California Polytechnic State University, San Luis Obispo | Work Sample 310.923.5883 drodri20@calpoly.edu cargocollective.com/dianarodriguez 27555 Endeavor Street, Agoura Hills, CA 91301
DIANA RODRIGUEZ 27555 Endeavor Street, Agoura Hills, CA 91301 | drodri20@calpoly.edu | 310.923.5883
EDUCATION Sept. 2010 - Present
CALIFORNIA POLYTECHNIC STATE UNIVERSITY, San Luis Obispo, CA Bachelor of Architecture, Current Standing: 5th Year Expected Graduation: June 2015 Concentration in Digital Fabrication
Jan. 2014 - Jun. 2014
LOS ANGELES METROPOLITAN PROGRAM, Los Angeles, CA Los Angeles Off-Campus, Professor Stephen Phillips
Design studio and theory courses focused on the architecture, urbanity, and culture of Los Angeles. Included digital workshops, lectures, and an internship with a local firm. Jun. 2013 - Sept. 2013
STUDIO TICINO, Ticino, Switzerland Switzerland Study Abroad, Professor Tom Di Santo
Traveled throughout France, Switzerland, Germany, and Italy studying architectural work. Completed workshops and studio design project for client.
WORK EXPERIENCE Jan. 2014 - Sept. 2014
TOM WISCOMBE ARCHITECTURE, Los Angeles, CA Architectural Intern, Principal Tom Wiscombe
International Competition SD drawings and diagrams for Kinmen Port Terminal and Guggenheim Helsinki. SD/DD/CD drawings for Old Bank District Museum, Los Angeles. Sept. 2014 - Present
CALIFORNIA POLYTECHNIC STATE UNIVERSITY, San Luis Obispo, CA CAED Web Design & Publishing Intern, Assistant Dean Natalie Schaefer
Upgrade and maintain College of Architecture and Enviornmental Design home page. Uploading of new material and constructing captivating layouts. Sept. 2014 - Dec. 2014
CALIFORNIA POLYTECHNIC STATE UNIVERSITY, San Luis Obispo, CA Instructional Student Assistant, Associate Dean Michael Lucas
Co-taught with Michael Lucas the activity section of EDES 101 to first year students in the College of Architecture and Enviornmental Design. Sept. 2013 - Dec. 2013
DEEGAN DAY DESIGN, Los Angeles, CA Architectural Intern, Principal Joe Day
Competition publication renders, diagrams, and model building in the conceptual design and development phase of projects in the Los Angeles area and London.
RECOGNITION Jun. 2014 - Present
Published work in ADD: Architecture, Design, and Discourse XIV and XV
Jun. 2013
Bello Mundo Cafe Parklet Design Competition, San Luis Obispo, CA
Mar. 2013
Cal Poly Architecture Courtyard Design Competition, San Luis Obispo, CA
SKILLS 3D Modeling / Rendering
Rhino/Grasshopper, Maya, SketchUp, AutoCAD, Vray, Maxwell, MentalRay
2D Graphics / Illustration
Adobe Photoshop, Illustrator, Indesign, Dreamweaver, Final Cut Pro, DSLR
Physical Production
CNC Milling [HAAS], RhinoCam, Laser-Cutting, 3D Printing, Model Making
Languages
English and Spanish Fluency
MACHINE OBLIQUE TYPE: Undergraduate Seminar DATE: Winter/Spring 2014_ LA Metro LOCATION: Hollywood, California PROGRAM: Mixed-Use [Digital Production Studios+Office+Retail]
ABOVE Urban context rendering RIGHT, CLOCKWISE Ground floor plan, aerial perspective, proximity to Los Angeles icons, section with interior floor plans, wall section detail
2 1 3
01 Machine Oblique
Diana Rodriguez | 310.923.5883 | drodri20@calpoly.edu
02 W Hotel Hollywood
03 Capitol Records
TOP Section perspective BOTTOM, LEFT 1/32 physical model in site, top view of 1/32, top view of 1/64 BOTTOM, RIGHT Top view of 1/16 physical model in site, axonometric view of 1/16 model
Diana Rodriguez | 310.923.5883 | drodri20@calpoly.edu
RED 40 DATE: Summer 2013_Studio Ticino LOCATION: Port Tonic, France PROGRAM: Mixed-Use [Art Gallery +Residential] COLLABORATION: With Ben Pennell
1
2
3
Studio Space and Gallery, Rooftop Living Unit
Studio Space and Gallery, Level 2
TOP Entry Perspective BOTTOM Existing and proposed program axons with corresponding floor plans
Diana Rodriguez | 310.923.5883 | drodri20@calpoly.edu
Studio Space and Gallery, Level 1 Garage and Public Park
Studio Space and Gallery, Studio Basement
Rear Entry, Level 1
TOP Circulation/Entry Diagram BOTTOM Aerial perspective with stuctural diagram, Elevations on left and far bottom
Main Entry, Level 2
Public Path Entry, Level 2 Studio Entry, Basement
Seaside Entry, Level 1
1
3
Living Unit, East Elevation
1
2
Studio Space and Gallery, West Elevation
2 Studio Space and Gallery, East Elevation
Garage and Public Park, East Elevation
3 Garage and Public Park, West Elevation
South Elevation
Diana Rodriguez | 310.923.5883 | drodri20@calpoly.edu
Remodeled Concrete
Building Axonometric
Extruded Steel Structure
North Elevation
C’EST BONE DATE: Spring 2013_ Cal Poly LOCATION: San Luis Obispo, CA TYPE: Digital Fabrication Installation COLLABORATION: Trevor Larsen, Layan Barakat, Stephanie Thompson
MODULE DETAILS LENGTH elongating the bone while maintaining the volume for high LENGTH Elongating while strengththetobone weight maintaining the volume ratio for high strength to weight ratio.
CONNECTION CONNECTION Using the idea ofusing 3-dimensional the idea of 3tessellation to connect dimensional tessellation and lock the modules into to connect and lock the each other.
modules into each other
THICKNESS THICKNESS Using the minimum material to achieve the using minimum material to maximum structural acheive capacity. maximum structural
capacity
Diana Rodriguez | 310.923.5883 | drodri20@calpoly.edu
FORMWORK PROCESS
DERIVED FORM
FIBER REINFORCED Fiber-Reinforced HYDROCALJACKET Hydrocal Jacket
SILICONE Silicone MOLD Mold
Hydrocal HYDROCAL POSITIVE Positive SILICONE Silicone MOLD Mold
Fiber-Reinforced FIBER REINFORCED Hydrocal Jacket HYDROCALJACKET
INTERLOCKING CONNECTION DETAIL
MATERIAL EFFICIENCY Initial Iteration
Improved Iteration
=
50 lbs.
=
50 lbs.
=
1.7 sets of 6 modules
4.25 sets of 4 modules 120% Efficiency
= Diana Rodriguez | 310.923.5883 | drodri20@calpoly.edu
PROCESS
TOP Transverse and Longitudinal Section
KINMEN PORT TERMINAL TOM WISCOMBE ARCHITECTURE
BOTTOM Fourth floor plan with details of upper floors
TYPE: Professional, Competition DATE: Winter/Spring 2014 PROGRAM: Port Terminal ROLE: Schematic Design, Presentation Drawings, Phase I & II COLLABORATION: With Jo Zho
+49.00M
屋頂層
ROOF LEVEL
3
+38.70M
4
機電機房層 MEP LEVEL
5
+33.40M
六樓
6
SIXTH LEVEL
+27.10M
6
五樓
10
FIFTH LEVEL
+21.80M
四樓
7
FOURTH LEVEL
+17.70M
三樓
8
THIRD LEVEL
11
+ 7.50M
二樓
1
2
9
12
+59.00m
一樓
13
5
HIGH TIDE
- 4.50M屋頂層 ROOF LEVEL +49.00m
2
LOW TIDE
3 1
3
9
4
4
6
2
五樓 FIFTH LEVEL 四樓 FOURTH LEVEL
1.
12 2
8
14
6
15
7
浮動碼頭
6.
FLOATING DOCK
2. 3.
7.
冷卻塔 (戶外空氣)
8.
COOLING TOWERS (OUTDOOR AIR)
8
4.
船舶交通管理中心
3 1
4
5.
餐館
12.
+49.00m + 7.50m
機電機房
10.
入境大廳
RESTAURANT
屋頂層 二樓 SECOND ROOF LEVEL LEVEL ARRIVAL LOBBY
商業空間
+- 0.00m
13.
停車層
一樓 FIRST LEVEL PARKING LEVEL - 4.50m +38.70m 停車層 PARKING 機電機房層 LEVEL 隔牆MEPLEVEL
港務空間
14.
+33.40m
PORT WORKSPACE
MEP
3
10 9
出境大廳 11. ROOF 屋頂層 LEVEL 三樓 THIRD LEVEL DEPARTURE LOBBY
COMMERCIAL SPACE
9.
VTC
3
+59.00m +17.70m
行政 ADMINISTRATION
岸肩作業區 DOCKSIDE OPERATIONS
13
2
3
PHASE 2 EXPANSION 1
+27.10m +21.80m
4
7 2
六樓 SIXTH LEVEL
14
11
3
二期擴建
PARKING LEVEL
+38.70m
機電機房層 MEP LEVEL
SITE LINE
3
10
4
2
4M SETBACK
+33.40m
3
5
4 米退縮線 基地線
13
2
3
1
FIRST LEVEL
停車層
2
低潮
SECOND LEVEL
+- 0.00M屋頂層 ROOF LEVEL
高潮
DIAPHRAM WALL
六樓 SIXTH LEVEL
屋頂步道
+27.10m
五樓 FIFTH LEVEL
ROOF PROMENADE
+21.80m
四樓 FOURTH LEVEL
11
+17.70m
三樓 THIRD LEVEL
4
4
6
4
14
6
+ 7.50m
二樓 SECOND LEVEL
5
7
12
2
8
2
15
7
+- 0.00m
一樓 FIRST LEVEL
8
- 4.50m
停車層 PARKING LEVEL
二期擴建 PHASE 2 EXPANSION
1.
屋頂步道
6.
ROOF PROMENADE
2.
機電機房
3.
行政
8.
商業空間
9.
急救站和電話亭
屋頂步道 機電機房
6.
行政
8.
商業空間 急救站和電話亭 FIRST-AID/TEL.
5
485 SM.
1159 SM.
1
1123 SM.
1584 SM.
1
882 SM.
1
1
649 SM.
586 SM.
1. 行政辦公空間 ADMINISTRATIVE SPACE
4. 金門歷史劇場
3
GREEN ROOF PROMENADE
584 SM.
2. 船舶交通管理中心 /設備空間 VTC/ MEP
5. 商業 COMMERCIAL 1159 SM.
649 SM.
3. 設備空間 MEP 649 SM.
6. 餐廳 RESTAURANT 774 SM.
Diana Rodriguez | 310.923.5883 | drodri20@calpoly.edu
2
14.
出境大廳 入境大廳 停車場 金門歷史劇院 往出境層 TO DEPARTURE LEVEL
行李提領區 BAGGAGE CLAIM
11.
行政 RESTAURANT
12.
港務空間 PORT WORKSPACE
13.
船舶交通管理中心 VTC
14.
KINMEN HISTORY THEATER
10.
票務及報到處 TICKETING CHECK-IN
15.
PARKING
9.
COMMERCIAL
5.
往出境層
船舶交通管理中心 VTC
ARRIVAL LOBBY
ADMINISTRATION
4.
4
13.
DEPARTURE LOBBY
7.
MEP
3.
金門歷史劇院
港務空間 PORT WORKSPACE
TO DEPARTURE LEVEL
ROOF PROMENADE
2.
停車場
行政 RESTAURANT
12.
KINMEN HISTORY THEATER
10.
FIRST-AID/TEL.
1.
11.
PARKING
COMMERCIAL
5.
入境大廳 ARRIVAL LOBBY
ADMINISTRATION
4.
出境大廳 DEPARTURE LOBBY
7.
MEP
票務及報到處 TICKETING CHECK-IN
15.
行李提領區 BAGGAGE CLAIM
2
3
4
118'-1" 28'-8" 28'-8"
20'-10"
9'-1"
12'-7"
9'-1"
12'-7"
4b 29'-6"
6
7
DN
20'-6"
4'-0"
10
11
4'-8"
12
18'-5"
13
20'-11"
14
20'-11"
15
13'-6"
(N) MECH
20'-9"
EXISTING: 136 EGRESS CAPACITY 41" CLEARWIDTH TREAD 7/12
14'-5"
16
13'-9"
17
10'-7"
18
20'-3"
PROPOSED: 200 EGRESS CAPACITY 60" CLEARWIDTH TREAD 7/12
B
B
B
B
B
H
(E) STAIR 3 UP
E
3'-4"
10" MIN.
10" MIN. 10" MIN.
10" MIN.
23'-2" DRIVE ISLE
R 20'-0"
PARKING GARAGE 2 R 20'-0"
E
E
E
E
29
30
31
32
E
E
33
34
1'-0"
18
19
20
21
22
25
24
23
5"
63 64
C
26'-6"
57
C
56'-6" PARKING WIDTH 26'-6" DRIVEBAY ISLE 90° COMPACT SPACE DOUBLE LOADED TWO WAY TRAFFIC
ELEVATOR CAB 10' L x 5'-8" W
58
C
56'-6" PARKING BAY WIDTH
DRIVER ISLE
C
65
C
66
C
51
C
52
C
53
C
54
C
55
36'-6" PARKING BAY WIDTH
59
C
60
C
61
C
E
M
15'-0"
67
C
CONFERENCE ROOM
BATHROOMS
GILMORE OFFICE EXTENSION (OBDM OFFICE)
20'-1"DRIVER ISLE
13
14
B
B
B
15
16
B
B
5"
DRIVER ISLE
24'-4"
45'-3" PARKING BAY WIDTH 90° STANDARD SPACE SINGLE LOADED TWO WAY TRAFFIC NON-REQUIRED STALLS
27'-1" DRIVE ISLE
64'-11" PARKING BAY WIDTH 90° STANDARD SPACE DOUBLE LOADED TWO WAY TRAFFIC NON-REQUIRED STALLS B
B
B
B
B
1
2
3
4
5
6
7
8
O
GILMORE ASSOCIATES OFFICE SPACE
EQ.
P
10" MIN.
E
EQ.
(E) ELEVATOR LOBBY
(E) STAIR 1
B
B
71
70
B
B
69
68
Q
17'-1"
B
18'-0"
A
UP DN
G
E
(E) STANDPIPE R
G2
OB EN D M M TR AN AIN CE
EL DORADO
MAIN STREET
W.
ALL
EY
TOTAL GROSS AREA 3998 SF TOTAL NET OCCUPIABLE 3002 SF TOTAL OCCUPANCY 100
HOTEL BARCLAY
4TH
STR EET
FARMERS & MERCHANTS + 124’-7"
STR EET
CAFE
HELLMAN BUILDING
SPRING STREET PARK
PR
ING
N
FARMERS AND MERCHANTS BANK
R 20'-0"
11"11"
3'-5"
29'-0" 20'-8"
CONTINENTAL BUILDING
C
WIDTH 90° COMPACT SPACE SINGLE LOADED TWO WAY TRAFFIC
4'-1"
EQ.
F3
0°°
R 20'-0"
R 20'-0"
2'-6"
2'-3"
F2
75.0
24'-0" DRIVE ISLE
DN NEW RAMP TO FIRST FLOOR
90° TURN RADIUS ENVELOPE COMPLYING WITH "FIGURE 7: CIRCULATION DRIVEWAYS" LADBS CITY STANDARD. (DOCUMENT No. P/ZC 2002-01, INFORMATION BULLETIN REVISED 03-18-03, "PARKING LOT DESIGN" PAGE 13 OF 16) TYP.
F
B
45'-3" PARKING BAY WIDTH
5'-0"
5" 5'-10"
5'-0"
E2
40'-4" PARKING BAY WIDTH 40'-4" PARKING BAY
17
16'-11"
12
B
21'-6"
11
R 20'-0"
1'-10"
B
18'-0"
10
B
18'-0"
26'-0"
20'-1" DRIVE ISLE
9
L L2
UP 15'-0"
D2
E
K K2
OTB
UP
56
50
C
36'-8" PARKING BAY WIDTH 75° COMPACT SPACE SINGLE LOADED ONE WAY TRAFFIC
26
18'-0"
26'-3"
E
OTB
E
35
18'-0"
154'-11"
1'-1"
C
C
R 20'-0"
10" MIN. 10" MIN.
E
28
18'-0"
E
27
E
62
C
11"
26'-0"
R 20'-0"
18'-0"
C2
J
J2
8"
2'-0" 1'-7" 10" MIN. 10" MIN.
5"
C
1'-11" 2'-0" 10" MIN.10" MIN.
1'-10"
10"
UP
24'-4" DRIVE ISLE
43'-10" PARKING BAY WIDTH 90° STANDARD SPACE SINGLE LOADED TWO WAY TRAFFIC NON-REQUIRED STALLS
27'-1" DRIVE ISLE
PARKING GARAGE 1
NEW RAMP TO SECOND FLOOR
43'-10" PARKING BAY WIDTH
64'-3" PARKING BAY WIDTH
29'-0"
64'-3" PARKING BAY WIDTH 90° STANDARD SPACE DOUBLE LOADED TWO WAY TRAFFIC NON-REQUIRED STALLS
3'-5"
UP
16'-7"
1'-8"
C
10"
10" MIN. 10" MIN.
1'-7"
49
C
23'-5" 156'-9"
3'-5"
48
C
13'-9"
10" MIN. 10" MIN.
2'-3"
47
E 4TH SREET
10" MIN.
3002 SF NET
23'-5"
6'-3"
46
17'-6"
45
16'-5"
44
5'-1"
43
1'-2"
6'-10"
42
1'-9"
5'-0"
B
M03-1 FSE 90
NO PARKING
44'-11" PARKING BAY WIDTH 44'-11" PARKING BAY WIDTH 90° STANDARD SPACE SINGLE LOADED TWO WAY TRAFFIC NON-REQUIRED STALLS
5'-0"
41
40
1'-9"
B2
39
18'-0"
24'-4"
2'-7"
B
D
16'-11" 16'-11"
146 EGRESS CAPACITY 44" CLEARWIDTH TREAD 7/12 36" DOOR CLEARENCE
MEZZANINE GALLERY 38
37
36 5'-0"
TYPE: Professional, In progress DATE: Spring/Summer 2014 PROGRAM: Museum, Rooftop Cafe ROLE: Schematic Design, Design Development, Presentation Drawings COLLABORATION: With Andrew Adzemovic
36'-4" 36'-4"
(N) EXHAUST FAN -SEE MECH.
(E) STAIR 2
UP
TOM WISCOMBE ARCHITECTURE
9
140'-1"
94'-5"
41'-2" 41'-2"
A
E
8
94'-5" 3'-2"
16'-11"
146 EGRESS CAPACITY 44" CLEARWIDTH TREAD 7/12 36" DOOR CLEARENCE
RELOCATED STANDPIPE
(N) MECHANICAL
6'-1"
5
3b
30'-0"
1'-8" 1'-9"
OBDM
118'-1"
29'-11" 29'-11"
13'-6"
1
+ 92’-8.75"
S. S
PARAPET
+ 88’-0.5"
ROOF
+ 75’-0"
OB EN D M P TR AR AN K CE
PETE’S CAFE
HIGH RISE
Y OB EN D M S TR EC AN O N CE DA R
EARTHWAVE
HAR LEM
PLA CE
ALL EY
SCULPTURE DECK
S. M A IN
STR
EET
AMPHITHEATER
+9’-6" + 0’-0"
MEZZANINE GROUND
14’-1"
BANKHOUSE GARAGE
CAFE
13’-1
BANK HOUSE GARAGE
1/2"
HELLMAN BUILDING
FARMERS & MERCHANTS BANK
ROWAN BUILDING
N STO WIN EET
STR
S EL E NG SA .S LO EET STR
ROSSLYN LOFTS
STR
GUGGENHEIM HELSINKI
EET
TOM WISCOMBE ARCHITECTURE
TOP DD Mezzanine Level Plan, Site plan, and Elevation for OBDM
E
E
BOTTOM Fourth level plan of gallery space, Ground level plan with site context, and Section
CRYSTAL GALLERIES ARTIFICIAL LIT. 840 SM.
UP
TYPE: Professional, Competition DATE: Summer 2014 PROGRAM: Museum ROLE: Schematic Design, Presentation Drawings, Phase I COLLABORATION: With Andrew Adzemovic
STORAGE
CRYSTAL GALLERIES ARTIFICIAL LIT. 840 SM.
E
E
SHELL GALLERIES ARTIFICIAL & DAYLIT. 785 SM
REST.
REST.
E
E
5TH
SHELL GALLERIES ARTIFICIAL & DAYLIT. 765 SM.
7M MAINTENANCE ROAD
5M BOARDWALK
10M ACCESS ROAD
GUGGENHEIM MAIN ENTRY
+64.00M TOP +0.0M
ETELÄSATAMA SOUTH HARBOUR
+2.1M
1 2
+50.95M LEVEL 6
3 VIP ENTRY
+44.25M
4
LEVEL 5
TO MAIN ENTRY LVL.
CRYSTAL GALLERIES
11 REST.
5
+37.55M LEVEL 4
UP
6
TO MAIN ENTRY LVL.
REST.
10
7
SECONDARY PARK ENTRY
LEVEL 3
9
RO NF
+3.5M
+24.15M
SHELL GALLERIES
EA OC
8
+30.85M
LEVEL 2
NT BO FUTURE EXPANSION & PARKING
DELIVERY ACCESS +0.5M
SHARED PORT & MUSEUM TURNAROUND
1. THEATER BOH 2. FLEXIBLE THEATER 3. SECURITY 4. FOYER 5. OFFICE 6. ART STORAGE 7. ART PREP. 8. KITCHEN 9. CAFE 10. OUTDOOR SEATING 11. CLASSROOM PED. ACCESS VEH. ACCESS
MULTIPURPOSE ZONE +10.75M MULTI-PURPOSE ZONE +7.5M
7.0M MAINTENANCE ACCESS +2.1M
+7.5M
ENTRY LOBBY
+06.50M
ENTRY LOBBY
+2.9M
CLASSROOMS +0.5M
THEATER LOBBY +0.5M
+00.00M
+0.0M
THEATER
SEA LEVEL
THEATER ENTRY DIAPHRAGM WALL
+4.6M
+1.0M
LEVEL 1
ALK DW
+2.1M
+2.9M
+5.1M
+17.45M
AR
6
DIAPHRAGM WALL
W.
10.0M ACCESS ROAD
5.0M BOARDWALK +5.5M
LAIVASILLANKATU RD. +5.0M
1:400 1M
Diana Rodriguez | 310.923.5883 | drodri20@calpoly.edu
5M
10M
DIANA RODRIGUEZ cargocollective.com/dianarodriguez drodri20@calpoly.edu 310.923.5883