ARCHITECTURE PORTFOLIO
SOUTHEAST PERSPECTIVE (DAY)
22
AND PERFORMANCE CENTER
DIKSHIT MAHAVEER CHAND SELECTED WORKS 2015-2020
Professional Practice - RTA Architects July 2019 - April 2020
Sports Medicine & Performance Center Health Care
Pueblo Community Health Center Health Care
SOUTHEAST PERSPECTIVE (DAY)
South Nevada Creekwalk Commercial 22
Summer Internship - NOA Design & Construction June 2018 - Aug 2018
2010 Jackson Residential
10
3959 Washington Residential
Master of Architecture - University of Illinois, Urbana Champaign Aug 2017 - May 2019
Shirley Ryan Ability Lab Health Care
Aquaculture for Architecture Industrial
Travelers Inn Hospitality
Professional Practice - PSP Design June 2015 - June 2016
One Night In Bangkok Hospitality
Adyar Anand Bhavan Hospitality
Other Skills
Free Hand Sketching
Photography
Xome and Nationstar Commercial
Voronoi Pavilion
Digital Fabrication
Sports Medicine & Performance Center
Location: Colorado Springs, USA Type: Health Care Site Area: 104,000 sq.ft Floors: 4 Year: 2019 (Professional Practice) Guided by: Scott Blosser, RTA Architects Software: Revit, AutoCAD, Lumion, Photoshop, InDesign The Sports Medicine & Performance Center will be the first facility of its kind to integrate undergraduate and graduate education with clinical practice and research in a sports medicine and performance environment. Provide transformative educational experiences in health, wellness, and human performance that are cross-disciplinary and supported by foundational courses in a range of programs and departments. Creates an efficient, sustainable project that achieves LEED Gold.
WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
01.
10
Drop-off
D
S
Student
Patient
Drop-off
Services
Patient
CLINIC CIRCULATION
S
Student
Services
CLINIC CIRCULATION EAGLE
EAGLE
ROCK RD
ROCK RD
ENT CENTER
ENT CENTER
-&(&/%
Vehicular Circulation
Main Entry
$POUSPMMFE "DDFTT -FGU 5VSO
S
S
LE R
Services
P
D.
The site approach is comprised PG UISFF DPODFQUVBM JEFBT 1. Campus Connections
WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER S
1. Campus Connections
LL
S
ICAL TACT LAZA P
WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
5IF mSTU DPODFQUVBM BQQSPBDI JT EJBHSBNNFE PO UIJT QBHF TIPXJOH UIF FTUBCMJTINFOU PG 4USFOHUIFOFE FEHFT B TUSPOH HSFFOXBZ DPOOFDUPS BOE PSHBOJ[FS SVOOJOH OPSUI UP TPVUI BOE MJOLJOH UIF FYJTUJOH 5IF mSTU DPODFQUVBM BQQSPBDI &/5 MBOETDBQF UISPVHI B OFX JT EJBHSBNNFE PO UIJT QBHF QMB[B BU UIF DBNQVT GSPOU UIFO TIPXJOH UIF FTUBCMJTINFOU PG MJOLJOH UP UIF HSPWF PO UIF LOPMM B TUSPOH HSFFOXBZ DPOOFDUPS BOE PSHBOJ[FS SVOOJOH OPSUI UP This concept is further TPVUI BOE MJOLJOH UIF FYJTUJOH PSHBOJ[FE CZ UIF SFQVSQPTJOH &/5 MBOETDBQF UISPVHI B OFX PG UIF QSJPS 0ME &BHMF 3PDL QMB[B BU UIF DBNQVT GSPOU UIFO corridor as a new pedestrian MJOLJOH UP UIF HSPWF PO UIF LOPMM focused connection between
N
ITE STRATEGY LANDSCAPE + WATER ONCEPT 2
5
RMANCE CENTER
LANE CENTER
STUDENT / FACULTY CIRCULATION
Vehicular Circulation $POUSPMMFE "DDFTT -FGU 5VSO
Pedestrian Circulation
A RT PLAOZRECOU ING F REEN) (G
Y NWA
GREE
RT COU ORE ING F REEN) D IL (G BU
Main Entry Exit Only
$POUSPMMFE "DDFTT -FGU 5VSO
Clinical Entry
N
4UVEFOU 1BSLJOH
P
4UBGG 'BDVMUZ 1BSLJOH
SITE STRATEGY INTUITIVE WAYFINDING Student Transit Hub CONCEPT 4
EGY INTUITIVE WAYFINDING
ENT CENTER
4UVEFOU 1BSLJOH
P
4UBGG 'BDVMUZ 1BSLJOH
WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
P
P HYBL CENTER
EAG
P
Student/Staff Entry
HYBL CENTER
N
P
7
LE R
OCK
RD
R
STUDENT / FACULTY CIRCULATION ROTC
KNOLL
N
LANE CENTER
-&(&/% Main Entry MO
Exit Only A I
KNOLL
T UN
T, DEN STU CULTY F FA STAF AND
MOUNTAIN LION STADIUM
Student Transit Hub
7 the various The combination of DPODFQUVBM TUSBUFHJFT SFTVMUT in a simple and intuitive 4USFOHUIFOFE &EHFT XBZmOEJOH BOE [POJOH PG UIF TJUF GPS UIF WBSJPVT VTFST B LFZ HPBM PG UIF QSPKFDU The combination of the various DPODFQUVBM TUSBUFHJFT SFTVMUT in a simple and intuitive XBZmOEJOH BOE [POJOH PG UIF TJUF GPS UIF WBSJPVT VTFST B LFZ HPBM PG UIF QSPKFDU
T, DEN STU CULTY F FA STAF AND
ROCK RD
ENT CENTER
4USFOHUIFOFE &EHFT
Student/Staff Entry
ERFORMANCE CENTER
N
LANE CENTER
LI O
N W Vehicular Circulation AY
(FU TU R
E) $POUSPMMFE "DDFTT -FGU 5VSO
T, DEN STU CULTY F FA STAF AND
TS
N PATIE
ENT ING/ PARKERFLOW OV
Pedestrian Circulation
WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
TS
ILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
EAGLE
Pedestrian Circulation P
IAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
ENT ING/ PARKERFLOW OV
14
-&(&/%
Pedestrian Circulation P
N
Student Transit Hub
6
Vehicular Circulation
D BUIL
T, DEN STU CULTY F FA STAF AND
$MJOJD 1BSLJOH
P
N STUDENT / FACULTY CIRCULATION
AVE
APE
A
E)
6
N NEVA DA
NCE QUE ) LUE
E
LL
KNO
14
Secondary Entry/Exit
The second conceptual BQQSPBDI PSHBOJ[FT B TFSJFT PG EAGLE stormwater detention features ROCK RD SVOOJOH FBTU UP XFTU BMMPXJOH 8BUFS HSFFOXBZ BT GPSFDPVSU for improvements to this area PG DBNQVT XIJMF BMTP TFUUJOH landscaped areas as the The second conceptual forecourts to both the initial BQQSPBDI PSHBOJ[FT B TFSJFT PG )ZCM QSPKFDU BT XFMM BT GVUVSF Main Entry stormwater detention features development to the immediate SVOOJOH FBTU UP XFTU BMMPXJOH east. for improvements to this area Exit Only PG DBNQVT XIJMF BMTP TFUUJOH landscaped areas as the forecourts to both the initial Vehicular Circulation )ZCM QSPKFDU BT XFMM BT GVUVSF development to the immediate $POUSPMMFE "DDFTT -FGU 5VSO
east.
-&(&/%
PLAZ Y NWA LL KNO GREE THE
E
W AY (FU TU R
Main Entry
AVE
THE
SCAP
ND NT LA
LI ON
8BUFS HSFFOXBZ BT GPSFDPVSU
EGY LANDSCAPE + WATER
NCE QUE R SE E) WATE (BLU
IN
-&(&/%
WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
ERFORMANCE CENTER
A
N
SPIN
.
RD
N. N
UIF OFX TIVUUMF TUPQ UIF )ZCM This concept is further QSPKFDU BOE UIF XBMLXBZ BMPOH PSHBOJ[FE CZ UIF SFQVSQPTJOH Nevada. PG UIF QSJPS 0ME &BHMF 3PDL corridor as a new pedestrian focused connection between UIF OFX TIVUUMF TUPQ UIF )ZCM QSPKFDU BOE UIF XBMLXBZ BMPOH WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER Nevada.
KNOLL
D
CK
E. AV DA EVA
CLINIC CIRCULATION
4USFOHUIFOFE FEHFT
ER
A PLAZD
Y NWA
GREE
ICAL TACT LAZA P
5
SPIN
APE
A
PLAZ
L AYE KNOL NWH GREE T
E)
NT
CAPE
NDS
W AY (FU TU R
N
OU
8BUFS HSFFOXBZ BT forecourt
LI ON
M
KNO
IN
and
and
LA ENT
A
LANE CENTER
ROTC
8BUFS HSFFOXBZ BT The site approach is comprised forecourt PG UISFF DPODFQUVBM JEFBT
THE
KNOLL
HYBL CENTER
5
NT OU
E AV DA EVA CONNECTIONS Clinical Entry N . N
N
RD
E
S
OCK
M
KR OC ER GL EA
Student
Patient $MJOJD 1BSLJOH
N NEVA DA
D.
PDrop-off
RD
ROTC
EAG
SITE STRATEGY LANDSCAPE + CONNECTIONS Student Transit Hub CONCEPT 1 .
EGY LANDSCAPE +
A AVE
Clinical Entry
Circulation D
OCK
HYBL CENTER
P
N NEVA DA AVE
KR
D
N NEVAD
OC ER GL EA
Student Transit Hub
$POUSPMMFE "DDFTT -FGU 5VSO S
N. N
LE R
$MJOJD 1BSLJOH
P
Vehicular Circulation
E. AV DA Pedestrian EVA
EAG
Pedestrian Circulation
Secondary Entry/Exit D
MOUNTAIN LION STADIUM
Secondary Entry/Exit
-&(&/%
. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
MOUNTAIN LION STADIUM
Main Entry
S
TIONS
SPIN ER D
D
MASSING SITE CONNECTIONS
SPIN ER D
TE CONNECTIONS
N PATIE
P
4UVEFOU 1BSLJOH
P
4UBGG 'BDVMUZ 1BSLJOH Student Transit Hub Student/Staff Entry
WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER 8
N
15
SP IN
CAMPUS SCALE SITE PLAN
MOUNTAIN LION STADIUM
EAG
N NEVA
DA AVE
LE R OCK
RD
HYBL CENTER ROTC
FUTURE
M O T UN
KNOLL
AI N
FUTURE
LANE CENTER
LI ON
WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
)ZCM $FOUFS (SFFO
3
Drop Off (level 1)
4
4FSWJDF "SFB
5
5BDUJDBM "SFB MWM MWM SPPG
6
%JOJOH 5FSSBDF MFWFM
7
Student Plaza (level 2)
8
Campus Shuttle stop
9
&YJTUJOH %FUFOUJPO #BTJO
10
Proposed Detention Basin
11
'JSF -BOF $POUSPMMFE "DDFTT
12
&YJTUJOH &OU $FOUFS 4JHO
13
&YJTUJOH 'JOF "SUT #VJMEJOH
D
Student Parking 84 sp +/-
9
EAG
11 2 DA AVE
2
MOUNTAIN LION STADIUM
Ent Center 0WFSnPX 113 sp +/-
12
N NEVA
Site Entrance
D
1
-&(&/% 1
ENT CENTER
ROCK R
14
ER
EAGLE
E)
SPIN
CAMPUS SCALE SITE PLAN
W AY (FU TU R
LE R
10
3
OCK
RD
10
HYBL CENTER
Clinic Parking 84 sp +/-
7
Faculty / Staff Parking 78 sp +/-
8
305$ 0WFSnPX Parking 68 sp +/-
ROTC
6 13 5 4
M
Student Entry
LANE CENTER
NT OU
KNOLL
Clinical Entry
A
IN
LI ON
W AY (FU TU R
E)
N WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
13
$$$
%
%
& &
'
'
(
)
9(67,%8/( &2))(( %$5
/2%%<
&/,1,& :$,7,1*
$$
(48,3 6725$*( &+$1*,1*
(/(9 %
7/7
5(&(37,21
3(5)250$1&( 5(&(37,21
35(3 /$% 5$',2*5$3+<
,0$*,1* 68% :$,7,1*
05 (48,3
7/7 &/($1 6833/< (/(&
&+$1*,1*
05,
&255,'25
CLINIC ENTRY
7/7
05, &21752/
+6.3*
,7
5$',2*5$3+< 0,125 352&('85(
68%:$,7 7(&+ 7/7 ,17$.( 05, 6&5((1,1*
$'$ %(1&+
$'$ %(1&+
3& ',5(&725
$'$ %(1&+
0(1 6 /2&.(5 5220
:20(1 6 /2&.(5 5220
02'$/,7< 5220
2&&83 (;$0 37
'85$%/( 0(',&$/ (48,30(17
&/26(7
$'$ %(1&+
7,(56
&255,'25
0('6
7/7 37 &$67,1*
62,/('
(;$0 257+2
(;$0 37
&(1785$ 0')
6&+(
(;$0 257+2
(;$0 257+2
(;$0 257+2
(;$0 68% 63(&,$/7<
(;$0 6325
(;$0 257+2
(;$0 37 5(+$% 7+(5$3< 23(1 63$&(
(;$0 3 63257 (;$0 257+2
(;$0 37
0' :25.
67$)) :25. $5($
0' :25.
(;$ 632
3(5)250$1&( 23(1 63$&(
7+(5$3,67 :25.
75$&.
81$66,*1('
&2$&+(6 2)),&(
(;$0 257+2
(;$0 257+2
(;$0 3& 632576
(;$0 3& 632576
(;$0 3& 632576
7/7 37
(;$0 68% 63(&,$/7<
+.63*
(48,3 6725$*(
'
5(&29(5<
6(59,&( &255,'25
08/7,385326(
03 6725
$9 &/2 ,7
027,21 $1$/<6,6
(/(& (175< 32:(5 (48,3 :$7(5 (175<
TRANSF
ORMER
SERVICE ENTRY
S
$$ %
GENER ATOR
'1
CB
R T C
LANEâ&#x20AC;&#x2122;S CHILLE R
(;,67,1* /$1( (1&/2685( :$//6 72 %( 5(029('
LANE C /$1( &(17(5
ENTER
&
*
View From North West
*
*
+
/281*(
2)),&( 6725
('8/,1*
+2/'
67$,5
6(59,&( (/(9
Student Entry
3& 576
3& 76
$0 3& 2576
$7&
&8672',$/ 2)),&(
LEVEL 1 PLAN &8672',$/ 2)),&( 6833257
$$$
% < &8672',$/ (48,3
CLINIC ENTRY
9(67,%8/(
6+$5('
632576 0(',&,1( $$
3(5)250$1&(
5(+$% 7+(5$3< 7($&+,1* /$%6 ,16758&7,21$/
View From South West
$1$720< 3+<6,2/2*< 5(6($5&+ $&$'(0,& $'0,1,675$7,21 6(59,&( 6833257
R
RECYCLE BIN
T
53"4) #*/
C
COMPOST BIN
CB
$"3% #0"3%
First Floor Plan
N 14
75$&.
$$$
%
%
& &
'
'
(
)
*
*
&2//,6,21
2)),&(
/2%%< 1'
2)),&( &21)
$$
(/(9 $'0,1 0$5.(7,1* 68,7(
2)),&(
&$6+ &2817,1*
$'0,1
+6.3*
675(1*7+ $1' &21',7,21,1* /$%
/(&785( +$//
,7
02725 /($51,1* %,20(&+$1,&6
/$% 0(&+ 6+$)7
7/7
7/7 7/7
(/(&
6725
&25( (48,3 6725$*(
%5($. 287
35,9$7( 9,(:,1*
&,5&8/$7,21
6725 +6.3
&$)( $/7,78'( 75$,1,1*
63257 1875,7,21 $7+/(7,& 75$,1,1* /$%
3+<6,&$/ 7+(5$3< /$% 0(3 6833257
0(7$%2/,& 7(67,1* 9(67,%8/( 6&(1$5,2 6725
6&(1$5,2 75$,1,1* $
'
'
$$
LANE C
%
ENTER
%
& &
( *
Student Commons +
75$6+ 5(&<&/(
9(67,%8/(
456%&/5 ENTRY
67$,5
6(59,&( (/(9
Entry
$7 6725$*(
LEVEL 2 PLAN
+
6+$5('
632576 0(',&,1( 3(5)250$1&(
Cafe
5(+$% 7+(5$3< 7($&+,1* /$%6 ,16758&7,21$/ $1$720< 3+<6,2/2*< 5(6($5&+ $&$'(0,& $'0,1,675$7,21 6(59,&( 6833257
Second Floor Plan
N 15
$$$
%
%
& &
'
'
(
)
*
*
+
67$,5
678'(17 &200216
&/$665220 '5< /$%
$$
&/$665220
:(7 /$%
&8/785(
(/(9
7/7 &2//$%25$7,21 %2'< &20326,7,21 %(1&+
+6.3*
%(1&+
(;(5&,6( 3+<6,2/2*<
6725 $872&/$9( (;$0
5(67,1* 0(7$%2/,&
'5< /$%
,7
0(&+ 6+$)7
'5< /$%
7/7 7/7
(;$0
&2/8016
(/(& 6(59,&( (/(9 &,5&8/$7,21 &25( (48,3 6725$*(
6725
3+<6,2/2*< 35(3
6725
'5< /$%
6725
6725
/$% &225'
/$% &225'
6725 /$81'5<
$17(
3+<6,2/2*< /$%
(19,5210(17$/ &+$0%(5
3+<6,2/2*< /$%
$1$720< /$%
&$'$9(5 52206
$1$720< /$%
0(3 6833257
Third Floor Plan
$
$$$
'
%
%
75$6+ 5(&<&/,1*
& &
'
67$,5
2)),&(
2)),&(
/2%%< 7+
2)),&(
2)),&(
2)),&(
2)),&(
%
2)),&( 2)),&(
2)),&(
2)),&(
0((7,1* 5220
+
)
*
*
+
2)),&(
2)),&(
6(0,1$5
2)),&(
%
2)),&(
2)),&(
&2//,6,21 2)),&(
+6.3*
2)),&(
/$&7$7,21
2)),&(
75$6+ 5(&
2)),&(
352*5$0 $'0,1
& &
6+$5(' 2)),&( 2)),&(
*
(
&/$665220 2)),&(
2)),&(
6+$5(' 2)),&(
$$
'
(/(9
0((7,1* 50
2)),&(
'
678'(17 :$,7,1* &2//$%25$7,21
&2//$%25$7,21
&2))(( %5($. $5($ $$
(
0(&+ 6+$)7
7/7
7/7
,7
2)),&(
(/(&
2)),&(
2)),&(
2)),&(
2)),&(
&21)(5(1&(
6(59,&( (/(9
&,5&8/$7,21 2)),&( *5$'8$7( $66,67$176
2)),&(
2)),&( 2)),&(
LANE C
ENTER
2)),&(
2)),&(
Fourth Floor Plan
2)),&(
2)),&(
2)),&(
2)),&(
2)),&(
2)),&(
0((7,1*
0((7,1*
0((7,1* 2)),&(
2)),&(
Cafe Space
RENDERING 04: view from knoll
View From Knoll WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
10
RENDERING 06: view from Ent Center
View From ENT Center WILLIAM J. HYBL SPORTS MEDICINE AND PERFORMANCE CENTER
9
Pueblo Community Health Center
Location: Pueblo, USA Type: Health Care Site Area: 63,000 sq.ft Floors: 3 Year: 2020 (Professional Practice) Guided by: Jon Houck, RTA Architects Software: Revit, Lumion, Enscape, Photoshop, InDesign Pueblo Community Health Center offers a Patient-Centered medical home for all who seek care. It has extensive care options like Medical services, Dental services, Prenatal Care and Behavioral Health services. The building material is mainly brick, CMU, stucco. For windows we have provided fiberglass. The canopy is welcoming and grand for the people visiting the PCHC.
02.
GLAZING
KEY PLAN
Conceptual Material Board
Scheme #4B- Elevations - East
BRICK BRICK ACCENT FIBER CEMENT SIDING METAL PANEL GLAZING
BRICK
GLAZED TOWER
BRICK ACCENT COLOR
KEY PLAN
45
Scheme #4A- Elevations - South
BRICK BRICK ACCENT
FIBER CEMENT SIDING METAL PANEL GLAZING
ROOF OVERHANG
ENTRANCE CANOPY
KEY PLAN
BRICK BASE BUILDING
Scheme #5B- Elevations - East/West
36
BRICK BRICK ACCENT
BRICK ACCENT FIBER CEMENT SIDING METAL PANEL GLAZING
BRICK ACCENT COLOR W/ BANDING
METAL PANEL ELEMENT W/ ROOF DECK
FIBER CEMENT SIDING
STAIR TOWER
KEY PLAN
CURTAIN WALL W/ SOLAR CONTROL
CORNER CANOPY
35
SSE
RO AC
AVE
L
8TH
7TH
/$%25$725<
STR
EET
STR
EET LUCERO LIBRARY
(/(9$7256
E
AV
M
NU
MO
T EN
Isometric Site Plan
Floor Plan - First Floor
67$,56
10 83
$'0,1 &,5&8/$7,21
23(1 67$,5 &/,1,&$/ 32'
/$%25$725<
+
3+$50$&<
67$,56
6+$5(' &/,1,&$/ )81&7,216 +
5(&(37,21 (152//0(17
3+$50$&< 5(6752206
83
23(1 67$,5
67$,56
:$,7,1*
(/(9$7256
5(6752206
83
&/,1,&$/ 32'
/$%25$725<
6+$5(' 32' )81&7,216 6833257 :$,7,1*
/2%%<
3+$50$&< 9(67,%8/( &/,1,&$/ 32' $)7(5 +2856
:$,7,1*
21,815 SF Finished 21,815 SF First Floor (175$1&( &$123<
First Floor Plan 4
67$,56
(/(9
Floor Plan - Second Floor
$'0,1 %(+$9,25$/ +($/7+
23(1 67$,5
'(17$/ :$,7,1*
'(17$/
&,5&8/$7,21
&/,1,&$/ 32'
&/,1,&$/ 32'
$'0,1
(/(9$7256
'(17$/ *5283 52206 5(6752206
67$,56
23(1 72 %(/2:
%(+$9,25$/ +($/7+
6+$5(' &/,1,&$/ )81&7,216
6+$5(' 32' )81&7,216
23(1 67$,5
:$,7,1*
6833257 :$,7,1*
%(+$9,25$/ +($/7+
5(&(37,21 (152//0(17
:$,7,1*
20,896 SF Finished 20,896 SF Second Floor
&/,1,&$/ 32'
Second Floor Plan
67$,56
(/(9$7256
67$,56
5(6752206
Floor Plan - Third Floor
$'0,1
23(1 67$,5
*5283 52206
5(6752206
6+(// 63$&(
&21)(5(1&( 5220
23(1 72 %(/2:
5(6752206 6+(// 6833257
67$,56
(/(9$7256
$'0,1
67$,56
5
&,5&8/$7,21
:$,7,1*
23(1 67$,5
67$)) /281*(
&21)(5(1&( 5220 67$)) /281*(
8,885 SF Finished 12,011 SF Shell 20,896 SF Third Floor
Third Floor Plan 6
MTL-1 COPING W/ B-3 SOLDIER COURSE CORNICE FRAMED OUT CORNICE TWO SOLIDER COURSES 1/2" AND 1" PROUD
MTL-1 FASCIA & SOFFIT DARK GRAY
B-1 BRICK BASE BUILDING MODULAR BRICK (8" LONG) GRAIN TEXTURE RUNNING BOND 153 SUNSET RED
MTL-2 COPING LIGHT GRAY TO MATCH FIBERGLASS WINDOWS B-2 VERTICAL ELEMENT NORMAN BRICK (12" LONG) SMOOTH TEXTURE STACK BOND 751L DOVE
S-1 STUCCO INFILL JOINTS ALIGN W/ MULLIONS WARM GRAY / CREAM
CONC-1 PRECAST SILL WARM GRAY TO MATCH STONE/STUCCO
S-1 STUCCO JOINTS ALIGN W/ WINDOW OPENINGS/MULLIONS WARM GREY / CREAM SMOOTH TEXTURE
MTL-1 REVEAL 8" STRUCTURAL SHAPE DARK GRAY
MTL-1 CURVED SUN SHADE 30" PROJECTION DARK GRAY PERFORATED METAL INFILL
MTL-2 CURVED SUN SHADE 48" PROJECTION LIGHT GRAY TO MATCH FIBERGLASS WINDOWS PERFORATED METAL INFILL
B-3 SOLDIER COURSE MODULAR GRAIN TEXTURE 1/2" OVERHANG 154 CEDAR RIDGE
FG-1 FIBERGLASS WINDOW RIBBON WINDOW, 10'-0" HIGH INSULATED FRAME GREY'S PEAK
B-3 ACCENT BANDING AT CORNERS PENCIL COURSE (1/2" REVEAL) 154 CEDAR RIDGE
CPI TRANSLUCENT CANOPY DOUBLED METAL COLUMNS EXPOSED BEAMS/PURLINS LIGHT GRAY
FG-1 FIBERGLASS WINDOW 4' WIDE, 5'-4" HIGH INSULATED FRAME GREY'S PEAK
BRICK BASE W/ PRECAST CAP
STN-1 BASE ELEMENT SPLITFACE OR ROCKFACE COURSED PATTERN WITH VARYING HEIGHTS CREAM OFF-WHITE COLOR
AUTOMATIC SLIDING DOORS ALUM ANNODIZED FINISH TO MATCH FIBERGLASS WINDOWS
Axon Material Blowup South West Corner
North Elevation
SOUTHWEST CORNER
14
South East Corner
NORTH ELEVATION
17
Entrance Canopy
SOUTHEAST PERSPECTIVE (NIGHT)
23
ENTRANCE CANOPY
21
South Nevada Creekwalk
Location: Colorado Springs, USA Type: Commercial Site Area: 47,995 sq.ft Floors: 1 Each (5 Buildings) Year: 2019 (Professional Practice) Guided by: Scott Blosser, RTA Architects Software: Revit, Lumion, Photoshop, InDesign Creekwalk is a planned neighborhood shopping center withing the South Nevada Avenue Urban Renewal Plan that will deliver a sense of place with an experiential Cheyenne Creek centerpiece. Nature, art, and urban planning will be showcased as Creekwalkâ&#x20AC;&#x2122;s architecture, and building materials transition form plunges and pools, landscaped grasses and live water to bus stops, bike paths, and multimodal transportation connections. Creekwalk will deliver on the spirit of urban renewal.
03.
Cheyenne Creek Restoration
Cheyenne Creek Restoration
Site Plan
Building B
2010 Jackson
Location: San Francisco, USA Type: Residential Site Area: 4,750 sq.ft Floors: 3 Year: Summer 2018 (Internship) Guided by: Mike Shankman Software: Revit, AutoCAD, Sketchup, V-ray, Lumion, Photoshop, InDesign Set in the midst of a tight neighborhood, the 2010 Jackson looks inwards and opens up to the existing landscape at site. The residence is clad with wooden facade for the car garage with high amount of green skin on the wall. The inside of the house has wooden flooring and antique furnitures and courtyard which is open to sky. This residence creates an interactive space between the interior and the exterior.
04.
Conceptual Ideas
Basement Level Construction Plan
First Floor Construction Plan
Second Floor Construction Plan
Front Elevation
Building Section 2
Main Staircase
Axonometric View
Front Elevation
Side Elevation
Courtyard
Living Area
Bedroom
Dining Area
Open Terrace
3959 Washington
Location: San Francisco, USA Type: Residential Site Area: 3,590 sq.ft Floors: 3 Year: Summer 2018 (Internship) Guided by: Mike Shankman Software: Revit, AutoCAD, Sketchup, V-ray, Lumion, Photoshop, InDesign The projectâ&#x20AC;&#x2122;s main concept was to make a fusion between traditional and modern architecture. The interiors are done in a simple yet elegant style, with quality materials and good workmanship being in priority. The elegant finish inspire warmth and comfort as a way to engage and experience a proper home atmosphere. The shape and size of the object in every room is consistent, with a harmony of color and texture.
05.
Conceptual Ideas
First Level Construction Plan
Second Level Construction Plan
Third Level Construction Plan
Side Elevation
Front Elevation
Rear Elevation
1
EXTERIOR WOOD TRIM MIDBAND
RESIDENTIAL REM O DEL
3959 WASHINGTON RESIDENCE 3959 WASHINGTON STREET, SAN FRANCISCO, CA 94118 0091/031
STUCCO.
MOISTURE & AIR INFILTRATION BARRIER) OWNER ANDREA AND JEFF SAMARDZIJA
DESIGN RIAZ INC.
WOOD FRAMING. SEE STRUCTURAL DRAWINGS.
2 4 2 7 1 7 T H S TR E E T SAN FRANCISCO. CA 94110 O/ 415.675.1775 F/415.675.1978
STEEL BEAM. SEE STRUCTURAL DRAWINGS
ARCHITECT OF RECORD MARTINKOVIC MILFORD ARCHITECTS 101 MONTGOMERY STREET SUI TE 650 SAN FRANCISCO. CA 94104 O/ 415.346.9990
CEILING ASSEMBLY. SEE DETAIL 7 IN PAGE A-707.
S TRUCTURA L EN GI N EER HIMMATI ENGINEERING 311 W HUNTER CT FREMONT. CA 94539 O/ 510.440.9602
TYP. CROWN MOLDING.SEE DETAIL 1 IN PAGE A-705.
1
Parapete Detail - Non Fire Rated
4 1/2"
MOISTURE & AIR INFILTRATION BARRIER.
SCALE: 6" = 1'-0"
GENERAL CONTRACTOR TOWEY CONSTRUCTION
6"
1
59 HOMESTEAD BOULEAVARD MILL VALLEY. CA 94941 C/ 415.314.0240
1 STUCCO.
5"
3/8" STONE TILE. SEE T&S SCHEDULE
4 1/2"
ELECTRICAL SHADES DECK RAILING. SEE METALWORK DRAWINGS SEE EUROLINE HEADER DETAIL FOR SWING DOOR.
1
DECK RAILING. WELDED INTO A METAL PLATE INTO THE CHANEL EXTERIOR WOOD TRIM MIDBAND
REV
BY
DESCRIPTION
DATE
C CHANNEL STEEL SHAPE. 1 1/2"
STUCCO.
MOISTURE & AIR INFILTRATION BARRIER)
5 3/4"
Detail 1
SWING DOOR SEE EUROLINE SILL DETAIL .
12"
WOOD FRAMING. SEE STRUCTURAL DRAWINGS.
2
STEEL BEAM. SEE STRUCTURAL DRAWINGS.
Header - Rear Facade Third Floor Doors.
SET
SCALE: 6" = 1'-0"
CD SET
STEEL BEAM. SEE STRUCTURAL DRAWINGS
14"
1
CEILING ASSEMBLY. SEE DETAIL 7 IN PAGE A-707. CONDITIONS: PLANS PROVIDED BY RIAZ, INC. ARE NOT PREPARED BY A CALI FORNI A REGI STERED ARCHI TECT AND ARE FOR ILLUSTRATI ON AND STUDY PURPOSES ONLY. THE CONTRACTOR SHALL CHECK AND VERI FY ALL DIMENSIONS ON SITE AND REPORT ANY DI SCREPANCI ES IN WRITING TO THE DESIGNER TYP. CROWN MOLDING.SEE BEFORE PROCEEDING WITH WORK. DETAIL ALL 1 IN DRAWINGS PAGE A-705. ARE THE PROPERTY OF THE DESI GNER AND SHALL NOT BE REPRODUCED WI THOUT THE WRI TTEN CONSENT. DRAWINGS SHALL NOT BE SCALED. MOISTURE & AIR INFILTRATION BARRIER.
Parapete Detail - Non Fire Rated
SCALE: 6" = 1'-0"
1
DATE
7/27/2017 12:22:50 PM
SCALE
6" = 1'-0"
STUCCO.
TITLE
3/8" STONE TILE. SEE T&S SCHEDULE
Exterior Details ELECTRICAL SHADES DECK RAILING. SEE METALWORK DRAWINGS
SHEET NO. DECK RAILING. WELDED INTO A METAL PLATE INTO THE CHANEL
3
3
A-708
C CHANNEL STEEL SHAPE.
Balcony - Rear Facade Third Floor
1 1/2"
2
SEE EUROLINE HEADER DETAIL FOR SWING DOOR.
SCALE: 6" = 1'-0"
SWING DOOR SEE EUROLINE SILL DETAIL .
Header - Rear Facade Third Floor Doors.
2
SCALE: 6" = 1'-0"
3
SCALE: 6" = 1'-0"
14"
STEEL BEAM. SEE STRUCTURAL DRAWINGS.
Balcony - Rear Facade Third Floor
Detail 2
RESIDENTIAL REM O DEL
3959 WASHINGTON RESIDENCE 3959 WASHINGTON STREET, SAN FRANCISCO, CA 94118 0091/031
6"
STUCCO
6"
TYP. CROWN MOLDING. SEE DETAIL 1 IN PAGE A-705. STUCCO TYP. CROWN MOLDING. SEE DETAIL 1 IN PAGE A-705.
OWNER ANDREA AND JEFF SAMARDZIJA
DESIGN RIAZ INC. 2 4 2 7 1 7 T H S TR E E T SAN FRANCISCO. CA 94110 O/ 415.675.1775 F/415.675.1978
ARCHITECT OF RECORD MARTINKOVIC MILFORD ARCHITECTS 101 MONTGOMERY STREET SUI TE 650 SAN FRANCISCO. CA 94104 O/ 415.346.9990
ELECTRICAL SHADES.
BIFOLDING DOOR. SEE EUROLINE HEADER DETAIL.
S TRUCTURA L EN GI N EER HIMMATI ENGINEERING 311 W HUNTER CT FREMONT. CA 94539 O/ 510.440.9602
6"
5"
6"
5"
ELECTRICAL SHADES.
GENERAL CONTRACTOR TOWEY CONSTRUCTION 59 HOMESTEAD BOULEAVARD MILL VALLEY. CA 94941 C/ 415.314.0240
BIFOLDING DOOR. SEE EUROLINE HEADER DETAIL.
4
4 1/2" 5 3/4"
Detail 3
SCALE: 6" = 1'-0"
3/8" STONE TILE. SEE T&S SCHEDULE. SEE FLOOR ASSEMBLY DETAIL 7 IN PAGE A-707.
DECK RAILING. SEE METALWORK DRAWINGS.
12"
Header - Rear Facade Second Floor Doors
1
4 1/2" 5 3/4"
12"
12"
BIFOLD DOOR. SEE EUROLINE SILL DETAIL.
Header - Rear Facade Second Floor Doors
1
SCALE: 6" = 1'-0" STEEL BEAM. SEE STRUCTURAL DRAWINGS.
DECK RAILING. WELDED INTO A METAL PLATE IN THE C CHANNEL.
THINSET MORTAR OVER WATERPROOFING MEMBRANE.
DECK RAILING. WELDED INTO A METAL PLATE IN THE C CHANNEL.
STEEL BEAM. SEE STRUCTURAL DRAWINGS.
DESCRIPTION
DATE
SET CD SET
3/8" STONE TILE. SEE T&S SCHEDULE.
FLOOR JOIST.
9 1/2"
BY
1 1/4"
WATERPROOFING MEMBRANE.
BIFOLD DOOR. SEE EUROLINE SILL DETAIL.
C CHANNEL STEEL SHAPE.
DECK RAILING. SEE METALWORK DRAWINGS.
REV
12"
3/8" STONE TILE. SEE T&S SCHEDULE.
SEE FLOOR ASSEMBLY THINSET MORTAR DETAIL 7 IN PAGE A-707. PLACED OVER
THINSET MORTAR PLACED OVER WATERPROOFING MEMBRANE.
STUCCO.
C CHANNEL STEEL SHAPE.
CONDITIONS: PLANS PROVIDED BY RIAZ, INC. ARE NOT PREPARED BY A CALI FORNI A REGI STERED ARCHI TECT AND ARE FOR ILLUSTRATI ON AND STUDY PURPOSES ONLY. THE CONTRACTOR SHALL CHECK AND VERI FY ALL DIMENSIONS ON SITE AND REPORT ANY DI SCREPANCI ES IN WRITING TO THE DESIGNER BEFORE PROCEEDING WITH WORK. ALL DRAWINGS ARE THE PROPERTY OF THE DESI GNER AND SHALL NOT BE REPRODUCED WI THOUT THE WRI TTEN CONSENT. DRAWINGS SHALL NOT BE SCALED.
1 1/4"
3/8" STONE TILE. SEE T&S SCHEDULE.
DATE SCALE
7/27/2017 12:22:51 PM 6" = 1'-0"
TITLE
THINSET MORTAR OVER WATERPROOFING MEMBRANE.
Exterior Details
SHEET NO.
A-709
9 1/2"
FLOOR JOIST.
Detailed Wall Section
STUCCO.
3
3
Balcony - Rear Facade Second Floor
Balcony - Rear Facade Second Floor
SCALE: 6" = 1'-0"
2
SCALE: 6" = 1'-0"
2
Floor - Rear Facade Second Level Door
SCALE: 6" = 1'-0"
Floor - Rear Facade Second Level Door
SCALE: 6" = 1'-0"
Detail 4
Living Area
Dining Area
Family
Staircase
Kitchen
Master Bedroom
Master Bathroom
Master Bathroom
Rear Facade
Sunset Rear Facade
Sunset Front Facade
Shirley Ryan Ability Lab
Location: Chicago, USA Type: Health Care Site Area: 66,500 sq.ft Floors: 40 Year: Fall 2017 (Masters) Guided by: Professor Micheal Kim Teaching Office: HDR, Chicago Software: Revit, AutoCAD, Sketchup, V-ray, Lumion, Photoshop The mission of Shirley Ryan Ability Lab is to optimise service through stimulating interaction between clinical care, research and therapy. Thus, enabling application of real time research to physical medicine and rehabilitation. Hence, the primary focus of this project has been the â&#x20AC;&#x153;Ability Labsâ&#x20AC;?; which is a pivotal part of the building. The ability labs are the essence of the philosophy behind Shirley Ryan Ability Labs. Our aim is to highlight and emphasize them, in planning as well as form of the building. The main significance is given to the users of the building. By creating optimum and comfortable spaces, which would have a positive impact on the users, contributing to the healing process of the patients.
Watch for Physical Model
06.
Physical Model
Zoning
Radiation Analysis
Meronic Design Concept
Sun Path Diagram
Site Zoning
Design Development Site Analysis
Conceptual Sketches
First Floor Plan
Main Entry
Public Area
Cafeteria
Lobby
Sky Lobby Floor Plan
Inpatient Floor Plan
Healing Garden on Sky Lobby
Transition Lobby
Ability Lab
Patient Room Layout
Sky Lobby
Mezzanine Floor of Sky Lobby
Healing Garden & Breakout
Patient Room
Conceptual Sketches
Longitudinal Section
Sectional Key
Typical Floor Framing A
Envelope System - Typical floor
Typical Floor Framing B
Transition Floor
Facade development Sketches
Skyline
Envelope System - Ability Lab Parking Structure
Architecture for Aquaculture
Location: Incheon, South Korea Type: Industrial Site Area: 455,700 sq.m Floors: 2 Year: Spring 2018 (Masters) Guided by: Professor Ralph Hamman Software: Revit, AutoCAD, Sketchup, V-ray, Lumion, Photoshop, InDesign, Wufi The goal of the project is to attain efficiency in the development of self-contained modules for the production of their respective fish species and in the usage of renewable sources of energy. With this objective in mind, I have envisioned a facility that proposes functionally flexible modules. Further, public spaces are integrated into the design program to cater to the recreational needs of the local Songdo community and generate additional revenue for the industrial facility. Algae are best produced in a factory environment where not only clean, controlled conditions can be assured, but where the plant is exposed to the most favorable temperature range, carbon dioxide supply and Ph level. The dried algae plant material will be used as algae feed for large-scale aquacultures.
Watch for Physical Model
07.
Site Plan
Legend
Road Network Water Supply Bus Station Subway Station Water Taxi
Site Analysis
Energy Utilization
Site Flow
Truck Flow
Fish Processing
Algae Processing
Aquaponics
Traffic
Plane Functionality
Zoning
Design Development
Legend 1. Fish and Algae Modules 2. Visitors Centre 3. Gazebo 4. Fresh Water Treatment Combined Heat and Power Plant 5. Nitrification Tank Biogas Plant Sewage Treatment Plant 4 2 1
3
5
First Floor - Fish Ponds
Site Layers
Building
Network
Landscape
Water
Legend Fish ponds Landscape Corridor Admin Toilet Elevator Disinfection Barrier Services CO2 Tank O2 Tank Fish Pond - Floor Plan Legend Raceway ponds Landscape Corridor Admin Toilet Elevator Disinfection Barrier Services
Raceway Pond - Floor Plan
3
2
1
Legend Skywalk Water Corridor 1 Restaurant 2 Viewing Deck 3 Bar
4
8
4 Gift Shop 5 Information Centre 6 Reception 7 Museum
7
Visitors Centre - Floor Plan
5 6
8 Staff
Fish Pond - Sectional View
Raceway Pond - Sectional View
Visitors Centre - Sectional View
Physical Model
Fish pond
Raceway pond
Longitudinal Elevation
Facade Treatment 1. 2. 3. 4. 5. 6. 7.
Metal Capping Rainscreen Water Resistive Barrier Insulation Steel Rod Bolt Steel Lock Joint
Detailed Wall Section
8. Insulation 9. Support Panel 10. Mechanical Louvre 11. Large Blade Aluminum 12. HC P453 Mullion 13. Double Layered Glass 14. HC P453 Mullion
Isometric Section
15. 16. 17. 18. 19. 20. 21.
Raceway Pond Structural Concrete Galvanized Steel Sheet I Beam ASTM A6 ASTM C-1048 Spandrel Sprinkler I Section Column
22. 23. 24. 25. 26. 27. 28.
Metal Catwalk Dado Tile ASTM C AAC Block Insulation Aluminum Facade Fish Tank Pile Foundation System
Isometric Detailed Wall Section
Travelers Inn
Design Development
Location: Faure Island, Australia Type: Hospitality Site Area: 250,000 sq.ft Floors: 2 Year: Fall 2018 (Masters) Guided by: Professor James Warfield Software: AutoCAD, Sketchup, V-ray, Lumion, Photoshop, InDesign Inter penetrating exterior & interior spaces with strong emphasis on harmony between man & nature which helps in conceptually reflecting the surrounding environment. To encounter the setting sun from a space afar can create a vibe of serenity and peacefulness. The phenomenal collection of plants, animals and landscape creating Earth, can give an exciting getaway reason.
Physical Model
Site Plan
08.
Coastal Mangroves
Mallee Shrubland Samphire
Spinifex Grassland
Atriplex Shrubland
Bottle Nose Dolphin
Bryde Whale
Dugong
Humpback Whale Loggerhead Sea Turtle
Site A
Analysis
Australian pied Cormont Red Necked Stint
Wader
Fairy Tern
Pied Oystercatcher
Seabird
Western Barred Bandicoot
Boodie
Sharkbay Mouse Banded Hare
Greater Stick
Room - 16 units
Conceptual Sketch
Ground Floor
Room - 16 Units
Bedroom
First Floor
View From Room
Club House
Viewing Tower
Tower Height - 35â&#x20AC;&#x2122;
Viewing Tower
View From Tower
Framing Structure
Site View - West Side
Overall Site View
Digital Fabrication-Voronoi Pavilion
Location: University of Illinois, Urbana Champaign, USA Type: Digital Fabrication Year: Spring 2019 (Masters) Guided by: Professor Kevin Erickson Software: Revit, AutoCAD, Sketchup, Rhino, Grasshopper, V-ray, Lumion, Photoshop This experimental design studio will introduce students to the history and application of digital fabrication techniques employed in the practice of architecture over the past twenty five years. Students will engage in a series of exercises used to establish foundational knowledge in modeling, materials, and machines culminating in a full scale installation. Precedents, processes, and prototypes will play a fundamental role in our approach, with the goal of creating new knowledge and methodologies for shaping our built environment. Working as individuals and as a team, the studio was structured around a series of lectures, workshops, and design projects. Previous experience with advanced modeling, digital fabrication, and construction techniques was not required, however, a genuine interest and willingness to test, fail, and iterate was.
Watch for Mock-up Model
Watch for Robotic Arm
09..
Assembly Guide Drawings
Column A
1/16” = 1’-0”
Column A - Assembly 1/64” = 1’-0”
A12 A9
A13
A6
A11
A8
A7
A10
A4
A2
A1 A3 A5
A1
Total # of unique connections: 18
Total # of unique triple connections: 2 (+1 to roof) Total # of “teeth” edges: 38 (+4 to roof)
A5, A6
A2, A3, A4
A8
A7, A10
A11, A13
A12
A9
Column B - Assembly 1/64” = 1’-0”
B15
Column Total # of B pieces: 13 1/16” = 1’-0”
B12
B3
B11
B14
B10
B9
B13
B2
B4
B5
B1
B1
B9
B3
B2
B4, B10
B5, B13, B14
B17
B15
B12
B11
B16
B6
B7
B8
Total # of unique connections: 24
Total # of unique triple connections: 4 (+2 to roof) Total # of “teeth” edges: 51 (+8 to roof) Total # of pieces: 17
B7
B8
B6, B16, B17
Column C
1/16” = 1’-0”
Column C - Assembly 1/64” = 1’-0”
* column C is rotated 90° for clarity
C13
C12
C7
C11
C8
C9
C14
C16
C15
C17
C6
C5 C3 C1 C2
C4
C1
Total # of unique connections: 26
Total # of unique triple connections: 5 (+1 to B)
C10
C6, C7
C2, C3, C4, C5
C8, C10
C9, C11
C17
C12
C14, C16
Roof D - Assembly 1/64” = 1’-0”
Total # of “teeth” edges: 57 (+3 to roof, +1 to B) Total # of pieces: 17
Roof D
D5
D1
1/16” = 1’-0”
D6
weight (lb) 816.6302083 629.6684028 617.6128472
D2 D4
D3
D3, D5
D4
essure, psf
D2, D6
D1
Complete - Assembly 1/64” = 1’-0”
4 4 6 4 2
Roof D
Column C Column A
Column B
Total # of unique connections: 6
Total # of unique triple connections: 3 Total # of “teeth” edges: 24 Total # of pieces: 6
Roof D
Colulmn C
Column B
Column A
C13, C15
B6
B8
B8
B7
B8
B7
B7
B6, B16, B17
B6, B16, B17
Column C - Assembly B11
1/64” = 1’-0”
* column C is rotated 90° for clarity
C13
Column C - Assembly 1/64” = 1’-0”
C12
C7
* column C is rotated 90° for clarity
C11
C8
C9
C17
C6
C5
C15
C14
C16
C13
C3
B11
C12
C1 C2
C4
C11
C10
C7
C8
C9
C14
C16
C15
C17
C6
C5 C3 C1 C2
C4
C1
C2, C3, C4, C5
C6, C7
C1
C2, C3, C4, C5
C6, C7
C10
C8, C10
C9, C11
C17
C12
C14, C16
C13, C15
C8, C10
C9, C11
C17
C12
C14, C16
C13, C15
Roof D - Assembly 1/64” = 1’-0”
Roof D - Assembly 1/64” = 1’-0”
D5
D1 D6 D2
D4
D3
D5
D1 D6 D2
D4
D3
D4
D3, D5
D2, D6
D1
D4
D3, D5
D2, D6
D1
Complete - Assembly 1/64” = 1’-0”
Complete - Assembly 1/64” = 1’-0”
Roof D Roof D
Column C Column C
Column A Column A
Column B Column B
Roof D Roof D
B11
B11
Colulmn C Colulmn C
Column B Column B
Column A Column A
One Night in Bangkok
Location: Bengaluru, India Type: Hospitality Site Area: 2,000 sq.ft Floors: 1 Year: 2016 (Professional Practice) Guided by: Ajay Sethi Software: AutoCAD, Sketchup, V-ray, Lumion, Photoshop One night in Bangkok is a refreshing change from the regular restrobars in town. This place is unmistakably small yet beautiful with a charm of its own. The interiors are wonderfully set up with dimly lit ambiance. The graphics and decor on the walls adds up to a feeling of being in Bangkok. The Buddha statuettes, the Muay Thai wall painting itself takes care of the Thai part. All these small pieces collectively brings out the Thailand architecture in place to create a memorable experience.
10.
Zoning
Ground Floor
Elevation A
Elevation B
Elevation C
Elevation D
NO
- ALL DIM
BRICK WORK
- THIS DR
IS NOT
5" X 1/2" THK CEMENT PLASTER SIZE) PINE W 5" X 1/2" THK (FINISHED SIZE) PINE WOOD PLANKS WITH EXTER WITH EXTERNAL GRADE RUBIO MON
USED F
- ALL DIM
5" X 1/2" THK (FINISHED PINE WOOD PLANKS 5" X 1/2" THKSIZE) (FINISHED SIZE) PINE WOOD WITH PLANKS EXTERNAL GRADE WITH EXTERNAL GRADE RUBIO MONOCOAT FINISH
ANY DI
- THE CO
AND DE SHALL
RUBIO MONOCOAT FINISH
RUBIO MONOCOAT FINISH
- THIS DR
ARCHIT
NOTICE
WITHIN PRIOR
5" X 1/2" THK (FINISHED SIZE) WOOD PLANKS 4 "PINE x 2" ASH WOOD WITH EXTERNAL GRADE FRAME RUBIO MONOCOAT FINISH
5" X 1/2" THK (FINISHED 4" x 2 " ASH 4" SIZE) x 2 " ASH PINE WOOD PLANKS WOODGRADE FRAME WOOD WITH FRAME EXTERNAL RUBIO MONOCOAT FINISH
H B
G
H
DETAIL - G
POLISH FINISH CARVED DOUBLE JALI PANEL WITH 5" X 1/2" THK 6MM PLY IN (FINISHED SIZE) PINE BETWEEN 5" IN 1/2" THK WOOD PLANKSXWITH POLISH FINISH (FINISHED SIZE) PINE RUBIO MONOCOAT WOOD PLANKS WITH FINISH 5" X 1/2" THK RUBIO MONOCOAT (FINISHEDFINISH SIZE) PINE WOOD PLANKS WITH RUBIO MONOCOAT FINISH
4"
2"
2 1/2"
4 " x 2" ASH FRAME
INFORM
EXECU
OR ANY
CONSU
4"x11 2 " SHU R ASH WOOD
4"x11 2 " SHUTTER IN ASH WOOD
2 1/2"
3/4"
1/2"
DETAIL - H
5'-0" x 1'-1 1/2" C DOUBLE JALI P WITH 6mm PLY BETWEEN IN P FINISH 4 " x 2" ASH WOOD FRAME
HOLY
ASH 4" x3/4"x1/4" 11 2 " TOP RAIL BEADING FORWOOD SHUTTER IN ASH WOOD
4"
3/4" 4" 3/4"
Detail -BH DETAIL
5'-0" x 1'-1 1/2" CARVED DOUBLE JALI PANEL WITH 6mm PLY IN BETWEEN IN POLISH FINISH 5'-0" x 1'-1 1/2" CARVED DOUBLE JALI PANEL WITH 6mm PLY IN 4 " x 2" ASH BETWEEN IN POLISH WOOD FRAME FINISH
11 2 " TOP RAIL 4 " x4"2"xASH FORFRAME SHUTTER IN WOOD 2 1/2" ASH WOOD
4"
4"
1/2"
Detailed Wall Section
AND TH
DETAILA -G Detail
4"
1 1 2"x4" ASH WOOD SHUTTERS WITH PANELS AS PER DETAIL 1 1 2"x4" ASH WOOD 1 1 2"x4" ASH WOOD WITH SHUTTERSSHUTTERS WITH PANELS AS PER PANELS AS PER DETAIL DETAIL
DETAIL - G
2"
H
4 " x 2" ASH WOOD FRAME 4"x11 2 " SHUTTER IN ASH WOOD
4" x 2 " ASH 5'-0" X 1'-1 1/2" WOOD FRAME 5'-0" X 1'-1 1/2" CARVED DOUBLE DOUBLE JALI PANEL CARVED WITH 6MM PLY IN JALI PANEL WITH BETWEEN IN6MM PLY IN POLISH IN 5'-0" X FINISH 1'-1 BETWEEN 1/2"
2"
G A
G
- IF VARI
1/2"
DETAIL - H
3/4"x1/4" ASHOF 8MM PLY AND PANELS WOOD 4MMBEADING VENEER FIXED ON BOTH SIDES WITH 3/4"X1/2" BEADING PANELS OF 8MM AND PROFILED ASPLY DETAIL 4MM VENEER FIXED ON BOTH SIDES WITH 3/4"X1/2" BEADING PROFILED AS DETAIL
4" x 11 2 " TOP R ONE FOR SHUTTER ASH WOOD
WIN
3/4"x1/4" ASH PS WOOD BEADIN ww
3A, R No. 1 Kottu Chen
PANELS OF 8M Tel: Emai 4MM VENEER F BOTH SIDES WITH 3/4"X1/2" PROFILED AS D
O
3/4"
Wall Painting
Elevation A
Elevation B
Plan
Perspective View
DJ Counter
Community Table
Adyar Anand Bhavan
Location: Trichy, India Type: Hospitality Site Area: 9800 sq.ft Floors: 2 Year: 2016 (Professional Practice) Guided by: Suniil Philip Software: AutoCAD, Sketchup, V-ray, Lumion, Photoshop The large chain of restaurant in south India is Adyar Anand Bhavan. To bring the change to the interiors we worked with minimalistic material both in ground and first floor with two colored laminates and three different grained mica respectively. The ground floor has a fast food and quick dining area whereas the first floor has party hall and fine dining space. Each and every element of the project is detailed with fineness. The facade consists of aluminum panels and fox brown granite. The fixed glazing window all over the building provides enough natural lighting. Decorative hanging lights acted as the highlight and the feature walls used with the help of pattern tiles, hexagonal shaped fabric pattern, are all added attractive element to the restaurant.
11.
A
QUICK DINING
B
FAST FOOD
Ground Floor
Initial views
Elevation A
Elevation B
C
A
B
First Floor
FINE DINING
Elevation A
Elevation B
Elevation C
Party Hall 1
Fine Dining
Xome and Nationstar
Location: Chennai, India Type: Commercial Site Area: 25,500 sq.ft Floors: 1 Year: 2015 (Professional Practice) Guided by: Ajay Sethi and Suniil Philip Software: AutoCAD, Sketchup, V-ray, Lumion, Photoshop A modern and open plan workspace with an innovative approach towards office hierarchy. The workstation cluster is juxtaposed with glass manager pods at regular intervals that are slightly elevated allowing a non intrusive yet clear visibility across the work floor. A clean design theme that works with the clients intent of a paperless office. Based on an open office plan with a number of collaborative and meeting spaces built into the workstation plan. Fit out includes height adjustable tables, media benches, phone booths and other collaborative design elements.
12.
Reception
Collaborative Space
Meeting Room
Xome Floor Plan Board Room
Cafeteria
Xome
Reception
Workstation
Board Room
Nationstar Floor Plan
Recreational Room
Cafeteria
Free Hand Sketching
13.
Photography
14.
dikshitbadolla93@gmail.com +12179045186