Utilities & Infrastructure Policy Challenge. Nicola Coppen.

POLICY FELLOWSHIPS PROGRAMME:

Civil or public servants with responsibility for policy or service design in any sector, with the ability to influence and impact public policy in their field

THE CHALLENGE

How could infrastructure & utilities issues be considered far earlier in the concept and planning processes to: Reduce disruption later in the project

Enable the best opportunities of time, cost, quality or environmental benefits (eg in the quest for a Zero Carbon Westminster)

Increase air quality, better delivery of services, building of quality developments - across the borough

CONTEXT

As part of a new London-wide infrastructure coordinationserviceinpartnershipwiththeGLA&Mayor ofLondon,myroleatWestminsterCityCouncilinvolved facilitating liaison between developers & infrastructure asset owners to proactively plan, design & construct London’sinfrastructure

By providing design advice & coordination, informing local policy and plans, and developing and implementating innovative infrastructure that contributes to more liveable, health, sustainable and biodiverseplaces

SYSTEMS THINKING IMPACT

Ability to plot, demonstrate and coordinate project utilityrequirements.

Collaborationbetweenclosedevelopmentprojectsin sharingcableroutesordeliveryofgoods;enabling savingsindeliverycosts,reduceddisruptiontimefor largevehicledeliveries&sharingcostofthebulkof routesforutilities

Planningguidanceinclusionforearlierconsideration of utilities and infrastructure in the pre-application forPlanningPermission

Support from the Infrastructure Coordinator is available to the Local Authority, Developer, Consultants, Land Agents, Contractors & other stakeholders - for the overall goal of successful projectdelivery

Identifying streamlined options through discussion andsystemsthinking

Creatingbestpracticethroughprojectexperienceat all stages of the Project (Inception, Feasibility, Construction,Completion&Handover)

AT A GLANCE

Challenges

Planning Authority & Planning Applicants - better guidance for utility requirements

Utilities being delivered late or returning work for additional projects - prolonged or repeats of disruptions

Developers & Land Owners often delegate roles via a Land Agent or Project Consultantshow do we affect change?

Outcomes

Planning Guidance incorporates a Utility Impact Assessment Ability for major projects to collaborate, making time & cost savings for all Stakeholder engagement & Utility Process coaching

Enabling change with less disruption, less frustration and better results

SUCCESS BY-PRODUCT

SystemsEngineeringoffersa simplisticviewtoteachcomplicated processesortoovercomechallenges

Recognitionoftheelementstoreach agoal&seeingthierinterlinking& relationshipoffersbehaviourchange asaby-productofthesuccess, whichthenhelpswiththenextscenario

RESULT

SystemsThinkingisagreatskilland thePolicyChallengeismycareergoal asitimprovestheUtilitiesIndustry