSIBLE PANEL

300

CONTINUOUS LINEAR LED LIGHT FITTING

FIXED POSITION LOCKABLE PEDESTAL TIMBER VENEER FINISH

3/33/14

1

WALNUT FINISH

650

P:\London\324301 TradeWeb - Moorgate Exchange\Drawings 2013\Finished Drawings\PBPW-324301-A-DJOI-08-01.dwg

WALNUT FINISH 650

650

30

400

300

900

500

900

30

4

Enlarged Plan

400

128 128

30 PC HOLDER FIXED TO UNDERSIDE OF DESK

PULL-OUT PRINTER DRAWER

400

Client

TRADE WEB

Revision

Date

Project

MOORGATE EXCHANGE LEVEL 08 Drawing Title

JOINERY DRAWING RECEPTION DESK Scale

AR

Description

PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREET LONDON EC2A 4QJ T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ

1:50 & 1:20 & A1 Company

Job Number

Status

FOR TENDER Drawing Number

PBPW - 324301 - A-DJOI-08-01

Checked By

AR

Revision

T

Enlarged Plan

900

500

900

400

4

747

400

74

900

500

30 PC HOLDER FIXED TO UNDERSIDE OF DESK

30

Enlarged Plan

PULL-OUT PRINTER DRAWER

PULL-OUT

1:20 @ A1

1:20 @ A1

Client Client

TRADE WEB

Project

TRADE WEB

MOORGATE EXCHANGE LEVEL 08 Drawing Title

JOINERY DRAWING RECEPTION DESK

3/33/14 TENDER ISSUE

T

P:\London\324301 TradeWeb - Moorgate Exchange\Drawings 2013\Finished Drawings\PBPW-324301-A-DJOI-08-01.dwg

Revision

128

747

PC HOLDER FIXED TO UNDERSIDE OF DESK

© PRINGLE BRANDON PERKINS+WILL LTD

4

awing indicates design intent only. e contractor is responsible for taking and heduling all dimensions on site. not scale from drawings. port all discrepencies to the architect before TENDER ISSUE T oceeding.

747

30

1:20 @ A1

otes

300

400

128

Date

Description

AR

PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONHILL STREETTLONDON EC2A 4QJ T +44 (0)20 7466 1000 Revision Date Registered in England and Wales No 05961514 10 Bonhill Street, London EC2A 4QJ

Scale TENDER ISSUE 1:50 Description

& 1:20 & A1

Company

Job Number

Status

AR TENDER FOR Drawing Number

© PRINGLE BRANDON PERKINS+WILL LTD

400

747

400

747

PRINGLE BRANDON PERKINS+WILL LIMITED 10 BONH Checked By T +44 (0)20 7466 1000 Registered in England and Wales No 05961514 10 Bonhill

PBPW - 324301 - A-DJOI-08-01

AR

Revision

T

-324301-A-DJOI-08-01.dwg

128

3/33/14

P:\London\324301 TradeWeb - Moorgate Exchange\Drawings 2013\Finished Drawings\PBPW-324301-A-DJOI-08-01.dwg

b

5. TradeWeb Office a. Bespoke reception desk, joinery drawing. b. Door types drawing for single glazed partition with framed pivot door.

- Work Experience

Deniz Kayımbaşıoğlu


a

b

c

d

a. Aerial view. b. A view from the Themes River, looking towards the A block. c. A typical flat interior, showing the kitchen and the dining area. d. A view looking towards blocks E, F and G.

6. New Capital Quay New Capital Quay is a masterplanning project located just to the south of the Thames river, surrounded by it. The project was originally started by the Broadway Malyan Architects and was eventually handed to the BUJ Architects. It is 10 minutes walk from Greenwich Town Centre and the Maritime Museum. The project consists of 980 flats with commercial spaces. There is a Waitrose on site as well as bars, restaurants and a proposed museum.

Deniz Kayımbaşıoğlu

- Work Experience


b

b

Block B

Block C

Block D

Block A

Block Ε Block H Blocks F & G

c

c

a

b

c a. Site plan. b. b:b North elevation. c. c:c South elevation.

6. New Capital Quay

- Work Experience

Deniz Kayımbaşıoğlu


71 71

1

32

2

450

16 32 60

12

60

16

450

460 460

495

3 888

325

150

3 888

325

150

1213 1314 14 15

Flat Type F03, F14,

150 1170

1516

285

1170

16 17 1718

285

200

16

Type SR08m Flat Type F03, F14, Type SR08m

Flat Type E08, G21

800

7

16

495

Type SR08 Flat Type E08, G21 Type SR08

600

800

3

7

320 320

150

1819 1920

5273 455 5273 455

365 365

10

1112

1125

600

1200

3

17

750

9

5 265

1125

17

1

750

9

10

9

1011

16

16

10

89

1

16

16

67 78

703

16 16 16

16

16

56 703

Layout to be confirmed Eng. Layoutby toM&E be confirmed by M&E Eng.

600

1141

4

4

8

1200

100

8

1

750

750 750 600 600 600 200 600

100

2

1

1200

2

1141

1491

4

4

1491

2

600

1 views 2 3

750 1200

16

32

1000

541

14

156

1 4views 3

300

14

32 60

1000

120 300 150 120 150

4

156

60

21

541

300

45

550

21

5 265

4

550

278

300

278

3

3

2021 21

120

18

450

13 25

450

5 273

150 300 120 541 150 300 120

455

5 273

455

18

888 3

320

365

320

25 13 150 888 3

460 460

5265 18

1141 4

18

5265

1141 4

150

3 800 1000 3 800 1000

6

600

13

1500

16

16

16

13 680

Notes

Kitchen

279 279

680

6

18

16

1500

1500

17

14

800 700 800 700

16

16 16

14

600

600

600 600

400 800 800 959 959 1500

12 12

17

400

750

680 800680 800

16

16

25 13 365

600

600 750

16

600 800 800 1000 1000

16

16

9

16

680

6

541

600

600

1500

17

6

13 25

600

600 600

600

14

9 17

16

16

16

16 16

150

18

14

7

16

680

19

21 21

680 800 800

16

600

600 600

16

16

16 16

150

150

9

12

20 19

16

7

680

480 150

9

12

15

800 800 680 680 400 400

750

15 20

1500

1500

1000

480

600

600 750

1000

1500

19 19

16

16

320 320

1000

16

10 750 11600 10 750 11600

11 10 11 10

1000

11

700 800700 900800 900

11

a

11

11

800

800 800 800 800

1000 1000

800

11

600

120

11

1

All dimensions are in millimeters.

2

Dimensions are not to be scaled directly from this drawing.

3

All dimensions are to be checked on site and the Architect is to be informed of any discrepancies before construction commences.

4

All references to drawings refer to the current revision of that drawing.

5

Structural and services information shown is indicative only. Refer to Consultants drawings for details and setting out.

164

164

K2

K1 A

Kitchen storage requirements - 4p. 2.1 cu.m. Extract from 'Standards and Quailty in Development'.

B

C

D

E

F

G

J1

J2

H

100 900 1000

528

600 700

900

900

1350

1850

1850

450

500 1350

600

1345

1850

450

723

500

900 700 600

1600

600

1200

300

300

600

1200

500 100

725

300

600

Description

Date

By

Chk

450

3 600

A Rev

600

1850

views 2

600

1

300

300

600

30 - 33 Monck Street

Tel: 020 7227 6900 Fax: 020 7227 6901 e-mail: buj@buj.co.uk

900 1000

150

SW1P 2AP

600

600

1350

London

Job title

Greenwich Reach Block F - Social Rented Flats Drawing title

529

b

1200

Kitchen Schedule 4 of 4 Wheelchair Accessible Flats Flat Type F12-3 Drawn by

Date

jj

October 2008 1:50 @ A2

Checked

Date

Job No.

CI/SfB Ref.

1039

(--)

Scale @ A2

Issued for

TENDER Project Status

C

Drawing No.

Revision

F593 A

6. New Capital Quay a. DDA bathroom type drawing. b. A kitchen type drawing of Block G.

Deniz Kayımbaşıoğlu

- Work Experience


Substation vent

FS

Slab edge

Garden

19

18

17

16

15

14

13

12

Ground Floor FFL +6.300

11

7800

Half Landing FFL +4.637

Substation vent

20

21

22

28

28

23

24

25

27

Ground Floor FFL +6.300

26

Slab edge

Ground Floor FFL +6.300

2.68°

7800

Lounge / Dining Lounge / Dining Kitchen Type A06

Kitchen Type A12

Stair Type 12 dwg A511

06

05

04

Lounge / Dining

01

02

Lounge / Dining

03

Cloakroom CR-02

2.68°

FS

FS

FS

FS

FS

FS

Cloakroom CR-12

W/M

09

08

07

Kitchen Type A10 Kitchen Type A08

Kitchen Type A04

Lounge / Dining

Cup'bd

Cloakroom CR-08

Cloakroom CR-06

Cloakroom CR-10

Lounge / Dining 11

Hall

Cup'bd

Cup'bd

Stair Type 10 dwg A509

14

7800

7800

Hall

Hall

10

Cup'bd

13

Cup'bd

Kitchen Type A02

01

Hall

12

12

11

13

09

10

Cup'bd

10

01

02

03

04

05

06

07

08

09

02

03

04

05

06

07

08

09

14

Stair Type 08 dwg A507

Hall

11

13 10

11

12

09

09

08

02

06

08

Stair Type 06 dwg A505

07 06

01

05

04

04

03

03

05

04

03

02

01

FS

02

06

07 01

FS

Stair Type 04 dwg A503

Hall

01

05

02

08

03

07

04

03

05

04

Notes Hall

01

02

03

FS

Cloakroom CR-11

06

Cloakroom CR-01

Stair Type 11 dwg A510

05

Cloakroom CR-09

Cup'bd

02

CR-04 06

01

07

GROUND FLOOR

Stair Type 02 dwg A501

08

04

07

06

05

04

Stair Type 05 dwg A504

01

02

03

04

05 06 07

Cloakroom CR-05

Hall

03

S

Cup'bd

Lounge / Dining

2 Dimensions are

07

Hall 02

Stair Type 07 dwg A506

2200

01

Cup'bd

01

1975

02

Hall

1 All dimensions

F

Stair Type 09 dwg A508

08

Cup'bd

06

LIFT SHAFT 02

Cloakroom CR-07

Cup'bd

05

600

Cup'bd

2365 2015

1950

01

02

03

04

06

Kitchen Type A11

Cup'bd

3 All dimensions informed of any

1900

05

Study

2734 FS

600

600

600

Kitchen Type A07

600

07

06

08

600

Lounge / Dining

Kitchen

Cloakroom CR-03

Stair Type 01 dwg A500

350

Lounge / Dining

600

05

7800

04

2901

7800

03

2600

LIFT SHAFT 01

Hall Stair Type 03 dwg A502

Hall

Kitchen Type A09

Kitchen Type A05

4 All references t drawing.

5 Structural and Consultants dra

600

Notes

Lounge / Dining

2670

2900

600 600

FS

600

1901 2670

2900

Flat Type - A19, A19-1 Number of Flats =10

Flat Type - A20, A20-1 Number of Flats = 9 600

2150

Flat Type - A18 Number of Flats = 9

1750

1750

1920

Flat Type - A17 Number of Flats = 10

2150

2905

2680

3220

2905

2605

2305

1750

1750 2150

1920

2150

2905

2680

FS

600

600

350

600

600 2150

7800

2150

Flat Type - A16 Number of Flats =11

7800

Flat Type - A15 Number of Flats =11

7800

b

Flat Type - A14 Number of Flats = 10

600

600

2345

600 1600

Flat Type - A14 Number of Flats = 10

2200

Flat Type - A16 Number of Flats =11

2015

600

2901

Flat Type - A15 Number of Flats =11 350

1950

600

Flat Type - A13 Number of Flats = 10

2600

1671

Flat Type - A17 Number of Flats = 10

Flat Type - A18 Number of Flats = 9

1975

600

1900

Flat Type - A19, A19-1 Number of Flats =10

Flat Type - A20, A20-1 Number of Flats = 9

2734

600

drawing.

5 Structural and Consultants dra 2670

2900

1750

1750

600

2150

1920

2150

2905

3220

2680

2305

2605

2905

600 2150

2150

Notes

Each kitc 2 Dimensions are integrated 3 All dimensions recycling informed of any 10 cot 4 Alllitre references

1 All dimensions

1901

2600

600

600

2365

Flat Type - A12 Number of Flats = 1

Each kitc integrated recycling 10 litre co

600

600

600

600

600

600

600

4 All references t drawing.

5 Structural and Consultants dra

1671

2600

600

7800

Flat Type - A13 Number of Flats = 10

600

600

7800

Flat Type - A12 Number of Flats = 1

2734

600

2345

600 1600

a

600

600

600

2 Dimensions are

3 All dimensions informed of any

1900

7800

600

3220

2905

2605

FS

1975

2901

600

Dining

1 All dimensions

2200

Lounge

7800

2150

2305

600

2365 2015

1950

2600

Lounge / Dining

7800

2150

Lounge Kitchen Type A01

600

600

600

600

600

600

600

2345

600 600

600

1600

1671 1901

2600

600

550 600

Flat Type - A18 Number of Flats = 9

550

51 19

600

600

98

26

550

98

26

51 19

95

26

325

2370

550

360

2620

819

1740 600

19 51

26

Flat Type - A24-3 Number of Flats = 1

98

26

Flat Type - A25 Number of Flats = 1

98

26

600

819

2500

1790

1510

371

600

600

Flat Type - A24-1, A24-2 Number of Flats = 5 95

51

Flat Type - A24 Number of Flats = 3

19

Flat Type - A23 Number of Flats = 9

58

Flat Type - A22 Number of Flats = 9

28

Flat Type - A21, A21-1, A21-2 Number of Flats = 9

1450

0

0 60

819

0 60

60

2089

3526

609

3776

600

Flat Type - A20, A20-1 Number of Flats = 9 1740

819

2500

1790

1510

600

371

600

58

600

600

28

600

600 3426

Flat Type - A19, A19-1 Number of Flats =10

Each kitc integrated recycling 10 litre co

1450

Flat Type - A17 Number of Flats = 10

819

Flat Type - A16 Number of Flats =11

609

Flat Type - A15 Number of Flats =11

819

360

0 60

Flat Type - A14 Number of Flats = 10

0

3526

60

Flat Type - A13 Number of Flats = 10

3776

0 60

Flat Type - A12 Number of Flats = 1

325

2370

3426

2620 2089

Flat Type - A22 Number of Flats = 9

600

600

Flat Type - A23 Number of Flats = 9

600 360

Flat Type - A24 Number of Flats = 3

Flat Type - A24-1, A24-2 Number of Flats = 5

Flat Type - A24-3 Number of Flats = 1

Flat Type - A25 Number of Flats = 1

550

325

550

819

Flat Type - A21, A21-1, A21-2 Number of Flats = 9 3776

1740

819

2500

A

600

95

51

26

600

26

3825

2370

3525

3426

Note rega

Rev

51

98

26

19

600

98

19

58

28

600

600

600

1510

1790

600

2620 2089

Flat Type - A24-1, A24-2 Number of Flats = 5

900

600

Rev

Job title 2105

Greenw

198

185

385

1600

Note rega

600

3525

176 176

3600

185

Flat Type - A31 Number of Flats = 1

Block A Kitchen 2 of 2 1039

Flat Type - A32 Number of Flats = 1

600

Job No.

2905

198

595

292

600

600

3825

3525

385

600

600

Flat Type - A30 Number of Flats = 1

2935

4309

3050

Drawn by

2905

1785

526

2085

3934

DK

600

900

Flat Type - A31 Number of Flats = 1

600

900

Greenw

Drawing title

400

600

600

600

3794

600

Job Job title No.

1039

600

2306

2651

2351

3686

600

Flat Type - A32 Number of Flats = 1

2105

Flat Type - A30 Number of Flats = 1

2105

Flat Type - A29 Number of Flats = 1

600

Flat Type - A28 Number of Flats = 1

600

Checked

600

2605

600

2105

2105

600

2306

185

71

Drawn by Note rega

Rev

Checked Drawing title

400

1834 724

Block A Kitchen Job title 2 of 2 Greenw A DK

3610

2351

2651

600 900

526

Flat Type - A29 Number of Flats = 1

3794

388

Flat Type - A28 Number of Flats = 1

3686

595

1600 2605

600

Flat Type - A27 Number of Flats = 1

1600

2905

3600

2935

3934

600

292

600

600 185

71

a. Sketch for a flat layout of the A block. Flat Type - A26 Flat Type - A27 b. Ground floor A block. Number of Flats = 1 plan of the Number of Flats = 1 c. Interiors of a typical flat.

600

600

600

600

600

724

Drawing title

600

900

388

1834

600

600

2905

1785

2306

3794

4309

600

2085

3686

3050

2351

2651

2605

600

600

Flat Type - A25 Number of Flats = 1

600 900

400

c

Flat Type - A24-3 Number of Flats = 1 3825

600

600

Flat Type - A26 Number of Flats = 1

A

2905

1785

3610

Flat Type - A24 Number of Flats = 3

2105

Flat Type - A23 Number of Flats = 9

600

600

600

3050

600

Flat Type - A22 Number of Flats = 9

4309

600

600

Flat Type - A21, A21-1, A21-2 Number of Flats = 9

2085

198

185

385

600

371

3610

1450

819

0

0

60

609

0

60

60

3526

724

185

71

3600 595

1834

292

176

388

2905

2935

3934

Block A Kitchen 2 of 2 Drawn by

526

DK Checked

Flat Type - A26 Number of Flats = 1

Flat Type - A27 Number of Flats = 1

Flat Type - A28 Number of Flats = 1

Flat Type - A29 Number of Flats = 1

Flat Type - A30 Number of Flats = 1

Flat Type - A31 Number of Flats = 1

Flat Type - A32 Number of Flats = 1

6. New Capital Quay

- Work Experience

Deniz Kayımbaşıoğlu

Job No.

1039


Garage Gazebo

Annex

Main house

a

b

c

d

a. Aerial view. b. View of the mantion through the site entrance. c. Interiors of the drawing room. d. View of the mantion through the gazebo.

7. The Heath Hall Heath Hall, or East Weald as it was originally called is a Grade II listed mansion located on the Bishops Avenue, Hampstead, London. It was designed by architects Victor Ashley and F. Winton Newman. It was made in 1910 and was originally owned by the son of sugar giant Tate & Lyle’s Lyle. It was then used as a house for the blind After the World War II, then in 1950, it was sold to the Bank of China and finally in 2001 to our client. The mansion is formed of 15 bedrooms, a panic room, a library, indoor and outdoor swimming pools, a gym, a cinema room, a sauna and a steam room and a comercial and a residential kitchens.

Deniz Kayımbaşıoğlu

- Work Experience


PLANT ROOM

PROPOSED PERGOLA

PROPOSED PERGOLA

GAZEBO

PROPOSED BEDS

CHILLERS

PROPOSED BEDS

BIN

Up

PROPOSED BEDS

PROPOSED BEDS

Hatch 1

Up

PROPOSED REFLECTED POOL

PROPOSED LAWN GARAGE

PROPOSED LAWN

Down

Down

REMODELLED EAST TERRACE

Down THE SUN ROOM G10

THE WINE CELLAR AG04 STAFF ROOM AG08

CUP'D

THE FAMILY ROOM G06

THE KITCHEN AG05

THE SNOOKER ROOM G11

AG07

WC3 AG09

STEAM ROOM AG10

WC1 AG13

THE GYM AG02

WC2 AG12

SAUNA AG11

EXISTING STAIRS G08

AG06

CLOAKROOM G09

ELECT CUP'D

COURT YARD

ENTRANCE HALL AG03

THE LIBRARY G13

ENTRANCE HALL G02

THE KITCHEN G05

VERANDA ROOM G12

ELECT CUP'D

D

STUDY G03

JACUZZI SWIMMING POOL AG01

THE DINING ROOM G04

ENTRANCE LOBBY G01

THE DRAWING ROOM G14 CLOAKROOM G16

BAR AREA G15

NEW JOINERY

a

b

c

7. The Heath Hall a. Site plan. b. East elevation. c. West elevation.

- Work Experience

Deniz Kayımbaşıoğlu


a Notes

Dimensions are not to be scaled directly from this drawing.

3

All dimensions are to be checked on site and the Architect is to be informed of any discrepancies before construction commences.

4

All references to drawings refer to the current revision of that drawing.

30

All dimensions are in millimeters.

2

4 5

Structural and services information shown is indicative only. Refer to Consultants drawings for details and setting out.

Void

Section A'

Void

3645

Polished timber gates, to match main entrance doors in detail, profiles, etc.

192

6

6mm thick ms plate to support lamp

Mild steel gates painted black

Brick and tile posts constructed to match brick coursing/creasing on main house using bricks to match

20

4 x 30mm ms flat framing on all 4 sides

Lead canopy

3380

214

Lead finial

Opaque glass panels with bronzed metal framing - illuminated from within

1

30

Stone plinth to match main house

Lamp stand to be galvanised and polyester powder coated black

Notes

650

Section B scale 1:5

900

650

4600

650

900

650

3mm clear border around text Solid black text

105

1525

1199

"OPAL" obscure film

220

Rev

Description

Date

Rev

London

30 130

B

Job title

DK Checked

30 170

b

Lamp stand elevation 1:20

rc

Section C scale 1:5

c

Checked

e-mail: buj@buj.co.uk

Job title

Drawn by

Front Entrance Lamp Stands Sheet 2 Drawn by

Scale @ A3

Date

05.11.10

1:5 @ A3 Issued for

Date

date

CONSTRUCTION

Job No.

CI/SfB Ref.

Project Status

909

(--)

C

Drawing No.

Scale @ A3

Date

09.10

1:10 & 1:5 Issued for

Date

TENDER

Job No.

CI/SfB Ref.

Project Status

909

(--)

C

Drawing No.

Revision

112 -

Revision

253 -

a. Planning application drawing for the new external pipes. b. Lamp stand design for the mansion entrance. c. Light box design for the site entrance.

7. The Heath Hall

Deniz Kayımbaşıoğlu

Chk

Drawing title

Drawing title

New Portland Stone plinth

By

Tel: 020 7227 6900 Fax: 020 7227 6901

East Weald The Bishops Avenue

initial

A

Date

30 - 33 Monck Street London

Bespoke Gate Lantern Text

East Weald 59 The Bishops Avenue

15

Description

SW1P 2AP

Fax: 020 7227 6901 e-mail: buj@buj.co.uk

SW1P 2AP

B

Chk

Tel: 020 7227 6900

30 - 33 Monck Street

Detail 1

By

60mm diameter ms circular bar collar to which the 4 legs are welded at the top

- Work Experience


Elevation AA

Elevation BB

B

B

A

A

Sanderson 47-7P Sanderson 47-8P Sanderson 47-9P Sanderson 47-10M Sanderson 47-11M

a

Silver

Colour Key

Key Plan

Elevation CC

a. Ground floor colours of annex corridor.

7. The Heath Hall

- Work Experience

Deniz Kayımbaşıoğlu


- Education

1.

Convergent Sonics: The Shifting Aural Focus University for the Creative Arts, Canterbury

2016

The MA graduation project. Interactive sound installation aimed at creating different acoustic environments for the visitors. Achieved: Distinction Blog: http://denizkayimbasioglu.tumblr.com

2.

Modular Acoustics Panels

2015

University of the West of England, Larnaca

Final PgC project. User interactive modular acoustic panel design. Achieved: Merit

3.

Portable Removable Partitions

2015

University of the West of England, Larnaca

Initial PgC project. Designed to be assembled and disassembled by employees of the office. Affordable parition solution for offices. Achieved: Merit

4.

Textile Museum (Lille)

Address: 4-14 Rue Charles Quint, 59000 Lille, France University of Kent

2010 - 2011

Final year, university project. Textile museum, formed of a permanent exhibition space, a temporary exhibition space, 8 workshops and 2 accommodation units.

Deniz Kayımbaşıoğlu

- Education


a

b

c

d

a. Aerial view. b. A view, looking towards structure type 1. c. An image demonstrating user interaction. d. A view, looking towards structure type 2.

1. Convergent Sonics: The Shifting Aural Focus An interactive sound installation designed and aimed at highlighting importance of form and material in altering acoustics and experience of sound in a space. In parallel with that, it draws focus on multi-sensory experience of architecture. The installation is formed of 6 parabolic dishes (sound mirrors) attached to 5 light timber frame structures, that are strategically positioned in order to create different acoustic environments. The first position (figure a) is intended to be a stand-alone experience where while a user is interacting with a sound mirror, their voice is amplified. The second position (figure c) is formed of two mirrors facing each other in order to create a ‘space inside a space’. The close relation of the two dishes create a semi isolated zone for the visitors which make them feel as if they are in a separate environment. This happens due to the sound dispersing properties of the back of the dishes as well as the magnitude of the amplification of their voice as they speak due to two mirrors functioning together, resulting in a disorienting experience. - Education

Deniz Kayımbaşıoğlu


a

b

+1626 Average female height +1504 Average female ear level

c

d

1. Convergent Sonics: The Shifting Aural Focus a. Structure tye 1, plan. b. Front elevation. c. Side elevation. d. Isometric drawing.

Deniz Kayımbaşıoğlu

- Education


a

1. Convergent Sonics: The Shifting Aural Focus a. Structure type 1, exploded diagram.

- Education

Deniz Kayımbaşıoğlu


a

b

+1626 Average female height +1504 Average female ear level

c

1. Convergent Sonics: The Shifting Aural Focus a. Structure tye 2, plan. b. Isometric. c. Elevation.

Deniz Kayımbaşıoğlu

- Education


a

1. Convergent Sonics: The Shifting Aural Focus a. Structure type 2, exploded diagram.

- Education

Deniz Kayımbaşıoğlu


a a. Structure tye 1 construction process.

1. Convergent Sonics: The Shifting Aural Focus

Deniz Kayımbaşıoğlu

- Education


a a. Construction process of a parabolic dish and attaching it to the structure type 1.

1. Convergent Sonics: The Shifting Aural Focus

- Education

Deniz Kayımbaşıoğlu


Soundscape Speakers 2 Sensor 4

Sensor 5

Sensor 6

Speakers 4

Speakers 5

Speakers 3

Speakers 6

Focal Point

Speakers 2 Sensor 3

Speakers 1

Sensor 1

Sensor 2

a

Soundscape Speakers 1

Sensor trigger

Sound travel route

Sensor trigger

Sound travel route

b

c

Sound travel route Sound travel route Focal point

Focal point Sensor trigger

Sensor trigger

b

c

1. Convergent Sonics: The Shifting Aural Focus Project Next Step The further step the project could have been taken to was to form a soundscape using speakers with the help of 6 sets of stereo speakers. The installation would be triggered with the presence of the visitors and different animal sounds that belongs to the Kent county nature would create the illusion of moving around in the exhibition space. a. Setting up diagram showing the positions of ultrasonic sensors which would detect visitors presence to trigger speakers connected with the help of an Arduino board. b., c. Diagrams demonstrate how the user interaction effects the installation. Deniz Kayımbaşıoğlu

- Education


a

b

c

d

a. Velcro pieces positioned on the wall for panels. b. A image demonstrating how the panels would fit onto the velcro. c. Panels positioned on to the velcros. d. Physical model representation of the panels.

2. Modular Acoustic Panels The concept given for this module was “innovation in design realisation”. For my project The origami acoustic panels were designed to be modular and can be assembled and disassembled by the user; making it playful and user interactive. The panels were to be constructed by 100% wool felt, totally recyclable. They would be attached to the wall with velcro, which can be used with good quality felt witout any repercussions.

- Education

Deniz Kayımbaşıoğlu


Cover Page Cover Page

Page 1 Page 1

Page 2 Please follow the folding instructions below:

FOLDING FOLDING INSTRUCTIONS INSTRUCTIONS KEY: KEY: FoldFold the the piece piece towards towards the the direction direction the the arrow arrow is showing is showing fromfrom where where the the dashed dashed line line passes. passes. FoldFold overover to the to the direction direction shown. shown. FoldFold intointo the the pocket. pocket. FoldFold to the to the other other faceface of the of the origami. origami. Make Make a crease a crease fromfrom where where the the dotted dotted line line passes. passes. Shows Shows the the frontfront andand the the back back of of the the model. model. Pull Pull the the pieces pieces fromfrom the the flapsflaps held. held. PushPush in. in.

a

b

1

Page 4 Page 4

Page 3

1

c

2

Back Back

Please follow folding instructions below: Please follow the the folding instructions below:

d

3

e

4

4

f

a. Cover page of the instruction manual of how to put the origami panels together. b. Page 1. c. Page 2. d. Page 3. e. Page 4. f. Back page.

2. Modular Acoustic Panels

Deniz Kayımbaşıoğlu

- Education


E

G

G

F

Kitchenette Printing Open Plan Office

Open Plan Office Break Out Meeting Rm 4

Meeting Rm 3 b

Meeting PB1 Admin 1 Rm 1

A

F Meeting Admin 2 Rm 2

140

D

80

A

110

D

E

60

PB2 a

d

c

e

f

a. The example office design that would use the portable removable partitions. b. System detail. c. Indicative dimensions for the panels. d., e., f. Physical model representation of the partition system.

3. Portable Removable Partitions What was expected for this module was to design ‘a game or a puzzle’ with particular focus on using the laser cutting technology. Project above demonstrates a portable removable partition system, fitted into a grid and can be assembled and disassembled by two people easily. The idea was to create an affordable solution for companies to form their own office spaces according to their needs. To portray the way these panels work, an office space was designed (for Coca Cola Enterprises) that would exclusively use these panels. The grid system for the panels would be inserted in between raised flooring and suspended ceiling systems.

- Education

Deniz Kayımbaşıoğlu


a

b

c

d

e

f

g

a. Elevation AA. b. Elevation BB. c. Elevation CC. d. Elevation GG. e. Elevation DD. f. Elevation EE. g. Elevation FF.

3. Portable Removable Partitions

Deniz Kayımbaşıoğlu

- Education


a

b

c

d

a. Site plan b. 3D representation, looking towards the courtyard. c. Pre-cast concrete facade panel design. d., e., f. 3D representation, aerial view of the project, looking towards the back of the building.

4. Textile Museum The project is a textile museum located in Lille, France. The site was located right next to the Wazemmes Market and the Gambetto underground station in a working class residential area. The site at the time was occupied with an abandonned supermarket. There is a permanent, a temporary exhibition space, a textile production museum, a cafe, a gift shop, 6 small and 8 large workshops, a lecture theatre, 4 seminar rooms, administration area, a library and a textile archive. The inspiration for this project came from the old pentagonal citadel with a fortress built by the French when they occupied Lille in 1667. Upon arrival to the building designed, people enter a courtyard which both serves as a meeting point and also a relaxing stop for people to rest and spend time at. There is also a cafe available both for the museum visitors and the outside. - Education

Deniz Kayımbaşıoğlu


a

b

4. Textile Museum a. Historical and touristic locations. b. Sun study for the site.

Deniz Kayımbaşıoğlu

- Education


a

b

d

e

4. Textile Museum a. Ground Floor 1 Plant room 2 Staff entrance 3 Staff area 4 Museum storage 5 Permanent exhibition area 6 Temporary exhibition area 7 Visitor entrance 8 Visitor WCs 9 Shop 10 Cafe staff area & kitchen 11 Cafe 12 Flats access - Education

b. First Floor 13 Library 14 Museum archive 15 Cafe staff area 16 Outdoor cafe area c. Second Floor 17 Storage 18 Lecture theatre 19 Seminar rooms 20 Small workshops 21 Public WCs 22 Textile production museum

c

23 Admin 24 Large workshops d. Third Floor 25 One bedroom flat, Level 1 26 Two bedroom flat, Level 1 e. Fourth Floor 27 One befroom flat, Level 2 28 Two bedroom flat, Level 2

Deniz Kayımbaşıoğlu


a

b

c

e

d

f

a. East elevation. b. South elevation. c. West elevation. d. Key plan, ground floor of the building. e. Section A. f. Section B.

4. Textile Museum

Deniz Kayımbaşıoğlu

- Education


- Hand Sketches

Deniz Kayımbaşıoğlu


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.