Seismic & Special Projects Brochure

Page 1

SPECIAL

PROJECTS & SEISMIC / HISTORIC RENOVATIONS

A CLOSER LOOK UNDER THE DOME


OUR GOAL Our Company is a team focused on one simple goal – your success. Our core philosophy remains consistent with each individual, and with each and every project - to deliver the highest quality product that exceeds our clients’ needs and expectations, providing personal attention and extra care that distinguishes us from our competition.

This philosophy is carried through with earnest at all

WE WORK HARDER TO MAKE YOUR JOB EASIER


HOW WE CAN HELP

clients

Seismic Upgrade to Current Codes

Some of our recent clients include:

Braced frames, moment frames

Bayer Healthcare

Viscous dampers

Best Foods/Orowheat

BioMarin Pharmaceuticals

Wood frame diaphragm and shear wall strengthening

Clorox Corporation

County of Marin

NPC utility system support upgrades

Dr. Richard Lee Genentech Inc.

Restoration of Historic Buildings Adaptive reuse

German Consulate Hamm’s Brewery

Facade restoration Concrete restoration Masonry restoration

HCV Partners Holy Names University Intrabiotics Pharmaceuticals

Ground Up Construction

Kaiser Permanente

Lucile Packard Children’s Hospital

Tilt-up construction

Marin Health and Wellness

Wood frame construction Method Home Nordstrom

Parks & Special Site Work Interface with governing authorities during design / permitting stage Plan development for contaminated site clean-up

Novartis Orinda Country Club

Waterproofing

Pixar Animation Studios

Exploratory investigation

Rossmoor - Walnut Creek

Seagate Properties

Mock-ups for testing Water intrusion mitigation

Simpson Gumpertz and Heger Stanford University Sutter Healthcare

Remedial Projects Structural remediation

Tishman Speyer

Soil and groundwater remediation

University of California, Berkeley

Hazardous material removal and demolition

Wareham Development

e

Leak and water damage remediation

World Trade Club


PROJECT HIGHLIGHTS PIXAR ANIMATION STUDIOS SEISMIC UPGRADES

625 MARKET STREET SEISMIC STRENGTHENING

50,000 square feet Historic Building 50 foot deep micropiles Contrete footings Structural steel moment frames

New roof diaphragm installation

""# "$

Shotcrete shear walls Extensive foundation work

% included a new 14 story steel & tower crane. Building in operation during construction.

STANFORD LAW SCHOOL NEW CONSTRUCTION

YMCA HOTEL SEISMIC & HISTORIC

68,000 square feet Innovative Moment Frame System BIM Modeling Design-Build MEP Systems

Conversion to low cost housing Remedial structural upgrades New Life-Safety systems ! Met Department of Interior’s standards for preservation of

HOLIS GREEN PARK PUBLIC GREEN SPACE

180 TOWNSEND SEISMIC & HISTORIC

30,000 square feet Removal of hazardous materials

Facade restoration Building upgrade Seismic steel frame system

Excavation, grading, underground utilities, irregation, site furnishings, concrete foundations, unit pavers, decorative stone work, fencing, masonry.

New elevators, stairs, toilets, ' ( ) * as well as tenant improvements.


ORINDA COUNTRY CLUB SEISMIC & EXPANSION 25,000 square feet Multiple phases New Addition and tennis facility

= > ; & ?>

> + facility. Project included a new kitchen, two new elevators, and the addition of 3,500 square feet. The scope also included the construction of a new tennis facility over an existing lake. Portions

* >

EXPERIENCE

MAKES THE DIFFERENCE

Dome Construction offers a vast amount of experience in providing preconstruction and construction services on + 2

* 2 + + 7

BAYER HEALTHCARE - BUILDING 60 SEISMIC UPGRADES Voluntary seismic upgrade Withstand a seismic event up to a 6.8 magnitude :

; Steel collectors Accelerated schedule This voluntary seismic upgrade was completed in a validated

< * at elevator shafts and stair wells, installation of structural steel collector lines throughout structure. Scope also included removal and replacement of mechanical systems as required to complete structural work. This upgrade was designed to withstand a 6.8 magnitude seismic event. Challenges included working in and around validated clean areas, as well as over sensitive process equipment.


OUR PEOPLE

At Dome Construction, we’ve got you covered. 7 @

GJ = J K

2 professional, we help employees reach new heights through various peer support programs. We offer

* + >

>

*

: Our talented staff is comprised of over 170 professionals. Individuals who share our core values and promote our core purpose. People that want to make a positive impact in their careers. People with a true passion for what they do. = +

These teams consist of highly trained construction professionals who work closely together over multiple projects, developing core expertise and the ability to work Their dedication, depth of knowledge and experience is the highest levels of communication, coordination, and documentation.

U + =

>

BUILDING RELATIONSHIPS Our success is built on you, our Clients.

2

*

% 7 +

: + +

successful outcome.


AT YOUR SERVICE PRECONSTRUCTION Preliminary Budgets Determining what your vision will cost

Site Investigation Survey of existing conditions for utilities and soil analysis

Constructability Review Evaluating the design for construction effectiveness )

Value Planning Planning the value in, not engineering the costs out

Schedule Development Realistic timeline from conception to delivery

Long Lead Procurement

* project on schedule

Bid Packages %

+

CONSTRUCTION Submittal Expediting & Tracking Monitoring progress to ensure targeted schedule dates are met

Cost Control Procedures (

Schedule Control Ensuring all construction activities are on track at all times

Document Control Daily/weekly/monthly reporting of project’s status

Quality Control Ensuring work is installed to your exacting standards the

Start-up & Commissioning Ensuring that all equipment is in proper working order prior to occupancy

TOP Document Planning Starting with the end in mind - early preparation of documentation to turn over a fully operational space


quotes “I want to express my gratitute and + Dome performed. The professionalism

dedicated

you and your crew displayed was of the highest quality.� John Bethe, General Manager

thorough

“The new park really looks spectacular. , and you know me well enough that this kind of praise rarely comes out of my mouth.�

trusted

Z '

G% 2 [

projects with them and have

.� Tom Carlisle ! " #

dependable

“As part of our project at BioMarin, Dome Construction was required to structurally upgrade a 15,000 square

\'( Pharmaceutical Production Plant. They

$ with the manufacturing operation. Their coordination and execution effort

success of this project.� Jim Youd

Headquarters

South Bay

Dome Construction Corporation 393 East Grand Avenue South San Francisco, CA 94080 650 416 5600 | tel 650 416 5602 | fax

Dome Construction Corporation 560 S. Winchester Blvd. Suite 500 San Jose, CA 95128 408 938 5770 | tel 408 572 5601 | fax

www.domeconst.com

8 printed on 100% recycled content.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.