Daniel Rodriguez Porfolio 2024

Page 1

Daniel Rodriguez

Portfolio


Content AutoStack Parking

01

The Connection

02

The Scandere v-u house

03


North Park housing

04

Fire House

05

Visualization

06


AutoStack “Taking It To The Next Level” I co-founded and led a company, playing a pivotal role in its growth and operations. A trip to China resulted in a strategic partnership, granting us exclusive rights to distribute products in America, requiring complex negotiations and collaboration with international partners and engineers. As the creative force behind Autostack, I developed our brand and all marketing materials, including from the website to catalogs. Additionally, I structured the company, implementing a robust CRM system for efficient operations. I managed projects from inception to completion, ensuring seamless installations and client satisfaction, further establishing our reputation in the industry.

01


Branding I conceived the name 'Autostack' to clearly convey the concept of automated stacking for parking solutions. This name quickly gained recognition in Tijuana, where more people began associating rotary parkings with Autostack. I also crafted the branding, slogan, and business cards to further establish our identity and message.

Website Design I successfully designed and developed our website using WordPress, where I created all the necessary materials, including 3D models, renderings, and spec sheets. This comprehensive approach ensured that our online presence effectively showcased our products and services, contributing to our overall success.

Advertisment I orchestrated a successful advertising campaign for Autostack, utilizing electronic billboards and fully rendered animations to effectively convey our message. These efforts were instrumental in attracting clients, as these is the way we got all of our clients.


Project: El Mentor College

2020-2022

At El Colegio Mentor, I led a transformative project to expand parking and create a new plaza. By installing two innovative rotary parking systems, we maximized space, adding 32 parking spots in just 814 square feet. My role encompassed design, planning, and hands-on supervision, including coordinating with Chinese engineers for technical integration. This project not only met immediate needs but also laid the foundation for future development, showcasing our commitment to excellence and innovation.

Two rotary systems and a plaza: maximizing space.

The project was completed in 2 years.


DESIGN In the initial phase of the El Colegio Mentor project, our focus was on integrating the rotary parking systems. However, as the project progressed, the school's director entrusted me with a broader vision—to develop a plaza on the opposite side of the school. Taking on this expanded role, I not only designed the plaza but also seamlessly integrated it with the rotary systems.

My responsibilities extended to developing detailed designs, including drawing plans for city approval and obtaining necessary permits. To visualize the concept, I created 3D renders that effectively communicated the proposed design. These designs were submitted for city approval, paving the way for the project's commencement.

Throughout the project, I oversaw the construction of the foundation and all related aspects, ensuring that the vision was executed with precision. As the project evolved, the director sought a more streamlined approach, prompting me to adapt the design to meet the new requirements. This experience demonstrated my ability to not only envision and design but also to adapt and deliver in response to evolving project needs.

1

Owner Colegio E www.auto-stack.com


FLOOR PLAN AutoStack

PRIMER NIVEL

2.4000

CALLE FRESNILLO 10 %

5%

NIVEL BANQUETA 699.89

699.62 699.67

699.51 699.56

NIVEL BANQUETA 699.77

Acceso Principal

699.77

699.77

(2.9000)

2.9000

3.90

BN 1002 (Y=7,002.89,X=6,992.47,Z=700.09)

2%

2%

NIVEL DE PLANTILLA 697.52

NIVEL ESQUINA BANQUETA 699.94

0.4000

This floor plan, crafted by me for city approval, marks the beginning of the El Colegio Mentor project's physical realization. It represents our meticulous attention to detail and collaborative effort with the civil engineer, who translated this design into the foundation construction. It was a new system for the city, they approved the project and encourage us to build more as is something the city needs.

FOUNDATION

(6.1500)

0.5000

3.2000

3.2000

2.4000 (5.6000)

(3)

699.91

1.2500

699.91

NIVEL LOZETA PATIO 700.09

1.2500

NIVEL LOZETA PATIO 700.05 (Y=7,000.00,X=7,000.00,Z=700.00)

BN 1000

Basura

As the supervisor of the foundation construction for the El Colegio Mentor project, I ensured precise placement of columns within a 1cm margin for error to meet the structural needs.

RECIEVING MATERIAL

Cubiculo

Cubiculo m

Altura: 2.67 m

LOCAL Altura: COMERCIAL2.62

Altura: 3.00 m

Patio

Altura: 3.00 m

Servicio generales

Cubiculo

Escalera

Altura: 2.67 m

Cubiculo

Bodega Oficina Altura: del 2.67 m Rector Altura: 2.67 m

Oficina

2021-07-13

I oversaw the unloading process, ensuring that all components were accounted for, and coordinated with both the Chinese engineers and the on-site construction team to ensure the proper assembly of the system.

Altura: 2.67 m

Oficina


INSTALLATION These photos capture the installation process of the groundbreaking rotary parking system at El Colegio Mentor. Working from 9 pm to 6 am to minimize disruption, we successfully completed the installation, marking the first of its kind in Baja California. In my role as supervisor, I ensured that the installation proceeded smoothly, adhering to the plan with precision. SCAN QR CODE:

link to video I made of the installation

The installation of the structural system at El Colegio Mentor proceeded smoothly, but we encountered unexpected challenges with the electrical components. I took a hands-on role in overcoming these difficulties, assisting with the installation of the PLC system, connecting it to the electrical motor, and programming the PLC. Through collaboration with Chinese engineers and our electromechanical engineer, we successfully resolved these issues, ensuring the system functioned as intended. Upon completion, the client expressed satisfaction with the outcome, leading to an order for a second rotary parking system to be installed in 2022. This project exemplifies our ability to navigate complex technical challenges and deliver solutions that exceed expectations.


2ND ROTARY INSTALLATION

FIRST ROTARY DONE These photos capture the impressive final installation of the rotary parking system at El Colegio Mentor, showcasing the innovative solution from a drone's perspective. The director's satisfaction with the outcome underscores the success of the project, which garnered significant attention and admiration in the area. The system's impact was such that it became a local attraction, with people driving by to take pictu-

The subsequent installation of the second system, despite being more complex due to concurrent plaza construction, proceeded efficiently. This efficient installation demonstrates our adaptability and expertise in managing multifaceted projects while maintaining high standards of quality and timeliness.

The installation of the second rotary parking system at El Colegio Mentor was marked by increased efficiency, as our team's experience allowed us to complete the installation in half the time. This optimization of our workflow enabled us to finish the installation more quickly without compromising quality. Once again, I led the organization and supervision of the installation process, ensuring its smooth execution. Additionally, I played a key role in the electrical installation and programming of the PLC, leveraging my expertise to ensure the system's seamless operation. This successful installation further showcases our team's expertise and ability to deliver exceptional results efficiently.


With the completion of the redesign and installation, our commitment continued through the provision of ongoing maintenance for each system. This comprehensive approach reflects our dedication to ensuring that the systems operate smoothly and efficiently, meeting the client's needs effectively.

RE-DESIGN This image captures the transformative redesign of the building at El Colegio Mentor, reflecting the client's new budgetary considerations. As part of this redesign, I took charge of the lighting design, focusing on enhancing the visibility of the rotary system at night. The addition of expertly designed illumination not only improved the functionality of the system but also contributed to its aesthetic appeal.

The addition of illumination to the rotary system has been particularly successful, leading to increased recognition and visibility, especially at night. Autostack's participation in an expo further highlighted this recognition, with the green illumination serving as a distinguishing factor, solidifying the system's place as a notable landmark.

SCAN QR CODE:


Project: El Mentor College

2022-2024

The Wedge project, initiated in October 2022, involved the installation of a rotary system equipped with a camera and touchscreen. I oversaw the shipment and unloading of the system, ensuring all components were delivered safely and accounted for. Simultaneously, I managed the installation process, meticulously preparing and supervising each step to ensure optimal functionality. I also played a pivotal role on the sales and financial side of the project, managing sales processes and ensuring financial aspects were handled effectively.

Render of the rotary system inside the apartment complex.

The project was completed in 2 years.


2 1/2”

2 1/2”

Caja de Control Interruptor Caja 12x8 PLC/Touchscreen 1” tubo

C

1/2” B

B

(2)

B-B

Entrada y Salida

The project was for an apartment complex, where the installation of this system was pivotal in overcoming parking space limitations, allowing for the expansion of the complex to accommodate more apartments. While the client provided their own construction team for the foundation work, my role encompassed overseeing their efforts to ensure the foundation met our rigorous standards. In the face of delays, I maintained close communication with the construction team, ensuring alignment and making necessary corrections to keep the project on track. This comprehensive oversight reflects our commitment to delivering exceptional results while effectively managing project complexities from inception to completion.

Cableado de esta tuberia baja por dentro de la estructura

NOTA: Estos planos son instrucciones y requisitos que requiere el sistema. El ingeniero eléctrico del proyecto debe incorporar estos planos a sus planos finales y aprobar los cambios.

Caja de Control

2 1/2”

Tuberia de 2 1/2” installar antes de sobre piso

Sensores PLC/ Touchscreen

Motor

2 1/2”

1” 2 1/2”

Nivel Del Piso Escalon

A

(Nivel de Banqueta)

2 1/2” 0.15 m 0.15 m

Tuberia de 1/2” installar junto con sobre piso


Project: Sendo Apartments

On Hold

The client required a solution for their apartment building, they required 14 parking spaces but had no space. We impress our clients with our parking rotaries and quick turn around. After discussion with their architecture and engineering team, we decided to make modifications to their current construction to allow for the rotary system. We worked on the proposal and planning of installation.

3D drawings were made to share the process of installation.

Current site with model superimposed. Construction had already begun when we arrived, and needed a quick turn around to avoid any delays.


Project: Tower

On hold

The client required a solution where they could park in the street level while not occupying significant space. After the discussion, the team of architects and engineers redesigned their building to fit with our new system. They were impressed with our work and knowledge, and decided to go with 15 of our rotary systems.

Due to their structure we had to plan accordingly for concrete

The client's project was saved with our systems. Simultaneously, the government was more than willing to give building permission, as the city needs more of our parking systems.


The Connection

02

The project was designed to help people with low income to live and incorporate residents into the Portland community. It is best suited for Students/workers with low income that prefer to live in a space shared with community. The Ground floor is open allowing the public and residents to cover from the weather and due to the building openings, natural light is cast on the ground level. The first 2 levels consist of micro housing with a shared space for all the residents. From the 3rd to 4th level the building consists of


SITE DISTRIBUTION STEPS

TRACE EXISTING STREET CIRCULATION

OPEN CIRCULATION PATH

Circulation

OPEN COMMUNITY SPACE

Space Distribution: Green Space

Micro Studio Air Circulation

Walk way light

Units natural lighting

Micro Housing

Facade Strategy:

Water Collection

Sun Protection

Facade Attachment

Summer-Winter Sun

Air Circulation

Shared Spaces


MICRO HOUSING

FORD DISTRICT SITE 7 BUILDINGS BROWNSTONES MICRO HOUSING/STUDIO COMMERCIAL AND RETAIL

SITE AXONOMETRIC DIAGRAM

SITE AXONOMETRIC


C

EXPLODED AXO

D

B

GROUND PLAN

2ND LEVEL PLAN 57’

47’

36’

26’

16’

WEST MICRO HOUSING ELEVATION

A - SECTION CUT

A


The Scandere v-u house "Descended into the view your mind needs." LATIN

de = down

scandre = to climb

De scandere V - U house is designed to help the resident to have a healthier family. the main entrance gives the resident something to look forward. As the resident descends into their comfort zone, they get closer to the outstanding view. The open floor plan allows for quick interaction from people around the house.

03


SITE PLAN NORTH ELEVATION THE HOUSE HAS BATTERIES TO SAVE THE ENERGY THAT WAS CAPTURE BY SOLAR ENERGY. THEY ARE HIDDEN UNDER THE FLOOR AND CAN BE ACCES FROM OUTSIDE OR INSIDE FROM THE STAIRS. SELF HEALING CONCRETE FLOOR. WHENEVER THE CONCRETE CRACKS, AIR AND MOSTURE BEGGIN TO TRIGGER A LIMESTONE BACTERIA. THEY CONCERT INTO A CALCIUM LACTATE TO CALCITE, ONE OF THE INGREDIENTS OF LIMESTONE, THEREFORE SEALING THE CRACK

THE WATER THAT IT IS CAPTURE DURING RAIN, IS STORAGED IN THIS TANK AND THEN PROCESS IN THE FILTERS


INDIVIDUAL VIEW

1 2

ADJECENT SITE HILLS

8 3 10

UP

11

DN

4

8 6

5 AIR CURCULATION

A

HOT AIR COLD AIR

9 12

7

NATURAL LIGHTING & HEATING SUMMER SUN WINTER SUN

2ND LEVEL - FLOOR PLAN

1ST LEVEL - FLOOR PLAN

FLOOR PLAN 1. ENTRANCE 2. LIVING ROOM SPACE 3. KITCHEN 4. DINNING SPACE

MORNING ROUTINE

SPACE DISTRIBUTION

CIRCULATION

PRIVATE

SHARED

PRIVATE

BUILDING FINAL FORM

SITE PLAN SECTION

10

5. FAMILY ROOM 6. RESTROOM 7. BALCONY 8. BEDROOM

9. MASTER BEDROOM 10.RESTROOM 11.LAUNDRY ROOM 12.LIBRARY/STUDIO


A- FAMILY ROOM

E- ENTRANCE

C-FRONT

D- EXTERIOR VIEW

A- FAMILY ROOM VIEW

B- ENTRANCE


North Park Apartments

Residential building is located in the corner of Ray street and North Parkway , It’s a four story building with 5 , 2 story, units. Each Unit has its own two car garage as well as an exterior space. On the last level of the building there is an exterior shared space. The building adapts the life style of North Park & brings out their style to the outside. Spaces made for small families or single workers that would like to live closer to the artistic neighborhood of North Park.

04


DIAGRAM

SPACE DISTRIBUTION

PARKING Each Unit has two bedrooms and an exterior space.

CIRCULATION KITCHEN DINNING

UNITS

BEDROOM #1

MC BATHROOM

EXTERIOR SPACES BEDROOM EXTERIOR SPACE LIVING ROOM

3

Level 3

2

Level 2


NORTH ELEVATION

12’-0” 13’-0”

50’-0”

12’-0”

13’-0”

SECTION PERSPECTIVE

SOUTH ELEVATION

WEST ELEVATION



FIRE STATION This Fire station was planned to suit the needs of firefighters. All of the rooms have been located at a close distance, allowing the fire fighters to leave as soon as they get a call. The curved walls allow for indirect light to enter into the building, reducing the usage of artificial light. A park for the community has been design next to the fire station and it can also be utilized for events. On the other side of the fire house is the Fire fighter training space. The training space is for fire fighters who are off duty and need to practice or learn new skills. It can also be used by other fire stations.

05


SPACE DISTRIBUTION

CIRCULATION PRODUCTIVITY

1. INDIRECT LIGHT

2. WIDE CIRCULATION SPACES SHARED PUBLIC REST

3. AIR CIRCULATION

EAST SECTION PERSPECTIVE


SITE PLAN


AXONOMETRIC

UP


vISUALLIZATIONS

06

Art Museum in Beijing Concept Located in Beijing China. Designed as a personal project.


Case Study: Florence Architects house

Case Study: 308 Building in Beijing


Case Study: Cidade House

Interior Design: Wall Decoration


3D Printing

3D Scanning

I use 3D scanning to measure and document changes in projects, such as the Wedge project. Using my drone, I capture images that are then converted into detailed 3D models. These models are invaluable for planning installations, allowing me to visualize the placement of systems and determine crane positioning with precision.

These 3D printing images demonstrate my expertise in the field since 2017, showcasing my use of 3D models for projects.


cONTACT Daniel Rodriguez (619) 250-1765 dnlrodriguez47@gmail.com dnlrodriguez47.com

Daniel Rodriguez

Portfolio


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.