design by
To complete the project on time and on budget, most aspects of the building were designed to be pre-fabricated at the studio. Hundreds of pieces of flat-pack, 1/4” steel were plasma cut and sent to our facility, where they were welded into the connections of the structure. Simultaneously, 20 foot lengths of 2”x8” LSLs were cut and drilled to create the basic structural components. The skeleton was then assembled on site in a matter of days.