ARCHITECTURE PORTFOLIO
SEM 1-VII (SELECTED WORKS) DIPSI ANAND
EDUCATION 2020-Now Bachelor of Architecture World University of Design Sonipat, Haryana, India
Higher Education
WORK EXPERIENC Summer Internship Qatar design consortium Doha,Qatar
Grade 9-12 Birla Public School Doha Qatar
SOFTWARE AND OTHER SKILLS
Primary and Secondary
Autocad 2D 90%
Education Grade 1-8 Divine Public School Shahabad Haryana India
LANGUAGES English (Professional) Hindi (Native) Punjabi (Native)
ACHIEVEMENTS & WORKSHOPS/ COMPETITIONS Dean’s List of Academics Joint Secretary of Academics for student council
Rhinoceros 3d 85%
Grasshopper Sketchup
85%
Revit 60%
Enscape 90%
Adobe Photoshop Adobe Illustrator
2nd position at Nasa event for String art Blue pottery workshop Resin art Workshop Revit Workshop AI house competition by nonArchitecture.edu
Adobe Indesign Microsoft Suite Hand Drafting Model Making
Science memorial competition, Ujjain
CONTACT +91-7206754563 dipsianand2708@gmail.com
70%
SOFT SKILLS Organized Adaptable Empathetic Observant
80%
70%
85%
85%
85%
60%
E
"In the labyrinth of creativity and structure, I find my passion for architecture flourishing. As a student, I approach design as a poetic dialogue between form and function. Inspired by the fusion of cultural diversity and sustainability, my work seeks to create spaces that resonate with human experience. Every line drawn, every concept conceived, reflects a commitment to innovation and social responsibility. I thrive on the challenge of transforming ideas into tangible, harmonious structures that enrich communities. Eager to embark on a lifelong journey of exploration and creation, I aspire to contribute my unique perspective to the ever-evolving tapestry of architectural excellence."
CONTENT 01. ANGANWADI DESIGN
02. KIOSK DESIGN
03. FORM DEVELOPMENT
04. DOCUMENTATIONJAGESHWAR DHAM
05. DOCUMENTATION- RABARI TRIBE
NOTES
Pedestrian Directional
NOTES
NOTESNOTES NOTES
Cast fiberglass monolith with fiberglass monolith with 1 Cast granite base and whitegranite pearlescent base and white pearlescent finish and interior illuminated finish and interior illuminated push-thru letters. push-thru letters.
1
1
NOTES
Cast Cast1fiberglass monolith Cast fiberglass monolith with monolith with with 1 fiberglass granitegranite base and base granite white andbase pearlescent whiteand pearlescent white pearlescent CONCEPT finish and finish interior andfinish interior illuminated andDESIGN illuminated interior illuminated push-thru push-thru letters. push-thru letters. letters.
1
06. INTERNSHIP WORK
Plan
2 3/4"
PLOT N9 & N10 // RACQUETS CLUB
1
1
Hotel Beach Club Beach Club Restaurant
1
Beach Club
Beach Club Ballroom Ballroom Vip Drop - Off Restaurant
Ballroom Restaurant
Restaurant
Beach Club
Beach Club
Ballroom
Ballroom
Restaurant
Restaurant
Context Elevation 1:10 Side View 1:10 Front View Side Context 1:15 View Rendering Elevation 1:10 1:10
s for the hotel by Square Peg Design 16
16 D evelo p ement | W IP | A pr il 3 0 , 2 018 Lus ail H otel
Cast fiberglass monolith with granite base and white pearlescent finish and interior illuminated push-thru letters.
Side View 1:10Side View Side View 1:10Context 1:10 Elevation 1:10
18
16
18
Side View 1:10
18
07. HORRIBLE HOUSE- AI COMPETITION
08. CONSTRUCTION DRAWINGS
THE ARCH
‘Well-being & community center for women’ IInd year :Academic project Rhinoceros 3d, Grasshopper, Enscape
“There are 360 degrees, so why stick to one?”
-Zaha Hadid
The site,having an area of 1240 sq.m, is located at Doha Qatar. It is directly facing the main ring road, which makes it a prominent landmark. The overall theme of this space is to reflect the elements of Islamic Architecture- Arches, Jallis and gradeur. These architectural elementshigh arches, massive columns, double heighted ares, etc. are very bold & massive and since it’s a women’s center, we need to neutralize this massiveness. In order to do this, natural and basic materials are used like terracota, limestone, etc. Furthermore, voronoi patterns are used to give it more organic touch. In regards to the layout; doctor rooms, lactation rooms, co-working space, library, chill out zone are provided for the well-beingness and communal space for women. The dome is an inspiration from the Louvre dome at Abu Dhabhi. This dome made from perforated teracota material offering horizontal yet perfectly radiating geometry and shade punctuated by bursts of sun.
Program Diagram PHARMACY DOCTOR’S ROOM
CO-WORKING SPACE
GROUND
LABORATORY
LACTATION ROOM ARCADE WASHROOM
LIBRARY CHILL-OUT ZONE
FIRST
BALCONY
FRONT ELEVATION
RIGHT ELEVATION
LEFT ELEVATION
REAR ELEVATION
SCALE- 1:250
TYPE-2: DOCTOR’S ROOM ANDLACTATION ROOM TYPE-1: LIBRARY AND CHILL OUT ZONE
Types of Ceiling
...rhythmm..
‘Protype design of an outdoor kiosk with seating ’ II nd year :Academic project Rhinoceros 3d, Enscape
“Architecture is about trying to make the world a little more like our dreams. ” -Bjarke Ingels This kiosk and its seating is different than usual. Its round form, curves, use of 3d fabrication as a material, placement and typology of the seatings installed make it unique and memorable. It takes up 250m2 of area and can put up at a park, mall, plazas, etc. The seating, so installed area are done keeping in mind the quanity of users- solo, couple, small-medium group and big group. It can fit in all sort of groups and ages. The seating capacity is around 70-75 people. The kiosk has a cool curvilinear shape. It is made up of engineered wood to sustain the outside temperature. The height of this structure is 7.5 feets. All kitchen equipments and machines are provided inside. There is a reception desk and waiting area at the front, followed by the kitchen at the back. Both the kiosks are the mirror images of each other that are placed at a gap of 4 feets. The lightning and drainage facilities are provided too.
Types of Seating
HAMMOCK SEATING: SOLO/ COUPLE PEOPLE
PUFFY SEATING TYPE 1: SOLO
PUFFY SEATING TYPE 2: 4 PEOPLE
BENCH AND TABLE SEATING TYPE 1: SMALL-MEDIUM GROUP
BENCH AND TABLE SEATING TYPE 2 : SMALL-MEDIUM GROUP
STEP SEATING: LARGE GROUP
Illustration Diagram
PUFFY TYPE 2
HAMMOCK
BENCH TYPE 2
STEP SEATING
PUFFY TYPE 1
BENCH TYPE 1
Elevation 1
SCALE- 1:100
Elevation 2
SCALE- 1:100
Elevation 3
SCALE- 1:100
Elevation 4
SCALE- 1:100
Form Development ‘A- Science memorial’ I st year :Academic project Rhinoceros 3d
The site was assumed to be hypothetical and having an area of 20 acres. The statement that ‘circles having smaller diamters have bigger slopes, while the circles having bigger diamters have smaller slopes’ was the concept of the form. The small circles (bigger slopes) are used at the base and their diameters incease as we move up, which represent that we started from small and today we are at the bigger scaler of advacement and technology. The phase and level of advacement has grown over the years. This idea is showcased by the ‘spiral form’ as each spiral curves are above, bigger and outside than each other showing that all the inventions are better, unique and different to one another. There are 4 blocks- main memorial; auditorium; seminar and lecture halls and library, cafe and maintenance block. Main memorial and auditoirum are connected to each other via sky bridge, while, the other two blocks are independent.
Form Development
‘B- Charging station for EV’s’ I st year :Academic project Rhinoceros 3d
The project brief was to make a protype of a charging station island for electric vehicles. The proposed design has a curvilinear form having shading device at the top. The charging device will be installed at the central distorted oval shaped space and it will be joined to the slender pipes via welding. The main idea was to create a simple, elegant, organic and light weight structure. The 5 slender curved pipes provide enough support to the shading device. The form is itself inspired from that of a sports car. Similar to the a sports car, this structure also has dynamics, boldness and swiftness in its design.
JAGESHWAR DHAM ‘Trip documentation’
3rd Year Main Co-ordinators: Dipsi, Mayank, Mitesh
History of Almora can be traced back to the ancient times of Mahabharata. However, the earliest historical account of the place is provided by a Chinese pilgrim of the seventh century.The pilgrim wrote in great detail about a kingdom called ‘Brahmaputra’. A kingdom was first established in this area by the Katyuri dynasty. The Katyuri dynasty reigned from Dwarahat in Katurya Valley. During those times, there was a small settlement in this area, not much of any political significance. King Baichaldeo of the Katyuri dynasty, who reigned in the region where present day Almora is located, donated a major part of this land to a Gujarati Brahmin by name Sri Chand Tiwari.In later times, during the rule of the Chand dynasty, Almora was founded around 1560 by Kalyanchand at this place which he called ‘Alam Nagar’. It was also called ‘Rajpur’.
MASTER PLAN
ELEVATIONS
CONTOUR PLAN
NOLLI MAP
RIGHT ELEVATION
LEFT ELEVATION FRONT ELEVATION
RAJ MAHAL- HOUSE 1
GROUND FLOOR FIRST FLOOR
HOUSE -2
LEFT ELEVATION
SECOND FLOOR FIRST FLOOR GROUND FLOOR
FRONT ELEVATION
LEFT ELEVATION
RIGHT ELEVATION
RABARI TRIBE
‘Documentation of a tribal community’ 2nd Year Main Co-ordinators: Dipsi, Mayank, Mitesh
The Rabari, also goes by the name Rewari, Raikas or Desai belongs to an indigenous tribal caste spread all across North-West India. The word Rebari literally means “outsiders” which fairly describes their social and professional life as nomadic cattle and camel herders. Proficient in Hindi, Marwari, and Haryanvi, they use Devanagari script to communicate among themselves. The Rabari tribe can be divided further into 133 recognized sub-castes following Hinduism. The nomadic life comes with migrating in groups consisting of individual families and living in a tent house or under open skies with their cattle and other supplies including utensils, rations, clothes, etc. Originally complete nomads, now live a life as semi-nomads as they move depending on the season making their living through milk selling. As time passed, some adopted the modernized way of living, living the nomadic life behind and settling down in cities.
The Rabaris can be divided into subgroups based on geographical locations and can be roughly distinguished as two large groups i.e., the Rabaris of Rajasthan inhabiting the region of Marwar ( Jalore, Pali) and Gowar (Sirohi, Mount Abu) and the Rabaris of Gujarat inhibiting the northern region ( Saurashtra, Kutch). They can also be found in other regions all across India like Madhya Pradesh, Haryana, and even in the Sindh region of Pakistan.
THE ROOTS OF RABARI MYTHOLOGICAL The origin of Rabari can be associated with the goddess Parvati and Lord Shiva. According to the myth, once Parvati made a creature out of the clay and asked Lord Shiva to breathe life into them. The creature originally had 5 legs which proved to be troublesome for the animal. When Lord Shiva got to know about it, he pushed the 5th leg upward, which was placed under the belly, creating a bump on the back of the animal. This is believed to be the story behind the camel's birth. Lord Shiva also created the first Rebari man who came to be known as Sambad and was responsible to take care of the camel. Ever since the Rabaris have been herding camels and have considered it a sacred profession.
HISTORICAL The exact origin of the Rabari community is still a subject of debate. Historians believe that the Rabaris are descendants of people from the Iranian plateaus and moved to India in the 4th Century settling all across Rajasthan and Gujarat. Dr. Yash Rabari has stated that Rabaris first settled in the Kutch region and then started migrating to various regions of India.
1
JODHPUR, RAJASTHAN
2
CHURU, RAJASTHAN
3
JHUNJHUNUN, RAJASTHAN
4
BHIWANI, HARYANA
5
SONIPAT, HARYANA
5
JALORE
4
The hometown to Rabari and the initial point of their journey.
3 2 SEWALA
First major resting point where they spend about 5 days.
BASNI
1
After continuous travelling of 4 days which includes just a single night stop, they take a break of about 4 days in Basni.
SANGSAR The next major resting point where they stay up to a week.
The long journey of 720 KMs starting from their town in Jalore, Rajasthan to the destination Sonipat, Haryana takes up to 3 months to cover requiring them to travel about 12 KMs/ Day. Mainly considering the overall wellness of the cattle, they take rest for a few days at multiple pre-decided stops throughout the route decided by the males of the community which includes the 5 major resting sites in Sewala, Basni, Sangasar, Khuriya, and Bhagwi.
KHURIYA Spend about 2 days in Khuriya, Jhunjhununi.
BHAGWI The major resting stop in Haryana in Bhiwani District where they stay for about 3 days.
SONIPAT The final destination point where they'd stay till the arrival of Holi festival.
https://www.telegraphindia.com/edugraph/news/world-university-of-design-architecture-students-draw-inspiration-from-nomadic-rabari-tribe/cid/1855173
https://www.telegraphindia.com/edugraph/news/wud-architecture-students-spend-time-at-arabari-tribe-settlement-photogallery/cid/1855489?slide=2
NOTES
Pedestrian Directional
NOTES
NOTESNOTES NOTES
Cast fiberglass monolith with fiberglass monolith with 1 Cast granite base and whitegranite pearlescent base and white pearlescent finish and interior illuminated finish and interior illuminated push-thru letters. push-thru letters.
1
1
Cast Cast1fiberglass monolith Cast fiberglass monolith with monolith with with 1 fiberglass granitegranite base and base granite white andbase pearlescent whiteand pearlescent white pearlescent CONCEPT finish and finish interior andfinish interior illuminated andDESIGN illuminated interior illuminated push-thru push-thru letters. push-thru letters. letters.
Plan
2 3/4"
urant Club rop - Off
1
Beach Club Beach Club Restaurant
Beach Club Ballroom Vip Drop - Off
Ballroom
Restaurant
Restaurant
Beach Club
Beach Club
Beach Club
Ballroom
Ballroom
Ballroom
Restaurant
Restaurant
Restaurant
Side View 1:10 Front View Side Context 1:15 View Rendering Elevation 1:10 1:10 Context Elevation 1:10
Side View 1:10Side View Side View 1:10Context 1:10 Elevation 1:10
sign Items for the hotel by Square Peg Design
018 3 0 , 2 018
PLOT N9 & N10 // RACQUETS CLUB
1
Hotel
SUMMER INTERNSHIP 16
16 D evelo p ement | W IP | A pr il 3 0 , 2 018 Lus ail H otel
QATAR DESIGN CONSORTIUM, DOHA, QATAR 2 nd year Autocad 2D, Revit
18
16
18
(FOR CIVIL DEFENSE US
B26 X02
4
OUTDOOR TERRACE L2-26-00010B
26
B26 Y03
5
6
+11.730 F.F.L.
7
+11.400 C.L.
8
9
LEGEND: PA-04
5MM BRASS FLOOR DIVIDER STRIP
PA-04
BR-02
3.2MM THK. BRASS FINISH ON 9MM MDF WALL CLADDING PANELS 1.0MM THK . BONDED METAL, BRASS FINISH FOR ELAVATOR DOOR AND FRAME
IPNT-01
FENOMASTIC WONDERWALL, SEMI-GLOSS FINISH WALL PAINT TO MATCH NCS-S-0500-N
ISTR-01
35MM X 100MM HT X 10MM THK .GREY TERRAZZO SKIRTING
MR-01
9MM THK . GREY TINTED MIRROR ON 12MMTHK MDF BOARD
PA-04
SPECIAL TEXTURED PAINT RAL 9010 WALL PAINT
LIVING/DINING ROOM L2-26-07001A
PA-04
25 1.5
27
TR-01 BR-01
ELEVATOR LOBBY L2-26-00009D +11.750 F.F.L.
TR-01
PA-03
+11.400 C.L.
30 0
2824 3120
Copyright by the Supreme C whole or in part, be reprodu mechanical, by photocopy, r expressly agreed in writing b otherwise) which may arise
ISTR-01
PA-04
390
8MM THK. GREY TERRAZZO FLOORING 20MM THK. MARBLE STONE THRESHOLD
ISTR-01
1374
27
TEXTURED ANTICHE PATINE FASE SILOSSANICA 6200 METAL PAINT
TR-01
1 2 26-2033 26-2032 1 2 26-2032 26-2033 2520
TRH-03
ISTR-01
DO NOT SCALE THIS DRA
1090
PA-03
TRH-03
B26 X03
ISTR-01 3340
BR-01
IPBR-01
Key Plan
PA-04
BR-01
Mecca 1+247
1+247
464
27 26
APART. ENTRY L2-26-06001A
26
1090
24
1083
TR-01
27 28 29 30 31 32 34
BUILDING (26) PARTITION AND FLOORING PLAN - SECOND FLOOR LEVEL
2
PA-04
+7.150 F.F.L. +7.050 C.L.
320
+7.150 F.F.L. +7.050 C.L.
TR-01 2860
+15.216 F.F.L. +15.166 C.L.
AZ-5001
TR-04
46 45
48 49
3 4
1090
ELEVATOR LOBBY R0-26-00019D
TR-01
BUILDING (26) PARTITION AND FLOORING PLAN - FIRST FLOOR LEVEL
849
B26 Y03
L04
LED CEILING -RECESSED DIMMABLE LUMINAIRE ,EQUIPPED WITH 32W LED MODULES , 4000k,WITH ELECTRONIC BALLAST INPUT VOLTAGE 240V50-HZ FED FROM EMERGENCY SUPPLY
SLSD / SUPPLY LINEAR SLOT DIFFUSER
ADDRESSABLE COMBINED SMOKE HEAT DETECTOR
RLSD / RETURN LINEAR SLOT DIFFUSER
50
52 54
56
ISTR-01
224
T&B R0-26-08009A
Purpose of Issue
ISSUED FOR CON
Designed (FOR CIVIL DEFENSE US
SA
Model File Ref:
4
5 BUILDING (26) PARTITION AND FLOORING PLAN - THIRD FLOOR LEVEL 6
3
1 : 50
IP FHD 2MP AUTO-FOCUS PTZ DOME CAMERA CEILING MOUNTED , POE ,WDR
ADDRESSABLE PHOTOELECTRIC SMOKE DETECTOR
STAGE : CON PROJECT / SU TYPE: LARGE BUILDING NO DESCRIPTION
B26 X02
CEILING MOUNTED LUMINAIRE WITH 600LM/FT6.4 ,W/FT LED Minimum 80CRI 4000k
L03
Doha, Qatar Drawing Title
20
224
MEP LEGEND LED CEILING -RECESSED DIMMABLE LUMINAIRE ,EQUIPPED WITH 32W LED MODULES , 4000k,WITH ELECTRONIC BALLAST INPUT VOLTAGE 240V50-HZ
OL
IPNT-01
1.5
PA-04
PA-04
1 : 50
L04
Main Contractor
Project Title
BR-01
TR-01
BR-01
MAID ROOM R0-26-08008A
DPP-DPQ-M-MD Drawing No
7
8
DPP-DPQ-D
9
LIVING/DINING ROOM L2-26-07001A
B26 X03
PENDENT SPRINKLER
ELEVATOR LOBBY L2-26-00009D IGYP-01 3.60
LEGEND: IGYP-01 H.T
MATT FINISH GYPSUM BOARD CEILING, COLOR TO MATCH NCS S 0500 - N
AC01
FROSTED ACRYLIC SHEET
BR02
BRASS FINISH
Copyright by the Supreme C whole or in part, be reprodu mechanical, by photocopy, r expressly agreed in writing b otherwise) which may arise
DO NOT SCALE THIS DRA Key Plan
Mecca 1+247
1+247 2.817
2.814
2.874
2.872 2.934 2.935
3.012
3. 3.123
3.190
3.183
3.250
3.385
3.452
3.488
3.421
3.88
24
25
26
2.849
30
0+
N
0+025
APART. ENTRY L2-26-06001A
23
STAIR L2-26-00008D
General Notes
29
19
28
20
27
21
22
KITCHEN L2-26-07002A B26 Y02
1. FOR INTERIOR FINISH NUMBER: DPP-DPQ-D-M
30
18
2. FOR CEILING FIXTURE DPP-DPQ-D-MDP-C-ID-AL
3. FOR LIFT DETAILS, RE DPP-DPQ-D-MDP-C-ID-AL
34
14
33
15
32
16
ELEVATOR SHAFT L2-26-00001D
31
17
B26 X02
11
4. FOR FLOORS, WALLS DPP-DPQ-D-MDP-C-ID-AL AND DPP-DPQ-D-MDP-C
13
12
LIVING/DINING ROOM L1-26-01001A
B26 Y03
ARCADE L1-26-00004B
5. FOR STAIR AND HAND DPP-DPQ-D-MDP-C-ID-AL
T&B L2-26-06008A
2
B26 X03
6. FOR MOSQUE MASHR NUMBER: DPP-DPQ-D-M
BUILDING (26) REFLECTED CEILING PLAN - SECOND FLOOR LEVEL
·
1 : 50
IFC DRAWINGS VALID
B26 X02
SLBG 2000mmL/s
No
BEDROOM R0-26-08013A
LOBBY L1-26-00018D
SAFETY, HEALTH AND EN Brief details on the identified
DRESSING R0-26-08015A
IGYP-01 3.10
BEDROOM R0-26-08011A B26 X03 CORRIDOR R0-26-08010A
IGYP-01 3.10
B26 Y02
10
47 45
48
43
49
46
PMCM and Construction Su
Designer
51
52 53 54
Main Contractor
57
POWDER ROOM L1-26-05002A
Project Title
OL
IGYP-01 3.20
B.O.H. L1-26-03002A
REVISE REVISE REVISE ISSU
56
38
ELEVATOR LOBBY R0-26-00019D
7
ELEVATOR SHAFT L1-26-00001D
STAIR R0-26-00011D
55
6
4m
39
5
.23
9
AC01
BR02
+2
8
CL
B26 Y02
40
4
41
3
STAIR L1-26-00002D
42
2
1
ELEVATOR SHAFT R0-26-00001D
44
LIVING/DINING ROOM L1-26-05001A
50
ELEVATOR LOBBY L1-26-00003D
C3 C2 C1 C0 Rev Client
BR02
R
+16.950 F.F.L. +16.600 C.L. TR-01 400
ISTR-01
POWDER ROOM R0-26-08005A
P
STAIR R0-26-00011D
LIFT PA CO NT NE RO L
L
+16.950 F.F.L. +16.600 C.L.
1
53
40 39
KITCHEN L1-26-05003A
TRH-03
15 27 3
AZ-5001 B.O.H. L1-26-03002A
38
150 15
0 26
10
3 4 26-2034 26-2034 2 1 26-2034 26-2034
ELEVATOR DETAIL
Designer
51
42
8
IPBR-01
POWDER ROOM L1-26-05002A
9
MR-01
55
510
41
7
IPNT-01
ELEVATOR SHAFT R0-26-00001D
57
BR-01 TR-01
43
6
BR-02
5
320
1140
TR-01
B26 Y02
PMCM and Construction Su
47
TR-01
REVISE REVISE ISSU
ISTR-01
ELEVATOR DETAIL
B26 Y02
LIVING/DINING ROOM L1-26-05001A
ISTR-01 320
C2 C1 C0 Rev Client
1
1.5
1930
IPBR-01
B26 X03 CORRIDOR R0-26-08010A
STAIR L1-26-00002D
2
320
BEDROOM R0-26-08011A 1050
TRH-03
20
ISTR-01 ELEVATOR SHAFT L1-26-00001D
SAFETY, HEALTH AND EN Brief details on the identified
DRESSING R0-26-08015A
BR-01
200
PA-04
No
BEDROOM R0-26-08013A
PA-04
ISTR-01
TR-01
IFC DRAWINGS VALID
B26 X02
4004
PA-03
·
1 : 50
ISTR-01 400
LOBBY L1-26-00018D
44
30 1.5
6. FOR MOSQUE MASHR NUMBER: DPP-DPQ-D-M
BR-01
+7.150 F.F.L. +7.050 C.L.
5. FOR STAIR AND HAND DPP-DPQ-D-MDP-C-ID-AL
TR-04
1.5 1090
BR-01
1 2 26-2031 26-2031
339
ELEVATOR LOBBY L1-26-00003D
3.88
4. FOR FLOORS, WALLS DPP-DPQ-D-MDP-C-ID-AL AND DPP-DPQ-D-MDP-C
12
1530 1080
TR-01
ISTR-01
BR-01
3.421
3.488
B26 X03
TRH-03
3 4 26-2030 26-2030 2 1 26-2030 26-2030
3.385
3.452
3. FOR LIFT DETAILS, RE DPP-DPQ-D-MDP-C-ID-AL
T&B L2-26-06008A
PA-04
3.
3.183
3.250
General Notes
13
ISTR-01 AZ-5001
20
2.935
3.123
3.190
2. FOR CEILING FIXTURE DPP-DPQ-D-MDP-C-ID-AL
11
+7.150 F.F.L. +7.050 C.L.
ELEVATOR DETAIL
2.872
3.012
1. FOR INTERIOR FINISH NUMBER: DPP-DPQ-D-M
33
15 14
ARCADE L1-26-00004B
2.814
2.934
22 20 19 18 17
16
ELEVATOR SHAFT L2-26-00001D
31/03/2021
B26 Y03
2.817
2.874
21
PA-04 IPBR-01
B26 Y02
LIVING/DINING ROOM L1-26-01001A
2.849
30
+11.400 C.L.
25
30163
ISTR-01
KITCHEN L2-26-07002A
B26 X02
N
+11.750 F.F.L.
TR-01
23
400
TR-01
0+
TRH-03
IPNT-01
0+025
STAIR L2-26-00008D
BR-01
KITCHEN L1-26-05003A
BUILDING (26) REFLECTED CEILING PLAN - FIRST FLOOR LEVEL
WW
POWDER ROOM R0-26-08005A
MAID ROOM R0-26-08008A
T&B R0-26-08009A
Doha, Qatar Drawing Title
STAGE : CON PROJECT / SU TYPE: LARGE BUILDING NO DESCRIPTION
Purpose of Issue
ISSUED FOR CON
(FOR CIVIL DEFENSE USE)
1890
1 AZ-5004
300
20
20
2 AZ-5004
IGYP-01 3.10
300
2820
300
20
850
300
850
20
1 AZ-5004
2 AZ-5004
IGYP-01 3.10
LEGEND: BR-01 IPBR-01
900
PA-04
870
C2-1
PA-04
C2-2
1100 IPBR-01 190
C2-3 PA-03 EQ
5MM BRASS FLOOR DIVIDER STRIP 1.0MM THK . BONDED METAL, BRASS FINISH FOR ELAVATOR DOOR AND FRAME
PA-04
SPECIAL TEXTURED PAINT RAL 9010 WALL PAINT
PA-03
TEXTURED ANTICHE PATINE FASE SILOSSANICA 6200 METAL PAINT
TR-01
8MM THK. GREY TERRAZZO FLOORING
IGYP-01 H.T
MATT FINISH GYPSUM BOARD CEILING ,COLOR TO MATCH NCS S - 0500N
ISTR-01
35MM X 100MM HT X 10MM THK .GREY TERRAZZO SKIRTING
Copyright by the Supreme Committee for Delivery & Legacy (SC). All rights res whole or in part, be reproduced, stored, transmitted or distributed in any form o mechanical, by photocopy, recording or otherwise, without the prior written per expressly agreed in writing by SC, SC shall have no responsibility or liability fo otherwise) which may arise from reliance on or use of this document or the info DO NOT SCALE THIS DRAWING. Key Plan
C2-4
EQ
Mecca 1+247
1+247
IPBR-01
0+000
0+350 0+050
0+300
01
2.805
2.711 2.669
03
2.872
2.935
3.012
3.318
02
3.378
3.385
3.452
3.488
3.354
3.421
2.737 2.788
2.829
3.197 3.245
3.279 3.318
3.197
3.161
3.159
3.288
3.191
3.221
3.251
3.281
3.516 3.318
3.341
3.311
3.378
3.348
3.408
3.957
3.385
4.458
3.261
4.953 4.953
04
4.742
4.809
07
09
4.876
3.325
3.295
3.237
3.415
3.445
3.475
3.355
3.460
4.391
3.834
5.448 4.886 4.886
13
5.381
4.324
4.819 4.819
5.943
5.876
5.314
5.809
06
DS02 60 35
DW09 60
40
08
34
33
39
38 36
35
MINA BASIC CUT PACKAGE BY OTHERS
37
41
IPBR-01
2200
2150
2230
IPBR-01
2.825
14
14
4.242
4.309
4.376
0+350
IPBR-01
2.854
2.902
10
05
3.754
3.821
3.888
17
2.636
3.176
3.116 3.183
3.250
PODIUM 01 @GF
IPBR-01
16
3.056 3.123
3.190
32
1450
0+100
0+150
2.814
2.934
0+200
2.817
2.874
0+050
1200
0+250 2.849
30
0+450
270
N
0+025
AS PER LIFT MANUFACTURER
IPBR-01
General Notes 1600
397
1. FOR INTERIOR FINISH LEGENDS/MATERIAL DESCRIPTION, REFER T NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-0002
ISTR-01
TR-01
TR-01 TR-01
TR-01
3 AZ-5002
BR-01
+7.150 F.F.L. +7.050 C.L.
100
BR-01
TR-01
3. FOR LIFT DETAILS, REFER TO GENERAL DETAILS, DRAWING NUMBE DPP-DPQ-D-MDP-C-ID-AL-AZ-5001
TR-01
BR-01
ISTR-01
TR-01
TR-01
4. FOR FLOORS, WALLS AND CEILING DETAILS , REFER TO GENERAL DPP-DPQ-D-MDP-C-ID-AL-AZ-5002, DPP-DPQ-D-MDP-C-ID-AL-AZ-5003, D AND DPP-DPQ-D-MDP-C-ID-AL-AZ-5005
BR-01
+7.150 F.F.L. +7.050 C.L.
100
10 AZ-5002
2. FOR CEILING FIXTURES LEGENDS DESCRIPTION, REFER TO GENER DPP-DPQ-D-MDP-C-ID-AL-AZ-0003
1000
1050
200
5. FOR STAIR AND HANDRAIL DETAILS , REFER TO GENERAL DETAILS DPP-DPQ-D-MDP-C-ID-AL-AZ-5006
6. FOR MOSQUE MASHRABIYA AND BALUSTRADE DETAILS, REFER TO NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-5007
BUILDING (26) INTERIOR ELEVATION -FIRST FLOOR LEVEL
BUILDING (26) INTERIOR ELEVATION -FIRST FLOOR LEVEL
2
1:20
1:20
·
IFC DRAWINGS VALIDATION ARE SUBJECT TO PERMIT APPROVAL
No
Description
SAFETY, HEALTH AND ENVIRONMENT INFORMATION Brief details on the identified hazard symbol referencing the unusual residual h
300
1890
300
20
20
300
2820
300
20
850
850
20
1 AZ-5004
2 AZ-5004
IGYP-01 3.10
1 AZ-5004
C2 C1 C0 Rev
2 AZ-5004
IGYP-01 3.10
REVISED ISSUED FOR CONSTRUCTION POST EI#3 REVISED ISSUED FOR CONSTRUCTION POST EI#3 ISSUED FOR CONSTRUCTION POST EI#3 Description
PA-04
900
900
Client
PA-04
PMCM and Construction Supervision Consultant
400
1900
150
600
250
400
90
PA-03
1200
1193
DS02 60 35
DW09 60
PA-03
PA-03
PA-03
Designer
DS02 60 35
DS04 60 35
DS02 60 35
Main Contractor
Design Consultan
DW09 60 Project Title
2200
2200
IPBR-01
OLD DOHA PORT PROJECT - MIN & DIVING POOL PACKAG
Doha, Qatar Drawing Title
ISTR-01
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
TR-01 BR-01
6 AZ-5002 TR-01
TR-01
TR-01
TR-01
TR-01
BR-01
BR-01
TR-01
ISTR-01
100
+7.150 F.F.L. +7.050 C.L.
TR-01
BR-01
+7.150 F.F.L. +7.050 C.L.
100
10 AZ-5002
STAGE : CONSTRUCTION DOCUMENT PROJECT / SUB PROJECT: MINA DISTR TYPE: ELEVATIONS BUILDING NO. BUILDING 26 DESCRIPTION: INTERIOR ELEVATIONS - FIRST
1000
1100
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
Purpose of Issue
ISSUED FOR CONSTRUCTION Designed
Drawn
SA
AZ
Model File Ref:
BUILDING (26) INTERIOR ELEVATION -FIRST FLOOR LEVEL
4
1:20
Scale A1 (594
1:20
DPP-DPQ-M-MDP-C-AR-AL-26-0001
BUILDING (26) INTERIOR ELEVATION -FIRST FLOOR LEVEL
Drawing No
1:20
DPP-DPQ-D-MDP-C-ID-01-26-203
(FOR CIVIL DEFENSE USE)
4355
20
1005
LEGEND: 850
20
BR-01 ISTR-01
1 AZ-5004
IGYP-01 3.10
PA-04
900
1900
5MM BRASS FLOOR DIVIDER STRIP 35MM X 100MM HT X 10MM THK .GREY TERRAZZO SKIRTING SPECIAL TEXTURED PAINT RAL 9010 WALL PAINT
TRH-03
20MM THK. MARBLE STONE THRESHOLD
TR-01
8MM THK. GREY TERRAZZO FLOORING
IGYP-01 H.T
MATT FINISH GYPSUM BOARD CEILING ,COLOR TO MATCH NCS S - 0500N
Copyright by the Supreme Committee for Delivery & Legacy (SC). All rights reserved whole or in part, be reproduced, stored, transmitted or distributed in any form or by a mechanical, by photocopy, recording or otherwise, without the prior written permissi expressly agreed in writing by SC, SC shall have no responsibility or liability for any otherwise) which may arise from reliance on or use of this document or the informat DO NOT SCALE THIS DRAWING. Key Plan
Mecca 1+247
1+247 0+000
0+350 0+050
0+300 0+250 2.814
01
2.805
2.872 2.934 2.935
3.012
2.669 2.711
2.802 2.711
2.861
0+100
3.318
02
3.378
3.385
3.488
0+050
3.452
3.354
3.421
3.754
3.821
3.888
2.737 2.788
10
05
14
14
2.829 2.825
2.854
2.902
3.176
3.116 3.183
3.250
3.245
3.620
2.964
2.894
3.572 3.636 3.556
3.197 3.159
3.288
3.161
3.191
3.221
3.251
3.516 3.318
3.281
3.348
3.311
3.378
3.341
3.408
3.375
3.693
3.438 3.579
3.438
3.468
3.648
0+500
3.874
3.575 3.385
3.261
4.953 4.953
04
07
09
4.876
3.237
3.295
3.325
3.415
3.445
3.475
3.502
3.837
3.498
3.355
3.572
3.800
3.460
4.391
0+350
4.742
4.809
2.942
3.197
3.279 3.318
3.957
4.458
4.242
4.309
4.376
17
2.636
16
3.056 3.123
3.190
30
2.827
2.669
03
0+150
2.817
2.874
0+200
2.849
0+025
N
0+450
3.834
5.448 4.886 4.886
13
5.381
4.324
4.819 4.819
5.943
5.876
5.314
5.809
06
DW04 60 30
PA-04
40
08 PODIUM 01 @GF
32
33
34
35
38 36
39 37
MINA BASIC CUT PACKAGE BY OTHERS
41
2200
2700
PA-04
DW07
General Notes
1. FOR INTERIOR FINISH LEGENDS/MATERIAL DESCRIPTION, REFER TO GE NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-0002
2. FOR CEILING FIXTURES LEGENDS DESCRIPTION, REFER TO GENERAL N DPP-DPQ-D-MDP-C-ID-AL-AZ-0003 SEE ARCHITECTURAL SCHEDULE OF OPENINGS 10 AZ-5002
ISTR-01
TR-01
3. FOR LIFT DETAILS, REFER TO GENERAL DETAILS, DRAWING NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-5001
TRH-03
TR-01
ISTR-01
BR-01
ISTR-01
4. FOR FLOORS, WALLS AND CEILING DETAILS , REFER TO GENERAL DETA DPP-DPQ-D-MDP-C-ID-AL-AZ-5002, DPP-DPQ-D-MDP-C-ID-AL-AZ-5003, DPP-D AND DPP-DPQ-D-MDP-C-ID-AL-AZ-5005
3 AZ-5002
TR-01
100
+7.150 F.F.L. +7.050 C.L.
5. FOR STAIR AND HANDRAIL DETAILS , REFER TO GENERAL DETAILS, DRA DPP-DPQ-D-MDP-C-ID-AL-AZ-5006
6. FOR MOSQUE MASHRABIYA AND BALUSTRADE DETAILS, REFER TO GEN NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-5007
BUILDING (26) INTERIOR ELEVATION - FIRST FLOOR LEVEL
1
1:20 ·
B26 Y03
IFC DRAWINGS VALIDATION ARE SUBJECT TO PERMIT APPROVAL
No
Description
SAFETY, HEALTH AND ENVIRONMENT INFORMATION Brief details on the identified hazard symbol referencing the unusual residual hazard
4815 3270
1485
20 850
20
1 AZ-5004
C2 C1 C0 Rev
2 AZ-5004
IGYP-01 3.10
REVISED ISSUED FOR CONSTRUCTION POST EI#3 REVISED ISSUED FOR CONSTRUCTION POST EI#3 ISSUED FOR CONSTRUCTION POST EI#3 Description
Client
1150
PMCM and Construction Supervision Consultant
PA-04
3100
Designer
DW09 60
PA-04
Design Consultant
Main Contractor
Project Title
2200
DW04 60 30
Doha, Qatar
OLD DOHA PORT PROJECT - MINA D & DIVING POOL PACKAGE
Drawing Title
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
10 AZ-5002
BR-01 TR-01
ISTR-01
TR-01
TR-01 +7.150 F.F.L. +7.050 C.L.
BR-01
TR-01
ISTR-01 100
3
0+400
1
STAGE : CONSTRUCTION DOCUMENTS PROJECT / SUB PROJECT: MINA DISTRIC TYPE: ELEVATIONS BUILDING NO. BUILDING 26 DESCRIPTION: INTERIOR ELEVATIONS - FIRST
Purpose of Issue
ISSUED FOR CONSTRUCTION Designed
SA
2
BUILDING (26) INTERIOR ELEVATION - FIRST FLOOR LEVEL 1:20
Model File Ref:
DPP-DPQ-M-MDP-C-AR-AL-26-0001
Drawn
AZ
Scale A1 (594x841
1:20
Drawing No
DPP-DPQ-D-MDP-C-ID-01-26-2031
(FOR CIVIL DEFENSE USE)
B26 Y03
850
20
6280
1430
1 AZ-5004
20
200
IGYP-01 3.60
LEGEND: 35MM X 100MM HT X 10MM THK .GREY TERRAZZO SKIRTING
ISTR-01
SPECIAL TEXTURED PAINT RAL 9010 WALL PAINT
PA-04
1150
1150
PA-03
TEXTURED ANTICHE PATINE FASE SILOSSANICA 6200 METAL PAINT
TR-01
8MM THK. GREY TERRAZZO FLOORING
IGYP-01 H.T
MATT FINISH GYPSUM BOARD CEILING ,COLOR TO MATCH NCS S - 0500N
Copyright by the Supreme Committee for Delivery & Legacy (SC). All rights reserved. whole or in part, be reproduced, stored, transmitted or distributed in any form or by an mechanical, by photocopy, recording or otherwise, without the prior written permission expressly agreed in writing by SC, SC shall have no responsibility or liability for any lo otherwise) which may arise from reliance on or use of this document or the informatio DO NOT SCALE THIS DRAWING. Key Plan
Mecca
PA-04
1+247
1+247
3400
PA-04
0+000
0+400
0+350 0+050
0+300 0+250
2.669 2.711 2.636
01
2.805
2.802 2.711
2.861
2.935
0+100
3.318
02
3.378
3.385
0+050
3.354
3.421
3.488
3.754
3.821
3.888
2.737 2.788
10
05
14
14
2.829 2.825
2.854
2.902
3.176
3.116 3.183
3.452
3.245
2.964 3.022
3.572
3.620
3.636 3.556
3.197 3.159
3.288
3.161
3.191
3.221
3.251
3.281
3.516 3.318
3.348
3.311
3.378
3.341
3.408
3.375
3.693
3.438 3.579
3.438
3.648
0+500
3.468
3.874
4.320
3.575
09
3.295
3.325
3.445
3.475
3.502
3.837
3.498
3.355
3.572
4.253 3.800
3.460
4.391
0+350
07
4.876
3.415
3.385
3.237
3.261
4.953 4.953
04
4.742
4.809
2.894
3.197
3.279 3.318
3.957
4.458
4.242
4.309
4.376
2.942
17
2.636
16
3.056 3.123
3.190
3.250
2.827
2.669
03
2.872
3.012
0+150
2.814
2.934
0+200
2.817
2.874
30
0+450
2.849
0+025
N DW04 60 35
06
IPBR-01
4.678 4.886 4.886
5.381
4.324
4.819 4.819
5.943
5.876
46
5.314
40
08 38
PODIUM 01 @GF 32
34
33
36
35
39
MINA BASIC CUT PACKAGE BY OTHERS
37
47
41
2200
DW04 20 30
4.7
4.186
3.834
5.448
13
5.809
DW10 45
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
General Notes
1. FOR INTERIOR FINISH LEGENDS/MATERIAL DESCRIPTION, REFER TO GEN NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-0002
2. FOR CEILING FIXTURES LEGENDS DESCRIPTION, REFER TO GENERAL NO DPP-DPQ-D-MDP-C-ID-AL-AZ-0003
10 AZ-5002
TR-01
ISTR-01
TR-01
ISTR-01
TR-01
TR-01
3. FOR LIFT DETAILS, REFER TO GENERAL DETAILS, DRAWING NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-5001
ISTR-01
+17.750 F.F.L. +17.400 C.L.
4. FOR FLOORS, WALLS AND CEILING DETAILS , REFER TO GENERAL DETAIL DPP-DPQ-D-MDP-C-ID-AL-AZ-5002, DPP-DPQ-D-MDP-C-ID-AL-AZ-5003, DPP-DP AND DPP-DPQ-D-MDP-C-ID-AL-AZ-5005
5. FOR STAIR AND HANDRAIL DETAILS , REFER TO GENERAL DETAILS, DRAW DPP-DPQ-D-MDP-C-ID-AL-AZ-5006
6. FOR MOSQUE MASHRABIYA AND BALUSTRADE DETAILS, REFER TO GENE NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-5007
1
1 : 20
·
B26 Y03
1430
6280
1 AZ-5004
IFC DRAWINGS VALIDATION ARE SUBJECT TO PERMIT APPROVAL
20 850
20
BUILDING (26) INTERIOR ELEVATION - SECOND FLOOR LEVEL
IGYP-01 3.60
No
Description
200
SAFETY, HEALTH AND ENVIRONMENT INFORMATION Brief details on the identified hazard symbol referencing the unusual residual hazards
C2 C1 C0 Rev
REVISED ISSUED FOR CONSTRUCTION POST EI#3 REVISED ISSUED FOR CONSTRUCTION POST EI#3 ISSUED FOR CONSTRUCTION POST EI#3 Description
Client
175
1150
300
400
150
600
300
400
PMCM and Construction Supervision Consultant
PA-03
PA-04
DS02 60 35
3400
PA-03 DS04 60 35
1170
PA-03 DS02 60 35
DW04 20 30
Designer
DW10 45
Design Consultant
Main Contractor
2213
IPBR-01
Project Title
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
OLD DOHA PORT PROJECT - MINA D & DIVING POOL PACKAGE
Doha, Qatar
1015
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
Drawing Title
ISTR-01
STAGE : CONSTRUCTION DOCUMENTS PROJECT / SUB PROJECT: MINA DISTRICT TYPE: ELEVATIONS BUILDING NO. BUILDING 26 DESCRIPTION: INTERIOR ELEVATIONS - SECOND FL
10 AZ-5002
TR-01
+17.750 F.F.L. +17.400 C.L.
Purpose of Issue
ISSUED FOR CONSTRUCTION Designed
Drawn
SA
AZ
Model File Ref:
2
1 : 20
DPP-DPQ-D-MDP-C-ID-02-26-2032
(FOR CIVIL DEFENSE USE)
20
900
2550 2 AZ-5004
900
1310 1 AZ-5004
1:20
Drawing No
B26 Y02
20
Scale A1 (594x841)
DPP-DPQ-M-MDP-C-AR-AL-26-0001
BUILDING (26) INTERIOR ELEVATION - SECOND FLOOR LEVEL
20
1560 1 AZ-5004
IGYP-01 3.20
20
IGYP-01 3.20
5MM BRASS FLOOR DIVIDER STRIP
ISTR-01
35MM X 100MM HT X 10MM THK .GREY TERRAZZO SKIRTING
TRH-03
8MM THK. GREY TERRAZZO FLOORING 20MM THK. MARBLE STONE THRESHOLD
IGYP-01 H.T
MATT FINISH GYPSUM BOARD CEILING ,COLOR TO MATCH NCS S - 0500N
Copyright by the Supreme Committee for Delivery & Legacy (SC). All rights reserved. whole or in part, be reproduced, stored, transmitted or distributed in any form or by an mechanical, by photocopy, recording or otherwise, without the prior written permission expressly agreed in writing by SC, SC shall have no responsibility or liability for any lo otherwise) which may arise from reliance on or use of this document or the informatio
1350
TR-01
DO NOT SCALE THIS DRAWING. Key Plan
Mecca 1+247
TEXTURED ANTICHE PATINE FASE SILOSSANICA 6200 WALL PAINT TEXTURED ANTICHE PATINE FASE SILOSSANICA 6200 METAL PAINT
1+247
880
1.0MM THK . BONDED METAL, BRASS FINISH FOR ELAVATOR DOOR AND FRAME
PA-04 PA-03
0+000
0+350
IPBR-01
987
BR-01
0+400
1000
LEGEND:
0+050
0+300 0+250
2.669 2.711 2.636
01
2.805
2.872
2.935
3.012
2.802 2.711
2.861
0+100
3.318
02
3.378
3.385
0+050
3.488
3.354
3.421
3.754
3.821
3.888
2.737 2.788
10
05
14
14
2.829 2.825
2.854
2.902
3.176
3.116 3.183
3.452
3.245
3.620
2.964
2.894
3.022
3.572 3.636 3.556
3.197 3.159
3.288
3.161
3.191
3.221
3.251
3.516 3.318
3.281
3.348
3.311
3.378
3.341
3.408
3.375
3.693
3.438 3.579
3.438
3.468
3.648
0+500
3.874
4.320
3.575 3.385
3.261
4.953 4.953
04
07
09
4.876
3.237
3.295
3.325
3.415
3.445
3.475
3.502
3.837
3.498
3.355
3.572
4.253 3.800
3.460
4.391
0+350
4.742
4.809
2.942
3.197
3.279 3.318
3.957
4.458
4.242
4.309
4.376
17
2.636
16
3.056 3.123
3.190
3.250
2.827
2.669
03
0+150
2.814
2.934
0+200
2.817
2.874
30
0+450
2.849
0+025
N
4.678 4.886 4.886
5.381
4.324
4.819 4.819
5.943
5.876
46
5.314
40
08 PODIUM 01 @GF
PA-03
PA-04
32
PA-04 DW04 60 35
34
35
38 36
39 37
MINA BASIC CUT PACKAGE BY OTHERS
47
41
General Notes
1650
1650
33
DW21
2200
DW04 45 30 2200
DW21
4.7
4.186
3.834
5.448
13
5.809
06
PA-03
1. FOR INTERIOR FINISH LEGENDS/MATERIAL DESCRIPTION, REFER TO GEN NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-0002
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
2. FOR CEILING FIXTURES LEGENDS DESCRIPTION, REFER TO GENERAL NO DPP-DPQ-D-MDP-C-ID-AL-AZ-0003 3. FOR LIFT DETAILS, REFER TO GENERAL DETAILS, DRAWING NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-5001
4. FOR FLOORS, WALLS AND CEILING DETAILS , REFER TO GENERAL DETAIL DPP-DPQ-D-MDP-C-ID-AL-AZ-5002, DPP-DPQ-D-MDP-C-ID-AL-AZ-5003, DPP-DP AND DPP-DPQ-D-MDP-C-ID-AL-AZ-5005
TRH-03 2 AZ-5002
TR-01
+16.950 F.F.L. +16.600 C.L.
2 AZ-5002
TR-01
ISTR-01 +16.950 F.F.L. +16.600 C.L.
200
TRH-03
ISTR-01
TR-01
200
BR-01 100
TR-01
100
ISTR-01
10 AZ-5002
5. FOR STAIR AND HANDRAIL DETAILS , REFER TO GENERAL DETAILS, DRAW DPP-DPQ-D-MDP-C-ID-AL-AZ-5006
6. FOR MOSQUE MASHRABIYA AND BALUSTRADE DETAILS, REFER TO GENE NUMBER: DPP-DPQ-D-MDP-C-ID-AL-AZ-5007
BUILDING (26) INTERIOR ELEVATION - THIRD FLOOR LEVEL
1
BUILDING (26) INTERIOR ELEVATION - THIRD FLOOR LEVEL
2
1:20
1:20
·
IFC DRAWINGS VALIDATION ARE SUBJECT TO PERMIT APPROVAL
B26 Y02
No
Description
20
2550
1310
1 AZ-5004
900
900
SAFETY, HEALTH AND ENVIRONMENT INFORMATION Brief details on the identified hazard symbol referencing the unusual residual hazards
20
20
2 AZ-5004
IGYP-01 3.20
1410 1 AZ-5004
130
20 C2 C1 C0 Rev
2 AZ-5004
IGYP-01 3.20
REVISED ISSUED FOR CONSTRUCTION POST EI#3 REVISED ISSUED FOR CONSTRUCTION POST EI#3 ISSUED FOR CONSTRUCTION POST EI#3 Description
987
1000
Client
PA-04
PA-04
PMCM and Construction Supervision Consultant
1100
354
50
190
IPBR-01 354
1150
1150
50
Designer
Design Consultant
Main Contractor
PA-04
240
234
IPBR-01
IPBR-01
IPBR-01
1474
IPBR-01 DW04 45 30
DW04 60 35
DW04 45 30
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
SEE ARCHITECTURAL SCHEDULE OF OPENINGS
IPBR-01
Project Title
2200
2200
275
Doha, Qatar
OLD DOHA PORT PROJECT - MINA D & DIVING POOL PACKAGE
1050
1300
Drawing Title
ISTR-01 TR-01 ISTR-01
TR-01
ISTR-01
BR-01
TR-01 10 AZ-5002
TR-01
TR-01
ISTR-01
ISTR-01
+16.950 F.F.L. +16.600 C.L.
100
+16.950 F.F.L. +16.600 C.L.
100
TRH-03
3 AZ-5002
STAGE : CONSTRUCTION DOCUMENTS PROJECT / SUB PROJECT: MINA DISTRICT TYPE: ELEVATIONS BUILDING NO. BUILDING 26 DESCRIPTION: INTERIOR ELEVATIONS - THIRD
Purpose of Issue
ISSUED FOR CONSTRUCTION Designed
10 AZ-5002
SA Model File Ref:
DPP-DPQ-M-MDP-C-AR-AL-26-0001
3
BUILDING (26) INTERIOR ELEVATION - THIRD FLOOR LEVEL 1:20
4
BUILDING (26) INTERIOR ELEVATION - THIRD FLOOR LEVEL 1:20
Drawn
AZ Scale A1 (594x841)
1:20
Drawing No
DPP-DPQ-D-MDP-C-ID-03-26-2034
Signage Schedule A - WA Hotel Identification A Big WA
B - Vehicular Wayfinding B1
Hotel Drop-Off Tennis Club Exit
B3
Tennis Club Hotel Drop-Off
C1
B4
Tennis Club Exit
C2
C - Pedestrian Wayfinding Pedestrian Vehicular Pedestrian Directional Directional Directional C1 Tennis Club
NOTES
NOTES
Cast fiberglass monolith Cast with fibergla 1 granite base and whitegranite pearlescen base finish and interior illuminated finish and in push-thru letters. push-thru le
1
ALAR RACQUETS CLUB - PHASE 01 SIGNAGE
C2
Paddle Courts Tennis Courts Canal Exit
Plan
Plan Plan
Hotel
2 3/4"
NOTE: Please match the Signage Design Items for the hotel by Square Peg D 2 3/4"
al
B2
ALAR LUSAIL // DOHA
ALAR LUSAIL // DOHA
Grand Villas Hotel Drop-Off Tennis Club
Hotel
Restaurant Restaurant Beach Club Beach Club Vip Drop - OffVip Drop - Off Beach Club
Beach Club
Ballroom
Ballroom
Restaurant
Restaurant
Hotel Restaurant Beach Club Vip Drop - Off
Front View 1:15 Rendering Front Rendering View Rendering NTS 1:15
018 P | A p r il 3 0 , 2 018
SIGNAGES
Side View 1:10 Front View Side Con Context Elevatio
NOTE: Please match the Signage Design Items for the hotel by Square Pe
L u s aLiluH s aote ilLH u l s ote Daeve ill H Dlote oeve p el m lo De peve nt e ml|e oW nt p eI P m | W e | nt A I Pp|r|ilW A3p IP 0r il , | 23A018 0p,r il 2 018 3 0 , 2 018
16
PLOT N9 & N10 // RACQUETS CLUB
B1 A B2 B3 B4
Pedestrian Directional
NOTESNOTES NOTES
ass monolith with nt e and white pearlescent nterior illuminated etters.
1
Cast Cast1fiberglass monolith Cast fiberglass monolith with monolith with with 1 fiberglass granitegranite base and base granite white andbase pearlescent white and pearlescent white pearlescent CONCEPT finish and finish interior andfinish interior illuminated andDESIGN illuminated interior illuminated push-thru push-thru letters. push-thru letters. letters.
Plan PLOT N9 & N10 // RACQUETS CLUB
Design 2 3/4"
1
Beach Club Beach Club Restaurant
Beach Clu
Beach Club Ballroom Ballroom Vip Drop - Off Restaurant
Ballroom
Restaurant
Restaurant Beach Club Ballroom Restaurant
entext 1:15 View Rendering Elevation 1:10 1:10 on 1:10
eg Design
6
1
Hotel
16l D eve l o p e m e nt | W I P | A p r il 3 0 , 2 018 L u s a il H ote
Side View 1:10Side View Side View 1:10Context 1:10 Elevation 1:10
18
16
18
AI ARCHITECTURE: HORRIBLE HOUSES Horrible house design using AI (openai-dalle) Competition by ‘nonarchitecture.eu’
CONSTRUCTION DRAWINGS Semester 1-VII Autocad 2D
RAIN WATER GUTTER
A
ALUMINUM COMPOSITE PANEL
NOTES:
600 600 600
UB 305X165X40kg/m
RUST PROTECTION : RUST PROOF EPOXY PRIMER
UB 305X205X25kg/m
1200 1200 1200
UB 305X165X40kg/m
1200
UB 305X165X40kg/m
EPOXY GROUT - 55 ( FOR COLUMN
ALL DRAWINGS ARE IN MILLIMETERS
1200
SHS 50X50X3.2
SHS 50X50X3.2 TYP.
CARBOLINE i.e.PYROLITE - 15 OVER
NON SHRINK GROUT -
1200
TRUSS DETAIL FOR PETROL PUMP
1200X2400X2.5mm ALUMINUM CHEQUERED PLATE
600 600 600 600 600 600 600 600 600 600 600 600
HIGH BUILD EPOXY PAINT
FIRE PROTECTION-
UB 305X165X40kg/m
A' 2
DETAILS OF ALUMINIUM PLATE AND CHEQUERED PANEL DETAIL AT X
PROJECT TITLE
SHS 50X50X3.2 TYP.
UB 305X165X40kg/m
WORLD UNIVERSITY O DESIGN
LOCATION
ALUMINUM COMPOSITE PANEL
BAHRAIN
SUBJECT
UB 254X102X25kg/m
L50X50X5
UB 203X135X25kg/m
1
UB 305X102X25kg/m
UB 305X165X40kg/m 3600
UB 305X165X40kg/m
LAYERS OF ROOF SECTION SCALE
600
UB 305X165X40kg/m
1:50
3600 2.5mm THK. ALUMINUM CHEQUERED PLATE
3
SECTION- A-A'
BUILDING CONSTRUCT MATERIALS- VI
STUDENT NAME DIPSI ANAND STUDENT ENROLMENT NO. 20B0174 DRAWING TITLE
CANOPY DESIGN AND MA
REMARKS:
SHEET N 12
SCALE
NOTES
1. ALL DRAWINGS ARE MILLIMETERS
TRUSS DETAIL- DISPENSER PLANS FOR PETROL PUMP
LEGEND: RWP RWO T/B F/A
RAIN WATE RAIN WATE RAIN WATE TO BELOW FROM ABO
WORLD UNIVERSIT DESIGN
PROJECT TITLE
GAS STATIO
LOCATION
BAHRAIN
SUBJECT
BUILDING CONSTRU MATERIALS-
DISPENSER ISLAND GROUND FLOOR
DISPENSER ISLAND ROOF PLAN
STUDENT NAME DIPSI ANAND STUDENT ENROLMENT NO 20B0174 DRAWING TITLE
RAINWATER- CANOPY
REMARKS: SCALE 1:100
SHEE 20
NOTES
STAIRCASE DETAILS
MEASUREMENTS RISER- 175 TREAD- 250x1300 NO. OF STEPS-20
SECTIONAL ELEVATION
MATERIAL GRANITE(riser and tread 12mm th.) STAINLESS STEEL(handle rail)
1. ALL DRAW MILLIMETE 2. ALL LEVEL
LEFT ELEVATION
WORLD UN DE
NOTE-
STAIRCASE ISN AN ADDITIONA MADE FOR PR
SUBJECT BUILDING C MATE
STUDENT NAME DIPS STUDENT ENROL 20
PLAN
DETAIL AT LANDING
DRAWING TITLE
STAIRC
REMARKS: SCALE 1:40
NOTES
1. ALL D MILLI
KEY PLAN
ELEVATION AT A
ELEVATION AT B
SCALE 1:40
SCALE 1:40
TOILET DETAILS
SCALE 1:30
WOR
PROJECT
LOCATION SUBJECT
BUILD
STUDENT
SECTION AT X-X'
ELEVATION AT C
SCALE 1:40
SCALE 1:40
ELEVATION AT D
STUDENT
SCALE 1:40
DRAWING
REMARKS SCALE 1:40
MEZZANINE FLOORING
HOLLOW PIPE(Ø150MM) GASKET TOUGHENED GLASS(12MM) C-CHANNEL(75MMx25MMx3MM th)
METAL PLATE(Ø150MMx10MM th.)
I BEAM(75MMx200MM)
TOP RAIL(Ø50MM th.)
POLYTHENE FOAM PLANK(20MM)
GASKET
MORTAR
TOUGHENED GLASS(12MM)
TIN SHEET
SCALE- 1:8
C-CHANNEL(75MMx25MMx3MM th)
DETAIL AT 'M'
POLYTHENE FOAM PLANK(20MM)
M 2660
MORTAR TINE SHEET P.O.P.(25MM) HOLLOW PIPE(Ø150MMX6MM th.) GROUND FLOOR TILE(600MMx600MMx18MM th.)
SECTIONAL ELEVATION(A A') 4800
A
A'
3200
MEZZANINE FLOOR DETAILS
I BEAM(75MMx200MM)
I BEAM(75MMx200MM) TOP RAIL(Ø50MM) MEZZANINE FLOOR WOOD(2600MM from ground floor) GROUND FLOOR TILE HOLLOW PIPE(Ø150MMX6MM th.) STEEL STAIRCASE(RISER-140MM,TREAD-250MMx1050MM)
ISOMETRIC VIEW PLAN
BUILDING CONSTRUCTION AND MATERIAL-V MEZZANINE FLOORING
MAYANK SARDIWAL SCALE- 1:25
20B0220
300.0
B A
SCALE- 1:2
300.0 30.0 18.0 45.0
1
B' A'
PLAN DETAIL AT 'M'
STEEL COLUMN (4MM) SCALE- 2:1 7800
15.0
NUT BASE PLATE
WASHER (3MM th.) THREAD
10.0
PLAIN WASHER (3MM th.)
30.0 15.0
3.0
7800
STIFFENERS (10MM th.)
NUT
THREAD (1MM PITCH)
M
SECTION AT (B B')
ANCHOR BOLT (Ø18MM) 900.0
STREET POLE (STEEL FOUNDATION) DETAILS
TOP PLATE (300MM x 300MM)
SHEET REMARKS-
10.0
STEEL FOUNDATION
DATE-
ALL DIMENSIONS ARE IN "MM"
300.0
WUD
LEGS (120MM)
ISOMETRIC VIEW
SECTION (A A')
BUILDING CONSTRUCTION AND MATERIAL-V
NOTE- JOINT BETWEEN STIFFENER AND BASE PLATE HAD BEEN DONE BY ELECTRIC WELDING
MAYANK SARDIWAL SCALE- 1:5 ALL DIMENSIONS
DATE-
SHEET REMARKS-
THANK YOU
+91-7206754563 dipsianand2708@gmail.com