TOURISM INFRASTRUCTURE PROGRAMS (DOT-DPWH CONVERGENCE PROJECTS)


PROVINCE OF CAVITE S01751LZ

LZ 72 17 S0

183 5!. L Z S0 57 LZ

IMUS !.

S01783LZ

LZ

07 04 8 S

GEN.TRIAS

Z

S01799LZ

4L

Z

!.

CAVITE

S0

589

!.

S01844LZ

58 S01782LZ 93 LZ

NAIC

Asphalt Overlay of Cavite-Batangas Road, Bacoor-Imus-Dasmariñas City, Cavite Province 2013:P 65,000.00

S 0 4270 L Z

DASMARIÑAS CITY

S0

!.

11 48

2LZ

GEN. MARIANO ALVAREZS0 17

LZ LZ

!.

5 S0481

!.

S

1LZ S 01

Z

S0 5 8 9

87

8L

84

SILANG !.

7L Z 0 5 8 8 2L Z

LZ

INDANG

06

!.

AMADEO

19

!.

77

!.

6

LZ

L S 019 0 2

7 L Z 0503 S

01

ALFONSO MENDEZ-NUNEZ

7LZ !.

S 05

87 5L Z

1 S0

Tagaytay-Talisay-Taal Lake Rd. Cavite with exception (K0057+300K057+800) 2012:P 32,516.00

Z

9L Z

!.

S0601

S

Tagaytay City to Batangas via Tuy, Cavite 2014:P 93,000.00

S0

MAGALLANES !. GEN. E. AGUINALDO

S05888L Z

CAVITE 2ND !.

S

Construction of Indang-Tagaytay Road via Balagbag Mahabang Kahoy, Cavite 2016:P 17,340.00 2015:P 17,655.00

CARMONA

Cavite-Batangas Road (S01799LZ), Bacoor, Imus and Dasmariñas, Cavite 2014:P 50,000.00

LZ

S 05

0 18 4 8 L Z

!.

L

S0

S0 6

TRECE MARTIRES CITY S0 5 025

036

S0

TERNATE !. MARAGONDON

8LZ

Z

LZ

!.

182

18

Construction of Tarapiche Bridge along Maragondon-Gen. Aguinaldo Road Brgy. Lumipa, Ballen, Cavite 2015:P 150,000.00

Z 2L

S0

7 17

!.

27

S0

Widening of Molino-Bacoor Road, Bacoor, Cavite Province 2012:P 52,000.00

S 04

9L TANZA 177

Geometric Improvement of Manila Cavite Road 2013:P 20,000.00 1 LZ 27

ROSARIO

Tanza-Trece Martires City-Indang Rd. Cavite 2012:P 7,730.00

CD

7 LZ KAWIT S01 45 !. 18 0 S

!. !.

008

CAVITE CITY !.

Z

S 04

Concreting of Maragondon-Alfonso Road Cavite 2016:P 34,200.00 2015:P 70,822.00

S0 0

6L

S0

1 84

Asphalt Overlay of Cavite-Batangas Road, Cavite Province 2013:P 65,000.00

90

TAGAYTAY CITY

Improvement/Widening of Tagaytay City to Batangas via Tuy Road, 7LD 2013:P 100,000.00


PROVINCE OF CAVITE 2016 NAME OF PROJECT

SCOPE OF WORK LENGTH (km)

1 Conc. of Maragondon-Alfonso Road, Cavite 2

Conc. of Indang- Tagaytay Road,via Balagbag Mahabang Kahoy, Cavite

ALLOCATION (P'000)

Upgrading

1.71

34,200

Ugrading

0.87

17,340

ABC (P'000)

CONTRACT AMOUNT (P'000)

33,515.00

31,069.26

16,733.10

15,553.33

DATE OF BIDDING

START DATE

COMPLETION DATE

STATUS (August 31,2015) COMPLETED COMPLETED

2015 NAME OF PROJECT Construction of Tarapiche Bridge along 1 Maragondon-Gen. Aguinaldo Road Brgy. Lumipa, Ballen, Cavite 2 Concreting of Maragondon-Alfonso Road Cavite 3

Construction of Indang-Tagaytay Road via Balagbag Mahabang Kahoy, Cavite

ALLOCATIO ABC N (P'000) (P'000)

CONTRACT AMOUNT (P'000)

SCOPE OF WORK

LENGTH (km)

Construction

0.03

Upgrading gravel to concrete

3.50

Concreting of Road and Stone Masonry

0.883

SCOPE OF WORK

LENGTH (km)

Concreting

1.00

93,000

88,625.30

CONTRACT AMOUNT (P'000) 82,424.31

Concreting from paved to paved

2.19

50,000

45,694.47

45,694.47

150,000.00 144,750.00 143,302.45

70,822.00

68,343.20

63,904.81

17,655.00

17,036.85

15,581.09

DATE OF BIDDING

START DATE

COMPLETIO N DATE

STATUS (October 31,2016)

7/21/2015

8/12/2015

7/7/2016

On-going (40%)

1/5/2015

5/4/2015

03/12/2016 COMPLETED

12/9/2014

4/14/2015

8/20/2015

COMPLTED

2014 NAME OF PROJECT 1 Tagaytay City to Batangas via Tuy, Cavite 2 Cavite-Batangas Road (S01799LZ), Bacoor, Imus and Dasmariñas, Cavite

ALLOCATIO ABC N (P'000) (P'000)

DATE OF BIDDING

START DATE

COMPLETI ON DATE

8/28/2014

9/12/2014

8/30/2015

STATUS (October 31,2016) Completed

11/14/2014

1/16/2015

6/5/2015

Completed


PROVINCE OF CAVITE 2013 ABC (P'000)

CONTRACT AMOUNT (P'000)

DATE OF BIDDING

START DATE

COMPLETION DATE

STATUS (October 31,2015)

65,000

63,034.73

58,285.60

12/19/2012

3/15/2013

12/27/2013

Completed

2.079

65,000

62,868.76

58,433.20

1/16/2013

3/16/2013

12/27/2013

Completed

Concreting

4.607

100,00

70,569.90

70,569.90

2/27/2013

3/25/2013

9/30/2015

On-going (90%)

Road Upgrading

0.653

20,000

19,400

18,387.32

12/19/2012

8/6/2013

12/5/2013

Completed/ Modified

LENGTH ALLOCATION (km) (P'000)

NAME OF PROJECT

SCOPE OF WORK

1 Asphalt Overlay of Cavite-Batangas Road, Bacoor-Imus-Dasmariñas City, Cavite Province

Asphalt Overlay

0.88

Asphalt Overlay

3 Improvement/Widening of Tagaytay City to Batangas via Tuy Road, 7LD 4 Geometric Improvement of Manila - Cavite Road

2 Asphalt Overlay of Cavite-Batangas Road, Cavite Province


PROVINCE OF LAGUNA Construction of Access Road leading to the Shrine of Jesus in the Holy Sepulchre (Lolo Uweng Shrine), Brgy. Landayan, San Pedro Laguna 2015:P 10,000.00

SANTA MARIA

Const./Widening/Upgrading Rizal Boundary - Famy Quezon Boundary Road linking Marikina Infanta Road via Sta. Maria, Laguna 2013:P 100,000.00

!.

67

LZ

Rizal Boundary-Famy Quezon Boundary Rd. linking the Marikina-Infanta Rd. via Sta. Maria, Laguna 2012: Upgrading/Gravelling: P 100,000.00 Concreting: P 50,000.00

S 01 6

!.

!. FAMY MABITAC !. SINILOAN

66 1

!.

01

PANGIL S

LZ

PAKIL

!.

PAETE

SAN PEDRO

!.

!.

LZ 730 .!

KALAYAAN

Mt. Makiling Eco-Tourism Road S0 1

S

2015: P 40,000.00

71 5

6

L LUMBAN Z !.

CABUYAO

0 6 6 !. S 0 1 6 39L

S 0 1 6 74

LZ

PAGSANJAN !.

S0 4

31 2

S

01

LZ

Z !.

L

LZ

01

67

!.

!.

2016: P 40,000.00 SANTA ROSA CITY

Z

S0 1

S0

17

35

LZ !.

!.

!.

LAGUNA 1ST

14

Z

CALAMBA CITY

17

314L

!.

PILA

S01 7 2 9LZ

!.

BAY 0

17

S 01 7

37

S01736LZ

!.

LUISIANA

Z 6L

LZ

S0

1

Z

S0 5 !.

!.

!.

8 1 7 LZ

NAGCARLAN RIZAL 70 5L

LAGUNA 3RD

Z

ALAMINOS

SAN PABLO CITY !.

!.

S0

LZ

8 1L Z

3 71

S 01 6

1 S0

LILIW

!.

S0 1

Construction of Access Road leading to Cuartel De Sto. Domingo, Sta. Rosa Laguna 2015:P 10,000.00

LZ

9

0L

67

1 MAJAYJAY S0

71

CALAUAN !.

Z

L

S01732LZ

7 2 5L Z S 0 1!.

!.

72

Z

S0

S

1L 73 01

16 S0

MAGDALENA

S0

LAGUNA 2ND

S0 4

S01659LZ LZ

CAVINTI VICTORIA

16

86

LZ

Construction/Improvement of Access Road leading to declared touirism destinations, Mt. Makiling Eco-Tourism Road,Los Baños, Laguna 2014:P 19,150.00


PROVINCE OF LAGUNA 2016 NAME OF PROJECT

1

Mt. Makiling EcoTourism Road, Los Banos, Cavite

SCOPE OF WORK

LENGTH (km)

ALLOCATION (P'000)

ABC (P'000)

Upgrading

2.00

40,000

39,200.00

CONTRACT DATE OF START DATE AMOUNT (P'000) BIDDING 37,377.33

3/17/2016

COMPLETION DATE

STATUS

9/12/2016

34.00%

2015 NAME OF PROJECT 1 Mt. Makiling Eco-Tourism Road

SCOPE OF WORK

LENGTH ALLOCATION ABC (P'000) (km) (P'000)

Upgrading gravel to concrete

6.00

Gravel to Paved

0.5

Construction of Access Road leading to 3 Cuartel De Sto. Domingo, Sta. Rosa Laguna

Gravel to Paved

0.50

Construction of Access Road leading to Regional 4 Government Center, Calamba City, Laguna

Gravel to Paved

2

Construction of Access Road leading to the Shrine of Jesus in the Holy Sepulchre (Lolo Uweng Shrine), Brgy. Landayan, San Pedro Laguna

40,000.00

39,200.00

10,000.00

10,000.00

10,000.00

9,800.00

CONTRACT AMOUNT (P'000)

DATE OF BIDDING

START DATE

COMPLETION DATE

STATUS (October 31,2016)

6/29/2015

8/7/2015

5/2/2016

Completed

7/24/2015

1/16/2016

6/22/2016

Completed

3/7/2015

6/11/2015

8/17/2016

Completed

3/16/2016

4/10/2016

CONTRACT AMOUNT (P'000)

DATE OF BIDDING

START DATE

17,547.37

11/19/2013

3/24/2014

9,289.57

44,947.00

On - Going 90%

2014 NAME OF PROJECT 1

Construction/Improvement of Access Road leading to declared touirism destinations, Mt. Makiling Eco-Tourism Road,Los Baños, Laguna

SCOPE OF WORK

Concreting

LENGTH ALLOCATION ABC (P'000) (km) (P'000)

1.134

19,150

18,767

COMPLETION STATUS DATE (August 31,2016)

8/11/2014

Completed


PROVINCE OF LAGUNA 2013 NAME OF PROJECT 1 Const./Widening/Upgrading Rizal Boundary - Famy Quezon Boundary Road linking Marikina Infanta Road via Sta. Maria, Laguna

SCOPE OF WORK

LENGTH (km)

ALLOCATION (P'000)

ABC (P'000)

CONTRACT AMOUNT (P'000)

DATE OF BIDDING

START DATE

Concreting

5.00

100,000

97,000

92,991.68

3/5/2013

3/25/2013

COMPLETION STATUS DATE (October 31,2016) 3/25/2016

Completed


PROVINCE OF BATANGAS

S

9 01

2 8LZ

TALISAY S 0 5 80 4 L

!.

!.

Z

01

MALVAR !.

BATANGAS 1ST

BALETE

TUY

S 01 9

32

29

7L

!.

15

18 LZ

ALITAGTAG

PADRE GARCIA !.

ROSARIO

!.

BATANGAS 4TH IBAAN !.

S 01

94 7 L

Z

!.

Calatagan-Poblacion Road leading to various beaches 2014: P 12,000.00

L

TAYSAN

19 3 6

Z

!.

LZ

4 6L

977

19

Rehabilitation/improvement of San Jose-Ibaan Road (Ibaan Section)link S0 4from 29 0 L Star Tollways to Batangas Z Quezon Roads and San Juan - Laiya SAN JUAN !. Road leading to various beaches, Laiya,San Juan, Batangas 2016: P 80,000.00 2015: P 20,000.00 S01

S0 !.

BAUAN!.

Z

S0

!.

Construction of Coastal Road along Taal Circumferential Road along the Municipalities of San NicolasSta. Teresita Alitagtag Batangas 2016: P 200,000.00 2015: P 100,000.00

S0

!.

CALATAGAN

SAN JOSE !.

LZ

57

SAN LUIS

!.

CUENCA

S

67 L Z

S0

!.

L!. Z

19

LZ

TAAL !. !. LEMERY

3 25

019

S 04

S0 5

05 80 0

LZ

!.

2LZ S0 1 9 5

!.

05

54

!.

AGONCILLO SAN NICOLAS

LZ

18

Z

30

S0

8L

MATAAS NA KAHOY LIPA CITY

S0

!.

97

50

CALACA

01 LZ S

S0

S 0 579

!.

S LZ 0051

BALAYAN

S05016LZ

Z

6 LZ

S0 5

0

01

S0 5

2L Z

LZ

!.

Rehabilitation/improvement of San Jose-Ibaan Road (San Jose Section) conjoining the Star Tollways Entry/Exit at Ibaan,Batangas/San Jose Section, San Jose Batangas 2015: P 50,000.00

17LZ

LAUREL !.

!.

LZ

!.

LIAN !.

9 11

TANAUAN CITY

S019

S0185 9

LZ

BATANGAS 3RD S

Concreting of Brgy. Road located in Brgy. Nonong Castro, Lemery, Batangas Z NASUGBU 0L 2016: P 1,500.00 !. 79 S 05 2015: P 18,400.00

Tanauan-Talisay-Tagaytay Road 2014: P 44,000.00 2012: P 30,000.00

Construction of Coastal Road along Taal Circumferential Road along Talisay-Laurel-Agoncillo Road (intermittent sections) 2014: P 150,000.00 2013: P 150,000.00 2012: P 100,000.00

BATANGAS CITY !.

S 0 50 0 3L Z

MABINI

S 019 53

LZ

BATANGAS 2ND

TINGLOY !.

LOBO Z 009 L

!.

60 57

S 05

S0

LZ

Bauan-Mabini Circumferential Road, Batangas 2012: P 40,000.00

Lobo-Malabrigo-Laiya San Juan Road (biga Section), Lobo, Batangas 2016: P 300,000.00 2015: P 150,000.00 2014: P 200,000.00


PROVINCE OF BATANGAS 2016 ABC (P'000)

CONTRACT AMOUNT (P'000)

DATE OF BIDDING

NAME OF PROJECT

SCOPE OF WORK

LENGTH (km)

ALLOCATION (P'000)

1

Lobo-Malabrigo-Laiya-San Juan Road, Lobo, Batangas

Improvement with Bridges

5.86

300,000

289,500.00

2

Const. of Road along Taal Circumferential Road, San Nicolas,-Sta. Teresita-Alitagtag

Construction

10.00

200,000

193,000.00

186,243.50

2/26/2016

3

Rehabilitation/Improvement of San Jose Ibaan (Ibaan Section)

Improv/Rehab

4.00

80,000

78,000.00

74,099.89

2/9/2016

4

Concreting of Brgy Road located in Nonong Castro, Lemery, Batangas

Upgrading

0.08

1,500

1,470.00

START DATE

COMPLETION DATE

With NTP dated 10/10/ 16

2/23/2016

1,447.49

10/19/2015

STATUS

3/30/2016

4278900%

25.00%

54.62.%

5/18/2016

100.00%

2015 NAME OF PROJECT 1 Lobo-Malabrigo-Laiya San Juan Road (biga Section), Lobo, Batangas 2 Construction of Coastal Road along Taal Circumferential Road along the Municipalities of San Nicolas-Sta. Teresita Alitagtag Batangas 3 Concreting of Brgy. Road located in Brgy. Nonong Castro, Lemery, Batangas 4 Rehabilitation/improvement of San Jose-Ibaan Road (San Jose Section) conjoining the Star Tollways Entry/Exit at Ibaan,Batangas/San Jose Section, San Jose Batangas

SCOPE OF WORK LENGTH (km)

Concreting

7.50

ALLOCATION (P'000) 150,000.00

ABC (P'000) 144,750.00

CONTRACT DATE OF START AMOUNT BIDDING DATE (P'000) 119,635.81 6/18/2015 09/11/2015

COMPLETION DATE 10/11/2016

STATUS (October 31,2016) Om Going (50.60%)

Construction 5.00

Concreting

Rehab./Improveme nt/Widening of 3.10 m PCCP, RCPC drainage with conc. Curb & Gutter & Sidewalk 5 Rehabilitation/improvement of San Jose-Ibaan Rehab./Improveme Road (Ibaan Section)link from Star Tollways to nt of carriageway Batangas Quezon Roads and San Juan - Laiya 6.7 m PCCP 2.25 m Road leading to various beaches, Laiya,San Juan, pavings of Batangas shoulders, RCPC drainage with conc. Curb & Gutter & Sidewalk

1.28

100,000.00 18,400.00

100,000.00

91,634.79

6/22/2015

7/31/2015

7/10/2016

COMPLETE D

18,032.00

17,108.61

3/16/2015

COMPLETED 10/20/2015 5/18/2015 10/20/2015 COMPLETE D

1.30

50,000.00

49,000.00

45,462.40

2/23/2015

4/30/2015

8/20/2016

COMPLETE D

0.4

20,000.00

19,600.00

18,418.27

2/12/2015

5/6/2015

11/12/2016

COMPLETE D


PROVINCE OF BATANGAS 2014 NAME OF PROJECT

SCOPE OF WORK

1 Lobo-Malabrigo-Laiya San Juan Road (biga Section), Lobo, Opening/ Concreting Batangas 2 Calatagan-Poblacion Road leading to various beaches 3 Taal Lake Circumferential Road Talisay - Laurel Agoncillo Road leading to Taal Lake, Talisay Laurel - Agoncillo Road (K0081+(-224) K0102+815) 4 Taal Lake Circumferential Road Talisay - Laurel Agoncillo Road leading to Taal Lake, Talisay Laurel - Agoncillo Road (K0102+815 - K0110+278) 5 Taal Lake Circumferential Road Talisay - Laurel Agoncillo Road leading to Taal Lake, Talisay Laurel - Agoncillo Road (K0114+054 - K0121+105) 6 Tanauan-Talisay-Tagaytay Road

LENGTH ALLOCATION (km) (P'000)

ABC (P'000)

CONTRACT AMOUNT (P'000)

DATE OF COMPLETION STATUS START DATE BIDDING DATE (October 31,2016)

5.586

200,000

192,797.90

178,926.22

11/11/2014

12/15/2014

10/28/2016

On-going (90.02%)

Concreting

0.5785

12,000

11,760

10,936.80

11/13/2013

4/21/2014

10/08/2014 10/8/2014

Completed

Concreting

2.31

50,000

49,000

43,284.29

12/21/2013

3/31/2014

12/10/2014

Completed

Concreting

2.31

50,000

49,000

45,263.41

12/21/2013

3/31/2014

12/10/2014

Completed

Concreting

1.33

50,000

49,000

45,318.16

12/21/2013

3/31/2014

12/10/2014

Completed

Concreting Slope Protection

6.076

44,000

43,120

40,039.48

12/21/2013

3/31/2014

12/10/2014

Completed


PROVINCE OF BATANGAS 2013 NAME OF PROJECT 1 Upgrading (Gravel to Concrete) Taal-Lake Circumferential Road (Section LaurelAgoncillo) inclusive of Talisay-LaurelAgoncillo Road, Batangas

SCOPE OF WORK

Upgrading/ Concreting

LENGTH ALLOCATION ABC (P'000) (km) (P'000) 18.75

150,000

150,000

CONTRACT AMOUNT (P'000)

DATE OF BIDDING

START DATE

COMPLETION DATE

STATUS (October 31,2016)

104,443.01

5/9/2013

7/26/2013

9/30/2015

Completed


2 LZ

RODRIGUEZ (MONTALBAN)

01

62

!.

S

San Mateo-Rodriguez Wawa Road, San Mateo and Rodriguez, Rizal 2012:P 100,000.00

S0 4

22

5L

Z

PROVINCE OF RIZAL SAN MATEO !.

RIZAL 1ST S 0161 9 L Z

S

810

63

LZ LZ

TAYTAY

!.

S0

9 1 58

LZ

LZ

Z

!.

TERESA !.

S0

1

61 0 1 S0

RIZAL 2ND

5

S0

!. MORONG BARAS 5

L

9

!.

1 55

ANGONO

LZ

LZ

S0

Improvement/Widening of MarikinaInfanta Road, Marcos Highway, Masinag Antipolo City 2013: P 98,935.00

599

2 1L

!.

Z

S01

CAINTA

7LZ

S0S 10613 5 61L2

S0 16

Z

01

S0 3

63 4L

84

S 01

Improvement of San MateoRodriguez Wawa Road, San Mateo and Rodriguez, Rizal 2013:P 150,000.00

1

LZ 5 91 S 0 1

Z

!.

TANAY S0 1

!.

58

1L

Z

CARDONA !.

70

L Z PILILLA !.

BINANGONAN

S015

Senator Lorenzo Sumulong Memorial Circle (Marikina-VictoriaValley-Antipolo Road), Rizal 2012:P 128,984.00

82LZ

!.

JALA-JALA !.


PROVINCE OF RIZAL 2013 LENGTH ALLOCATION (km) (P'000)

NAME OF PROJECT

SCOPE OF WORK

1 Improvement/Widening of MarikinaInfanta Road, Marcos Highway, Masinag Antipolo City

Concreting/ Widening

2.837

98,935

2 Improvement of San Mateo-Rodriguez Wawa Road, San Mateo and Rodriguez, Rizal

Drainage

8.353

150,000

DATE OF BIDDING

START DATE

95,472.30

CONTRACT AMOUNT (P'000) 89,672.06

3/12/2013

4/1/2013

3/15/2015

Completed

135,447.70

97,495.73

10/21/2013

12/7/2013

12/12/2015

Completed

ABC (P'000)

COMPLETION STATUS DATE (October 31,2016)


PROVINCE OF QUEZON PANUKULAN !.

Atimonan-Mauban, Tignoan Road leading to various beaches and resorts, Quezon Province (Mauban Section) 2013:P 50,000.00 2014:P 50,000.00 2015:P 100,000.00

BURDEOS !.

INFANTA !. S 0 1 5 !.

!.

POLILLO

JOMALIG

!.

Z

LZ

PATNANUNGAN 4

2L

QUEZON 1ST

!.

55 1

REAL

S 01

!.

S0 1 5 53LZ

154

015 4LS Z !.

3 7L

Z

S 01

S0

55 2

LZ

Atimonan-Mauban, Tignoan Road leading to various beaches and resorts, Quezon Province (Real Section) 2013:P 50,000.00 2014:P 50,000.00 2015:P 100,000.00

Construction of Camagong Villa Norte Eco-Tourism Road, Brgy. Camagong, Brgy. Villa Victoria, Villa Jesus Weste & Villa Norte Alabat, Alabat Island Quezon 2016:P 53,300.00 2015:P 40,000.00

!.

PEREZ

MAUBAN

!.

ALABAT !.

Z

!.

S0

55

0L

LUCBAN

Z

LZ 01 20 S0

S02042L

S0

!.

22

7L

Z Z

S02002LZ

LOPEZ

!.

42

!.

03 7L

S0

Z

3 42

5L Z

S04249

GEN. LUNA S0 2

Access Road leading to Catanuan Cove & Beaches,Catanuan, Quezon 2016:P 122,000.00 2015:P 37,380.00 2014:P 30,000.00

GUINAYANGAN !.

S0

PITOGO MACALELON !.

Construction of Eco-Tourism Road leading to Bantakay Falls and Cave, Brgy. Sta. Catalina, Atimonan, Quezon 2016:P 122,000.00 2015:P 20,000.00

TAGKAWAYAN !.

CALAUAG

UNISAN !.

74 L

QUEZON 4TH 4

AGDANGAN

!.

231L

38LZ

!.

Z

!.

QUEZON

S0 4

4

58

B

S0 4 2

!.

!.

Z

LUCENA CITY

PLARIDEL 0L

!.

!.

0 0 5A

!.

24

S01994LZ !. PAGBILAO S0 S 0 1 9 8 5L Z .! SARIAYA 20 !.

S 00

Z

8 6 8 LZ S0 5

0L

!.

QUEZON 2ND

S02003LZ

!.

S0 1 !.

4 S0

9 S 01

L Z DOLORES 98 !.

54

LZ

BUENAVISTA !.

LZ

!.

CATANAUAN QUEZON 3RD S 02 0 !.

5 7L

MULANAY

Z

S 04 2 5

SAN FRANCISCO (AURORA) S0425

!.

2L

Z

!.

3 LZ

Construction of Concepcion-Ilaya Eco-Tourism Road, Plaridel, Quezon 2016:P 42,400.00 2015:P 30,000.00

SAN NARCISO !.


PROVINCE OF QUEZON 2nd DEO Const./Upgrading (Gravel to concrete) Quezon Eco-Tourism Road Lucena City-Batangas Coastal Rd.) Phase III Road Const. of Morong Bridge and Approaches Brgy. Salinas-Ibabang Talim, Lucena City (Phase I) 2013:P 50,000.00 Quezon Eco-Tourism Rd. (Lucena City-Batangas Coastal Road) Const./Conc. Of Manggalang Section including RROW and other related activities) (KO120+040.24 KO120+860.24) 2011:P 50,000.00

Quezon-Eco-Tourism Road (Lucena City-Batangas Coastal Road) including bridges and slope protection and RROW Quezon 2nd LD Const. of slope protection @ Bantilan Guisgis Sect. (both sides at intermittent section) (KO120+040 KO127+300) 2012:P 35,000.00

Quezon Eco-Tourism Rd. (Lucena City-Batangas Coastal Road) Completion of Bantilan Bridge II Approaches (including RROW and other related activities) (KO120+820 - KO121+180) 2011:P 25,000.00

Legend !(

5 Km Interval

!.

City/Municipal Center Paved Unpaved

Const. of Drainage canal at CastaĂąas Sect.including RROW & other related activities (both sides) (KO135+304 - KO135+557) 2012:P 5,000.00

Opening of Bocohan Section (KO142+480 - KO144+810.31 (w/ exception) ) 2012:P 50,000.00

Const./Upgrading (Gravel to concrete) Quezon Eco-Tourism Road Lucena City-Batangas Coastal Rd.) Phase III Road opening Ilayang Talim-Isabang Section Lucena City 2013:P 50,000.00

Quezon Eco-Tourism Rd. (Lucena City-Batangas Coastal Road) Const./Conc. Of Canda-Talaan Sect. (including RROW and other related activities) (KO132+980 KO134+760 & KO135+860 KO136+840) 2011:P 90,000.00 Opening of Salinas Section (KO137+454 KO139+130) 2012:P 50,000.00

Quezon-Eco-Tourism Road (Lucena City-Batangas Coastal Road) including bridges and slope protection and RROW Quezon 2nd LD Concreting of Talaan Section (KO136+969 - KO137+567.50) 2012:P 15,000.00

Quezon Eco-Tourism Rd. (Lucena City-Batangas Coastal Road) Opening of Talaan Section (including RROW and other related activities) (KO120+040 KO120+860) 2011:P 20,000.00


PROVINCE OF QUEZON 2nd DEO Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Construction of Isabang Bridge & Approaches, Quezon 2014:P 122,500.00

Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Concreting of Eco-Tourism Coastal Road (Section III), TalaanBocohan Section,Km. 142+343.50 Km. 144+803, Quezon 2014:P 50,000.00

Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Opening/Concreting of EcoTourism Coastal Road (Section III), Quezon v- Realigned 2014:P 68,000.00

Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Construction of Ilayang Talim Bridge & Approaches along EcoToruism Coastal Road (Section III), Km. 141+980, Quezon 2014:P 50,000.00 Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Construction of Gibanga Bridge & Approcahes Km. 141+680), Quezon 2014:P 43,250.00

Quezon-Eco-Tourism Road (Lucena City-Batangas Coastal Road) including bridges and slope protection and RROW Quezon 2nd LD Const. of slope protection @ San Roque- Talaan Sec. (both sides at intermittent section) (KO130+157 - KO137+578) 2012:P 40,000.00

Legend !(

5 Km Interval

!.

City/Municipal Center Paved Unpaved

Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Completion of Morong Bridge & Approaches (Km. 139+100), Quezon 2014:P 50,000.00

Const./Upgrading (Gravel to concrete)Quezon Eco-Tourism Road Lucena City-Batangas Coastal Rd.) Phase III Road Const. of Masay Bridge and approaches Brgy. Salinas, Lucena City 2013:P 50,000.00


PROVINCE OF QUEZON 2016 NAME OF PROJECT 1

2

3

4

Acces Road Leading to Catanauan Cove, Catanauan , Quezon Const. of Camagong- Villa Norte Eco Tourism Road, Brgy Camagong, Brgy Victoria, Brgy Jesus Weste,Villa Norte, Alabat Quezon Const. Of Eco-Tourism Road Leading to Bantakay Falls and Cave, Brgy. Sta. Catalina, Atimonan, Quezon Const. of Concepcion Ilaya Eco Tourism Road, Plaridel, Quezon

SCOPE OF WORK

LENGTH (km)

ALLOCATION (P'000)

Concreting

6.10

122,000

Construction

2.67

53,300

Construction

6.10

122,000

Construction

2.12

42,400

ABC (P'000)

CONTRACT DATE OF START DATE AMOUNT (P'000) BIDDING 95,260.04

51,434.50

48,862.31

117,730.00

111,493.18

41,024.26

38,161.46

COMPLETION DATE

STATUS

4/14/2016

12/10/2016

50.45%

2/29/2016 3/30/2016

8/27/2016

77.00%

2/23/2016 3/18/2016

2/26/2017

45.00% 89.00%

2015 SCOPE OF WORK

LENGTH (km)

1 Atimonan-Mauban, Tignoan Road leading to various beaches and resorts, Quezon Province (Mauban Section)

Concreting

3.165

2 Atimonan-Mauban, Tignoan Road leading to various beaches and resorts, Quezon Province (Real Section)

Concreting

5.00

3 Acces Road leading to Catanauan Cove & Beaches, Catanauan, Quezon

Concreting

1.869

Concreting/ Opening

1.00

5 Construction of Concepcion-Ilaya Eco-Tourism Road, Plaridel, Quezon

Construction

1.50

6 Construction of Camagong Villa Norte EcoTourism Road, Brgy. Camagong, Brgy. Villa Victoria, Villa Jesus Weste & Villa Norte Alabat, Alabat Island Quezon

Construction

2.00

NAME OF PROJECT

4 Construction of Eco-Tourism Road leading to Bantakay Falls and Cave, Brgy. Sta. Catalina, Atimonan, Quezon

ALLOCATION ABC (P'000) (P'000)

CONTRACT AMOUNT (P'000)

100,000.00

96,108.20

89,934.23

100,000.00

96,500.00

82,429.17

37,380.00

36,063.30

20,000.00

19,606.71

18,230.44

30,000.00

29,329.00

28,373.99

40,000.00

38,672.20

STATUS COMPLETION (October DATE 31,2016)

DATE OF BIDDING

START DATE

2/3/2015

3/4/2015

09/24/2016

On-going (68%)

3/2/2015

5/8/2015

7/1/2016

Completed

1/27/2015 3/20/2015

11/14/2015

Completed

2/24/2015

3/16/2015

12/12/2015

Completed

5/19/2015

7/7/2015

2/2/2016

Completed

7/16/2015

8/25/2015

5/28/2016

Completed


PROVINCE OF QUEZON 2014 NAME OF PROJECT

SCOPE OF WORK

LENGTH (km)

ALLOCATION (P'000)

ABC (P'000)

CONTRACT AMOUNT (P'000)

DATE OF COMPLETION START DATE BIDDING DATE

Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 1 Construction of Isabang Bridge & Approaches, Quezon

Br. Const.

1.00

122,500

60,965.10

58,793.54

6/13/2014

Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 2 Opening/Concreting of Eco-Tourism Coastal Road (Section III), Quezon

Opening/ Concreting

1.454

68,000

66,423.60

62,103.88

10/7/2014 11/18/2014

Const./Improvement of Access Road along 3 Atimonan-Mauban Road, Mauban Section

Concreting gravel to paved

1.332

50,000

47,000

43,615.15

12/26/2013

7/4/2014

2/25/2015

Completed

Const./Improvement of Access Road along Atimonan-Mauban Road, Real Section

Concreting gravel to paved

1.518

50,000

48,000

45,124.68

12/26/2013

7/4/2014

7/30/2015

Completed

Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 5 Completion of Morong Bridge & Approaches (Km. 139+100), Quezon

Br. Comp.

1.00

50,000

47,500

43,605.12

12/27/2013 7/22/2014

9/16/2015

Complteted

Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 6 Concreting of Eco-Tourism Coastal Road (Section III), Talaan-Bocohan Section,Km. 142+343.50 - Km. 144+803, Quezon

Concreting

0.187

50,000

47,500

43,128.94

12/27/2013 5/15/2014

5/29/2015

Completed

Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 7 Construction of Gibanga Bridge & Approcahes Km. 141+680), Quezon

Br. Const.

0.126

43,250

40,885

37,609.74

12/27/2013 6/26/2014

4/13/2015

Completed

Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 8 Construction of Ilayang Talim Bridge & Approaches along Eco-Toruism Coastal Road (Section III), Km. 141+980, Quezon

Br. Const.

1.00

50,000

48,000

44,563.58

12/27/2013

8/3/2015

Completed

Access Road leading to Catanuan Cove & Beaches,Catanuan, Quezon

Concreting

1.5

30,000

29,306.22

26,375.33

12/23/2013 3/26/2014

12/10/2014

Completed

4

9

9/1/2014

9/8/2014

05/26/2016

10/07/2016

STATUS (October 31,2016)

Completed

Completed


PROVINCE OF QUEZON 2013 NAME OF PROJECT

SCOPE OF WORK

LENGTH (km)

ALLOCATION (P'000)

ABC (P'000)

CONTRACT AMOUNT (P'000)

DATE OF BIDDING

START DATE

COMPLETION STATUS DATE (October 31,2016)

1

Concreting of Mauban-Tignoan Road (Real Section)

Upgrading

2.02

50,000

46,060

42,739.69

1/11/2013

2/7/2013

2/3/2014

Completed

2

Concreting of Mauban-Tignoan Road (Mauban Section)

Concreting

1.05

50,000

46,060

43,318.38

1/11/2013

2/7/2013

5/23/2014

Completed

Const./Upgrading (Gravel to concrete) Quezon Eco-Tourism Road Lucena City3 Batangas Coastal Rd.) Phase III Road opening Ilayang Talim-Isabang Section Lucena City

Concreting

1.96

50,000

46,500

42,509.11

1/8/2013

6/7/2013

6/30/2014

Completed

Const./Upgrading (Gravel to concrete) Quezon Eco-Tourism Road Lucena CityBatangas Coastal Rd.) Phase III Road 4 Const. of Morong Bridge and Approaches Brgy. Salinas-Ibabang Talim, Lucena City (Phase I)

Br. Const.

0.07

50,000

46,500

45,088.13

2/14/133

8/23/2013

6/14/2015

Completed

Const./Upgrading (Gravel to concrete)Quezon Eco-Tourism Road Lucena 5 City-Batangas Coastal Rd.) Phase III Road Const. of Masay Bridge and approaches Brgy. Salinas, Lucena City

Br. Const.

0.034

50,000

45,095.78

2/14/2013 8/23/2013

6/20/2015

Completed

46,500.00


PROVINCE OF QUEZON


PROVINCE OF QUEZON


SUMMARY OF DOT-DPWH CONVERGENCE PROJECTS CY 2011-2016 2011

2012

2013

2014

2015

2016

TOTAL

Province No. of Projects

Allocation No. of Allocation No. of Allocation (000') Projects (000') Projects (000')

No. of Projects

Allocation (000')

No. of Projects

Allocation (000')

No. of Projects

Allocation (000')

No. of Projects

Allocation (000')

Batangas

5

170,000

1

150,000

6

406,000

5

338,400

4

581,500

21

1,645,900

Cavite

2

84,516

5

157,730

2

143,000

3

238,477

2

51,540

14

675,263

Laguna

2

150,000

1

100,000

1

19,150

3

60,000

1

40,000

8

369,150

6

195,000

5

250,000

9

513,750

6

327,380

4

339,700

35

1,825,830

2

228,984

2

250,000

4

478,984

17

828,500

14

907,730

82

4,995,127

Quezon

5

200,000

Rizal

Grand Total

5

200,000

18

1,081,900

17

964,257

11

1,012,740


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.