MAI DUC TRUONG
PROJECTS INVOLVED & MY ROLE
.
HIIVE
4* Hotel | 11 floors | 172 keys
.
.
Fusion Original Saigon Centre
5* Hotel | 10 floors of Saigon Centre | 147 keys
Fusion Resort & Villa Da Nang
5* Hotel & Resort | 18 floors hotel | 86 villas
.
.
Fusion Resort Cam Ranh (Phase 2)
5* resort | 6.5ha land | 50 villas & facilities
Fusion Suite Vũng Tàu
4* Hotel | 20 floors | 171 keys 2014
.
Fusion Resort Phu Quoc
5* resort | 4.8ha land | 105 villas
.
.
Fusion Suite Saigon
4* Hotel | 11 floors + 2 basement
FLC Quy Nhon Beach & Golf resort
5* resort | I contributed to low-rise
FUSIONHOTELGROUP
Website:https://fusionhotelgroup.com/
Mytitle:JuniorDesignManager
Sky Tower Office
4 floors | Da Nang city . .
Mix-use Office & Apart. | 12 floors | Da Nang
Green island apartment
Website:https://www.sceproject.it/ Mytitle:ArchitectcumProjectCoordinator
Apartment| 856 apart. | 24 floors
Website:https://www.capitaland.com/vn
Waterpoint-GeneralHospital
2.9haland|7floors|290bed
Waterpoint-Kindergarten
4.128sqmland|4floors|18classrm
Waterpoint–Golfdrivingrange
4.43haland|36drivingcarpets
Waterpoint-BoardingSchool
5.9haland|4floors+1bsmt|70classrooms
NAM LONG GROUP
Deputy Design Manager
Mizuki Park Township| Binh Chanh
Project: Commercial Shops
Land area: 3,247sqm
3 floors with 12 shop units
MY RESPONSIBILITY
Successfully followed & managed the project from design development to completion & handover to operator
1. Project legal tasks:
• Supported legal team to prepare/ explain submission doc./dwgs for authorities during design/construction stage
2. Project development:
• Attended Site weekly progress meeting to solve site issues
• Attended VO assessment meeting, worked on VE
• Coordinated to reply RFA/ RFI/ MA/ Shop drawing
• Design enhancements: Signage, hoarding, pergola
study to enhance design
3. Marketing & Leasing support:
• Designed & issued Tenant Fit-out Guidelines
• Hoarding design & constructor selection
• Supported design flag banner advertising & announcement letters
• Supported events: Groundbreaking, Mockup visit
WATERPOINT TOWNSHIP| LONG AN
Project: Kindergarten NS2
Land area: 4,128sqm
Floors: 4 | 2 phases
MY RESPONSIBILITY
Served as the key design management of developer
1. Design management:
• Managed master procurement plan to select consultant (RFP/ reply TCQ/ assessment/ seek approval)
• Consultant management (timeline/ budget/ deliverable quality)
• Led meetings between consultants, advisor/ expert, operator/ Group Chief Architect
• Led meetings with the Chairman to seek design approval
Project: General Hospital
290 beds | 2.9ha |3 phases
Project: Golf Driving Range
36 driving carpets
4.43ha/ 1.456m2
2. Internal relationships:
• Supported the Investment team/ Business Development team:
• Created initial layouts for FS, Drove project efficiency, computed GFA to comply with approvals
• Provided information/ Visual image to present & seeking partner
3. External relationships: connected & keep updated report to advisor/ operator & BOD
WATERPOINT| LONG AN
Project: Emasi Boarding School
Land area: 5.9ha, 3 phases
Phase 1: 4 floors + 1 basement
MY RESPONSIBILITY
1. Project legal support:
• Supported legal team to prep. & explain submission doc./dwgs for authorities during design/construction stage
2. Project development:
• Attended Site weekly progress meeting to follow up & monitor progress
• Participated in regular updates reports to BOD & related department
PARAGON| DAI PHUOC
Project: Commercial land lots
Land area: 14ha, 3 phases
Task: Masterplan feasibility study
masterplan study for commercial area
Land area: 4.3ha
CAPITALAND
Senior Executive | Design Management
DELASOL | D4 HCMC
Project: Residential apartment
1,4ha land area | 870 units
3 blocks | 24 story
Project status: completed
MY RESPONSIBILITY
1. Main Project: Served as key design management of developer
• Participated in TCM/ CCM/ SPM/ VO assessment meetings: to monitor design progress
• Participated in tender process for NSC: Alu & Glazing, Timber doors, fixed furniture, façade lighting
• Monitored the work of CGI & 3d animation vendors appointed to produce Marketing materials
• Supported the Legal dept.: provided Resettlement Units plans
• Followed up & maintained updated handover conditions & sale purchase agreements
DELASOL
Sale Gallery & Show Units
650sqm GFA
Project status: completed
2. Sale Gallery & Show Units: Served as key Architect, successfully followed & monitor project from initial to completion.
• In charge of full concept design layout/ 3d visual & present the concept to seek approval
• Contractor tendering process: briefed design to contractor, reply related TCQ & evaluate
• During construction progress:
• Participated in Site progress meeting/ VO assessment: to resolve design related site issues
• Finishing mat. Selection: visited showrooms & factories to review materials
PROJECTS SUPPORTED
Zenity at D1 & Define at D2
Provide concept design for their Show Units
Project status: completed
MY RESPONSIBILITY
1. Support other team members:
• Provided concept designs for Show Units of: Zenity & Define high-rise luxury apartments
2. Project study:
• Massing study: provided sketch perspectives for presentation to BOD
• Layout study: to ensured the area met initial investment requirements
PROJECTS STUDY
Study: Massing, capacity, area
massing study for 18.9ha urban area
The Vista – Oxygen supported (as No.3 below)
3. Supported Property management office of The Vista mix-use project:
• Provided documents & drawings to tenants
• Reviewed & commented on design submitted by tenants
• Computed project areas: provided the information to other department
4. Contributed & enhanced the company design standards manual
SCE PROJECT
Architect cum Project Coordinator
SKY TOWER OFFICE
Located in Da Nang city
350 Nguyen Van Linh, Thanh Khe District
12 floors + 1 basement | 1300sqm land area
Client: Vicoland Group (Risemount)
MY RESPONSIBILITY
1. Architectural work:
• Led the architectural work from concept design to develop drawings
• In charge of present proposals to convince the client
2. Project coordination:
• Attended in TCM/ SPM to reply RFI and review Shop drawing from main cons Tín An
• Managed and monitor progress, updated team member and partners the workflow
GREEN ISLAND VILLAS
Location: Da Nang city
35 keys | 4 stories | 3000sqm land area
Client: Vicoland Group (Risemount)
Project status: pending
MY RESPONSIBILITY
1. Architectural work:
• Led the architectural work from concept design to basic drawings
• In charge of present proposals to convince the client
2. Project coordination:
• Managed and monitored progress, keeping team members and partners updated on the workflow
• Managed outsourcing consultants
MIT STONE SHOWROOM
Renovation design for Façade & ID
Locate in Hanoi 1200sqm GFA
FUSION HOTEL GROUP
Junior Design Manager
FUSION RESORT & VILLAS
5-star | Da Nang city
Truong Sa street, Ngu Hanh Son District
15ha land area | Hotel block with 18 floors & 86 Villas
MY RESPONSIBILITY
Massing study for FS
Successfully contributed to all phases of design process for: Masterplan + Hotel block + Spa + BOH & Sale gallery
1. Architectural work:
• Led the architectural work from concept design (layouts/ 3ds rendering) to construction drawings
• Prepared material specifications, work closely with suppliers
• Served as the lead Design Architect for the project’s Sale Gallery
2. Project coordination:
• Assisted Design Director in coordinating & monitoring project execution, Interior team’s work with other depts
Sale Gallery
Proficient in design work from concept… …to develop drawings
FUSION SUITES VUNG TAU
4-star hotel (high-rise)
2 Truong Cong Dinh Street, ward 2, Vung Tau
Owner: Hodeco | 20 floors | 171 keys | 1.986sqm land area
MY RESPONSIBILITY
Successfully followed the project from initial to completion
1. Architectural work:
from concept to complete
• Participated in the FS process: layout studies, drive efficiency, massing studies
• Led the architectural & interior design work for all facility areas from concept to construction drawings
• Prepared material specifications, FF&E, worked closely with suppliers for OS&E
• Participated in design-related presentations to the BOD
resto.
HIIVE HOTEL
4-star |Binh Duong
Lot 390, VSIP1, Thuan An 11 floors | 172 keys | 2262sqm land area
MY RESPONSIBILITY
Successfully followed the project from initial to completion.
1. Architectural work:
• Participated in the FS process: layout study, drive efficiency, massing study
• Led interior design work for all facility areas from concept to construction drawings
• Prepared material specifications, FF&E, worked closely with suppliers
• Participated in design-related presentations to the BOD
2. Project coordination:
• Participated in technical meeting to coordinate with Operator dept. & other design consultants (717, ASP)
• Assisted the Design Director to following up on project execution on-site
• Assisted the Design Director to managing & monitoring the workflow of Interior team
• Followed up on tender process to clarify design-related queries
• Organized meetings with contractors & suppliers (prepared RFIs/ MOMs)
FUSION RESORT CAM RANH
PHASE 2 | 5-Star resort
Lot D10B, near Cam Ranh international airport
Owner: Tai Thanh Cong - VinaCapital
50 Villas & Facilities| 6.5ha land area (phase 2)
MY RESPONSIBILITY
• Participated in design-related presentations to the BOD from concept to complete
Successfully followed Phase 2 of the project from initial to completion: 50 Villas + Restaurant + Gym + BOH
Phase 2 – Main design tasks:
• Led the architectural & interior concept design work. Served as the key Architect
• Participated in developing drawings, from basic to construction drawings
• Prepared material specifications, work closely with suppliers
Phase 1
– Design Enhancements:
Produced villas concept for phase 2 (AD & ID)
• Enhancement work: solution for main reception (leaking)
• Defect drawings for phase 1: tent roof, villa cantilever
• Assisted the Design Director to clarifying tender queries for constructor selection
• Solution for restaurant maintenance, restaurant renovation
FUSION RESORT PHU QUOC
5-star resort (closed/ demolished)
Owner: Lan Anh – Phu Quoc JSC | Hamlet 4, Vung Bau beach, Cua Can ward
105 suites & villas | 70-105sqm/unit | 4.8ha land area
MY RESPONSIBILITY
Successfully followed from initial to completion, in charge of: Riverside Villas + Main restaurant + pool coffee shop + gym
Architectural work:
• Led the architectural & interior design work from concept to construction drawings
• Prepared material specifications, worked closely with suppliers
• Participated in design-related presentations to the BOD from concept to complete
MY RESPONSIBILITY
FLC QUY NHON BEACH & GOLF RESORT
5-star hotel & resort | Participated in Low-rise design
Zone 4, Nhon Ly – Cat Tien beach
110 villas | Owner: FLC Group
Successfully followed from initial to completion, in charge of Low-rise (all type of villa)
Architectural work:
• Led the architectural & interior design work from concept to construction drawings
• Prepared material specifications, worked closely with suppliers
• Participated in design-related presentations to the BOD
FUSION ORIGINAL SAIGON CENTRE
Renovation work | 5-star hotel
67 Le Loi, District 1 | Owner: Kepple Land
Lv14s to Lv24 | 147 keys
MY RESPONSIBILITY
Project Scope: Reception area, Pedicure/ manicure room, Suites room
• Conducted a site survey to assess existing conditions for proper concept design development
• Developed drawings for tender process, detailed design drawings for construction
• Prepared material specifications, FF&E, worked closely with suppliers
Design for Reception area
MY RESPONSIBILITY
FUSION SUITES SAIGON
Renovation work | 4-star hotel
3-5 Suong Nguyet Anh, District 1 | Investor: TAP 11 floors + 2 basement | 72 keys hotel rooms
Project Scope: Reception area, Out-door Cafeteria, rooftop meeting room
• Conducted a site survey to assess existing condition for proper concept design development
• Developed drawings for tender process, detailed design drawings for construction
• Prepared material specifications, FF&E, worked closely with suppliers
FUSION SUITES PHU QUOC
Concept work
11 floors | 300 hotel rms + 98 townhouse
MY RESPONSIBILITY
• Participated in FS process: layout study, masterplan study, massing study
• Provided concept designs for: main cafeteria, sport bar, retail shop, karaoke area, typical room hotel
• Participated in presentations to BOD, Investor
FUSION’s OFFICE
Interior design work
Served as the key Project Architect, to develop and monitor the process from initial to completion
• Conducted a site survey to assess existing condition to proper design execution
• Led the interior design work from concept to construction drawings
• Prepared material specifications, worked closely with suppliers
• Participated in tendering process to select a contractor
7th floor in Vincom
Dong Khoi
700sqm GFA
FUSION RESORT QUANG BINH
Concept work
Bao Ninh town, Dong Hoi city
3ha land area | 10.000sqm footprint
65 Villas & facilities
MY RESPONSIBILITY
• Participated in FS process: layout study, masterplan study, massing study
• Provided concept design for: reception & hide-out caving spa & 2 stories villas
• Participated in presentations to BOD, Investor
FUSION SUITES HOI AN Concept work
Dien Duong village, Dien Ban District
230 keys & facilities | 27.000sqm GFA
• Participated in FS process: layout study, masterplan study, massing study
• Provide concept design for: reception, main restaurant, gym, retail shop & villas
• Participated in presentations to BOD, Investor
FUSION SUITES DN.BAY
Concept work
Lot B4-4 & B4-5, New city Đa Phước, Tam thuan, Hai Chau
17 floors + 1 basements | 6ha land area | 615 keys
MY RESPONSIBILITY
• Participated in FS process: layout study, massing study
• Provided concept design for facade
• Participated in presentations to BOD, Investor
FEASIBILITY STUDY PROJECT
Concept work
5.6ha land area
10.400sqm footprint
• Participated in FS process: layout study, masterplan study, massing study
• Participated in presentations to BOD, Investor
PERSONAL PROJECTS
& University’s final projects
School of rchitecture
GRADUATE RCHITECTURE PROJECT
13 ha | district 7 | HCM city | 3000 students
Campus with residence, library, 4 studio block
transforming a word into reality
Creating public spaces for each studio floor helps students connect with each others. Teamwork & relaxation are encouraged in this
connect this place.
Villa Nha Trang 08, Tran Phu
Concept design work
Personal job: Architectural design
BITIS
70sqm GFA
68 Hai Ba Trung, Hanoi Interior & façade design