TOURISM INFRASTRUCTURE PROGRAMS (DOT-DPWH CONVERGENCE PROJECTS)
PROVINCE OF CAVITE S01751LZ
LZ 72 17 S0
183 5!. L Z S0 57 LZ
IMUS !.
S01783LZ
LZ
07 04 8 S
GEN.TRIAS
Z
S01799LZ
4L
Z
!.
CAVITE
S0
589
!.
S01844LZ
58 S01782LZ 93 LZ
NAIC
Asphalt Overlay of Cavite-Batangas Road, Bacoor-Imus-Dasmariñas City, Cavite Province 2013:P 65,000.00
S 0 4270 L Z
DASMARIÑAS CITY
S0
!.
11 48
2LZ
GEN. MARIANO ALVAREZS0 17
LZ LZ
!.
5 S0481
!.
S
1LZ S 01
Z
S0 5 8 9
87
8L
84
SILANG !.
7L Z 0 5 8 8 2L Z
LZ
INDANG
06
!.
AMADEO
19
!.
77
!.
6
LZ
L S 019 0 2
7 L Z 0503 S
01
ALFONSO MENDEZ-NUNEZ
7LZ !.
S 05
87 5L Z
1 S0
Tagaytay-Talisay-Taal Lake Rd. Cavite with exception (K0057+300K057+800) 2012:P 32,516.00
Z
9L Z
!.
S0601
S
Tagaytay City to Batangas via Tuy, Cavite 2014:P 93,000.00
S0
MAGALLANES !. GEN. E. AGUINALDO
S05888L Z
CAVITE 2ND !.
S
Construction of Indang-Tagaytay Road via Balagbag Mahabang Kahoy, Cavite 2016:P 17,340.00 2015:P 17,655.00
CARMONA
Cavite-Batangas Road (S01799LZ), Bacoor, Imus and Dasmariñas, Cavite 2014:P 50,000.00
LZ
S 05
0 18 4 8 L Z
!.
L
S0
S0 6
TRECE MARTIRES CITY S0 5 025
036
S0
TERNATE !. MARAGONDON
8LZ
Z
LZ
!.
182
18
Construction of Tarapiche Bridge along Maragondon-Gen. Aguinaldo Road Brgy. Lumipa, Ballen, Cavite 2015:P 150,000.00
Z 2L
S0
7 17
!.
27
S0
Widening of Molino-Bacoor Road, Bacoor, Cavite Province 2012:P 52,000.00
S 04
9L TANZA 177
Geometric Improvement of Manila Cavite Road 2013:P 20,000.00 1 LZ 27
ROSARIO
Tanza-Trece Martires City-Indang Rd. Cavite 2012:P 7,730.00
CD
7 LZ KAWIT S01 45 !. 18 0 S
!. !.
008
CAVITE CITY !.
Z
S 04
Concreting of Maragondon-Alfonso Road Cavite 2016:P 34,200.00 2015:P 70,822.00
S0 0
6L
S0
1 84
Asphalt Overlay of Cavite-Batangas Road, Cavite Province 2013:P 65,000.00
90
TAGAYTAY CITY
Improvement/Widening of Tagaytay City to Batangas via Tuy Road, 7LD 2013:P 100,000.00
PROVINCE OF CAVITE 2016 NAME OF PROJECT
SCOPE OF WORK LENGTH (km)
1 Conc. of Maragondon-Alfonso Road, Cavite 2
Conc. of Indang- Tagaytay Road,via Balagbag Mahabang Kahoy, Cavite
ALLOCATION (P'000)
Upgrading
1.71
34,200
Ugrading
0.87
17,340
ABC (P'000)
CONTRACT AMOUNT (P'000)
33,515.00
31,069.26
16,733.10
15,553.33
DATE OF BIDDING
START DATE
COMPLETION DATE
STATUS (August 31,2015) COMPLETED COMPLETED
2015 NAME OF PROJECT Construction of Tarapiche Bridge along 1 Maragondon-Gen. Aguinaldo Road Brgy. Lumipa, Ballen, Cavite 2 Concreting of Maragondon-Alfonso Road Cavite 3
Construction of Indang-Tagaytay Road via Balagbag Mahabang Kahoy, Cavite
ALLOCATIO ABC N (P'000) (P'000)
CONTRACT AMOUNT (P'000)
SCOPE OF WORK
LENGTH (km)
Construction
0.03
Upgrading gravel to concrete
3.50
Concreting of Road and Stone Masonry
0.883
SCOPE OF WORK
LENGTH (km)
Concreting
1.00
93,000
88,625.30
CONTRACT AMOUNT (P'000) 82,424.31
Concreting from paved to paved
2.19
50,000
45,694.47
45,694.47
150,000.00 144,750.00 143,302.45
70,822.00
68,343.20
63,904.81
17,655.00
17,036.85
15,581.09
DATE OF BIDDING
START DATE
COMPLETIO N DATE
STATUS (October 31,2016)
7/21/2015
8/12/2015
7/7/2016
On-going (40%)
1/5/2015
5/4/2015
03/12/2016 COMPLETED
12/9/2014
4/14/2015
8/20/2015
COMPLTED
2014 NAME OF PROJECT 1 Tagaytay City to Batangas via Tuy, Cavite 2 Cavite-Batangas Road (S01799LZ), Bacoor, Imus and Dasmariñas, Cavite
ALLOCATIO ABC N (P'000) (P'000)
DATE OF BIDDING
START DATE
COMPLETI ON DATE
8/28/2014
9/12/2014
8/30/2015
STATUS (October 31,2016) Completed
11/14/2014
1/16/2015
6/5/2015
Completed
PROVINCE OF CAVITE 2013 ABC (P'000)
CONTRACT AMOUNT (P'000)
DATE OF BIDDING
START DATE
COMPLETION DATE
STATUS (October 31,2015)
65,000
63,034.73
58,285.60
12/19/2012
3/15/2013
12/27/2013
Completed
2.079
65,000
62,868.76
58,433.20
1/16/2013
3/16/2013
12/27/2013
Completed
Concreting
4.607
100,00
70,569.90
70,569.90
2/27/2013
3/25/2013
9/30/2015
On-going (90%)
Road Upgrading
0.653
20,000
19,400
18,387.32
12/19/2012
8/6/2013
12/5/2013
Completed/ Modified
LENGTH ALLOCATION (km) (P'000)
NAME OF PROJECT
SCOPE OF WORK
1 Asphalt Overlay of Cavite-Batangas Road, Bacoor-Imus-Dasmariñas City, Cavite Province
Asphalt Overlay
0.88
Asphalt Overlay
3 Improvement/Widening of Tagaytay City to Batangas via Tuy Road, 7LD 4 Geometric Improvement of Manila - Cavite Road
2 Asphalt Overlay of Cavite-Batangas Road, Cavite Province
PROVINCE OF LAGUNA Construction of Access Road leading to the Shrine of Jesus in the Holy Sepulchre (Lolo Uweng Shrine), Brgy. Landayan, San Pedro Laguna 2015:P 10,000.00
SANTA MARIA
Const./Widening/Upgrading Rizal Boundary - Famy Quezon Boundary Road linking Marikina Infanta Road via Sta. Maria, Laguna 2013:P 100,000.00
!.
67
LZ
Rizal Boundary-Famy Quezon Boundary Rd. linking the Marikina-Infanta Rd. via Sta. Maria, Laguna 2012: Upgrading/Gravelling: P 100,000.00 Concreting: P 50,000.00
S 01 6
!.
!. FAMY MABITAC !. SINILOAN
66 1
!.
01
PANGIL S
LZ
PAKIL
!.
PAETE
SAN PEDRO
!.
!.
LZ 730 .!
KALAYAAN
Mt. Makiling Eco-Tourism Road S0 1
S
2015: P 40,000.00
71 5
6
L LUMBAN Z !.
CABUYAO
0 6 6 !. S 0 1 6 39L
S 0 1 6 74
LZ
PAGSANJAN !.
S0 4
31 2
S
01
LZ
Z !.
L
LZ
01
67
!.
!.
2016: P 40,000.00 SANTA ROSA CITY
Z
S0 1
S0
17
35
LZ !.
!.
!.
LAGUNA 1ST
14
Z
CALAMBA CITY
17
314L
!.
PILA
S01 7 2 9LZ
!.
BAY 0
17
S 01 7
37
S01736LZ
!.
LUISIANA
Z 6L
LZ
S0
1
Z
S0 5 !.
!.
!.
8 1 7 LZ
NAGCARLAN RIZAL 70 5L
LAGUNA 3RD
Z
ALAMINOS
SAN PABLO CITY !.
!.
S0
LZ
8 1L Z
3 71
S 01 6
1 S0
LILIW
!.
S0 1
Construction of Access Road leading to Cuartel De Sto. Domingo, Sta. Rosa Laguna 2015:P 10,000.00
LZ
9
0L
67
1 MAJAYJAY S0
71
CALAUAN !.
Z
L
S01732LZ
7 2 5L Z S 0 1!.
!.
72
Z
S0
S
1L 73 01
16 S0
MAGDALENA
S0
LAGUNA 2ND
S0 4
S01659LZ LZ
CAVINTI VICTORIA
16
86
LZ
Construction/Improvement of Access Road leading to declared touirism destinations, Mt. Makiling Eco-Tourism Road,Los Baños, Laguna 2014:P 19,150.00
PROVINCE OF LAGUNA 2016 NAME OF PROJECT
1
Mt. Makiling EcoTourism Road, Los Banos, Cavite
SCOPE OF WORK
LENGTH (km)
ALLOCATION (P'000)
ABC (P'000)
Upgrading
2.00
40,000
39,200.00
CONTRACT DATE OF START DATE AMOUNT (P'000) BIDDING 37,377.33
3/17/2016
COMPLETION DATE
STATUS
9/12/2016
34.00%
2015 NAME OF PROJECT 1 Mt. Makiling Eco-Tourism Road
SCOPE OF WORK
LENGTH ALLOCATION ABC (P'000) (km) (P'000)
Upgrading gravel to concrete
6.00
Gravel to Paved
0.5
Construction of Access Road leading to 3 Cuartel De Sto. Domingo, Sta. Rosa Laguna
Gravel to Paved
0.50
Construction of Access Road leading to Regional 4 Government Center, Calamba City, Laguna
Gravel to Paved
2
Construction of Access Road leading to the Shrine of Jesus in the Holy Sepulchre (Lolo Uweng Shrine), Brgy. Landayan, San Pedro Laguna
40,000.00
39,200.00
10,000.00
10,000.00
10,000.00
9,800.00
CONTRACT AMOUNT (P'000)
DATE OF BIDDING
START DATE
COMPLETION DATE
STATUS (October 31,2016)
6/29/2015
8/7/2015
5/2/2016
Completed
7/24/2015
1/16/2016
6/22/2016
Completed
3/7/2015
6/11/2015
8/17/2016
Completed
3/16/2016
4/10/2016
CONTRACT AMOUNT (P'000)
DATE OF BIDDING
START DATE
17,547.37
11/19/2013
3/24/2014
9,289.57
44,947.00
On - Going 90%
2014 NAME OF PROJECT 1
Construction/Improvement of Access Road leading to declared touirism destinations, Mt. Makiling Eco-Tourism Road,Los Baños, Laguna
SCOPE OF WORK
Concreting
LENGTH ALLOCATION ABC (P'000) (km) (P'000)
1.134
19,150
18,767
COMPLETION STATUS DATE (August 31,2016)
8/11/2014
Completed
PROVINCE OF LAGUNA 2013 NAME OF PROJECT 1 Const./Widening/Upgrading Rizal Boundary - Famy Quezon Boundary Road linking Marikina Infanta Road via Sta. Maria, Laguna
SCOPE OF WORK
LENGTH (km)
ALLOCATION (P'000)
ABC (P'000)
CONTRACT AMOUNT (P'000)
DATE OF BIDDING
START DATE
Concreting
5.00
100,000
97,000
92,991.68
3/5/2013
3/25/2013
COMPLETION STATUS DATE (October 31,2016) 3/25/2016
Completed
PROVINCE OF BATANGAS
S
9 01
2 8LZ
TALISAY S 0 5 80 4 L
!.
!.
Z
01
MALVAR !.
BATANGAS 1ST
BALETE
TUY
S 01 9
32
29
7L
!.
15
18 LZ
ALITAGTAG
PADRE GARCIA !.
ROSARIO
!.
BATANGAS 4TH IBAAN !.
S 01
94 7 L
Z
!.
Calatagan-Poblacion Road leading to various beaches 2014: P 12,000.00
L
TAYSAN
19 3 6
Z
!.
LZ
4 6L
977
19
Rehabilitation/improvement of San Jose-Ibaan Road (Ibaan Section)link S0 4from 29 0 L Star Tollways to Batangas Z Quezon Roads and San Juan - Laiya SAN JUAN !. Road leading to various beaches, Laiya,San Juan, Batangas 2016: P 80,000.00 2015: P 20,000.00 S01
S0 !.
BAUAN!.
Z
S0
!.
Construction of Coastal Road along Taal Circumferential Road along the Municipalities of San NicolasSta. Teresita Alitagtag Batangas 2016: P 200,000.00 2015: P 100,000.00
S0
!.
CALATAGAN
SAN JOSE !.
LZ
57
SAN LUIS
!.
CUENCA
S
67 L Z
S0
!.
L!. Z
19
LZ
TAAL !. !. LEMERY
3 25
019
S 04
S0 5
05 80 0
LZ
!.
2LZ S0 1 9 5
!.
05
54
!.
AGONCILLO SAN NICOLAS
LZ
18
Z
30
S0
8L
MATAAS NA KAHOY LIPA CITY
S0
!.
97
50
CALACA
01 LZ S
S0
S 0 579
!.
S LZ 0051
BALAYAN
S05016LZ
Z
6 LZ
S0 5
0
01
S0 5
2L Z
LZ
!.
Rehabilitation/improvement of San Jose-Ibaan Road (San Jose Section) conjoining the Star Tollways Entry/Exit at Ibaan,Batangas/San Jose Section, San Jose Batangas 2015: P 50,000.00
17LZ
LAUREL !.
!.
LZ
!.
LIAN !.
9 11
TANAUAN CITY
S019
S0185 9
LZ
BATANGAS 3RD S
Concreting of Brgy. Road located in Brgy. Nonong Castro, Lemery, Batangas Z NASUGBU 0L 2016: P 1,500.00 !. 79 S 05 2015: P 18,400.00
Tanauan-Talisay-Tagaytay Road 2014: P 44,000.00 2012: P 30,000.00
Construction of Coastal Road along Taal Circumferential Road along Talisay-Laurel-Agoncillo Road (intermittent sections) 2014: P 150,000.00 2013: P 150,000.00 2012: P 100,000.00
BATANGAS CITY !.
S 0 50 0 3L Z
MABINI
S 019 53
LZ
BATANGAS 2ND
TINGLOY !.
LOBO Z 009 L
!.
60 57
S 05
S0
LZ
Bauan-Mabini Circumferential Road, Batangas 2012: P 40,000.00
Lobo-Malabrigo-Laiya San Juan Road (biga Section), Lobo, Batangas 2016: P 300,000.00 2015: P 150,000.00 2014: P 200,000.00
PROVINCE OF BATANGAS 2016 ABC (P'000)
CONTRACT AMOUNT (P'000)
DATE OF BIDDING
NAME OF PROJECT
SCOPE OF WORK
LENGTH (km)
ALLOCATION (P'000)
1
Lobo-Malabrigo-Laiya-San Juan Road, Lobo, Batangas
Improvement with Bridges
5.86
300,000
289,500.00
2
Const. of Road along Taal Circumferential Road, San Nicolas,-Sta. Teresita-Alitagtag
Construction
10.00
200,000
193,000.00
186,243.50
2/26/2016
3
Rehabilitation/Improvement of San Jose Ibaan (Ibaan Section)
Improv/Rehab
4.00
80,000
78,000.00
74,099.89
2/9/2016
4
Concreting of Brgy Road located in Nonong Castro, Lemery, Batangas
Upgrading
0.08
1,500
1,470.00
START DATE
COMPLETION DATE
With NTP dated 10/10/ 16
2/23/2016
1,447.49
10/19/2015
STATUS
3/30/2016
4278900%
25.00%
54.62.%
5/18/2016
100.00%
2015 NAME OF PROJECT 1 Lobo-Malabrigo-Laiya San Juan Road (biga Section), Lobo, Batangas 2 Construction of Coastal Road along Taal Circumferential Road along the Municipalities of San Nicolas-Sta. Teresita Alitagtag Batangas 3 Concreting of Brgy. Road located in Brgy. Nonong Castro, Lemery, Batangas 4 Rehabilitation/improvement of San Jose-Ibaan Road (San Jose Section) conjoining the Star Tollways Entry/Exit at Ibaan,Batangas/San Jose Section, San Jose Batangas
SCOPE OF WORK LENGTH (km)
Concreting
7.50
ALLOCATION (P'000) 150,000.00
ABC (P'000) 144,750.00
CONTRACT DATE OF START AMOUNT BIDDING DATE (P'000) 119,635.81 6/18/2015 09/11/2015
COMPLETION DATE 10/11/2016
STATUS (October 31,2016) Om Going (50.60%)
Construction 5.00
Concreting
Rehab./Improveme nt/Widening of 3.10 m PCCP, RCPC drainage with conc. Curb & Gutter & Sidewalk 5 Rehabilitation/improvement of San Jose-Ibaan Rehab./Improveme Road (Ibaan Section)link from Star Tollways to nt of carriageway Batangas Quezon Roads and San Juan - Laiya 6.7 m PCCP 2.25 m Road leading to various beaches, Laiya,San Juan, pavings of Batangas shoulders, RCPC drainage with conc. Curb & Gutter & Sidewalk
1.28
100,000.00 18,400.00
100,000.00
91,634.79
6/22/2015
7/31/2015
7/10/2016
COMPLETE D
18,032.00
17,108.61
3/16/2015
COMPLETED 10/20/2015 5/18/2015 10/20/2015 COMPLETE D
1.30
50,000.00
49,000.00
45,462.40
2/23/2015
4/30/2015
8/20/2016
COMPLETE D
0.4
20,000.00
19,600.00
18,418.27
2/12/2015
5/6/2015
11/12/2016
COMPLETE D
PROVINCE OF BATANGAS 2014 NAME OF PROJECT
SCOPE OF WORK
1 Lobo-Malabrigo-Laiya San Juan Road (biga Section), Lobo, Opening/ Concreting Batangas 2 Calatagan-Poblacion Road leading to various beaches 3 Taal Lake Circumferential Road Talisay - Laurel Agoncillo Road leading to Taal Lake, Talisay Laurel - Agoncillo Road (K0081+(-224) K0102+815) 4 Taal Lake Circumferential Road Talisay - Laurel Agoncillo Road leading to Taal Lake, Talisay Laurel - Agoncillo Road (K0102+815 - K0110+278) 5 Taal Lake Circumferential Road Talisay - Laurel Agoncillo Road leading to Taal Lake, Talisay Laurel - Agoncillo Road (K0114+054 - K0121+105) 6 Tanauan-Talisay-Tagaytay Road
LENGTH ALLOCATION (km) (P'000)
ABC (P'000)
CONTRACT AMOUNT (P'000)
DATE OF COMPLETION STATUS START DATE BIDDING DATE (October 31,2016)
5.586
200,000
192,797.90
178,926.22
11/11/2014
12/15/2014
10/28/2016
On-going (90.02%)
Concreting
0.5785
12,000
11,760
10,936.80
11/13/2013
4/21/2014
10/08/2014 10/8/2014
Completed
Concreting
2.31
50,000
49,000
43,284.29
12/21/2013
3/31/2014
12/10/2014
Completed
Concreting
2.31
50,000
49,000
45,263.41
12/21/2013
3/31/2014
12/10/2014
Completed
Concreting
1.33
50,000
49,000
45,318.16
12/21/2013
3/31/2014
12/10/2014
Completed
Concreting Slope Protection
6.076
44,000
43,120
40,039.48
12/21/2013
3/31/2014
12/10/2014
Completed
PROVINCE OF BATANGAS 2013 NAME OF PROJECT 1 Upgrading (Gravel to Concrete) Taal-Lake Circumferential Road (Section LaurelAgoncillo) inclusive of Talisay-LaurelAgoncillo Road, Batangas
SCOPE OF WORK
Upgrading/ Concreting
LENGTH ALLOCATION ABC (P'000) (km) (P'000) 18.75
150,000
150,000
CONTRACT AMOUNT (P'000)
DATE OF BIDDING
START DATE
COMPLETION DATE
STATUS (October 31,2016)
104,443.01
5/9/2013
7/26/2013
9/30/2015
Completed
2 LZ
RODRIGUEZ (MONTALBAN)
01
62
!.
S
San Mateo-Rodriguez Wawa Road, San Mateo and Rodriguez, Rizal 2012:P 100,000.00
S0 4
22
5L
Z
PROVINCE OF RIZAL SAN MATEO !.
RIZAL 1ST S 0161 9 L Z
S
810
63
LZ LZ
TAYTAY
!.
S0
9 1 58
LZ
LZ
Z
!.
TERESA !.
S0
1
61 0 1 S0
RIZAL 2ND
5
S0
!. MORONG BARAS 5
L
9
!.
1 55
ANGONO
LZ
LZ
S0
Improvement/Widening of MarikinaInfanta Road, Marcos Highway, Masinag Antipolo City 2013: P 98,935.00
599
2 1L
!.
Z
S01
CAINTA
7LZ
S0S 10613 5 61L2
S0 16
Z
01
S0 3
63 4L
84
S 01
Improvement of San MateoRodriguez Wawa Road, San Mateo and Rodriguez, Rizal 2013:P 150,000.00
1
LZ 5 91 S 0 1
Z
!.
TANAY S0 1
!.
58
1L
Z
CARDONA !.
70
L Z PILILLA !.
BINANGONAN
S015
Senator Lorenzo Sumulong Memorial Circle (Marikina-VictoriaValley-Antipolo Road), Rizal 2012:P 128,984.00
82LZ
!.
JALA-JALA !.
PROVINCE OF RIZAL 2013 LENGTH ALLOCATION (km) (P'000)
NAME OF PROJECT
SCOPE OF WORK
1 Improvement/Widening of MarikinaInfanta Road, Marcos Highway, Masinag Antipolo City
Concreting/ Widening
2.837
98,935
2 Improvement of San Mateo-Rodriguez Wawa Road, San Mateo and Rodriguez, Rizal
Drainage
8.353
150,000
DATE OF BIDDING
START DATE
95,472.30
CONTRACT AMOUNT (P'000) 89,672.06
3/12/2013
4/1/2013
3/15/2015
Completed
135,447.70
97,495.73
10/21/2013
12/7/2013
12/12/2015
Completed
ABC (P'000)
COMPLETION STATUS DATE (October 31,2016)
PROVINCE OF QUEZON PANUKULAN !.
Atimonan-Mauban, Tignoan Road leading to various beaches and resorts, Quezon Province (Mauban Section) 2013:P 50,000.00 2014:P 50,000.00 2015:P 100,000.00
BURDEOS !.
INFANTA !. S 0 1 5 !.
!.
POLILLO
JOMALIG
!.
Z
LZ
PATNANUNGAN 4
2L
QUEZON 1ST
!.
55 1
REAL
S 01
!.
S0 1 5 53LZ
154
015 4LS Z !.
3 7L
Z
S 01
S0
55 2
LZ
Atimonan-Mauban, Tignoan Road leading to various beaches and resorts, Quezon Province (Real Section) 2013:P 50,000.00 2014:P 50,000.00 2015:P 100,000.00
Construction of Camagong Villa Norte Eco-Tourism Road, Brgy. Camagong, Brgy. Villa Victoria, Villa Jesus Weste & Villa Norte Alabat, Alabat Island Quezon 2016:P 53,300.00 2015:P 40,000.00
!.
PEREZ
MAUBAN
!.
ALABAT !.
Z
!.
S0
55
0L
LUCBAN
Z
LZ 01 20 S0
S02042L
S0
!.
22
7L
Z Z
S02002LZ
LOPEZ
!.
42
!.
03 7L
S0
Z
3 42
5L Z
S04249
GEN. LUNA S0 2
Access Road leading to Catanuan Cove & Beaches,Catanuan, Quezon 2016:P 122,000.00 2015:P 37,380.00 2014:P 30,000.00
GUINAYANGAN !.
S0
PITOGO MACALELON !.
Construction of Eco-Tourism Road leading to Bantakay Falls and Cave, Brgy. Sta. Catalina, Atimonan, Quezon 2016:P 122,000.00 2015:P 20,000.00
TAGKAWAYAN !.
CALAUAG
UNISAN !.
74 L
QUEZON 4TH 4
AGDANGAN
!.
231L
38LZ
!.
Z
!.
QUEZON
S0 4
4
58
B
S0 4 2
!.
!.
Z
LUCENA CITY
PLARIDEL 0L
!.
!.
0 0 5A
!.
24
S01994LZ !. PAGBILAO S0 S 0 1 9 8 5L Z .! SARIAYA 20 !.
S 00
Z
8 6 8 LZ S0 5
0L
!.
QUEZON 2ND
S02003LZ
!.
S0 1 !.
4 S0
9 S 01
L Z DOLORES 98 !.
54
LZ
BUENAVISTA !.
LZ
!.
CATANAUAN QUEZON 3RD S 02 0 !.
5 7L
MULANAY
Z
S 04 2 5
SAN FRANCISCO (AURORA) S0425
!.
2L
Z
!.
3 LZ
Construction of Concepcion-Ilaya Eco-Tourism Road, Plaridel, Quezon 2016:P 42,400.00 2015:P 30,000.00
SAN NARCISO !.
PROVINCE OF QUEZON 2nd DEO Const./Upgrading (Gravel to concrete) Quezon Eco-Tourism Road Lucena City-Batangas Coastal Rd.) Phase III Road Const. of Morong Bridge and Approaches Brgy. Salinas-Ibabang Talim, Lucena City (Phase I) 2013:P 50,000.00 Quezon Eco-Tourism Rd. (Lucena City-Batangas Coastal Road) Const./Conc. Of Manggalang Section including RROW and other related activities) (KO120+040.24 KO120+860.24) 2011:P 50,000.00
Quezon-Eco-Tourism Road (Lucena City-Batangas Coastal Road) including bridges and slope protection and RROW Quezon 2nd LD Const. of slope protection @ Bantilan Guisgis Sect. (both sides at intermittent section) (KO120+040 KO127+300) 2012:P 35,000.00
Quezon Eco-Tourism Rd. (Lucena City-Batangas Coastal Road) Completion of Bantilan Bridge II Approaches (including RROW and other related activities) (KO120+820 - KO121+180) 2011:P 25,000.00
Legend !(
5 Km Interval
!.
City/Municipal Center Paved Unpaved
Const. of Drainage canal at CastaĂąas Sect.including RROW & other related activities (both sides) (KO135+304 - KO135+557) 2012:P 5,000.00
Opening of Bocohan Section (KO142+480 - KO144+810.31 (w/ exception) ) 2012:P 50,000.00
Const./Upgrading (Gravel to concrete) Quezon Eco-Tourism Road Lucena City-Batangas Coastal Rd.) Phase III Road opening Ilayang Talim-Isabang Section Lucena City 2013:P 50,000.00
Quezon Eco-Tourism Rd. (Lucena City-Batangas Coastal Road) Const./Conc. Of Canda-Talaan Sect. (including RROW and other related activities) (KO132+980 KO134+760 & KO135+860 KO136+840) 2011:P 90,000.00 Opening of Salinas Section (KO137+454 KO139+130) 2012:P 50,000.00
Quezon-Eco-Tourism Road (Lucena City-Batangas Coastal Road) including bridges and slope protection and RROW Quezon 2nd LD Concreting of Talaan Section (KO136+969 - KO137+567.50) 2012:P 15,000.00
Quezon Eco-Tourism Rd. (Lucena City-Batangas Coastal Road) Opening of Talaan Section (including RROW and other related activities) (KO120+040 KO120+860) 2011:P 20,000.00
PROVINCE OF QUEZON 2nd DEO Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Construction of Isabang Bridge & Approaches, Quezon 2014:P 122,500.00
Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Concreting of Eco-Tourism Coastal Road (Section III), TalaanBocohan Section,Km. 142+343.50 Km. 144+803, Quezon 2014:P 50,000.00
Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Opening/Concreting of EcoTourism Coastal Road (Section III), Quezon v- Realigned 2014:P 68,000.00
Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Construction of Ilayang Talim Bridge & Approaches along EcoToruism Coastal Road (Section III), Km. 141+980, Quezon 2014:P 50,000.00 Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Construction of Gibanga Bridge & Approcahes Km. 141+680), Quezon 2014:P 43,250.00
Quezon-Eco-Tourism Road (Lucena City-Batangas Coastal Road) including bridges and slope protection and RROW Quezon 2nd LD Const. of slope protection @ San Roque- Talaan Sec. (both sides at intermittent section) (KO130+157 - KO137+578) 2012:P 40,000.00
Legend !(
5 Km Interval
!.
City/Municipal Center Paved Unpaved
Quezon Eco-Tourism Road (Lucena City-Batangas Coastal Road) Phase III Completion of Morong Bridge & Approaches (Km. 139+100), Quezon 2014:P 50,000.00
Const./Upgrading (Gravel to concrete)Quezon Eco-Tourism Road Lucena City-Batangas Coastal Rd.) Phase III Road Const. of Masay Bridge and approaches Brgy. Salinas, Lucena City 2013:P 50,000.00
PROVINCE OF QUEZON 2016 NAME OF PROJECT 1
2
3
4
Acces Road Leading to Catanauan Cove, Catanauan , Quezon Const. of Camagong- Villa Norte Eco Tourism Road, Brgy Camagong, Brgy Victoria, Brgy Jesus Weste,Villa Norte, Alabat Quezon Const. Of Eco-Tourism Road Leading to Bantakay Falls and Cave, Brgy. Sta. Catalina, Atimonan, Quezon Const. of Concepcion Ilaya Eco Tourism Road, Plaridel, Quezon
SCOPE OF WORK
LENGTH (km)
ALLOCATION (P'000)
Concreting
6.10
122,000
Construction
2.67
53,300
Construction
6.10
122,000
Construction
2.12
42,400
ABC (P'000)
CONTRACT DATE OF START DATE AMOUNT (P'000) BIDDING 95,260.04
51,434.50
48,862.31
117,730.00
111,493.18
41,024.26
38,161.46
COMPLETION DATE
STATUS
4/14/2016
12/10/2016
50.45%
2/29/2016 3/30/2016
8/27/2016
77.00%
2/23/2016 3/18/2016
2/26/2017
45.00% 89.00%
2015 SCOPE OF WORK
LENGTH (km)
1 Atimonan-Mauban, Tignoan Road leading to various beaches and resorts, Quezon Province (Mauban Section)
Concreting
3.165
2 Atimonan-Mauban, Tignoan Road leading to various beaches and resorts, Quezon Province (Real Section)
Concreting
5.00
3 Acces Road leading to Catanauan Cove & Beaches, Catanauan, Quezon
Concreting
1.869
Concreting/ Opening
1.00
5 Construction of Concepcion-Ilaya Eco-Tourism Road, Plaridel, Quezon
Construction
1.50
6 Construction of Camagong Villa Norte EcoTourism Road, Brgy. Camagong, Brgy. Villa Victoria, Villa Jesus Weste & Villa Norte Alabat, Alabat Island Quezon
Construction
2.00
NAME OF PROJECT
4 Construction of Eco-Tourism Road leading to Bantakay Falls and Cave, Brgy. Sta. Catalina, Atimonan, Quezon
ALLOCATION ABC (P'000) (P'000)
CONTRACT AMOUNT (P'000)
100,000.00
96,108.20
89,934.23
100,000.00
96,500.00
82,429.17
37,380.00
36,063.30
20,000.00
19,606.71
18,230.44
30,000.00
29,329.00
28,373.99
40,000.00
38,672.20
STATUS COMPLETION (October DATE 31,2016)
DATE OF BIDDING
START DATE
2/3/2015
3/4/2015
09/24/2016
On-going (68%)
3/2/2015
5/8/2015
7/1/2016
Completed
1/27/2015 3/20/2015
11/14/2015
Completed
2/24/2015
3/16/2015
12/12/2015
Completed
5/19/2015
7/7/2015
2/2/2016
Completed
7/16/2015
8/25/2015
5/28/2016
Completed
PROVINCE OF QUEZON 2014 NAME OF PROJECT
SCOPE OF WORK
LENGTH (km)
ALLOCATION (P'000)
ABC (P'000)
CONTRACT AMOUNT (P'000)
DATE OF COMPLETION START DATE BIDDING DATE
Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 1 Construction of Isabang Bridge & Approaches, Quezon
Br. Const.
1.00
122,500
60,965.10
58,793.54
6/13/2014
Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 2 Opening/Concreting of Eco-Tourism Coastal Road (Section III), Quezon
Opening/ Concreting
1.454
68,000
66,423.60
62,103.88
10/7/2014 11/18/2014
Const./Improvement of Access Road along 3 Atimonan-Mauban Road, Mauban Section
Concreting gravel to paved
1.332
50,000
47,000
43,615.15
12/26/2013
7/4/2014
2/25/2015
Completed
Const./Improvement of Access Road along Atimonan-Mauban Road, Real Section
Concreting gravel to paved
1.518
50,000
48,000
45,124.68
12/26/2013
7/4/2014
7/30/2015
Completed
Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 5 Completion of Morong Bridge & Approaches (Km. 139+100), Quezon
Br. Comp.
1.00
50,000
47,500
43,605.12
12/27/2013 7/22/2014
9/16/2015
Complteted
Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 6 Concreting of Eco-Tourism Coastal Road (Section III), Talaan-Bocohan Section,Km. 142+343.50 - Km. 144+803, Quezon
Concreting
0.187
50,000
47,500
43,128.94
12/27/2013 5/15/2014
5/29/2015
Completed
Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 7 Construction of Gibanga Bridge & Approcahes Km. 141+680), Quezon
Br. Const.
0.126
43,250
40,885
37,609.74
12/27/2013 6/26/2014
4/13/2015
Completed
Quezon Eco-Tourism Road (Lucena CityBatangas Coastal Road) Phase III 8 Construction of Ilayang Talim Bridge & Approaches along Eco-Toruism Coastal Road (Section III), Km. 141+980, Quezon
Br. Const.
1.00
50,000
48,000
44,563.58
12/27/2013
8/3/2015
Completed
Access Road leading to Catanuan Cove & Beaches,Catanuan, Quezon
Concreting
1.5
30,000
29,306.22
26,375.33
12/23/2013 3/26/2014
12/10/2014
Completed
4
9
9/1/2014
9/8/2014
05/26/2016
10/07/2016
STATUS (October 31,2016)
Completed
Completed
PROVINCE OF QUEZON 2013 NAME OF PROJECT
SCOPE OF WORK
LENGTH (km)
ALLOCATION (P'000)
ABC (P'000)
CONTRACT AMOUNT (P'000)
DATE OF BIDDING
START DATE
COMPLETION STATUS DATE (October 31,2016)
1
Concreting of Mauban-Tignoan Road (Real Section)
Upgrading
2.02
50,000
46,060
42,739.69
1/11/2013
2/7/2013
2/3/2014
Completed
2
Concreting of Mauban-Tignoan Road (Mauban Section)
Concreting
1.05
50,000
46,060
43,318.38
1/11/2013
2/7/2013
5/23/2014
Completed
Const./Upgrading (Gravel to concrete) Quezon Eco-Tourism Road Lucena City3 Batangas Coastal Rd.) Phase III Road opening Ilayang Talim-Isabang Section Lucena City
Concreting
1.96
50,000
46,500
42,509.11
1/8/2013
6/7/2013
6/30/2014
Completed
Const./Upgrading (Gravel to concrete) Quezon Eco-Tourism Road Lucena CityBatangas Coastal Rd.) Phase III Road 4 Const. of Morong Bridge and Approaches Brgy. Salinas-Ibabang Talim, Lucena City (Phase I)
Br. Const.
0.07
50,000
46,500
45,088.13
2/14/133
8/23/2013
6/14/2015
Completed
Const./Upgrading (Gravel to concrete)Quezon Eco-Tourism Road Lucena 5 City-Batangas Coastal Rd.) Phase III Road Const. of Masay Bridge and approaches Brgy. Salinas, Lucena City
Br. Const.
0.034
50,000
45,095.78
2/14/2013 8/23/2013
6/20/2015
Completed
46,500.00
PROVINCE OF QUEZON
PROVINCE OF QUEZON
SUMMARY OF DOT-DPWH CONVERGENCE PROJECTS CY 2011-2016 2011
2012
2013
2014
2015
2016
TOTAL
Province No. of Projects
Allocation No. of Allocation No. of Allocation (000') Projects (000') Projects (000')
No. of Projects
Allocation (000')
No. of Projects
Allocation (000')
No. of Projects
Allocation (000')
No. of Projects
Allocation (000')
Batangas
5
170,000
1
150,000
6
406,000
5
338,400
4
581,500
21
1,645,900
Cavite
2
84,516
5
157,730
2
143,000
3
238,477
2
51,540
14
675,263
Laguna
2
150,000
1
100,000
1
19,150
3
60,000
1
40,000
8
369,150
6
195,000
5
250,000
9
513,750
6
327,380
4
339,700
35
1,825,830
2
228,984
2
250,000
4
478,984
17
828,500
14
907,730
82
4,995,127
Quezon
5
200,000
Rizal
Grand Total
5
200,000
18
1,081,900
17
964,257
11
1,012,740