conceptual 1. CO_HOUSING/ HOUSE FOR ONE FAMILY/ STUDIO PROJECT 1 / FIRST YEAR_ FIRST SEMESTER pg. 2

technical 5. NEW AGEING CITIES (DfA)/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER pg. 10-13

urbanistic 2. ARCHITECTURAL _CONCEPT/LIGHTHOUSE_ON_CLIFF/ ELEMENTS OF PROJECT/ FIRST YEAR_ SECOND SEMESTER pg. 3-4

6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER pg. 14-22

technical 3. ARCHITECTURAL_CONSTRUCTION/EXHIBITION_PAVILION/ STUDIO PROJECT 2 / SECOND YEAR_ SECOND SEMESTER pg. 5-6

7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS pg. 23-28

4. APARTMENT_BUILDINGS_AND_FISH_POND / STUDIO PROJECT 4 / THIRD YEAR_ SECOND SEMESTER pg. 7-9

TO BE CONTINUED...

8. PRODUCT_DESIGN/ BEST DESIGN STUDENT WORKSHOP/ WINE AND FOOD PACKAGE pg. 29 9. PHOTOGRAPHY / ART JEWELLERY / FURNITURE pg. 30-31

1


1. CO_HOUSING/ HOUSE FOR ONE FAMILY/ STUDIO PROJECT 1 / FIRST YEAR_ FIRST SEMESTER

Conceptual drawings

Description HOUSE_OF_HETEROTOPIA- Foucault uses the term heterotopia to describe spaces that have more layers of meaning or relationships to other places than immediately meet the eye. Co-housing with common obligations in micro society, like in one block in the city. The house are made to be eco-friendly, to have everything one family need witout unnecessary units and luxory. The house have one central garden, to which can be reached from outside, or by the stairs form the inside. When the windows are opened in the kitchen and in the living room, the gentral garden becomes a part of inside space, and oposite.

Atmospheres

courtyard

sleeping

living

green roof

cooking

2


2. ARCHITECTURAL _CONCEPT/LIGHTHOUSE_ON_CLIFF/ ELEMENTS OF PROJECT/ FIRST YEAR_ SECOND SEMESTER

Description

Diagrams

LIGHTHOUSE_FOR_THE_GUARDIANS- tower for two guardians_the lighthouse has two shells. Shells are moved depends of weather. When is nice weather the two shells are in the same position, so every window is open and roof don’t has parapet like a fence. _when the weather is bad, the wind is stong and the level of ocean is rise, the shells are changed the position so every window is closed, and the roof gets the fence like a parapet. _units are small just for basic activity. The lighthouse has all technical machines for fog, lights, gps, radio... N

situacija R=1:50

Moving facade according to weather conditions

situation

good weather

bad weather

3


2. ARCHITECTURAL _CONCEPT/LIGHTHOUSE_ON_CLIFF/ ELEMENTS OF PROJECT/ FIRST YEAR_ SECOND SEMESTER

Conceptual section and plans

300

+30.00

SECOND_SECTION _kitchen _toilet _dining space _room for rest,social activity _entrance to the roof _observatory

600

+24.00 1200

+27.00

+21.00

300

+24.00

+27.00

+18.00

100

100

400

100 +15.00 600

600

600

400 600

3000

100

+12.00

600

+6.00

+3.00

300

+9.00

+9.00

1200

+6.00

_entrance _ground floor _work room _for horn _lights _room for guardians _toilet

300

FIRST_SECTION

+0.00

100

400 600

100

100

400

100

600

1

1

Axonometry

4


3. ARCHITECTURAL_CONSTRUCTION/CAR_EXHIBITION_PAVILION/ STUDIO PROJECT 2 / SECOND YEAR_ SECOND SEMESTER

Description CAR_EXHIBITION_PAVILION_“WAVE”_basic idea was multifunctional building for art exhibitions_the object must have two seperated parts of building, one for visitors and one for employees. Each group of people has differtent entrance, stairs, elevetor and toilet. _outside space can become space for exhibition too. Roof is one more useable space, as well as the garden behind the building _the parking and easy way of access to the object. Access to the building is good for all kind of transport _in the basement there are technical and mechanical rooms and storages.

Concept and Program

first_stage

second_stage

third_stage

final_stage

_offices_warehouse_restorant_mini kitchen_director_secretery_meeting room_elevator_basement_technical rooms_work rooms_toilets_room ADMINISTRATION for pojections_seperate entance

_main entrance_elevator_information desk_cafe COMMUNICATION bar_stairscase

_exhibition pavilion_laser show_light show_paintings_photographies_instalations_scultures_parPAVILION ties _lectures_projections_films_music_workshops_presentations

Situation

5


3. ARCHITECTURAL_CONSTRUCTION/CAR_EXHIBITION_PAVILION/ STUDIO PROJECT 2 / SECOND YEAR_ SECOND SEMESTER

Section

Plan

5

0

22

46.25

0 35

0

330

380

18 .5

47

0

35

0

29

.25

46

47.5

40

0

54

30

5 51

0

150

0

51

35

5

380

1

90 0 22

54

38

51 0 14

5

38

5/3

0

90

90 220

x1

1

56

12

10

35

5

0

41

/30

15

8x

0

35

0

32

5

10

48

0

30

0 5/3

3

46

40

512

1

37

12

39

+4.70

90 0 22

0

24

90

680

5

207.5

0

26

400 375

O

0

23

161.25

90

220

32

90 0 22

0

16 0

90 0 22

5

1,8

300

1

65

2

23

170

170 220

N

35 90

2

47

35

1

0

6.5

1510

1178

1220

5

46

32

68

5

1,2

64

35

0

6

32

5

3

90 0 22

34

M

8

32

32

425

27

380

50

.5

90

+0.00

16

1

+0.00

18

6

1 64

217.5

90 0 22

8

60

6

380

35

POS 7

0 10 0 21

33

150

90

12

50

10

12

x1

4

450

450

45

6

0

19

50

530

6

530

530

54

530

25

530 40

1

90

36 24

.25

43

380

0

35 0

13

47

L

.5

65 5

395 0

42 27

5,5

130.5

130.5

130.5

130.5

130.5

130.5

5

5

130.5

130.5

130.5

130.5

130.5

130.5

130.5

130.5

130.5

130.5

91

210 10

6

5

79

8x15/30

200

130.5

200

130.5

12.5

2 147

1,2

25 41.25

4

K

J

47.25 40 20 40

380

8

15 1,25

I

410 200

160

10

210

+4.70

14

450

31

900

10 95

30

POS 8

D

16x15/30

C

100

B

85

A

450

890,5

+0.00

240

200

POS 7

8x15/30

320

7 G

F 450

3D Model

H 450

E

6


4. APARTMENT_BUILDINGS_AND_FISH_POND/ STUDIO PROJECT 4 / THIRD YEAR_ SECOND SEMESTER

Description APARTMENT_BUILDINGS - Project task was to build apartment buildings on the location with a certain topic. On the location there was canal which is connected with Sava river. In project this canal was activated into a fish pond. People who will live at this place would be keen on fishing and apartments will be functionally for this activity. Beside apartment there are docks and platforms for fishing or walking.

7


4. APARTMENT_BUILDINGS_AND_FISH_POND/ STUDIO PROJECT 4 / THIRD YEAR_ SECOND SEMESTER

Typologies

Plans

ACCESS PATH

SERVICE PATH

Elevations

8


4. APARTMENT_BUILDINGS_AND_FISH_POND/ STUDIO PROJECT 4 / THIRD YEAR_ SECOND SEMESTER

Line model

Views

Section 1

Section 2

Section 1

Section 2

9


5. NEW AGEING CITIES/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER

Analysis

Master Plan

In the district of Milano, one of the challenges was designing for all people. Plot has protected budiling from 19th century taht serves for garaging of trams. New residential area, first will include elderly as their new residence. Next to it is student dormitory with all sevices. Public space is design to meet these deversities together in the same place. Design for All consider disabled people, elderly, kids, yought. Places need to be easy accessible.

Concept

connection with surrounding

construction areas

builings and green elements

Program 14

15

13

12

7 10

9

6

11

5

8

4

3

1

2

1. church 2.market street 3.new passage 4.Politecnico 5.administrative officies 6.protected ATM 7.services for students 8.library/reading room 9.canteen 10.commercial /food 11. students’dormitory 12.common room 13.computer/reading room 14.elderly housing 15.parking

10


5. NEW AGEING CITIES/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER

3D Model

Master Plan

SEMI-PRIVATE OPEN GYM REST AREA ELDERLY’S

PUBLIC SPACE EVENTS COMMERCIAL CAFFE/FOOD

SPORT GROUND PUBLIC GREEN ROOF GARDEN STUDENT’S

SHARED STREET

Section

11


5. NEW AGEING CITIES/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER

Typologies ELDERLY HOUSING monolocal one person/single two persons 41msq

ELDERLY HOUSING one bedroom two persons or with help 62msq

Deatil section

ELDERLY HOUSING two bedroom two/four persons or with help 88msq

STUDENT HOUSING two bedroom two students or with help 50msq

Elderly apartment plan

12


5. NEW AGEING CITIES/ STUDIO ARCHITECTURAL DESIGN / FIRST YEAR_ FIRST SEMESTER

Atmospheres

Models

13


6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER

Description

Monte Sibillini Park

Affected by the earthquake in 2016, Norcia, Castelluccio di Norcia and Visso are deeply changed. After disaster there is opportunity for new and smarter start of a new cycle, investing in sustainable systems and solving the problems enriching the economy and making the unity and independency as much is possible. Dealing with the water Santa in Scolastica strategy, three cities Casteluccio it is developed different strategy, Visso-flood protection, Castelluccio-colFiume Sordo Piano Grande lection of water and Norcia-water redistribution of new river Torbidone.

MACERATA

CAMERINO

CESSAPALOMBO ONE STR FIA

FI

LA G AS O D TR I A

PERUGIA FOLIGNO

FIASTRA

ACQUACANINA FERMO BOLOGNOLA AMANDOLA

Norcia Marcite

USSITA

VISSO

O AMBR MONTEFORTINO A NN TE

A SIT

US TEVERE TERNI SPOLETO

Problems

MARE ADRIATICO A14

A ER

N

CASTELSANTAGNELO SUL NERA

PRECI

MONTEMONACO MARE ADRIATICO

O

AS

MONTEGALLO

ASCOLI PICENO

CASTELLUCCIO

Casteluccio Santa Scolastica

SPOLETO NORCIA PERGUGIA TO FOLIGNO RB O IDO RD NERA NE SO

Piano Grande

Norcia

ARQUATA DEL TRONTO

Phenonemon of ‘’carsismo’’

ASCOLI PICENO S. BENEDETTODEL TRONTO MARE ADRIATICO

O

T phenomenon of erosion that affects areas ON TR where limestone ROMA rocks are present, a type ROMAof rock formed of calcium carbonate.VIA Calcium VIA SALARIA SALARIA carbonate in contact with water becomes soluble.

Marcite

Karst phenomena of Norcia and Castelluccio

Visso

9 July ‘17 private water distribution for animals Castelluccio

22 January ‘17 flood and landslides after earthquake Visso

12 March ‘17 made river bed for Torbidone river Norcia

River Ussita River Nera

Flood and landslides of Visso

09 July 2017

From the private funds people reorganise and made a water path by themselve for their animals during summer from fountain up in the mountains on 6km from Castelluccio.

22 Octobar 2017

09 July 12 2017 March 09 2017 222017 January 2017 2017 22 Octobar July 2017 22 Octobar

14

12 March 2017 22 January 2017 22 Janu 22 Octobar 2017 12 March 2017

Animals didn’t have fresh From the private After this funds last earthquake people flow of Animals didn’t Sensitive have Animals fresh possition and After fresh this last earthquake New flow of earthquake settleSensitive From the private funds people didn’t have After this “temporary” last flow of possition and Sensitive po water because flow of the reorganise and made thereorganise Torbidone a water and was made again water becausenature flow water ofinthe Visso, caused the Torbidone was ments again now covers nature this a water because flow of the the Torbidone was againin Visso, caused nature in Viss underground water path by drasticaly themselve increased, for their firemen for underground several water problems afterdrasticaly so firemen sensitive land, making several problems after path by so themselve their underground water increased,drasticaly increased, so firemen several prob changed and previous animals during made summer a animals bedfrom to prevent wet changed and previous Floods, landmade a bed to prevent ground wet less porous, earthquake. which wet Floods, earthquake. landduring summer from earthquake. changed and previous made a bed to prevent Flo used fountains were dry, so fountain up in land theand mountains destroying on inthe used fountains were and dry, non socosolidated land and can the agraricause great problems slides and non cosolidated fountain up theagrarimountains onslides used fountains were dry, so destroyingland and destroying the agrarislides and non co people broght water in 6km from an Castelluccio. land due to uncontroled people broght land water arepeople comon in thing. water an land duetotouncontroled floods. land are comon thing. 6km from Castelluccio. broght in due to uncontroled an land due land are com tanks for them. water scape. tanks for them. water scape. tanks for them. water scape.


6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER

Master plan

VISSO RA

E

N

PRECI

CAMPI TODIANO

CASTELLUCCIO

CO

NORCIA

RN

O SORDO

TO

RB

ID

ON

E

S. PELLEGRINO

Data extracted from www.erg.eu/it/le-nostre-centrali-idroelettriche and from the DWG of Umbria Region Cartography

Strategy

Norcia

DISTRIBUTION

Castelluccio

COLLECTION

Visso

PROTECTION

15


6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER L

Master plan

30 october 2017 closed streets in Casteluccio red zone

0

200m

COLLECTION CANALS

COLLECTION LAKE

LAKE DEPURATION

PIPING SYSTEM

BELVEDERE POINT

WATER USE

MIX-USED INFO CENTER

BIOFILTRATION GARDEN

1 300 m

1 310 m

1 310 m

CASTELUCCIO 1 440m

1 840 m

1 480 m

1 550 m

1 550 m

1 650 m

System section

IRRIGATION SYSTEM

16


6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER

Problems

moved plane caused change of water flow / dry pipes

fountains are dry so the animals are getting water from the tucks

dry land suitable / problems of irrigation agriculture

Solutions

ARTIFICIAL LAKE using for the collection of storm water, together with the system with the canals from the mountains.

BELVEDERE POINT on the top of the mountain view point as a visual connection with the water system, Castelluccio, landscape and Piano Grande.

WATER USE water use in the town brought from the lake and after use graz water goes to the fitodepuration.

10cm

BIOFILTRATION in the valley redeveloping existing fitodepuration of gray water, making the new mixed-use center, that has functional and attraction value.

IRRIGATION AND ANIMALS after filtration of the water it can be reused for irrigation or given to the animals by the system of pumps, so the cycle of water is closed.

120cm

17


6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER

Project of phitodepuration

Castelluccio

0

25m

water collection

solar panels movable walls

multifunctional room

restroom

water use restroom entrances

water use kitchen

kitchen

info point

clarification well fisical water well biofilter secondary grit removal unit primary grit removal unit

storm water pipes storm water collector

18


6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER

Project of restored train station and renaturation of Torbidone

Norcia

19


6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER

Project of restored train station and renaturation of Torbidone

NEW MILLS AND CONNECTIONS the proposal is to create two distinc paths through the wet land that valorize the marcite area and and connects the area with bicycle path.

RENOVATION OF FORMER TRAIN STATION a new function is proposed for the abandoned and destroyed former train station building, providing new facilities for cyclists and visitors.

Norcia

TORBIDONE RENATURATION the renaturation of the Torbidone river is proposed by the use of new land art which helps control the new power and speed of the river.

RADIAL CONNECTIONS OF RIVERSIDES as a new waterscape Torbidone imposes new connections to the city and to the agrarian fields through the system of paths and small passages.

NEW IRREGATION SYSTEM new irregstion system is proposed by the use of underground canals that are connected from the Torbidone river and reach the irregate the agrarian fields

Sculptural silhouette of old train station

clay tile

wooden trusses new constructed part info point info wall old storage building

bicycle rental bicycle repair meeting point

conference room/cafe event stage bicycles’ parking

20


6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER

Project

Norcia

0m

To r

bid

on

el

ine

ar

pa

rk

To r

bid

ter en c y Cit rcia No

10m

on

el

ine

ar

pa

rk

of

21


6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING / FIRST YEAR_ SECOND SEMESTER

Norcia

Castelluccio

22


7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS

Concept

Description COLLECTIVE EMERGENCY HOUSING- The teham of the studio was post-earthquake Umbria, speciďŹ cally selected in this case the city of Norcia. The analysis are made for the whole Umbria or/and the major effected cities by destruction. At the end was developed collective housing out of modular elements, easy and cheap to montage, that can be transformed after the emergency phase and removed.

Analysis

IN-STABILITY

TEMPORALITY

FLEXIBILITY

Period of reconstruction after earthquakes in Italy and period of temporary residential phase 1968 Valle del Belice Sicilia

Comparison between average life lenght in Italy and post reconstruction reconstruction time lenght 1976 Friuli

Friuli 1976 1980 Irpinia

Pianura Emiliana 2012 1997 Umbria Marche

Umbria Marche 1997

2002 Molise

Aquilano Abruzzo 2009 Molise Puglia 2002

Irpinia 1980

2009 Aquilano Abruzzo 2012 Pianura Emiliana

1 - 10 % 10 - 20 %

Finished projects Temporary housing phase

20 - 30 % 30 - 40 %

Other phases of

40 - 50 %

2016 Norcia

50 - 55 %

reconstruction

average life in Italy 78 years

On-going projects

Valle del Belice 1968

Temporary housing phase ????

2023 2024 2022 2029

2018

Other phases of reconstruction

0

10 km

0

10 km

23


7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS

Regional analysis

Strategy

Water flow analysis

Peak ground velocity

Slope analysis

Peak ground acceleration

Soil stability

Solar radiation analysis

Final overlapping terrain analysis

24


7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS

Strategy

Strategy analysis

I emergency REALITY

N 0

Map of areas for patching and shake velocity map 350m

Highest shake velocity

Reconstruction POSIBILITY

old core NEW SHELL

functional connections PATCH BUILDINGS

Map of infrastructure Voronoi division and pos sible area for patching

N 0

350m

Connection area Voronoi out of infrastructure

25


7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS

Concept of the building CONCEPT PROCESS

PATH

RIVER

PATH

Situation plan

Perspective view GSPublisherVersion 0.0.100.100

1,5x1,5

3x3

VOXEL MODULS

26


7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS

Section A-A

Section B-B

B

Floor plan

A

A B

27


7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS

Construction details

Detail section

Construction system

28


8. PRODUCT_DESIGN/ BEST DESIGN STUDENT WORKSHOP/ WINE AND FOOD PACKAGE

, ВАС

Љ

НАС ОД У

ИДЕ ОВРАТА

у

ем слажсвакују з инаци

GRUPA I

ЗА САВРШЕН

PASTA

СВАКИ ДАН

ИЗ БЕОГРАДА

С ЉУБАВЉУ

IS ART

ДОКАЗ СМО ДА

GRUPA II

У БРЗОЈ ХРАНИ

ЈЕДЕ ЗДРАВО И

МОЖЕ ДА СЕ

СВОЈИМ ЧУЛИМА

РУЧАК ПОСЛЕ ПОСЛА

PASTA KOJA SPAJA SVET

УЖИНА ЗА ВРЕМЕ ШКОЛЕ

УДОВОЉИТЕ

UKUS I MIRIS ITALIJE

TO TAKE AWAY МИСЛИТЕ ИЗВАН КУТИЈЕ

БРЗА ДОСТАВА

ХУМАНОСТ ЈЕ КУЛ

желимо да вам дан уз нас буде посебан Бициклом око света!

тигања до

право из твог срца

n jam n jam nj

R

GRUPA ALF

CON EDO POL LO KU V

ТС

Р

УКУС

Е

ОЉ

K

И

ИТАЛ МИРИС ИЈЕ

III

JE U ANJE ME ОКТО TNOS T БА

25.

СВЕ

К И Н И ДАН ПА АШ

БИР РОЂЕНД СТЕ АМО АН НАЈБ

VRH

T A

A P UNSKI GASTON OMSK G SA U ŽIT I A

am

I

одам

а мет

ним онал ици трад

В ЗА УБА С ЉАЛНАК

З ПАСТУ?

П ЈЕ АМО ЗА РГИ ЕНЕ СПРЕМ АС А В о се МИ

ITALIJE А ШТА ВИ ПИЈЕТЕ УЗ

ни гаје ци саст ој

б ком

AROMA

B ИЦ РАД С Т У КУ

JE EL BIT GAJA LJU ALO ZA RIH Z ИЈЕ DO

Branding for AgiPastaAway BEST workshop 2016. second price IN USE 10.000 boxes Branding for Tikves winery BEST workshop 2014. first price

Food package Wine bottle

29


9. PHOTOGRAPHY / ART /JELLERY / FURNITURE

Photography

Murals

30


9. PHOTOGRAPHY / ART / JEWELLERY / FURNITURE

Jewellery, costime and furniture

Art

31


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.