ARCHITECTURAL PORTFOLIO

Page 1

STREET FACADE ELEVATION (OLD RAJKOT CITY)


DEVANSH N BHUDIYA Dob : 14 Sept, 2000 Nationality : Indian Bachelor Of Architecture (4th Year) Faculty Of Architecture Marwadi University, Morbi Road, Rajkot, Gujarat Contact Info: +91 7984799605 Ranco, Navavas Madhapar 3370020 Bhuj-Kutch devanshbhudiya72@gmail.com Internship or practical training is an opportunity for me to connect myself with actual transformation of design process in to reality & to work in an environment which offers a great opportunity to enhance my design approach, knowledge and skills with a great exposure to the up gradation of humanity.

Area of Interests: Sketching Music Cricket & Table Tennis Training Period: (December 2021- May 2022


EDUCATION

WORKSHOPS ATTENDS,

Studying Architecture (Currently 7th Semester) At Marwadi University , Rajkot, Gujarat

Rammed Earth Workshop, By Hunarshara Foundation. Rogan Art, By Khamir Crafts. Metal Workshop at Himmachal Pradesh

H.S.C. & S.S.C.: Doon Public School, Bhuj.(2014-2018) Primary Education: Sandipani Vidhyaneketan, Porbandar.(2012-2014) Madhapar Patel English School, Bhuj. Language Proficiency

PARTICIPATION 61st Anuaal NASA (2019) Held on Bangalore HiveCraft Competetion (Co-working & Co-living) EXPEIRENCES TO TOURS Tour at Morbi and Vadodra, Gujarat. (Sem-I&II) for Sketching and to enhance the abilities and develop the 3d Visualization, and how to place it on Paper.

Mannual Skills Sketching Hand Draft Presentation Model making 3D Visualization Techical Skills

Tour at Kalatop, Himachal Pradesh. (Sem-III) to understand the architecture style. (Katkhuni Architecture). And conducted the Woodeen & Metal Workshops. Tour to Udwada, Gujarat. (Sem IV) (RSP) Study of Parsi Houses and their Community, with relate to the climate of the Udwada. (Costal Area). Documentation Of Modi Lodge, to get the brief Idea of the parsi Lifestyle and their activities.


CONT

1. INSTITUTE DESIGN

SEM-6, (7 WORKING DRAWINGS)

2. HOUSING STUDIO SEM-8

3. RESIDENCE DESIGN

SEM-4, (CLIMATE STUDIO)

4. COMMUNIT

SEM-3 (CONTE


TENTS

TY DESIGN

EXTUAL STUDIO)

5. HOBBY CENTRE SEM-2

6. SKETCHES/ WORKSHOPS/ MODELS/ RSP

7. Miscellaneous Work


01.INSTITUTE DESIGN SEM-V (EXPERIMENTAL SCHOOL) Design of Elementary school, upto 8th Standard in which site is located on the hillstation Mt. Abu (Adjecent to Delwara Temple). Site having an contor of 0 to 6mt from one end to other, so taking contor in consideration, move forward to design. Primary focus was to create semi-open gathering spaces, shaded corridors under pergolas & having a double heighted space. Co-relation direct from class to landscape part.



2, GENERAL NOTES In case of any ambiguity please contact architect's only. Unless specified all the dimensions are unfinished measured. Drawings are to be read only and not to be measured. All dimensions are in mm.

5,170

3

GENERAL NOTES 98°

In case of any ambiguity please contact architect's only. Unless specified all the dimensions are unfinished measured. Drawings are to be read only and not to be measured. All dimensions are in mm.

90 °

46°

10°

°

21

Working Drawings of Elementary School Design, In which all the drawings and appropriate details are given where required.

+8500

13

5

Ridge

Ridge

S-C

S-C

Ridge

30 416

57

2

Ridge

Section B

12

54

6 Ridge

Ridge

Ridge

+12150

6827

21746

10°

5216 36068

+10900 S-78

10260

Ridge

Ridge

12

4,027

16742

Ridge

1

15

4714

8

36

1

80°

12

48

Ridge

6

Start Phase

SCHEDULE FOR WINDOW

+9400

Window

WxH

W-2

1200X1500 900

Sill Lvl

Lintel Lvl

Quantity

2400

1

1,200 1,500

Ridge

W-2

+11700

UP

DOWN

1 8

Sill -900

2

7

3

15R x 0.150 14G x 0.300

S-76

S-76

8R x 0.150 7G x 0.300

6

5

4 5

4

6 3

7 2

1 UP

+10200

8 9

Ridge

Ridge

10 11 12 13 14 15

Section A

Y Axis

DOWN

D-5 1,200 2,100

SCHEDULE FOR DOOR Door

WxH

Lintel Lvl

Quantity

D-5

1200x2100

2100

1

S-78

Section A

3,

A

Ridge

X Axis +10200

Ridge

+6700

GSEducationalVersion

Ridge

ge Rid

15693

37244

N

N

UP

24R x 0.150 23G x 0.300

9

8

7

6

5

4

3

2

1

10 11 12 19

18

17

16

15

24

23

22

21

DOWN

7 11 43

Studio VI Working Drawings Project

I

J

L

K

M

N

O

P

Q

230

800

1,500

W-4

Sill -00

230

1,500

1,500 2,400

14210

Sill -00 2,180

1,500 2,400

W-4

1,500 2,400

1,500 2,400

1,500 2,400

1,500 2,400

1,500 2,400

W-4

Sill -00 800

800

800

Sill -00

1,500

2150

1,500

R

Section B

800

230

6746

Workshop 2 6736x6746

7200

6746

Workshop 1 6770x6746

P Sill -1500

D-2

1,500 2,400

6,746

6,746 1,500 2,400

750 2,100

D-3

230

3170

1,200

1,200 1,500

230

1,100

1,200 Sill -900

W-2

W-2

230 3,180

1,200

100

6,736 100

1,200

D-2

D-2

2150

1,200

1,100

230

Sill -900

D-2

1,200 1,500

D-2

W-2 1,500 2,400

6,770

1,100

Sill -900

1,200 2,100

1,200 2,100

1,200 1,500

3270

1,100

230

1,200

230

6,746

800

230

S-C

T

6,770

100 100

1,200 2,100

1,200

1,200 2,100

3170

1,200 1,500

230

1,200

1,200 1,500

6,770

Dance room 6770x6746

230

6,746

7200

S

Gymnasym room 6770x6746

W-2

3,200

H

W-4

3290

Sill -00 1,500

2170

3,500

G

W-4

1100

1,200

F

W-4

Sports room 6770x6746

800

Sill -900

W-4

E

1,500

14200

1,500

D

2170

230

Faculty of Architecture Marwadi University 3290

C

W-4

Sill -00 1,500

230 800

Sill -00

1,500

Faculty of Architecture Marwadi University

Name of Institute

B

800

6990 Sill -00

800

Name of Institute

Remark

A

W-4

14230

Sill -00 1,500

2170

V-1

1,210

Remark

W-2

Ridge

Date 14/05/2021

Drawing Scale 1:100

Date 14/05/2021

Drawing Scale 1:200

GSEducationalVersion 01.pln; roof; 100%; 10-05-2021 11:13 AM

Sill -00 1,500

800

450 600

Drawing No 04

Demarcation Plan Drawing No 01

Sill -900

°

Roof Floor Plan

Drawing Name

+5500

230

Drawing Name

Ar. Devansh N Bhudiya (006) 46294

230

2018-2023 By

Ar. Devansh N Bhudiya (006)

By

Section B

68 ° 52

°

Batch

2018-2023

W-4

1,500 2,400

Ridge

Ridge

Batch

11

W-4

Experiental School (Mt Abu) Rajasthan

Experiental School (Mt Abu) Rajasthan

+9600

98

230

Project Ridge

52°

22° 24°

Sill -00

49

4

37

5

41093

14

20

13

4225

41006

Studio VI Working Drawings

S-C Q

C88

3,500

C90

C91

C89

C102

C101

C104

C103

C106

C105

W-4

D-2

1,500

Sill -00

1,200

DOWN

7,300

6

Art room 6780x6840

3

6,840 2,240

7

8R 7G x x 150 350

D-2

2 UP

1

1

230

1,500 2,400

W-4

1,500 6,780

Sill -00

230

800

1,200 1,500

1,200

W-2 3,146

Sill -900

+3800

1,100

230

100 1,200

1,500 2,400

3,240

3290

4

2

UP

800

100

6,770 100

5

3210

+3800

7,240

23 1,200 1,500

D-3

900 2,10 0

S-78

750 2,10 0

D-5

230

6,746

D-5

1,500 2,400

22

1200

70,862

22

3,170 1,200

800 800

Classroom 6746x6746

800

C108

5 4 3

7290

1,200 2,100

3520

W-4

74,362

3,500

C107

1,500 2,400

W-4

24

C109

23

1,200 2,100

1,200 2,100

6,746

C115

In case of any ambiguity please contact architect's only. Unless specified all the dimensions are unfinished measured. Drawings are to be read only and not to be measured. All dimensions are in mm.

2,146

C114

77,862

C113

+5000

230

14200

81,362

3,500 3,500

C112

D-2

150 x 350 8R x 7G

C111

C110

Sill -900

6

C118

24

7,240

3290

1,500 2,400

GENERAL NOTES

25

Classroom 6746x6770

100

7

C117

1,200

8

C116

3170

DOWN

25

1,200

D-2

66,500

W-2

59,500

1,200

52,500

Sill -900

49,000

1,100

45,500

2,170

41,997

W-4

38,500

1,500

35,000

Sill -00

31,499

1,500

28,000

Sill -00

24,500

1,500

21,000

Sill -00

17,500

1,200 2,100

1,100

14,000

8

11,590 10,500

1,200 1,500

W-2

7,000 6,584

3,500

+5000

A

900 2,10 0

DOWN

3R x 150 2G x 350

3290

1,050

3

2

1

N

UP

+4700

1,200 1,500

230

3,270

230

3,270

230

250

2,700

2,195

D-2

3240

3260

W-2

Small Canteen 6740x3240

V-1

1,200

2

1,200 1,500

3,490

W-2

1,200

Sill -900

W-3

1,100

1,100

1,500

W-2

1,200 1,500

3,500

1,090

3,084

B

C

Drawing Scale 1:100

C2

416

Y Axis

5300

3,500

D

2,410

E

F

3,500

G

3,500

H

3,500

I

3,500

J

3,499

K

3,501

L

3,500

M

3,497

N

3,503

O

3,500

P

3,500

Q

7,000

R

Name of Institute

7,000

S

T

Faculty of Architecture Marwadi University

X Axis

GSEducationalVersion

GSEducationalVersion 01.pln; Master layout 5; 100%; 10-05-2021 11:00 AM

1,800

Sill -900

2,544

Security Cabin 5300x4330 1,444

D-1

900 2,100

1,800 1,500

4330

Sill -1500 1,200

W-1

500

230

Date 14/05/2021 Remark

A

230 2070

1 C1

1,100

1,800

4,027 4,027

Centre Line Drawing Start Phase

900

200

880 600

V-1

1200

15

18

16

17

1325

450 350 Sill -1500 115

1,800 1,500

60 600

460 2600

600

500

500

+2600

600

460 2600

600

500

600 6300

1,800

1,800 1,500

500

W-1

1300

4850

4,110

5900

1,800 406 1,800

1,800

Sill -900 600

6300

Section B

5,170

2018-2023 Ar. Devansh N Bhudiya (006) Drawing Name

Drawing No 02

Acountant and Admin 3240x4110

Sill 900

300 W-1

By

1

900 2,100

900 410

1,800 400

Sill -900

W-1 1,800

+2000

2

1,800 1,500

3240 Sill 900

Experiental School (Mt Abu) Rajasthan

C4

450 600

400

1060 300

900 2,100 4100

4600

W-1

1,800 1,500

Batch

C3

450

20

19

23

22

21

24 DOWN 1,000

300

7210

18,362 14,862 11,362

2,165

Studio VI Working Drawings Project

3

2

3,270

+2450 1,800 1,500

Administration 3240x4100

1300

4

900 2,100

2400

D-1

9,197

C8

C7

900

1,800 1,500

2,165

13,527

3,500 1,335

C6

C5

3

1,500

1,260

11 13

C12

2000

W-1

C11 C10

C9

400

+2450

Sill -900

4

5

3R x 150 2G x 350

10

C15

3700

N

COLUMN TYPE B C5,C6,C7,C8,C10,C11,C14,C15,C17,C18,C19, C20,C26,C27,C30,C31,C32,C45,C46,C47,C49, C50,C51,C52,C54,C55,C56,C57,C58,C59, C60,C61,C62,C63,C64,C65,C66,C67,C68,C69, C70,C71,C72,C73,C74,C75,C76,C77,C78,C80, C81,C82,C83,C84,C85,C86,C87,C88,C89,C90, C91,C92,C93,C94,C95,C96,C97,C98,C99,C100, C101,C102,C103,C104,C105,C106,C107,C108, C109,C110,C111,C112,C113,C114,C115,C116, C117,C118

115 D-1

3270

6

230

W-1

5

1355

2

1 UP

Sill -900

COLUMN TYPE A C1,C2,C3,C4,C9,C12.C13, C16,C13,C16,C21,C22,C23, C24, C25,C28,C29,C30,C33, C34,C35,C36,C37,C38,C39, C40,C41,C42,C43,C44,C48, C53,C79.

C16

9

450

3

880

1,000

14200

DOWN

+2450

3470

14200

+3200

C20

C14

230

24R x 150 23G x 300

D-1

C21

C19

760

230

7210

8

As Per Str.

1000

6740

7

21,862

6740

6

3,500

1,200 1,500

300 230

450 600

450 600 750 2,100

750 2,100

115 7260

115 230 230 1,474 230

3770

115

750 2,100

230

1700 3460

6780

3,270

3490

5

C18 C17

C13

230 450 600

3,510

Classroom 6740x6770

4

6

1700 450 600

230

3,510

1,200 2,100

3170 2170

6,770

Sill -900

9

377

7,230 3460

1,200 1,500

W-3

1,200

1,200 1,500

1,200

Sill -900

10

750

900

1,100

D-2

1,200 2,100

100 100

3

365

6770

7010

D-2

DOWN

7

230

Sill -1500

D-3

750 2,100

4770

3320

1,200 1,500

1,100

3280

3

7

750 2,100

750 2,100

Washroom 6770x3770

900

W-3 3240

Sill -900

1,200 1,200 Sill -900

930

3180

1,200 2,100

1,200

Classroom 6740x6730

12

7,230

1,100

3280

750

100 10 100

1,200 1,500

1,200 1,500

Classroom 6780x6770

W-2

1,200 2170

100

2

C23

V-1

1,197

1,115

Sill -1500

D-3

365

900 2,100

230

5,460 230

750

D-1

900 2,100

230

840

+3200

8

115

Sill -1500

D-3

365

230

6,746

750

W-2

11

V-1

1,000

D-3

365

1,200 1,500

230

1,200 1,500

750

D-1

W-3

1

C22

V-1 115

1,000

Sill -1500

D-3

365

10 230

4,640 1000

1,200 Sill -900

6,770

2400

6740

UP

8

V-1 115

450 600

V-1

115 1,000

Sill -1500

750 2,100 750

750 2,100

1,100

W-3

1,200 1,500

1,200 Sill -900

6730

4570

12 12

1,000

D-3

1,200 Sill -900

1,200 1,500

6740 1,100

1,100

1330 Sill -900

W-2

1,200 1,500

1,330

C30

750 2,100

450 600

V-1 V-1

450 V-1 600 230

230 3300

5840 Sill -900

1,500 6,746

7,180

25,362

C29

C28

C27

750 2,100

750 2,100

450 600

V-1

70

2,100 1,500 2,400

4,570

28,862

3,500 3,500

C26

1,000

V-1

450 600

115

V-1

750 2,100 1,210

D-3

750 D-1

900 2,100 1,185

230

14

C25

D-3 Sill -1500

115

1,000

V-1

6780

12

C24

D-3 Sill -1500

115

1,000

V-1

450 600

3800

1,200 1,500

As Per Str. 9

D-3 Sill -1500

115

1,000

V-1

450 600

230

Sill -1500

W-3

1

C36

D-3 Sill -1500

115

450 600

1,151

450 600

840

450 600

1,200 Sill -900

UP

C35

D

Section A

V-1

450 600

D-2

C34

70 230

365 2400

W-3

W-3

+2450

C32

C31

750

70

D-3

750 D-1

1,000 Sill -1500

365

450 600

1080 115 Sill -1500

1,200 Sill -900

1,200

C33

10

365

115 750 2,100

D-3

W-2

1,100

1,100

C42

750

170

13740

1,200

Sill -00

230

230

3R x 150 2G x 350

C41

365

115 D-3

750

750 2,100

750

Sill -900

1,500

1,500

Sill -00

450 600

1,000 Sill -1500

6250

6750

7,000

750 2,100

1,000 Sill -1500

3,100 2,100

230 10,500

Library 13740x6746

1,330

C40

C39

32,362

3,500

C38

750

230

115

+3200

C37

450 600

230

S-78

1,450

365

C48

365

230

3000 150

W-2

C47

750

D-3 Sill -1500

4610

Staffroom 13770x6750

1,200

C46

365

W-3

900 2,100

Sill -900

C45

1,200 1,500

3,250

C44

35,862

3,500

C43

11

70 230

1,474

750

1470 1,200

1,405

230

Plinth Beam 300x450

12

750

2,160

2,050 13,770

800

C53

13

W-4

C52

C51

C50

39,362

3,535

C49

1,500 2,400

1,500

C56

13

COLUMN TYPE A C1,C2,C3,C4,C9,C12.C13, C16,C13,C16,C21,C22,C23, C24, C25,C28,C29,C30,C33, C34,C35,C36,C37,C38,C39, C40,C41,C42,C43,C44,C48, C53,C79.

Sill -00

C59

C58

14

800

C57

42,862

3,465

C55

C54

1,500 2,400

2540

C67

365

D-01

W-4

C66

C65

C64

C

750

5,900

560

1,010

Sill -900

1,200

W-3

230

W-4

C63

S-76

D-3

365

1700

900 2,100

900

15

14100

C62

C61

46,362

3,500

C60

14

750

230

3400

1,200

Sill-1200

W-2

W-5

Sill -900

1,200 1,100

1,500

6,746

1,200 1,200

365

Boys Washroom 5900x3770

115

8R x 150 7G x 300

Sill -900 1,200

1,200 1,500

100

1,200 1,500

D-2

230

750

115

1,200 2,100 1,200

495

100

1,100 230

1,200 2,100

365

D-1

1080

+4700

+3200

3,270

3170 6,770

2260 230

300

230

49,862

16

800

53,362

3,500 3,500

C69

1,500 2,400

1,200 1,500

1,000

Sill -1500

Girls Washroom 5900x3770

8

W-4

C68

15

V-1

115

14,000

D-2

7

Section A Sill -00

16

Classroom 6746x6770

230

As Per Str.

6

17

750 2,100

750 2,100 W-5

15

3280

750

750 2,100

1,200 1,200

W-5

115

1,200 1,200

W-5

5

C79

C78

D-3

750 2,100

230 1460 1210 6790

230 1,200 1,200

230

12

D-2

14

1,500

560

733

4

C77

1,000

Sill -1500

D-3

115

1000 100

3

C76

450 600

450 600 230 1970 1,200 Sill -900

2

C75

C74

C71

V-1

115

1,000

Sill -1500

D-3

750 2,100

8R x 150 7G x 300

D-2 3,270

2040

1

C73

C72

C70

V-1

115

1,000

Sill -1500

1220

D-2 13750

230

1,200 230

100 100

4,960 12

1,200

1,200 Sill -900

900 2,100

3490

1,500 800

1,200

13

60,362

700

9 11

14200

970 230

10

56,862

8

1,200 Sill -900

UP

17

115

D-3

6,740 1,100

1,200 2,100

1,151

Sill -1500

D-1

+3200

230

DOWN

3,500

1,200

5170

3 4 5 6

+4700

115

900

UP

1,200 2,100 495

DOWN

W-4

3,500

S-76

Store Room 6740x3270

2

6,250

18 Sill -00

C82

C81

1,200 2,100

5

3

1

1,500 2,400

6970

7

6

7

1,500 2,400

1,010

100

6,746

Sick Room 3270x6746

230

6,990

6,746

DOWN

8

3,146

Classroom 6746x6746

15R x 150 14G x 300

W-4

C80

C83

V-1

3300

+4700

230

18

B

Type B

19

Sill -00

C96

C95

C94

100

D-4

3240

1,200

W-6

4

19

1,500

1,500 2,100

1,100 1,200

1,500

150 100 150

150 100 150

Type A

2,146

63,862

3,500

20

1

C93

1,200 2,100

2

C92

230

230

6790

UP

C87

C86

C85

W-4

C84

Sill -00

20

1,500 2,400

10720 Sill -900

2,700 1,500

3,270

600

230

6790

230

1040 6,746

230

230

Sill -900

3,290

800

C100

800

C99

C98

21 800

3,500

C97

67,362

21

1,200 2,100


C9

3

D-2

1,200 1,500

SB-27

1,200 2,100

SB-28

750 2,100 D-2

7

V-1

+3800

V-1

V-1

1,200 1,500

Sill -900

+4100

Sill -00

V-1

1

+4400

+4700 +5000 +5300 V-1

900 2,100

+5600

D-5

D-3

750 2,100

900 2,100

8

7

6

5

4

3

2

1

T

2

1 UP

+4700

9

S

+5900 DOWN

SB-18

1,500 2,100

2,700 1,500 D-2

V-1

D-4

V-1

Small Canteen 6740x3240 V-1

450 600

V-1

450 600

V-1

450 600

V-1

450 600

V-1

+4700

450 600

SB-19

Sill -900

Sill -1500

Sill -1500

Sill -1500

Sill -1500

D-3

D-3

D-3

UP

DOWN

1 2

D-2

750 2,100

4

8R x 150 7G x 300

Sick Room 3270x6746

5

5

4

750 2,100

3

15R x 150 14G x 300

D-3

S-76

D-3

750 2,100

Sill -1500

S-76

1,200 2,100

750 2,100

8

7

6

750 2,100

V-1

Sill -00

1,200 1,500

Classroom 6746x6746

+4700

150 16R x 300 15G x

Sill -900

1,200 2,100 1,500 2,400

900 2,100

10

R

3

11

Q

900 2,100

D-4

DOWN

P

750 2,100

+5900

7,000

+5000

12

7,000

D-5

3,500

UP

1,200 1,500

S-78

3,500

750 2,100

Sill -900

Sill -00

1,500 2,400

V-1

3,503

O

+3800

2

13

N

Art room 6780x6840

3

14

M

Sill -00

8

+3500

4

1

15

L

1,500 2,400

5

UP

+3800

Classroom 6746x6746

16

K

3,497

1,500 2,400

Sill -00

D-2

5

2

UP

1,200 2,100

1,500 2,400

1,200 2,100

6

8R 7G x x 150 350

D-2

1

DOWN

+5000

3R x 150 2G x 350

J

3,500

1,200 2,100

1,200 2,100

SB-29 D-2

D> ID><I

I

3,501

1,200 1,500

+4100

1,200 1,500

V-1

Sill -900

ink D-5 <Hotl

H

3,499

1,200 2,100

S-C

V-1

D-3

G

3,500

D-2

D-3

F

3,500

D-2

1,500 2,100

E

3,500

V-1

150 x 350 8R x 7G

D

3,500

V-1

SB-24

1,200 1,500

Classroom 6746x6770

6

C

2,410

Sill -1500

Sill -900

V-1

Sill -900

V-1 V-1

1,500 2,400

Sill -00

1,500 2,400

7

B

3,500

Sill -900

1,200 1,500

D-2

8

3,084

Workshop 2 6736x6746

SB-26 1,200 2,100

1,200 1,500

D-2

Sill -900

V-1

DOWN

,500

1,500 2,400

V-1

4

SEM-VI (INSTITUTE DESIGN)

Sill -00

Workshop 1 6770x6746

3

1,090

V-1

Sill -00

Gymnasym room 6770x6746

1,200 2,100

SB-25

S-C

SB-23

416

V-1

Sill -00

D-3

Sill -900

SB-22

C2

V-1

Sill -00

V-1

Dance room 6770x6746

1,200 2,100

C1

V-1

Sill -00

2

4,027

1,500 2,400

1,500 2,400

Sports room 6770x6746

V-1

V-1

1,500 2,400

Sill -00

1,500 2,400

1,500 2,400

Sill -00

1,500 2,400

1,500 2,400

V-1

1,500 2,400

V-1

Sill -00

Sill -00

1,500 2,400

01,1.WORKING DRAWINGS

C4

V-1

Sill -00

450 600

C3

C8

C7

Sill -00

C6

C5

9,197

C12

6 2

Store Room 6740x3270

1 UP

+4700

Sill -900

Sill -900

1,200 1,200

1,200 1,200

8 9

SB-21

Girls Washroom 5900x3770

D-1

+3200

SB-16

D-2

1,200 2,100

900 2,100

SB-17

V-1

3

7

V-1

1,500 2,400

Sill -00

1,500 2,400

V-1

V-1

Sill -900

10

Boys Washroom 5900x3770

13

D-1

D-3

Sill -1500

Sill -1500

Sill -1500

Sill -1500

450 600

450 600

450 600

450 600

S-85

750 2,100

D-3

Sill -1500

450 600

D-3

750 2,100

14 15 DOWN

D-3

750 2,100

Section A 750 2,100

+4700

UP

+3200

DOWN

Sill -00

8R x 150 7G x 300

900 2,100

V-1

750 2,100

D-2

1,200 1,200

12

1,200 2,100

SB-15

11

SB-20

GENERAL NOTES

V-1

V-1

V-1

V-1

V-1

D-3

D-2

V-1

V-1

SB-14 1,200 1,500

D-2

SB-12

S-83

D-3

450 600 Sill -1500

D-3

750 2,100

450 600

450 600

V-1

450 600

V-1

Sill -1500

D-3

750 2,100

V-1

Sill -1500

D-3

750 2,100

V-1

Sill -1500

D-3

V-1

1,200 1,500

V-1

Sill -1500

D-3

750 2,100

D-3

V-1 V-1

Sill -1500

D-3

V-1

D-3

Sill -1500

450 600

V-1

D-3

450 600

450 V-1 600

450 600

750 2,100

Sill -1500

D-1

SB-13

750 2,100

Sill -1500

Sill -900

1,500 2,400

750 2,100

450 600

1,200 1,500 V-1

750 2,100

Sill -900

V-1

450 600

750 2,100

Sill -900

1,200 1,500

900 2,100

Library 13740x6746

D-1

1,200 1,500

V-1

1,500 2,400

750 2,100

Sill -1500

S-78

Staffroom 13770x6750

Sill -00

V-1 V-1 V-1

900 2,100

Sill -00

V-1

1,200 1,200

Sill -900

V-1

Sill -900

S-82 Sill-1200

Sill -00

Sill -900

S-82

Sill -900

1,200 1,500

1,200 2,100

8

7

6

5

1,200 2,100

S-83

1,200 1,500

In case of any ambiguity please contact architect's only. Unless specified all the dimensions are unfinished measured. Drawings are to be read only and not to be measured. All dimensions are in mm.

In case of any ambiguity please contact architect's only. Unless specified all the dimensions are unfinished measured. Drawings are to be read only and not to be measured. All dimensions are in mm.

4

SB-11

Section A 1,500 2,400

3

GENERAL NOTES

2

1

Classroom 6746x6770

Section B

D-1

900 2,100

Washroom 6770x3770

900 2,100

SB-9

D-1

Sill -900

Sill -900

1,200 1,500

V-1

1,200 1,500

1,200 1,500 V-1

Sill -900

1,200 1,500

V-1

SB-8

1,200 1,500

V-1

V-1

Sill -900

1,200 1,500

Sill -900

1,500 2,400

Sill -900

Sill -00

V-1

Classroom 6780x6770

P SB-10

1,200 1,500

1,200 2,100

Sill -900

Classroom 6740x6730

D-2

V-1

V-1

+3200 D-2

1,200 2,100

14200 SB-7

+3200 DOWN

SB-6

3

230

1,100

1

1,200 1,500

V-1

Sill -900

1,200 1,500

Sill -900

+2450

3,400

1,200

1,200 1,500

W-3

1,200 2,100

2

UP

Sill -900

W-4

1,500 2,400

2130

S-C

1,500

Sill -00

S-C

1,024 115

D-2

6,746

3R x 150 2G x 350

230

800

3290

Q Classroom 6740x6770

Sill -900

V-1

1,200 1,500

2,070

3,170

Classroom 6746x6770

V-1

6,770

2,170

+4100

+3200 DOWN

24R x 150 23G x 300

2

1

10

W-4

9

8

7

6

5

4

3

2

1

1,500

UP

Sill -00

3R x 150 2G x 350

3

1,500 2,400

UP

+2450

11 12

+3500

16

15

20

19

18

17

24

23

V-1

Sill -1500

900 2,100

100

450 600

1,200

SB-5

V-1

Sill -900 Sill -900

900 2,100

1,500

1,800 1,500

1,800 1,500

V-1

1,800 1,500

Sill -900

1,800 1,500

V-1

D-1

Sill -900

W-4

D-1

Acountant and Admin 3240x4110

SB-2

+2450

Sill -00

22

DOWN

100

100 230 100

D-2

800

1,200

1,200 2,400

+4100 1,500 2,400

21

1,200

D-2

800 230

14200

SB-4 900 2,100

D-1

+3800

14

1,200

13

1,200 2,400

+2450

2,183

+4400 Administration 3240x4100

6,746

Sill 900

Sill 900

1,800 1,500

+5000

SB-3

1,800 1,500

2,146

Classroom 6746x6746

V-1

3146

+4700

+2600

V-1

V-1

1,200 1,500

3,263

W-3

1,200

W-4

1,500 2,400

1,500

D-3

+5600

Sill -00

750 0 2,10

Sill -900

D-3

+5300

Transformer +2000

230

1,024 115

2130

230

230

Security Cabin 5300x4330

D-4

DOWN

GENERAL N

D-1

900 2,100

> <ID

1,200

ID>

V-1

+8650

D-4

1,800 1,500

6,746

900 0 2,10

1,500 2,100

D-5 tlink <Ho

1,500 2,100

900 0 2,10

S-78

+5900

1,100

800

750 0 2,10

SB-1

3290

3R x 150 2G x 350

1

2

Sill -900 2

5

4

3

1050

3

7

6

In case of any am architect's only. Unless specified unfinished measu Drawings are to b measured. All dimensions ar

+8200 230

+5900

6,746

230

1,024 115

2130

1040

UP

10

11

12

13

14

15

16

9

8

1 UP

+4700

230

3,270

230

6790

10720

DOWN

150 16R x 300 15G x

SCHEDULE FOR WINDOW

230

800

3,290

SCHEDULE FOR WINDOW 230

1,100

6746

1,024 115

2130

230

3,270

230

6790

Window

3400

115

4610

Quantity

2400

6

900

2400

0

450 600

Lintel Lvl

900

1200X1500

750 2,100

750 2,100 750

365

230

7260

230 D-3

750

365

D-3

750

365

D-3

750

750 2,100

365

750 2,100

750

D-3

900

2400

14

1500X2400

00

2400

8

1200

2400

1

900

2400

0

1500

2100

11

1200X1200

+8200

W-6

1700 70

365

1200X1500

W-4 W-5

Washroom

2700x1500

V-1

6,970 750

+11700

W-3

+10200

750

450X600 +4700

Quantity

2100

10

2100

17

2100

21

2100

1

1,266

3,244

4610

V-1

115

Sill -1500 115

1,000

V-1

V-1

+4700

D-3

Sill -1500 115

1,000

V-1

+8200

Classroom

+6700 AV. Room

Science Lab

Washroom

1,000

+3200 Library

230

Sill -1500

1,000

SCHEDULE FOR DOOR

12

Sill -900

1,200

450 600

3,398

450 600

1,200

450 600

100

450 600

230

1,200 1,500

D-2

3,300

450 600

Sill -1500 115

1,200 1,500

1,200

1,200 2,100

Lintel Lvl

V-1

Door

W-3

WxH 3.500

Lintel Lvl 3.503

3.497

Quantity

3.500

3.501

D-1

900X2100

2100

5

D-2

1200X2100

2100

7

D-3

750X2100

2100

10

D-4

1500X2100

2100

0

3.499

3.500

3.500

3.500

3.500

2.410

1.090

3.500

0.416

3.084

3.500

6,746

6746

W-3

W-3

2040

1,200

1,200

2330

1,200

Sill -900

Sill -900

1,200 1,500

1,200

Sill -900

W-3

1,200 1,500

2,399

1,200 1,500

1,200

Sill -900

1,200 1,500

1,100

230

230 100

230

1,200 2,400

W-3

W-3

3400

Section AA

1,100

6770

6770

1,200 1,500

W-3

1,200

Sill -900

6770

Computer Lab 6970x6770

1,200

Sill -900

14100

2,100

3170

1,200

W-3

1,200 1,500

Sill -900

W-3

1,200 1,500

1,200 1,500

D-2

Sill -900

1,200

230

6970

1100

230

1100

1,200 1,500

1,200

1500X2100

6746

3146

S-78

3.500

Science Lab 13770x6750

Sill -900

D-4

AV Room 6970x6746

230 1,100

750X2100

2,100

1200X2100

D-3

6746

2130

D-2

W-3

Sill -1500

1,200 2,400 100

1,100 230 1,200

Sill -1200

3,263

Sill -900

W-5

1,200 1,100

8

1,200 1,200

900X2100

7

WxH

1,024 115

6

230

5

1,200 1,500

4

6,970

Classroom

Section A

230

Staffroom 3

+12150

1,024

230

1,100

115

1,100

+11700

2150

6,970

1024 115

2150

230

+10200

Stair Cabin

+9600

+8650 Classroom

Computer Lab

+6700 +6100 3280

7230

3280

+8200

AV. Room

Cabin

+5500

+5150 Classroom

+3200 +2600 +2000

+4700

Library

Admin

Security Cabin

4.027

5.170

2.165

2.165

1.335

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

3.500

Section BB

N

N

UP

24R x 150 23G x 300

9

8

7

6

5

4

3

2

1

10 11 12

V-1

600 450

1200

17

16

15

19

18

1325

450 350 Sill -1500

900 2,100

Studio VI Working Drawings

5900 400 1,800

1,800 1,500

300 600

600 6300

460 2600

600

500

500

+6100

600

460 2600

600

500

Project

Experiental School (Mt Abu) Rajasthan

+12150

Sill 900

600 6300

1,800

1,330

1,800 1,500

W-1

300 1,800 1,500

1,800

400

400 W-1

1,800

1,800 400 1,800

Sill -900 Sill -900

500 1,330

450 600

W-1

1,800 1,500

Sill 900

2018-2023

Cabin-2 3240x4110

Sill -900

Batch

2000

115

230

D-1

115

115

900 2,100

4100

4600

Cabin-1 3240x4100

1,800 1,500

W-1

Experiental School (Mt Abu) Rajasthan

1,800 1,500

Sill -900

D-1

4,110

900

900 2,100

2400

300

900

4,110

1355

2400

400

D-1

Studio VI Working Drawings Project

400

300 12

DOWN

20

13 14

6,770

365

Boys Washroom 5900x3770

560

750 2,100

115

2,270

1470

115

2

Wo

Batch

+8650

Classroom +8500

W-1

+8500

Project

2018-2023

W-1

Experie

By

Ar. Devansh N Bhudiya (006)

By +5150

Drawing Name

Ar. Devansh N Bhudiya (006)

Ground Floor Drawing No 03

+5000

Dance Room

Sports Room

Gymnasym Room

Workshop-1

Workshop-2

Ar. Deva

First Floor 3.500

Drawing Scale 1:100

3.084

Drawing No 04 0.416

3.500

1.090

2.410

3.500

Drawing Name 3.500

3.500

Date 14/05/2021

3.500

3.499

3.501

3.500

Drawing Scale 1:100

Name of Institute 1st

1:110 GSEducationalVersion 01.pln; section; 100%; 10-05-2021 12:50 PM

Faculty of Architecture Marwadi University

3.497

3.503

3.500

3.500

7.000

7.000

Drawing No 07

Remark

Name of Institute

+5000

By

Drawing Name Date 14/05/2021 Remark

Faculty of Architecture Marwadi University

Batch

Classroom

Section B

W-3

750

1700

1210

3170

1,945

1

6,758

365

Girls Washroom 5900x3770

D-1

900

3170

DOWN

1,200

Sill Lvl

1800X1500

D-2

Door

6746

750

1200 115 1080

+8200

+6700

15

3280

8R x 150 7G x 300

UP

W-4

Sill -00

1,500 2,400

365

900 2,400

100 D-2

1,200

230

100

14

21

DOWN

2100

SCHEDULE FOR DOOR D-1

230

750

1

13

1,200

2400

WxH

S-76

D-3

11

4960

W-2

Sill -1500

115

3300

W-3

3290

560

750 2,100

100

1500

1,000

70 900

D-1 10720

6790

D-2

1,200

1,200 100

900

450X600

+6700

5

Sill -900

Section A

450 600

450 600 3,240

1,500 800

2700x1500

2400

9

1200

8

14200

2

1

+8200

1200X1200

W-1

V-1

115

+11700

5

330

Classroom 6746x6770

D-3

UP

10

1,200 2,400

Sill -1500

D-3

4

23

12

W-6 V-1

W-4

Sill -00

1,500 2,400

Sill -1500

D-3

750 2,100

9

6

1,200 2,400

W-5

Sill -1500

D-3

750 2,100

2400

Sill -1500

115

2400

00

8R x 150 7G x 300

900

1500X2400

5

2,046

4

1200X1500

1,000

750 2,100

S-76

3

W-4

V-1

115

1,000

230

8

7

6

7

W-4

1,500 2,400

V-1

115

1,000

1460

17

3

W-3 Sill -00

F E

V-1

115

900 2,400

2400

15R x 150 14G x 300

G

900

1,278

DOWN

250

3,146

1200X1500

2

W-2

1

6,746

UP

2,146

+8200

450 600

7

230 12

Quantity

2400

115

Lintel Lvl

900

115

Sill Lvl

1800X1500

450 600

WxH

V-1

W-1 Classroom 6746x6746

750 2,100

Window

3490

3,400

1,200 1,500

Sill -900

W-3

1,200

W-4

Sill -00

1,500

GSEducationalVersion

1,500 2,400

Drawing Scale 1:100

Section CC

Name of Instit

Faculty of Marwadi U


GENERAL NOTES INSIDE

INSIDE In case of any ambiguity please contact architect's only. Unless specified all the dimensions are unfinished measured. Drawings are to be read only and not to be measured. All dimensions are in mm.

D1

150

BOTTOM RAIL TEAK (40 X 165)

TIMBER

RCC

50

TOP RAIL TEAK (40 X 165) SHUTTER FRAME TEAK (40 X 100)

MID-RAIL TEAK (30 X 165)

PANEL TEAK (30 X 110)

MAIN FRAME TEAK (65 X 100)

MID RAIL TEAK (40 X 165)

DETAIL A TYPICAL SECTION

MAIN FRAME TEAK (65 X 100)

DETAIL B

TOP RAIL TEAK (40 X 165)

BOTTOM RAIL TEAK (40 X 165)

900

BRICK

10050

DETAIL B

MID RAIL TEAK (40 X 165)

600

900

MATERIAL HATCH

1200

50100

150

50 1000

PANEL TEAK (30 X 110)

150

60 100

TRANSLUCENT GLASS (4MM) 50 40

50 40

SHUTTER FRAME TEAK (40 X 100)

2100

10

40

2400

1500

TRANSLUCENT GLASS (4MM)

DETAIL C

TOP RAIL TEAK (40 X 165)

50

SHUTTER FRAME TEAK (40X55) 1320

1320

1500

40

65

MAIN FRAME TEAK (65 X 100)

CLASSROOM 1500

MAIN FRAME TEAK (65 X 100)

1000

40 50

1620

15

50 40

40 50

40 50

MAIN FRAME TEAK (65X100)

10050

15

1800

SHUTTER FRAME TEAK (40X55)

2400

10

600

2100

1500

80

50100

150

10

50 40 615 80 615 40 50

D2 900

TYPICAL DETAIL FOR DOOR AND WINDOW MAIN FRAME (1:2)

150 600 150

W1

FOR FOR D2

W2

TIMBER(10 X 80)

BOTTOM RAIL TEAK (40 X 165)

OUTSIDE

INSIDE

OUTSIDE

INSIDE

DETAIL A

GENERAL NOTES OUTSIDE

INSIDE

PANEL TEAK (30 X 110)

550

INSIDE

DETAIL C

OUTSIDE

In case of any ambiguity please contact architect's only. Unless specified all the dimensions are unfinished measured. Drawings are to be read only and not to be measured. All dimensions are in mm.

2,150

150 1,216

150

450

390

395

390

400

390

3,350

80

735

150

315

N

TOP RAIL TEAK (40 X 165)

1,300

1,300

150

Batch

By

Ar. Devansh N Bhudiya (006) Drawing Name

3,350

390

390

390

390

DETAIL C

300x300mm Ceramic Tile

OUTSIDE

Experiental School (Mt Abu) Rajasthan

1,130

450

300x300mm Ceramic Tile 6MM Thick

400

450 400

DETAIL A 390

1,136 675

PANEL TEAK (30 X 110)

Project

2018-2023

10MM Thick 600x600 Ceramic Matte Tiles

264

675

100

INSIDE

TIMBER(10 X 80)

BOTTOM RAIL TEAK (40 X 165)

2,220

1480

Studio VI Working Drawings

800

INSIDE

2,134

1,750

Markation of Wastage Otlet

DETAIL B

BOTTOM RAIL TEAK (40 X 165)

300x300mm Ceramic Tile (Glossy)

10 MM of Granite Band Height 100 MM

390

(40 X Ceramic 165) 300x300mm Tile

150 600 150

FOR FOR D2

1310

400

MID RAIL TEAK

DETAIL A TYPICAL SECTION

300x300mm Ceramic

MAIN Tile FRAME TEAK (65 X 100)

10MM Thick 600x600 Ceramic Matte Tiles

600 150

BOTTOM RAIL TEAK (40 X 165)

MID-RAIL TEAK (30 X 165)

PANEL TEAK (30 X 110)

238

DETAIL B

MID RAIL TEAK (40 X 165)

TOP RAIL TEAK (40 X 165) SHUTTER FRAME 300x300mm Ceramic Tile (Glossy) TEAK (40 X 100)

675

100 675

150

Screeding

Light Weight Material Filling

MAIN FRAME TEAK (65 X 100)

1,300

1480 710 1,136 797

PANEL TEAK (30 X 110)

10050

150

2,859

SHUTTER FRAME TEAK (40 X 100)

1200

50100

80

600

50

DETAIL C

TOP RAIL TEAK (40 X 165)

800

1000

2100

10 MM of Granite Band Height 100 MM

1500

MAIN FRAME TEAK (65 X 100)

1000

10050

CLASSROOM

2100

600

150

50

900 50100

D2

1,650

150

GSEducationalVersion

D1

Door Window Detail

OUTSIDE

Section 4-4'

Drawing No 12

Section 3-3'

SCHEDULE FOR WINDOW

Date 14/05/2021

V-1

Remark

450X600

1500

2100

10

Drawing Scale NTS

Name of Institute

Faculty of Architecture Marwadi University

GSEducationalVersion

IC

V-1

SCHEDULE FOR DOOR

V-1

V-1

V-1

D-3

750X2100

2100

10

D-1

900X2100

2100

2

V-1

Section 1-1' 1120

Section 1-1'

1,000

-10MM

Slop e

-10MM

Slop e

-10MM

Slop e

D-1

Slop e

Slop e

1400

S-3 1400

S-3

-10MM

300x300mm Ceramic Tile (Matte) 10MM Thick

-10MM

100mm Kota Ston

-20MM

365

750

300

D-3 600x600mm Ceramic Tile (Matte)

300

300

300

300

300

300

300

Kota Stone Finish

1

750

D-3

2

Slope

365

D-3

3

750

4

365

D-3

5

750

6

365

7

750

D-3

8

554

100mm Kota Stone Skirting

300

Kota Stone Finish 20 MM

Nosing

S-1

UP +3200

+4700

8R x 150 7G x 300

S-4

DOWN

Nosing

S-1

S-4

D-3 554

D-3

D-3

750

365

750

365

750

D-3 365

750

600x600mm Ceramic Tile (Matte)

D-3 365

750

10MM Mortar

RCC Slab

N e Slop

10MM Mortar

RCC Slab Grove for Avoid Slipery Surface

1040

1590

1,500

Grove for Avoid Slipery Surface

1200

300

-20MM -10MM

-10MM

-10MM

e Slop

e Slop

e Slop

e Slop

pe Slo

300

1440

1,000

300

300

300

300

1,000

300

15R x 150 14G x 300

UP

1120

S-2

300

300

300

300

300

300

300

300

Studio VI Working Drawings DOWN

300x300mm Ceramic Tile (Matte)

Project

S-2

+6700

-10MM

+4700

-10MM

1440

D-1

23

22

21

20

19

18

17

16

13

12

15

14

9

11

10

Experiental School (Mt Abu) Rajasthan

Batch V-1

V-1

V-1

V-1

2018-2023

V-1 By

Ar. Devansh N Bhudiya Plan

(006)

Drawing Name

IC

Plan

Toilet Detail

GSEducationalVersion

Drawing No 11 Drawing Scale 1:25

Name of Institute

Faculty of Architecture Marwadi University

Date 14/05/2021 Remark

STAIRCASE DETAIL


Coping Finish Kota Stone 20MM RCC Sill 100MM

GENERAL NOTES

Drawings Include

150

150

Vata Water Proofing Material

+11700

RCC Slab 150 MM

850

+11700

RCC Slab 150 MM

465

Squirting 50MM Finished Kota Stone Flooring 20MM Mortar 10MM

RCC Lintel 100MM

530

1145

RCC Slab 150 MM

RCC Slab 150 MM

530

150

Vata Water Proofing Material

105

1,035

In case of any ambiguity please contact architect's only. Unless specified all the dimensions are unfinished measured. Drawings are to be read only and not to be measured. All dimensions are in mm.

465

Vata Water Proofing Material

Vata Water Proofing Material

+10200

GENERAL NOTES

+10200

In case of any ambiguity please contact architect's only. Unless specified all the dimensions are unfinished measured. Drawings are to be read only and not to be measured. All dimensions are in mm.

1,035

880

Door Window details Toilet details Staircase details Wall Sections

880

Coping Finish Kota Stone 20MM RCC Sill 100MM

1,200

105

RCC Lintel 100MM

2,100

150

RCC Slab 150 MM

1,050

150

+6700

RCC Slab 150 MM

100

RCC Lintel 100MM

1145

535

RCC Slab 150 MM

535

150

315

RCC Slab 150 MM

315

Finished Kota Stone Flooring 20MM Mortar 10MM

150

+6700

RCC Slab 150 MM

1,050

+8200

RCC Sill Lvl

+8200

RCC Sill Lvl

150

1,200

100

RCC Lintel 100MM

RCC Lintel 100MM

Damp Proof Course Bitumenus Felt 10-12MM +4700

100

1,200

RCC Sill Lvl

Damp Proof Course Bitumenus Felt 10-12MM 150

ne Skirting

1,200

100

RCC Lintel 100MM

+4700

h 20 MM

RCC Slab 150 MM

RCC Slab 150 MM

2100

150

N

1050

RCC Sill Lvl Backfill Finished Kota Stone Flooring 20MM

N

Studio VI Working Drawings Project

Experiental School (Mt Abu) Rajasthan

+3200

Backfill Finished Kota Stone Flooring 20MM

150

1050

+3200

Finished Kota Stone Flooring 20MM Screeding 25MM

895

Batch

By

Ar. Devansh N Bhudiya (006) Drawing Name

2018-2023 Backfill

Remark

Faculty of Architecture Marwadi University

Drawing Name

150

327

Name of Institute

By

Ar. Devansh N Bhudiya (006)

100

Drawing Scale 1:25, Detail 1:10

100

Plinth Beam 300x450

Experiental School (Mt Abu) Rajasthan Batch

Date 14/05/2021

327

Drawing No 10

Studio VI Working Drawings Project

RCC Slab 150 MM

Plinth Beam 300x450

Staircase Detail

895

150

150

2018-2023

Wall Sections Drawing No 09

Column Design As Per Str.

Date 14/05/2021 Remark

150

Drawing Scale NTS

Name of Institute GSEducationalVersion

Faculty of Architecture

Column Design As Per Str.


BB 11

11

AA

02.HOUSING STUDIO (RAJKOT) SEM-VII

The Programme was to design a Housing project with High rise low density. In which according to the urban area I have incooperated the number of flats and semidetated units. And to create the enviornment in which all buildings and semidetateched units get their individual common open space plus all together a COP for site. So the project gives the brief idea of integrity to the individuality, privacy and the interactual gatherring space for all units. A Housing with Living with gathering (Unity) and individuality.

01

02

02

ENTRANCE

11 12 13 14 10

15 16

9

17

20R 19G x x 0.150 0.301

8 7 6 5

18 19 20

4 3 2

10

1

20 19 18 17 16

1

15

2 3 4 5

20R 19G x x 0.150 0.301

14 13 12 11

6 7 8

09

9 10

11

18 MT WIDE ROAD 11 12 13 14 10

15 16

9

17

20R 19G x x 0.150 0.301

8 7 6 5

18 19 20

4 3 2

10

1

10 9 8 7

20R 19G x x 0.150 0.301

6

11

5

12 13 14

4 3 2

15

1

16 17 18 19

08

20 20 19 18 17 16

2 4

10

5

20R 19G x x 0.150 0.301

3

The enimities includes: 2BHK Flats 3BHK Flats 4BHK Flats Semi detacthed bungalows

CC

1

15 14 13 12 11

6 7 8 9 10 1 2 3 4 5

20R 19G x x 0.150 0.301

20 19 18

6 7 8

17

9

16 15

10 14 13 12 11

10 9

10

8 7

20R 19G x x 0.150 0.301

6

06

11

5

12 13 14

4 3 2

15

1

16 17 18 19

11

20 1 2 3 4 5

20R 19G x x 0.150 0.301

20 19 18

6 7 8

17

9

16 15

10 14

12

13 12

11

11

11

+45.000 15 Story

+42.000 14 Story

+39.000 13 Story

+36.000 12 Story

+33.000 11 Story

GSEducationalVersion hav final.pln; A1

+30.000 Landscape; 100%; 06-10-2021 07:34 PM 10 Story

+27.000 9 Story

+24.000 8 Story

+21.000 7 Story

+18.000 6 Story

+15.000 5 Story

+12.000 4 Story

+9.000 3 Story

+6.000 2 Story

+3.000 1 Story

±0.000 0 Ground Floor

-3.000 -1 basement

BB

Building Section

CC


LEGENDS

01 SECURIT

LEGENDS

02 2&3 BHK BB

01 SECURITY CABIN

03 VISITOR

AA

02 2&3 BHK BLOCK

04 4BHK FLA

03 VISITOR PARKING

05 4BHK DU

04 4BHK FLAT BOLCK 11

06 3BHK BLO

07 COMMON

7

8

9

10

11

08 EXISTING 4

9

7

5

10

8

6

11

9

10

11

07 COMMON OPEN PLOT

DR 6M IVE T W W A ID Y E

06 3BHK BLOCK

03

DR 6M IVE T W W A ID Y E

03

11

05 4BHK DUPLEX BLOCK

20R 19G x 0.150 x 0.327

2 1

2

2

UP

3

1

20R 19G x 0.150 x 0.327

5

3

6

4

7

5

8

20R 19G x 0.150 x 0.327

4

3

6

09 RAMP FO

1

12

UP

13 14

12

15

14

16

UP

13

20

10 SEMI DET

20

18

DOW

17

19

N

16

18

DOW

15

17

19

N

14

16

18

13

15

17

12

DOW

08 EXISTING TEMPLE

19

N

DR 6M IVE T W W A ID Y E

20

09 RAMP FOR BASEMENT

11 COMMON

12 STRUCTU ENTITIES

02

DR 6M IVE T W W A ID Y E

02

02

EN

12 STRUCTURE FOR COMMUNITY ENTITIES

02

TR

AN

11 COMMON OPEN PLOT

DR 6M IVE T W W A ID Y E

CE

10 SEMI DETACHED UNITS

1 2 3 4

UP

1 2

5

3 6

UP

1

4 7

2 5

NOTES

6

20R 19G x 0.150 x 0.329

7

DOW

20R 19G x 0.150 x 0.329

N

15 14 13 12

DR 6M IVE T W W A ID Y E

12

13

14

12

15

13

16

14

17

15

18

16

19

17

20

18

16

19

17

20

18

19

11

20

10

N

11

9

DOW

10

8

N

7

20R 19G x 0.150 x 0.329

9

11

6

DOW

8

PERMISIBLE FSI USED =

DR 6M IVE T W W A ID Y E

F 20R 19G x x 0.150 0.301

10

5

8 7 6 5

4 3 2

N

1

UP

3R 2G x 0.200 x 0.250

DOW

9

4

01

8

3

UP

SITE AREA =

2

3

F

07

10

1

COMMON O

1 4 5

07

3

20R 19G x x 0.150 0.301

2 6 7

12

N

UP

12

DOW

1

2

3

09

8 3R 2G x 0.200 x 0.250

12 13 14 15

+45.000 15 Story

16 17 18

+45.000 15 Story

19

8

UP

R .8

FO 2.2 YE X1

N

PO 2.2 RC X1 H .4 DOW

11 10 9 8 7 6 5 4

UP 3

04

2 1

1

2

3

UP

LIV ING 3.8 SP x5 AC .3 E

08

LIV ING 3.8 SP x5 AC .3 E 1

2

3

PO 2.2 RC X1 H .4 N

F

3R 2G x 0.200 x 0.250

UP

3R 2G x 0.200 x 0.250

N

DOW

DOW

+33.000 11 Story

DR 6M IVE T W W A ID Y E

7

3

10

6

2

+27.000 9 Story

DR 6M IVE T W W A ID Y E

CO TO MM 1.8 ILE ON X2 T .0

GU RO UE 2.8 OM ST x4 .6 20R 19G x x 0.150 0.301

ST AIR 4.3 CA X2 SE .0

WA SH 2.7 AR X1 EA .8

KIT 2.4 CH X2 EN .5

ST OR 1.2 E RO X1 .8 OM ST OR 1.2 E RO X1 .8 OM

CO TO MM 1.8 ILE ON X2 T .0 GU RO UE 2.8 OM ST x4 .6

ST AIR 4.3 CA X2 SE .0 5

1

FO 2.2 YE X1 R .8

4

20R 19G x x 0.150 0.301

3

20R 19G x x 0.150 0.301

DI SP NING 3.8 AC x2 E .4

F

10

3

2

2

+30.000 10 Story

+36.000 12 Story

1

3R 2G x 0.200 x 0.250

1

+33.000 11 Story

+39.000 13 Story

CC

N

DOW 8 7 6 5 4 3 2 1

DI SP NING 3.8 AC x2 E .4

KIT 2.4 CH X2 EN .5

F UP

+36.000 12 Story

3R 2G x 0.200 x 0.250

04

+42.000 14 Story

8 7 6 5

4 3 2

1

20R 19G x 0.150 x 0.329

+39.000 13 Story

N

18 MT WIDE ROAD

DOW

11

20

+42.000 14 Story

+30.000 10 Story

+27.000 9 Story

1 2 3 4 3R 2G x 0.200 x 0.250

1 2 3

10

8 7

+18.000 6 Story

20R 19G x x 0.150 0.301

1

6

2

5

4

UP

06

3

4 3

5

2

6

1

7 8 10

20R 19G x 0.150 x 0.329

N

11

DOW

9

+15.000 5 Story

PROJECT

11

1

STUDIO 7

2

UP

+12.000 4 Story

9 8

F

7

DOW

3R 2G x 0.200 x 0.250

N

HOUSING

10

3

6 5 4 3 2

20R 19G x x 0.150 0.329

+12.000 4 Story

05

12

13

14

15

16

11

05

17

18

19

20

+15.000 5 Story

11

8

BB

DR 6M IVE T W W A ID Y E

7

N

DOW

+18.000 6 Story

BB

6

11

20R 19G x x 0.150 0.301

5

+21.000 7 Story

UP

N

+21.000 7 Story

+24.000 8 Story

F

+24.000 8 Story

1

+9.000 3 Story

PROJECT

+6.000 2 Story

HOUSING (RAJKOT)

12 14 15

1 2 3

N 19

DOW 20

5

20R 19G x x 0.150 0.301

18

6 7 8

F

12

17

DR 6M IVE T W W A ID Y E

4 16

BATCH 2018-2023 (4TH YEAR 2021)

+3.000 1 Story

+6.000 2 Story

2018-202

+3.000 1 Story

NOTES

±0.000 0 Ground Floor

Drawing Name

11

11

±0.000 0 Ground Floor

UP

13

+9.000 3 Story

-3.000 -1 basement

SI

-3.000 -1 basement

CC

TERACE PLAN

AA

Building Section

CC

1:300

Building Section

1:300

BY

DEVANSH N BHUDIYA Drawing No 03 Drawing Scale 1:300

Drawing Scale 1:300

Remarks

Name of Institute +45.000 15 Story

Name of Institute

FACULTY OF ARCHITECTURE MARWADI UNIVERSITY +42.000 14 Story

+42.000 14 Story

+39.000 13 Story

+39.000 13 Story

+36.000 12 Story

+36.000 12 Story

+33.000 11 Story

+33.000 11 Story

+33.000 11 Story

+30.000 10 Story

+30.000 10 Story

+30.000 10 Story

+27.000 9 Story

+27.000 9 Story

+27.000 9 Story

+24.000 8 Story

+24.000 8 Story

+24.000 8 Story

+21.000 7 Story

+21.000 7 Story

+21.000 7 Story

+18.000 6 Story

+18.000 6 Story

+18.000 6 Story

+42.000 14 Story

+39.000 13 Story

+36.000 12 Story

DEVAN Drawing No 01

Date 07/10/2021

+45.000 15 Story

+45.000 15 Story

BY

AA

CC

Drawing Name BB

FACULTY MARWAD

S PROJECT

GSEducationalVersion hav final.pln; 01 ML; 100%; 06-10-2021 08:07 PM

HOUSING

2018-2023 Drawing Name

SITE BY

+15.000 5 Story

+15.000 5 Story

+15.000 5 Story

+12.000 4 Story

+12.000 4 Story

+12.000 4 Story

+9.000 3 Story

+9.000 3 Story

+9.000 3 Story

+6.000 2 Story

+6.000 2 Story

+6.000 2 Story

+3.000 1 Story

+3.000 1 Story

+3.000 1 Story

±0.000 0 Ground Floor

±0.000 0 Ground Floor

Building Section

1:300

GSEducationalVersion

AA

Drawing Scale 1:300

±0.000 0 Ground Floor

-3.000 -1 basement

-3.000 -1 basement

1:300

DEVANS Drawing No 05

-3.000 -1 basement

Building Section

1:300

Name of Institute

FACULTY O MARWADI U


LEGENDS BEDROOM 3.2X3.2

BEDROOM 3.2X3.2

POWDER ROOM 1.2X.8

POWDER ROOM 1.2X.8

BEDROOM 3.2X3.2

POWDER ROOM 1.2X.8

TOILET 2.5X1.3

BEDROOM 4.0X3.0

TOILET 2.5X1.3

W

WASH AREA 2.8X1.2

BALCONY 0.9X3.4

WASH AREA 2.8X1.2

BEDROOM 3.2X3.4

BEDROOM 4.0X3.0

TOILET 2.7X1.2

W

TOILET 2.5X1.3

BEDROOM 3.2X3.4

TOILET 2.7X1.2

BEDROOM 3.6X3.5

BEDROOM 3.6X3.5 KITCHEN 2.8X3.5

DINING SPACE 2.7X3.7

11

KITCHEN 2.8X3.5

BALCONY 0.9X3.5

BALCONY 0.9X3.5

DINING SPACE 2.7X3.7

10 12 9

BEDROOM 3.2X3.5

STORE ROO 2.0X1.2

TOILET 3.2X1.2

TOILET 2.7X1.2

W

BALCONY 0.9X3.5

LIVING SPACE 4.6X4.3

PASSAGE WAY 1.2X3.0 TOILET 2.7X1.2

W

W

WASH AREA 2.8X1.2

BALCONY 0.9X3.4

BALCONY 1.2X4.3

PASSAGE WAY 1.2X3.0 TOILET 3.2X1.2

WASH AREA 2.2X1.8

WASH AREA 2.2X1.8

KITCHEN 3.3X3.0

KITCHEN 3.3X3.0

BEDROOM 3.2X3.5

BALCONY 0.9X3.5

F

13 8 20R x 0.150 19G x 0.327

14

F

15 16 17

DINING 2.8X3.6

F

DINING 2.8X3.6

6 5 4 3

19

BEDROOM 3.6X3.5

STORE ROOM 1.8X1.2

KITCHEN 3.3X3.0

2 20 1 DOWN

BALCONY 0.9X3.5

7

18

STORE ROOM 1.8X1.2

BALCONY 1.2X4.1

F

LIVING SPACE 5.5X4.1

BALCONY 1.2X4.1

STORE ROOM 2.0X1.2

KITCHEN 2.8X3.5

DINING SPACE 2.7X3.7

F

UP

LIVING SPACE 5.5X4.1

BALCONY 1.2X4.3

STORE ROOM 2.0X1.2

LIVING SPACE 4.6X4.3

LIVING SPACE 4.6X4.3

DINING 2.8X3.6

BALCONY 1.2X4.3

12

BALCONY 0.9X3.5

WASH AREA 2.2X1.8

13 UP

14

DOWN

BEDROOM 3.2X3.5

LIVING SPACE 4.6X4.3

BALCONY 1.2X4.3

19 18

20R x 0.150 19G x 0.329

15 16

15 14

F

STORE ROOM 2.0X1.2

7

17 16

6

STORE ROOM 2.0X1.2

STORE ROOM 2.0X1.2

5 8

LIVING SPACE 5.5X4.1

BALCONY 1.2X4.3

4

BALCONY 1.2X4.1

LIVING SPACE 4.6X4.3

20 3

BALCONY 1.2X4.1

2

LIVING SPACE 4.6X4.1

W

1

F

F

17

13 12

18

10 11

KITCHEN 3.3X3.0

F

STORE ROOM 1.8X1.2

2BHK BUILT UP AREA= 102 SQ,MT

20 BALCONY 0.9X3.5

BALCONY 0.9X3.5

KITCHEN 2.8X3.5

BEDROOM 3.6X3.5

BEDROOM 3.2X3.4

WASH AREA 3.0X1.5

BALCONY 0.9X3.5

W

TOILET 3.2X1.3

2&3 BHK BLOCK

3BHK CLUSTER

BEDROOM 3.5X4.0

POWDER ROOM 1.2X.8

GSEducationalVersion

W

BALCONY 1.5X2.6

BEDROOM 3.2X3.4

WASH AREA 2.8X1.2

TOILET 2.7X1.2

W

WASH AREA 3.0X1.5

BEDROOM 3.6X3.5

BALCONY 0.9X3.5

DINING SPACE 3.0X3.6 KITCHEN 2.9X3.0

F

PASSAGE WAY 1.2X3.0

STORE ROOM 1.8X1.2

BALCONY 1.2X4.1

BEDROOM 3.2X3.4

KITCHEN 2.8X3.5

DINING SPACE 2.7X3.7

TOILET 1.4X2.6

TOILET 3.2X1.3

PASSAGE WAY 1.2X3.0

STUDIO 7

F

PROJECT

STORE ROOM 2.0X1.2

LIVING SPACE 5.5X4.1

HOUSING (RAJKOT)

BALCONY 1.2X4.1

BATCH 2018-2023 (4TH YEAR 2021)

BEDROOM 3.5X4.0

TOILET 2.7X1.3

LIVING SPACE 4.6X4.1

Drawing Name BALCONY 1.2X4.1

LIVING SPACE 5.5X4.1

LIVING SPACE 5.5X4.1 DOWN

BALCONY 1.2X4.1

2&3 BHK BLOCK

UP

TOILET 2.7X1.2

BEDROOM 3.2X3.5

TOILET 2.5X1.3

N

BALCONY 0.9X3.5

BEDROOM 3.2X3.2

BALCONY 1.5X2.6

1 20 19 18

14 8 13 9

DINING SPACE 2.7X3.7

KITCHEN 2.8X3.5

11

BALCONY 0.9X3.5

DINING SPACE 2.7X3.7

12 10

KITCHEN 2.8X3.5

BEDROOM 3.6X3.5

BALCONY 0.9X3.5

BEDROOM 3.6X3.5

W

WASH AREA 2.8X1.2

WASH AREA 2.8X1.2

Drawing No 04 Drawing Scale UNIT 1:50, BLOCK 1:100

W

BALCONY 0.9X4.0

DEVANSH N BHUDIYA

F

7

WASH AREA 3.0X1.5

BY

6

16 15

F

STORE ROOM 1.8X1.2

5

17

20R x 0.150 19G x 0.329

4

STORE ROOM 1.8X1.2

3

W

2

KITCHEN 2.9X3.0

BEDROOM 4.0X3.0

BALCONY 0.9X3.4

BUILT UP IN SINGLE FLOOR 896 SQ,MT

BEDROOM 3.2X3.4

TOILET 2.7X1.3

F

BEDROOM 3.2X3.4

BEDROOM 4.0X3.0

BEDROOM 3.5X4.0

BALCONY 0.9X4.0

BEDROOM 3.2X3.4

TOILET 2.7X1.2

BEDROOM 4.0X3.0

TOILET 1.4X2.6

STORE ROOM 2.0X1.2

TOILET 2.7X1.2

BEDROOM 3.2X3.4

TOTAL BUILT UP OF SINGLE BLOCK= 12544 SQ,MT

2 BHK UNIT

TOILET 2.5X1.3

Date 07/10/2021 Remarks

TOILET 2.5X1.3

BEDROOM 3.2X3.2

GSEducationalVersion hav final.pln; UNIT23; 100%; 06-10-2021 08:52 PM

BALCONY 0.9X3.4

PASSAGE WAY 1.2X3.0

TOILET 2.7X1.2

BEDROOM 3.2X3.4

BALCONY 0.9X3.5

TOILET 3.2X1.2

TOILET 2.7X1.2

6 UNITS OF 2BHK AND 2 OF 2BHK

POWDER ROOM 1.2X.8

BALCONY 0.9X4.0

3 BHK UNIT

BEDROOM 3.2X3.5

WASH AREA 2.2X1.8

TOILET 2.7X1.2

TOILET 2.7X1.3 BEDROOM 3.2X3.2

DINING SPACE 3.0X3.6

BALCONY 0.9X3.4

PASSAGE WAY 1.2X3.0

PASSAGE WAY 1.2X3.0

DINING 2.8X3.6

PASSAGE WAY 1.2X3.0

TOILET 2.7X1.2

WASH AREA 2.8X1.2

TOILET 2.5X1.3

BALCONY 1.2X4.1

WASH AREA 2.2X1.8

TOILET 3.2X1.2

LOBBY COVERAGE = 12 SQ,MT (REMAINIG FROM FSI FREE )

W

LIVING SPACE 4.6X4.1

BEDROOM 3.2X3.5

3BHK BUILT UP= 128 SQ,MT W

DINING SPACE 3.0X3.6

DINING SPACE 2.7X3.7

LIVING SPACE 5.5X4.1

KITCHEN 2.9X3.0

TOILET 2.7X1.2

KITCHEN 3.3X3.0

DINING 2.8X3.6

W

19 F

BALCONY 1.2X4.1

TOILET 3.2X1.2

9

STORE ROOM 1.8X1.2

POWDER ROOM 1.2X.8

POWDER ROOM 1.2X.8

Name of Institute BEDROOM 3.2X3.2

FACULTY OF ARCHITECTURE MARWADI UNIVERSITY

3BHK UNIT


EE

LEGENDS LEGENDS

NOTES +45.000 15 Story

+45.000 15 Story

+45.000 15 Story

+45.000 15 Story

+42.000 14 Story

+42.000 14 Story

+42.000 14 Story

+42.000 14 Story

+39.000 13 Story

+39.000 13 Story

+39.000 13 Story

+39.000 13 Story

BALCONY 3.8X1.2

TOILET 1.3X2.7 BALCONY 0.9X4.0

WASH AREA 2.4X2.0

12 TOILET 1.2X2.7

13 16 18 +36.000 12 Story

+36.000 12 Story

+33.000 11 Story

+33.000 11 Story

+33.000 11 Story

+33.000 11 Story

+30.000 10 Story

+30.000 10 Story

+27.000 9 Story

+27.000 9 Story

+24.000 8 Story

+24.000 8 Story

+21.000 7 Story

+21.000 7 Story

+18.000 6 Story

+18.000 6 Story

+15.000 5 Story

+15.000 5 Story

+12.000 4 Story

+12.000 4 Story

+9.000 3 Story

+9.000 3 Story

STORE ROOM 1.6X1.4

F

+36.000 12 Story

F DOWN

15 14

12

TOILET 1.3X2.7

POOJA SPACE 1.6X1.2

16

13

TOILET 1.3X2.7

20

3BHK BUILT UP AREA= 130 SQ,MT

+36.000 12 Story

19

18 17

BALCONY 3.0X0.9

LIVING SPACE 3.8X4.4

17

19

OM

W

15

BEDROOM 3.4X3.2

20

KITCHEN 3.3X3.6

14

BEDROOM 3.8X4.0

KITCHEN 4.0X3.0

DINING 2.7X5.1

BALCONY LOBBY COVERAGE = 13.2 SQ,MT 0.9X4.0 (REMAINIG FROM FSI FREE )

LIVING SPACE 4.4X5.1

4 BHK BUILT UP AREA= 4 BHK BUILT UP AREA= 185 SQ,MT +30.000 10 Story

+30.000 10 Story

LOBBY COVERAGE = 0 (FSI FREE )

4 UNITS OF 3BHK IN ONE FLOOR STORE ROOM 1.4X2.0 17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

17R x 0.182 16G x 0.285

UP

WASH AREA 2.2X1.8

DOWN

BUILT UP IN SINGLE FLOOR 533.2 SQ,MT

LOBBY COVERAGE = 0 SQ,MT (FSI FREE ) +27.000

+27.000 9 Story

9 Story

BEDROOM 3.8X3.2

2 UNITS OF 4BHK

BUILT UP IN SINGLE FLO 320 SQ,MT

7 Story

+21.000 7 Story

+18.000 6 Story

+18.000 6 Story

+15.000 5 Story

+15.000 5 Story

BALCONY 0.9X7.0

BALCONY 0.9X3.2

4 BHK UNIT

N

DD

16

17

11

15

10

12

13

14

6

7

8

9

1

2

3

4

5

N

DOWN

UP

17R x 0.182 16G x 0.285

HOUSING (RAJKOT) BATCH 2018-2023 4TH YEAR 2021

+12.000 4 Story

+12.000 4 Story BALCONY 3.8X1.2

BALCONY 3.8X1.2

STUDIO 11

20R x 0.150 19G x 0.329

5

HOUSING (RAJKO

W

BALCONY 3.0X0.9

LIVING SPACE 3.8X4.4

4

STORE ROOM 1.6X1.4

F

3

F

STORE ROOM 1.6X1.4

TOILET 1.3X2.7

2

TOILET 1.3X2.7

TOILET 1.3X2.7

20 1 DOWN

+3.000 1 Story

LIVING SPACE 3.8X4.4 TOILET 1.3X2.7

BATCH +6.000 2018-2023 (4TH2 StoryYEAR 2021)

19

+3.000 1 Story

KITCHEN 3.3X3.6

18

+6.000 2 Story

17

+6.000 2 Story

Date 07/10/2021

7 6

16

W

15

DEVANSH N BHUDIYA

9 8

KITCHEN 3.3X3.6

BALCONY 3.0X0.9

HOUSING (RAJKOT)

3 BHK APPARTMENT BY

PROJECT

WASH AREA 2.4X2.0

10 13

PROJECT

WASH AREA 2.4X2.0

+9.000 3 Story

3 Story

14

STUDIO 7 +9.000

12

KITCHEN 4.5X4.0

Drawing Name

UP

BEDROOM 2.9X3.2

+6.000 2 Story

POOJA SPACE 1.6X1.2

Drawing Name

DINING 3.3X3.0

BEDROOM 3.4X3.2

Remarks

BATCH 2018-2023 (4TH YE

POOJA SPACE 1.6X1.2

4 BHK BLO

Drawing Name BEDROOM 3.8X4.0

Name of Institute

4 BHK BLOCK +3.000

+3.000 1 Story

1 Story

BY

TOILET 1.2X2.7

FACULTY OF ARCHITECTURE MARWADI UNIVERSITY

BEDROOM 3.5X3.2

BY

BEDROOM 3.5X3.2

TOILET 1.4X2.6

BEDROOM 3.8X3.2

TOILET 1.4X2.6

BEDROOM 3.8X3.2

TOILET 1.4X2.6

BEDROOM 3.5X3.2

TOILET 1.4X2.6

BEDROOM 3.5X3.2

DEVANSH N BHU

DEVANSH N BHUDIYA

BALCONY 0.9X4.0 TOILET 1.3X2.7

±0.000 0 Ground Floor

±0.000 0 Ground Floor

±0.000 0 Ground Floor

±0.000 0 Ground Floor

Drawing No 08

-3.000 -1 basement

Drawing Scale -3.000 BLOCK 1:50, SECTION 1:100 -1 basement

-3.000 -1 basement

BALCONY 0.9X7.0

BALCONY 0.9X3.2

Date 07/10/2021

Drawing No 07

BALCONY 0.9X7.0

BALCONY 0.9X3.2

Drawing Scale UNIT 1:50, BLOCK 1:100

Remarks -3.000 -1 basement

DD

Drawing Scale UNIT PLAN 1:50, CLUSTER 1:100(BLOCK)

2 UNITS OF 4BHK

BEDROOM 3.5X3.2

TOTAL BUILT UP OF SIN BLOCK= 4480 SQ,MT

TOTAL BUILT UP OF SINGLE BLOCK= 2405 SQ,MT +21.000

PROJECT

Drawing No 06

BEDROOM 3.5X3.2

TOILET 1.4X2.6

12

13

14

15

16

17

18

20

19

DOWN

N

TOILET 1.4X2.6

+24.000 8 Story

20R x 0.150 19G x 0.329

UP

STUDIO 7

BUILT UP IN SINGLE FLOOR +24.000 8 Story 185 SQ,MT

11

10

9

8

7

6

5

4

3

2

1

TOTAL BUILT UP OF SINGLE BLOCK= 7464.8 SQ,MT

Name of Institute

4 BHK CLUSTER

Name of Institute

EE

4 BHK UNIT (CLUSTER)

FACULTY OF ARCHITECTURE MARWADI UNIVERSITY

SECTION EE

FACULTY OF ARCH MARWADI UNIVERS

SECTION DD (SCALE 1:100)

GSEducationalVersion

GSEducationalVersion

LEGENDS

LEGENDS

+3.000 1 Story

±0.000 0 Ground Floor

±0.000 0 Ground Floor

ELEVATION

Valley line

+3.000 1 Story

Ridge Line

+6.000 2 Story

Valley line

+6.000 2 Story

NOTES

Valley line

+9.000 3 Story

Valley line

+9.000 3 Story

11

12

13

14

15

17

16

18

19

20

19

18

17

16

15

14

13

12

11

20

SECTION FF

WASH AREA 2.7X1.8

FF

1

2

4

3

5

6

7

10

BATCH 2018-2023 (4TH YEAR 2021)

WALDRABE+TOILET 2.8X3.2

LIVING SPACE 3.8x5.3

Drawing Name

FOYER 2.2X1.8

BEDROOM 5.2x3.2

SEMI DETATCHED

Valley line

SEMI DETATCHED

BEDROOM 5.2x3.2

BATCH 2018-2023 4TH YEAR 2021

BY BY

DEVANSH N BHUDIYA

DEVANSH N BHUDIYA PORCH 2.2X1.4

PORCH 2.2X1.4 DOWN 3

3

2

2

1

1

UP

3R x 0.200 2G x 0.250

DOWN

Drawing No 09 Drawing Scale 1:50

UP

Date 07/10/2021

BALCONY 1.2X4.8

Drawing No 10

BALCONY 1.2X4.8

Drawing Scale 1:50

Remarks

Drawing Name

Date 07/10/2021

SEMI DETACHED BY

Remarks

DEVANSH N BHUDIY Drawing No 11

Name of Institute Name of Institute

FACULTY OF ARCHITECTURE S-38 MARWADI UNIVERSITY

10

FIRST FLOOR PLAN

S-38

STUDIO 7 PROJECT

HOUSING (RAJKOT)

Drawing Name LIVING SPACE 3.8x5.3

Ridge Line

Ridge Line

13

12

16

15

18

11

HOUSING (RAJKOT)

Valley line

Valley line

N 1

3

2

4

6

5

8

7

10

9

17

19

20

N

WALDRABE+TOILET 2.8X3.2

STUDIO 7 PROJECT

Valley line

2

1

4

3

9

8

7

6

5

10

4

3

2

6

FF

20R x 0.150 19G x 0.301

1

5

20R x 0.150 19G x 0.301

BATCH 2018-2023 (4TH YEAR 2021)

8

7

DRAWING SPACE 3.2X4.0

HOUSING (RAJKOT)

FF 7

6

5

4

3

2

1

8

20

19

18

17

16

15

14

13

FF

STUDIO 7 PROJECT

STAIRCASE 4.3X2.0 20R x 0.150 19G x 0.301

BEDROOM 2.8x4.6

DRAWING SPACE 3.2X4.0

14

F

F

GUUEST ROOM 2.8x4.6

DINING SPACE 3.8x2.4

12

STORE ROOM 1.2X1.8

11

STORE ROOM 1.2X1.8

20R x 0.150 19G x 0.301

3R x 0.200 2G x 0.250

9

8

7

6

10

5

4

3

KITCHEN 2.4X2.5

STAIRCASE 4.3X2.0

GSEducationalVersion

2

1

KITCHEN 2.4X2.5

BEDROOM 2.8x4.6

DINING SPACE 3.8x2.4

FOYER 2.2X1.8

FF

20R x 0.150 19G x 0.301

COMMON TOILET 1.8X2.0

GUUEST ROOM 2.8x4.6

FF

20R x 0.150 19G x 0.301

TERRACE GARDEN 3.2x2.8

9

TOILET 1.8X2.0 TERRACE GARDEN 3.2x2.8

8

TOILET 1.8X2.0

COMMON TOILET 1.8X2.0

FACULTY OF ARCHITECTURE MARWADI UNIVERSITY

TERRACE PLAN

Drawing Scale 1:50 Name of Institute

FACULTY OF ARCHITEC MARWADI UNIVERSITY

GSEducationalVersion

GSEducationalVersion


03.RESIDENCE DESIGN CLIMATE STUDIO SEM-III The Programme was to design a Residence House in responce to the climate of the particular region (Udwada, Gujarat). The class was divided into 4 zones , from which our site lies under the warm and humid climate.

SITE


The design was to give a better living to the Client (as Artist and his wife as Dancer). Which adds up a newer lifestyle than village with resspond to the climate analysis of the site.


03,1.RELATED STUDY PROGRAM (UDWADA) The RSP involved documenting various Traditional and settlements of Parsis which create platforms for explorations. Programe includes drawings, sketches, and photography documentations. Incorporated the study of : Lifestyle Culture Traditional Building Material

Construction system Understanding in type of Architectural Style. (Portuguese Style)

E X P L O A T I O N



04. MADRASA AND COMUNITY DESIGN The Programe was comunity centre is to provide a few basic amenities and facilities accross a people that constitute the comunity. In which programe incooperated are:

Madrasa for the students, Tiffin services for the Bohra Community, and space for the gattherings to the Bohras Community.



05. HOBBY CENTRE DESIGN SEM-II

The Programe involves an different types of activies according to their Hobbies of the children in which spaces incooperated, with some intermediate breakthroughs, small courtyards, semi open spaces and area with some refreshment spaces. Spaces are designed and placed in a manner in which the individual can get connected with nature and to take inhanced and interest in their activities (individuality)



M E T A L

06. WORKSHOPS

& W O O D E N


S K E T C H E S


07. Miscellaneous Works B M C W O R K S H O A W O R K S


C O M P E T I T I O N

P R O J E C T

RENDERS

W O R K

W O R INT. DESIGN OF SALOON AT (MADHAPAR BHUJ)

K


“I pick up my pen. It flows. A building appears. There it is. There is nothing more to say.”

- Ar. Oscar Niemeyer

THANK YOU +91 7984799605 devanshbhudiya72@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.