Tourism Infrastructure Mapping Workshop Report Meeting Preparatory to the Regional DOT-DPWH Consultation Workshop RSM Seafood Garden Restaurant, Calamba City, Laguna 04 November 2016 RMKA SCID/RPMC Secretariat 1
Rationale • Result of the joint monitoring of tourism roads under DPWH-DOT Convergence • Need to show connectivity & convergence of efforts • Tool for monitoring of existing & planning of new road networks 2
Objectives • To prepare an Infrastructure Tourism Map for Calabarzon • To show connectivity in the region and accessibility to tourist spots • To validate and organize the spatial location of roads & tourist spots 3
Workshop Proper • The activity was conducted on 28 July 2016 • 16 Participants from the 5 provinces, DOT IV-A and DPWH IV-A
4
Initial Outputs Ongoing
Completed Proposed
Calabarzon Tourism Roads Plotted on Google Earth Pro
5
Initial Outputs
Calabarzon Tourism Sites Plotted on Google Earth Pro
6
Next Steps/Action Plan/Agreements • Conduct of technical meeting to harmonize GIS programs used and standardize file conversion to format readable in GIS program • Core team on tourism mapping will be composed of the participants
7
Next Steps/Action Plan/Agreements • DPWH to update status of roads and kilometer post markings • Present to the RPMC for further improvement of the map
8
Live Demonstration
9
10