STEP Skills Development and Competitions CONTEST AREA: Indutsrial Arts CONTEST PACKAGE Simple Wiring Circuit
GRADE LEVEL: Grade VI
ASSESSMENT CRITERIA
RESOURCES
PROCEDURE/SPECIFICATIONS
PERCENTAGE
T
PRELIMINARY ACTIVITIES a. Contest registration of trainers and contestants.
TIME ALLOTMENT TIME ALLOTMENT
Workmanship
50%
1 hour and 30 minutes DESCRIPTION
Functionality
20%
Health and Safety
10%
b. Submission of required documents for the contest. c. Ocular inspection of the contest venue. d. Briefing orientation of trainers with the contest administrator a day before the actual competition. e. Inspection and distribution of contest materials.
DURING Lamp controlled by a single pole switch using four (4) different wiring methods and a convenience outlet.
Handling and Use of Tools
10%
c. Other instructions (i.e. coaches)
a. Trainers shall serve as judges.
Speed
5%
Communacation Skills
5%
Assistant Electrician USE
TOTAL
For household and industrial use.
b. All outputs shall be endorsed to the Secretariat by the Contest Administrator. c. All endorsed outputs shall be displayed until the duration of the skills competition.
NOTES
100%
ATTACHMENT(S)
a. With regard to the provision of resources, the division and regional organizers may opt to deviate.
b. Coaches are allowed to observe the process within 3 Analytic Scoring Rubrics/ Percentage Table
FORM OF JUDGING Compatriot Judging
T O O L S
a. Briefing of trainers and contestants with the contest administrator (10 minutes) b. Inspection of contest materials, tools, and equipment.
AFTER EMPLOYABILITY OR BUSINESS OPPORTUNITY
Number of Participants: 1
meter range.
M A T E R I A L S
Contestant/s a. Screw drivers (flat and philip)
Organizer/s
cutting b. Pliers (common, side cutting and long nose) c. Claw Hammer d. Wire stripper e. Pull push rule f. Tester g. Hack saw
a. Cut out switch 30A b. Duplex wire (stranded #26) 3 meters long c. TW #14 (solid) 10 meters d. Plastic split knob, 6 pcs. with screw e. f. g. h. i. j.
Mica tubing (1 meter) PVC junction box PVC utility box Lamp p receptacle p Plastic moulding PVC fllexible conduit (½" ø)
k. PVC conduit (½" ø) l. PVC adaptor (½" ø) m. convenience outlet n. single pole switch
a. 1/2" or 3/4" x 2' x 2' plywood
ANALYTIC PERFORMANCE SCORING RUBRICS FOR SIMPLE WIRING CIRCUIT CRITERIA A. WORKMANSHIP 1. Installation of Junction Box 2. Installation of Light Receptacle
50%
•
8%
3. Installation of Switch
• Light receptacle was properly mounted and tightly screwed.
•
8%
• Switch was properly mounted and tightly screwed.
•
8%
• Duplex convenient outlet was properly mounted and tightly screwed. • Cut-out fuse was properly mounted and tightly screwed.
•
• Correct splicing and connecting of wires to the terminal. • Switching outlet switch; convenience outlet has power.
•
4. Installation of Duplex Convenient Outlet 8% 5. Installation of Cut-Out Fuse 6. Splicing and Connecting Wires
95 • Junction box was properly mounted and tightly screwed.
8%
10%
B. FUNCTIONALITY 1. Convenience Outlet 10% 2. Lamp
20%
• Switching single pole switch; lamp function. • Show the following standards:
10%
D. HEALTH AND SAFETY
E. HANDLING AND USE OF TOOLS F. SPEED
G. COMMUNICATION SKILLS (3-5 minutes only)
10%
10% 5%
5%
¾ Safety precautions was followed ¾ Working place is clean and orderly • All specified tools were properly used. • Was able to finish the output 10 minutes before the allotted time. • Able to clearly discuss/explain with confidence all of the following: a. Process b. function of tools and materials c. cost of production d. employability e. business opportunity
•
PERFORMANCE INDICATOR 90 85 Junction box was properly • Junction box was not properly mounted with one (1) slightly mounted with one (1) loose loose screw. screw. Light receptacle was properly • Light receptacle was not mounted with one (1) slightly properly mounted with one (1) loose screw. loose screw. Switch was properly mounted • Switch was not properly with one (1) slightly loose mounted with one (1) loose screw. screw. Duplex convenient outlet was • Duplex convenient outlet was properly mounted with one (1) not properly mounted with one slightly loose screw. (1) loose screw. Cut-out fuse was properly • Cut-out fuse was not properly mounted with one (1) slightly mounted with one (1) loose loose screw. screw. Correct splicing with slightly • Correct splicing but with loose loose connection of wires to the connection of wires to the terminal. terminal.
• One (1) of the following standards was not followed: ¾ Safety precautions was followed ¾ Working place is clean and orderly • One (1) of the specified tools was not properly used. • Was able to finish the output 5 minutes before the allotted time. • Able to discuss/explain with confidence only four (4) of the following: a. Process b. function of tools and materials c. cost of production d. employability e. business opportunity
80 • Junction box was not properly mounted with loose screws. • Light receptacle was not properly mounted with loose screws. • Switch was not properly mounted with loose screws. • Duplex convenient outlet was not properly mounted with loose screws. • Cut-out fuse was not properly mounted with loose screws. • Incorrect splicing and connection of wires to the terminal.
• Two (2) of the following standards was not followed: ¾ Safety precautions was followed ¾ Working place is clean and orderly • Two (2) of the specified tools were not properly used. • Was able to finish the output within the allotted time.
• Did not follow the healthy and safety standards.
• Able to discuss/explain with confidence only three (3) of the following: a. Process b. function of tools and materials c. cost of production d. employability e. business opportunity
• Able to discuss/explain with confidence only two (2) of the following: a. Process b. function of tools and materials c. cost of production d. employability e. business opportunity
• Specified tools were not properly used. • Was not able to finish the output within the allotted time.