Validating the Construction Schedule by simulations
Based on the addition of scheduling data to the project information model, construction stakeholders can have an exhaustive real-time visualization of the project from design to completion at a very early stage. The real time visualization leads to the identification of risks and issues before they become expensive mistakes.
Project monitoring through 4d graphical
representation:
The 4D Dynamic model helps in comparing the scheduled plan with the actual graphically. Schedule that is linked to the 3D model needs to be updated through the construction phase with the actual dates to compare the planned vs actual graphically.
Better project interdisciplinary coordination
It provides a platform to improve the planning and management of construction activities by running a number of simulations. 4D Model streamlines team member coordination. With everyone in the project being on the same page and all members know what needs to be done next through visualizing the construction flow.