Desgin Exploration

Page 1

Zone Existing Work

1

1

Runoff control bio-swale

2

Social space

3

Trasitional area-Sustainable stimulated timber decking Ecological Buffer zone: see section-elevation sheet

4

Key

Amelanchier Fast growing, flood tolerant tree

2

4

3

Interactive brick structure with bench - Slab paving Timber floor with mow grass

Moor Market

Po

rte rB

ro

ok

Bench - simulated timber with concrete infill

l St

nde

Aru

Decathlon Sylv

ey

este

r St

Sidn

St

Selected Site

Mary St

Location Plan

Scale: 1:5000@A3

DETAILED PLAN - SCALE : 1:100@A3

Lsc 234 Landscape Design - Exploration and Intervention @ Dominic Yang 140184673


SECTION-ELEVATION &ECOLOGICAL APPROACH

A2

Section-Elevation A2-J2 Scale: 1:100

J2

ECOLOGICAL BUFFER ZONE DETAILS References: Low Impact Development Manual For Michigan Urban Design

Multi-functional raise bed with 500mm edge as seats.

G1

I11

Section-Elevation G1-I11 Scale: 1:100

Runoff through garbion wall (white edging)

Zone A: Runoff control - bioswale consists of native perennial grasser, with herbaceous and woody vegetation that slow runoff and absorb most contaminants Zone B: Managed forest consists of slow-growing trees and shrubs that provide wildlife habitat, and mitigate remaining contaminants from Zone A

Zone C: Undisturbed forest riverside zone consists of fast-growing, flood-tolerant trees and reedy plants that stabilize banks and cool water through shading. Multi-functional wall Materials: Concrete slabs paving

Raise bet & Seats

Ramp Resin Bound

Wall 1m

Wall 3m Steps

Decking Ecological buffer Porter Brook ‘Timber’

Gabion wall

Lsc 234 Landscape Design- Exploration and Intervention @Dominic Yang 140184673


SOCIAL ,ECOLOGICAL & HISTORICAL APPROACH

Design process:

Design concept: 1

2

The design attempts to bring back the historical context to current use with social interactive spaces and play ground where to allow social activities, also, multi-functional facilities are introduced for visitor to adventure. A transitional deck path behind the retaining wall is designed to link with Porter Brook (river) and the social space.

3

The ecological buffer zone consists of a bio-swale(at the edge of the exist works), a terraced remediation wetland with gabion wall system then join the river which allows nature process instead of human intervention of the river.(Reason for not access the water see journal process).

Steps & wall details:

3m retaining wall with hollow carved words (taken from old graffiti content) frame provides transparency for people to see through.

1.5m retaining wall with words

Ecological approach: terraced remediation wetland with gabion wall edging.

3m retaining wall with designed words

400mm landing

e

nc

ra

t En

6 steps (2R+G=750mm)link the transitional area with the 3m retaining wall, with openning to create interlocking space.

sin

Re d

un

bo el

av

gr

Vantage point

Historical approach:

C

on

cr

et

e

sla

bs

Brick structure with interactive bench.

Materials:

Old building brick bonds and window frames. Ramp

1.5m retaining wall allows parents on higher view look after children on the designed play ground.

3 steps (2R+G=750mm) link the ramp with the designed brick structure and playground.

Transitional zone:

Decking link with social approach andecological zone

Materials:

Sustainable glass reinforced concrete simulated timber

Entrance

Porter Brook

Lsc234 Landscape Design- Exploration and Intervention @ Dominic Yang 140194673


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.