Nguyen Mai Duc Truong | Portfolio 2024

Page 1


MAI DUC TRUONG

PROJECTS INVOLVED & MY ROLE

.

HIIVE

4* Hotel | 11 floors | 172 keys

.

.

Fusion Original Saigon Centre

5* Hotel | 10 floors of Saigon Centre | 147 keys

Fusion Resort & Villa Da Nang

5* Hotel & Resort | 18 floors hotel | 86 villas

.

.

Fusion Resort Cam Ranh (Phase 2)

5* resort | 6.5ha land | 50 villas & facilities

Fusion Suite Vũng Tàu

4* Hotel | 20 floors | 171 keys 2014

.

Fusion Resort Phu Quoc

5* resort | 4.8ha land | 105 villas

.

.

Fusion Suite Saigon

4* Hotel | 11 floors + 2 basement

FLC Quy Nhon Beach & Golf resort

5* resort | I contributed to low-rise

FUSIONHOTELGROUP

Website:https://fusionhotelgroup.com/

Mytitle:JuniorDesignManager

Sky Tower Office

4 floors | Da Nang city . .

Mix-use Office & Apart. | 12 floors | Da Nang

Green island apartment

Website:https://www.sceproject.it/ Mytitle:ArchitectcumProjectCoordinator

Apartment| 856 apart. | 24 floors

Website:https://www.capitaland.com/vn

Waterpoint-GeneralHospital

2.9haland|7floors|290bed

Waterpoint-Kindergarten

4.128sqmland|4floors|18classrm

Waterpoint–Golfdrivingrange

4.43haland|36drivingcarpets

Waterpoint-BoardingSchool

5.9haland|4floors+1bsmt|70classrooms

NAM LONG GROUP

Mizuki Park Township| Binh Chanh

Project: Commercial Shops

Land area: 3,247sqm

3 floors with 12 shop units

MY RESPONSIBILITY

Successfully followed & managed the project from design development to completion & handover to operator

1. Project legal tasks:

• Supported legal team to prepare/ explain submission doc./dwgs for authorities during design/construction stage

2. Project development:

• Attended Site weekly progress meeting to solve site issues

• Attended VO assessment meeting, worked on VE

• Coordinated to reply RFA/ RFI/ MA/ Shop drawing

• Design enhancements: Signage, hoarding, pergola

study to enhance design

3. Marketing & Leasing support:

• Designed & issued Tenant Fit-out Guidelines

• Hoarding design & constructor selection

• Supported design flag banner advertising & announcement letters

• Supported events: Groundbreaking, Mockup visit

WATERPOINT TOWNSHIP| LONG AN

Project: Kindergarten NS2

Land area: 4,128sqm

Floors: 4 | 2 phases

MY RESPONSIBILITY

Served as the key design management of developer

1. Design management:

• Managed master procurement plan to select consultant (RFP/ reply TCQ/ assessment/ seek approval)

• Consultant management (timeline/ budget/ deliverable quality)

• Led meetings between consultants, advisor/ expert, operator/ Group Chief Architect

• Led meetings with the Chairman to seek design approval

Project: General Hospital

290 beds | 2.9ha |3 phases

Project: Golf Driving Range

36 driving carpets

4.43ha/ 1.456m2

2. Internal relationships:

• Supported the Investment team/ Business Development team:

• Created initial layouts for FS, Drove project efficiency, computed GFA to comply with approvals

• Provided information/ Visual image to present & seeking partner

3. External relationships: connected & keep updated report to advisor/ operator & BOD

WATERPOINT| LONG AN

Project: Emasi Boarding School

Land area: 5.9ha, 3 phases

Phase 1: 4 floors + 1 basement

MY RESPONSIBILITY

1. Project legal support:

• Supported legal team to prep. & explain submission doc./dwgs for authorities during design/construction stage

2. Project development:

• Attended Site weekly progress meeting to follow up & monitor progress

• Participated in regular updates reports to BOD & related department

PARAGON| DAI PHUOC

Project: Commercial land lots

Land area: 14ha, 3 phases

Task: Masterplan feasibility study

masterplan study for commercial area

Land area: 4.3ha

CAPITALAND

Senior Executive | Design Management

DELASOL | D4 HCMC

Project: Residential apartment

1,4ha land area | 870 units

3 blocks | 24 story

Project status: completed

MY RESPONSIBILITY

1. Main Project: Served as key design management of developer

• Participated in TCM/ CCM/ SPM/ VO assessment meetings: to monitor design progress

• Participated in tender process for NSC: Alu & Glazing, Timber doors, fixed furniture, façade lighting

• Monitored the work of CGI & 3d animation vendors appointed to produce Marketing materials

• Supported the Legal dept.: provided Resettlement Units plans

• Followed up & maintained updated handover conditions & sale purchase agreements

DELASOL

Sale Gallery & Show Units

650sqm GFA

Project status: completed

2. Sale Gallery & Show Units: Served as key Architect, successfully followed & monitor project from initial to completion.

• In charge of full concept design layout/ 3d visual & present the concept to seek approval

• Contractor tendering process: briefed design to contractor, reply related TCQ & evaluate

• During construction progress:

• Participated in Site progress meeting/ VO assessment: to resolve design related site issues

• Finishing mat. Selection: visited showrooms & factories to review materials

PROJECTS SUPPORTED

Zenity at D1 & Define at D2

Provide concept design for their Show Units

Project status: completed

MY RESPONSIBILITY

1. Support other team members:

• Provided concept designs for Show Units of: Zenity & Define high-rise luxury apartments

2. Project study:

• Massing study: provided sketch perspectives for presentation to BOD

• Layout study: to ensured the area met initial investment requirements

PROJECTS STUDY

Study: Massing, capacity, area

massing study for 18.9ha urban area

The Vista – Oxygen supported (as No.3 below)

3. Supported Property management office of The Vista mix-use project:

• Provided documents & drawings to tenants

• Reviewed & commented on design submitted by tenants

• Computed project areas: provided the information to other department

4. Contributed & enhanced the company design standards manual

SCE PROJECT

Architect cum Project Coordinator

SKY TOWER OFFICE

Located in Da Nang city

350 Nguyen Van Linh, Thanh Khe District

12 floors + 1 basement | 1300sqm land area

Client: Vicoland Group (Risemount)

MY RESPONSIBILITY

1. Architectural work:

• Led the architectural work from concept design to develop drawings

• In charge of present proposals to convince the client

2. Project coordination:

• Attended in TCM/ SPM to reply RFI and review Shop drawing from main cons Tín An

• Managed and monitor progress, updated team member and partners the workflow

GREEN ISLAND VILLAS

Location: Da Nang city

35 keys | 4 stories | 3000sqm land area

Client: Vicoland Group (Risemount)

Project status: pending

MY RESPONSIBILITY

1. Architectural work:

• Led the architectural work from concept design to basic drawings

• In charge of present proposals to convince the client

2. Project coordination:

• Managed and monitored progress, keeping team members and partners updated on the workflow

• Managed outsourcing consultants

MIT STONE SHOWROOM

Renovation design for Façade & ID

Locate in Hanoi 1200sqm GFA

FUSION HOTEL GROUP

Junior Design Manager

FUSION RESORT & VILLAS

5-star | Da Nang city

Truong Sa street, Ngu Hanh Son District

15ha land area | Hotel block with 18 floors & 86 Villas

MY RESPONSIBILITY

Massing study for FS

Successfully contributed to all phases of design process for: Masterplan + Hotel block + Spa + BOH & Sale gallery

1. Architectural work:

• Led the architectural work from concept design (layouts/ 3ds rendering) to construction drawings

• Prepared material specifications, work closely with suppliers

• Served as the lead Design Architect for the project’s Sale Gallery

2. Project coordination:

• Assisted Design Director in coordinating & monitoring project execution, Interior team’s work with other depts

Sale Gallery

Proficient in design work from concept… …to develop drawings

FUSION SUITES VUNG TAU

4-star hotel (high-rise)

2 Truong Cong Dinh Street, ward 2, Vung Tau

Owner: Hodeco | 20 floors | 171 keys | 1.986sqm land area

MY RESPONSIBILITY

Successfully followed the project from initial to completion

1. Architectural work:

from concept to complete

• Participated in the FS process: layout studies, drive efficiency, massing studies

• Led the architectural & interior design work for all facility areas from concept to construction drawings

• Prepared material specifications, FF&E, worked closely with suppliers for OS&E

• Participated in design-related presentations to the BOD

resto.

HIIVE HOTEL

4-star |Binh Duong

Lot 390, VSIP1, Thuan An 11 floors | 172 keys | 2262sqm land area

MY RESPONSIBILITY

Successfully followed the project from initial to completion.

1. Architectural work:

• Participated in the FS process: layout study, drive efficiency, massing study

• Led interior design work for all facility areas from concept to construction drawings

• Prepared material specifications, FF&E, worked closely with suppliers

• Participated in design-related presentations to the BOD

2. Project coordination:

• Participated in technical meeting to coordinate with Operator dept. & other design consultants (717, ASP)

• Assisted the Design Director to following up on project execution on-site

• Assisted the Design Director to managing & monitoring the workflow of Interior team

• Followed up on tender process to clarify design-related queries

• Organized meetings with contractors & suppliers (prepared RFIs/ MOMs)

FUSION RESORT CAM RANH

PHASE 2 | 5-Star resort

Lot D10B, near Cam Ranh international airport

Owner: Tai Thanh Cong - VinaCapital

50 Villas & Facilities| 6.5ha land area (phase 2)

MY RESPONSIBILITY

• Participated in design-related presentations to the BOD from concept to complete

Successfully followed Phase 2 of the project from initial to completion: 50 Villas + Restaurant + Gym + BOH

Phase 2 – Main design tasks:

• Led the architectural & interior concept design work. Served as the key Architect

• Participated in developing drawings, from basic to construction drawings

• Prepared material specifications, work closely with suppliers

Phase 1

– Design Enhancements:

Produced villas concept for phase 2 (AD & ID)

• Enhancement work: solution for main reception (leaking)

• Defect drawings for phase 1: tent roof, villa cantilever

• Assisted the Design Director to clarifying tender queries for constructor selection

• Solution for restaurant maintenance, restaurant renovation

FUSION RESORT PHU QUOC

5-star resort (closed/ demolished)

Owner: Lan Anh – Phu Quoc JSC | Hamlet 4, Vung Bau beach, Cua Can ward

105 suites & villas | 70-105sqm/unit | 4.8ha land area

MY RESPONSIBILITY

Successfully followed from initial to completion, in charge of: Riverside Villas + Main restaurant + pool coffee shop + gym

Architectural work:

• Led the architectural & interior design work from concept to construction drawings

• Prepared material specifications, worked closely with suppliers

• Participated in design-related presentations to the BOD from concept to complete

MY RESPONSIBILITY

FLC QUY NHON BEACH & GOLF RESORT

5-star hotel & resort | Participated in Low-rise design

Zone 4, Nhon Ly – Cat Tien beach

110 villas | Owner: FLC Group

Successfully followed from initial to completion, in charge of Low-rise (all type of villa)

Architectural work:

• Led the architectural & interior design work from concept to construction drawings

• Prepared material specifications, worked closely with suppliers

• Participated in design-related presentations to the BOD

FUSION ORIGINAL SAIGON CENTRE

Renovation work | 5-star hotel

67 Le Loi, District 1 | Owner: Kepple Land

Lv14s to Lv24 | 147 keys

MY RESPONSIBILITY

Project Scope: Reception area, Pedicure/ manicure room, Suites room

• Conducted a site survey to assess existing conditions for proper concept design development

• Developed drawings for tender process, detailed design drawings for construction

• Prepared material specifications, FF&E, worked closely with suppliers

Design for Reception area

MY RESPONSIBILITY

FUSION SUITES SAIGON

Renovation work | 4-star hotel

3-5 Suong Nguyet Anh, District 1 | Investor: TAP 11 floors + 2 basement | 72 keys hotel rooms

Project Scope: Reception area, Out-door Cafeteria, rooftop meeting room

• Conducted a site survey to assess existing condition for proper concept design development

• Developed drawings for tender process, detailed design drawings for construction

• Prepared material specifications, FF&E, worked closely with suppliers

FUSION SUITES PHU QUOC

Concept work

11 floors | 300 hotel rms + 98 townhouse

MY RESPONSIBILITY

• Participated in FS process: layout study, masterplan study, massing study

• Provided concept designs for: main cafeteria, sport bar, retail shop, karaoke area, typical room hotel

• Participated in presentations to BOD, Investor

FUSION’s OFFICE

Interior design work

Served as the key Project Architect, to develop and monitor the process from initial to completion

• Conducted a site survey to assess existing condition to proper design execution

• Led the interior design work from concept to construction drawings

• Prepared material specifications, worked closely with suppliers

• Participated in tendering process to select a contractor

7th floor in Vincom
Dong Khoi
700sqm GFA

FUSION RESORT QUANG BINH

Concept work

Bao Ninh town, Dong Hoi city

3ha land area | 10.000sqm footprint

65 Villas & facilities

MY RESPONSIBILITY

• Participated in FS process: layout study, masterplan study, massing study

• Provided concept design for: reception & hide-out caving spa & 2 stories villas

• Participated in presentations to BOD, Investor

FUSION SUITES HOI AN Concept work

Dien Duong village, Dien Ban District

230 keys & facilities | 27.000sqm GFA

• Participated in FS process: layout study, masterplan study, massing study

• Provide concept design for: reception, main restaurant, gym, retail shop & villas

• Participated in presentations to BOD, Investor

FUSION SUITES DN.BAY

Concept work

Lot B4-4 & B4-5, New city Đa Phước, Tam thuan, Hai Chau

17 floors + 1 basements | 6ha land area | 615 keys

MY RESPONSIBILITY

• Participated in FS process: layout study, massing study

• Provided concept design for facade

• Participated in presentations to BOD, Investor

FEASIBILITY STUDY PROJECT

Concept work

5.6ha land area

10.400sqm footprint

• Participated in FS process: layout study, masterplan study, massing study

• Participated in presentations to BOD, Investor

PERSONAL PROJECTS

& University’s final projects

School of rchitecture

GRADUATE RCHITECTURE PROJECT

13 ha | district 7 | HCM city | 3000 students

Campus with residence, library, 4 studio block

transforming a word into reality

Creating public spaces for each studio floor helps students connect with each others. Teamwork & relaxation are encouraged in this

connect this place.

Villa Nha Trang 08, Tran Phu

Concept design work

Personal job: Architectural design

BITIS

70sqm GFA

68 Hai Ba Trung, Hanoi Interior & façade design

Turn static files into dynamic content formats.