A P1 25x25 cm B1 50x50 cm Hb = 60 cm ca = -0.55m
B
P2 25x25 cm B2 50x50 cm Hb = 60 cm
C
B1
P3 25x25 cm
P4 25x25 cm B2
B3
B4 50x140 cm Hb = 60 cm
ca = -0.55m
ca = -0.55m
P5 25x25 cm
B4
ca = -0.55m
B5
B6
P6 25x25 cm B6 50x140 cm Hb = 60 cm
B5 50x140 cm Hb = 60 cm
ca = -0.55m
ca = -0.55m
B7
B3 50x50 cm Hb = 60 cm
B10
B9
B8
D
D P7 25x25 cm
P8 25x25 cm
B7 50x50 cm Hb = 60 cm
B8 50x140 cm Hb = 60 cm
ca = -0.55m
ca = -0.55m
B14
B14 50x50 cm Hb = 60 cm
P9 25x25 cm B11
B10 50x50 cm Hb = 60 cm
B9 50x140 cm Hb = 60 cm
B12
B13
ca = -0.55m
ca = -0.55m
P12 25x25 cm
P11 25x25 cm
P14 25x25 cm
P10 25x25 cm
P13 25x25 cm
B11 50x140 cm Hb = 60 cm
B13 50x140 cm Hb = 60 cm
ca = -0.55m ca = -0.55m
B12 50x140 cm Hb = 60 cm
P15 25x25 cm B15
B15 50x50 cm Hb = 60 cm
ca = -0.55m ca = -0.55m
ca = -0.55m B16
C
P16 25x25 cm
B
B1 50x50 cm Hb = 60 cm ca = -0.55m profundidade estimada = 10,0m
A profundidade estimada = 10,0m
FORMAS
Proger Engenharia ltda PROJETOS ESTRUTURAIS - CONSULTORIA - GERENCIAMENTO