Compiled and edited by Kati Westlake and Callantha Brigham
Copyright ©2012 Parramatta City Council This book in this form is copyright. Permission is granted to reproduce part of this publication for non-commercial purposes provided that the source is properly acknowledged. Published by Parramatta City Council 30 Darcy Street Parramatta NSW 2150 PO Box 32 Parramatta NSW 2124 Compiled and edited by Kati Westlake, Parramatta City Council Callantha Brigham, Government Architect’s Office Sub-editor Barbara Cameron-Smith, Parramatta City Council Graphic design - publication Marietta Buikema, Government Architect’s Office Graphic design - Design Parramatta branding and website Doppio Design NSW Dept of Finance and Services Cataloguing-in-Publication data Westlake, Kati Design Parramatta : new ideas to shape the city / compiled and edited by Kati Westlake and Callantha Brigham. ISBN: 978-0-7347-4463-0 1. Town planning - New South Wales - Parramatta. I. Title. II. Westlake, Kati. III. Brigham, Callantha. IV. Parramatta City Council. V. Government Architects Office. 711.4099441 ISBN 978-0-7347-4463-0 Photograph on cover: Aerial view of Parramatta CBD (Image from Parramata City Council)
The publication of this book was made possible by support of the Lord Mayor of Parramatta City Council, Councillor John Chedid and the Chief Executive Officer of Parramatta City Council, Dr Robert Lang, as well as Parramatta City Council’s Councillors.
Compiled and edited by Kati Westlake and Callantha Brigham
“The Creative City idea advocates the need for a culture of creativity to be embedded within how the urban stakeholders operate. It implies reassessing the regulations and incentives regime and moving towards a more ‘creative bureaucracy’. Good governance is itself an asset that can generate potential and wealth. By encouraging creativity and legitimizing the use of imagination within the public, private and community spheres, the ideas bank of possibilities and potential solutions to any urban problem or opportunity will be broadened.”
Pg xxii - Charles Landry – The Creative City, London 2012
PETER POULET “Parramatta is on the cusp of an exciting and reinvigorated future. The City has bravely engaged with its community and many creative people to speculate creatively about its future. This has taken leadership, innovative thinking and trust in our architects, landscape architects, artists, poets and dreamers. The Design Parramatta initiative highlights the understanding by Parramatta City Council that our built environment can enhance our quality of life and generate economic prosperity. The Design Parramatta initiative has harnessed the creativity and innovation of many talented people and has highlighted the potential our urban environment has in building and celebrating our communities. With this critical understanding Parramatta City Council has played a pivotal and inspirational role. I commend Parramatta City Council for embarking on this initiative and in taking the first steps toward a renewed and revitalised public realm.”
JANE IRWIN “Design Parramatta is an exciting urban design project that harnessed the ‘complementarity’ of landscape architecture, architecture and art to shape the future of Parramatta city centre. The project captures the City on the brink of major change, and takes a whole of city, rather than project by project approach, to urban design, to set up a coherent framework for urban renewal. Nineteen multi-disciplinary teams were engaged for 16 sites, with some teams working together at the edges of their sites to coordinate outcomes. It was a hothouse process of analysis and design, investigating place physically and culturally as a basis for high level concepts. Teams shared their exploratory work in a first workshop, and the ideas for sites in a second workshop. All the projects were enriched by the workshops and design panel feedback. The Australian Institute of Landscape Architects congratulates Design Parramatta for initiating such a brave project. It engaged so many landscape practices in a collaborative, creative way; it generated energy and excitement about urban design, and will help to highlight the role of landscape architecture in the making of cities.” President, The Australian Institute of Landscape Architects NSW
MATTHEW PULLINGER “Our greatest cities are each very different, but have at least two things in common — strong leadership with the vision to imagine a better future, and a constituency that understands what that vision means and why it’s important. The rest of city making, although often complex and protracted, cannot exist without these two preconditions. But it is also the part of city making where design becomes the dominant factor. Design determines the quality of a place, its amenity, attractiveness, efficiency and cohesion. And it’s where great design makes a critically important difference. Design Parramatta demonstrates a deep appreciation for each of these elements — a strong, community-based vision for the future, and a collaborative, team-based design process to give physical expression to this vision. Landscape architects, architects and urban designers all possess different perspectives, but share a skill set and training in design that is quite unique. Harnessing this ‘design thinking’ is a powerful way to imagine and communicate an alternative future for the places we know and love. While change can be a confronting process, cities have an almost limitless capacity for accommodating renewal and reinvention. The important point is that change can be good or bad, it can be embraced or resisted, and quality of design is usually the difference between one and the other. The Australian Institute of Architects is very proud to lend its support to Design Parramatta. It has been a powerful model demonstrating the value of good design. It is also a great way to communicate with a passionate, engaged community. In this context, it is clear that Parramatta has not only a rich heritage but also a very bright future.” President, The Australian Institute of Architects, NSW
Introduction by Chief Executive Officer
Dr Robert Lang “Design Parramatta builds on our new identity and reflects Council’s commitment to the delivery of future urban spaces that connect and interact with both people and place.”
A joint project between Parramatta City Council and the NSW Government Architect’s Office, Design Parramatta represents a considerable step forward in the future development of Parramatta — and with the concentration of residents, businesses and workers set to increase markedly over the coming years — this is a significant project that has the potential to deliver a number of positive community outcomes. Comprising different groups of multi-disciplined talent, including urban designers, architects, landscapers and artists, the Design Parramatta participants have collaborated impressively to bring to life their collective vision for the City’s spaces. The results of this intensive project speak for themselves, as you will see over the coming pages. From a local level — taking into account the diversity of our community — to the bigger picture and how Parramatta is poised to drive Greater Sydney’s growth, Design Parramatta will transform how the City is seen and experienced. The next 12-18 months are going to be an exciting period, no doubt galvanised by the recent launch of the new City Identity, Parramatta: Future Generation which captures the energy and positivity for Parramatta’s future. Design Parramatta builds on our new identity and reflects Council’s commitment to the delivery of future urban spaces that connect and interact with both people and place. From Parramatta Square, to the river foreshore, streets or lanes, we aim to increase engagement with young entrepreneurs and new business owners, inviting them to explore the possibilities of the area — and simultaneously, to provide opportunities to urban designers, architects and artists to activate and renew the City’s spaces, drawing on the following concepts as inspiration and facilitation. Through initiatives like Design Parramatta, the City will strengthen its growing position as a vibrant and inspired place for businesses, visitors, residents and workers. I’d like to congratulate everyone involved with this exciting initiative and look forward to seeing many of these concepts brought to life over the coming years.
Introduction by Lord Mayor
Councillor John Chedid “This project comes at an exciting time in Parramatta’s development and I am excited that some these big ideas may soon become a reality.”
I am proud to present to you this inspiring collection of designs from the Parramatta City Council Design Parramatta initiative. The 19 concepts laid out inside these pages provide a visual blue print of the future of our city centre. I congratulate the 65 participants who gave their talents, expertise and energy to creating these concepts for Design Parramatta. This project was about re-imagining our City, especially spaces that are run down, underused, neglected and need rejuvenation. Some of the places identified include the Church Street Mall and the River foreshore. Revitalising these areas will provide our residents, workers and visitors with a better experience of the City. Design Parramatta will complement the city building projects that Council already has underway, such as Parramatta Square. It will also be used as a blue print for Council to prioritise works and lobby the State and Federal Governments for funding. This project comes at an exciting time in Parramatta’s development and I am excited that some these big ideas may soon become a reality. Again, I offer my congratulations to everyone who took part, including the Council team that has driven this project, and the participants. The final Design Parramatta concepts can be viewed online at www.designparramatta.com.au as well as an exhibition in 2013.
Contents PART 1
About 12 About Design Parramatta
15
The Public Domain 16
The Importance Of Design In The Public Domain
16
City Foundations 17 A Designed Process 17 Building From Precedents 20 An Iterative Approach 20 Multi-disciplinary Collaboration 21
PART 2
What Happened When - A Timeline Of Events
24
Projects 28 Introduction to Projects
31
Main Streets 32
George Street 34
Macquarie Street 40 Phillip Street 46
Parramatta City Ring Road
Public Spaces and Parks
50
56
River Square 58 Charles Street Square 64
Horwood Avenue Civic Link
70
Church Street Mall 76
Clay Cliff Creek Parklands
84
Smith and Station Street
90
Lanes 96 Freemason’s Arms Lane 98 Barrack Lane 108
Erby Place and Lane 13
112
Wenworth Avenue Car Park and Lanes
118
Batman Walk 124
Art and Experimental 126 Lonely Laneways 128
A Space for Urban Follies
130
Parranet 132
A Place in the Sun
134
PART 3
Student Projects 136
PART 4
The Parramatta City Centre Public Domain Framework Plan 2012
PART 5
148
Credit 156 Teams 158 References 162
PART 1 /
12
ABOUT
13
The 16 project sites
14
Design Parramatta is a collaborative project to revision Parramatta City Centre’s public domain. Undertaken by Parramatta City Council in collaboration with the NSW Government Architect’s Office, the project invited multidisciplinary design teams to participate in a six week intensive design event. A total of 19 concept designs for public spaces were created to form a conceptual masterplan and provide a catalyst for transformation of Parramatta city centre’s public spaces.
About Design Parramatta “The real voyage of discovery consists not in seeking new landscapes but in having new eyes”
Marcel Proust
Parramatta City Council has committed to a program of rapid growth and change and recognises that an improved public domain is vital to supporting the City Centre’s planned renewal and providing the necessary amenity for attracting and retaining new residents and employees who will drive the City Centre’s sustainable growth. Design Parramatta captures a diverse ‘palette’ of creative input across Parramatta City Centre’s public domain at a strategic moment in time; creating a new vision for its streets, parks and public spaces. It has increased design involvement in shaping and refining Parramatta City Centre’s public spaces and introduces many architects, landscape architects, artists and urban designers to Parramatta. The Design Parramatta project provides the City Centre with; • concept designs for 15 sites and four art projects • an appreciation of the distinct identities that can be drawn from the individual characteristics of each of the sites • a rich palette of design approaches and elements • a set of plans and images that describe each of the concepts and can form the basis for community discussion and engagement • a Public Domain Framework Plan to help shape the ongoing development of Parramatta City Centre’s public domain.
15
“Well designed and maintained public spaces should be at the heart of any community. They are the foundation for public interaction and social integration, and provide the sense of place essential to engender civic pride.” 1927 - Parramatta survey of the town in 1822, compiled by J.F. Campbell
Lord Richard Rogers Pritzker Architect and Chairman Urban Task Force, London 1998
THE PUBLIC DOMAIN The public domain, comprising streets, parks and public spaces is the shared, social, cultural and democratic heart of the city. It forms the common access point and provides shared amenity for all the city buildings, utilities and institutions. An expanded and improved public domain is pivotal to a vibrant and successful city. Design Parramatta focuses on the public domain because of its pivotal role in shaping the way people experience Parramatta’s city centre. The absence of differentiation and individual character in its streets and public spaces, create an overall lack of memorable image for Parramatta’s city centre.
THE IMPORTANCE OF DESIGN IN THE PUBLIC DOMAIN The many benefits of high quality design for cities have been recognised internationally. As cities become denser and more complex, the adoption of a design framework becomes increasingly important to resolve competing demands and ensure high quality, well integrated buildings, streets and public spaces. Additionally as most public domain elements are built over time and as a series of discrete projects, a strong framework or masterplan ensures that sequentially developed elements create coherent and attractive streets, spaces and places.
16
CITY FOUNDATIONS Parramatta began life in 1788 as a planned settlement with a fine street grid, excellent transport connections and many significant buildings and institutions. The City of 2012 has a clear and legible street and block structure due to its early Georgian street grid, riverside location and relatively flat terrain. In recent times the Parramatta City Centre Local Environmental Plan 2007 and Development Control Plan 2007 have provided a solid framework for the ongoing development of Parramatta’s buildings. Design Parramatta builds upon a number of existing urban design resources to generate a complementary framework for Parramatta’s public domain. These include: • the Parramatta Civic Improvement Plan 2007 • the Parramatta City Centre Lanes Strategy 2010 • the Parramatta Public Domain Guidelines
A DESIGNED PROCESS Design methodology typically uses analysis, synthesis and an iterative process. Recent research has highlighted the importance of creativity in creating new approaches. This is particularly powerful when previously unrelated ways of thinking or disciplines are brought together in new and novel relationships.
The iterative design process can be summarised as follows:
define > analysis > synthesis > review and feedback > concept
17
Two mapping series created a shared foundation for the Design Parramatta design projects; the Urban Design Analysis series and the City Design Strategy Mapping series. These seven images are from the Analysis series.
18
19
BUILDING FROM PRECEDENTS Design Parramatta builds upon the methodology of a City of Sydney project entitled Sydney Spaces that was undertaken in 1995. The latter project initiative generated public domain concept designs for a variety of city streets and spaces. The designs were sought simultaneously from a range of designers in order to create a collective blueprint for urban renewal. The outcome of this initiative was a diverse palette of concepts which were compiled into a publication, further developed over time, and the majority of which were ultimately built. Design Parramatta utilised a similar approach borrowing a number of the most successful elements of this precedent project. These were: • the undertaking of a suite of strategically selected public domain projects to inform the overall development of a city • the adoption of an intensive program format to ensure focus and engagement by parties • the selection of a diverse range of designers to ensure a variety of design input and approach • the deliberate matching of designers to projects based on individual project characteristics and design team strengths. Design Parramatta distinguishes itself from Sydney Spaces by utilising an iterative approach and promoting discourse and collaboration by all parties across all projects. This approach allowed the project to evolve in a responsive manner and ensured that the resulting framework would be developed as a series of interrelated projects.
AN ITERATIVE APPROACH Design Parramatta was deliberately programed to incorporate an iterative approach. Key components of this included: • ongoing engagement by the project team with a range of Council stakeholders throughout the project • opportunities for direct interaction between designers and Council stakeholders through the intensive workshop format. Design presentations were hosted as group events where design teams could view other team’s work and received feedback from Council and a design panel.
20
Workshops were held at Information and Cultural Exchange Studios Parramatta.
• a website set up to facilitate sharing of information and approaches served as a tool for sharing public information about the project and provided a design hub to generate discussion and professional collaboration between the designers and project team. • written feedback provided to design teams mid-way through the process captured key points of overlap between projects and prompted specific discussion between relevant teams.
MULTI-DISCIPLINARY COLLABORATION Design Parramatta supported a multi-disciplinary collaborative approach by: • embedding collaboration within the project team and combining the technical expertise and local experience of a number of teams within Parramatta City Council with strategic input from the NSW Government Architect’s Office • undertaking a range of design projects simultaneously to allow projects to be developed cognisant of nearby design project developments • selecting a range of scaled projects to suit a range of experiences and teams • encouraging design work to be undertaken by multi-disciplinary teams from different backgrounds and disciplines • encouraging student engagement with the project through the University of Sydney urban design studio • creating a website and a film to facilitate engagement and collaboration with the community in the next steps of the design and construction process.
21
Workshop 3 3 September 2012
22
Teamwork and collaboration have been identified as shortcuts to increasing creativity and new approaches in many areas of human endeavour. Recent research has shown that major developments are more likely to occur when a new point of view or skill is merged with an existing discipline.
23
What Happened When - A Timeline Of Events
MAY 2012 PROJECT ESTABLISHMENT
JUNE 2012
OVERALL PROJECT SCOPING The Design Parramatta concept was defined and scoped as a collaborative effort between Parramatta City Council and the Government Architect’s Office. A graphic design agency, Doppio, was also engaged to assist in project communications.
EXPRESSIONS OF INTEREST
The project scoping was limited to the concept design stage only to ensure the first stage of the Design Parramatta project would be delivered as a sketch plan. The intention was to provide a wholistic outline for a future city that would not be dominated by any single style or project and could be used as the basis for community consultation and the preparation of a whole of city public domain framework plan. INDIVIDUAL PROJECT SCOPING Concise briefs were developed for each project clarifying the project scope, program and key aspects of the existing site and context. Each brief provided site specific background information, a succinct project objective, a listing of major constraints, directions to key resources and a scaled plan. A collection of shared resources were also collated and uploaded to the project website.
24
Design Parramatta invited participants to become involved in the project through an Expression of Interest process. Key public and professional media were approached and multi-disciplinary design teams were invited to form specifically for the project and apply to participate. Conceptual design and public domain experience were listed as key criteria in the selection process. Teams were selected for their demonstrated expertise in high quality conceptual design and their ability and experience in public domain projects.
3O JULY 2012 THE DESIGN EVENT THE FIRST WORKSHOP The first workshop was a half-day event and served as an introductory session to introduce the selected design teams to the Design Parramatta initiative. The Lord Mayor of Parramatta welcomed participants and the designers were able to meet with the project team, key stakeholders from Council and intermingle with one another. A synopsis of each of the project briefs was on display and the forum provided an opportunity for participants to ask questions and begin conversations.
13 AUGUST 2012 THE DESIGN EVENT THE INTERIM WORKSHOP The interim workshop was held two weeks into the process and was an opportunity for designers to present their first ideas on each of the 19 city centre projects. The full-day workshop was attended by a design panel and was structured to allow projects with similar themes to be presented in the context of one another. Each team presented site analysis drawings as well as preliminary concept designs. It was a forum for hypothesising, testing ideas and receiving critical feedback. The event included participants from each of the design teams, a range of Council representatives and a distinguished design panel. A film crew was in attendance to record the event and each of the design teams received written feedback in the following week.
3 SEPTEMBER 2012 THE DESIGN EVENT THE FINAL WORKSHOP The final workshop was held at the end of the design event and was the culmination of the Design Parramatta initiative to date. Similar in format to the interim workshop it was held as a full-day event with the design panel and design teams in attendance throughout the day. Each design team was required to present analysis drawings, conceptual design drawings and 3D images of their projects to enable others to understand the design thinking that led to a particular solution and how the scheme may eventually appear. The images also demonstrated how the proposal would change the existing site and facilitate future communications with the Parramatta community regarding the proposals in order for them to make comment and provide feedback to guide the next steps.
25
Exploration through scaled drawings, plans and models: ‘A picture tells a thousand words’
26
FEEDBACK ON THE PROCESS The workshop and group presentations were one of the most successful elements of Design Parramatta to date. Many participants expressed enthusiasm, appreciation and delight at the opportunity to present, review the work of other designers, and to receive similar feedback of their own. Similarly, Council staff expressed appreciation at being able to see projects unfold as works in progress. For many it was surprising to witness the design process, the many changes and iterations that can occur, and the huge range of factors that are brought to bear on any single city centre design project.
27
PART 2 /
PR
28
ROJECTS
29
16
5
11
13
6 7
1
2
15
12
8
10
4
14
9
1
George Street
5
River Square
11
Freemason’s Arms Lane
2
Macquarie Street
6
Charles Street Square
12
Barrack Lane
3
Phillip Street
7
Horwood Avenue-Civic Link
13
Erby Place and Lane 13
4
Parramatta City Ring Road: Victoria Road, O’Connell, Parkes and Harris Street
8
Church Street Mall
14
Wentworth Avenue Car Park & Lanes
9
Clay Cliff Creek Parklands
15
Batman Walk
10
Smith & Station Streets
16
Blank Canvases
Plan of Design Parramatta Project sites
30
Introduction to Projects “ ...the best way to predict the future is to design it” Buckminster Fuller systems theorist, architect, engineer, author, designer, inventor, and futurist, 1895 – 1983
Design Parramatta incorporated 15 sites and 19 projects within the Parramatta city centre. Each of the projects were either selected for their individual importance or their ability to contribute in a temporary or permanent way towards the City Centre’s program of urban renewal. As a group, the selected sites reflect the complexity of the city centre and provided a canvas against which teams of varying levels of experience could participate. This in turn encouraged diverse designs reflecting the city’s scale and dynamism. Based on type, scale and program, four main groups of projects developed. • Main Streets • Public Spaces and Parks • Lanes • Art and Experimental During the design event, shared themes became apparent for the project groupings; • the Main Streets teams focused on augmenting the structure, access and identity of the city centre • the Public Spaces and Parks teams focused on public life in the city centre; creating places for public events and celebrations; and improving its amenity, especially through ‘mediating’ the environment and introducing green elements • the Lanes teams developed places suitable for local activation that could provide individuation, vibrancy and dynamism in their immediate vicinity and provide a more local counterpoint to the civic character created in the larger projects • the Art and Experimental teams were able to bring to light previously hidden or less well-known sites in Parramatta’s city centre as well as creating pockets of surprise and beauty. Freed from the constraint of creating an enduring icon or place, these proposals could be current and immediate.
31
The Main Streets The Main Streets Projects are: 1. George Street 2. Macquarie Street 3. Phillip Street 4. Parramatta City Ring Road
16
5
11
13
6 Phill
ip St
7 1
Macqu
arie St
Georg
e St
2
15
12 City Ri ng
Rd
8
Parra
matta
10
4
14
9
Clay Cliff
Diagram of Main Streets
32
lands Creek Park
George Street, Macquarie Street and Phillip Street are Parramatta’s three main east-west streets running parallel to the river, with continuous views through the entire city centre. These flat long streets traverse the city centre’s core and connect to key institutions and the Parramatta City Ring Road, the City’s orbital loop. While their form, size, location and importance give them the potential to become major avenues, they currently lack this appearance. The ring road has been developed from seven existing streets to reduce traffic congestion and divert unnecessary traffic from Parramatta’s central core. Although it exists as a concept, because it is not widely recognised, the ring road is not as well used as envisaged. A common issue for each of these streets and routes is that none have a recognisable identity that distinguishes their role within the city centre or contributes civic quality, despite their importance to both the city centre wide access and Parramatta’s identity.
For Parramatta City Ring Road the opportunity was defined as creating a unique, compelling and cohesive identity for the route. The teams’ shared approach for each of these proposals centred on developing a rich analysis that unearthed the fundamental qualities of the site, leading to the formation of design principles for the streets’ ongoing character and future city centre function. The analyses of all four projects combine to form an interesting narrative about Parramatta’s development. Four routes of similar character have been redefined to become more distinct and recognisable, with each providing a unique contributing character to Parramatta’s city centre.
The project briefs framed this issue in differing ways to reflect each street’s existing and potential future function in the larger network. For George Street the opportunity was about harnessing the heritage value and affirming the street’s role as the city centre’s ‘civic spine. For Macquarie Street the perceived opportunity was about designing the street to become an important transport corridor, potentially with light rail, linking to Parramatta’s Transport Interchange. For Phillip Street the opportunity was defined as highlighting the street’s potential for night-time activation and as a connector of many important city centre thresholds.
33
Plan 1792
Plan 1805
Plan 1813
1792
1805
1813
1820-21 -Brislington
1823-29 - Harris Ford
1841 - Perth House
1885 - Tudor Gates
racter Buildings
George Street – Historic Character Buildings
Historic Character Buildings
George Street – H
George Street Hill Thalis Architecture + Urban Projects, Jane Irwin Landscape Architecture and Turpin + Crawford Studio George Street, Parramatta, is Australia’s first premeditated street — its original grand and formal plan confidently anticipating a vibrant future for Parramatta. Initially planned and constructed to a width of 60m wide, George Street was subsequently reduced to a more standard 25m width. Today, the street contains many important civic, government and heritage buildings.
Parramatta River and Parramatta CBD’s principal eastwest spine. Commencing at the Tudor Gates entrance to Parramatta Park, George Street crosses a range of city centre areas including; the Justice Precinct; Church Street retail and eateries; the future civic link and the city centre office core, and terminates at parklands at either end. Despite its historic importance, in 2012 George Street’s significance is not immediately recognisable and its character is fragmented along its length.
Parramatta 1793 - Fernando Brambi George Street is located midway between the Parramatta Transport Interchange and the
34
Plan 1823 1823
1924-38 - Civic Arcade
Plan 2012 Synthesis
1930 - Roxy Theatre
c Character Buildings
1938 - Bank of NSW
1938 - Courthouse
George Street – Historic Character Buildings Professor James Werrick
“Acknowledging the colonial generator of this project.”
George Street – Historic Character Buildings mark is a
George ldings Street – Historic Character Buildings Historic Character Bui
ila
1793, Fernando Brambila
The brief asked the team to revitalise George Street, harness its heritage value and affirm its role as Parramatta’s civic and commercial spine. A major strength of the team’s approach was the comprehensive and detailed analysis of the street’s historic development. The analysis showed the many important buildings along George Street that have been setback to the original wider alignment creating a series of small squares and forecourts.
The scheme suggests that all existing forecourts and squares are retained and the built form between them should be limited to four storey podiums, with any new commercial towers set behind. The street’s termination points would be reordered commensurate with the street’s significance and promote pedestrian priority at these parkland connections. The new ‘double spatial order’ would guide the built form, location of street trees, landscape and art. 35
George Street will be reinstated as Parramatta’s pre-eminent street by emphasising its length, interpreting its original 60m width, celebrating its green ends and marking its symbolic cross axis.
Sheila hand drawn Plan
George Street Proposal View East from Parramatta Park
36
Philip Thalis
“The CBD needs to gain a new understanding with George Street at its centre.”
The long-term design proposal would reinstate the street’s grandeur and create an immediately recognisable identity for both the street and Parramatta’s city centre. The project would be realised through an Urban Design Strategy and an Urban Art Strategy. The proposed Urban Design Strategy involves: • a double spatial order • a series of small publicly accessible squares and forecourts • changed podium heights and setbacks in the City Centre Develoment Control Plan to define the existing squares and forecourts and emphasise the double spatial reading
• the elimination of requirements for awnings unless part of heritage architecture to highlight civic and commercial building elevations • revitalisation of the individual squares by reducing walls and level changes, shifting stairs and ramps back from the edge of the 20m street reserve, to enable these spaces to reconnect with the life of the street • reviewing street tree planting along George Street to concentrate in the squares and spaces beyond the 20m street reserve to preserve the vista down George Street • deciduous planting in squares along the southern side to allow for good sun access during winter.
37
Projects Ð Parramatta Park Threshold
Projects Ð Justice Precinct
Parramatta Park Threshold
Justice Precinct
George St
38
Projects Ð Perth House
Perth House
Projects Ð Perth H
Ghost heritage Parramatta’s First Wharf
River Park
Projects – River Park
treet Public Domain
House
Plan
The Urban Art Strategy proposes a suite of site specific projects to highlight and reveal the underlying character of Parramatta’s first planned street through a ‘ghost heritage’ that would interpret: • the lost ‘ghost heritage’ in green anchor parklands framing either end of George Street • the lost convict buildings along the former extension to George Street inside the gates of Parramatta Park • the street’s lost original length formerly extending into Parramatta Park • the lost former colonial wharf to be reinstated as a waterside viewing tower, platform or design element activated by tide and water wash.
39
Macquarie Street
Macquarie Street - Existing View
Cox Richardson Architects and Planners, Oculus and Parsons Brinkerhoff Macquarie Street is the southernmost of Parramatta city centre’s three main avenues and has been identified as a possible route for the proposed new light rail eastwest route which would connect between Epping/ Strathfield and Liverpool, via Sydney Olympic Park, the University of Western Sydney, Parramatta and the Westmead Biomedical precinct. Macquarie Street will connect to Parramatta’s Transport Interchange via the proposed public domain of Parramatta Square. The brief asked the team to redesign Macquarie Street as a key component of Parramatta’s transport interchange, with a two-way light rail system and platforms at Parramatta Square and Civic Link in the heart of the city centre. The team presented a highly compelling narrative of the symbiotic relationship between transport and Parramatta’s historical development and then described the best way that the light rail could help renew Parramatta’s city centre.
40
Six key periods mark points of change in the history of Parramatta’s city centre. 1792 – Ferry • town at western extent of navigable Parramatta River • town serviced by water • ferry docked to east of township • George Street as first planned street from ferry to Government House • river an extension of the axis • extension of grid to south. 1883 – Steam Train • arrival of rail makes Church Street the major northsouth route • larger ferries unable to reach original wharf • steam tram on George Street to new wharf at Duck River from 1883
Church Street c 1950
Church Street c 1950
• tram north to Baulkham Hills opened 1902 and extended to Castle Hill in 1910
• ring road formed to eliminate through traffic in central Parramatta
• major catchment to the north reinforces importance of Church Street.
• structured car parks built in the city centre
1920-50s – Car • private vehicles displace public transport • trams removed by 1932 (Castle Hill) and George Street (1943) • Church Street as major north-south arterial • congestion increases as Western Sydney grows • main street retail on Church Street • new vehicular river crossings. 1970s – Ring Road • function of streets and urban blocks altered to accommodate cars • traffic volumes on Church Street impact city centre environment
• pedestrianisation of Church Street at St. John’s • one-way road system introduced. 2015 – Light Rail • light rail transport facilitates north-south connectivity • two-way light rail on Macquarie Street • north-south light rail on Marsden Street • relationship to transport interchange • Pitt/Macquarie streets not part of ring road O’Connell Street two-way • Church Street one-way south from George Street • connect ‘park to park’ and break down block length - new north-south links.
41
ption 2 Side Platform
View of Macquarie Street looking east
42
Macquarie Street will drive the development of ‘large opportunity’ sites and become a tree-lined boulevard for light rail, cars and pedestrians with integrated platforms. 43
pace Types
Public Domain Plan - Space Types
A Public Domain for a Nationally Important CBD
Public Domain for a nationally important CBD
44
Two-way Light Rail Option 2 Side Platform ISSUES & OPPORTUNITIES – Straight alignment – Straight footpaths – Platforms integrated into the public domain – Stopping zones up to 50m long - less impact on public domain, tree planting etc – Footpath width on south side of street 4.1m - 5.2m – Footpath width on north side of street +/- 4m – One north drive accessed affected and one southern driveway access affected by stop locations
Two-way light rail - Option 2 Side platform
Designs were based on the assumption that the proposed system needed to be compatible with other Sydney light rail systems. These are: System Assumptions • vehicle length 30m - 40m • 280m - 320m distance between stops • minimum stop widths - 2m [side footpath] - 2.8m [single sided island] • stop lengths 40m • potential for lane sharing on intersections for turning • LRT priority at traffic lights • overhead power supply or battery/hidden rail through the city centre allows tree planting.
Route options and typical street sections were prepared and compared with the preferred option providing for the best integration of the platforms and tracks within the street and allowing for a fine avenue of new street tree planting to be implemented. It would have: • a two-way system on Macquarie Street with side platforms on north and south pavements — traffic one-way west or east in central lane • lines located on east and west pavements to maximise connectivity to pedestrian network • a route joining George Street at Harris Street intersection and passing along the edge of Robin Thomas Reserve • a north-south light rail route that may be relocated to Marsden Street to protect Church Street amenity.
45
Phillip Street existing view
Phillip Street HASSELL Phillip Street is the threshold between the grid of Parramatta city centre and Parramatta River and links many city centre destinations including the Justice Precinct; the proposed new Riverbank Square, ‘eat street’ north and nine connecting lanes. It is the shortest and most northern of Parramatta’s three main east-west avenues. It is uniquely positioned, with river frontage at both ends of the street, and could form a
46
direct axis between Parramatta’s ferry wharf and the southern end of (and potential entry to) Parramatta Stadium. Currently Phillip Street has a scattered pattern of functions and activity with many available spaces for adaption and activation.
Street is close(but to thenot activity of the city to the river 1. PhillipPhillip Street is close connected)
2. PhillipPhillip Street is the line between Street is thedividing dividing line between city andcity riverand river RIVER CORRIDOR
GEORGE ST= +70%
CITY CORE
MACQUARIE ST= +130%
CHURCH ST= +500%
Phillip Street has a scattered pattern of functions and activity
3. PhillipPhillip Street can visually extended to the water Street canbe mediate the conditions of city and river
4. Phillip Street can become an important social space
A STREET FLOODED WITH LANDSCAPE
Eating and drinking Shopping Doing business Doing business Shopping Eating and drinking
A STREET FLOODED WITH LIGHT
Phillip Street experiences: the big event
5. Phillip Street can amediate the conditions of city and river
Phillip of Street is close (butinfrastructure not connected) to the 6. Two lines subsurface areriver introduced
Parramatta Park/Stadium Ferry Wharf
1_Arrive by ferry 2_Wait for buddies in Market Square 3_A couple of pre-match beers 4_Parramatta Stadium (only a 5 minute walk!) 5_Celebratory drinks at the Streetside Bar 6_Night market for kebabs 7_Onward to Church Street... 8_How did I get home again ...?
Phillip Street can be visually the water 7. End points are marked withextended larger to elements
8. Phillip Street has a scattered pattern of functions and activity Phillip Street can become an important social space Culture Precinct
Parramatta Park/Stadium
Riverside Precinct
Parramatta Park/Stadium
Ferry Wharf Justice Precinct
Church Street
Ferry Wharf
Commercial Precinct
9. Parramatta’s population today Parramatta is ...
RAPIDLY EVOLVING
#2
YOUNG 35.2% OF PEOPLE ARE AGED
25-34 YRS
GLOBALLY CONNECTED
50%
OF PEOPLE (CBD) BORN OVERSEAS
ENTREPRENEURIAL
85.9%
OF BUSINESSES HAVE 1-4 EMPLOYEES) 5
MULTICULTURAL
84%
SPEAK ENGLISH + ANOTHER LANGUAGE
LGA IN SYDNEY (2010)
47
5. HTTP://FORECAST2.ID.COM.AU/DEFAULT.ASPX?ID=265&PG=5210
Phillip Street will become a new event promenade linking adjoining night-time and recreational uses with Parramatta Stadium and Charles Street Wharf.
Two lines of subsurface infrastructure are introduced
End points are marked with larger elements Phillip Street experiences: the daily journey home
CIVIC SYSTEM (water, energy, gas, fibre, etc)
LIG INF
1_Arrive by train 2_Drop by the gym 3_Pick up take-away dinner 4_Home
WATER SYSTEM (subsurface water collection system)
Two lines of subsurface infrastructure are introduced
Phillip Street experiences: the daily journey home
WA PA
End points are marked with larger elements
The brief asked the team to design a high quality street environment to highlight the various city thresholds and embrace the street’s potential as a night-time destination.
special character and highlight the many recreational destinations that can be reached from Phillip Street. They illustrated this by mapping a range of imaginary routes that a visitor could experience.
Two major strengths of the team’s approach were the recognition of Parramatta city centre’s existing and future community and the identification of the street’s potential to be extended along its axis to connect to the southern tip of Parramatta Stadium. This would bring this popular and symbolic destination into real connection with the city centre, public transport and other key night-time destinations. The concept proposal identified a loose structure to create a
“Parramatta is a young area that is highly multicultural leading to a demand for new urban amenities and services that meet the needs of the diverse population. A large portion of the population speaks a language other than English and the majority of businesses in Parramatta are small. We recognise the entrepreneurial spirit that exists in Parramatta and we are looking to harness and promote this in our design.” HASSELL.
48
Design tactics Streetside parking is inhabited for night and weekend uses
Design tactics Setback zones become filled with landscape and sculpture Design tactics
Setback zones become filled with landscape and sculpture
HASSELL
GHT SCULPTURE/ FORMATION POST
“This design will establish Phillip Street as an event street. It will enable the community to actively shape the street and adapt it to their various requirements on a daily basis.”
ATER TREATMENT ARK
The design detailing was conceived as an apparatus for community activity. The proposal introduces two lines of infrastructure. On the northern river side, a subsurface water and drainage system would support the landscape. On the southern city side there would be a system of multifunction poles to integrate energy, gas and most importantly light, and become markers for different activities. The riverside terminations would be marked by a larger sculptural element and open space. The new infrastructure would identify Phillip Street’s city/river threshold character, with each side of the street reflecting their adjacent and differing contexts. There would be mini
parks, reed beds and rain gardens. Green trellis would be used to create shade, points of rest and to mitigate flooding and heat island effects. Light poles could support market structures for evening food stalls and weekend markets, incorporating inbuilt projectors for street cinemas and providing information screens, community notice boards, phone charging points and drinking fountains and other services.
49
“Boring, plain, frustrating, 1980s”
Parramatta City Ring Road TERROIR, ASPECT Studio, u.lab University of Technology Sydney and Richard Goodwin Pty Ltd The Parramatta City Ring Road was planned to reduce traffic congestion by diverting through traffic away from the city centre. It comprises seven existing streets; the Great Western Highway, Pitt Street, O’Connell Street, Victoria Street, Macarthur Street, Harris Street and Parkes Street. While the road infrastructure exists, as do several planned design changes to traffic lanes and signalling, to increase capacity and efficiency, the ring road and its relation to the city and surrounds has not been well articulated to date.
Parra Block is the name the team developed to embrace all aspects of the project, including the functional and physical and the changed perception of the city centre.
The brief asked the team to create a unique, compelling and cohesive identity for the Parramatta City Ring Road.
• the ring road doesn’t correspond to the actual city centre boundaries, either physically or perceptually
The team started from the assumption that the road’s identity is interwoven with the city centre, both spatially and from an image perspective. They undertook extensive site analysis — including mapping, photographs and documentation of physical attributes — and asked community members to describe Parramatta as a place, as well as to draw its perimeter.
50
Appropriately for a project with such a strong focus on movement through space, sequence, image and way finding, these analyses were edited together with a drive around the road to create a film bringing the whole experience together. The analysis described several key elements:
• the ring road, due to its width and heavy traffic volumes could act as a barrier or could become a gateway element into the city centre and a connector between the city and surround rather than a divider • 28 streets and paths currently cross the ring road, where people enter or leave the ‘block ‘
“I think of a place where there are people from all over the world.”
“Very busy place, pretty much got everything.”
“I think of traffic and congestion.”
• a large low-density neighbourhood exists inside the ring road but outside Parramatta’s city centre, and could become a new high-density neighbourhood to enrich Parramatta and help develop the city, namely the north bank. • new citizens will help to strengthen and subtly refine the city centre’s identity as it grows and cultural programs will help to attract these citizens to Parramatta. The team extrapolated that in 20 years time the combination of the ring road and the city centre’s 40km pedestrian amenity zone could greatly reduce the percentage of vehicles in the city centre compared to people walking, using public transport and cycling which would further enliven Parramatta’s cultural and street life and the city centre’s resilience.
Its four main components are: 1. The City Centre project 2. The North Bank project 3. Pressure Point projects. A series of pressure point projects providing improved connectivity are necessary to deliver the vision; including bridges, river buildings, cycle paths and pedestrian networks; which integrate the 14 other curated city centre projects. 4. Software projects. Culture will be developed in parallel with the physical projects over a 20-year timeframe with small initial projects gathering creative citizens via social media and public engagement to larger and longer-term ambitions to develop major cultural institutions.
Parra Block would be developed via a 20-year plan to become a distinct place to live, work and create.
51
1
7
2
8
a
g
b
h
c
i
d
j
9
10
i
e
k
f
l
j
11 12
r
m
13 14
k l
n
m
o o
p
s
q
t
52
Parramatta City Ring Road - Existing Views
Residents and workers were asked to draw Parramatta City Centre
15
16 n
h
9
g
f 8
e 7
c
d 6
5
b 2
3
4
a
1
28 y x w 27
17 o p
v 26 25 22 24 21 23 20 19 18 u s t q r In addition to the analysis and film, the team prepared concept designs for three defining parts of the proposed ring road. • a new pedestrian bridge across the river at Gasworks Bridge
Parramatta City Ring Road - Existing Plan
• improved intersection design for ring road users as well as people crossing at the intersection of Church Street and Great Western Highway • a schematic approach to ‘fine grain densification’ of the proposed addition to the city centre in the northeastern corner.
53
EET CHURCH STR
p
o o
GREAT
WESTER
N HWY
GREAT
EET
PARKES STR
WESTER
N HWY
Map with 4 strategies = Church Street
Church Street
NORTH DIRECTION SOUTH DIRECTION EAST DIRECTION WEST DIRECTION CHURCH STR EET
w
CURRENT CONDIITIOON O : EXI EXISTING I ST TRAAFFIC FFLLOW TRAFFIC WS 1:1000
27
v
Map withGasworks 4 strategies = Church Street
Bridge
North Bank
EET
WILDE AVE
ROAD
SORRELL STR
VICTORIA
CHURCH STR EET
4 STREET
3
MARSDEN
28
RETAIN PROMINENT URBAN FABRIC
PAR
RAM
54
STREET SMITH
CHURCH
STREET
ET N STRE MARSDE
O`CONN
ELL STRE
ET
Map with 4 strategies = Church Street
ATT
AR
IVER
EET CHURCH STR EET
PARKES STR
NEW RIGHT HAND TURN LANE WAY NORTH DIRECTION SOUTH DIRECTION EAST DIRECTION WEST DIRECTION CHURCH STR EET
BBRIEF I F : ADDITTIOONAAL RRIGHT I T HHAND AN D TURN NNORTH TURN ORTTH BOUUND [ADDITIONAL [AD ITIOONAL LAN LANE] NE] 1:1000
Proposal 1 - Church Street
SECTION A 1:200
Parramatta Ring Road will become an identifiable threshold inviting movement between Parramatta’s city centre and surrounding neighbourhoods, and directing flows around the city centre.
SECTION B 1:200
ELEVATION C 1:500
EET
Proposal 2 -Gasworks Bridge
BULLER STR
THOMAS
STREET
EXISTING BUILT CBD RETAIN BUILT FABRIC NEW BUILDING DENSITY OPEN SPACE NEW CYCLE PATH NEW PEDESTRIAN LINKS FORESHORE ACTIVATION ZONE NORTH BANK AREA
HARRIS STR EET
ELIZABETH
STREET
NEW GAS WORKS BRIDGE PROPOSAL
UPGRADE BRIDGE CONNECTION NEW & UPGRADED PEDESTRIAN BRIDGES RING ROAD BOUNDARY
PHASE 2: NEW MIXED-USED URBAN DENSITY TO NORTH BANK
Proposal 3 -North bank 55
Public Spaces and Parks The Public Space and Parks Projects are 5. River Square 6. Charles Street Square 7. Horwood Avenue-Civic Link 8. Church Street Mall 9. Clay Cliff Creek Parklands 10. Smith and Station Streets Greening
16
5
11
13
6 Phill
ip St
7 1
Macqu
arie St
Georg
e St
2
15
12 City Ri ng
Rd
8
Parra
matta
10
4
14
9
Clay Cliff
lands Creek Park
Diagram of Public Spaces and Parks Projects
56
Like many Australian cities, Parramatta’s public life has focused on its streets rather than its squares. Recognising the need for larger spaces to house big events and the importance of squares to foster the planned and spontaneous social life and activities that encourage people to gather, Parramatta is planning for the creation of new public spaces as well as substantially reworking and expanding existing spaces. The sites are located in a north-south spine along the centre of the city centre and several coincide with one or more of the major streets projects. The public space and parks projects share a theme of change and represent most clearly Parramatta’s aspirations for transformation. One of these sites, River Square, does not currently exist as a public space, and two sites, the Civic Link and Clay Cliff Creek Parklands, involve considerable expansion of the current space and complete renewal. While the Church Street Mall, Charles Street Square and Smith and Station Streets greening projects inhabit existing spaces, major transformation of the space’s appearance are proposed through transfiguring the plan, decluttering the site and including elements such as seating and stalls that will encourage people to inhabit the space, rather than just passing through. Three of the public space sites are streets with reduced traffic roles to allow increased pedestrian and social life. These are: • Church Street Mall – which has been closed (between Darcy and Macquarie streets) to traffic since 1970 • Horwood Avenue – a partially existing street that will be extended when a Council car park is demolished to create a civic link extending from
Parramatta Transport Interchange through to the river. Even though it will be as wide as a main street, the avenue’s traffic role is limited to providing access to buildings, affording spare capacity for a series of small pedestrian pocket parks. • Smith and Station Streets are currently major traffic arteries with widened footpaths created by generous building setbacks providing considerable potential for a green overlay to enhance its current function as a major bus route. These three projects shared a common theme of creating smaller spaces within a larger public area to catalyse activation and create small havens of amenity and comfort. The opportunity for Church Street Mall was to propose options for an immediate short-term makeover/clean up designed to improve the mall’s appearance, and encourage events. The opportunity for Horwood Avenue was to design a green spine including water, landscape, and places to socialise and relax. The opportunity for Smith and Station Street Greening was to propose alternative green solutions for footpath locations where street trees are precluded due to services and other conditions. Presented as a green ‘necklace’ of parks and places along Clay Cliff Creek, this team’s proposal extended a linear park model to link important parks surrounding Parramatta’s city centre and form a four kilometre continuous parkland walk with the potential to act as a new ‘green lung’ for the city centre and foster new recreational activities. This expanded green loop would corresponded with the eastern section of the ring road loop as well as the three main city streets and also points to opportunities for a revitalised image for Parramatta’s city centre.
57
aa low low still still reflective reflective canal... canal... Helen Lochhead
“... Parramatta needs to bring people back to the river ... This is a once in a lifetime opportunity to reengage with the water in an evocative way….”
A low still reflective canal
River Square JAAA, Turf Design Studio, Roberts Day, Equatica and Electrolight River Square, a new public space, is planned to replace an existing Council car park.
allowing for gathering, meeting, quiet contemplation, conversations and celebrations.
The brief asked the team to design a concept for a new riverfront square and terraced foreshore to the river and parklands. The square, an urban character, would have; capacity for everyday uses and well as major events of up to 20,000 people, be able to withstand flooding and designed on the assumption that the ferry wharf remains at Charles Street.
There were important functional requirements that needed to be resolved:
The team noted that the river is presently barely visible from adjoining streets due to the level changes and width. They subtly expanded the brief as about reconnecting with the river — physically and symbolically — and transforming a vast space at the edge into a meeting place at the heart,
58
• the six to eight metre change in levels between the city centre and the water • the requirement for a space that works well for individuals, groups, and city centre and regional events • the creation of a thematic link to the Civic Link • periodic flooding impacts. The simple, pared back and restrained design would provide an elegant and enduring space for Parramatta’s city centre, that amplifies the river rather
...
or accommodates a celebrating
respite - to simply sit & chat......
A place that offers respite - to simply sit & chat
or accomodates a celebrating community
than dominating or competing with it. The square has a unique character and its scale would augment Paramatta’s existing suite of public spaces
would allow for widened platforms of grass and gravel in which you can ‘nestle’ and find quiet, and the tree canopy is integrated.
Four main elements are proposed.
Steps are also proposed on the northern bank, cascading down and visually linking the square across the river.
The River Steps The river steps are the spine of the square, a continuous unifying link running the 250m length of the square, and allowing access to the river edge at any point. The general step structure is a 1600mm wide by 450mm high terrace step. Walkway and ramp access would be embedded within the steps, providing seamless at grade access to the river edge. The river walk widens out to a promenade at the base of the river steps. Further modulation of the steps
The Green A generous open grass green space would be at the heart of the square. The grassy lawn gently orients towards the river, overlooking the steps and terraces and facing the wooded northern foreshore and the sun’s warmth. The lawn would accommodate many modes of use from weekday lunchtimes to events and gatherings.
59
River Square will be a grand square drawing people to the river, formed by elemental, grandly proportioned terraces, lawns and stairs.
Upper Plaza The upper plaza flanked by cafes and bars would be above the river flood level (at RL 6.4), and provide a meandering progression through colonnades and smaller spaces that open up at bends and junctions. River Square Proposal - View from the North Bank
The Link The river link would extend the Horwood Place axis and draw you in. The Willow Grove heritage building provides a fine anchor to this link and could be flanked by still reflective water, echoing the river’s character. Water would transition into ephemeral shallow depressions in the main square overlooking the river that would fill with rainfall and provide opportunities
60
for engaging with the water. The marshalling of the waters in lineal formations echoes the strength of the business district — while the capacity for overflow and ripple reflects the ephemeral modes of the river at the River Square — drawing the curious through to the plaza.
The potential to integrate nodal spaces within the lane network may also be possible.
At the centre of the link, a new public building made of glass and with public and cultural uses is proposed to replace the existing rear extension to Willow Grove.
• 1:100 flood level = 6.0
Floods and Levels • 1:20 flood level = 5.5
• Minimum habitable level = 6.4 • River level generally = 1.15
Public Domain Driven Development
• Drop from adjoining streets to river level = 7-8 metres
A masterplan with some suggested refinements is also proposed — identifying some modification of building footprints potentially with concessions for height to maintain gross floor area which would enable an extended river plaza.
61
the river link
River Square Proposal - View looking East
the river link the river link
Context Plan
62
masterplan Masterplan
63
ACTIVITIES ACTIVITIES - Ferry - Ferry - Cafe - Cafe - Amphitheatre - Amphitheatre - Water performance - Water performance - Park Ribbon- Park Ribbon - Sound + Light - Sound + Light
1
MOVEMENTMOVEMENT - Pedestrian - Pedestrian - Ferry - Ferry - Pier - Pier - Vehicles - Vehicles
2
GREEN GREEN - Landscape -Planes Landscape Planes - Canopy - Canopy - Green walls- Green walls
3
AXES + VIEWS AXES + VIEWS - Phillip Street- axis Phillip Street axis - Charles Street - Charles axis Street axis - Water axis - Water axis
4
PLACE PLACE - tidal salt water - tidal / river salt water / river - fresh water -weir fresh water weir - embankments - embankments - slopes - slopes - 1:100 storm- flood 1:100line storm RL 6flood line RL 6
5
8 / 25
8 / 25
Charles Street Square Context Landscape Design, Zoe Spiegel, CM+ and Urban Art Projects The Charles Street Square site is the closest access point to the river and parklands from Parramatta’s main city centre area and at its lowest point is the ferry wharf. The current space is cluttered, municipal in character and acts as a visual barrier to the river. The brief asked the team to redesign the northern terminus of Charles Street and create a lively urban square and series of terraces adjoining the wharf and river parklands. The team’s approach was based on detailed historical and physical analysis of the site’s development. They noted: “Here saltwater meets fresh, and inland waters first reach those of the tidal harbour. …. Prior to European settlement, this place was a gathering place for traders from across Australia. 64
Middens and stones attest to the power of this place as a place of coming together ... Governor Phillip’s plan for this part of Parramatta included a riverfront square, Queen Square, and survives somewhat in the current name for this area,’ Charles Street Square. Its current use an as a ferry landing point is, in some ways, a continuation of this earlier pattern.” Charles Street Square team The analysis led to their description of the site as being a place in motion and to a design approach centred on drawing the broader city grid and natural setting into place and stripping back the unnecessary clutter to reveal the site’s inherent potential, and improve its function.
Charles Street Square team
“There is motion in the tides, ‌ in ferry movements, in people arriving and departing, and in vehicles skirting the edge of the space ... These movements give this place an authentic life, but are not yet placed into a framework ...â€?
Charles Street Square - Existing
65
Charles Street Square will be pared back to its essential elements to connect to the river, frame the escarpment and create activated terraces.
Charles Street Square - Proposal View from the North
66
Charles Street Square team
“The development of the city centre, required a bold vision for projecting the city grid over the landscape to create a ‘clear urban framework’ …Our responsibility would be to respect the place’s past while giving its narrative meaning for the future. We envision a new name for this place that does not rely on a nearby street name, but supports its own complex identity ‘Water Square’. “ 67
14
16 14 10
+4.0
09 11
+5.85
08 +7.5
13 02 03
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17
Charles Street Phillip Street Plaza Cafe Terrace Phillip St Pier Pier Kiosk Rivercat dock River amphitheatre River walk Weir Basin Artwork to pier Tidal artwork Riverside artwork Outlook/artwork To River Sq. To Queen Sq. Concept Plan
ncept plan
68
05 12
+7.5
01
04
12
06
Helen Lochhead
c h a r l e s s t re e t s q u a re
‘There is nothing static in the quality of the site. There is an opportunity to reinforce its dynamism and make the invisible visible …. But it doesn’t want to be overdesigned ... It wants to be the ‘prelude’ and part of a new language in how the city centre meets the river….”
07
15
17
folds
“The design builds upon the city centre grid by projecting street corridors north and south of the river to define a greater square that also embraces the river. New elements were then positioned to reinforce this ‘conceptual’ square 0and to make 10 a place 20 that is conducive to movement and resting. Phillip Street is unique in Parramatta as it essentially 11 begins and ends at the river. As such it provides an opportunity for connecting the city centre, physically and metaphorically, back to the river.” Charles Street Square team Philip Street would be extended as an art walk, and a metaphorical ‘landing pier’ toward the east that would act as a marker (when seen from the river), allow for
Detail
a café overlooking the river and provide shelter for arriving and departing passengers beneath. Its eastern end could house a signature piece of art visible along Phillip Street.
50m The Charles Street axis would continue down to the water, (as it once did for cattle crossing), and be / marked 25 by a landscape gesture. The other sides of the square would be implied within bush and riverside parkland across the river and art pieces would be installed to inviting the public to discover the square. The slope down to the river would be configured as a ‘folded’ welcome terrace providing access as well as a place for gathering; lunch sunshine, evening performances, and promenade.
69
Horwood Avenue Civic Link Gallagher Ridenour, Redshift and Equatic The Horwood Avenue Civic link is a planned extension of Horwood Place that would eventually connect Parramatta’s two major public spaces, the River and the transport interchange beyond. The brief asked the team to design a green spine including water, landscape, and places to socialise and rest. The team identified the site’s key elements as being; passage and flow of people and cars; the existing
70
and evolving built form; and the creation of places of collection and “pooling” of water, sunlight and activity. They developed a narrative around three main themes, flow, flux and collection, to integrate these elements. The extensive site analysis also revealed the importance of the section both longwise and cross wise to understanding this site and revealing and magnifying its unique characteristics. A long-term vision as well as short-term interventions embracing the reality of the ‘here and now’ have been proposed.
Brief - Civic to River FLUX FLOW COLLECT
CIVIC PLACE
ith
.
St
M
Sm
ac
Ge
or
ie
St
.
St
.
St h
p
St
C hu rc
illi
RIVER SQUARE
ar
.
Ph
ge
qu
.
Axis - Civic Place to River Square
Flow - Flow Civic Place to River Square - Civic to River +14
+12
Flow- water - Water Flow
+10 M
ac
St.
St.
St.
ith
h
M
ac
3600m2
qu
ari
e
Flow - people Flow - People
St.
22.4 ha GeCatchment
+8
org
e
St.
p
St.
h
illi
St.
3500m2
Ph
5.6 ha Catchment
ith
St.
M
ac
Sm
qu
ari
e
St.
Localised storm water collection
Ge
org
Ph
illi
p
e
St.
St.
Primary storm water flow
St.
h
St.
St.
Sm
rc
p
hu
illi
hu rc
e
+10 Ph
C
org
St.
C
+8
Ge
e
rc
+10
ari
hu
+10
qu
C
ith
Sm
Greater than 1000 p/h 300 - 600 p/h 200- 299 p/h
Analysis
Horwood Avenue - Existing View
71
Horwood Avenue Civic Link will become an activated green spine connecting Parramatta Square and River Square.
72
River Square Phillip Street
Civic Square
George Street
Macquarie Street
Flow Flux Collect - The Street
Conceptual Conceptual planplan
Flow Flux Collect - the street
Phillip Street
George Street
Macquarie Street
Collect - Water treatment and planting
Collect - water treatment and planting
Pools Water
Water
Trees
LightLight
Trees
M
People People
M
ac
qu
ac
ar
ie
Geo
rg
e
Geo
rg
St.
e
St.
s
Phi
llip
Phi St.
qu
ar
St.
s
llip
St.
Pools Horwood Avenue Proposal - View of New Bar near Roxy 73
ie
St.
Flow - Building interface and street activation Commercial Frontage Lobbies
Fine Grain Commercial
Lane way Activation Opportunities
O
Phillip Street
George Street
Macquarie Street
Existing Cafe/Bar & Future Opportunities
built form and solar access potential
12pm - January 22
12pm - March 22
12pm - June 22 20st
O
24st 35st 6st Built and Solar Access Flow Form - building interface andPotential street activation
Future Lane
Roxy 01 - Plan
+0.45 +0.45
Waste Storage
Existing Access Stair
Existing Plant Room
+1.35
+0.90
+0.45
+0.45
Roxy
Plan
Flow “The design reveals the flow of water through the site. Rain gardens are located at key areas of stormwater collection and extend beyond the kerb edge and into the public space, creating incidental garden ‘rooms’.” Horwood Avenue team The design is for a generous 10m wide linear pedestrian footpath along the eastern side of the street, providing ease of movement and social places. At four locations, there would be groves of deciduous trees extending the full width of the street, creating pockets of sun and shade, protection and respite. A rain garden ‘threshold’ would extend across the avenue signalling the nearby river, where the street slopes down to Phillip Street.
74
+0.45
The rain gardens could be watered by stormwater runoff from adjoining Council car park rooftops collected through a tapestry of coloured pipes. New lighting and paving would reinforce pedestrian movement. The detailed design of materials and elements such as inlet kerbs, facetted gutter details and custom paving would make explicit the concealed patterns of the stormwater flow and collection. Flux Recognising that Horwood Avenue is a space in flux, the design changes the proposed building envelopes (to those currently proposed in the Development Control Plan) to ensure maximise solar access can reach the street during lunchtime hours.
Existing Forecourt
Phill
Geo
Mac
west
east
Option 1
4m footpath
Phillip Street
George Street
Macquarie Street
Horwood Place
6m carriageway
10m linear walk
west 3m setback
Option 2
3m pkg
east Horwood Place
Flow - parking
George Street
Temporary Installation - Carpark Water Treatment -1
Temporary installation - Carpark Water Treatment
Closure of the southern vehicular entry to Horwood Place car park is suggested in the short-term to improve the exisiting pedestrian link through the car park. This can be achieved without undue impact on car park function, and would be a first step to creating the busy pedestrian area lined with retail tenancies envisaged in the long-term. Collection and Pooling The design provides many opportunities for gathering and meeting. There would be seating and small squares at the cross-locations of lanes and the avenue. Seating would also be located beneath tree groves. Garden beds and seating have been sited and scaled to encourage incidental gathering and meeting.
Two options for seating were developed in more detail next to the blank western façade (facing Horwood Place) of the Roxy Theatre. One, a low-key approach, involves alternating planting with terraces and seating facing the street. The second more dramatic and theatrical solution creates a four metre high stepped ‘bleacher’ terrace facing north. The terrace would connect to a second higher terrace, (providing for future connection into the Roxy) and create a public ‘stage’. Beneath the terraces would be a small café/or bar with colourful lighting, creating a new destination under the red neon sign of the Roxy Theatre.
75
Church Street Mall JMD Design, Lacoste + Stevenson Architects and Toko. Concept. Design. Church Street Mall is the city centre’s most enduring public space but currently lacks identity, civic character and is perceived by some to be unsafe at certain times of day. The long-term plan is for the mall to become the first in a series of interlocking public spaces running across Parramatta Square. The brief asked the team to propose two different options for an immediate short-term makeover/clean up to improve the mall’s appearance, encourage visitation, and events while the construction of Parramatta Square unfolds over the next 10-15 years.
76
Church Street Mall is a valuable public space that has been incrementally added to without a vision for its role in the city centre’s public life. The space contains some of Parramatta’s oldest civic buildings and monuments, but they are aligned along the previous street’s geometry resulting in a space more suited to walking and moving through than gathering and socialising.
Church Street Mall - Existing
s and the site Consider reversing traffic flow in Church St towards Church St Mall to raise its presence
Church Street Mall team
5. 3.
k
1.
4.
2.
Historical elements and the site
“Church Street Mall suffers the same fate as many Australian city centres; we need a pedestrian area, let’s close a street! This has not achieved a great public space for pedestrians, market stall holders, entertainers, and public art or Council maintenance staff ...”
1. St Johns Church 2. Town Hall 3. Centennial Clock 4. Royal Gates 5.Protected view to church from Church Street 77
Concept 01
pt 01
Concept 02
Macq
uarie
1.
3.
4.
Concept 1
2.
7.
9.
6. 5.
10.
8.
Legend 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
all
nson Design obin Dyke
g See
Market lanterns. Pavement artwork activity zone. Ephemeral water feature. Upgraded playground. Church gate. Seating edge. Flower beds. Cinema screen. Lighting. Future light rail.
Proposal 1: The Public Room(s) In this first option the dominance of the street geometry is minimised and a new order that is more like a public room is created from a series of smaller spaces. The newly configured space integrates with the St John’s Church garden and children’s playspace area to create a legible whole that would be able to accommodate a full range of current and future civic, event and social functions.
78
Three different but related principal spaces terminating the newly created Parramatta Square and Church Street connection to Westfield are proposed. • a paved market area runs north south • an upgraded playground and water feature on axis with the northern section of Church Street • the gardens of St John’s and its forecourt. The paved market area would reinforce the markets as a major and recurrent event. It would be anchored
Stree
Church Street Mall will become a lively public square and garden area providing a setting for heritage buildings and events and a front door to Parramatta Square.
t 01
et
on sign in Dyke
Concept 1 - Plan
Concept 1
See
at its northern end by permanent iconic stalls providing colour and shade and serving as ‘lanterns’ at night. New paving would incorporate public art. The permanent market would be augmented with temporary stalls as demand dictates. Performance and cinema would take place at the southern end of the market area. There would be places to sit and watch the world go by. It is a place of activity and vibrancy as people traverse it towards the station and southern retail precinct. Should the light rail eventuate it could also run through this space.
In contrast, the gardens of St John’s, including lawns and beds, would continue to be a place of calm and repose for conversation, reading and exercise. Construction hoardings along the southern end of Church Street would be enlivened with public art projections and crazy mirrors to invigorate the mall in the short-term.
79
Concept 02
Concept 02
Layout
Concept 2
PARRAMAT TA Church Street Mall TEAM Lacoste + Stevenson Toko. Concept. Design Daryl Jackson Robin Dyke JMD Design Pamela Mei-Leng See
Proposal 2: The River Of Activity This second option accepts the strong diagonal street geometry of the mall and utilises it as an organisational device to unify the surrounding areas that symbolically and physically reconcile the opposing forces of history and development. The concept builds upon the ideas of Parramatta Square as a meeting place and Parramatta as the meeting place of salt and fresh water. It sees the river as a conceptual spine with the ability to reconcile the site’s disparate and sometimes opposing elements. Historical buildings meet new development, farming meets the civic space.
80
A unifying space would be created that could provide all of the necessary functions of a multicultural civic space. Utilising many of the same features as the first concept, this option also delivers flexibility to the space, allowing it to be reinvented, night and day through the use of multifunction street furniture and innovative lighting to highlight elements.
The Story
Civic Square = Meeting Place Parramatta = Meeting place of salt and Fresh water Agricultural History meets City The Meeting point of Opposites Historical Elements meet City Development
SALT CITY CONTROL ORDER CORPORATE FIXED FORMAL ORDER
FRESH AGRICULTURE ORGANIC ADAPTABLE LANDSCAPE DISORDER SOFT FLUID
PARRAMAT TA Church Street Mall TEAM Lacoste + Stevenson Toko. Concept. Design Daryl Jackson Robin Dyke JMD Design Pamela Mei-Leng See
Concept 02
Flexibility/ modes
PARRAMAT TA Church Street Mall TEAM Lacoste + Stevenson Toko. Concept. Design Daryl Jackson Robin Dyke JMD Design Pamela Mei-Leng See
Concept 2 - Plan
81
PARRAMAT TA Church Street Mall TEAM Lacoste + Stevenson Toko. Concept. Design Daryl Jackson Robin Dyke JMD Design Pamela Mei-Leng See
View of proposed screen 82
Night time view
Both concept designs envisage a more cohesive, distinct place with an altered geometry and an improved public domain. Adjacent areas — including the grass and gardens surrounding St John’s and the future Parramatta Square — are embraced in both proposals. A suite of common elements has also been designed to accompany both schemes. The range includes purpose-built stalls and street furniture elements which will help to animate the public realm.
Market as flexible street furniture 83
Clay Cliff Creek Parklands Government Architect’s Office, Parramatta City Council Landscape Architecture, Equatica and Lightwell Clay Cliff Creek Parklands is a proposal for several new neighbourhood parks and the revitalisation of Jubilee Park to form a much needed local recreational focus in ‘Auto Alley’, along Church Street south of the Transport Interchange. The brief asked the team to develop a concept for managing Clay Cliff Creek and designing adjoining parks, both existing and proposed, to assist in revitalising the Auto Alley area.
84
The team’s approach was complex and multi-layered. The new parklands were designed to accommodate intermittent flooding of Clay Cliff Creek, reduce the ‘heat island’ effect, create a recreational focus and the potential for kitchen gardens while providing urban habitat. They summarised their approach as ‘Urban by Nature,’ addressing the cross-dependencies within the infrastructures of water management, food production and heat islands.
IRON IRON IRONCOVE COVE COVE COVECREEK CREEK CREEK CREEK IRON IRON IRON COVE COVE CREEK
HAWTHORNE HAWTHORNECANAL CANAL CANAL CANAL HAWTHORNE HAWTHORNE HAWTHORNE CANAL CANAL
Parramatta River system
THE THE THEPONDS PONDS PONDS PONDSCREEK CREEK CREEK CREEK THE THE THE PONDS PONDS CREEK CREEK VINEYARD VINEYARD VINEYARDCREEK CREEK CREEK CREEK VINEYARD VINEYARD VINEYARD CREEK CREEK ARCHER ARCHER ARCHERCREEK CREEK CREEK CREEK ARCHER ARCHER ARCHER CREEK CREEK
SUBIACO SUBIACO SUBIACOCREEK CREEK CREEK CREEK SUBIACO SUBIACO SUBIACO CREEK CREEK
CHARITY CHARITYCREEK CREEK CREEK CHARITY CREEK CHARITY CHARITY CREEK
CLAY CLAY CLAYCLIFF CLIFF CLIFFCREEK CREEK CREEK CLAY CLAY CLAY CLIFF CLIFF CREEK CREEK
ABECKETTS ABECKETTS ABECKETTSCREEK CREEK CREEK ABECKETTS ABECKETTS ABECKETTS CREEK
TARBAN TARBAN TARBANCK CK CK CK TARBAN TARBAN TARBAN CK CK
DUCK DUCKCREEK CREEK DUCK CREEK DUCK DUCK CREEK
DUCK DUCK DUCKRIVER RIVER RIVER RIVER DUCK DUCK DUCK RIVER RIVER
HASLAMS HASLAMS HASLAMSCREEK CREEK CREEK CREEK HASLAMS HASLAMS HASLAMS CREEK CREEK
POWELLS POWELLS POWELLS POWELLS POWELLS POWELLS CREEK CREEK CREEK
SALTWATER SALTWATER SALTWATER SALTWATER SALTWATER SALTWATER CREEK CREEK CREEK
Parramatta CBD showing river and channel IRON IRON IRON COVE COVE CREEK CREEK IRON IRONCOVE COVE COVECREEK CREEK CREEK IRON COVE CREEK
HAWTHORNE HAWTHORNECANAL CANAL CANAL HAWTHORNE CANAL HAWTHORNE HAWTHORNE CANAL
Parramatta River system Parramatta River system
Parramatta CBD and channel Parramatta cityshowing centreriver showing river High hydraulic hazard zone and channel
High hydraulic hazard High hydraulic hazard zonezone Cycle network showing proposed link
Context Plan
Cycle network showing proposed link
Cycle network showing proposed link
85
Clay Cliff Parklands team
86
“The park attempts to address three major global challenges: food production, water management and heat island effects while at the same time providing exciting new local experiences.�
Clay Cliff Creek Parklands is a proposal for expanding and revitalising Jubilee Park to form a much needed local recreational focus in Auto Alley.
87
Clay Cliff Parklands - Proposal at Jubilee Park
Creek Banks & Margins 88
Detail of proposal at stormwater channel
Clay Cliff Parklands - Plan
The parks have been designed as a series of urban wetlands, which are essentially green spaces, bound by reeds reminiscent of a creek system. Tree-lined avenues would define pedestrian and cycle access and create a positive transition between the adjoining buildings and parks. The existing stormwater channel must be retained to accommodate flooding and a boardwalk has been proposed to better integrate the channel with the park. The boardwalk would include art and seating and would float over the concrete channel and form a main pedestrian spine through the parklands. The revitalised parks would become part of a sequence of existing parklands, including Parramatta Park, Ollie Webb Reserve and the river banks, ringing the city centre. These can be linked together to create a four kilometre green ‘armature’ to assist with cooling and civilising the city centre.
“The parkland loop would establish a new path for pedestrians and cyclists and establish the city centre of Parramatta as a greener, more habitable and better … integrated with its natural surrounds.” Clay Cliff Parklands team This re-imagining of Clay Cliff Creek will contribute to improving the quality of the the city centre’s stormwater and the creek’s urban ecological role; connect the inner city suburbs to the river; strengthen the landscape experience for those approaching the city centre; and offer the opportunity for a larger open space network that would improve pedestrian and cycle links through and around the city centre.
89
Smith and Station Streets team
“The site has become a disconnected, segmented, underutilised and cluttered environment lacking a commonly understood identity. It has untapped potential that needs to be recognised and revealed.� #05 GREEN ENVY
#0
#05 GREEN ENVY
•T
• PARADISE LOST • 01_ LACK OF GREEN SPACE IN CBD • LACK OF GREEN SPACE IN CBD • 02_ SMITH + STATION SITS CENTRALLY WITHIN CBD
RIVER FORESHORE WILLOW GROVE
HERITAGE COURTYARD PARRAMATTA PARK
RIVER FORESHORE
PARRAMATTA PARK
•V BR
SMITH + STATION SITS •• 03_ SMITH + STATION INTERCENTRALLY WITHIN BARRACKS CBD FACES WITH LANCER
•N
• 04_ SMITH + STATION CAN FORM GREEN THREAD IN CBD • SMITH + STATION INTERFACES WITH LANCER BARRACKS
•P VA
ROBIN THOMAS RESERVE
BICENTENNIAL SQUARE
SMITH + STATION
ST JOHNS CHURCH
LANCER BARRACKS
ST JOHNS CEMETERY
• SMITH + STATION CAN FORM GREEN THREAD IN CBD
•L
• REMNANTS REMAIN
•S RI
•L
CHURCH STREET
Site Context
Analysis - The Disconnect
_ SITE 15_SMITH + STATION STREET CARMICHAEL STUDIOS LANDSCAPE ARCHITECTS_NOBBS RADFORD ARCHITECTS_SUZIE IDIENS
_ SITE 15_SMITH + STATION STREET
#02
3$5$',6( )281' CARMICHAEL STUDIOS LANDSCAPE ARCHITECTS_NOBBS RADFORD ARCHITECTS_SUZIE IDIENS ‡ 723 2) 7+( +,// $6 $;,6 +8%
SITE 15_SMITH + STATION STREET. THE GREEN THREAD
CARMICHAEL STUDIOS LANDSCAPE ARCHITECTS_NOBBS RADFORD ARCHITECTS_SUZIE IDIENS
‡ 7+5($'6 &211(&7 $1' %,1'
• LIK OCC DIVE POT
• SM THE WHIC CAN
• SM CEN
• THE THE COM THE
_ SITE 15_SMITH + STATION STREET CARMICHAEL STUDIOS LANDSCAPE ARCHITECTS_NOBBS RADFORD ARCHITECTS_SUZIE IDIENS
Analysis - Paradise found
Analysis - The Thread
_ SITE 15_SMITH + STATION STREET CARMICHAEL STUDIOS LANDSCAPE ARCHITECTS_NOBBS RADFORD ARCHITECTS_SUZIE IDIENS
Smith and Station Street Nobbs Radford Architects and Carmichael Studios Smith and Station Streets are strongly affected by public transport and paved surfaces and hard building surfaces, resulting in localised heating during summer and excessive run-off during rainstorms.
development. The analysis showed how ongoing interventions had worked to obscure the city centre’s original terrain.
The brief asked the team to propose green solutions for footpath locations where street trees are precluded due to underground pipes, driveways, street furniture and services.
The design proposal is composed of several elements that could be built independently and join together to create a previously unrecognised ‘green thread’. Some elements would require major transformation, others are more immediately achievable.
A major strength of the team’s approach was the comprehensive analysis of the site’s historic
The major transformation proposed was to relocate the bus interchange and allow the site to be
90
Smith and Station Street - Existing
s “
n C s
transformed into a central new green park adjacent to the station and opposite the Lancer Barracks — to be known as the Hill. The proposal envisages the creation of a stepped green wall and rain gardens along the railway edge in Station Street — the Urban Wetland. The small-scale interventions were for small pocket arbours along Smith Street — described as the Hubbub.
91
The Hill - Morphology
The Hill - Existing
The Hill - Proposed
The Hill The Hill - View looking South Best described as a place to provide relief from the _ SITE 15_SMITH + STATION STREET hectic urban rush, The Hill would connect with the Lancer Barracks across the CARMICHAEL road. Lining the western STUDIOS LANDSCAPE ARCHITECTS_NOBBS RADFORD ARCHITECTS_SUZIE IDIENS edge would be a floating ‘urban veranda’ allowing visitors and workers to gather and gaze across the street, north towards the river. Within the barracks, ‘Smiths Orchard’ and a market place are proposed to replace the car park and establish a productive forecourt.
92
LAWN/MEADOW - PERMEABLE #12 WATER WATER SURFACE
LAWN/MEADOW - PERMEABLE SURFACE
S S
S S
SOFTSCAPE PLANTING - PERMEABLE SURFACE
SOFTSCAPE PLANTING - PERMEABLE SURFACE
Smith and RAIN Station GARDEN/BIO Streets SWALE - WATER POLISHING ZONES team
RAIN GARDEN/BIO SWALE - WATER POLISHING ZONES
“ This natural hilltop, provides a natural vantage point that once offered prospect and sanctuary. Today itS is divided, harsh S and inaccessible.” FLOATING DECK/BRIDGE
S
S
FLOATING DECK/BRIDGE - PERMEABLE GRAVEL UNDER - PERMEABLE GRAVEL UNDER
STORM WATER/RAINSTORM WATER WATER/RAIN WATER MOVEMENT MOVEMENT
EDGE STORMWATER PICK UP EDGE STORMWATER PICK UP IN GROUND STORM WATER IN GROUND STORM WATER COLLECTOR/TANK
COLLECTOR/TANK
NOTE: - TREAT STORMWATER NOTE: - REDUCE RUN OFF - TREAT STORMWATER - REDUCE DOWN STREAM - REDUCE RUN OFF POLLUTANT DISCHARGE - REDUCE DOWN STREAM - WATER TO PLANTING ZONES
POLLUTANT DISCHARGE - WATER TO PLANTING ZONES
The Urban Wetland _ SITE- Plan 15_SMITH + STATION STREET CARMICHAEL STUDIOS LANDSCAPE ARCHITECTS_NOBBS RADFORD ARCHITECTS_SUZIE IDIENS
#10 THE HILL • REPLACE THE BUS + CAR • URBAN VERANDAH. THE VIEW ACROSS THE PADDOCK. SANCTUARY. • PEDESTRIANISED ACTIVATED PROMENADE. • TILTING PLANES. PROSPECT. EVENT SPACES. AMENITY. STAGE. MEADOW. ART INSTALLATIONS. GATHERINGS • BRIDGES ACROSS THE CREEK. • INDIGENOUS PLANTING FAUNA HABITATS FRAME AND DEFINE • GREEN THREAD. BLUE THREAD • WIND + SOLAR POWERED • ORCHARD COURTYARD AND MARKETS REPLACE CAR PARK. • EXISTING BUILT FORM RETROFITTED. • ACTIVATION NODES ADDED • BARRACKS CONNECTED. GREEN HUB FORMED
The Urban Wetland The southern end of the site is the flood prone section of Station Street bounded by the elevated rail line. A new ‘folded’ wall is proposed to clad the rail wall. The wall’s northern facets would transform in response to changing light and climatic conditions. The wall’s southern facets would be green walls that could transform into an urban waterfall during rain events. At the lowest point of the lowlands would be an urban wetland incorporating rain gardens.
The Urban Wetland View to Station Street Wall
93
#23
• RE DES
• PE NUR PRO
• WI OFF
• CA
• AC RAIN
• CA
• WE COM PLA
The Hubbub
_ SITE 15_SMITH + STATION STREET
ARMICHAEL STUDIOS LANDSCAPE ARCHITECTS_NOBBS RADFORD ARCHITECTS_SUZIE IDIENS
The Hubbub - Detail
94
Smith and Station Streets will be civilised with seating, shade and rain gardens.
The Hubbub 2
The Hubbub
The Green Thread
The Hubbub proposed for Smith Street includes green meeting places and wi-fi facilities under green shade canopies within activity pods floating above roadside rain gardens. By providing café spill out spaces, vendor havens and market stalls and stages, a range of spontaneous activation opportunities would become available. Pedestrian and planting zones would be separated to allow the urban desert to ‘bloom’.
Pre-European plant communities that characterised the Parramatta region including River-flat Forest, Cumberland Plain Woodland, Shale/Sandstone Transition Forest, Sydney Sandstone Ridge top Woodland and Sydney Sandstone Gully Forest, would be planted to create the green thread linking these proposals. This would be complemented by the water sensitive urban design ‘blue thread’. “Our desire is to create a blue thread for Smith and Station Streets by integrating a stormwater narrative throughout the site. This is particularly poignant given the sites’ geography and connection to Parramatta River and its environs.” Smith and Station Streets team
95
The Lanes The Lanes Projects are; 11. Freemasons’ Arms Lane 12. Barrack Lane 13. Erby Park and Lane 13 14. Wentworth Car Park and Lanes 15. Batman Walk
16
5
11
13
6 Phill
ip St
7 1
Macqu
arie St
Georg
e St
2
15
12 City Ri ng
Rd
8
Parra
matta
10
4
14
9
Clay Cliff
Diagram of Lanes Projects
96
lands Creek Park
Parramatta’s extensive lanes network will be improved to increase ‘fine grain’ access and street level activation. The lanes sites have previously been identified in the Parramatta City Lanes Strategy as being suitable for renewal and activation. Two of these lanes, Barrack and Freemason’s Arms, are older service type lanes mostly addressed by back entrances and providing shared pedestrian and vehicular access along the carriageway. Wentworth, Erby and Batman Lanes are part of networks that were created in the 20th century to provide access to the decked car parks built in the city centre. Batman Lane will eventually be incorporated into the extended Horwood Avenue Civic Link. This project was for an installation that could exist and enliven the lane in the intervening years. The opportunity for Freemason’s Arms Lane was to design a temporary installation or event to allow the adjacent property owners and public to see the lane as an interesting destination instead of a car park, and to encourage adjacent properties to address the lane. The opportunity for Barrack Lane was to make it a popular city centre destination, not just a through route. The project approach for both teams was to identify new activities along the way that could lead to ongoing transformation. The proposed new activation had a strong relationship to existing nearby building uses. The Barrack Lane team took a long-term and interventionist approach suggesting changes to the adjoining buildings that would be possible to deliver as these sites slowly became renewed as part of the developing city centre. They saw the school as an important contributor to lane activation. The Freemason’s Arm’s Lane team approach was based upon a clear mapping and analysis of site opportunities and constraints. The latter identified highly imaginative and practical small-scale interventions that could occur almost immediately and would gradually transform how people perceived the lane and its appearance and role in Parramatta.
The opportunity for Erby Park and Lane 13 was to provide a concept design for the park and adjoining lane that creates a well-used leafy green and activated haven in the city centre. The opportunity for Wentworth Car Park Lanes was to develop a concept for the lanes network and the car park elevations that activates and enhances this part of the city centre. The opportunity for Batman Lane was to propose a short-term makeover incorporating the proposed adjacent bakery to enliven this area and create a fine grain pocket square in the city centre. The Wentworth Car Park and Erby Park and Lanes teams all analysed the relationship between these ‘hidden’ parts of the lanes network and the mainstream city grid and considered opportunities of this ‘second’ city for enriching Parramatta’s city centre. A shared theme of these car park lanes projects was to replan and repave the ground plane to reduce space designed for vehicles to a minimum and increase the available area for pedestrians and more social uses. These projects also shared similar proposals to incorporate a mix of uses into the car park to encourage activation, especially on the roof, through the installation of public stairs. Batman Lane, the smallest of the lanes projects, was also posited as a short-term installation and the team used this brief to develop a proposal for a new seat and pavement with a strong artistic element. The five lanes projects combine to form many approaches for realising the vibrancy of the city centre’s lanes network. Together they show that the ‘lanes’ palette can be more localised and diverse than the more traditional streets and spaces of the ‘first city’ and can introduce a range of elements including; public stairs over several floors; relocatable and foldaway kiosks; pop-up activities and timesharing of spaces and buildings to increase usage and micro businesses that bring life to the city centre 24/7.
97
Freemason’s Arms Lane - Existing View
Freemason’s Arms Lane Heide Axelsen, Hugo Moline, Adriano Pupilli Freemason’s Arms Lane is a service lane providing back of house access to retail shops and restaurants along Church Street. The back elevations of these shopfronts provide a diminutive scale and fine grain character to the lane. Despite its physical potential, the lane is currently uninviting to pedestrians due to a domination of parking, garbage collection and servicing needs.
98
The brief asked the design team to create a temporary installation or event which allowed adjacent property owners and the general public to see Freemason’s Arms Lane as an interesting destination and address rather than a car park. A major strength of the team’s approach was their detailed study of the site, mappings and ‘bespoke’ response. The team mapped out the physical
“they all know where to park so we can’t get them” Parking Enforcement Officer
“it’s just a back door to the restaurant, just a place to get deliveries, to park and to put out the rubbish” Indian restaurant manager
“I don’t think I would use it for anything else” Indian restaurant manager
properties of the site as well as interviewing locals to identify a set of transformative, albeit small-scale, opportunities. The lack of “inexpensive entertainment for young people” was clearly iterated within community responses and became a critical driver of this project. Interviews were also undertaken with adjacent building owners in order for the design team to discern temporal opportunities within existing daynight rhythms of use.
The proposal is to develop a staged reinterpretation of the lane through a series of mini projects and events. A staircase theatre, legal street hawking, a pop-up bar in a nook, and collectivised rubbish were key aspects, with each option presenting different opportunities within the scheme. Pivotal to activation of the space is a program of focused and sensitive curation that builds off existing Parramatta city centre cultural events.
99
CURRENT USES: CURRENT USES: ACCESS ACCESS
CURRENT USES: CURRENT USES: PARKING PARKING
PROPOSED USES: PROPOSED USES: AS OPPORTUNITIES VOIDSAS VOIDS OPPORTUNITIES
PROPOSED USES: TIDAL RYTHYMS
MON.
24.00
TUE.
24.00
WED.
24.00
THU.
24.00
FRI.
24.00
SAT.
24.00
CURRENT USES: CURRENT USES: RUBBISH RUBBISH
PROPOSED USES: PROPOSED USES: VOIDSAS AS OPPORTUNITIES EXPAND OPPORTUNITIES VOIDS OPPORTUNITIES
CURRENT USES: CURRENT USES: TREES VEGETATION
CURRENT USES: CURRENT USES: ALLCURRENT CURRENT USES ALL USES
PROPOSED OCCUPATION: RUBBISH
GARBAGE COOPERATIVE RENTS ONE CAR SPACE FROM CROWN PROPERTY TO CREATE CENTRALISED, SECURE, WASTE DEPOT.
PROPOSED USES: LEGAL STREET HAWKING
Current Uses
Proposed Uses
100
SUN.
24.00
24.00
Freemason’s Arms Lane team
Voids as Opportunities - 1
“We see the lane as an estuary – it’s a place for the ‘little shrimp’ to grow up before they become the ‘king shrimp’ of Church Street.”
Voids as Opportunities - 2
Voids as Opportunities - 3
101
CONNECTING IN FREEMASONS ARMS LANE TO ONGOING CULTURAL PROGRAMS
SYDNEY SACRED MUSIC FESTIVAL
STRATEGY LAUNCH GARBAGE COLLECTIVE INTRODUCE ‘SIDESHOW’ PLAN LOCAL BUSINESSES
INTRODUCE LANE TO EXISTING FESTIVALS FOR PROGRAMMING
CALL FOR EXPRESSIONS OF INTEREST FOR RESIDENCIES TO ACTIVATE STAIRCASE THEATRE, STABLES BAR, ART WALL, CINEMA
FABRICATE & INSTALL STAIRCASE THEATRE, STABLES BAR, CARTS AND GATEWAYS LAUNCH OCTOBER 2013
INDIVIDUALISED RUBBISH
COLLECTIVISED RUBBISH
(CURRENT APPROACH)
(POTENTIAL APPROACH)
= 9920L of rubbish 23 x 240L
3 x 4500L 4 x 1100L
102
INFORMATION & CULTURAL EXCHANGE
OFF-SITE CULTURAL ACTIVATORS RIVERSIDE THEATRE FORM DANCE MARS HILL CAFE MILKCRATE THEATRE
9 LIVES PARKOUR
OPERA AUSTRALIA (Western Sydney Community Choirs)
POWERHOUSE YOUTH THEATRE
MISSION AUSTRALIA (soup kitchen/entertainment)
SYDNEY SACRED MUSIC FESTIVAL + SYDNEY FESTIVAL PARRAMATTA + HERITAGE ROSE FESTIVAL + PARRAMASALA + LOY KRATONG FESTIVAL
POP UP PARRAMATTA
2100
PARRAMATTA ARTIST STUDIO
1100
Proposal - Section detail
Proposal - Section detail
View of Proposal for the Theatre 103
Freemason’s Arms Lane - Proposal
Freemason’s Arms Lane will undergo a staged reinterpretation to realise its unique potential as a fine grain public space through a series of micro projects and sensitively curated cultural events.
104
Helen Lochhead
“This scheme reminds me of the kitchen at parties, where all the excitement happens out the back.�
105
Barrack Lane Group of Like-minded Designers (G.O.L.D.) Barrack Lane is a busy pedestrian route located between the Parramatta Transport Interchange and George Street’s commercial zone. It is Parramatta’s oldest existing lane and is a key route in the city centre’s lanes network. The brief asked designers to recognise Barrack Lane’s historic significance and realise its potential as a popular city centre destination, rather than a pedestrian through route. The team’s approach was to identify the opportunity for a youth-focused public space offered by the location of Arthur Phillip High School within the lane. Introducing an element of fun into the laneway — through the concept of urban play — builds off this opportunity and is a key feature of the design. 106
Activation by the school is currently limited due to their back-of-house utilisation of lane. The team accordingly focused on a methodology for drawing out this potential through a long-term plan for engagement with the school. This relationship would be the basis for the lane’s youth focus and would assist in activating the lanes’ existing elements. The project recognised the potential of Barrack Lane to become more than just a lane and vehicular servicing point, and developed strategies for the site to transform into an interesting public space within the city centre. The team presented a long-term view of the lane’s development and included options for five, 10 and 20 year scenarios. The long term scenarios involved expensive land acquisition and major redevelopment of nearby sites.
Barrack Lane -Analysis
Framework Diag
The three key themes of the project were: • Destination: Create a destination rather than a thoroughfare through strengthening of the northern and southern end points of the laneway, providing art installations and cafés to provide anchors of activity. • History: Acknowledge the lane’s rich history by revealing existing heritage items — including the underground convict drain, cottages and convict barrack’s wall to new audiences. • Education: Develop the potential of the site as a place for children and teenagers within the city centre through community engagement with Arthur Philip High School. Consider blurring the boundary between the school and the laneway to encourage interaction between the two. Barrack Lane - Existing
107
“As children and young people explore the outside world... They develop detailed knowledge, often intertwining their own identity with that of the places they spend time in. This...relationship...provides an important foundation for seeing children not merely as objects of adults’ care and protection, but rather as citizens with a feeling of ownership and belonging with an active stake in a locality.”
0-5 YEARS: UNVEILING HERITAGE
5-10 YEARS: CREATING DESTINATION
10 - 20 YEARS: COMMUNITY INTEGRATION
“Excitement for the future should be anchored in the security of the past”
“A continuously used public space with its many memories can help anchor one’s sense of personal continuity in a rapidly changing world.”
”By the building up of overlapping memories of individual and shared experience, a place becomes sacred to a community.”
- Demolish substation and activate gravel pit with urban playscape - Open first half of Green Lane - Commence Community Garden
- Develop carpark site through PPP – lower level school and workshops with commercial above - School consolidated along laneway edge - Redevelop sports grounds - Open up cross block links
- Remove a percentage of carparks and replace with bike store and end of trip facilities - Clusters of school demountables - Commence new Green Lane connection - Aquire and remove college building and open up forecourt to heritage cottages
E Adams and S Ingham, Changing Places: Children’s participation in environmental planning (London:Children’s Society, 1998); M Jans, ‘Children as citizens: towards a contemporary notion of child participation’, Childhood 11 (2004).
Lynch (1960) in G. Ashworth & J. Tunbridge, The Tourist-Historic City: Retrospect and Prospect of Managing the Heritage City (Oxford: Elsevier Science Ltd, 2000)
D.Francis & S.Hester, An Invitation to Ethnomethodology: Language, Society and Interaction (London: Sage Publications Ltd, 2004)
D.Francis & S.Hester, An Invitation to Ethnomethodology: Language, Soci Sage Publications Ltd, 2004)
MACQUARIE STREET
TREET
Section
GEORGE STREET
EET GEORGE STREET
MACQUARIE STREET
Plan
108
Barrack Lane will be enlivened by urban play elements and engaging with Arthur Phillip High School.
D
D - Existing
H - Existing
H
D - Proposed
D
H - Proposed
109
Sub Station - Existing
Sub Station - Proposed
Analysis - Plan
Erby Place and Lane 13 DRAW, Tyrell Studio, Dr L.Stickells and Dr Z.Begg The Erby Place car park was built during the 1980s with vehicular access from Horwood Avenue and a set of narrow lanes running along its northern edge to Phillip Street. The project site focused on an existing pocket park fronting Phillip Street and Lane 13 which wraps the west and southern edges of the car park. Such pocket parks are rare in Parramatta’s city centre and this one does not currently realise its potential due to poor design and amenity and the absence of activation. 110
The brief asked designers to provide a concept design for Erby Place and Lane 13 which converted the existing space into a well-utilised leafy green activated haven within the city centre. A major strength of the team’s approach was to highlight the possibilities offered by an alternate reading of the lanes network as a second-layer to the city centre. This ‘second city’ could have a different set of rules, ambitions and modes of activation to the
first city of main streets and major public spaces. The proposal for the project site begins to explore the potential for Parramatta’s service spaces to become more than sites for storing cars and garbage. It builds on the Parramatta Lanes Strategy, improves the pedestrian network, increases city centre parkland, and provides new areas for activation. Erby Park - Existing View
111
Erby Place and Lane 13 will become an animated pocket park and community hub.
Erby Park Proposal - View South
The main elements of the proposal are: a reduction in car dominance, improvements to the appearance of the lane, car park and park; and increased opportunities for activation. This will be achieved by: • a unifying permeable treatment across the lane and park that increases the pedestrian area and recognises the historic significance of the site as the original location of Wycombe House, owned by the lane’s namesake, GT Erby, who was a draper in the 1890s.
112
Rod Simpson,
“This design presents one of the most compelling narratives of Parramatta’s second city.”
The Second City from Phillip Street
• a new planted public stair which leads from the park to the roof of the car park, integrating the two areas and providing access to a rooftop event space for markets and other community events. • the installation of a modular amenities block with a generous roof on the top level of the car park to support the new community event space.
• a community engagement strategy proposed to invite different people to use the roof. Planned gatherings such as a rooftop farmers markets, basketball games or car boot sales are also proposed to encourage community investment in the park.
113
Erby Park Proposal - View East
Erby Park Proposal - Plan 114
Erby Place and Lane 13 Team,
“How can a ‘second city’ coexist? It has a second set of rules, a second set of spaces — provides hints and clues which intervene, interact and ‘infect’ the first city.”
Erby Park Proposal - Section 115
• Poor sightlines through site • Lack of permeability • Poor wayfinding
• Poorly defined pedestrian paths • Dominant car use
Ride
Ride
Walk • Back-of-house, service zones address lanes • Mixed uses, lack of identity and urban clarity
Wentworth Car Park Team
“Parramatta has many enticing qualities — an historic urban grid, heritage parklands Walk and river frontage, yet it suffers from a lack of distinctiveness. To escape the urban sameness, the city needs to cultivate distinctive neighbourhoods with special places, diverse facilities, and delightful happenings.” Wentworth Avenue Car Park and Lanes BKK Architects, Glas Urban Design and Landscape Architecture, Electrolight & Renew Australia Wentworth car park is a 1,000 vehicle parking facility located in the southern portion of Parramatta’s city centre. It is a Council owned asset which provides a key service to commuters. The existing lanes network at its perimeter connects northbound to the transport interchange, east to the southern commercial office hub and west to the Church Street eateries. Despite daily pedestrian use, the Wentworth car park lanes network is dominated by vehicular use and does not currently present a desirable image. 116
The brief asked the design team to propose improvements to the lanes’ network and car park elevations to encourage pedestrians use and reinvigorate this part of the city centre. The design approach was to challenge the ‘urban sameness’ that characterises much of Parramatta’s public spaces and streets by drawing out a compelling narrative from the existing ‘mosaic of subcultures’ within Parramatta city centre.
ER
RIV
ER
FR
ST
LN ETH
EW AL
K
AT E
RR
ROBE
E
T
LIP
ST
ST
PHIL
ERBY PLAC E ERBY PLAC E
ST
IL LINE
LN ARG
ST
DAR CY
LITTLE
ST
CHARLES
ST
M
PARKES
IN E
ST
JUBILEE PARK
ST
ST
ES
COWPER
UNA
L AL ND KE ADA
Wentworth Carpark - Close proximity to intermodal transport hub
ST
ST
STspace cityYpublic
NT
ST
EARL
HW Y
ON
on-grade carpark
TERN
LE
E
building footprint
PARK W ES
ANDERS
AT
ALL
AV
GRE
Key
VA
H ST
ST
WENTW ORT
ST
HASS
ION
ST
ST
IA
ST
ILL
CHURCH
ELL
ST
STAT
FIT ZW
AIRD CAM PB
ST
RN RA
ST
ST
AIRD
UNIO N
US
CHAR
ST
LES
BA R RAC K
LN
ST
SMIT H
CHU RCH
Laneway network - A Second City
UARI E
ST
WESTE
ST
WOO D PL
EN MAR SD
ST
SMITH
ARGY LE
N
HOR
ST
LL
GEO RG E
MAC Q
RTSO
ST
BRIS LIN HOUS GTON E
ST. JO HNS PARK
AS
ALAS KA
PROP S PUBL OSED ERV E SPAC IC E
JUST ICE PREC INC
ELIZAB
THOM
ONT PDE
SID
NS AV E
DA VID
RIV
Pedestrian networks make for a walkable city of human scale
QUEE
MA TTA
ELIZAB
RA
ETH
LAM
PA R
OCON NE
TER PD E
W IL
EDGEWA
DE
ST
PARRAMATTA PARK
ST
ST
ST
SORRELL
EN MAR SD
PALMER
MARKET
HUNT ER
RD
ST
PL
VICTORIA PRINCE ALFRED PARK
Walk
Wentworth Car Park - Existing
117
Wentworth Car Park and Lanes will realise their potential as a ‘slow hub’ and multimodal transport interchange lined with pedestrian activities and lively shopfronts.
118
Wentworth Car Park and Lanes Proposal - Aerial View
119
THE PROPOSITION A layered approach
Pedestrian/Car shared zone
Layer 1: A shared ground plane
N
Pedestrian zone
• Reconfigure traffic circulation for equity between cars, pedestrians and bikes. • Remove short term parking from car park periphery • Pedestrianise the East and part of the North lane • Provide dedicated cycle lanes with lane resurfacing to articulate ‘slow’ zones
“Slow Hub” programs within the car park
A blank canvas...
The concept for the Wentworth Car Park and Lanes Network is a strategy for a ‘slow hub’ — a multimodal transport interchange that provides an easy transition from car, bus and train into the slower, more experiential modes of walking and cycling. The design limits the space required by vehicles in order to free up parts of the lanes for pedestrian use and improved activation. The north face of the car park and the roof are identified as key locations for activation, to draw people into and around the lanes network.
120
The design for Wentworth Car Park and Lane’s Network is a strategy consisting of a several layers: • Layer 1: A shared ground plane of consistent surface which changes the priority of the site away from cars towards ‘slow users’. This includes reconfigured traffic circulation, prioritisation of pedestrian movement and removal of short-term parking within the lanes. • Layer 2: An upgraded urban environment and activated ground plane. This includes encouraging
N
Rooftop Cinema?
Wentworth Car Park Team
“The ‘slow hub’ will make it easier and more enjoyable to move from the car into city life. It will welcome people into an unexpected and memorable urban experience.”
Layer 3: The Roof & Car Park Facade
Layer 2: Activated ground level
• A new, highly visible roof use - attract users from the city and the wider Sydney area for a specific activity • Animate the facade - provide a new address to broader urban context
• Provide incentives to encourage surrounding cafe & restaurant owners to spill into the lanes • Open up the ground & first levels of the North façade to provide additional programs - a Slow Hub theme • Provide more direct connections between the car park and the surrounding lanes
N
An Urban Park?
A Bar?
?
existing café and restaurant occupants to spill into the laneways; sculptural intervention; and potential vertical activation of parts of the northern facade, a new external stair, and steps from the ground plane into the basement of the car park connecting into a multi-use facility for commuter cyclists.
• These three layers will be implemented over time resulting in a gradual transformation of the area. Gradually a strong identity will emerge assisting to create a distinctive neighbourhood within the city centre.
• Layer 3: A highly visible, sculpturally iconic roof and enticing roof activity. Strategies proposed include a roof top bar, roof top cinema, pop up park, aerial velodrome or play space.
121
Batman Walk Team
“Batman Walk presents the challenge of an apparently ordinary lane. The task is to create a work that will extend the cultural aspirations of the city by way of impact, presence and quality.” Batman Lane - Existing View
Batman Lane - Plan
Batman Walk Andrew Burns and Brook Andrew Batman Walk has a sunny north-south orientation and central location, making it an ideal lunchtime retreat. It will eventually be widened and redeveloped to create the Horwood Avenue Civic Link, however in the meantime the lane has the potential to function as a much needed pocket square within the city centre. Council have negotiated to lease the Council owned building to the east of the lane to an artisan baker in order to activate the laneway and attract passersby.
122
The brief asked the design team to propose a shortterm renovation for the lane which incorporates the proposed bakery, enlivens the space, and creates a fine grain pocket square in the city centre. The strength of the design approach was to recognise the potential of an everyday element, such as public seating, to become a fun and iconic element. The team’s design built on existing seating precedents
Batman Lane - Proposal Plan
from around the world, together with explorations of geometry and pattern. The seat serves a functional purpose, acts as a drawcard and is used to transform the lane into a popular destination. The artistic seat element envelopes the lane and attracts passersby through the use of strong visual imagery. Bold use of monochromatic colour, geometry and pattern are applied to the ground plane
and ‘folded’ over the solid perimeter edge seating. The geometry of the bench’s form creates a variety of spaces and seating options for café visitors. The uniform material finish uses optical devices to change in response to pedestrian motion and perspective.
123
Batman Lane Existing View looking North
124
The short-term proposal for Batman Walk will use a compelling artwork/seat to attract passersby and define a lively pocket square.
Batman Lane ProposedView North
125
The Art and Experimental The Art and Experimental Projects are: Lonely Laneways A Place in the Sun A Space for Urban Follies Parra-Net
16
5
11
13
6 Phill
ip St
7 1
Macqu
arie St
Georg
e St
2
15
12 City Ri ng
Rd
8
Parra
matta
10
4
14
9
Clay Cliff
lands Creek Park
Diagram of Potential sites for Blank Canvas Projects
126
These four projects invited design teams to identify a previously unrecognised site for an appropriate installation, known as the Blank Canvas projects. The opportunity defined by the brief was for designers and artists to identify and propose a site specific improvement and/or artwork for a blank wall or group of blank walls that currently make a negative contribution to the city centre. Artists’ played an intrinsic role in most of the Design Parramatta teams. For these projects in particular, the artist’s role was paramount. These projects share an exploratory and experimental theme but are all very different in realisation. Some used the artistic input to encompass the entire space while other projects proposed a more traditional approach of a free standing object. For several, a strong component of interactivity between the use of work and passerby. operated. These projects work with the senses through light and dark, sound, sitting in the sun and/or colour and recognise the possibilities the city centre offers beyond work and home.
127
ART WORKS LOCATIONS - Erby Place - Batman Lane - Wentworth Laneway
MIRROR ALUMINIUM
LED LIGHTING
1800 mm
LIGHT DIFFRACTION PLASTIC
Artworks for Lonely Laneways Studio Damien Butler The proposal is for a series of sculptural objects placed within disused lanes that change in response to human interaction. The main design approach is to provide an artwork which embodies and reflects the character and mood of disused spaces within the city centre. The design proposes a collection of sculptures to be placed in lanes which share the same shape and form
128
but respond differently to each environment based on how different objects are placed and interacted with. Each sculpture is technologically hardwired and consists of mirrored aluminium, light diffracting plastic and LED lights. As people approach the sculpture – either incidentally or deliberately – the object alters its ‘mood’, reflecting this with a combination of colour and light.
A proposal for a series of sculptures placed within quiet lanes that would respond to people passing by.
Studio Damien Butler
“Lonely spheres placed in laneways across Parramatta anxiously pulse their lights to express their loneliness ... not until people choose to enter the laneway and interact with the sphere do they change their state and respond to the attention given.� Proposal - View 129
ACTIVITY / FUNCTION
ANATOMY OF SPACE
AGENDA / PRINCIPLES
Distil and intensify the experience of third layer spaces, and promote diversity in their use. 1.
Enveloping, immersive, sensory and/or invites exploration, is dynamic, interactive or participatory
2.
Infrastructure to facilitate activity, platform for exhibition, clever furniture
3.
Opportunistic, contextual, ‘ minimal’or sensitive, varied and free to grow
Exterior
Primary
Side space
Service space
Through space
Gates
Secondary
Level change
Corner
Beacon / sign
Boundary / wall
Collective – formal
Collective – informal
Service
• • • •
• • •
• • •
• • •
Meditation/contemplation Study Coffee Exercise
Immersive
Light
Pixel
Door / window
Thresholds
Individual
Sculptural
ELEMENTS
Entry / arrival space
Cinema Bar, cafe Group exercise
Surface
Kinetic
Digital record
Sound
Picnic Event Spontaneous dance
Framed view
Gallery
Landscape
Green
Kitchen, toilet Loading dock, bin enclosure AC / plant
Folded / pop out
Object
Temporary / mobile
Furniture
Meta Strategy - Old Eyes / New Eyes
A Space for Urban Follies Old Eyes New Eyes
te Two, Macquarie Lane - Old Eyes / New Eyes
The ‘meta-strategy’ provides a design framework which enhances the sensory experience of leftover spaces and creates opportunities for new types of activity. The design approach is to develop a whole of city strategy for approaching and improving small-scale, forgotten spaces. The strength of the scheme was its principle-based approach to spatial improvement unencumbered by property boundaries.
130
Site Three, Railway Embankment and Art Studios - Old Eyes /
The team developed a series of design interventions that could be applied to enhance the sensory experience of different types of space and which provided a variety of platforms for different types of activation. The interventions focused on the addition of light, sound, landscape and urban furniture. The strategy was tested on a number of demonstration sites which included an alley opposite Bicentennial Square, Macquarie Link, and an art playground.
FR
EW AL
K
AT E
Existing pedestrian links to be retained
RR
LIP
HOR WOO D
ST
UAR IE
ST
ST
S
BA R RAC K
MAC Q
ST
SMIT H
CHU RCH
MAR S
ST
CHA RLE
DEN
OCON
GEO RG E
LN
NELL
ST
PL
ST
ST
HUNT ER
WEST
ERN R
ST
AIL LIN
E
LITTLE
ST
M
ST
VA
A HASS
LL
ST
IA
WENTW
Map of Third Layer Spaces - Old Eyes / New Eyes
ST
IL L
ST
ST
L
CHURCH
BEL
ST
ION
AIR I D
ST A T
FIT ZW CAM P
ST
S CHARLE
ST
AIRD
ST
ST
DAR CY
UNIO N
ARG
SMITH
ARGY LE
ST
LN
ST
ER VE
US
PHIL
Third layer demonstrated sites
ROBE RTSO N
ES
Desired new pedestrian links Potential third layer spaces
An art framework for enhancing the quiet out of the way spaces focusing on sensory experiences.
SID
NS A VE
ER
ER
QUEE
Desired new lanes
RIV
RIV
ST
DA VID
ALA LASK A
MA TTA
BET H
RA
Existing lanes to be retained and enhanced
ELIZA
PA R
Key
LE
NT
IN E
PARKES
ST
Map of Third Layer Spaces
/ New Eyes
Old Eyes New Eyes
“We believe that Parramatta’s creative culture is underestimated and hidden.”
131
input
output
‘then and now’ photographs of the old and new of the City
Element 1
viewer Element 2
camera / sensor
central repository system
detect movement / density of people in each location
council building / foyer / library / future civiv square
Element 1 output interface site specific inter face
phone apps programmed to influence colour output on display screen
LED screen / billboard and camera where required
Element 4 transfer of data to localised driver at each site
Element 1 Element 2 Element 3 Element 4
design parramatta - mulloway studio + ernest edmonds - september 2012
Parranet Mulloway Studio and Ernest Edmonds The design proposal is for an interconnected urban artwork which utilises a network of screens of varying size and location, and an accompanying smart phone ‘app’ to provoke thought and activate negative facades and spaces within the city centre.
dge
Pop Ups september 2012
The design approach is to propose an artistic framework which collects data on different parts of Parramatta (past and present) and redistributes
design parramatta - mulloway studio + ernest edmonds - september 2012
132
it based on a pre-formulated algorithm onto four proposed elements. Multiple levels of public engagement are proposed within the artwork which changes with respect to colour, image and speed and can be interacted with by movement, viewing, and an element of public curating. The four display elements are: 1. three large-scale billboard and LED/LCD screen elements installed in key locations between the
river parraNET 03
future river square
future civic link parraNET 02 future civic square
central node railway
parraNET 01
An artwork proposal made of mounted screens, and an accompanying smart phone ‘app’, using colour and community generated images to animate blank facades and spaces within the city centre.
pop up’s
Mulloway Studio and Ernest Edmonds
“Parranet is a project that explores how large scale, ‘flat’ artistic installations can activate the negative elevations of buildings in Parramatta’s city centre. Through the use of large colour surfaces coupled with historical and real time images activated by sensory technology, Parranet aims to transform parts of the city centre into an urban gallery by arousing cultural curiosity.”
railway and the river. Each installation is equipped with individual cameras and sensors which are networked to a central database. 2. a central display node which acts as the network control point for all installations. The node is a sculptural element located within a publicly-accessible area and will display the ‘network’ of the artwork in real-time on a LED/LCD screen.
design parramatta - mulloway studio + ernest edmonds - september 2012
3. a series of six ‘pop-up’ or temporary short-term screens located within secure, weather protected environments such as shop fronts and arcades. The screens are temporary in nature, can be easily relocated and placed to encourage curiosity and activation. 4. an ‘app’ (for smart phones, tablets or similar devices) that provides a guide to the work, as well as collecting data and illustrating the output.
133
CHUR REET CH ST
TOWN HALL CIVIC
PLAC
E
LIBRARY
DA
RC
YS TR E
ET
STREET
TRANSPORT HUB
DESIGN PARRAMATTA SEPTEMBER 2012
AR
REET CH ST
CHUR
GY
AIRD
LE
PUSH PLAY PAUSE BLANK CANVAS A - COLLINS DO
ST RE
ET
FIT ZW
ILL
IA
M
ST RE
ST
ET
VA SITUATION 1:1000
LE
NT IN
E
A Place in the Sun Push Play The design proposal is for a small-scale intervention which celebrates the simple pleasure of sitting in the sun. The approach adopted by the design team was to analyse the common small-scale components which frequently combine to create great public space. This thinking was applied to Parramatta’s city centre and it was concluded that what was missing was a humble design intervention to better facilitate the simple act of sitting in the sun.
134
The proposal is for a strategy which identifies public space opportunities and provides small-scale design interventions to improve public amenity. The strategy is demonstrated through the creation of a sun-drenched pocket park, located midway along a pedestrian thoroughfare between the transport interchange, a coffee shop and the existing library.
A proposal for a small-scale intervention which celebrates the simple pleasure of sitting in the sun.
Push Play
“We don’t want to be showy. We don’t want to make big promises for the future. We want to be kind, and speak how we like to be spoken to. We don’t want to be forced into participation. We don’t want to be forced to interact. We don’t want interaction to be novel or kitsch or overt, and we don’t want our interaction to blink or buzz. What we do want is interaction that is real and useful; dare we say functional.”
Precedent photo
135
PART 3 /
ST PR
136
TUDENT ROJECTS
137
Perspective View - Joanne Munn
Perspective View -Krista McMaster
138
Finding the Future in the Exisiting Urban Fabric Faculty of Architecture, Design and Planning University of Sydney Rod Simpson Associate Professor, Faculty of Architecture, Design and Planning The University of Sydney
As part of the Design Parramatta process the urban design studio at the University of Sydney has developed alternative designs for Horwood Avenue; the civic link. This project was selected not only because it may link the rail station to the river, but also because the avenue is at the junction occupying a middle ground between the concentration of large offices to the east and the highly modified historic subdivision ‘grain’ around Church Street to the west. With its ‘cranked’ alignment, modernist car parking structures, and tendency to branch off to other smaller random spaces occupied by small business ventures, it can also be seen as the location of two distinct and misaligned urban processes; the planned and the unplanned. There is always a tension between top-down planning that conceives of the city at a metropolitan scale and then attempts to define a role, capacity and function for parts within it ‘Parramatta as Sydney’s second CBD’, and the existing fabric of the place and the patterns of activity that are constantly emerging from individuals’ actions, investments and entrepreneurship. The Design Parramatta process, even at this early stage needs to be recognised as a clear attempt to reconcile these tensions, and to develop an approach and methodology that is able to mediate between the macro and micro. We are all too familiar with the excessive zeal of top-down planning of the 1960’s that would have cut multi-lane motor-swathes through the city and erased the Rocks, Woolloomooloo, Kings Cross and much of North Sydney in the name of efficiency and renewal. But although we have introduced and embedded heritage as a consideration in response to these ravages, by identifying particular items, curtilages or even physical patterns of urban form as being of heritage significance, this is essentially a static, reactive, backward looking approach based on an understandable sense of distrust.
139
There is no question that heritage should be recognised and preserved, but that is not enough: culture and urbanity are dynamic and occupy places that mostly do not have any particular heritage, high cultural or aesthetic value, but that does not mean they are worthless, or that their potential should not be a principal focus of planning and design. We also forget that the resistance to the top-down approach was also socially motivated, with the ‘green bans’ in the Rocks being as much concerned with the retention of affordable housing and defence of tenants as with heritage preservation. Authenticity comes from places having many authors, not just physical preservation. Heritage alone does not provide the basis for discussing how we want places to be in the future. To do that we need to look at the qualities of place and the activities and seek out the potential of the places. In other words, Design Parramatta in order to Imagine Parramatta!
DESIGN PARRAMATTA AS AN INTERMEDIARY PROCESS Although Design Parramatta duly acknowledges the City of Sydney ‘City Spaces’ project as a precedent, it differs in a number of important respects: Parramatta’s city centre is smaller. This means that rather than a scattering of projects that could improve the City of Sydney, the combined Design Parramatta projects have the potential to provide a comprehensive framework that is linked up. Parramatta’s city centre is ‘grittier’. Sydney was already in pretty good shape and the ‘City Spaces’ project could be seen as further embellishment. We forget that the Rocks and Woolloomooloo were also ‘gritty’ in the early 70’s, and it took imagination to see their potential and the value of what was already there, and perhaps as importantly, manage to keep some of the authenticity, which is still a ‘tension’ in the Rocks. Parramatta’s city centre is more open to intervention. This because it is not as capitalised or built-up as Sydney was in the 1990’s. This should mean that new connections and re-configuration of the city centre could be made more easily and at lower cost than Sydney, facilitated by the extensive publicly owned land in the centre: the car parks and lanes. 140
Parramatta’s city centre has lower density and more intimate scale than Sydney and the potential for intriguing juxtapositions of scale, age and building typologies should be recognised as a unique potential, while not allowing any one type to dominate; there is nothing inherently wrong with having two storeys next to 65 storeys. Most importantly, the process suggests that it possible to use urban design, the definition and formulation of ideas for the public domain as a way of revealing, illuminating and articulating the potential of what already exists in the city centre, (both fabric and activities), in relation to major redevelopment proposals that might be seen as ‘top-down’. Having articulated these values, the challenges for designers then becomes how to reconcile these different scales; how do large buildings come down to ground and interact and mesh with surrounding activities?
FINAL COMMENT ON PROCESS The innovation in the approach lies in the valuing of both what exists and its potential using design as an exploratory, explanatory and structuring process. Major urban renewal projects often see existing fabric and activities as a major impediments, both physical in terms of development capacity, and in relation to ‘market perceptions’ that suggest places need to be ‘cleaned-up’ and re-branded. The challenge and potential for Parramatta’s city centre may be to question these assumptions, and develop new approaches that are unique, specific and consequently; ‘world class’ urban design.
PROPOSITIONS The idea that the ‘first city’ grid of rectilinear streets with consistent street frontages, could be complemented and contrasted with a ‘second city’ of lanes and irregular diverse spaces that already exist within the large street blocks emerged as a recurrent theme from both the professional and student schemes. The more detailed exploration of Horwood Avenue by the urban design studio showed that this theme could be developed in a number of ways.
141
Horwood Place/Avenue
Four blocks
Daniel Sharp
1. Parramatta Square block: Public buildings set in a sequence of a generous link to station under buildings, commercial buildings focused to the east.
Sharp proposes the modification and adaptation of existing structures en route to the river where the articulation of landform into promontory and embayment provides both vistas and containment. Horwood Place/Avenue is a minor street in the grid geometry and, the diagram above shows it in relation to the ‘second city’ that exists in the midblocks of the main city grid. Working with the existing structures: modification and adaptation may be the way forward.
142
2. Roxy block: Horwood Place as a central unifying space with minor spaces pooling off the place, a temporal shared way. 3. Erby block: Horwood Place as a minor street, linear pedestrian link to courtyards, sets up clear view towards river 4. River block: Willow House as upper promontory park with a terraced link to the lower riverside park, cut in to create large lower park.
Public domain as the venue for individual and programed activity.
Horwood Place/Urban Playground
Main Principles
Joanne Mun
1. Realign Horwood Link: a well-connected northsouth approach from transport interchange to the river through pedestrian ways, shareways and service lanes.
Mun takes advantage of the lack of preciousness about what happens in the centre of the block to propose a programed urban playground. Parramatta’s city centre will be as busy on the weekends as midweek, while office workers may also be drawn to the water park midsummer.
2. Built forms to make way for Horwood Link: subtracting/adding/multiplying/subdividing potential new sites for future developments. 3. New spaces within each block: allocating new parks/ squares/urban spaces to encourage social activities. 4. Life on Street: creating opportunities to bring life back onto the street with street furniture, intimate parks, art installations, active retail frontages and opportunity for events and fairs along Horwood Link.
143
Horwood Link Mike Harris Harris’ proposal sees the Horwood Link as a variegated spine changing in scale, enclosure and character. These spaces a supplemented and linked to smaller courts to the west.
144
Urban Parramatta contains inherent strengths in both form and space. A range of buildings, such as the Victorian Town Hall to the elegant Modernist library to the contemporary glass Deloitte tower, exhibit the historic urban layering. These forms are embedded in a diverse network of pedestrian connections and spaces that the people of Parramatta know and inhabit. Understanding these qualities of urban Parramatta, organically grown over more than a century, and carefully integrating contemporary interventions will build on the existing richness and embody the urban identity of Parramatta.
Proposal Description
Horwood Link Ghazal Zolghadr Zolghadr envisages a series of green mid-block oases; residential, education and civic, providing verdant respite from the hard surfaces of the main streets and leading to an extensive intense river park, active day and night.
Parramatta’s city centre vision: To no longer be just a combination of oversize parking buildings, blank facades and back lanes. It will be an integrated network of open spaces connected by walking and cycling through green and active footpaths. A place for people, with buildings that open out to the streets and engage people. There will be cafés, outdoor dining, shopping, entertainment, places where people can linger, sit, have a coffee and connect. The public realm will culminate at the river, linked to the water with a focus on activities, sports, cafés, restaurants and green space. Parramatta’s city centre will be a safe, vibrant place for cultural activities, street theatre, fine views and interesting facades. It will be a lively, diverse and safe place for people to move around in and create beautiful memories. 145
Horwood Alignment Krista McMaster McMaster sees the Horwood alignment as a highdensity pedestrian spine of commercial office premises on both sides. Although there will be some significant overshadowing of the spine itself, solar access will be preserved in mid-block open spaces by lower scale development to the west. In addition, the shaded spine will be pleasant midsummer and the idea is to have people moving through and using the whole city centre; a realistic objective given the relatively intimate scale.
146
Reinforce Church Street as the main pedestrian spine • encourage movement between the civic core, riverfront, theatre and station • public domain is already of a high standard • create a new civic core which interacts with the Church Street spine and promote development of Horwood Place as the commercial/mixed use city spine • provision for high density • create links with Church Street • residential/mixed use function to waterfront The common monotony of commercial office precincts is avoided by the retention of heritage buildings and the unexpected on the Horwood alignment adjacent to other more intimate spaces as well as the nearby active strip of Church Street.
Additional fine grain mid-block subdivisions
The growth in population of residential and workers should make the smaller lanes viable (left) and reduce the concentration on Church Street
The Soft Centre Christiane Whiteley Whiteley argues the need for a doubling of active frontage by utilising the inside of blocks —‘the soft centre’ — as well as the need for a significant increase in ways to move through and around the city centre with the possible tripling of the total number of people living and working in the centre.
147
PART 4 /
PARRA CITY PUBLIC D FRAM PL
148
AMATTA CENTRE DOMAIN MEWORK LAN 2012
149
Dr Robert Lang Chief Executive Officer Parramatta City Council
“ ...we need to get the design right, we need to think carefully about the small scale, the human scale, the fine grain. This is as much about the big picture of what building and what architecture can bring to us.� Public Interview 150
Parramatta City Centre Public Domain Framework Plan 2012 Design Parramatta has provided a new focus for Parramatta City’s program of urban renewal. The concept designs generated present the City with the opportunity to embark on 15 strategic public domain projects and combined with existing strategies, further contribute to revitalising the city centre as a whole. Together, the proposed interventions have the potential to improve both the physical fabric of the city centre and the ways in which it can be used by the community. The Parramatta City Centre Public Domain Framework Plan 2012 is a new plan that has been generated as a result of the Design Parramatta initiative. It combines the Design Parramatta projects, with ongoing public domain projects to provide a unified framework to guide the renewal of the Parramatta city centre public domain for the next 16 years. Key elements of the plan include: • incorporation of the proposals and strategies identified for the each of the streets, lanes, public spaces and parks included in the Design Parramatta initiative; • activation projects for short term improvements and seasonal events including new kiosks and shelters; • continued upgrade of city streets including new pavement, street furniture and street trees in accordance with the Parramatta Public Domain Guidelines and the Parramatta Street Tree Masterplan; • continued upgrade of city lanes as described in the Parramatta City Centre Lanes Strategy and the Parramatta Public Domain Guidelines; • continued integration of public art into public domain upgrades either as individual commissioned elements and/or through embedding of the artistic approach into design responses and detailing; and • additional strategic projects including Parramatta Square, a future civic space for the city centre; the upgrade of Church Street in addition to Project 8, Church Street Mall, and the upgrade of the entire City Foreshore Area.
151
PARRAMATTA CITY CENTRE PUBLIC DOMAIN FRAMEWORK PLAN 2012
1
2
Sheila hand drawn Plan
George Street will be reinstated as Parramatta’s pre-eminent civic street.
Macquarie Street will become a tree-lined transit boulevard.
D
A Place in the Sun An invitation to celebrate sitting in the sun.
C
11
Macq
uarie
Parranet Artworks to activate blank walls with colour and images.
St
2 8
B
y bridge
Street Church
edmonds - september 2012
A Space For Urban Follies A framework for artistic installations focusing on sensory experience.
Site Two, Macquarie Lane - Old Eyes / New Eyes
A
ands
rkl Creek Pa Clay Cliff
Artworks For Lonely Laneways A series of sculptures objects which respond to people
15
Batman Walk will become a lively pocket square with artwork seat.
14
Wentworth Car Park and Lanes will become an activated multi-modal transport interchange.
13
Erby Place and Lane 13 will become an animated pocket park and community hub.
Design tactics Street-side parking is inhabited for night and weekend uses
3
4
5
Concept 01 Night Cinema
Phillip Street will become an event promenade linking River Square, Parramatta Stadium and the wharf.
Parramatta Ring Road will become a distinct city entrance.
River Square will become a grand event square drawing people to the river.
6
Charles Street Square will activate Parramatta wharf and the river’s edge.
5
7
PARRAMAT TA Church Street Mall
13
6
TEAM Lacoste + Stevenson Toko. Concept. Design Daryl Jackson Robin Dyke JMD Design Pamela Mei-Leng See
Philli p St
7 1
Georg
e St
15
Parra m
atta C
10
charles street square
ity Rin
g Rd
12
Horwood Avenue Civic Link will connect major spaces and streets.
8
4
14 Church Street Mall will be a lively public square with gardens.
25 / 25
9
9
Clay Cliff Creek Parklands will expand Jubilee Park into a natural green recreational haven.
12
Barrack Lane will be enlivened by urban play elements and engaging with Arthur Phillip High School.
11
Freemason Arm’s Lane will become a focus for local culture.
10
Smith and Station streets will be civilised with seating, shade and rain gardens.
Parramatta is ...
RAPIDLY EVOLVING
#2
YOUNG 35.2% OF PEOPLE ARE AGED
25-34 YRS
GLOBALLY CONNECTED
50%
OF PEOPLE (CBD) BORN OVERSEAS
ENTREPRENEURIAL
85.9%
OF BUSINESSES HAVE 1-4 EMPLOYEES) 5
MULTICULTURAL
84%
SPEAK ENGLISH + ANOTHER LANGUAGE
LGA IN SYDNEY (2010)
5. HTTP://FORECAST2.ID.COM.AU/DEFAULT.ASPX?ID=265&PG=5210
Parramatta’s Population
COMMUNITY ENGAGEMENT AND ACTIVATION Community use is central to improving Parramatta city centre’s public domain. Activation can be encouraged in a variety of ways including both short-term targeted events and longer term design improvements. While a short-term event can be used either as a quick fix or to test different approaches; design improvements generally focus on redressing the physical barriers which inhibit activation. Often the two strategies are best used together, with designers engaged to ameliorate spatial issues, which can then be overlaid with targeted events. Meaningful involvement and engagement of the local community is critical to ensuring ongoing use of the city centre’s public domain. Many of the Design Parramatta teams engaged with the local community and their findings helped shape the designer’s response. The Parramatta Ring Road, Church Street Mall, Clay Cliff Creek Parklands, Freemason’s Arms Lane, Wentworth Carpark Lanes Network, Erby Park and Lane 13 and Phillip Street projects each include proposals for further community engagement as part of design development.
THE NEXT STEPS Consultation A rigorous consultation process would form the immediate next step for further development of all the Design Parramatta projects. The concept proposals for the individual sites have been well illustrated and modelled,
154
providing an excellent platform for further engagement of Council and the community. Additional mediums such as the Design Parramatta website and the Design Parramatta film will also help in broadcasting these ideas by increasing the ease with which the community can engage with both project and the process of revitalising the public spaces of their city centre. Prioritisation Plan Council will develop a 16 year plan to select and develop preferred public domain projects from the Parramatta City Centre Public Domain Framework Plan 2012 and apportion funding. The prioritisation plan will run on four year cycles and be reviewed every 4 years to align with Council’s Delivery Program. Once a project has been scheduled for further work the following steps are involved: • consultation with the Community, Councillors and relevant technical experts; • design Development leading to an approved project plan; • design Documentation resulting in detailed technical plans and specifications; • tendering of the works; • construction; and • ongoing management and maintenance of the places. Consultation, design and technical expertise will be necessary components of all these stages. The Parramatta Public Domain Framework Plan 2012 will enable Council to undertake a coordinated approach to the upgrade and revitalisation of the city centre’s public domain in partnership with Government bodies, the private sector and the community.
155
PART 5 /
C
156
CREDITS
157
Teams TEAMS
FIRM / ORGANISATION
INDIVIDUALS
Project Team
Parramatta City Council – Urban Design Unit
Kati Westlake
Parramatta City Council – Place Services
Steve Ellis
Parramatta City Council – Urban Design Unit
Andrew Tam
Government Architect’s Office
Callantha Brigham
Government Architect’s Office
Helen Lochhead
Government Architect’s Office
Marietta Buikema
Parramatta City Council – Urban Design Unit
Penny Bowen
Parramatta City Council – Place Services
Robyn Hobbs
Parramatta City Council – Place Services
Angie Paravalos
Parramatta City Council – Place Services
Anthony Budini
Parramatta City Council – Place Services
Anthony Milward
Parramatta City Council – Place Services
Bruce Mills
Parramatta City Council – Place Services
Eleni McRae
Parramatta City Council – Place Services
Geoff Weston
Parramatta City Council – Place Services
Sandra DaSilva
Parramatta City Council – Place Services
Neile Robinson
Parramatta City Council – Place Services
Wendy Read
Parramatta City Council
Kati Westlake
Government Architect’s Office
Helen Lochhead
Government Architect’s Office
Peter Poulet
University of New South Wales
James Weirick
University of Sydney
Rod Simpson
Doppio
Sinead McDevitt
Doppio
Ali Ozden
Director / Producer
Carli Leimbach
Camera Operator / Editor
Shaun Dougherty
Editor
Cris Balmaceda Errazuriz
Sound
Eren ‘Pinky’ Sener
Sound
Sam Ada
Parramatta City Council
Sue Weatherley
Parramatta City Council
Scott Gregg
Parramatta City Council
Geoff King
Parramatta City Council
David Gray
Parramatta City Council
Richard Searle
Parramatta City Council
Amitabha Choudhury
Parramatta City Council
Peter Lichaa
Parramatta City Council
Jim Stefan
Parramatta City Council
Andy Ling
Parramatta City Council
Mark Leotta
Parramatta City Council
James Smallhorn
Parramatta City Council
Kim Foskett
Workshop Team
Workshop Panelists
Graphic Design - website
Film Crew
Project Control Group
158
TEAMS
Barrack Lane
Batman Walk
Blank Canvas A
Blank Canvas B
FIRM / ORGANISATION
INDIVIDUALS
Parramatta City Council
Adam Cook
Parramatta City Council
Rebecca Grasso
Parramatta City Council
Solaire Eggert
Parramatta City Council
Vanessa Villa
Parramatta City Council
Jennifer Concato
Parramatta City Council
Helen Papathanasiou
Parramatta City Council
Alison McDonagh
Parramatta City Council
Michelle Desailly
Parramatta City Council
Sophia Kouyoumdjian
G.O.L.D. (Group of Like Minded Designers)
Rebecca Caldwell
G.O.L.D. (Group of Like Minded Designers)
Ash Every
G.O.L.D. (Group of Like Minded Designers)
Regina Kaluzny
G.O.L.D. (Group of Like Minded Designers)
Tersius Maass
G.O.L.D. (Group of Like Minded Designers)
Phillip Nielsen
G.O.L.D. (Group of Like Minded Designers)
Katie O’Brien
Andrew Burns Architect
Andrew Burns
Artist
Brook Andrew
Push Play
Nuala Collins
Push Play
Kelly Doley
Push Play
Nadia Wagner
Push Play
Charlotte Karlsson
Mulloway Studio
Anthony Coupe
Mulloway Studio
Esther Chew
Mulloway Studio
James Baker
Artist
Ernest Edmonds
Blank Canvas C
Studio Damien Butler
Damien Butler
Blank Canvas D
Old Eyes / New Eyes
Nikki Butlin
Old Eyes / New Eyes
Asha Tsimeris
Old Eyes / New Eyes
Patrick Stein
Old Eyes / New Eyes
Louie Lester Yao
Old Eyes / New Eyes
Janet Thomson
Old Eyes / New Eyes
Ann Cleary
Old Eyes / New Eyes
Robert Thorne
Context Landscape Design
Oi Choong
Zoe Spiegel
Zoe Spiegel
CM+
Richard Nugent
Urban Art Projects
Daniel Tobin
Heritage Advisor
Craig Burton
Charles Street Square
159
TEAMS
FIRM / ORGANISATION
INDIVIDUALS
Church Street Mall -
JMD Design
Anton James
Lacoste + Stevenson Architects
Thierry Lacoste
Lacoste + Stevenson Architects
David Stevenson
Daryl Jackson Robin Dyke
Emma Howarth
Toko. Concept. Design.
Michael Lugmayr
Toko. Concept. Design.
Eva Dijkstra
Artist
Pamela See
GAO Landscape Architecture
Barbara Schaffer
GAO Landscape Architecture
Luke Wistencroft
Parramatta City Council Landscape Architecture
Kim Foskett
Parramatta City Council Landscape Architecture
Adam Cook
Parramatta City Council Landscape Architecture
Alastair Hickey
Parramatta City Council Landscape Architecture
John Graham
Equatica
Alexa McAuley
Lightwell
Michael Hill
DRAW
Adam Russell
DRAW
Imogene Tudor
DRAW
Edward Rosier
Tyrrellstudio
Mark Tyrrell
Tyrrellstudio
Dan Sharp
Short Term Project
Clay Cliff Creek Parklands
Erby Park and Lane 13
Dr Lee Stickells Dr Zanny Begg Freemason’s Arms Lane
George Street
Horwood Avenue
The Lot
Adriano Pupilli
The Lot
Heidi Axelsen
The Lot
Hugo Moline
Hill Thalis Architecture + Urban Projects
Philip Thalis
Hill Thalis Architecture + Urban Projects
Sheila Tawalo
Hill Thalis Architecture + Urban Projects
Alex Rink
Jane Irwin Landscape Architecture
Jane Irwin
Jane Irwin Landscape Architecture
Linden Crane
Jane Irwin Landscape Architecture
Sam Westlake
Turpin + Crawford Studio
Jennifer Turpin
Turpin + Crawford Studio
Michaelie Crawford
Gallagher Ridenour Urban & Landscape Projects
Libby Gallagher
Gallagher Ridenour Urban & Landscape Projects
Deena Ridenour
Gallagher Ridenour Urban & Landscape Projects
Jane Nalder
Redshift Architecture & Art
Angelo Konrsanos
Redshift Architecture & Art
Michael Lewarne
Redshift Architecture & Art
Wesley Grunsell
Equatica
Richard McManus
Civic Link
160
TEAMS
FIRM / ORGANISATION
INDIVIDUALS
Macquarie Street
Cox Richardson Architects and Planners
John Richardson
Cox Richardson Architects and Planners
Ian Connolly
Cox Richardson Architects and Planners
Joe Rowling
Cox Richardson Architects and Planners
Shirin Adorbehi
Oculus
Roger Jasprizza
Oculus
Simon Bond
Parsons Brinkerhoff
Scott Ney
TERROIR
Gerard Reinmuth
TERROIR
Scott Balmforth
TERROIR
Teneil van Dyck
TERROIR
Malina Brueckner
ASPECT Studios
Sacha Coles
ASPECT Studios
Orit Meylakh
u.lab, University of Technology Sydney
Dr Joanne Jakovich
u.lab, University of Technology Sydney
Dr Jochen Schweitzer
u.lab, University of Technology Sydney
Vida Asrina
Richard Goodwin Pty Ltd
Professor Richard Goodwin
Richard Goodwin Pty Ltd
Samaneh Moafi
HASSELL
Ken Maher
Parramatta City Ring Road
Phillip Street
Matthew Pullinger David Tickle Sarah Meyer Felicity Stewart Anton Grimes River Square
Smith and Station Streets
Andersen Hunter Horne
Jeppe Aagaard Andersen
Andersen Hunter Horne
Mike Horne
Andersen Hunter Horne
Adam Hunter
Roberts Day
Stephen Moore
Equatica
Alexa McAuley
Electrolight
Don Salisbury
Nobbs Radford Architects
Alison Nobbs
Nobbs Radford Architects
Sean Radford
Nobbs Radford Architects
Cecile Marguin
Carmichael Studios
Rupert Carmichael
Artist
Suzie Idiens
Greening
Wentworth Car Park
BKK Architects
Tim Black
BKK Architects
George Huon
Glas Urban Design & Landscape Architecture
Mark Gillingham
Renew Australia
Marcus Westbury
Electrolight
Paul Beale Peter Emmett
161
References NAME
PAGE
ATTRIBUTE
Project sites
p14
Parramatta City Council
Urban design analysis
p18
Parramatta City Council
Photo from Design Parramatta Workshops
p21-27
Parramatta City Council
Design Parramatta Plan
p30
Parramatta City Council and Doppio Design
Main Streets Diagram
p32
Parramatta City Council /Doppio Design/
Series 2012-10-21 Parramatta City Council
Government Architetct’s Office George Street Analysis and Proposal Images
p33-39
George Street Project Team
Macquarie Street Analysis and Proposal Images
p40-45
Macquarie Street Project Team
Phillip Street Analysis and Proposal Images
p46-49
Phillip Street Project Team
Parramatta City Ring Road Analysis and Proposal Images
p50-55
Parramatta City Ring Road Project Team
Public Space and Parks Projects Diagram
p56
Parramatta City Council /Doppio Design/ Government Architect’s Office
River Square Analysis and Proposal Images
p58-63
River Square Project Team
Charles Street Square Analysis and Proposal Images
p64-69
Charles Street Project Team
Horwood Avenue Civic Link Analysis and Proposal Images
p70-75
Horwood Avenue Civic Link Project Team
Church Street Mall
p76-83
Church Street Project Team
Clay Cliff Creek Parklands Analysis and Proposal Images
p84-89
Clay Cliff Creek Parklands Project Team
Smith and Station Streets Analysis and Proposal Images
p90-95
Smith and Station Streets Project Team
Lanes Projects Diagram
p96
Parramatta City Council /Doppio Design/
Analysis and Proposal Images
Government Architect’s Office Freemason’s Arms Lane
p98-105
Freemason’s Arms Lane Project Team
Barrack Lane
p106-109
Barrack Lane Project Team
Erby Place and Lane 13
p110-115
Erby Place and Lane 13 Project Team
Wentworth Car Park and Lanes
p116-121
Wentworth Car Park and Lanes Project Team
Batman Walk
p122-125
Batman Walk Project Team
Art and Experimental Projects Diagram
p126
Parramatta City Council /Doppio Design/ Government Architect’s Office
Lonely Laneways
p128
Lonely Laneways Project Team
A Space for Urban Follies
p130
A Space for Urban Follies Project Team
Parra-net
p132
Parra-net Project Team
A Place in the Sun
p134
Push Play Project Team
Student Projects
P138-147
University of Sydney Urban Design Studio
Parramatta City Centre Public Domain Framework Plan 2012
p152-153
2012 Parramatta City Council/Doppio Design/ Government Architect’s Office and all project teams Parramatt’s Population Cover front and back
162
p154
HASSELL Parramatta City Council
163
166