1 Leadenhall Street
- I was working on the feasibility and massing studies of this project and later I was involved in the RIBA stage 3 issue working on the core and internal areas including the basement cycle facilities.
![](https://assets.isu.pub/document-structure/230203120511-b73024e9677fea57041741be0a1562fd/v1/d91a370dca7db4298203041ee0522bd2.jpeg?width=720&quality=85%2C50)
Advertisement
- 1 Leadenhall is a skyscraper that we worked on together with Brookfield. During the early days of the design I was able to learn the demands of the client and how this high-end projects differ from the other ones. I had a close relationship with the client and attended all design team meetings.
![](https://assets.isu.pub/document-structure/230203120511-b73024e9677fea57041741be0a1562fd/v1/8662ef28255cb970187e3d92901893f0.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230203120511-b73024e9677fea57041741be0a1562fd/v1/c10120b7da1508464939235a4056f9f2.jpeg?width=720&quality=85%2C50)
- Developing more than 300 massing studies I also had to make sure that the building has the required office area. I worked on the design of the public terrace on level 2 and later during stage 3 I was leading the internal areas and coordinating the design with the sub-consultants. I was working on the interior of this areas which was a steep learning curve of how to design a high-end interior spaces.
Office skyscraper / London , UK /// 36 storeys + basements / 65,000 sqm GEA
![](https://assets.isu.pub/document-structure/230203120511-b73024e9677fea57041741be0a1562fd/v1/47f3ae437778e26e3f46c6e87f68ae20.jpeg?width=720&quality=85%2C50)
Professional work / Make Architects / 2015