SPECIAL
PROJECTS & SEISMIC / HISTORIC RENOVATIONS
A CLOSER LOOK UNDER THE DOME
OUR GOAL Our Company is a team focused on one simple goal – your success. Our core philosophy remains consistent with each individual, and with each and every project - to deliver the highest quality product that exceeds our clients’ needs and expectations, providing personal attention and extra care that distinguishes us from our competition.
This philosophy is carried through with earnest at all
WE WORK HARDER TO MAKE YOUR JOB EASIER
HOW WE CAN HELP
clients
Seismic Upgrade to Current Codes
Some of our recent clients include:
Braced frames, moment frames
Bayer Healthcare
Viscous dampers
Best Foods/Orowheat
BioMarin Pharmaceuticals
Wood frame diaphragm and shear wall strengthening
Clorox Corporation
County of Marin
NPC utility system support upgrades
Dr. Richard Lee Genentech Inc.
Restoration of Historic Buildings Adaptive reuse
German Consulate Hamm’s Brewery
Facade restoration Concrete restoration Masonry restoration
HCV Partners Holy Names University Intrabiotics Pharmaceuticals
Ground Up Construction
Kaiser Permanente
Lucile Packard Children’s Hospital
Tilt-up construction
Marin Health and Wellness
Wood frame construction Method Home Nordstrom
Parks & Special Site Work Interface with governing authorities during design / permitting stage Plan development for contaminated site clean-up
Novartis Orinda Country Club
Waterproofing
Pixar Animation Studios
Exploratory investigation
Rossmoor - Walnut Creek
Seagate Properties
Mock-ups for testing Water intrusion mitigation
Simpson Gumpertz and Heger Stanford University Sutter Healthcare
Remedial Projects Structural remediation
Tishman Speyer
Soil and groundwater remediation
University of California, Berkeley
Hazardous material removal and demolition
Wareham Development
e
Leak and water damage remediation
World Trade Club
PROJECT HIGHLIGHTS PIXAR ANIMATION STUDIOS SEISMIC UPGRADES
625 MARKET STREET SEISMIC STRENGTHENING
50,000 square feet Historic Building 50 foot deep micropiles Contrete footings Structural steel moment frames
New roof diaphragm installation
""# "$
Shotcrete shear walls Extensive foundation work
% included a new 14 story steel & tower crane. Building in operation during construction.
STANFORD LAW SCHOOL NEW CONSTRUCTION
YMCA HOTEL SEISMIC & HISTORIC
68,000 square feet Innovative Moment Frame System BIM Modeling Design-Build MEP Systems
Conversion to low cost housing Remedial structural upgrades New Life-Safety systems ! Met Department of Interior’s standards for preservation of
HOLIS GREEN PARK PUBLIC GREEN SPACE
180 TOWNSEND SEISMIC & HISTORIC
30,000 square feet Removal of hazardous materials
Facade restoration Building upgrade Seismic steel frame system
Excavation, grading, underground utilities, irregation, site furnishings, concrete foundations, unit pavers, decorative stone work, fencing, masonry.
New elevators, stairs, toilets, ' ( ) * as well as tenant improvements.
ORINDA COUNTRY CLUB SEISMIC & EXPANSION 25,000 square feet Multiple phases New Addition and tennis facility
= > ; & ?>
> + facility. Project included a new kitchen, two new elevators, and the addition of 3,500 square feet. The scope also included the construction of a new tennis facility over an existing lake. Portions
* >
EXPERIENCE
MAKES THE DIFFERENCE
Dome Construction offers a vast amount of experience in providing preconstruction and construction services on + 2
* 2 + + 7
BAYER HEALTHCARE - BUILDING 60 SEISMIC UPGRADES Voluntary seismic upgrade Withstand a seismic event up to a 6.8 magnitude :
; Steel collectors Accelerated schedule This voluntary seismic upgrade was completed in a validated
< * at elevator shafts and stair wells, installation of structural steel collector lines throughout structure. Scope also included removal and replacement of mechanical systems as required to complete structural work. This upgrade was designed to withstand a 6.8 magnitude seismic event. Challenges included working in and around validated clean areas, as well as over sensitive process equipment.
OUR PEOPLE
At Dome Construction, weâ&#x20AC;&#x2122;ve got you covered. 7 @
GJ = J K
2 professional, we help employees reach new heights through various peer support programs. We offer
* + >
>
*
: Our talented staff is comprised of over 170 professionals. Individuals who share our core values and promote our core purpose. People that want to make a positive impact in their careers. People with a true passion for what they do. = +
These teams consist of highly trained construction professionals who work closely together over multiple projects, developing core expertise and the ability to work Their dedication, depth of knowledge and experience is the highest levels of communication, coordination, and documentation.
U + =
>
BUILDING RELATIONSHIPS Our success is built on you, our Clients.
2
*
% 7 +
: + +
successful outcome.
AT YOUR SERVICE PRECONSTRUCTION Preliminary Budgets Determining what your vision will cost
Site Investigation Survey of existing conditions for utilities and soil analysis
Constructability Review Evaluating the design for construction effectiveness )
Value Planning Planning the value in, not engineering the costs out
Schedule Development Realistic timeline from conception to delivery
Long Lead Procurement
* project on schedule
Bid Packages %
+
CONSTRUCTION Submittal Expediting & Tracking Monitoring progress to ensure targeted schedule dates are met
Cost Control Procedures (
Schedule Control Ensuring all construction activities are on track at all times
Document Control Daily/weekly/monthly reporting of projectâ&#x20AC;&#x2122;s status
Quality Control Ensuring work is installed to your exacting standards the
Start-up & Commissioning Ensuring that all equipment is in proper working order prior to occupancy
TOP Document Planning Starting with the end in mind - early preparation of documentation to turn over a fully operational space
quotes â&#x20AC;&#x153;I want to express my gratitute and + Dome performed. The professionalism
dedicated
you and your crew displayed was of the highest quality.â&#x20AC;? John Bethe, General Manager
thorough
â&#x20AC;&#x153;The new park really looks spectacular. , and you know me well enough that this kind of praise rarely comes out of my mouth.â&#x20AC;?
trusted
Z '
G% 2 [
projects with them and have
.â&#x20AC;? Tom Carlisle ! " #
dependable
â&#x20AC;&#x153;As part of our project at BioMarin, Dome Construction was required to structurally upgrade a 15,000 square
\'( Pharmaceutical Production Plant. They
$ with the manufacturing operation. Their coordination and execution effort
success of this project.â&#x20AC;? Jim Youd
Headquarters
South Bay
Dome Construction Corporation 393 East Grand Avenue South San Francisco, CA 94080 650 416 5600 | tel 650 416 5602 | fax
Dome Construction Corporation 560 S. Winchester Blvd. Suite 500 San Jose, CA 95128 408 938 5770 | tel 408 572 5601 | fax
www.domeconst.com
8 printed on 100% recycled content.