Construction Analysis_Kew House Flipbook

Page 1

PL ANS ABPL20033 F L I PBOOKAS S I GNME NT2 | KEW HOUS EBYBE NTARCHI T E CT URE


STAGE 1

SITE PREPARATION, EXCAVATION & FILL

FLIPBOOK ASSIGNMENT 2

Scale 1:50

NGL. 10.00

EXISTING DOUBLE STOREY DWELLING

SITE CLASSIFICATION IN ACC. WITH A.S.2870 - CLASS M

MEMBER SCHEDULE

RL. 13.75

SITE DEMOLITION IN ACC. WITH A.S. 2601 N

CONTRACTOR TO OBTAIN ALL NECESSARY PERMIT PRIOR TO DEM.

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 2

FOOTINGS, REINFORCEMENT, SLAB

FLIPBOOK ASSIGNMENT 2

3AR

Scale 1:50

MAIN SERVICES CONNECTION (WATER, SEWER, ETC.)

500 DEEP 300 WIDE STRIP FOOTING

WATERPROOFING PROVIDED TO RETAINING WALL AS SPEC.

50mm COMPACTED SAND BED & NATURAL SILTY CLAY UNDER TRENCH

NGL. 10.00

REINFORCING MESH * LIGHTLY COMPACTED GRANULAR BACKFILLWITH FREE DRAINING

0.2mm VAPOUR BARRIER

150 kPa CONCRETE 3-L12TM BTM ACC. TO A.S./NZS 4671

RUMPUS FFL. 12.45

3AR

90 DIA. AGRICULTURAL PIPE

REINFORCING MESH * - 3 - L12TM IN BOTTOM (50 COVER)

N

- SL82 IN TOP (20 COVER)

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 3

RETAIINING WALL, BUILDING FRAME & STRUCTURE

FLIPBOOK ASSIGNMENT 2

3AR

Scale 1:50

290 THICK REINFORCED BLOCK N16 @ CTS. VERTICALLY TO REAR FACE

3AR

N12 @ 400 CTS. HORIZONTALLY

N

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 4

GROUND FLOOR FRAME & STRUCTURE

FLIPBOOK ASSIGNMENT 2

3AR

Scale 1:50

MASONRY WORK *

0.75 B.M.T. BONDEK SL82 MESH ON TOP (30 COVER)

89 x 89 x 3.5 SHS COLUMN

C15

3AR

TIMBER FRAME *

MASONRY WORK *

TIMBER FRAME *

MASONRY IN ACC. WITH A.S. 3700

ALL WORK AND MATERIAL MUST COMPLY TO A.S. 3700 & A.S.1684

CONCRETE MASONRY UNITS - GRADE 15 UNITS TO A.S.2733 WALL TIES COMPLY TO A.S./NZS 2699.1

N

GROUT- MIN. COMPRESSIVE STRENGTH 15MPa,MIN. CEMENT CONTENT OF 300kg/m3

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 5

INTERMEDIATE SUSPENDED STRUCTURE

FLIPBOOK ASSIGNMENT 2

3AR

Scale 1:50

GL1

SOLID BLOCKING BETWEEN JOISTS AT ENDS & 1800 MAX. CTS

240 X 45 FLOOR JOISTS @ 450 MAX CTS.

PRIMARY BEAM 250 UB 37 METAL CROSS BRACING

C3

C4

C5

C6 C15 PRIMARY BEAM 150 x 75 PFC

3AR

1B5

18mm STRUCTURAL PARTICLE BOARD

MEMBER SCHEDULE 2 / 90 x 45 F17 KDHW 89 x 89 x 3.5 SHS 250 x 90 PFC + THICK PLATE TO SUPPORT UNDERNEATH BLOCKWORK 250 x 90 PFC WITHIN FLOOR JOIST DEPTH

N

C5 - 8 C15 - 18 GL1 1B5

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 6

PREPARATION OF ROOF STRUCTURE

FLIPBOOK ASSIGNMENT 2

3AR

RB14

Scale 1:50

PROVIDE SOLID BLOCKING BETWEEN JOISTS AT ENDS & 1800 MAX CTS. ; GRADED BATTENS OVER TO CREATE ROOF SLOPE

R1

L24

R1 C12

C13

C14

R4

FIXED TOGETHER WITH SOLID KDHW PACKING @ 1500 MAX CTS., 2-M12 4.6/GALV BOLTS THROUGH

RB

6

RB5

3AR

L25

R1

L10

L15

PB4

RB6

MEMBER SCHEDULE 2 / 90 x 45 F17 KDHW 89 x 89 x 3.5 SHS 180 x 75 PFC WINDOW TRANSOM 2/140 x 45 MGP10 PINE 90 x 45 MGP10 PINE 300 x 90 PFC

RB5 RB6 RB14 R1 R4 PB4

180 x 75 PFC WITHIN RAFTER DEPTH 180 UB 10 WITHIN RAFTER DEPTH 300 x 45 HYSPAN LVL 200 x 45 HYSPAN ROOF JOISTS @ 600 MAX CTS. 140 x 45 MGP10 PINE ROOF JOISTS @ 600 MAX CTS. 2/240 x 45 F17 KDHW

N

C5 - 8, 14 C12,13,15 - 18 L10 L15 L24 L25

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 7

LOCK UP - EXTERNAL WALLS

FLIPBOOK ASSIGNMENT 2

Scale 1:50

3AR

SCAFFOLDING ON SITE MUST COMPLY TO AS/NZS 1576.1

STAIRS & HANDRAILS TO COMPLY WITH B.C.A. PART 3.9.1 & A.S. 1657-2013

3AR

ZINC CLADDING OVER 15mm PLYWOOD OVER 30 mm BATTENS AS SPEC.

N

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 8

LOCK UP - ROOF COVER

FLIPBOOK ASSIGNMENT 2

Scale 1:50

3AR

LYSAUGHT 'KLIP LOK' 406 ROOF SHEETING AS SPEC.

ROOF SARKING ROOF INSULATION

DP. C *

PC

STEEL BATTEN PC

PC2

DP. C * PC2

FF *

RETRACTABLE SUNSHADING BLIND AS SPEC.

GF

PC

BG.1

12˚FALL

3AR

PC2

42˚FALL

MEMBER SCHEDULE

DP. C

90mm I DIA. UPVC DOWNPIPE TO BE FULLY CONCEALED WITHIN WALL

PC

PARAPET CAPPING AS SPEC.

STRUCTURE & CONNECTED TO STORM WATER SYSTEM AS REQUIRED

PC2

INTEGRATED PARAPET & FASCIA CAPPING IN FOLDED SHEET AS SPEC.

STAINLESS STEEL FIREPLACE FLUE INSTALLED ACC. TO MANUFACTURERS SPEC.

BG. 1

400x100mm DEEP ZINCALUME BOX GUTTER WITH FALL TO SUMP AS

FF

INDICATED ON THE DRAWINGS

N

SERVICES SCHEDULE

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 9

FLIPBOOK ASSIGNMENT 2

LOCK UP - WINDOW SYSTEM

3AR

3AR

Scale 1:50

WINDOW SPECIFICATIONS - ALL GLAZING, SELECTION & INSTALLATION TO COMPLY WITH AS1288-2006 GLASS IN BUILDING - ALL WINDOWS TO BE INSTALLED WITH MATCHING HEAD, SILL & JAMB FLASHING AS REQUIRED INDICATED

N

- ALL WINDOWS DOORS ARE TO BE DOUBLE GLAZED WITH 12mm ARGON GAP UNLESS OTHERWISE

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 10

FLIPBOOK ASSIGNMENT 2

FIXINGS/ SERVICES ROUGH IN

3AR

3AR

Scale 1:50

NOTES: - ALL ELECTRICAL INSTALLATION TO COMPLY TO AS/NZS 3000 TO COMPLY WITH AS 3786 & BCA

N

- SELF CONTAINED SMOKE ALARM DETECTOR & ALARM WIRED TO MAINS

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 11

FLIPBOOK ASSIGNMENT 2

INTERNAL PARTITIONS & CEILING STRUCTURE

3AR

3AR

Scale 1:50

SPECIFICATIONS - ALL GLAZING, SELECTION & INSTALLATION TO COMPLY WITH AS1288-2006 GLASS IN BUILDING - ALL DOORS TO BE INSTALLED WITH MATCHING HEAD, SILL & JAMB FLASHING AS REQUIRED INDICATED

N

- ALL GLAZED DOORS ARE TO BE DOUBLE GLAZED WITH 12mm ARGON GAP UNLESS OTHERWISE

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 12

FIXINGS, FINISHING TRADES

FLIPBOOK ASSIGNMENT 2

3AR

Scale 1:50

JN

JN

JN

JN

MASTER BEDROOM F5

F3

HH.R

HH.R

F5

ENTRY F9

F1

COURTYARD FFL. 12.45 FP

WS

JN

LIVING

GALLERY

DECK F6

F5

3AR

FFL. 15.50

GENERAL JN FP WS HHR

BUILT-IN JOINERY UNIT FIRE PLACE WOOD STORAGE HYDRONIC HEATING RADIATOR

N

FLOOR FINISHES F1 600 x 300mm PORCELAIN TILES AS SPEC.; ALLOW 200mm F3 CARPET AS SPEC. ALLOW 20mm F5 80mm WIDE x 19mm THICK (NOM) TIMBER FLOORBOARDS OVER 18mm PARTICLEBOARD FLOORING OR OVER 40mm BATTENS; ALLOW 40mm & 60mm RESPECTIVELY. F6 19mm EXTERNAL TIMBER DECKING AS SPEC. F9 450mm x 450mm PORCELAIN TILES AS SPEC.

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)



S E CT I ONS ABPL20033 F L I PBOOKAS S I GNME NT2 | KEW HOUS EBYBE NTARCHI T E CT URE


STAGE 1

SITE PREPARATION, EXCAVATION & FILL

FLIPBOOK ASSIGNMENT 2

Scale 1:50

EXISTING GROUND LEVEL SHOWN AS HATCHED

N

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 2

FOOTINGS, REINFORCEMENT, SLAB

FLIPBOOK ASSIGNMENT 2

Scale 1:50

N16 STARTER BARS @ 200 CTS REINFORCING MESH* ABOVE: 50mm COMPACTED SAND BED BELOW: 0.2mm VAPOUR BARRIER

REINFORCING MESH * - 3 - L12TM IN BOTTOM (50 COVER)

N

- SL82 IN TOP (20 COVER)

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 3

RETAIINING WALL, BUILDING FRAME & STRUCTURE

FLIPBOOK ASSIGNMENT 2

Scale 1:50

GL1

BW

MEMBER & MATERIAL SCHEDULE 250 x 90 PFC + 8 THICK PLATE TO SUPPORT BLOCKWORK BORAL CONCRETE BLOCKWORK AS SPEC.

N

GL1 BW

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 4

GROUND FLOOR FRAME & STRUCTURE

FLIPBOOK ASSIGNMENT 2

Scale 1:50

WALL STUD

SARKING METAL STRAP BRACING

0.75 B.M.T. BONDEK SL82 MESH ON TOP (30 COVER) WALL INSULATION

NOTES: N

- ALL TIMBER WORK & MATERIAL MUST COMPLY TO AS 3700 & AS 1684 - ALL MASONRY WORK MUST COMPLY TO AS 3700

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 5

FLIPBOOK ASSIGNMENT 2

INTERMEDIATE SUSPENDED STRUCTURE

Scale 1:50

C15

C12 GL1

1B5

C16

SCAFFOLDING ON SITE MUST COMPLY TO AS/NZS 1576.1

MEMBER & MATERIAL SCHEDULE 250 x 90 PFC + 8 THICK PLATE TO SUPPORT BLOCKWORK 250 x 60 PFC WITHIN FLOOR JOIST DEPTH 89 x 89 x 3.5 SHS

N

GL1 1B5 C12, 15, 16

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 6

FLIPBOOK ASSIGNMENT 2

PREPARATION OF ROOF STRUCTURE

Scale 1:50

200 x 45 HYSPAN LVL ROOF JOISTS @ 600 MAX CTS.

250 x 90 PFC + 8 THICK PLATE

140 x 45 MGP10 PINE ROOF JOISTS @ 600 MAX CTS.

TIMBER BLOCKING FOR CEILING LINING 2/200 x 45 HYSPAN LVL

N

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 7 | SECTION

LOCK UP - EXTERNAL WALLS, BALUSTRADES & HANDRAILS

FLIPBOOK ASSIGNMENT 2

Scale 1:50

42˚

ZINC CLADDING OVER 15mm PLYWOOD OVER 30 mm BATTENS AS SPEC.

STAIRS & HANDRAILS TO COMPLY WITH B.C.A. PART 3.9.1 & A.S. 1657-2013

N

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 7 | NORTH ELEVATION

LOCK UP - EXTERNAL WALLS

FLIPBOOK ASSIGNMENT 2

Scale 1:50

ZINC CLADDING OVER 15mm PLYWOOD OVER 30 mm BATTENS AS SPEC.

DECK BALUSTRADE WALLS* - C1

BORAL CONCRETE BLOCKWORK AS SPEC.

C1

ZINC CLADDING OVER 15mm PLYWOOD OVER 30 mm BATTENS AS SPEC.

N

MATERIAL SCHEDULE

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 8

FLIPBOOK ASSIGNMENT 2

LOCK UP - ROOF COVER

Scale 1:50

2˚ LYSAUGHT "KLIP LOK" 406 ROOF SHEETING AS SPEC

42˚ 300MM x 100mm ZINCALIME BOX GUTTER

NOTES: ROOF INSTALLATION TO COMPLY WITH A.S. 1562.1-1992 SOLAR PANELS TO BE INSTALLED ON ROOF FLASHINGS, CAPPING, GUTTERS OF MATERIAL SUITED TO ROOF SHEET INSTALLED

N

-

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 9

LOCK UP - WINDOW SYSTEM

FLIPBOOK ASSIGNMENT 2

Scale 1:50

WINDOW SPECIFICATIONS - ALL GLAZING, SELECTION & INSTALLATION TO COMPLY WITH AS1288-2006 GLASS IN BUILDING - ALL WINDOWS TO BE INSTALLED WITH MATCHING HEAD, SILL & JAMB FLASHING AS REQUIRED INDICATED

N

- ALL WINDOWS DOORS ARE TO BE DOUBLE GLAZED WITH 12mm ARGON GAP UNLESS OTHERWISE

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 10

FIXINGS/ SERVICES ROUGH IN

FLIPBOOK ASSIGNMENT 2

Scale 1:50

10A 240V DOUBLE GPO MOUNTED 200mm ABOVE FFL UNLESS INDICATED OTHERWISE

NOTES: N

- ALL ELECTRICAL INSTALLATION TO COMPLY TO AS/NZS 3000

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 11

FLIPBOOK ASSIGNMENT 2

INTERNAL PARTITIONS & CEILING STRUCTURE

Scale 1:50

PB

BW

PB

MATERIAL SCHEDULE BORAL CONCRETE BLOCKWORK AS SPEC. 10mm PLASTERBOARD AS SPEC.

N

BW PB

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)


STAGE 12

FIXINGS, FINISHING TRADES

FLIPBOOK ASSIGNMENT 2

Scale 1:50

MASTER BEDROOM

LIVING PB

BW

RUMPUS

GARAGE C2

PB

MATERIAL SCHEDULE BORAL CONCRETE BLOCKWORK AS SPEC. 10mm PLASTERBOARD AS SPEC. LYSAGHT "MINI-ORB" WALL CLADDING IN COLOURBOND METALLIC RANGE COLOUR "CORTEX"; INSTALL VERTICALLY WITH CAPPING/FLASHING TO MATCH

N

BW PB C2

SECTION 3AR KEW HOUSE by bent Architecture Name: Diana Ong (701832) Tutor : Katie Miller (T4)



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.