Dockyard Magazine Media Pack '15

Page 1

Media Pack 2015 Marine & Renewables Journal

www.dockyard-mag.com


Advertising Rates Advertising Rates for 2015

for 2015

Product Advertorials 1/6 Page consisting of 100 words Special andpositions; 1 image £150 First right hand page +5% on Full Page Rate 1/3 Page consisting of 200 Inside Front Cover +10% onwords Full Page Rate and 1 image £200 Outside Back Cover +20% on Full Page Rate Inside Front Cover + 10% on Full Page Rate Outside Back Cover +20% on Full Page Rate 1/8 1/4 Page Page With With Bleed Bleed only only 75mm 75mm xx 216mm 216mm £250 £450 + + vat vat

1/4 1/4 Page Page Portrait Portrait Only Only No No Bleed Bleed 130mm 130mm xx 90mm 90mm £395 £450 + + vat vat 1/2 1/2 Page Page Horizontal Horizontal 130mm 130mm xx 210mm 190mm With With Bleed Bleed 151.5mm 151.5mm xx 216mm 216mm £595 £695 + + vat vat 1/2 1/2 Page Page Vertical Vertical 270mm 270mm xx 90mm 90mm With With Bleed Bleed 303mm 303mm xx 108mm 108mm £595 £695 + + vat vat Full Full Page Page 297mm 297mm xx 210mm 210mm With With Bleed Bleed 303mm 303mm xx 216mm 216mm £795 £995 + + vat vat Double Double Page Page Spread Spread 600mm 600mm xx 210mm 210mm With With Bleed Bleed 606mm 606mm xx 216mm 216mm £995 £1795

6,000 Copies of this are are 7488 printed copies of magazine this magazine circulated across the UK. circulated across the UK. Controlled circulation through a leading The Dockyard digital edition has a worldwide specialist distribution company, closely coverage of 9851 readers, giving that industry monitored by our team means Dockyard professionals, wherever they are based, the Magazine is distributed to the main Decision opportunity to and read the Makers in to thesubscribe Ship/Boatbuilding and refitting industry, including Contractors and publication. OEM’S The website features continuous newsfeeds Backed by our Website, which features and industry relevant information. continuous News Feeds and Information relevant to the Industry, our clients are Hyper-linked Web Banners are readily certain to expect recognition and awareness available onthe the site from as little as £50 per through publication. month depending on size in pixels. Hyper-linked Web Banners are readily 215w x 55h = £50+vat per month available on the site from £50 per month 215w x 135h = £60+vat per month depending on size in pixels 215w x 55h £50 + vat 215w x 135h £60 + vat Acceptable formats We can accept most software; Design programs such as Acceptable Formats ●

Pagemaker We can accept most software.... ● Design Quarkprograms Express such as.... ● Publisher ■ Pagemaker ● Photoshop ■ Quark Express ■ Publisher Images should be supplied no less than ■ Photoshop 300 dpi in EPS, JPeg, TIFF, CMYK or Greyscale Images should be supplied no less format. than 300dpi in EPS, JPeg, TIFF, CMYK or Greyscale. Files should be sent to; design@dockyard-mag.com Files should be sent to design@dockyardOr via Dropbox, Wetransfer or any other mag or via Dropbox or any other FTP FTP Server Server....

Please contact Wetton or Rob Taylor with queries regarding Please contact DavidAlex Peters or Alex Wetton with anyany queries regarding anyany Advertising or Advertorial queries 01634 568925 (5 Lines) Advertising or Advertorial queries 01634 568925 (5 Lines)


Dockyard Magazine Breakdown of readership profile and circulation Dockyard Magazine is read by marine industry professionals around the world.

It touches on the latest product innovations, news and technical developments, plus in-depth industry specific features.

With 7488 printed copies of the magazine distributed to a controlled circulation across the UK, we reach out to all the major decision makers who have a buying and / or specifying responsibility for products and services within the marine industries.

A digital edition is also available on our website: www.dockyard-mag.com

Printed Magazine distribution by Job function OEMs & Production Managers

1547

Marine Contractors

556

Sub-Contractors

510

Technicians

904

Project Engineers

656

Engineers – Electrical

217

Engineers – Wind Resource/Renewables

304

Engineers – Marine Civils

204

Designers

113

Maintenance/Repair Managers

717

Vessels Finishers

428

Port Operators/Authorities

177

Marine Consultants

106

Naval Architects

117

Marine Superintendents/Health & Safety

134

Marine Software Developers

101

Marine Planning Consultants

326

Renewable Energy Consultants

371

Total

7488


Dockyard Magazine Breakdown of digital circulation by area

The Dockyard digital edition has a worldwide coverage of 9851 readers, giving industry professionals, wherever they are based, the opportunity to subscribe to and read the publication.

Area

Percentage

Quantities

UK

52.47%

5169

Belgium

10.16%

1001

Netherlands

9.50%

936

Norway

8.63%

850

Germany

7.44%

733

Estonia

5.42%

534

Turkey

3.35%

330

Other EU

1.88%

185

Non Europe

1.15%

113 9851 Total


Features List for 2015

Marine & Renewables Journal

January

July

February

August

March

September - O/S Europe Show Issue

April

October - RenewableUK Show Issue

May - Seawork Preview Issue

November

Propulsion Workboats & Tugs Navigation & Communication Courses, Training & Certification Dredging Marine Finance & Legal Diving & Underwater Services Marine Civils, Engineering & Construction Marine Renewables & Windfarms

Pollution Control Engines & Transmissions Marine Surveying & Inspection Moorings, Ropes, Chains & Anchors Workboats & Tugs Navigation & Communication Deck Equipment & Lifting Gear Vessel Build, Repair & Maintenance Marine Renewables & Windfarms Safety Dredging Paints & Coatings Courses, Training & Certification

June - Seawork Show Issue

Fabrication Engines & Transmissions Marine Finance, Insurance & Legal Moorings, Ropes, Chains & Anchors Marine Renewables & Windfarms

Workboats & Tugs Diving & Underwater Services Marine Surveying & Inspection Port & Quayside Facilities Surveying & Inspection Navigation & Communication Vessel Build, Repair & Maintenance Marine Civils, Engineering & Construction Marine Renewables & Windfarms

Safety Dredging Engines & Transmissions Courses, training & Certification

Propulsion Deck Equipment & Lifting Gear Marine Finance, Insurance & Legal Moorings, Ropes, Chains & Anchors Marine Renewables & Windfarms Pollution Control Workboats & Tugs Vessel Sale & Charter Diving & Underwater Services

December

Propulsion Paints & Coatings Engines & Transmissions Vessel Build, Repair & Maintenance Marine Renewables & Windfarms

Please contact Alex Wetton or Rob Taylor on: 01634 568925 (5 lines)


Crystal Design & Media Ltd Suite 2 AJA Business Centre Unit 6 Laker Road Rochester Kent ME1 3QZ

Tel: 01634 568925 (5 Lines) E-Mail: Alex Wetton alex@dockyard-mag.com Rob Taylor rob@dockyard-mag.com

www.dockyard-mag.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.