Portfolio

Page 1

Portfolio

Dennis Larsen



Flexible Module system BRIEF: Being approach by the company B-Management a trendy urban retail chain residing in London and Brighton. B-Management wanted a new flexible module system designedn as the conventional shop fittings did not meet the criteria of flexibility and design. Rio Beach wanted the system implemented in the new flagstore in Covent Garden


backplate

frontplate

rubberpad

construction

mdf

The back plate is routed in from behind the wall, the front plate attaches and rubber pad finishes of to create the basic grid. The construction pole is then attached to take shelves or other steel parts



The Flexible Module System consists of several different parts to maximize the usage options of display. shelves with oak frames are pushed over the construction poles and locked. The locks picks up the hanging rails.






Rio Beach

Flagstore in Covent Garden

BRIEF: The Clients wanted a complete redesign of their shop in Covent Garden. The trendy semi expensive clothing collections demanded a perfect setting that not only reflected the items but also the customers. The choice of solid oak shelves combined with rubber skirtings and raw key-clamp systems with glass shelves. A white resin floor is used on both floors. A problem that needed to be solved was the flow tp the lower ground floor that under the existing cicumstances did not prove well. The introduction of a dobbelt high “staple� drags the eye and the customer downstairs and connects the two floors.


podium

podium

flexible module system

ground floor

changing room





changing room

flexible module system

changing room

Lower ground floor

flexible module system

changing room










Portfolio

Dennis Larsen







Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.