P O R
conceptual 1. CO_HOUSING/ HOUSE FOR ONE FAMILY/ STUDIO PROJECT 1 / FIRST YEAR_ FIRST SEMESTER pg. 2
technical 5. NEW AGEING CITIES (DfA)/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER pg. 10-13
urbanistic 2. ARCHITECTURAL _CONCEPT/LIGHTHOUSE_ON_CLIFF/ ELEMENTS OF PROJECT/ FIRST YEAR_ SECOND SEMESTER pg. 3-4
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER pg. 14-22
technical 3. ARCHITECTURAL_CONSTRUCTION/EXHIBITION_PAVILION/ STUDIO PROJECT 2 / SECOND YEAR_ SECOND SEMESTER pg. 5-6
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS pg. 23-28
4. APARTMENT_BUILDINGS_AND_FISH_POND / STUDIO PROJECT 4 / THIRD YEAR_ SECOND SEMESTER pg. 7-9
TO BE CONTINUED...
8. PRODUCT_DESIGN/ BEST DESIGN STUDENT WORKSHOP/ WINE AND FOOD PACKAGE pg. 29 9. PHOTOGRAPHY / ART JEWELLERY / FURNITURE pg. 30-31
1
1. CO_HOUSING/ HOUSE FOR ONE FAMILY/ STUDIO PROJECT 1 / FIRST YEAR_ FIRST SEMESTER
Conceptual drawings
Description HOUSE_OF_HETEROTOPIA- Foucault uses the term heterotopia to describe spaces that have more layers of meaning or relationships to other places than immediately meet the eye. Co-housing with common obligations in micro society, like in one block in the city. The house are made to be eco-friendly, to have everything one family need witout unnecessary units and luxory. The house have one central garden, to which can be reached from outside, or by the stairs form the inside. When the windows are opened in the kitchen and in the living room, the gentral garden becomes a part of inside space, and oposite.
Atmospheres
courtyard
sleeping
living
green roof
cooking
2
2. ARCHITECTURAL _CONCEPT/LIGHTHOUSE_ON_CLIFF/ ELEMENTS OF PROJECT/ FIRST YEAR_ SECOND SEMESTER
Description
Diagrams
LIGHTHOUSE_FOR_THE_GUARDIANS- tower for two guardians_the lighthouse has two shells. Shells are moved depends of weather. When is nice weather the two shells are in the same position, so every window is open and roof don’t has parapet like a fence. _when the weather is bad, the wind is stong and the level of ocean is rise, the shells are changed the position so every window is closed, and the roof gets the fence like a parapet. _units are small just for basic activity. The lighthouse has all technical machines for fog, lights, gps, radio... N
situacija R=1:50
Moving facade according to weather conditions
situation
good weather
bad weather
3
2. ARCHITECTURAL _CONCEPT/LIGHTHOUSE_ON_CLIFF/ ELEMENTS OF PROJECT/ FIRST YEAR_ SECOND SEMESTER
Conceptual section and plans
300
+30.00
SECOND_SECTION _kitchen _toilet _dining space _room for rest,social activity _entrance to the roof _observatory
600
+24.00 1200
+27.00
+21.00
300
+24.00
+27.00
+18.00
100
100
400
100 +15.00 600
600
600
400 600
3000
100
+12.00
600
+6.00
+3.00
300
+9.00
+9.00
1200
+6.00
_entrance _ground floor _work room _for horn _lights _room for guardians _toilet
300
FIRST_SECTION
+0.00
100
400 600
100
100
400
100
600
1
1
Axonometry
4
3. ARCHITECTURAL_CONSTRUCTION/CAR_EXHIBITION_PAVILION/ STUDIO PROJECT 2 / SECOND YEAR_ SECOND SEMESTER
Description CAR_EXHIBITION_PAVILION_“WAVE”_basic idea was multifunctional building for art exhibitions_the object must have two seperated parts of building, one for visitors and one for employees. Each group of people has differtent entrance, stairs, elevetor and toilet. _outside space can become space for exhibition too. Roof is one more useable space, as well as the garden behind the building _the parking and easy way of access to the object. Access to the building is good for all kind of transport _in the basement there are technical and mechanical rooms and storages.
Concept and Program
first_stage
second_stage
third_stage
final_stage
_offices_warehouse_restorant_mini kitchen_director_secretery_meeting room_elevator_basement_technical rooms_work rooms_toilets_room ADMINISTRATION for pojections_seperate entance
_main entrance_elevator_information desk_cafe COMMUNICATION bar_stairscase
_exhibition pavilion_laser show_light show_paintings_photographies_instalations_scultures_parPAVILION ties _lectures_projections_films_music_workshops_presentations
Situation
5
3. ARCHITECTURAL_CONSTRUCTION/CAR_EXHIBITION_PAVILION/ STUDIO PROJECT 2 / SECOND YEAR_ SECOND SEMESTER
Section
Plan
5
0
22
46.25
0 35
0
330
380
18 .5
47
0
35
0
29
.25
46
47.5
40
0
54
30
5 51
0
150
0
51
35
5
380
1
90 0 22
54
38
51 0 14
5
38
5/3
0
90
90 220
x1
1
56
12
10
35
5
0
41
/30
15
8x
0
35
0
32
5
10
48
0
30
0 5/3
3
46
40
512
1
37
12
39
+4.70
90 0 22
0
24
90
680
5
207.5
0
26
400 375
O
0
23
161.25
90
220
32
90 0 22
0
16 0
90 0 22
5
1,8
300
1
65
2
23
170
170 220
N
35 90
2
47
35
1
0
6.5
1510
1178
1220
5
46
32
68
5
1,2
64
35
0
6
32
5
3
90 0 22
34
M
8
32
32
425
27
380
50
.5
90
+0.00
16
1
+0.00
18
6
1 64
217.5
90 0 22
8
60
6
380
35
POS 7
0 10 0 21
33
150
90
12
50
10
12
x1
4
450
450
45
6
0
19
50
530
6
530
530
54
530
25
530 40
1
90
36 24
.25
43
380
0
35 0
13
47
L
.5
65 5
395 0
42 27
5,5
130.5
130.5
130.5
130.5
130.5
130.5
5
5
130.5
130.5
130.5
130.5
130.5
130.5
130.5
130.5
130.5
130.5
91
210 10
6
5
79
8x15/30
200
130.5
200
130.5
12.5
2 147
1,2
25 41.25
4
K
J
47.25 40 20 40
380
8
15 1,25
I
410 200
160
10
210
+4.70
14
450
31
900
10 95
30
POS 8
D
16x15/30
C
100
B
85
A
450
890,5
+0.00
240
200
POS 7
8x15/30
320
7 G
F 450
3D Model
H 450
E
6
4. APARTMENT_BUILDINGS_AND_FISH_POND/ STUDIO PROJECT 4 / THIRD YEAR_ SECOND SEMESTER
Description APARTMENT_BUILDINGS - Project task was to build apartment buildings on the location with a certain topic. On the location there was canal which is connected with Sava river. In project this canal was activated into a fish pond. People who will live at this place would be keen on fishing and apartments will be functionally for this activity. Beside apartment there are docks and platforms for fishing or walking.
7
4. APARTMENT_BUILDINGS_AND_FISH_POND/ STUDIO PROJECT 4 / THIRD YEAR_ SECOND SEMESTER
Typologies
Plans
ACCESS PATH
SERVICE PATH
Elevations
8
4. APARTMENT_BUILDINGS_AND_FISH_POND/ STUDIO PROJECT 4 / THIRD YEAR_ SECOND SEMESTER
Line model
Views
Section 1
Section 2
Section 1
Section 2
9
5. NEW AGEING CITIES/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER
Analysis
Master Plan
In the district of Milano, one of the challenges was designing for all people. Plot has protected budiling from 19th century taht serves for garaging of trams. New residential area, first will include elderly as their new residence. Next to it is student dormitory with all sevices. Public space is design to meet these deversities together in the same place. Design for All consider disabled people, elderly, kids, yought. Places need to be easy accessible.
Concept
connection with surrounding
construction areas
builings and green elements
Program 14
15
13
12
7 10
9
6
11
5
8
4
3
1
2
1. church 2.market street 3.new passage 4.Politecnico 5.administrative officies 6.protected ATM 7.services for students 8.library/reading room 9.canteen 10.commercial /food 11. students’dormitory 12.common room 13.computer/reading room 14.elderly housing 15.parking
10
5. NEW AGEING CITIES/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER
3D Model
Master Plan
SEMI-PRIVATE OPEN GYM REST AREA ELDERLY’S
PUBLIC SPACE EVENTS COMMERCIAL CAFFE/FOOD
SPORT GROUND PUBLIC GREEN ROOF GARDEN STUDENT’S
SHARED STREET
Section
11
5. NEW AGEING CITIES/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER
Typologies ELDERLY HOUSING monolocal one person/single two persons 41msq
ELDERLY HOUSING one bedroom two persons or with help 62msq
Deatil section
ELDERLY HOUSING two bedroom two/four persons or with help 88msq
STUDENT HOUSING two bedroom two students or with help 50msq
Elderly apartment plan
12
5. NEW AGEING CITIES/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER
Atmospheres
Models
13
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER
Description
Monte Sibillini Park
Affected by the earthquake in 2016, Norcia, Castelluccio di Norcia and Visso are deeply changed. After disaster there is opportunity for new and smarter start of a new cycle, investing in sustainable systems and solving the problems enriching the economy and making the unity and independency as much is possible. Dealing with the water Santa in Scolastica strategy, three cities Casteluccio it is developed different strategy, Visso-flood protection, Castelluccio-colFiume Sordo Piano Grande lection of water and Norcia-water redistribution of new river Torbidone.
MACERATA
CAMERINO
CESSAPALOMBO ONE STR FIA
FI
LA G AS O D TR I A
PERUGIA FOLIGNO
FIASTRA
ACQUACANINA FERMO BOLOGNOLA AMANDOLA
Norcia Marcite
USSITA
VISSO
O AMBR MONTEFORTINO A NN TE
A SIT
US TEVERE TERNI SPOLETO
Problems
MARE ADRIATICO A14
A ER
N
CASTELSANTAGNELO SUL NERA
PRECI
MONTEMONACO MARE ADRIATICO
O
AS
MONTEGALLO
ASCOLI PICENO
CASTELLUCCIO
Casteluccio Santa Scolastica
SPOLETO NORCIA PERGUGIA TO FOLIGNO RB O IDO RD NERA NE SO
Piano Grande
Norcia
ARQUATA DEL TRONTO
Phenonemon of ‘’carsismo’’
ASCOLI PICENO S. BENEDETTODEL TRONTO MARE ADRIATICO
O
T phenomenon of erosion that affects areas ON TR where limestone ROMA rocks are present, a type ROMAof rock formed of calcium carbonate.VIA Calcium VIA SALARIA SALARIA carbonate in contact with water becomes soluble.
Marcite
Karst phenomena of Norcia and Castelluccio
Visso
9 July ‘17 private water distribution for animals Castelluccio
22 January ‘17 flood and landslides after earthquake Visso
12 March ‘17 made river bed for Torbidone river Norcia
River Ussita River Nera
Flood and landslides of Visso
09 July 2017
From the private funds people reorganise and made a water path by themselve for their animals during summer from fountain up in the mountains on 6km from Castelluccio.
22 Octobar 2017
09 July 12 2017 March 09 2017 222017 January 2017 2017 22 Octobar July 2017 22 Octobar
14
12 March 2017 22 January 2017 22 Janu 22 Octobar 2017 12 March 2017
Animals didn’t have fresh From the private After this funds last earthquake people flow of Animals didn’t Sensitive have Animals fresh possition and After fresh this last earthquake New flow of earthquake settleSensitive From the private funds people didn’t have After this “temporary” last flow of possition and Sensitive po water because flow of the reorganise and made thereorganise Torbidone a water and was made again water becausenature flow water ofinthe Visso, caused the Torbidone was ments again now covers nature this a water because flow of the the Torbidone was againin Visso, caused nature in Viss underground water path by drasticaly themselve increased, for their firemen for underground several water problems afterdrasticaly so firemen sensitive land, making several problems after path by so themselve their underground water increased,drasticaly increased, so firemen several prob changed and previous animals during made summer a animals bedfrom to prevent wet changed and previous Floods, landmade a bed to prevent ground wet less porous, earthquake. which wet Floods, earthquake. landduring summer from earthquake. changed and previous made a bed to prevent Flo used fountains were dry, so fountain up in land theand mountains destroying on inthe used fountains were and dry, non socosolidated land and can the agraricause great problems slides and non cosolidated fountain up theagrarimountains onslides used fountains were dry, so destroyingland and destroying the agrarislides and non co people broght water in 6km from an Castelluccio. land due to uncontroled people broght land water arepeople comon in thing. water an land duetotouncontroled floods. land are comon thing. 6km from Castelluccio. broght in due to uncontroled an land due land are com tanks for them. water scape. tanks for them. water scape. tanks for them. water scape.
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER
Master plan
VISSO RA
E
N
PRECI
CAMPI TODIANO
CASTELLUCCIO
CO
NORCIA
RN
O SORDO
TO
RB
ID
ON
E
S. PELLEGRINO
Data extracted from www.erg.eu/it/le-nostre-centrali-idroelettriche and from the DWG of Umbria Region Cartography
Strategy
Norcia
DISTRIBUTION
Castelluccio
COLLECTION
Visso
PROTECTION
15
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER L
Master plan
30 october 2017 closed streets in Casteluccio red zone
0
200m
COLLECTION CANALS
COLLECTION LAKE
LAKE DEPURATION
PIPING SYSTEM
BELVEDERE POINT
WATER USE
MIX-USED INFO CENTER
BIOFILTRATION GARDEN
1 300 m
1 310 m
1 310 m
CASTELUCCIO 1 440m
1 840 m
1 480 m
1 550 m
1 550 m
1 650 m
System section
IRRIGATION SYSTEM
16
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER
Problems
moved plane caused change of water flow / dry pipes
fountains are dry so the animals are getting water from the tucks
dry land suitable / problems of irrigation agriculture
Solutions
ARTIFICIAL LAKE using for the collection of storm water, together with the system with the canals from the mountains.
BELVEDERE POINT on the top of the mountain view point as a visual connection with the water system, Castelluccio, landscape and Piano Grande.
WATER USE water use in the town brought from the lake and after use graz water goes to the fitodepuration.
10cm
BIOFILTRATION in the valley redeveloping existing fitodepuration of gray water, making the new mixed-use center, that has functional and attraction value.
IRRIGATION AND ANIMALS after filtration of the water it can be reused for irrigation or given to the animals by the system of pumps, so the cycle of water is closed.
120cm
17
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER
Project of phitodepuration
Castelluccio
0
25m
water collection
solar panels movable walls
multifunctional room
restroom
water use restroom entrances
water use kitchen
kitchen
info point
clarification well fisical water well biofilter secondary grit removal unit primary grit removal unit
storm water pipes storm water collector
18
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER
Project of restored train station and renaturation of Torbidone
Norcia
19
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER
Project of restored train station and renaturation of Torbidone
NEW MILLS AND CONNECTIONS the proposal is to create two distinc paths through the wet land that valorize the marcite area and and connects the area with bicycle path.
RENOVATION OF FORMER TRAIN STATION a new function is proposed for the abandoned and destroyed former train station building, providing new facilities for cyclists and visitors.
Norcia
TORBIDONE RENATURATION the renaturation of the Torbidone river is proposed by the use of new land art which helps control the new power and speed of the river.
RADIAL CONNECTIONS OF RIVERSIDES as a new waterscape Torbidone imposes new connections to the city and to the agrarian fields through the system of paths and small passages.
NEW IRREGATION SYSTEM new irregstion system is proposed by the use of underground canals that are connected from the Torbidone river and reach the irregate the agrarian fields
Sculptural silhouette of old train station
clay tile
wooden trusses new constructed part info point info wall old storage building
bicycle rental bicycle repair meeting point
conference room/cafe event stage bicycles’ parking
20
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER
Project
Norcia
0m
To r
bid
on
el
ine
ar
pa
rk
To r
bid
ter en c y Cit rcia No
10m
on
el
ine
ar
pa
rk
of
21
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER
Norcia
Castelluccio
22
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
Concept
Description COLLECTIVE EMERGENCY HOUSING- The teham of the studio was post-earthquake Umbria, speciďŹ cally selected in this case the city of Norcia. The analysis are made for the whole Umbria or/and the major effected cities by destruction. At the end was developed collective housing out of modular elements, easy and cheap to montage, that can be transformed after the emergency phase and removed.
Analysis
IN-STABILITY
TEMPORALITY
FLEXIBILITY
Period of reconstruction after earthquakes in Italy and period of temporary residential phase 1968 Valle del Belice Sicilia
Comparison between average life lenght in Italy and post reconstruction reconstruction time lenght 1976 Friuli
Friuli 1976 1980 Irpinia
Pianura Emiliana 2012 1997 Umbria Marche
Umbria Marche 1997
2002 Molise
Aquilano Abruzzo 2009 Molise Puglia 2002
Irpinia 1980
2009 Aquilano Abruzzo 2012 Pianura Emiliana
1 - 10 % 10 - 20 %
Finished projects Temporary housing phase
20 - 30 % 30 - 40 %
Other phases of
40 - 50 %
2016 Norcia
50 - 55 %
reconstruction
average life in Italy 78 years
On-going projects
Valle del Belice 1968
Temporary housing phase ????
2023 2024 2022 2029
2018
Other phases of reconstruction
0
10 km
0
10 km
23
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
Regional analysis
Strategy
Water flow analysis
Peak ground velocity
Slope analysis
Peak ground acceleration
Soil stability
Solar radiation analysis
Final overlapping terrain analysis
24
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
Strategy
Strategy analysis
I emergency REALITY
N 0
Map of areas for patching and shake velocity map 350m
Highest shake velocity
Reconstruction POSIBILITY
old core NEW SHELL
functional connections PATCH BUILDINGS
Map of infrastructure Voronoi division and pos sible area for patching
N 0
350m
Connection area Voronoi out of infrastructure
25
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
Concept of the building CONCEPT PROCESS
PATH
RIVER
PATH
Situation plan
Perspective view GSPublisherVersion 0.0.100.100
1,5x1,5
3x3
VOXEL MODULS
26
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
Section A-A
Section B-B
B
Floor plan
A
A B
27
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
Construction details
Detail section
Construction system
28
8. PRODUCT_DESIGN/ BEST DESIGN STUDENT WORKSHOP/ WINE AND FOOD PACKAGE
, ВАС
Љ
НАС ОД У
ИДЕ ОВРАТА
у
ем слажсвакују з инаци
GRUPA I
ЗА САВРШЕН
PASTA
СВАКИ ДАН
ИЗ БЕОГРАДА
С ЉУБАВЉУ
IS ART
ДОКАЗ СМО ДА
GRUPA II
У БРЗОЈ ХРАНИ
ЈЕДЕ ЗДРАВО И
МОЖЕ ДА СЕ
СВОЈИМ ЧУЛИМА
РУЧАК ПОСЛЕ ПОСЛА
PASTA KOJA SPAJA SVET
УЖИНА ЗА ВРЕМЕ ШКОЛЕ
УДОВОЉИТЕ
UKUS I MIRIS ITALIJE
TO TAKE AWAY МИСЛИТЕ ИЗВАН КУТИЈЕ
БРЗА ДОСТАВА
ХУМАНОСТ ЈЕ КУЛ
желимо да вам дан уз нас буде посебан Бициклом око света!
тигања до
право из твог срца
n jam n jam nj
R
GRUPA ALF
CON EDO POL LO KU V
ТС
Р
УКУС
Е
ОЉ
K
И
ИТАЛ МИРИС ИЈЕ
III
JE U ANJE ME ОКТО TNOS T БА
25.
СВЕ
К И Н И ДАН ПА АШ
БИР РОЂЕНД СТЕ АМО АН НАЈБ
VRH
T A
A P UNSKI GASTON OMSK G SA U ŽIT I A
am
I
одам
а мет
ним онал ици трад
В ЗА УБА С ЉАЛНАК
З ПАСТУ?
П ЈЕ АМО ЗА РГИ ЕНЕ СПРЕМ АС А В о се МИ
ITALIJE А ШТА ВИ ПИЈЕТЕ УЗ
ни гаје ци саст ој
б ком
AROMA
B ИЦ РАД С Т У КУ
JE EL BIT GAJA LJU ALO ZA RIH Z ИЈЕ DO
Branding for AgiPastaAway BEST workshop 2016. second price IN USE 10.000 boxes Branding for Tikves winery BEST workshop 2014. first price
Food package Wine bottle
29
9. PHOTOGRAPHY / ART /JELLERY / FURNITURE
Photography
Murals
30
9. PHOTOGRAPHY / ART / JEWELLERY / FURNITURE
Jewellery, costime and furniture
Art
31