AD0-E300 Dumps Questions and Answers

Page 1

Adobe AD0-E300 Adobe Campaign Classic Business Practitioner


Don’t you want to succeed in your first attempt at getting Adobe Certified Expert certification? If so, then grab on this chance to train better with Dumpspedia. We will provide you with all the basic essential to ace the exam in just one try given that you train through our Adobe Campaign Classic Business Practitioner Practice Exam Dumps there is nothing that can stop you from passing. We have specially collaborated with high professionals to get you these fantastic Adobe AD0-E300 Practice Test Questions.

AD0-E300 Questions Answers Dumps

AD0-E300 Braindumps


You don’t need to take any stress about your AD0-E300 Dumps Questions. We will provide you latest updated test engine and some demo questions and answers of AD0-E300 Exam Dumps here.

AD0-E300 Questions Answers Dumps

AD0-E300 Braindumps


Did You Know! AD0-E300 Questions Answers Dumps

AD0-E300 Braindumps


Question NO 1, The sent count is less than the upstream population. What are two reasons for this result? (Choose two.)

A. B. C. D.

The upstream population did NOT include seeds. Some pressure typologies were applied. Some recipients were quarantined. The upstream population was too large.

Answer: B D

www.dumpspedia.com/AD0-E300-dumps-questions.html


Question NO 2, A workflow has a scheduler and default error management. What happens if an error occurs during a run?

A. The scheduler starts another run at the next scheduled time and runsnormally. B. The scheduler does NOT start another run until the workflow is restarted. C. The scheduler waits 24 hours before starting the next run based on the next scheduled time. D. The scheduler starts another run at the next scheduled time and therun stops at the activity that had an error previously. Answer: B

www.dumpspedia.com/AD0-E300-dumps-questions.html


Question NO 3, A campaign workflow has been executed and has reached the Finished state. Which two tasks must have occurred? (Choose two.)

A. B. C. D.

The deliveries have been sent. The temporary worktables have been dropped. The campaign state has changed to Finished. The approval steps have been approved.

Answer: A C

www.dumpspedia.com/AD0-E300-dumps-questions.html


Question NO 4, When utilizing the updated list process, a campaign business practitioner must make sure to append additional records to a list if it exists. How can a campaign business practitioner do that? A. B. C. D.

Only create new lists and avoid updating an existing list Uncheck the option to purge the list if it exists Specify the name explicitly in the options Store the list on an external database

Answer: A

www.dumpspedia.com/AD0-E300-dumps-questions.html


Question NO 5, What is the value for status and state of the edit options when a campaign reaches the schedule end date?

A. B. C. D.

Finished and can no longer be edited Finished but can still be edited Completed and can no longer be edited Completed but can still be edited

Answer: D

www.dumpspedia.com/AD0-E300-dumps-questions.html


Question NO 6, A campaign is sent past the end date. What is the result? A. B. C. D.

The campaign does not execute past the end date The campaign sends as usual The campaign prompts for an update end date. The campaign continues to send with outdated datA.

Answer: C

www.dumpspedia.com/AD0-E300-dumps-questions.html


Question NO 7, A query returns 0 records for a specific date. What is the most efficient method to determine what dates exist in the table?

A. B. C. D.

Use SQL, query the database or open the files being imported Use a split process to parse out dates Click on the “Distribution of values� button in the query. Go to the schema to view the data

Answer: A

www.dumpspedia.com/AD0-E300-dumps-questions.html


Question NO 8, What is the purpose of configuring a campaign with start and end date? A. B. C. D.

To ensure that the campaign works only between those dates These dates are used for tracking purpose only To sequence campaign delivery To ensure that dates show on campaign calendar

Answer: C

www.dumpspedia.com/AD0-E300-dumps-questions.html


Question NO 9, Which module(s) needs to be installed in order to be able to create Marketing Campaigns? A. B. C. D.

Marketing Campaigns (Campaign) Marketing Resources Central/Local Marketing (Distributed Marketing) Campaign Optimization

Answer: A C

www.dumpspedia.com/AD0-E300-dumps-questions.html


Offering Effective PDF Tests Training to Individuals and Companies 100% Passing Assurance on All Dumps Special Student Discount Available Printable and Searchable PDF Braindumps User Interactive Exams Software

AD0-E300 Questions Answers Dumps

AD0-E300 Braindumps


AD0-E300 Questions Answers Dumps

AD0-E300 Braindumps


Good luck Dumpspedia provides you guaranteed success in AD0-E300 Dumps Questions as we have latest AD0-E300 Exam Dumps. Click Here following link to download AD0-E300 Exam Braindumps.

AD0-E300 Questions Answers Dumps

AD0-E300 Braindumps


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.