P O R
building technology
urbanistic
1. NEW AGEING CITIES/DESIGN FOR ALL/ STUDIO ARCHITECTURAL DESIGN/THEORY AND ACCESSIBILITY pg. 8-10
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES pg. 13-21
2. NODE/CO-WORKING IN GALLARATE/ BUILDING TECHNOLOGY STUDIO/SOLAR ENERGY pg. 11-12
7. COLLECTIVE EMERGENCY HOUSING/ POST EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS/GRASSHOPPER pg. 22-27
GIS and data base projects 8. INTERACTIVE MAPPING OF HISTORICAL CENTRE OF VIMERCATE/GIS/CADASTERS/THESIS pg. 28-29
others 9. PRODUCT_DESIGN/ BEST DESIGN STUDENT WORKSHOP/ WINE AND FOOD PACKAGE pg. 30
10. PHOTOGRAPHY / ART JEWELLERY / FURNITURE
pg. 31-32
4. NEW AGEING CITIES/DESIGN FOR ALL/ STUDIO ARCHITECTURAL DESIGN/THEORY AND ACCESSIBILITY
Analysis
Master Plan
In the district of Milano, one of the challenges was designing for all people. Plot has protected budiling from 19th century taht serves for garaging of trams. New residential area, first will include elderly as their new residence. Next to it is student dormitory with all sevices. Public space is design to meet these deversities together in the same place. Design for All consider disabled people, elderly, kids, yought. Places need to be easy accessible.
Concept
connection with surrounding
construction areas
builings and green elements
Program 14
15
13
12
7 10
9
6
11
5
8
4
3
1
2
8
1. church 2.market street 3.new passage 4.Politecnico 5.administrative officies 6.protected ATM 7.services for students 8.library/reading room 9.canteen 10.commercial /food 11. students’dormitory 12.common room 13.computer/reading room 14.elderly housing 15.parking
4. NEW AGEING CITIES/DESIGN FOR ALL/ STUDIO ARCHITECTURAL DESIGN/THEORY AND ACCESSIBILITY
3D Model
Master Plan
SEMI-PRIVATE OPEN GYM REST AREA ELDERLY’S
PUBLIC SPACE EVENTS COMMERCIAL CAFFE/FOOD
SPORT GROUND PUBLIC GREEN ROOF GARDEN STUDENT’S
SHARED STREET
Section
9
4. NEW AGEING CITIES/DESIGN FOR ALL/ STUDIO ARCHITECTURAL DESIGN/ THEORY AND ACCESSIBILITY
Typologies ELDERLY HOUSING monolocal one person/single two persons 41msq
ELDERLY HOUSING one bedroom two persons or with help 62msq
ELDERLY HOUSING two bedroom two/four persons or with help 88msq
Deatil section
STUDENT HOUSING two bedroom two students or with help 50msq
Elderly apartment plan
10
5. NODE/CO-WORKING IN GALLARATE/ BUILDING TECHNOLOGY STUDIO/SOLAR ENERGY
Description
Concept
Node, the new co-working space of Gallarate, brings together travellers and workers from Gallarate, Varese, Malpensa and Milano. While Villa Pasta transforms into a welcoming creative and pleasant co-working environment, the new extension enhnaces both the existing park and the Villa, as it becomes a cross-point between the two. The extension offers the users, both public and private, to visualise the main aim that the project wishes to impose : the relationship or crossing between leisure and work.
interactive activities work related cafe/ exible public garden yoga/ courses backyard
Axonometry of existing building 0
Site plan 25
2B
1B
11
5. NODE/CO-WORKING IN GALLARATE/ BUILDING TECHNOLOGY STUDIO/SOLAR ENERGY
Detail section
Shadow analysis
1
N
-15°
°
-30
30
°
30°
20
50°
-75°
07
70° 80°
W
17 16
15
14
13
11
10
09
-105
12
08
105°
°
21 June
60°
18
E
3
06
0° -12
+520
-1
5°
13
° 35
12 0°
15
0°
165°
°
-165
S
-15
85
0°
10 6
summer
325
9
75°
1%
05
40°
19
° 60
-60 °
°
-4
5°
20°
45
+615
2
15°
10°
4pm
8 am 12 pm
°
N
-15°
-30
15°
30
°
10°
5°
°
-4
45
20° 30°
° -60
°
50°
-75°
60°
5
75°
70°
W
80°
14
13
12
11
09
10
-1
5°
13
° 35
-12
15
°
16
12 0
0°
105°
° -105
21 December
E
4
60
40°
15
0°
0°
165°
S
°
-165
-15
8
winter
7
4pm
8 am 12 pm
12
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES
Description
Monte Sibillini Park
Affected by the earthquake in 2016, Norcia, Castelluccio di Norcia and Visso are deeply changed. After disaster there is opportunity for new and smarter start of a new cycle, investing in sustainable systems and solving the problems enriching the economy and making the unity and independency as much is possible. Dealing with the water Santa in Scolastica strategy, three cities Casteluccio it is developed different strategy, Visso-flood protection, Castelluccio-colFiume Sordo Piano Grande lection of water and Norcia-water redistribution of new river Torbidone.
MACERATA
CAMERINO
CESSAPALOMBO ONE STR FIA
FI
LA G AS O D TR I A
PERUGIA FOLIGNO
FIASTRA
ACQUACANINA FERMO BOLOGNOLA AMANDOLA
Norcia Marcite
USSITA
VISSO
O AMBR MONTEFORTINO A NN TE
A SIT
US TEVERE TERNI SPOLETO
Problems
MARE ADRIATICO A14
A ER
N
CASTELSANTAGNELO SUL NERA
PRECI
MONTEMONACO MARE ADRIATICO
O
AS
MONTEGALLO
ASCOLI PICENO
CASTELLUCCIO
Casteluccio Santa Scolastica
SPOLETO NORCIA PERGUGIA TO FOLIGNO RB O IDO RD NERA NE SO
Piano Grande
Norcia
ARQUATA DEL TRONTO
Phenonemon of ‘’carsismo’’
ASCOLI PICENO S. BENEDETTODEL TRONTO MARE ADRIATICO
O
T phenomenon of erosion that affects areas ON TR where limestone ROMA rocks are present, a type ROMAof rock formed of calcium carbonate. Calcium VIA SALARIA VIA SALARIA carbonate in contact with water becomes soluble.
Marcite
Karst phenomena of Norcia and Castelluccio
9 July ‘17 private water distribution for animals Castelluccio
Visso River Ussita River Nera
Flood and landslides of Visso
13
22 January ‘17 flood and landslides after earthquake Visso
12 March ‘17 made river bed for Torbidone river Norcia
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES
Master plan
Strategy Norcia
DISTRIBUTION
Castelluccio
COLLECTION
14
Visso
PROTECTION
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES L
Master plan
30 october 2017 closed streets in Casteluccio red zone
0
COLLECTION CANALS
COLLECTION LAKE
LAKE DEPURATION
PIPING SYSTEM
BELVEDERE POINT
15
WATER USE
MIX-USED INFO CENTER
BIOFILTRATION GARDEN
1 300 m
1 310 m
1 310 m
CASTELUCCIO 1 440m
1 840 m
1 480 m
1 550 m
1 550 m
1 650 m
System section
IRRIGATION SYSTEM
200m
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES
Problems
moved plane caused change of water flow / dry pipes
fountains are dry so the animals are getting water from the tucks
dry land suitable / problems of irrigation agriculture
Solutions
ARTIFICIAL LAKE using for the collection of storm water, together with the system with the canals from the mountains.
BELVEDERE POINT on the top of the mountain view point as a visual connection with the water system, Castelluccio, landscape and Piano Grande.
WATER USE water use in the town brought from the lake and after use graz water goes to the fitodepuration.
BIOFILTRATION in the valley redeveloping existing fitodepuration of gray water, making the new mixed-use center, that has functional and attraction value.
IRRIGATION AND ANIMALS after filtration of the water it can be reused for irrigation or given to the animals by the system of pumps, so the cycle of water is closed.
120cm
10cm
16
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES
Project of phitodepuration
Castelluccio
0
25m
water collection
solar panels movable walls
multifunctional room
restroom
water use restroom entrances
water use kitchen
kitchen
info point
storm water pipes
clarification well fisical water well biofilter secondary grit removal unit primary grit removal unit
storm water collector
17
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES
Norcia
Project of restored train station and renaturation of Torbidone
18
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES
Project of restored train station and renaturation of Torbidone
NEW MILLS AND CONNECTIONS the proposal is to create two distinc paths through the wet land that valorize the marcite area and and connects the area with bicycle path.
RENOVATION OF FORMER TRAIN STATION a new function is proposed for the abandoned and destroyed former train station building, providing new facilities for cyclists and visitors.
Norcia
TORBIDONE RENATURATION the renaturation of the Torbidone river is proposed by the use of new land art which helps control the new power and speed of the river.
RADIAL CONNECTIONS OF RIVERSIDES as a new waterscape Torbidone imposes new connections to the city and to the agrarian fields through the system of paths and small passages.
NEW IRREGATION SYSTEM new irregstion system is proposed by the use of underground canals that are connected from the Torbidone river and reach the irregate the agrarian fields
Sculptural silhouette of old train station
clay tile
wooden trusses new constructed part info point info wall old storage building
bicycle rental bicycle repair meeting point
conference room/cafe event stage bicycles’ parking
19
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES
Project
Norcia
0m
To r
bid
on
el
ine
ar
pa
rk
To r
bid
ter en c y Cit rcia No
10m
of
20
on
el
ine
ar
pa
rk
6. RECONSTRUCTION COMMON GROUND/ TOWN PLANNING STUDIO/WATER INFASTRUCTURE STRATEGY ON THREE CITIES
Norcia
Castelluccio
21
7. COLLECTIVE EMERGENCY HOUSING/ POST EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS/GRASSHOPPER
Concept
Description COLLECTIVE EMERGENCY HOUSING- The teham of the studio was post-earthquake Umbria, speciďŹ cally selected in this case the city of Norcia. The analysis are made for the whole Umbria or/and the major effected cities by destruction. At the end was developed collective housing out of modular elements, easy and cheap to montage, that can be transformed after the emergency phase and removed.
IN-STABILITY
TEMPORALITY
FLEXIBILITY
Period of reconstruction after earthquakes in Italy and period of temporary residential phase
Analysis
1968 Valle del Belice Sicilia
Comparison between average life lenght in Italy and post reconstruction reconstruction time lenght 1976 Friuli
Friuli 1976 1980 Irpinia
Pianura Emiliana 2012 1997 Umbria Marche
2002 Molise
Umbria Marche 1997 Aquilano Abruzzo 2009 Molise Puglia 2002
Irpinia 1980
2009 Aquilano Abruzzo 2012 Pianura Emiliana
1 - 10 % 10 - 20 %
Finished projects Temporary housing phase
20 - 30 % 30 - 40 %
Other phases of
40 - 50 %
2016 Norcia
50 - 55 %
reconstruction
average life in Italy 78 years
On-going projects
Valle del Belice 1968
Temporary housing phase ????
2023 2024 2022 2029
2018
Other phases of reconstruction
0
10 km
0
22
10 km
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
Strategy
Regional analysis
Water flow analysis
Peak ground velocity
Slope analysis
Solar radiation analysis
Peak ground acceleration
Soil stability
Final overlapping terrain analysis
24 23
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
Strategy
Strategy analysis
I emergency REALITY
N 0
Map of areas for patching and shake velocity map 350m
Highest shake velocity
Reconstruction POSIBILITY
old core NEW SHELL
functional connections PATCH BUILDINGS
Map of infrastructure Voronoi division and pos sible area for patching
N 0
350m
Connection area Voronoi out of infrastructure
25 24
7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
Concept of the building CONCEPT PROCESS
PATH
PATH
RIVER
Situation plan
1,5x1,5
Perspective view GSPublisherVersion 0.0.100.100
3x3
VOXEL MODULS
25
26
VOXELIVING
temporary as permanent solution 7. COLLECTIVE EMERGENCY HOUSING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS
SECTION Section A-A1:200
Elevation A-A
SECTION 1:200
B
Floor plan
A
A B
ELEVATION A-A
26
27
VOXELIVING 7. COLLECTIVE EMERGENCY HOUStemporary as permanent solution ING/ POST_EARTHQUAKE NORCIA / ANALYSIS AND HYPOTESIS Construction details
Detail section
CONSTRUCTION SYSTEM
(In)stability
Construction system
SECTION 1:20 Design studio 2 Prof. Giostra Simone Prof. ssa Cattaneo Elisa
Jovanovic Dina
27
Final Review
01
8. INTERACTIVE MAPPING OF HISTORICAL CENTRE OF VIMERCATE/GIS/CADASTERS/THESIS
Description
Location
Vimercate is a city located in the province Monza and Brianza, not far away from Milan and Monza. This excellent position has been very important since the way back to the Roman period when Vimercate was founded. Such an important historical development of the city needs to have special attention in analyzing its urban core. Nevertheless, Vimercate only recently got the attention of the individual researchers and institutions for its protection and investigation. More recently one of the biggest drivers in developing the awareness and interest in Vimercate is Politecnico di Milano, particularly the course of Preservation studio in the Master degree in Architecture and other researches from this academic institution.
Vimercate Monza Milano
Map from 1721
28
Bergamo Brescia
8. INTERACTIVE MAPPING OF HISTORICAL CENTRE OF VIMERCATE/GIS/CADASTERS/THESIS
Photos
C ARD
O
Roman period map
DEC
UMA
NUS
Map from 1721
Map from 1832
29
9. PHOTOGRAPHY / ART /JELLERY / FURNITURE
Photography
Murals
30 31