Typology Schedule and Budget
THE FOLLOWING PAGES PRESENT SEVEN TYPES OF INTERVENTIONS. THE LOCATIONS OF THE INTERVENTIONS ARE PRESENTED IN THE OVERALL CORRIDOR PLAN THAT IS DIVIDED INTO 13 AREAS. USE THE IMAGES PRESENTED IN THE TYPOLOGY SECTION AS REFERENCE WHEN CONSIDERING POSSIBILITIES FOR PUBLIC ART AND PLACEMAKING INTERVENTIONS THROUGHOUT THE CORRIDOR. THE IMAGERY PRESENTED IS FOR INSPIRATION ONLY AS ARTISTS WILL BE HIRED TO COMPLETE EACH PROJECT.
# Budget: Base Project
Size Category Allocated Budget for Artists Corresponding Area Typology
1 Traffic Signal Controller Cabinet Small $1,500 Area 10 Typology 2 - Traffic Signal Controller Cabinet Mural 2 Traffic Signal Controller Cabinet Small $1,500 Area 7 Typology 2 - Traffic Signal Controller Cabinet Mural 3 Traffic Signal Controller Cabinet Small $1,500 Area 5 Typology 2 - Traffic Signal Controller Cabinet Mural 4 Traffic Signal Controller Cabinet Small $1,500 Area 3 Typology 2 - Traffic Signal Controller Cabinet Mural 5 Traffic Signal Controller Cabinet Small $1,500 Area 2 Typology 2 - Traffic Signal Controller Cabinet Mural 6 Bright Words to Live By Medium $7,000 Throughout Typology 5 - Rain Activated Sidewalk Art 7 I-70/71 Mural Large $40,000 Area 13 Typology 1 - Underpass Mural & Lighting 8 Custom Transit Stop Bench Small $3,500 Area 9 Typology 4 - Custom Bench at Transit Stop 9 Custom Transit Stop Bench Small $3,500 Area 6 Typology 4 - Custom Bench at Transit Stop 10 Custom Transit Stop Bench Small $3,500 Area 4 Typology 4 - Custom Bench at Transit Stop 11 Custom Transit Stop Bench Small $3,500 Area 3 Typology 4 - Custom Bench at Transit Stop 12 Custom Transit Stop Bench Small $3,500 Area 2 Typology 4 - Custom Bench at Transit Stop 13 Northside Public seating amenity Large $22,000 Area 7 Typology 6 - Public Amenity Zone 14 Northside Public seating amenity Large $22,000 Area 3 Typology 6 - Public Amenity Zone 15 Transit Shelter art Small $3,500 Area 9 Typology 3 - Transit Shelter Art 16 Transit Shelter art Small $3,500 Area 1 Typology 3 - Transit Shelter Art 17 Burroughs Elementary South Lane
Mural 18 Cream and Sugar Parklet
19 Food Truck Lane
Total Budget without Bulbs
Medium $3,000 Area 3 Typology 7 - Painted Roadway Area & Curb Extension
Large $22,000 Area 7 Typology 6 - Public Amenity Zone & Permanent Curb Extension
Small $2,000 Area 7 Typology 7 - Painted Roadway Area & Curb Extension
$150,000
*The budget proposed above does not include a determination on whether permanent bus bulbs and curb extensions will be installed. Upon determination of the lifespan of these investments, a complete budget will be presented and will extend to the allotted $200,000.00 public art budget.