Jackson Boulevard Transit Center re-Framing Civic Infrastructure Beyond Transit
URS
URS w/ DLZ, CTG + the [Toledo] Design Center
w/
DLZ, CTG + the [Toledo] Design Center
TARTA + City of Toledo
0-2 min
INTRODUCTION
Christopher Diehl Creative Director URS Corporation
2-5 min
SETTING THE STAGE
James K. Gee
transit, decommissioning “the Loop”
General Manager, TARTA Toledo Area Regional Transit Authority
5-8 min
LAY OF THE LAND planning for economic development
8-10 min
GOALS, DESIGN PROCESS
David Dysard Administrator, Engineering Services City of Toledo
Christopher Diehl
transit, placemaking + sustainability
10-20 min
TRANSIT CENTER DESIGN
URS w/ DLZ, CTG + the [Toledo] Design Center
Christopher Diehl
TOLEDO DESIGN
crossroads
URS w/ DLZ, CTG + the [Toledo] Design Center
‌in the midst of the year 1908, Toledo was the fastest growing city in the USA because of its transportation system.
URS w/ DLZ, CTG + the [Toledo] Design Center
1940’s The Toledo & Chicago Interurban Railway Company
URS w/ DLZ, CTG + the [Toledo] Design Center
1959 view on Adams St
0-2 min
INTRODUCTION
Christopher Diehl Creative Director URS Corporation
2-5 min
SETTING THE STAGE
James K. Gee
transit, decommissioning “the Loop”
General Manager, TARTA Toledo Area Regional Transit Authority
5-8 min
LAY OF THE LAND planning for economic development
8-10 min
GOALS, DESIGN PROCESS
David Dysard Administrator, Engineering Services City of Toledo
Christopher Diehl
transit, placemaking + sustainability
10-20 min
TRANSIT CENTER DESIGN
URS w/ DLZ, CTG + the [Toledo] Design Center
Christopher Diehl
crossroads
URS w/ DLZ, CTG + the [Toledo] Design Center
the
loop
existing conditions
URS w/ DLZ, CTG + the [Toledo] Design Center
the
loop
existing conditions
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
0-2 min
INTRODUCTION
Christopher Diehl Creative Director URS Corporation
2-5 min
SETTING THE STAGE
James K. Gee
transit, decommissioning “the Loop”
General Manager, TARTA Toledo Area Regional Transit Authority
5-8 min
LAY OF THE LAND planning for economic development
8-10 min
GOALS, DESIGN PROCESS
David Dysard Administrator, Engineering Services City of Toledo
Christopher Diehl
transit, placemaking + sustainability
10-20 min
TRANSIT CENTER DESIGN
URS w/ DLZ, CTG + the [Toledo] Design Center
Christopher Diehl
URS w/ DLZ, CTG + the [Toledo] Design Center
key
Planning guidelines
• Reinforce the riverfront and adjacent districts by enhancing accessibility and
as a unique public asset and better link to the CBD
vitality of activities.
• Enhance public realm links among Downtown’s Entertainment (Live, Work, Play & Learn) anchors.
• Add market rate rental
residential opportunities for young and empty-nesters within
the downtown core.
• Promote mixed-use re-use of a select number vacant and underutilized historic and quality buildings beginning at the ground floor, then upper of
levels.
• Focus new mixed-use development
on a key number of
vacant sites w/in the Central Business District.
• Foster a re-development culture built on sustainable design and energy efficiency principles. •
Finalize the creation and funding of a Downtown Toledo Development Corp.(DTDC) as the private sector champion of the vision and continually refine and re-invigorate the private/public organizational structure to support the DTDC.
URS w/ DLZ, CTG + the [Toledo] Design Center
Goals of the City, 2011 Toledo Downtown Plan federal court house
Huron / Madison – Defined Heart Connectors county court house
Project Area Downtown District Signed Bikeway
county library valentine theater
Proposed Bikeway Off Road Bikeways
arena
seagate centre 5/3rd field
URS w/ DLZ, CTG + the [Toledo] Design Center
2011 Toledo Downtown Plan
URS w/ DLZ, CTG + the [Toledo] Design Center
Paramount Block
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
0-2 min
INTRODUCTION
Christopher Diehl Creative Director URS Corporation
2-5 min
SETTING THE STAGE
James K. Gee
transit, decommissioning “the Loop”
General Manager, TARTA Toledo Area Regional Transit Authority
5-8 min
LAY OF THE LAND planning for economic development
8-10 min
GOALS, DESIGN PROCESS transit, placemaking + sustainability
10-20 min
TRANSIT CENTER DESIGN
URS w/ DLZ, CTG + the [Toledo] Design Center
David Dysard Administrator, Engineering Services City of Toledo
Christopher Diehl Creative Director URS Corporation
502 Adams St
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
CIVIC CENTER MALL
ONE GOVERNMENT CENTER
TOLEDO BLADE UNITED WAY
LUCAS COUNTY COURTHOUSE
LIBRARY SQUARE
URS w/ DLZ, CTG + the [Toledo] Design Center
SEAGATE CENTER
IMAGINATION STATION
CIVIC CENTER MALL
ONE GOVERNMENT CENTER
TOLEDO BLADE UNITED WAY
LUCAS COUNTY COURTHOUSE
LIBRARY SQUARE
URS w/ DLZ, CTG + the [Toledo] Design Center
SEAGATE CENTER
IMAGINATION STATION
CIVIC CENTER MALL
ONE GOVERNMENT CENTER
TOLEDO BLADE UNITED WAY
LUCAS COUNTY COURTHOUSE
LIBRARY SQUARE
URS w/ DLZ, CTG + the [Toledo] Design Center
SEAGATE CENTER
IMAGINATION STATION
OPTIONS: Bus Operations Plan
URS w/ DLZ, CTG + the [Toledo] Design Center
OPTIONS: Bus Operations Plan
URS w/ DLZ, CTG + the [Toledo] Design Center
OPTIONS: Bus Operations Plan
URS w/ DLZ, CTG + the [Toledo] Design Center
OPTIONS: Bus Operations Plan
URS w/ DLZ, CTG + the [Toledo] Design Center
Bus Operations Plan
URS w/ DLZ, CTG + the [Toledo] Design Center
Bus Operations Plan + Pedestrian Access
PEDESTRIAN ACCESS URS w/ DLZ, CTG + the [Toledo] Design Center
Bus Operations Plan set w/in Urban Fabric
PEDESTRIAN ACCESS URS w/ DLZ, CTG + the [Toledo] Design Center
TRANSIT DESIGN
SUSTAINABLE DESIGN
PLACE MAKING
ECONOMIC DEVELOPMENT
PUBLIC ART
BICYCLE COMMUTING
SOLAR ENERGY
Design Selection Process
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
Design Selection Process
URS w/ DLZ, CTG + the [Toledo] Design Center
Design Selection Process
URS w/ DLZ, CTG + the [Toledo] Design Center
Design Selection Process
URS w/ DLZ, CTG + the [Toledo] Design Center
Design Selection Process
URS w/ DLZ, CTG + the [Toledo] Design Center
Design Selection Process
URS w/ DLZ, CTG + the [Toledo] Design Center
Design Selection Process
CIVIC CENTER MALL
ONE GOVERNMENT CENTER
TOLEDO BLADE UNITED WAY
LUCAS COUNTY COURTHOUSE
LIBRARY SQUARE
URS w/ DLZ, CTG + the [Toledo] Design Center
SEAGATE CENTER
IMAGINATION STATION
CIVIC CENTER MALL
ONE GOVERNMENT CENTER
TOLEDO BLADE UNITED WAY
LUCAS COUNTY COURTHOUSE
LIBRARY SQUARE
URS w/ DLZ, CTG + the [Toledo] Design Center
SEAGATE CENTER
IMAGINATION STATION
Bus Operations Plan
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
HISTORIC PRESERVATION
502 Adams St
502 Adams St
URS w/ DLZ, CTG + the [Toledo] Design Center
Design Selection Process
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
URS w/ DLZ, CTG + the [Toledo] Design Center
Jackson Boulevard Transit Center re-Framing Civic Infrastructure Beyond Transit
URS
URS w/ DLZ, CTG + the [Toledo] Design Center
w/
DLZ, CTG + the [Toledo] Design Center
TARTA + City of Toledo