Jackson Boulevard Transit Center: ReFraming Civic Infrastructure

Page 1

Jackson Boulevard Transit Center re-Framing Civic Infrastructure Beyond Transit

URS

URS w/ DLZ, CTG + the [Toledo] Design Center

w/

DLZ, CTG + the [Toledo] Design Center

TARTA + City of Toledo


0-2 min

INTRODUCTION

Christopher Diehl Creative Director URS Corporation

2-5 min

SETTING THE STAGE

James K. Gee

transit, decommissioning “the Loop”

General Manager, TARTA Toledo Area Regional Transit Authority

5-8 min

LAY OF THE LAND planning for economic development

8-10 min

GOALS, DESIGN PROCESS

David Dysard Administrator, Engineering Services City of Toledo

Christopher Diehl

transit, placemaking + sustainability

10-20 min

TRANSIT CENTER DESIGN

URS w/ DLZ, CTG + the [Toledo] Design Center

Christopher Diehl


TOLEDO DESIGN


crossroads

URS w/ DLZ, CTG + the [Toledo] Design Center


‌in the midst of the year 1908, Toledo was the fastest growing city in the USA because of its transportation system.

URS w/ DLZ, CTG + the [Toledo] Design Center

1940’s The Toledo & Chicago Interurban Railway Company


URS w/ DLZ, CTG + the [Toledo] Design Center

1959 view on Adams St


0-2 min

INTRODUCTION

Christopher Diehl Creative Director URS Corporation

2-5 min

SETTING THE STAGE

James K. Gee

transit, decommissioning “the Loop”

General Manager, TARTA Toledo Area Regional Transit Authority

5-8 min

LAY OF THE LAND planning for economic development

8-10 min

GOALS, DESIGN PROCESS

David Dysard Administrator, Engineering Services City of Toledo

Christopher Diehl

transit, placemaking + sustainability

10-20 min

TRANSIT CENTER DESIGN

URS w/ DLZ, CTG + the [Toledo] Design Center

Christopher Diehl


crossroads

URS w/ DLZ, CTG + the [Toledo] Design Center


the

loop

existing conditions

URS w/ DLZ, CTG + the [Toledo] Design Center


the

loop

existing conditions

URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


0-2 min

INTRODUCTION

Christopher Diehl Creative Director URS Corporation

2-5 min

SETTING THE STAGE

James K. Gee

transit, decommissioning “the Loop”

General Manager, TARTA Toledo Area Regional Transit Authority

5-8 min

LAY OF THE LAND planning for economic development

8-10 min

GOALS, DESIGN PROCESS

David Dysard Administrator, Engineering Services City of Toledo

Christopher Diehl

transit, placemaking + sustainability

10-20 min

TRANSIT CENTER DESIGN

URS w/ DLZ, CTG + the [Toledo] Design Center

Christopher Diehl


URS w/ DLZ, CTG + the [Toledo] Design Center


key

Planning guidelines

• Reinforce the riverfront and adjacent districts by enhancing accessibility and

as a unique public asset and better link to the CBD

vitality of activities.

• Enhance public realm links among Downtown’s Entertainment (Live, Work, Play & Learn) anchors.

• Add market rate rental

residential opportunities for young and empty-nesters within

the downtown core.

• Promote mixed-use re-use of a select number vacant and underutilized historic and quality buildings beginning at the ground floor, then upper of

levels.

• Focus new mixed-use development

on a key number of

vacant sites w/in the Central Business District.

• Foster a re-development culture built on sustainable design and energy efficiency principles. •

Finalize the creation and funding of a Downtown Toledo Development Corp.(DTDC) as the private sector champion of the vision and continually refine and re-invigorate the private/public organizational structure to support the DTDC.

URS w/ DLZ, CTG + the [Toledo] Design Center


Goals of the City, 2011 Toledo Downtown Plan federal court house

Huron / Madison – Defined Heart Connectors county court house

Project Area Downtown District Signed Bikeway

county library valentine theater

Proposed Bikeway Off Road Bikeways

arena

seagate centre 5/3rd field

URS w/ DLZ, CTG + the [Toledo] Design Center


2011 Toledo Downtown Plan

URS w/ DLZ, CTG + the [Toledo] Design Center


Paramount Block

URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


0-2 min

INTRODUCTION

Christopher Diehl Creative Director URS Corporation

2-5 min

SETTING THE STAGE

James K. Gee

transit, decommissioning “the Loop”

General Manager, TARTA Toledo Area Regional Transit Authority

5-8 min

LAY OF THE LAND planning for economic development

8-10 min

GOALS, DESIGN PROCESS transit, placemaking + sustainability

10-20 min

TRANSIT CENTER DESIGN

URS w/ DLZ, CTG + the [Toledo] Design Center

David Dysard Administrator, Engineering Services City of Toledo

Christopher Diehl Creative Director URS Corporation


502 Adams St

URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


CIVIC CENTER MALL

ONE GOVERNMENT CENTER

TOLEDO BLADE UNITED WAY

LUCAS COUNTY COURTHOUSE

LIBRARY SQUARE

URS w/ DLZ, CTG + the [Toledo] Design Center

SEAGATE CENTER

IMAGINATION STATION


CIVIC CENTER MALL

ONE GOVERNMENT CENTER

TOLEDO BLADE UNITED WAY

LUCAS COUNTY COURTHOUSE

LIBRARY SQUARE

URS w/ DLZ, CTG + the [Toledo] Design Center

SEAGATE CENTER

IMAGINATION STATION


CIVIC CENTER MALL

ONE GOVERNMENT CENTER

TOLEDO BLADE UNITED WAY

LUCAS COUNTY COURTHOUSE

LIBRARY SQUARE

URS w/ DLZ, CTG + the [Toledo] Design Center

SEAGATE CENTER

IMAGINATION STATION


OPTIONS: Bus Operations Plan

URS w/ DLZ, CTG + the [Toledo] Design Center


OPTIONS: Bus Operations Plan

URS w/ DLZ, CTG + the [Toledo] Design Center


OPTIONS: Bus Operations Plan

URS w/ DLZ, CTG + the [Toledo] Design Center


OPTIONS: Bus Operations Plan

URS w/ DLZ, CTG + the [Toledo] Design Center


Bus Operations Plan

URS w/ DLZ, CTG + the [Toledo] Design Center


Bus Operations Plan + Pedestrian Access

PEDESTRIAN ACCESS URS w/ DLZ, CTG + the [Toledo] Design Center


Bus Operations Plan set w/in Urban Fabric

PEDESTRIAN ACCESS URS w/ DLZ, CTG + the [Toledo] Design Center


TRANSIT DESIGN


SUSTAINABLE DESIGN


PLACE MAKING


ECONOMIC DEVELOPMENT


PUBLIC ART


BICYCLE COMMUTING


SOLAR ENERGY


Design Selection Process

URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center

Design Selection Process


URS w/ DLZ, CTG + the [Toledo] Design Center

Design Selection Process


URS w/ DLZ, CTG + the [Toledo] Design Center

Design Selection Process


URS w/ DLZ, CTG + the [Toledo] Design Center

Design Selection Process


URS w/ DLZ, CTG + the [Toledo] Design Center

Design Selection Process


URS w/ DLZ, CTG + the [Toledo] Design Center

Design Selection Process


CIVIC CENTER MALL

ONE GOVERNMENT CENTER

TOLEDO BLADE UNITED WAY

LUCAS COUNTY COURTHOUSE

LIBRARY SQUARE

URS w/ DLZ, CTG + the [Toledo] Design Center

SEAGATE CENTER

IMAGINATION STATION


CIVIC CENTER MALL

ONE GOVERNMENT CENTER

TOLEDO BLADE UNITED WAY

LUCAS COUNTY COURTHOUSE

LIBRARY SQUARE

URS w/ DLZ, CTG + the [Toledo] Design Center

SEAGATE CENTER

IMAGINATION STATION


Bus Operations Plan

URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


HISTORIC PRESERVATION

502 Adams St

502 Adams St


URS w/ DLZ, CTG + the [Toledo] Design Center

Design Selection Process


URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


URS w/ DLZ, CTG + the [Toledo] Design Center


Jackson Boulevard Transit Center re-Framing Civic Infrastructure Beyond Transit

URS

URS w/ DLZ, CTG + the [Toledo] Design Center

w/

DLZ, CTG + the [Toledo] Design Center

TARTA + City of Toledo


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.