Government of Nepal Ministry of Federal Affairs and Local Development
ANNUAL PROGRESS REPORT FY 2015/16 (2072/73) Local Governance & Community Development Programme (LGCDP-II) Regional Coordination Unit (RCU) Dhangadhi
Local Governance & Community Development Programme (LGCDP-II) Regional Coordination Unit (RCU) Dhangadhi
Tel:+977-091-523240/525301 Fax: +977-091-523039
Executive Summary Annual Progress Report of the fiscal year 2072/73 (2015/16) covers the progress status and achievement of LGCDP Phase II of Far Western Development Region (FWDR). The progress report is analysed on the based on output 1-7 of District Development Committees (DDC), Municipalities and Village Development Committees (VDC). It also highlighted the problems, issues, way forward and some recommendations observed during site support, backstopping and monitoring supervision at all. The key achievements highlighted here Empowered citizen and community organization: Till the FY 2072/073, Social
Mobilization activity has been implementing in all 314 VDCs (2824 Ward) and all 25 Municipalities (321 Ward). SM activities have been implementing in the technical support of 58 LSPs, 463 SMs and 30 D/MCCs in the region. Under this activity, 3145 WCFs and 907 CACs have been formed in VDCs and Municipality wards; in which more than 102020 members, including 60% female, have been mobilized in community. Similarly, VDCs and Municipalities ward have been a good plate form of more than 102020 members representing from CACs and WCF. Out of total WCF members 50% women are representing whereas more than 90% women are representing from ultra-poor and under-privileged group. The CAC members are being empowered and able to coordinate with VDCs and other service providers through REFLECT classes, training/exposure's in local level. The program has initiated to provide LIP grant support of Rs.100, 000 to each CACs. Till the date 069/70 to 072/73 total 435 VDCs and Municipality CACs have received LIP grants Rs. 44000000 for income generating activities for better livelihood. The total of 3452 members of 435 CAC has been benefited so far. Only 11 graduated CACs of MUNs and VDCs are remaining to receive LIP grants. Similarly, community infrastructure development grant schemes were implemented and focused in directly income generation and livelihood development of CAC members. Till the date 070/71 to 072/73 total 443 CACs received grant sum of Rs. 149577812 to implement 4661 income generating schemes at VDCs and Municipality level. The total benefited member of those 443 CACs is 67796 (male 31899 and female 35897) so far. Established accountability mechanism at local level: LGAF provides assistant to the CSOs with the objective institutionalized the downward accountability system in local level to strengthen the good governance system. The CSOs has been implementing the program from February 2015. Total 8 DDCs and 21 Municipalities have been supported by CSOs. Total 198 VDCs out of 314 VDCs and 252 Municipality wards out of 324 wards have been covered so far. The CSOs facilitating on the three intervention areas (1) i
coordination with local bodies (2) Facilitation (3) Monitoring of the service delivery system. Access to resource increase: Regarding this output, programme has made efforts to
increase the internal revenue of LBs. In order to increase the internal review of LBs LGCDP supported fund Rs. 10 lakh each for newly formed municipalities namely Kamalbazar, Beldandi, Krishanpur and Bedkot to establish computerised record keeping system, purchased office equipments, solar/printer and networking by which the IPT system could established. All entire MUNs have committed to implement IPT system from fiscal year 2073/74. The internal revenue of LBs has not been increased as per target. However, DDCs Kailali, Kanchanpur and Doti and Dhangadhi, Tikapur, JhalariPipladi, Krishnapur, Api, Bheemdatta, Attriya succeed to increased the internal revenue. MCPM result shows that most of LBs performance decreasing order only Bajhang and Dadeldhura DDCs has received additional grant by 15% and 10% respectively. Similarly Dhangdhi Metropolitan City received additional 10% grant rest of the Municipalities deducted by 10% to 20%. The result of MCPM of VDCs also shows negative due to the delay of reporting to MoFALD. Public Financial management system improved: In order to strengthen the capacity of financial management the programme have organised VDC accounting software training and support resources to internal audit section in all nine districts in last year. However only 7 VDCs succeed to utilized the VDC accounting software. Similarly, four municipalities and nine DDCs have been practicing of e-bidding system and 20 Municipalities and nine DDCs have prepared procurement plan in this year. Capacity strengthening in Local bodies: Capacity development a major cross-cutting area of the programme. CD activities are mandated to LBs for making more accountable and effective service delivery through institutional and human resource development. Therefore, programme have supported on demand and supply driven activities to the LBs. Besides, MoFALD and other aliened development agencies (UNICEF, GIZ/CD-Mun, UNWOMEN and RVWRMP) have provided various training programmes for the LBs staff. As a National Service Provider (NSP) of LGCDP II, LDTA/RDTC have organized various regional level training/workshop for the LBs. Access to and quality of local infrastructure and other socio economic administered by LBs are improved This output address and ensure their effectiveness and efficiency while delivering of services related to infrastructure development, vital events registration, social security payments and community mediation. There are 1849 different projects completed in LBs (DDC 430, Municipality 1126 & 293 VDCs) in this region of which total 738323 population (DDC 120886, Municipality 605719 & 11718 VDCs ) benefited. Similarly the total cost of the implemented project is Rs. 595612000. Regarding the provision of 35% budget allocation for target group, most LBs followed the LBRMMG 2069. MoFALD supported fund for establishment of Lab and purchased the survey equipment for ii
Punarbas MUN, Kailali, Achham and Darchula DDCs to assure the quality of projects. Under the social security allowance, LBs are gradually starting to distribute through bank with close coordination of WCF/CACs. Altogether 305363 beneficiaries are benefited so far. Strengthen integrated planning, budgeting, monitoring, evaluation and coordination amongst local governance actors Now it is a regular practice that all LBs are following the LBRMM Guidelines 2069 during the planning, monitoring and implementing process. Integrated Planning Formulation and supervision and monitoring committee has functional and Result Based Monitoring (RBM) is introduced by LBs. Project wise Monitoring & Supervision Committee were formed and carried out monitoring at field level. The political leaders have also been mobilized to monitor the projects. In addition, MoFALD has been occasionally involved in the monitoring process, where the regular monitoring, supervision backstopping has been made by Regional Coordination Unit. Regarding the long term planning, eight DDCs prepared DPP, seven MUNs prepared MTMP, two MUNs prepared open space mapping and one MUN prepared Urban City Center Plan during the year. Cross cutting theme: All LBs have allocated 35% target budget for women Children and DAG community. All the nine DDCs have formed Gender Responsive Budget committee (GRBC) and Gender Equality and social Inclusion Implementation Committee (GESIIC). Altogether nine DDCs and 19 Municipalities conducted GESI/GRB. Almost all VDCs and MUNs conducted BALBHELA and incorporated children's demands in their annual plan. All DDCs, 21 MUNs and 14 VDCs adopted the CFLG and 13 VDCs are in progress to declare the CFLG VDC. In addition, Belauri and Dhangadhi MUNs invested Rs. 1500000 construct Children Park. Information & Communication Technology (ICT) LGCDP Phase -II provides the system, procedures, structures, tools and capacities for the facilitating the transformation of LBs into local government entities. MoFALD and UNV have set up new polite initiative, ICT Volunteers' for LGCDP-II. This component aims to digitize the working procedure of government of Nepal as well as strengthen and maintain the IT infrastructure of LBs. To make effective public service delivery of LBs the scope of ICT and e-governance is highly important. During the year budget provisioned Rs. 3,000,000 to 6 new Municipalities to procure desktop sever, hybrid solar along with required networking devices and utilized received budget. The basic IT infrastructure setup are being utilized with optimize resources with the best possible. Similarly, LGCDP provides NRs. 1722000 budget to carry out the ICT capacity development training for DDCs and MUNs.
iii
List of Acronyms/Abbreviations ADB ASIP
Asian Development Bank Annual Strategic Implementation Plan
CAC
Citizen Awareness Center
RCU
Regional Co-ordination Unit
CD
Capacity Development
CFLG
Chile Friendly Local Governance
CSO
Civil Society Organization
DAG
Disadvantaged Group
DDC
District Development Committee
DGE
District Governance Expert
DP
Development Partner
DSMC
District Social Mobilization Committee
EMP
Environment Management Plan
GESI
Gender Equality and Social Inclusion
GIZ
German Society for International Cooperation
I/NGOs
International/Non-Government Organization
IGA
Income Generating Activity
IEC
Information, Education and Communication
LB
Local Body
LBFC
Local Body Fiscal Commission
LGAF
Local Governance & Accountability Facility
LGCDP
Local Governance & Community Development Programme
LIP
Livelihood Improvement Programme
LLP
Local Level Planning
LSP
Local Service Provider
M&E
Monitoring & Evaluation
MoFALD
Ministry of Federal Affairs and Local Development
ICT
Information Communication Technology
ICTV
Information Communication Technology Volunteers
iv
Table of Contents Introduction .................................................................................................................................... 1 1.1 Program Background ............................................................................................................. 1 1.2 Introduction of Far-West Region (Province 7) ....................................................................... 2 1.3 Topography of Far west Development Region ...................................................................... 2 1.4 Socio-economic Condition of Region ..................................................................................... 3 1.5 Local Development Bodies in Nepal ...................................................................................... 3 1.5.1 District Development Committees ................................................................................. 3 1.5.2 Municipalities.................................................................................................................. 4 1.5.3 Village Development Committees .................................................................................. 4 OUTPUT 1 ........................................................................................................................................ 5 Citizen and Community Organization are Empowered to Actively Participated and Assert their Right in Local Governance .............................................................................................................. 5 1.1 Social Mobilization ................................................................................................................. 5 1.1.1 Overall Status of Social Mobilization (SM) Coverage: .................................................... 5 1.1.2 Ward Citizen Forum (WCF) ............................................................................................. 7 1.1.3 Status of 1/4th WCFs Replacement: ................................................................................ 7 1.1.4 Status of WCFs Monthly Meeting: .................................................................................. 8 1.1.5 Status of WCF Categorization: ........................................................................................ 8 1.1.6 WCFs Engaged in Oversight Functions:........................................................................... 8 1.1.7 Citizen Awareness Center (CAC) ..................................................................................... 9 1.1.8 Status of CAC Graduation: ............................................................................................ 10 1.1.9 Capacity Building under Social Mobilization:................................................................ 11 1.1.10 Exposure Visit for CAC Members: ............................................................................... 12 1.1.11 District/Municipal Social Mobilization Coordination Committee............................... 12 1.1.12 Local Service Provider (LSP) ........................................................................................ 13 1.1.13 Status Social Mobilizer: ............................................................................................... 13 1.1.14 SM Cluster Meeting: ................................................................................................... 13 1.1.15 Inclusive LBs Planning Process .................................................................................... 14 1.1.16 Conduction of Underlying Causes of Poverty Analysis (UCPA) in wards or VDCs....... 16 1.1.17 Harmonization and Linkage of CACs: .......................................................................... 16 1.1.18 Status of Balbhela ....................................................................................................... 17 1.2 Livelihood Improvement Program ....................................................................................... 18 v
1.3 Community Infrastructure Development Grants:................................................................ 21 OUTPUT 2 ...................................................................................................................................... 26 Accountability Mechanism for Local Governance are in place ................................................... 26 2.1 Local Governance Accountability Facility (LGAF)................................................................. 26 OUTPUT 3 ...................................................................................................................................... 29 Local Bodies Access to Resource Increased ................................................................................. 29 3.1 MCPM of District Development Committee (DDC) ............................................................. 29 3.2 MCPM of Municipalities ...................................................................................................... 29 3.3 MCPM of Village Development Committee (VDC) .............................................................. 30 OUTPUT 4 ...................................................................................................................................... 31 Public Finance Management System Improved........................................................................... 31 OUTPUT 5 ...................................................................................................................................... 32 Institutional and Human resource Capacities of LBs and Central Level Agency Involved in Local Governance ................................................................................................................................... 32 5.1 Capacity development ......................................................................................................... 32 5.2 Information & Communication Technology (ICT) and Capacity Development of LBs ......... 33 OUTPUT 6 ...................................................................................................................................... 37 Access to and quality of local infrastructure and other socio economic administered by LBs are improved ....................................................................................................................................... 37 6.1 Status of Project Funding Matrix ......................................................................................... 37 6.1.1 District level .................................................................................................................. 37 6.1.2 Municipality Level ......................................................................................................... 39 6.1.3 VDC Level ...................................................................................................................... 40 6.2 Budget Expenditure ............................................................................................................. 41 6.3 Social Security & Vital Registration ...................................................................................... 42 6.4 Community Mediation ......................................................................................................... 44 6.4.1 Community Mediation: ................................................................................................. 44 6.4.2 Progress Made by Other Aligned Programmes ............................................................ 45 OUTPUT 7 ...................................................................................................................................... 47 Strengthen integrated planning, budgeting, monitoring, evaluation and coordination amongst local governance actors ................................................................................................................ 47 7.1 Planning and Monitoring and Evaluation ............................................................................ 47 7.2 Financial Delivery ................................................................................................................. 48 7.3 Gender and Social Inclusion (GESI) ...................................................................................... 48 vi
7.3.1Major achievement in GESI: .......................................................................................... 49 Issues, challenge and way forward .............................................................................................. 54 Major Achievements of LBs FY 2072/73....................................................................................... 56 New Innovations of LBs: ............................................................................................................ 57 The major problem of LBs.......................................................................................................... 57 Recommendation ...................................................................................................................... 58
Annexes Annex 1
Result Base Monitoring (RBM)
Annex 2A
DDC/VDC SM Database
Annex 2B
DDC/VDC SM Database
Annex 3A
District/VDC Level Status of LIP
Annex 3B
Municipality Status of LIP
Annex 3C
DDC & Municipality Budget Summary of LIP Grant
Annex 4A
District/VDC Level Status of Community Infrastructure Grant
Annex 4B
Municipality Status of Livelihood Infrastructure Grant
Annex 4C
DDC & Municipality Budget Summary of CAC
Annex 5
Status of Training/Workshop/Orientation
Annex 6
Field Visit Summary of RCU Professional
vii
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Introduction 1.1 Program Background The Government of Nepal (GoN) is committed to improving people’s standards of living through the citizen-centric governance and effective service delivery based on democratic values and right based development approach. After the significant achievement in implementing first phase of the Local Governance and Community Development Programme (LGCDP), leads as a national programme in the area of local governance and community development. The importance of this programme is ensuring the accountability on delivery of local services through established institutions and systems and the commitments being expressed for its continuation, by the GoN and the LGCDP development partners (DPs). LGCDP Phase I, successes while it has addressed its emerging challenges, demonstrating value for money and practicing effective risk management in a transitional and politically uncertain environment. LGCDP I activities were planned to achieve three overarching outcomes related to citizen empowerment, local government operations and local government policy making and execution. Together they aimed to strengthen the demand and supply sides of local governance by empowering citizens to actively engage with local government bodies and to increase the capacity of the government to deliver basic public services through a devolved system of local government. The vision for the programme calls for LGCDP II to act as a key support mechanism to the GoN’s poverty reduction efforts. By the positive experience of Phase I, LGCDP II will make pathways with a number of changes in focus and approach. As describe above; LGCDP - a national programme of Government of Nepal and is under implementation across the country from the last five years. Ministry of Federal Affairs and Local Development (MoFALD) is the executive agency for this programme and has implemented its activities in community level through the Local Bodies with financial support from a range of Development Partners. In order to co-ordinate/facilitate LGCDP's activities in local level and provide technical backstopping support to implementing agencies (LBs), LGCDP has established a six Regional Co-ordination Unit (RCU) in the country. RCU Dhangadhi is responsible for facilitating, monitoring and backstopping of 9 District Development Committees, 25 Municipalities and 314 VDCs being existed in the region. The RCU also serves as a link between the Programme Co-ordination Unit (PCU)/MoFALD and the LBs. Additionally, RCU is responsible in carrying out regular monitoring of field level activities and ensuring timely delievery of services along with preparing periodic and annual plan and progress reports. This report describes the major activities implemented by LBs under LGCDP-II in the region on Fiscal year 2072/73 (2015/16).
1|P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
1.2 Introduction of Far-West Region (Province 7) The Far-West Development Region of Nepal covers 19,539 km2 out of 147, 181 km2 area of the country. It has nine districts with the regional headquarters at Dipayal of Doti district. The Far West Region is remote and developmentally challenged. About 44% of people in the Far-West Hills and 49% in the Himalayan districts live beneath the poverty line. The region has limited access to basic service delivery and increasing service delivery is always challenging because of its difficult topography. The region has complex socio-economic structures and there is both widespread gender and caste based discrimination. Traditional systems associated with religion, culture and customs also have a great impact on overall development. It has two zones: i.e. Mahakali and Seti. The main cities are; Dhangadhi is the district headquarters of Kailali District of Seti Zone. Mahendranagar is the districts headquarter of Kanchanpur District in Mahakali Zone. It is located on the Mahakali River, 6 km north of the India border. Kanchanpur is inhabited by people of various races, including the indigenous Tharu people. Dipayal Silgadhi municipality is the headquarters of Doti district as well as regional centre of Far-West Development Region. It is within trekking distance of Khaptad National Park. Dipayal is also the name of the scenic valley of Seti River. Amargadhi is the district headquarters of Dadeldhura district.
1.3 Topography of Far west Development Region Far west development region is a smallest development region of Nepal. The eastern boundary of the Far-west Development Region is Karnali River and its western boundary is Mahakali River. The region is influenced by the monsoon wind which is coming from the North West which brings enough rainfall in winter. Thus, FarWest Development Region gets more rainfall in winter than in summer. Hence, the Region is comparatively less dry than other region. During the summer 2|P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
season extremely hot wind called Loo blows from the Thar deserts of India towards the terai of Nepal. Such winds affect Mahendranagar, Dhangadi and even Dipayal in the north.
1.4 Socio-economic Condition of Region Far-West Development Region is least economically backward in compression to other region. Most of the remote areas of the districts are not accessed by transportation and facing problems. However district headquarters' of all 9 districts are nearly linked with the roads, which makes people easy access to find job market to Nepal and India. But the condition of women is miserable in the region. Tharus live in different part of terai. They earn their living by agriculture, animal rearing, fishing, etc. Besides, other groups of people also live here like Brahmin, Chhettri, etc. The main crops grown in FarWest Development Region are millet, barley, wheat and oil seeds. Paddy is mostly cultivated in the terai. The important tourist centers are Shuklaphanta Wildlife Reserve, Khaptad National Park, Mount Api and Saipal. Because of less infrastructures and distance from the capital city, that very few tourists are visiting the Region. As from socio-economic indicators, about 44 % of people of Hills and 49% in the Himalayan districts is living below the poverty line. The region has limited access to basic services and to increase the service delivery is also challenging due to difficult topography. It has complex socio-economic structures and there is both widespread gender and caste-based discrimination. Traditional systems associated with religion, culture and customs also have a great impact on overall development of the region. Opportunities are in far western Nepal, thousands of people can cross the border at Kanchanpur / Kailali on their way to Bardia. As there is a good road network, have water supply and electricity, and plenty of natural beauty on offer the districts can easily attract transit passengers to stay over. Exclusive products like rice wine, banana wine, allo (a local fibre), and Tharu and Rana handicraft just need better branding to capture a wider international market.
1.5 Local Development Bodies in Nepal 1.5.1 District Development Committees District development committee (DDC) is a leading organization for district level development activities. It is considered as the central point of the local development. There are many government and non-government agencies in district for the integrated development. DDC plays an important role for coordinating all the development initiatives implemented by line agencies and I/NGOs. District Council is the supreme body for the formulation of district development plan. The Council should ratify the plans and programmes of line agencies, which are prepared following participatory planning process. District Development Committee is the executive body of the District
3|P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Council. The Committee conducts its activities in accordance with the decisions and direction of the District Council. The DDC implements its programme within the framework of district periodic plan. We have 75 districts i.e. 75 district development committees are in functional now. 1.5.2 Municipalities A municipality is usually an urban administrative division having corporate status and usually powers of self-government or jurisdiction. The term municipality is also used to mean the governing body of a municipality. A municipality is a general-purpose administrative subdivision, as opposed to a special-purpose district. Currently, there are 217 municipalities in Nepal. 1.5.3 Village Development Committees It is the lower administrative part of district has several VDCs, similar to municipalities but with greater public-government interaction and administration. Currently, there are 3,157 village development committees in Nepal. A VDC is further divided into wards; the number depends on the population of the district: the average is nine wards.
4|P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
OUTPUT 1 Citizen and Community Organization are Empowered to Actively Participated and Assert their Right in Local Governance 1.1 Social Mobilization Social Mobilization is one of the major component of LGCDP which is more focused on the empowerment of citizens especially women children and disadvantage group by strengthening their institutions like Citizen Awareness Center (CAC) at settlement level and Ward Citizens Forum (WCF) at ward level of all VDCs and ward of Municipalities. It aims to engage these institutions through Local Service Providers (LSPs) in the local governance process to ensure the most disadvantaged groups are well informed about their rights and their demands are include in the LBs planning process. WCF is taken as the major vehicle for facilitating the community in settlement level planning process, social harmony, social reform and civic oversight functions. Hence, more focus is given in reformation of old WCF and formation of new WCF in all wards of municipalities. 1.1.1 Overall Status of Social Mobilization (SM) Coverage: LGCDP was begun one year late (2009/10) than the LGCDP programme implemented in the country (2008/09). Till the FY 2072/073 (2015/016), Social Mobilization activity has been implementing in all 314 VDCs (2824 Ward) and all 25 Municipalities (321 Ward). SM activities have been implementing in the technical support of 58 LSPs, 463 SMs and 30 D/MCCs in this region. Under the WCF and CAC status, total 3145 WCFs and 907 CACs have been formed at VDCs and Municipality Wards. So far 50% women has been mobilized in community out of total 76645 members. Similarly, representation of CACs member has been reached 25374 members of 907 CACs at VDCs and Municipalities wards. Of the total CAC members, 90% women represents from ultra-poor and under-privileged group. The CAC members are now being empowered and able to coordinate with VDCs and other service providers through REFLECT classes, training/exposure's in local level. Under the institutional development of Social Mobilization, all 30 DS/MSCC has conducted 261 regular monthly or bi-monthly meeting along with 467 decisions. At present total 460 SMs has been facilitating to CACs on the regular Reflect classes, WCF monthly meeting, oversight function, UCPA data update and other social activity. So far 25% (14) women are working as SM coordinator post of total 58 LSP-SMs. During this year all 58 LSPs has conducted cluster wise meeting/monitoring at their respective clusters.
5|P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
As per AMEP target, 95% (2980) WCFs are categorization and qualified under category A & B of total 3096 WCFs. So far 97% WCFs are replaced as per provision of Âź members in SM guideline. The total replaced member were 20783, which is 27% of total members. Total 82% WCFs conducted monthly or bimonthly meeting in regular basis. Similarly, 1981 WCF actively engaged in oversight function at local level. Under CAC categorization, total 424 CACs are qualified under good and medium category of total 438 old CACs. During this fiscal year total 13 training events were conducted. Out of them 2 event Basic Social Mobilization training conducted for SMs & LSPs, 1 event Reflect Social Mobilization for SMs & LSPs, 10 event for LRPs & 314 event for management committee member of WCF. Similarly 2 exposure visits for CAC members of Kailali and Kanchanpur has also been conducted. Under the LBs planning process of FY: 2073/074, almost 100% LBs has conducted planning workshop at different level and 84% LBs has maintained the list of participants by women, children, youth and DAG in ward level planning workshop. During the planning process total 44646 projects were forwarded by WCFs in LBs council; whereas 29.52% (13197) projects of WCFs were approved by LBs council. However, the actual demanded projects by WCF that are approved by LBs council is 11043 out of total 13197 approved projects by LBs council. The ration of approved projects is more than 84%. Similarly, the percentages of budget allocation shows that 11.12% budget for women, 11.91% budget for children and16.28% budget for DAG sectors of the total approved budget Rs. 1293089000 by LBs. Regarding progress of Balbhela, altogether 338 Balbhella forum network has been formed in 313 VDCs and 25 Municipalities respectively. Altogether 72 local level community mediators were trained on community mediation process. Of these participants 40% women were trained. In addition, Six Community Mediation Centers has been established in 6 VDCs and Tow CMC in Municipalities. WCFs and CACs become the most bottom level structure of Local Governance. WCF and CAC have been gradually empowered through training/exposure with the support of SMs/LSPs at local level. WCFs with technical support from the trained social mobilisers have already played a significant role in local level planning process; especially in such transition period of Nepalese political situation. What is further needed is to get coordinated closely with VDC and locally available Line Agencies and other service providers for its institutional development and making WCF as entry point for all sorts of development intervention in local level.
6|P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
1.1.2 Ward Citizen Forum (WCF) WCF have been formed with the technical support and facilitation of SMs/LSPS at ward level. Thus, WCFs become the most bottom line structures of government in grass root level for local governance process. Till end of FY 2072/073 (2015/016), the given below table shows that all together 3145 WCFs are formed. Out of total WCFs, 2824 WCFs formed at 314 VDC wards and 321 WCF are formed at 25 Municipalities Wards. Almost, in all WCFs composition WCF meeting on DCM 8 Tripura Sundari Baitadi is gender friendly and socially inclusive as envisaged by the programme. Total 76647 members are aligned in 3145 WCFs. whereas women represent 50% VDC level and 46% women represent at Municipality ward. Moreover 899 women lead as a chairperson. The ethnicity composition of total members including VDC and Municipality comprised 22% Dalit, 11% Janajati, and 67% are others.
LBs Name VDCs Municipality Total
Status of WCFs Status of WCFs Total Existing Progress WCFs WCF 2824 2824 100% 324 321 99%
Sex wise WCF Members Total Total Total Male Female Members 33789 34574 68363 4431 3853 8284
3148
38220
3145
38427
76647
1.1.3 Status of 1/4th WCFs Replacement: The table below shows that total 97% (3077) WCF that replaced Âź members of total 3145 WCFs as per the mandate of SM guideline. The percentages of WCF replaced 99% (2806) WCFs at VDCs and 78% (253) WCFs at Municipality respectively. Total 68 WCFs were not reformed in nw Municipality and 2 VDCs of Bajura district. Moreover, the replaced ration of members is 27% (20783) out of total 76645 members. The women ration of replaced members is 51% of total 20783 members. Status of 1/4th WCF replaced Status of WCFs Sex wise WCF Members LBs Name
Total WCFs
Achieved as of date
VDCs Municipality Total
2824 321 3145
2806 253 3077
Progress 99% 78%
Total Male
Total Female
Total Members
9257 995 10252
9397 1134 10531
18654 2129 20783
Total WCF members
76645
% of replaced members
27.12
% of women replaced members
50.67
Not replaced 68 Mun ward and 2 VDC of Bajura
7|P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
1.1.4 Status of WCFs Monthly Meeting: Entirely 3145 WCFs are functional and performing their regular monthly/bi-monthly meeting and discuss about the need of deprived with local bodies and other service providers. Further WCF discussed in civic oversight of service delivery actors and facilitating to communities in minimizing the local level social ill practices. The table below shows that out of the total 2824 WCF of VDCs, only 51% (1423 WCFs) has conducted regular monthly meeting whereas 77% (238) WCF of Municipality wards conducted regular meeting. The overall conduction of WCF meeting ration is 82% both in VDC and Municipality. WCFs that conducted monthly meeting regularly LBs VDC MUN
No. of WCFs 2824 321 3145 % of Meeting
Monthly 1423 238 1661 53
Bi- Monthly 844 72 916 29
Three Month 386 11 397 13
Trimester 170 0 170 5
Need base 1 0 1 0
1.1.5 Status of WCF Categorization: In order to measure the performance and status of WCF member in a participatory way a format was developed with 10 indicators based on the roles and responsibilities of WCF. By the end of this year the categorization activity of 3096 WCFs has been completed out of total 3145 WCFs. Meanwhile, the categorization of new Municipalities WCFs was not carried out due to incompletion of one year cycle. The table below shows that 95% (2980) WCFs are qualified under category A & B of total 3096 WCFs. Under category A & B WCF of VDC falls 96.42% and WCF of Municipality falls 85% respectively. Status of WCFs Categorization Name of LBs
DDcs Municipality Total
Total Wards of VDCs & Mun.)
2824 321 3145
Mention Number as per Category A
B
C
D
Total
Remaining WCFS
1285 1438 99 1 2824 0 141 116 15 0 272 49 1426 1554 114 1 3096 49 Remaining 49 WCFs belongs to 5 New Municipality 3 WCF are not formed in Parsuram Municipality
1.1.6 WCFs Engaged in Oversight Functions: WCF are facilitating local level planning process, prioritization of projects and articulating the demand of deprived citizens. Further, WCF act as civic watch dog to regulate the local body affairs and their implemented activities. WCF are usually initiating to conduct public hearing and audit at VDCs and community level in different activities. In the same time WCF members are involved in monitoring and supervision committee of VDCs and actively participated in monitoring and oversight process. During this year 1981 WCFs has been directly engaged in social functions, like, open defection free (ODF) declaration, full
8|P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
immunization deceleration, and full literate deceleration. In the same time they organize their efforts to stop early child marriage, gender violence, stop alcohol; Chhaupadipartha cast discrimination and other social malpractices. To till date, with continuous efforts of WCFs jointly with local bodies and other support agencies, 5 districts, 15 Municipalities have declared ODF. Similarly 5 DDCs has declared complete immunization to children and 1 DDC has declared complete literate district.
1.1.7 Citizen Awareness Center (CAC) Citizen Awareness Center (CAC) is a forum disadvantage group, who are left behind the mainstream of development. Hence, programme aims to educate them in their rights, identifying their issues affecting their daily life and enhance their access in basic service in local body and development agencies. Reflect process is the instrument of transformational social mobilization. Reflect process is conducted in each CACs with two hours interaction session to empower DAG members to advocate and lobby the marginal section of the community for their own rights as well as those of the whole community including the welloff and disadvantage. The table shows that as of FY: 2072/073 total 907 CACs has been formed with 25374 members and conducted regular Reflect class in the facilitation of social mobilizer. The VDCs and Municipality wise CAC and their members distribution is 634 CAC at VDC and 273 CAC at Municipality ward and member composition is 17625 at VDC and 7749 at Municipality wards. The sex wise women representation is 90% out of 25374 CAC members. Similarly 721 women Siddhababa CAC at ward 9 of Bhimdatt Mun led as a coordinator in in CAC. The ethnicity wise compassion of CAC members are 61% Dalit, 14% Janajati and remaining 25% are others respectively. Status of Citizen Awareness Center (CACs) Status of CACs Sex wise CAC Members New Achieved LBs Name Old Total Total Total targeted Total as of Progress CAC Male Female Members CAC date VDCs 314 320 634 634 100% 2146 15479 17625 Municipality 124 149 273 273 100% 274 7475 7749 Total 438 469 907 907 2420 22954 25374
Number of CAC led by Women
466 255 721
Progress of Aligned program Community Development Programme (CDP):
Community Development Programme (CDP) is the Non-State Led Service Delivery Component as well as complementary of Local Governance and Community development
9|P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Programme (LGCDP) supported by Government of Nepal/Government of UK and leaded by Rural Reconstruction Nepal (RRN) with consortium partner World Food Programme (WFP) and Oxford Policy Management (OPM). CDP has lunched transformational SM approach in three districts namely Bajhang, Bajura and Achham of this region. As of date CDP has covered social mobilization activity in 30 VDCs of three districts. So far SM coverage status is 10 VDC of each district. The following table shows that total 255 CACs has been formed with 6937 members. Total 255 LRPs facilitating these CACs through Reflect regular classes. Status of CAC & LRP under CDP: SN. 1 2 3
Name Coverage of VDCs District Bajhang 10 Bajura 10 Achham 10 Total 30
Total CACs 85 85 85 255
Total CAC Members Female 2521 2275 2098 6894
Male 27 1 15 43
Total 2548 2276 2113 6937
Status of LRPs Female 81 85 76 242
Male 4 0 9 13
Total 85 85 85 255
1.1.8 Status of CAC Graduation: The key objective of this assessment is to visualized real outcomes in terms of creation of self-awareness, participation and empowerment level of CACs. The indicators are developed in a way that even CAC member could identify them self the real gap between what they have expected before and real situation in the ground at present. The assessment encourages the CAC member released to improve the weakness in future. During the year all VDCs and Municipalities made assessment and analyzed CAC status based on 14 criteria's provisioned in Categorization Mannual. The key dimensions of analyzing CACs were; CAC functional status, level of awareness, transformation, linkage and resource mobilization and empowerment. The assessment was conducted among CAC members in participatory way by using the spider web, facilitated by social mobilizer. The situation analysis result shows that out of total 438 CAC 77% (336) falls in satisfactory, 20% (88) falls medium and rest 3% (14) falls in weak category.
10 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
1.1.9 Capacity Building under Social Mobilization: As the social mobiliser is the front liner of the programme for the transformational social changes in the community. The capacity of the social mobilizer should be upgraded periodically. In the current year total 13 event of training were conducted. Of them 2 event Basic Social Mobilization for SMs & LSPs, 1 event Reflect Social Mobilization for SMs & LSPs, 10 event for LRPs. All 13 events of LRP training in Achham training were conducted by national service provider, RDTC Punna Doti with the close
Basic SM training in Punna-Doti
coordination of RCU. Altogether 392 SMs, LSP coordinators and Local Resource Person/Volunteers were trained. Out of which Orientation WCF members Kharkad VDC of Darchula 94% women social mobilizers were trained on the concept of REFLECT Social Mobilization, UCPA, LIP/CIG and general concept of CFLG, EFLG, GESI, accountability tools were widely discussed and practiced. Only 71 SMs of VDC and Municipality ward were trained on 6th day basic social mobilization and 4 day reflect SM trainings. In addition, 314 training events of WCF management committee members were conducted with the close coordination of RCU, SM- coordinator, Social Mobilizer and VDC secretary. So far, total 14184 WCFs member of 314 VDCs were oriented. Out of total participants 47% women were oriented on their role and responsibility, role of WCF and CACs, IPCs, oversight functions, planning process, role of LBs and coordination linkage to other local level development partners.
11 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Status of Training & Orientation Participants:
S.N Training/orientation
Social LSPLRP/Volunteer Mobilizer Coordinator F
1
2
3
4
M
F
6th Day Basic SM training DDCs 21 0 3 Mun 24 0 2 4 Day SM Reflect DDCs 15 3 2 Mun 4 4 1 3 Day SM training for LRP/Volunteers New SM VDCs 2 VDCs Orientation to WCF management (2824) Total
66
7
8
M
F
M
WCF Mange. Members F
M
9 4 3 0
294
16
294
1
1
Total F
M
24 26 0 17 5
9 4 0 6 4
2 294
0 1
6624 7560 6624 7560 6624 7560 6992 7584
1.1.10 Exposure Visit for CAC Members: As per the received grant for exposure visit of CAC members, during this year DDC Kailali and Kanchanpur has organized exposure visit. The objective of the visit was to learn and sharing the best practices which were carried out by the CAC of other districts. Altogether, 86 participants have visited to palpa, Jhapa, Illam, Nepaljguj and Chitwan district. Of them 73% (65) women have participated.
S.N.
1 2
Name of District
Kailali Kanchanpur Total
Status of Exposure Visit: Status of Sectorial Participants From CAC From LBs SMs DDC/VDC SM coordinators, LRP Female Male Female Male Female Male
38 9 47
1 0 1
0 1 1
1 10 11
15 2 17
7 4 11
Total
62 26 88
1.1.11 District/Municipal Social Mobilization Coordination Committee As of fiscal year all 9 DDCs and 21 Municipalities has formed D/MSMC and functioning well. The main purpose of the committee is to implementation of social mobilization activities successfully by coordinating the SM agencies working in the districts as well as Municipality. By the end of this year the total number of members involved in D\MCMSC is 288 of which 30% are female. All 30 D/MCMSC has been conducted 261
12 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
meeting and made average 467 decisions during this the year. The major decisions comprised; LSPs and SMs contract extension, recruitment of vacant SMs, LSP-SM coordinators. Moreover, DS/MSMCC members were involved in the joint monitoring function of social mobilization activities and LBs activities as well as oversight status of WCFs. The RCU team has frequently provided feedbacks to D/MSMCC on their role and responsibilities for the effective implementation of social mobilization activity at ground level. 1.1.12 Local Service Provider (LSP) At present, there are 58 LSPs working in their respective cluster as per the signed agreement between LBs and Local Service providers. In total 58 LSP, 36 in DDC and 22 LSPs working in Municipality respectively. So far 25% (14) women are working as SM coordinator of total 58 LSP-SMs. The SM coordinator role & responsibility is found more effective in regular monitoring of overall social mobilization process and providing inputs and facilitation Social Mobilizers, WCF/CAC for smooth operation by organizing the cluster level meeting and sharing of best practices. The SM coordinator has been contributing effectively at local level planning process, oversight function, undertaking of UCPA database, selection of SMs, cluster wise meeting and monitoring, CAC graduation, WCF categorization, selection of local resource person, formation of new CACs, and implementation of LIP/CIG activities. Similarly, the support and role of SM coordinator found very crucial in the formation/reformation of WCF in to creating conducive environment of social mobilization process by coordinating political parties, civil society organizations (CSOs) and other stakeholders at local level. 1.1.13 Status Social Mobilizer: At present, there are 460 SMs working of 312 VDCs and 149 wards of 25 Municipality. Remaining three vacant SM post are in hiring process of total 463 SM post. Sex wise men and women ratio is 50%. Meanwhile there is no provision to fulfil the additional SMs in the new Municipalities wards. However, 149 SMs have addition responsibility to cover the social mobilization activity in all 325 ward of 25 Municipality. The role of SM is increasing day by day. In addition to his/her regular assignment they are working as key focal person for VDC and municipality. Most of the government and non-government agencies are closely coordinating SMs before implementing the program in VDC and ward level. 1.1.14 SM Cluster Meeting: In order to effective implementation of SM activities, sharing of best practices and maintained the common understanding of issues mitigation, all 58 LSP coordinators conducted cluster level meetings as per the ASIP and their annual plan in the close coordination of respective VDC Secretary, social development officers, DDC planning officers, Program Officer, DGE/UGE, SMs, WCF coordinators, CAC members, Local
13 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
facilitators and VDC staffs. The common discussion agendas in meeting are i.e. regular monthly meeting of WCFs, activate to WCF in the civic oversight function, aliened of old CAC into cooperative/micro-credit institutions, increase coordination and linkage with local level development partners, regular support to CAC in the conduction of Reflect classes.
1.1.15 Inclusive LBs Planning Process WCFs play pioneer role to facilitate local planning process, prioritized ward level development projects and articulate the demand of deprived citizens. The active involvement of WCF in local level planning process has really supported the local bodies to address the genuine need of poor and disadvantaged communities. Participation Status of Citizen in Planning Workshop and Council: In the FY: 2072/073, all LBs (VDC, Municipality and DDC) has prepared annual plan for the FY: 2073/074 as per mandatory of Local resource mobilization & management guideline2069, budget ceiling of NPC and 14th steeps of planning process. Altogether 100% (346) LBs (VDCs and Municipality) has conducted ward level planning workshops in the participation of 162133 citizens of which 44 % (71205) were women citizens. However 84% LBs has maintained the list of participants by women, children, youth and DAG in ward level planning workshop. Similarly, In Local bodies Council, the participation of citizens seem very positive. A total of 55813 people have participated in 314 VDCs and 25 Municipalities council. The women participation in Local Bodies council seems in an average 32% (17886) whereas participation in municipality 31% women only. Citizen Participation in Ward Level Planning Workshop and LBs Council: S.N.
Name of LBs
No. of VDC/Mun
No. of VDC wards and Mun. Wards
Participation in Ward level planning workshop
Citizen Participation in LBs council
Male
Female
Male
Female
1
VDCs
314
2824
71753
58066
33709
16002
2
Municipality
25
325
19175
13139
4218
1884
Total
339
3149
90928
71205
37927
17886
Projects Demand by WCF Vs Project Approved by LBs Council:
The budget allocation of the local bodies addressing the need of local people found remarkable in this fiscal year. Following given table shows that total 44646 projects were forwarded by WCFs in LBs council; where as 29.52% (13197) projects of WCFs were approved by LBs council. Meanwhile, 84% (11043) projects forwarded by WCFs that are approved by LBs council of total approved 13197 projects. Projects Demand by WCF Vs Project Approved by LBs Council:
S.N.
Name of LBs
No. of VDC/Mun
Number of projects forwarded by WCFs to LBs
Number of projects approved by VDC/Municipality/District Council
Number of projects forwarded by WCFs that are approved by VDC/Municipality Council
LBs Plan
1
VDCs
314
26512
9427
8107
1320
2
Municipality
25
18134
3752
2936
816
339
44646
13179
11043
2136
Total
14 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Target Project Forwarded by WCF vs Target Projects Approved by LBs Council:
While analysing sectorial targeted projects, total number of 16631 projects were forwarded by WCFs to LBs and LBs council has addressed number 6130 projects regarding to women, children and DAG projects. Following table shows that, 36.86% projects approved by LBs of total approved 13197 projects. In case of 34% (1836) projects of women addressed by LBs council in their annual plan of total 5372 WCF demanded projects of women. Similarly, 41% (2243) projects of children approved by LBs of total 5463 WCF demanded children projects. So far 36% (2051) projects of DAG has addressed by the local bodies in their annual plan of total 5796 WCF forwarded DAG projects. Target Project Forwarded by WCF vs Target Projects Approved by LBs Council Total Forwarded Targeted projects Approved Targeted projects Name S.N. Need of Need of Need of Need of Need of Need of LBs Total Women Children DAG Women Children of DAG 1 VDCs 3781 4062 4045 11888 1337 1717 1507 2 Mun 1591 1401 1751 4743 499 526 544 Total 5372 5463 5796 16631 1836 2243 2051
Total 4561 1569 6130
Projects Cost Forwarded by WCF Vs Projects Cost Approved by LBs:
Total cost of projects forwarded by WCFs to LBs Rs. 5761704.00 (in 000) and LBs has addressed WCF budget Rs 1293089.00 (in 000) in their annual plan. However LBs has also address the WCF project cost Rs. 945810.00 (in 000) in their annual plan of total approved budget. Similarly LBs has addressed the total target project cost Rs. 508306.00 (in 000) in their annual plan. The targeted budget allocation percentage is shown that 11.12% budget for women, 11.91% budget for children and16.28% budget for DAG sectors of the total approved budget Rs. 1293089.00 (in 000) by LBs.
Number of projects forwarded by WCFs to LBs
Projects Cost Forwarded by WCF Vs Projects Cost Approved by LBs Total cost of Approved Approved WCF WCF Target Approved the projects Demand Budget Demand Budget Demand Target forwarded (000) (000) Demand by WCFs to LBs (000)
44646
5761704
Name of LBs
MUN DDC
13179
1293089
11043
945810
16631
Total LBs Approved Budget vs Approved Targeted Budget: Total Approved Women Child DAG Approved Target Budget Budget 598105 694984 1293089
223561 284746 508307 39.31
6130
Approved Target Budget (000) 508307
Total
65707 64525 93329 223561 78024 89482 117240 284746 143731 154007 210569 508307 11.12 11.91 16.28
The scope of WCF in local level has increasing day by day. WCF member are proactively involved in planning process. It seems that, local bodies are able to address major demands
15 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
by WCF. Capacity development training to WCF and local bodies may support in effective prioritization of the programme in ward level and LBs can address 100% demand from WCF in its annual planning process. The above figure shows that WCF has played vital role in LBs planning process. WCFs are now gradually becoming grass root level institution to claim their right and addressing their demands in local level planning process. 1.1.16 Conduction of Underlying Causes of Poverty Analysis (UCPA) in wards or VDCs As the main thrust of the program is to reduce poverty, identification of the poor settlements in all VDCs and municipal wards by analyzing the underlying causes of poverty was the most crucial task for specific intervention. LGCD has made mandatory to analyzed UCPA for all VDCs and Municipalities to identify the socioeconomic condition of community/settlement. The process of UCPA is basically applied three steps with the participation of local people. a) Preparation of Access Resource Map of VDC/ wards, b) Preparation of Social Resource Map and c) Preparation of Wellbeing Ranking of Poor Settlement. As of date 175 wards of Municipalities and 149 VDCs has been completed social maps and wellbeing ranking.
DAG mapping preparation at DCM 8 Baitadi
1.1.17 Harmonization and Linkage of CACs: As of date, out of 438 graduate CACs, 219 CACs of 3205 member has been received cooperative share certificate and aligned with different local level cooperatives and financial institutions on their own effort. The following table shows that out of total 219 CACs, more than 80% (2134) member aligned from 85 CACs, whereas rest 134 CACs members aligned below 80%. The practice of aligned and linkage is in increasing trend of CACs and able to pull resources from cooperatives/financial institutions and other stakeholders.
Baskot CAC member received ginger seed from Dashrathchand Multipurpose Cooperative Ltd. DCM 5 Baitadi
16 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
14 Status of CAC Aligned in Local Level Cooperatives/Financial Institution:
DDC
Dadeldhura Darchula Doti Bajhang Baitadi Achham Total
No. of CACs those aligned in cooperative 80% above members 10 4 14 5 20 12 65
Total Member
Municipality
250 116 328 110 462 315 1581
Dasharatchand Bhimdatt Deayal Attareya Belori Patan Parshuram Total
No. of CACs those aligned in cooperative 80% above members 3 3 2 1 3 6 2 20
Total Member
94 75 42 27 84 180 51 553
1.1.18 Status of Balbhela Child gathering is an important activity of the Local bodies to ensuring the children's meaningful participation in the planning process, budgeting to address the demands and choices of children. Balbhela is the best platform to discussed identify the need and priorities of children. LBs are conducting balbhela between the fourth and fifth steps of planning process to endorse their demands in WCF meeting. Therefore, LGCDP II has carried out this activity in all LBs. During the year programme supported Rs. 6000 each VDCs and Rs 20,000 each Municipality to conduct Balbhela. In the context of this region except Bichha VDC of Bajura all VDCs and Municipalities conducted Balbhela and endorsing their plan in WCF planning. As per RBM report, 4062 projects of children forwarded by WCF to the VDC and 1,401 project forwarded to the municipalities of which 42% projects addressed by VDC and 37% project addressed by Municipality in their annual plan. However, the actual ration of approved projects of VDC and Municipality council is more than 85% as those approved projects were included from WCF demanded projects. During the planning process of fiscal year 2072/73 the key activities are assessed and indorse by LBs council are as follows.
17 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Awareness activities/street drama: child marriage/child labor/child abuse, social evils i.e cast discrimination, Chaupadi system, gender discrimination, use of alcohol, and so on. Health related activities: awareness raising programme on adolescent and reproductive health, nutrition improvement activities, Campaign activities on birth registration and school enrollment. Learning materials and dress supported to the propoor children Strengthening the child club through capacity development activities s and stationeries. Construction related activities: School building construction, furniture management, library established, playground, established Early Child Development Center (ECDC), toilet and drinking water construction in school and environment sanitation activities. Logical Frame work concerning Community Mediation:
1.2 Livelihood Improvement Program Since FY 069/70 onward LIP program has been implementing for poor of poorest members of CACs in order to address the needs and bringing changes in their economic and livelihood status. This component is considered as one of the best among various activities carried out by programme. The grant is directly being utilized in community level in small enterprises based on their decision and local priorities. The program has initiated to provide LIP grant support of Rs.100, 000 to each CAC. Till the date
18 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
(069/70 to 072/73) all together 435 CACs of VDCs and Municipalities received LIP grants. The total of 3452 CAC members were benefited of those 435 CACs so far. During this fiscal year only 10 CACs (5 CACs of Doti district, 4 CACs of Dipayal-Silgadi and 1 CAC of Jaiprithibi Municipality received LIP grant disbursed among 40 members. Details of LIP in District and Municipality Local Bodies
Total Number
of
Total Amount
Benefited CAC
Expended
members
LIP
Male
Total
Female
Districts (9)
306
31100000
414
1767
2181
Municipalities (21)
129
12900000
75
1196
1271
Total
435
44000000
489
2963
3452
Source: Data collected from SMs LBs wise data is attached in Annex
Among total members 3452, female are 2963 (86%) and male are 489 (14%). The figure shows that female members received more LIP funds. This is due to the Municipalities, where more than 97% members are female. During the reporting period Sum of Rs. 44000000 has been disbursed to the CAC members. Out of the total Rs 31100000 (71%) amount is allocated for VDCs and remaining amount Rs.12900000 (29%) is allocated for Municipalities. The total amount of VDC is reduced in compression of last year as VDCs were merged in Municipalities in this year.
During the reporting period different income generation activities were identified and implemented by the CAC members in consultation with SMs. The implemented income generating activities are divided in 19 different heads i.e. goat raising, pig raising, poultry, other livestock (buffalo/Cow/Rabbit etc), vegetables, Mushroom, cash crop (ginger), other (Retail/Tea/Cosmetic/Meat Shops, Furniture, Hair dressing and Beauty Parlor, Catering, Tailoring, Metal workshop/Aran/, Candle, Carpet, Lather Shoe making.
19 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
These 20 activities are further analysed and summarized in three major categories namely a) Agriculture/Irrigation b) Livestock and c) Others. The chart below shows that sum of 2668 CAC members have utilized the grant in Livestock related schemes, which is more than 77% of total benefited members. Similarly some of 245 members utilized grant in category agriculture/irrigation, which becomes 7% only out of total benefited members. In category others, the total benefited members are 539, which is 16% of total benefited member. This means CAC members have given first priorities in livestock, especially Goat, Pig and poultry farming. The LIP grant is utilized as revolving fund by the CAC member's. The short term revolving schemes found as daily income generating types of businesses like different types of shops (grocery, sewing cutting) then after vegetables poultry, mushroom. In activities like raising goats, pigs and growing cash crops, which are taking as business taking longer period to
20 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
have income but still members are able to manage refund in instalments and most of members are ready to invest in those business. Raising animals are taking as easy business where women from CACs can run together with households and farms works. During the year total 1506 CAC members revolved the grant both in VDCs and Municipalities (On farm 1290 and off farm 216) in various income generating activities. The interest rate is 6% to 10%. However RCU have suggesting CACs the interest rate should not more than 6 percent. CACs are making their own decisions hence there is no much cases about loan overdue and bad debt but It is necessary to provide skills on loan mobilization to those CACs.
1.3 Community Infrastructure Development Grants: This program has been implemented in CACs in name of SPMP since FY 070/71 and during FY 071/72, the program operational guideline is slightly changed and implemented as Community Infrastructure Development Schemes in CAC, where those schemes are more focused in directly income generation and livelihood development of CAC members. Till the date (069/70 to 072/73) total of 443 CACs received grant sum of Rs. 149577812 to implement 4661 income generating schemes at VDCs and Municipality level. Out of total 311 CAC of VDCs received grant Rs. 106453302 for 2940 community and individual schemes, where has 132 CACs of Municipalities received grant of Rs. 43124510 for 1721 community and individual schemes. The total benefited member of those 443 CACs is 67796 (male 31899 and female 35897) so far. Out of total member 45482 (male 21247 and female 24235) benefited at VDC level. Similarly, out of total member 22314 (male 10652 and female 11662) benefited at Municipality level. Details of CIGs in Districts and Municipality
Local Bodies
No. of CAC
Total
Total Amount
Benefited CAC
Received
Number of
Expended
members
CIGs Grant
CIGs
311
2940
106453302
21247
24235
45482
Municipalities (25) 132
1721
43124510
10652
11662
22314
443
4661
31899
35897
67796
Districts (9)
Total
Male
149577812
Total
Female
During the fiscal year 072/73 total of 83 CACs received grant sum of Rs. 25236000 to implement 1063 income generating schemes at VDCs and Municipality. Out of total 70 CAC of
21 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
VDCs received grant Rs. 21382000 for 715 community and individual schemes, where has 13 CACs of Municipalities received grant of Rs. 3854000 for 348 community and individual schemes. The total benefited member of those 83 CACs is 11254 (male 5074 and female 6180) so far. Out of total member 9719 (male 4438 and female 5281) benefited at VDC level. Similarly, out of total member 1535 (male 636 and female 899) benefited at Municipality level. Almost all schemes are completed and few of them are supposed to complete by next month.
Pig farming Ghodaghodi MUN CAC
Different Community Infrastructure Schemes are identified by CACs and concerned LBs and RCU have assessed and recommended for the implementation. The LBs have released grants for the in CACs account through VDC to construction of those schemes. The orientation was given to LBs and SMs about the guidelines. The RCU/DGE/UGEs has provided support to SMs on assessing the feasibility of proposed schemes for the poverty reduction of CACs members. Different infrastructure schemes e.i. Sheds of Goat, Pig, Poultry, Buffalo/Cow, Milk Dairy, Irrigation (Sallow/Cannel), Vegetable tunnel house, Mushroom farming, Vegetable collection center, Fruit farming, Banana farming, Bee keeping, Fish pound, Herbal plant collection center, Bamboo products, Drinking water, Community building, Water/Cellar Mill, Others, Metal Workshop/Iran, Tent House/Catering, Handicraft, Solar/Micro-Hydro, Aggregate/Bolder Collection center, Toilet, Tailoring, Lather Shoe making, Improving Stop, Foot Trial and Pre-Primary School. The details of types and number of schemes are presented in following diagram.
22 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
The above diagram shows that there are higher number of schemes on sheds of goats, pigs and other livestock. In FY 070/71, the guideline also allowed to approve schemes related to 23 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
community building, drinking water schemes, public toilet and rural electrification so more numbers of such types of schemes are constructed. But in FY 2071/72 to 072/73, only schemes related to direct income generation are identified and approved. CACs are running public audit after the completion of CIG schemes. The details of Small infrastructure schemes supported in CAC till date are as per attached sheet (Annex end of report). Program coordination and harmonization RCUs has been regularly coordinating among various stakeholders INGOs, LBs, LSPs, CSOs and other development agencies working at the local level. The possible list of livelihoods activities and livelihood related infrastructures activities for CACs were discussed and shared in meetings working and prioritizing their activities at local level planning process. Now it is a becomes a regular practice to share the resources from different development agencies in CACs with the support of WCF. A meeting was conducted with senior field director, Sajedari bikaas, USAID funding programme and RCU Dhangadhi. They have committed to provide support CACs of Kailali regarding the LIP training. In the same a joint meeting was also conducted with CDP regional office and agreed to select the participants from CACs, while organizing skill/vocational training at district level. Similarly with the facilitation of RCU, CAC of ward no. 5 Dhangadhi Metropolitan received Rs. 250000 grant for mushroom farming from RISMFP supported project of ADB.
24 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
INDICATORS, BASELINES AND TARGETS OUTPUT OUTPUT 1: Citizens and community organizations are empowered to actively participate and assert their rights in local governance
INDICATOR (for outputs only) or ACTIVITY
BASELINE (as at 15 July 2013)
END OF PROGRAMME TARGET (SIP)
VDCs and Municipalities conducted ward level 80% of VDCs and Municipalities conduct ward 95 % VDCs and Municipalities conducted planning workshop to prepare annual plan as per level annual planning workshops in FY 2012/13 ward level planning workshop annually by guideline. the end of 2016/17 Ward level planning workshop with Unknown documented participation of women, children and DAG.
TARGET for 2015/16 90% of VDCs and Municipalities conductd ward level planning workshops in 2015/16
90 % Ward level planning workshop 85% ward level planning workshops documented participation of women, children documented participation of women, and DAG children and DAG in 2015/16
ACTUAL ACHIEVEMENT (as at 16 July 2016) 100% LBs (314 VDCs and 25 Municipality) has conducted ward level planning. 84% LBs (261 VDCs and 25 Municipality) has maintained documentation of women, child and Dag participants.
CAC members engaged in Livelihood Improvement Programme (LIP).
Less than 100 CACs have implemented Livelihood Improvements Plans in 2012/13
WCF are empowered to actively participate and assert their rights in local governance
5% WCFs are under Category A and 30% under 75% of WCFs under Category either A or B. 66% of WCFs under Category A or B 95% (2980) WCFs falls under Category A and B Category B on performance basis. by the end of 2015/16
3,000 graduate CACs have received LIP 600 CACs will receive LIP support in support by 2016/17, supporting an estimated 2015/16 - CAC graduation process 25,000 households to get out of poverty institutionalised
Number of local bodies (DDC, Municipality, 20 VDCs in 5 districts of MFDR,32 VDCs in 4 At least 15 priority DDCs, 7 municipalities 30 DDCs, 15 Municipalities and 500 VDC) that have incorporated children's needs in districts of EDR, 10 VDCs in 3 districts of CDR and 800 VDCs incorporated children's needs VDC incorporate children’s needs in their annual plan from "balbhela" (annual children have incorporated children needs in their annual in their annual plan by 2016/17 annual plan through BalBhela consultation meeting) plan 2012/13 All projects at VDC level monitored
LGAF supported 538 VDCs with monitoring and oversight activities in 2012/13
90% of projects are subject to Public Audit in Public audit compliance1: - VDCs: 2016/17 80% MUNs: 80%- DDCs: (80%)
0.1.Strengthen the social mobilisation institutions - 5% WCFs are under Category A and 30% - 75% of WCFs under Category either A or under Category B on performance basis (ref. B- 80% of D/MSMCs have regular meeting, Focused Evaluation 2012- D/MSMCs meetings decisions taken and actions made. discontinued
0.2.Ensure consistentmethodology and quality No national social assurance of Social Mobilisation implementation assurance mechanism
0.3.Clarifying WCF mandate
mobilisation
quality Social Mobilisation methodology standardized by a national service provider (e.g. LDTA)
No provision of re-constituting WCFs in existing social mobilisation guideline and manuals
0.4.Mainstreaming accountability and monitoring - LGAF supported 538 VDCs with monitoring at the local level and oversight activities in 2012/13- X% LBs conducted Social Audit, Public Audit and Public Hearing as per guideline 0.5.Establish CAC graduation and expansion modality
4,000 CACs are implementing programmes in 2012/13
0.6.Implement LIP activities for graduated CACs Less than 100 CACs have implemented Livelihood Improvements Plans in 2012/13
90% of WCFs replace members according to new guidelines (e.g. 1/3 annually) in 2016/17
65% WCF under category either A or All 30 DS/MSCC has conducted 261 regular monthly or bi-monthly meeting with 467 designs. So far 58 B At lest 60% DS/MSCC hold regulare LSPs are working from FY 2071/072 to as of date bimonthly meeting LSP hiring completed by the end of 1st trimester National Service Provider (LDTA) develop social mobilization assurance mechianism ¼ of WCF members replaced in line with social mobilizatoin guideline
97% (3077) WCFs are replaced under ¼ replace process and 27% members reconstitute of total 20783 replace members
- 75% of WCFs perform oversight function in More than 55% of WCFs are engaged 63% (1981) WCFs are engaged in monitoring and local accountability in 2016/17- 90% of LBs in monitoring and oversight functions oversigh funcions by the end of 2015/16 conduct Social Audit, Public Audit and Public Hearing as per guideline in 2016/17 - 5,000 CACs have graduated by 2016/175,000 CACs are implementing programmes in 2016/17
,- 4300 CACs graduated, - 6,000 new CACs established- 2,000 additional CACs with new/aligned funding
97% (434) CACs are graduated under good and medium Category 219 CACs aligned with cooperative society.
3,000 graduate CACs have received LIP 600 CACs receive LIP support, support by 2016/17, supporting an estimated 25,000 households to get out of poverty
25 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
OUTPUT 2 Accountability Mechanism for Local Governance are in place 2.1 Local Governance Accountability Facility (LGAF) Local Governance Accountability Facility (LGAF) is to improve governance at local level by coordinating local bodies and citizens through greater participation of the citizens on the planning, implementation, monitoring process. Its main objective is to support and institutionalized the downward accountability system in local level. CSOs have been assigned to implement the Programme from January 2015. Out of 9 DDCs 8 DDCs and 21 Municipalities have been supported by 8 CSOs in the region and rest one district (Achhan) was from Strengthening Accountability of Local Government Programme (SALGP). Out of 314 VDCs 62 VDCs (2071/72) and 136 VDCs (2072/73) has been implemented the Programme. Altogether 198 VDCs and 21 Municipalities and 252 wards of those VDCs and Municipalities covered so far. The CSOs are facilitating in three intervention areas; Coordination with local bodies, Facilitation and Monitoring of the service delivery system. After the contract renewed with CSOs, LGAF provided 4 days capacity development training to project coordinators, focal persons, accountability officers & sub-engineers of CSOs about the importance of LGAF on the local bodies, Local self-governance act/ regulations-1999, local bodies resource mobilization & management guideline-2012, public hearing, public auditing, social auditing guideline-2011 and Compliance Monitoring guidelines, 2014 with code of conduct to be followed by the CSOs for the successful implementation of Programme. Similarly, CSOs organized orientation Programme to LBs officials, political parties' leaders, WCF/CAC members, Social mobilizers, VDC secretary and other stakeholders of respective DDCs, VDCs & municipalities. LGAF Programme has supported to CSOs with grant to facilitate and enhance the capacity of Local Bodies, Line Agencies, I/NGOs and DPs as well as the private sectors accountable towards citizen and maintaining transparency and promoting downward accountability. The LBs have already started/committed to conduct planning, monitoring & evaluation processes by following 14 steps participatory methods with inclusive participation from local level. The local communities/citizens have started field verifications of the progress as shown in the documents by the local bodies and have become more vocal in expressing their
26 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
opinions and demands. Details of Public participation by CSOs' activities are given below: Total Participant Janjati Others
Dalit SN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Total
Training/workshop/orientation District Level Orientation Mun. Level Orientation VDC Level Orientation District Level Dialogue Mun. Level Learning & Sharing VDC Level Learning, Sharing & Review Meeting VDC One Day Capacity Development Training WCF, CAC & SM Mun. One Day Capacity Development Training WCF,CAC & SM Awareness on Citizen Entitlements Civic Oversight Public Hearing (DDC ) Public Hearing (Mun ) Public Hearing (VDC) Social Audit (DDC) Social Audit (Mun) Other Activities Total
M F M F M F M F 18 5 33 3 192 52 243 60 15 14 27 27 88 62 130 101 262 226 216 96 2671 686 3149 1008 59 21 24 4 400 72 483 97 11 6 28 6 89 46 141 46 282 195 145 75 1401 1015 2156 974 278 226 153 102 2143 17
20
302 528
14
26
88
91 203 1966
903 2577 1229 61
119
107
976 2329 1738
126 83 37 111 908 332 1064 554 63 29 42 8 436 99 450 136 479 272 89 56 2535 672 3102 1001 14 4 5 2 78 11 97 16 15 3 3 0 62 17 80 20 14 2 1 0 63 11 78 13 705 522 116 43 4286 1733 5435 1965
In addition, DDC-VDCs and Municipalities are found more aware of conducting the Social audit, Public hearing and Public audit at local level which directly support the establishment of governance system. Following table illustrates the status of Public Audit, Social Audit and Public Hearings in the Local bodies. SN
Description
VDCs
Municipalities
DDCs
1
Social Audit
-
4
7
2
Public Audit
235
25
9
3
Public Hearing
233
25
9
4
Number of public audit completed projects Number of LB's where civil society led compliance monitoring introduced Number of WCFs in which at least one member received orientation on monitoring and oversight function
1,610
686
510
206
20
8
5 6
1224
86
-
27 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
7
8 9
| 2072/73(2015/16)
Number of WCFs that engaged in monitoring & oversight function in the current fiscal year Number of WCF's that perform oversight function (public audit) Number of LSPs involved in social mobilization oriented on accountability tools in the current fiscal year
1,725
206
1,725
206 22
36
INDICATORS, BASELINES AND TARGETS Output
INDICATOR (for outputs only) or ACTIVITY
TARGET (for 15 July 2016)
OUTPUT 2: Account ability mechanis m for local governin g are in place
WCFs start practicing social accountability tools in monitoring of local governance actors’ activities Civil society led compliance monitoring in 75 districts
85% of LBs compliant with public hearings and social audits guidelines
National accountability initiatives are closely aligned
Local Bodies grievance system established 2.1. Establish new LGAF modality
2.2.
Output
Civil society led compliance monitoring in 75 districts
INDICATOR (for outputs only) or ACTIVITY
CSOs operating in 75 districts and report progress regularly (LGAF 66; SALG 9; alignment with PRAN) - Develop training and IEC materials, and experience sharing with PRAN/SALG - Introduce alignment activities with (USAID) Sajhedari Programme Establish tracking system of grievance cases in LBs - LGAF NC meet at least once every trimester - LGAF institutionalized in Good Governance Section CSOs operating in 75 districts and report progress regularly (LGAF 66; SALG 9; alignment with PRAN) TARGET (for 15 July 2016)
2.3. Consolidate Social Mobilization process of LGCDP II by integrating accountability tools
30,000 (85%) WCFs oriented on social accountability tools
2.4. Align national accountability Programme with LGAF
- Develop training and IEC materials, and experience sharing with PRAN/SALG - Introduce alignment activities with (USAID) Sajhedari Programme Public hearing compliance: VDCs: 3000 (83%) Municipalities: 100 (85%) - DDCs: 75 (100%) Social Audit compliance: DDCs: 60 (80%)
2.5. Improve grievance mechanism
ACTUAL ACHIEVEMENT (as at 15 July 2016) 9 DDCs, 198 VDCs 21 municipalities have completed 9 DDC ,21 Mun & 198 VDCs LGAF/CSOs (LGAF,8 District & SALG 1 )
9 DDCs assigned Focal Persons Not Applicable
8 CSOs are working in the 8 districts ACTUAL ACHIEVEMENT (as at 15 July 2016) 21 municipality and 198 VDCs WCF & CAC are oriented on public audit & oversight monitoring
198 VDC,9 DDC and 21 Mun
28 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
OUTPUT 3 Local Bodies Access to Resource Increased LBs are supposed to increased resources either from receiving more funds from central level agencies or increased their own internal resources by tax and harmonizing local tax system with national level tax system. The programme has made efforts to increase the internal revenue of LBs. Local self-governance act 2056 as made provision to apply the Integrated Properly Tax to increase the internal revenue. In this connection, LGCDP supported fund Rs. 10 lakh each for newly formed municipalities namely Kamalbazar, Beldandi, Krishanpur and Bedkot. The purpose of the activities was established computerised recording keeping system, purchased office equipments, solar/printer and networking by which the IPT system could established. All four municipalities has conducted this activity and committed to implement IPT starting from fiscal year 2073/74. During the year LBs internal revinue has not been increased as per expectation. However, DDCs Kailali 37%, Kanchanpur and Doti and Dhangadhi (102%), Tikapur (35%), Jhalari-Pipladi, Krishnapur, Api, Bheemdatta, Attriya municipalities and and 31 VDCs has increased their inter review. MoFALD has taken initiation to major the performance of LDOs, Eos which also helps to improvement the LBs resources.
3.1 MCPM of District Development Committee (DDC) The performance of MCPM result does not seem satisfactory. During the year as usual the performance of MCPM went down. The table below shows that only Bajhang and Dadeldhura DDCs has increase additional grant by 15% and 10% respectively. The remaining 7 DDCs are in position of deduction additional grant by 10% to 20% respectively. DDC MCPM Status Fiscal Year SN District 67/68 68/69 69/70 70/71 71/72 57 58 73 47 69 1 Bajhang 65 57 69 68 59 2 Kanchanpur 49 52 68 71 65 3 Dadeldhura 58 61 63 35 55 4 Doti 41 61 59 41 47 5 Achham 55 57 58 36 56 6 Baitadi 59 58 54 56 59 7 Kailali 51 61 54 31 47 8 Bajura 46 56 48 28 47 9 Darchula
Remarks 15% Additional grant 10% Deduction 10% Additional Grant 20% Deduction All Deduction (MCPM failed) 15% Deduction 20% Deduction (PM failed) 20%Deduction (PM failed) 20%Deduction (PM failed)
3.2 MCPM of Municipalities The performance of MCPM during the reporting period is not satisfactory. The table below shows that only Dhangdhi Metropolitan City received additional 10% grant rest of the Municipalities deducted by 10% to 20%. Regarding the Tikapur municipality it has got
29 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
additional 10% grant previous year, however by this year due to the failed in MC, loosed all additional grant. Municipality MCPM Status
SN MUNS 1 2 3 4 5 6
Fiscal Year
Remarks
67/68 68/69 69/70 70/71 71/72 76 78 72 74 Tikapur 75 73 75 72 66 Dhangadhi 76 52 64 68 61 Bheemdatta 66 53 57 68 50 Dipayal Silgadhi 57 45 69 60 51 Amargadhi 46 42 65 51 45 Dashrathchand 43
All Deduction (F) MC failed 10% Additional Grant (B) 10% Deduction (C) 15% Deduction (D) 20% Deduction (E) PM Failed 20% Deduction (E) PM Failed
3.3 MCPM of Village Development Committee (VDC) Table below shows comparison of the MCPM of VDCs from fiscal year 2067/68 to 071/72. The MC result is calculated based no. of existing VDCs of fiscal year 067/68 to 069/70, While MCPM result is calculated for fiscal year 070/71 to 71/72 after deducting VDCs whose are merged in municipality. During the year 2071/72 the total number of MCPM failed VDCs is 109. Due to the delay of reporting by DDC Bajhang and Doti VDC MCPM result is not included in the report of MoFALD. The number of failed VDC of Bajhang is 3 and Doti is 3 respectively Hence, in this region the actual number of failed VDCs is 23 only. VDC MC & MCPM Status
SN District
Total no of VDC
Fiscal Year VDC Failed in MC
Remarks
VDC failed in MCPM
1
Bajhang
42
67/68 1
68/69 3
69/70 4
70/71 15
71/72 42
2 3 4
Kanchanpur Dadeldhura Doti
4 18 50
1 1 0
2 3 6
2 2 3
0 11 11
0 2 50
5 6 7 8 9
Achham Baitadi Kailali Bajura Darchula Total
56 56 28 24 36 328
2 5 1 1 2 1
21 7 4 2 5 53
9 17 3 8 12 60
3 39 4 11 23 117
2 11 2 0 0 109
MCPM is conducted and 3 VDCs were failed, however, due the delay of reporting all VDCs shown failed.
MCPM is conducted and 3 VDCs were failed, however, due the delay of reporting all VDCs shown failed.
30 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
OUTPUT 4 Public Finance Management System Improved The output four basically aims to improve efficiencies and effectiveness of MoFALD, local bodies and other governance agencies in the field of financial management system to reduce the fiduciary risk at centre and local level. The programme has focussed to support process of planning monitoring, implementing, budgeting and reporting system. The programme conducted VDC accounting software training to the 283 VDC staffs and 57 VDCs reported to using the software. Unfortunately, only 7 VDCs (six VDCs of Kailali and 1 VDC of Bajhang have been fully utilising this software. VDC Accounting Software Chaumala VDC Similarly, five municipalities and nine DDCs have been practicing of e-bidding system and 20 Municipalities and nine DDCs have prepared annual procurement plan in this year. These system started by LBs supporting the reducing fiduciary risk in some extent. Indicator VDCs adopted VDC accounting software and made functional Municipalities that adopted accrual accounting system and made functional Number of DDC/Municipalities initiated/practiced e-bidding for procurement
Number of LBs (DDC & municipality ) that prepared procurement plan in the current fiscal year
Target 1000 National wide(57 last year) 6 National wide
Achievement Remarks 7 6 VDCs of Kailali and 1 VDC of Bajhang has adopted. 0
NA
9 DDC and 5 municipality
75 DDC and 130 Mun
Dashrathchan, Sanfebagar, Amargadhi Dhangadhi & Tikapur Mun. 9 DDC and 20 20 Mun. comprised Mun out of 58
31 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
OUTPUT 5 Institutional and Human resource Capacities of LBs and Central Level Agency Involved in Local Governance 5.1 Capacity development Capacity development is a major cross-cutting area of the programme and every output required to the CD inputs. CD activities are more focussed LBs to strengthening the institution and human resource development to become more accountable towards citizen through effective service delivery. Therefore, programme have supported on demand driven and supply driven (Contextual) CD activities to the LBs based on annual ASIP and AMEP. Besides, MoFALD and other aliened development agencies also supporting to LBs capacity building. In the context of this region, UNICEF, GIZ/CD-Mun, UNWOMEN and RVWRMP have provided various training programmes for the LBs staff and provided technical and financial support in terms of equipment by which institutional capacity has been upgraded. As a National Service Provider (NSP) of LGCDP II, LDTA have organized various regional level training/workshop for the LBs. Moreover, GIZ/CD-Mun have been supporting on capacity building activities in 10 new Municipalities of this region for human resource and organizational development. Training/workshop/Exposure visit:
During
LB's Capacity building fiscal year 2072/73, 50 different trainin/workshop trainings/workshops/exposure have been organized from VDC to regional level for LBs human resource and organizational Women development. The training were seems 39% related with all the seven outputs of the Men LGCDP II i.e GESI/GRB/CFLG/DRR, building 61% bylaws, LGAF, RBM, ICT/MIS/DPMAS, Social security/MIS/VERSS, Community mediation, SM related and so on. During the year altogether 35175 participants from LBs personnel, WCF/CAC citizen, political parties and citizen have participated in the various training/orientation programmes of which 39% were women. Likewise, Kanchanpur and Kailali DDCs conducted exposure visit of CAC member outside of this district to cross learning and sharing their experience, skill and knowledge. Total 86 CAC members from both the district have participated in the exposure visit of which 73% participants were women. The exposure visit seemed really supportive to the disadvantage member of CACs to get chance to learn about different community, place and working style of other CACs. (See detail training data base in Annex) MoFALD allocated Rs. 1, 00,000 for 21 municipality and 9 DDCs to setup Personal Information System (PIS). As per MoFALD strategy to setup central PIS, LBs are advised not to spend budget during the current year. However, few LBs utilize this budget to purchased 32 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
computer related equipment. After termination of DGE/UGEs, MoFALD provided support to recruit Engineers, Program Officers, and LGCDP Focal Person during the year. However, Seven Programme Officers recreated (DDC Baitadi & Punarbas, Belauri, Dodhara-Chandani, Jhalari-Pipaladi Dashrathchan and Kamalbazar Municipality) respectively. Similarly eight municipalities namely Dipayal-Silgadhi, Kamalbazar, Dodhara-Chandani, Jhalari-Pipalidi, Bedkot, BhajaniTrisakti, Ghodi-ghodi and Patan recreated Engineers respecttively. The remaining DDC and municipalities assigned as a LGCDP focal person from LBs staff . 5.2 Information & Communication Technology (ICT) and Capacity Development of LBs Electronic governance or simply e-governance is use of Information Communication Technology (ICT) to improve services delivery of government agencies. ICT supports transformation governance in delivering the information and services. The essence of egovernance is bringing government closer to citizen through possible ICT tools and techniques. E-governance helps in providing better services to citizens, improve
transparency
(Open
Government), and work towards the knowledge
ICT Training DDC Achham
based society. LGCDP Phase -II provides ICT support to the LBs through the ICT Volunteer's, to establish the e-governance system in the LBs and make the LBs digitized. Therefore MoFALD/LGCDP II providing technical and financial support to the LBs for personnel capacity development and developed infrastructure regarding ICT. Fiscal year 2071/72 total 14 municipality and 9 DDC were supported basic IT infrastructure such as computer, printer, solar and other digital equipment. During this fiscal year 6 Municipality were supported Rs. 500000 each on basic IT infrastructure. Similarly, LGCDP provides NRs. 40,000 to 81,000 each 21 Municipalities and NRs 44,000 all DDCs for ICT training to the LBs personnel. From this training LBs staff get chance to know about the computer based reporting system, server and its benefits during service delivery. Subsequently, from the regular technical supported by the ICT Volunteer now LBs have gradually internalizing ICT and getting initiation for the entire infrastructure. As of now, DDC Kanchanpur and five Municipalities have installed back server, Kailali DDC and Dhangadhi, Tikapur, Amargadhi and Dashrathchand MUNs have printer server. Similarly, all Nine DDCs, 33 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
22 VDCs (4 VDCs from kanchanpur and 18 in Dadeldhura) and 15 Municipalities installed solar system. Respectively, DDC Kailali started digital notice board and 2 MUNs (Dashrathchand and Amargadhi) and 2 DDCs (Dadeldhura and Achham) started group SMS.
ICT infrastructure initiation in LBs F/Y 2072/073 LBs
Backup server
Printer Server
Municipals
Amargadhi, Krishnapur, Dhangadhi
Dhangadhi, Tikapur, Dipyalsilgadhi, Krishnapur
DDC
Kanchanpur
Kanchanpur
VDC
Solar Panel
Dhangadhi, Tikapur, Attriya, LamkiChuwa,Dipyal-silgadhi, Mangalsen, Sanfebagar, Jaypritivi, Dashrathchand, Amargadhi, Parsuram, Bheemdutta, Punarwas, Belauri, DodharaChandani All nine
Digital notice board
Group SMS
None
Dashrathchand and Amargadhi
Kailali
Dadeldhura and Achham
4 VDC in Kanchanpur and 18 in Dadelhura
ICT Capacity Building Training for LBs staffs:
MoFALD/LGCDP allocated budge for IT capacities development of local bodies (DDC and Municipalities) in this FY 2072/73. Altogether 68 ICT based capacity building training were conducted in local bodies few in community level. All these capacity development activities were supported by UNVs and ICT Volunteers.
During the year 2072/73 altogether, ICT training (8 DDCs and 21 MUNs) for LBs Staffs inducing social mobilize has been conducted. The total 818 participants has been benefited of which 663 were male and 155 were female.
34 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
After having various ICT related trainings the knowledge confidence level of local body staff has been
improved and created ICT friendly environment at LBs. Apart from this, The volunteering activities related to ICTs has been carried out in Schools in Bajhang district and sanitation companion in Tikapur Municipalithy.
Regional DDC Website Training in Dadeldhura: MoFALD has initiated the procedure to obtain uniformity in website in the Local Bodies for effective and efficient flow of information to all citizens, and both governmental and non-governmental organizations. This website training was held from 2073/02/6-8 for 24 Different DDCs in the mid & farWestern Region, ICT Volunteers and Information Officers from the Local Bodies have participated. All participants of 24 DDCs of Mid and Far- western region released that due to this training no any other external vendor issues will be faced in by LBs in future. In addition, LBs could share each other for different problems and issues faced while updating the website, since the website of LBs are uniform. This will encourage also create the learning and sharing environment among LBs staff. In the designed website, the LB staff is able to update, alter, and create any new fields/menus as required. The new website will 35 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
encourage transparency, because every LBs will have minimum requirement to be updated in the website. LBs have following scope and interventions areas of ICT for effective service delivery and e-governance: ● Website development and update ● Software development/ upgrading, data entry and support ● ICT Training to local body staffs and at community level ● Online reporting support ● Social media platform creation and update ● Group SMS ● Digital Notice Board ● Audio Notice Board ● Biometric Attendance ● Queue Management System ● Free Wi-Fi ● Mobile Application development (in selected LBs and MOFALD) ● GIS map creation ( Social, Political, resource & new municipality boundaries) ● ICT Infrastructure management and backstopping support Although remarkable improvement has been observed in this short period and despite of various challenges, there is still room to improve and adoption e-governance in all level of LBs. Following are areas to support in future e-governance system.
Developing a long term e-governance strategy for ministry and local level Orientation to Local Development Officers/ Executive Officers in e-Governance ICT awareness for public at community level Development of innovative ICT product ICT capacity building training to local body staffs
36 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
OUTPUT 6 Access to and quality of local infrastructure and other socio economic administered by LBs are improved This output address and ensure their effectiveness and efficiency while delivering of services related to infrastructure development, vital events registration, social security payments and community mediation. In FY 2072/73, there are 1849 different projects completed in LBs (DDC 430, Municipality 1126 & 293 VDCs) in this region, which have benefitted 738323 population (DDC 120886, Municipality 605719 & 11718 VDCs ) respectively. Similarly the total cost of the implemented project is Rs. 595612000. The information and data are analysed for 9 DDC and 25 MUNs 18 VDCs of Dadeldhura district. So far target group wise budget allocation and implementation is concerned; both DDC & Municipalities followed the Local Bodies Resource Mobilization and Management Guideline 2069. Details of district and municipality wise information of infrastructure projects are shown below table and figure.
6.1 Status of Project Funding Matrix 6.1.1 District level In FY 2072/73, there are 430 different projects completed in nine districts of this region, which have benefitted 120886 population of the region. Out of total benefitted population 24% are from Disadvantaged groups. The details summary of DDCs, Municipalities, and VDCs regarding completed projects, Project cost and benefited population show in table below.Regional Scenario of Sectoral Projects:
37 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
District-wise project, cost and benefitted population SN
1 2 3 4 5 6 7 8 9
District
Achham Baitadi Bajhang Bajura Dadeldhura Darchula Doti Kailali Kanchanpur Total
Number of Projects completed
Cost NRs ('000)
Approx. Benefitted Population Remarks
29
6930
DAG 589
NON DAG 2367
Total 2956
255
19354
30456
27524
57980
73
6495
1228
940
2168
65
9847
3000
1995
4995
106
42970
2970
3402
6372
55
31845
17600
10879
28479
93
10885
2816
2465
5281
92
14765
6600
5470
12070
117
22656
2368
2916
5284
885
165747
67627
57958
125585
District-wise benefitted Population (DAG and NON DAG)
Regional Scenario of Sectoral projects under DDCs
District-wise benefitted Population (DAG and NON DAG) comparison chart
38 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
6.1.2 Municipality Level Altogether, 1126 projects were implemented in 25 municipalities of this region during the FY: 2072/73. Total of 738323 populations have been benefited through the implemented projects (54 % DAG). All 25 MUNs implemented targeted programmes as per provision made in Local Bodies Resource Mobilization and Management Guideline 2069. The figure below shows that the more DAG population were benefited in compression of Non DAG. Municipalities-wise project, cost and benefitted population District
Achham
S N
1 2 3 Baitadi 4 5 Bajura 6 Bajhang 7 Dadeldhura 8 9 Darchula 10 Doti 11 Kailali 12 13 14 15 16 17 Kanchanpur 18 19 20 21 22 23 24 25
Municipalities
Kamalbazr Mangalsen Sanfebagar Dasharathchand Patan Badimalika Jayaprithvi Amargadhi Parashuram Api Dipayalsilgadhi Attariya Bhajanitrishakti Dhangadhi Ghodaghodi Lamki Chuha Tikapur Bedkot Belauri Beldandi Bheemdatta Dodharachadani Jhalaripipaladi Krishnapur Punarbas
Total
No. of Project s
Cost NRs ('000)
Approx. Benefitted Population
Remar ks
DAG
NON DAG
Total
74 73 122 88 142 109 58 161 67 87 117 223 17 231 126 61 54 62 140 42 122 150 153 35 103
10295 15479 11349 6554 19515 36634 22592 13355 26219 28503 20197 40697 22069 107734 22468 25177 19570 11365 36640 6486 70133 22838 23632 2517 21999
13680 5805 7106 4527 24569 16830 10280 32470 23256 6172 10817 31113 11129 61422 10240 5325 6308 8302 82347 195 25219 26718 2832 705 41710
15331 3771 5338 2236 12707 6834 3070 31733 10786 4245 9537 18170 11129 25787 10580 3033 4099 4008 67049 207 61422 18012 2684 965 62434
29011 9576 12444 6763 37276 23664 13350 64203 34042 10417 20354 49283 22258 87209 20820 8358 10407 12310 149396 402 86641 44730 5516 1670 104144
2617
644017
469077
395167
864244
39 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Sectoral Investments in Municipalites Promotional Activities Projects 19% Roads, Bridges & Culverts 36%
Agriculture 1% Health 4% Social Infrastructures 8% Education 9%Environment 7%
Economic Infrastructures 5%
Irrigation 2%
WASH 9%
Regional Scenario of Sectoral projects under Municipalities
Municipality benefitted Population (DAG and NON DAG)
6.1.3 VDC Level At VDC level, there are 700 small projects run by different community and users groups. This FY only VDCs of Dadeldhura submitted PMF report. So this data and information gives only VDC level project and budget expenditure scenario of far west region however it not suitable for data analyse and different perspective.
40 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
VDC wise project, cost and benefitted population
SN
Sector
No. of Projects
Cost NRs ('000)
Approx. Benefitted Population DAG
1
Roads, bridges & culverts
2
NON DAG
Total
6
11,970
284
166
450
WASH
27
2,867
502
200
702
3
Irrigation
22
4,534
419
109
528
4
Economic Infrastructures
7
2,957
168
56
224
5
Environment
15
702
400
320
720
6
Education
56
1,638
2,360
2,022
4382
7
Social Infrastructures
23
1,295
773
345
1118
8
Health
19
1,482
915
88
1003
9
Agriculture
41
2,453
646
430
1076
77
2,158
1,217
298
1515
407 700
2,415 34471
1,180 8864
611 4645
1791
10 Promotional activities 11 Targeted Activities Total
13509
6.2 Budget Expenditure The following figure shows the sector-wise details of DDC, Municipalities and VDCs out of total Rs 595612000 during the FY 2072/73. S N
1
Sector
2
Roads, bridges & culverts WASH
3
Irrigation
4 5
Economic Infrastructures Environment
6
Education
7 8
Social Infrastructures Health
9
Agriculture
10
Promotional Activities Total
DDCs Total Cost ('000)
Benefitted Population
55
59366
48186
20 34 9
7743 21559 4500
10656 10781 9678
67 54 35
45741 8418 11987
15298 25201 10894
27 22 7
2867 4534 2957
702 528 224
16 20 13
10200 8050 3000
2690 8192 888
21 70 86
12267 22643 12105
7548 16271 17371
15 56 23
702 1638 1295
720 4382 1118
7 11 245
1683 1085 24524
5078 1699 23038
23 5 498
9219 849 95140
28373 2364 229677
19 41 77
1482 2453 2158
1003 1076 1515
430 141709
120886
1126 421846
605719
293 32056
11718
Projects
Project
Municipalities Total Benefitted Cost Population ('000)
267 203478
252722
Project
VDCs Total Benefitted Cost Population ('000)
6 11970
450
Note: In the above only VDCs of Dadeldhura district is included
41 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
To build the technical capacity of district offices and municipal technical unit MoFALD supported fund for establishment of LAB and purchased the survey equipment. During the year Rs. 500000 to purchase the survey equipment for Punarbas municipality. Similarly Rs. 1200000 fund supported to Kailali DDC to maintain the quality of LAB and technical support. Both Punarbas and Kailali DDC has implemented the activities as per the suggestion made by MoFALD. In addition, Achham and Darchula DDCs receive fund Rs 2000000 each to construct quality lab office and survey equipment's. Both districts have completed the LAB building. They have now planned to carry out the LAB testing to maintain the quality of infrastructure from next fiscal year.
6.3 Social Security & Vital Registration The Government of Nepal has provision to distribution of social security allowances to senior citizens, single woman, widow woman, disable person, endangered people. Similarly the nutrition allowance for dalit children & medicine allowance for senior citizen is also provisioned in Social Security Programme Operational guideline 2072. It is observed that all DDCs and Municipalities has formed social security coordination committee and assigned focal person to conduct regular meeting and other supports. During the year most of the VDCs and Municipalities received budget timely and delivered allowance by vital and social security section with the close coordination of SMs and WCFs of the respective VDCs. However, few VDCs faced problem to deliver the allowance in time due to the workload of
42 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
VDC secretary having responsibilities of more than two VDCs. Similarly, DDCs and Municipalities updated mismatched data during the period of time. MIS of social security system has already been started during the fiscal year 2071/72 in Dadeldhura, Kanchanpur, Bajahang & Achham DDCs and Municipalities of those districts and software is functioning well. During this fiscal year all remaining DDCs and Municipalities installed MIS social security system and started data entry online. Except few DDCs and Municipality, all completed the data entry task so far. Including cash payment 15 municipality has started banking payment system through opening personal account in different financial institutions. MoFALD/DOCR organized social security & vital registration/MIS training with the close coordination of RCU. Altogether 31 LBs staff participated in MIS training and total 14 participated in social security training respectively. In addition, MoFALD/DOCR conducted social security performance audit in sample VDCs of Kanchanpur (Rakawarbichawa, Bayisebichawa & Dekhatbhuli VDCs) and Bajura (Barabise, Barmatola & Gudukhati) respectively. Similarly Bheemdatt and Badimalika municipalities were taken as a sample to make performance audit. The performance audit shows that the recording keeping, distribution mechanism of allowances, identification of beneficiaries, communication and coordination among the stakeholders is quite satisfactory in Kanchanpur DDC and Bheemdatt municipality whereas Bajura DDC and Badimalika municipality found unsatisfactory in all indicators. The table below shows that the details of allowances distributed by the LBs; Status of Social Security Allowance Distribution SN 1 2 3 4 5 6 7 8 9
Types of Beneficiaries Senior citizen (Other) Senior citizen (Dalit) Single Woman Widow woman Fully Disabled Partial Disabled Endangered (Raute,Raji) Children Dalit Medicine above 70 Total
Numbers Payment Amount RS. Remarks 55403 332418000 33702 202212000 20215 121290000 47182 283092000 1961 23532000 2024 7286400 2807 33684000 72624 174297600 73452 146904000 305363 1341192000
43 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Summary of Vital Event Registration SN 1 2 3 4 4.1 4.2 5 Total
Types Birth Mirages Death Migration Entire Exit Divorce
Number Remarks 118220 22123 10726 25360 54235 37410 28 242742
6.4 Community Mediation 6.4.1 Community Mediation: The phase II of LGCDP emphasizes on service delivery and improved citizens' access to basic services. MoFALD has identified community mediation as one of the core functions of LBs along with social security payments, vital registrations and local infrastructure projects and decided to roll out CM across the country under the LGCDP. LGCDP is coordinating
other agencies to bring them in one umbrella within the districts. During this FY 2072/073 LGCP program has provided financial support as matching fund to Bajhang and Bajura DDCs & municipalities of the same district to undertake the community mediation activity. Thus both districts has conducted two events training. Altogether 72 local level community mediators were trained on community mediation process. Of these participants 40% women were trained. Similarly both VDCs established eight community mediation center at VDC and Municipality office with support of DDCs. The table below shows the detail progress of fiscal year 2071/72 to 072/73. Progress of LGCDP supported activity of FY: 2072/073 Name of LBs Activity Event Training to CM No. of Established New CM Mediators New Centers at VDC, Mun CM M F Total center District Development DDC Bajhang Training 1 14 7 21 3 Khiratadi, Kailash, Moulali DDC Bajura Training 1 17 7 24 3 Pandusen, Manakot, Brahamtola Jayprithive Training 10 5 15 1 Office of Jayprithive Mun MUN Badimalika Training 2 10 12 1 Office of Badimalika Mun Mun Total 2 43 29 72 8 44 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
Name of LBs
District Development DDC Doti DDC Kailali DDC Dadeldhura DDC Kanchanpur Municipality Bhimdatt MUN Depayal-Silgadi MUN Total
| 2072/73(2015/16)
Progress of LGCDP supported activity of FY: 2071/072 Activity Event Orientation to No. of Established New CM Centres at Participants New CM VDC, Mun Center M F Total Orientation Orientation Orientation
Orientation
4 3 2
2 11
142 43 176
42 38 66
53 35 414 181
184 81 242 0 0 0 88 595
4 2
Rupal, Alital, Chipur and Manilek Suda and Beldadi
1 1 8
Office of Bhimdatt Mun Office of Depayal Silgadi Mun
6.4.2 Progress Made by Other Aligned Programmes Since first phase (2062), REWDUC and CeLRRD has been working to expand the community mediation activity with the financial support of The Asia Foundation (TAF). During the first phase these organizations have covered 30 VDCs and 5 Municipality of 4 districts. In the second phase REWDUC working at 16 VDCs of 3 district with the technical and financial support of GF (DANIDA, DFID and SDC), and CeLRRD is working 15 VDCs of 2 district and 2 Municipality with financial and technical support of USAID-PACT (Sajhedari). The table shows that as of date community mediation mapping process has covered 57 VDCs and 6 Municipality. So far 40% women are working as a mediator of which 1396 total local staffs. During the end of the fiscal year total 6447 community disputes were registered and 83% (5382) community disputes were settled at community level. Mapping of Community Canters Name of Organization
District
RUWDUC
Kailali Dadeldhura Doti Kailali Kanchanpur Total
CeLRRD
First Phase No. No. of VDCs Mun 4 1 6 1 4 1 11 1 5 30 4
Second Phase No. VDCs No. of Mun 4 4 4 10 5 27
2 2
45 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
Activity Mapping the CM agencies Rolling out the mediation program
Indicators
Community level dispute settlement through mediation
| 2072/73(2015/16) Baseline
300 CM center established of 200 VDCs of 20 Districts
Achievements Documentation of CM database 12 VDCs & 4 Mun has been established new CM center in the support of Matching fund of LGCDP. 595 citizens oriented on Community Mediation process in the support of LGCDP 72 community Mediators trained on CM in the support of LGCDP CM centers of 57 VDC, 7 Mun has established by the support of aligned programme. 83% (5382) disputes of total 6447 disputes were settled by aligned programme.
46 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
OUTPUT 7 Strengthen integrated planning, budgeting, monitoring, evaluation and coordination amongst local governance actors 7.1 Planning and Monitoring and Evaluation The 14 step planning process has been internalized in LBs. Most of the DDCs/VDCs/Municipalities are following the Local Bodies Resource Mobilization and Management Guidelines 2069 during the planning process of local bodies. Integrated Planning Formulation and supervision and monitoring committee has been formed in all LBs. The program follows the performance and Result Based Monitoring (RBM) system from implementation to execution level. There is a monitoring mechanism from grass root level to central level. As per provision, project wise Monitoring & Supervision Committee were formed and carried out monitoring accordingly in field level. The concerning LBs technicians, though not much frequently, carried out monitoring of projects being implemented by their respective LBs. Besides, many LBs made involved political party leaders in carrying out monitoring of projects implemented in field level. There were occasional visits to local bodies from central level personnel for monitoring purposes. Besides, but regular monitoring, supervision and quality control is from regional coordination unit as well as district/ municipality Office bearers. Baitadi, Kanchanpur, Kailali, Bajura, Achham, Bajhang and Doti district has completed the District Periodic Plan last year. During the year Darchula district has completed the DPP whereas Dadeldhura district has not yet finalized the DPP. This output also supports to prepare and update the DTMP and MTMP. During this fiscal year, Badimalika, Dodharachandani, Jhalaripipaladi, Trisakti-Bhajhani, Ghodaghodi, Parsuram and Patan municipalities to were supported Rs. 1000000 each to prepare the Municipality Transport Master Plan (MTMP). All MUNs has prepared and submitted to the MoFALD. Similarly Dodhara- Chandani and Patan municipality has received Rs. 100000 each to mapping the open space within the territory of municipality. Both municipalities hired the consultants to indentify and mapping the open spaces. They also analysed the appropriate space at the time of disaster. The final report along with GIS map has been submitted by consultants to the respective municipality. Bheemdatt municipality received Rs. 500000 for Urban City Center Plan and invested to constructed street e lights within the core city area. Moreover, Dhangadhi and Bheemdatt municipality received Rs. 2500000 each to prepare Comprehensive Urban Development Plan. Due to the last hour of the fiscal year, the activity could not carried out.
47 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
7.2 Financial Delivery For the FY: 2072/73, LGCDP supported fund to archived its objectives for output 1-7 to LBs. Almost demand side budget has expenditure by LBs. Altogether Rs.249604000/- fund has been received from MoFALD of which total NRs. 224079000/- has been expended. The expenditure ration of DDC is more than 92% whereas 85% budget expended by MUNs. The expenditure ration of Municipality seem less than compression of last year due to the budget freeze of NRs.5000000 for comprehensive urban development plan.
7.3 Gender and Social Inclusion (GESI) Gender Equality and Social Inclusion (GESI) is a cross-cutting issue of the LGCDP II. Despites the integration GESI by all output, output seven intend roll-out the GESI in to the Local Bodies (LBs) in process of planning, budgeting, implementation, monitoring, evaluation and governance local actors. GESI acknowledge the diversity among women, the poor, socially/economically disadvantage and marginalized group of people. It recognize the specific need and analyzed the root causes of poverty, discrimination, gender relation, local power structure among different ethnicity group of people and men and women. Similarly, GESI focuses inequalities of access to services provided by government, access and control over the resource, decision making level and meaningful participation. According to the Global Gender Gap Survey (3GS) report 2015, the gender gap rank of the Nepal is 110 out of 145 countries. Likewise, the Gender Development Indicator (GDI) score of Nepal is 0.430, of which Mid-west and Far-west region have lowest value 0.423 & 0.442 respectively. Mainly four sub-indexes are measures between men and women for gender gap analysis. Moreover, women are back or excluded in terms of economic participation and opportunity, educational attainment, health and survive and political empowerment than men. 48 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
(Resource: The Global Gender Gap survey report 2015 and Gender Human Development report 2014). Therefore, fostering these issues, MoFALD have developed GESI policy 2066, Gender Responsive and Social inclusion budget implementation and auditing guideline 2068, Gender Responsive Budget Localization Strategic 2072 and included in other act and regulation too for addressing voices, needs and problems of women and socially excluded group. Similarly, addressing national and international commitment, MoFALD have made special provision of 35% capital budget and 33% of women GESI/GRB orientation and audit in Dashrathchand participation in all level of LBs activities Municipality, Baitadi to bring GESI mainstreaming. Furthermore, LGCDP II has been backstopping LBs towards effective service delivery to the entire group through internalization of GESI/GRB/GRBA and other national/international action plan. The women, children, Dalits and Disadvantage people are gradually involving in the process of planning, budgeting, implementation and monitoring. 7.3.1Major achievement in GESI: GESI and GRB adoption: All the nine DDCs have formed Gender Responsive Budget committee (GRBC) and Gender Equality and Social Inclusion Implementation Committee (GESIIC) according to the GESI policy and GRB localization strategic guideline 2072. However regarding the Municipalities and VDCs the GRB localization strategic is not internalized so far and GESI policy being revised. Therefore VDCs and municipalities have not formed GESIIC and GRB yet. Despites, the Gender responsive and Social Inclusion budget formulation and auditing guideline 2068 developed and approved from the government on 2069 but its implementation in the LBs seems poor. However, DDCs and Municipalities have gradually adopting GESI auditing guideline but expecting financial support from MoFALD or LGCDP. Regarding GRB sill LBs have understanding 35 percentage amount is GRB. Therefore, sometime they claimed to adopt GRB. But actually, single of LBs have not adopted GRB to date in case of this region. As per the DDCs report eight DDCs have endorsed GESI agendas in the District Periodic Plan for mainstreaming GESI.
49 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
GESI audit progress status of DDCs and Municipalities: GESI audit is a regular process of LBs to make effective service delivery system regarding budgeting, planning and implementation to the socially and economically discriminated group like women, children, Dalit and DAG. This process ultimately supports to establish good governance. During the fiscal year all nine DDCs and 18 Municipalities have conducted GESI audit according to the GESI budgeting and auditing guideline 2068. Only one Municipality have conducted GRB. It is observed that GESI audit is new activity for most of the Municipalities. During this programme DDCs and Muns have invited political parties, sectoral agencies, LBs staff, local journalist and likeminded agencies. Key findings are highlighted here below. Built common understanding and importance of GESI audit among political parties, sectoral agencies, LBs staff and other likeminded participants. The participants also realized its importance in MCPM. Five DDCs namely Dadeldhura, Kailali, Baitadi, Doti and Bajhang and Six Muns (Mangalsen, Dipayal-Silgadhi, Dashrathchand, Patan, jahalari-Pipladi and Attriya) prepared action plan in weak indicators. The remaining LBs decided and committed to prepare action plan. All DDCs have formed GESIIC and GRB committee and assigned Social Development Officer as a GESI focal person. More than 80% women have actively participated during the planning, budgeting and implementation process related to target programmes. LBs including sectoral agencies and political parties made attention and committed to regularize GESI audit in regular basis by LBs council. It is observed that due to the awareness and sensitization of GESI, the women and DAG participation in public activities have been gradually increasing trend. The spider diagram below shows the indicator wise status of the DDCs and Municipalities related to GESI. The spider diagram shows that the good governance indicator scored 10 in DDCs and 9 in Muns. Overall, this indicator seems in strong. The indicator of target group is moderate and scored 9 in DDC and 8 in Muns. Similarly, the indicator of internal structure scored 8 DDC and 6 Muns, planning monitoring and evaluation scrored 7 DDC and 6 Muns, capacity development scored 6 DDC and 5 Muns, national policy commitment scored 6 DDC and 5 Muns, local bodies policy/guideline scored 7 in DDCs and 4 in Muns and Human resource development/coordination/collaboration scored 4 in DDCs and 3 in Municipalities. Despites the various activities implemented by LBs to mainstreaming the GESI but lack of the proper documentation and less sensitive towards the indicators they get less or zero score the 50 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
simple indicators.The overall score shows that each indicator need to strengthened. However, LBs should focus more attention to those indicators which score is less than 6. Representation of the women in the CAC, WCF, ward level planning and LBs council This data is based on the RBM of the LBs. The total members of WCF are 76645 of which 50% are women, whereas last year the women representation was only 46%. The trend of women representation is increased by 4%. In addition, most of the WCF chairperson are women coordinator. Similarly, 25374 DAG people have involved in to the CAC of which 90% are women. However, last year, 12666 DAG community have participated in the CACs of which 88% were women. Likewise, 162133 citizens have participated in ward level planning process and of which 44% are women in the same case last year (f/y 2071-72) 41% women have participated total of 148,722. The current data shows the women become aware to participate in the planning process and puts their demands as well. In respect to the women participation in LBs council in this year is 32% only whereas has 36% women participated during the last year, which is decreased by 4%. Regarding the women participation in planning process and decision making it is gradually increasing trend in comparatively of last year. However, LBs need to ensure meaningful participation of the women in decision making and involvement in monitoring and supervision committee. Demand of WCF V/S addressed by LBs As per the RBM report 2072/73 all about 16631 demands were forwarded by WCF to the LBs for women, Children and DAG of which only 37% demands were approved and include in to the LB's annual plan, which is less than the last year (Last year 45%). Out of total approved projects women, 34%, Children 41% and DAG 35% demands are included in LBs annual plan. However, the actual ration of approved projects of VDC and Municipality council is more than 85% as those approved projects were included from WCF demanded projects. 51 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Target group budget allocation v/s expenditure (in thousands.000) in FY 2072/73: As per the RBM and PFM report all about NRs. 230108 budget allocated by DDCs and Municipalities for the target group in fiscal year 2072/73 from their total capital amount. The data shows on an average 91% budget expended on 1953 projects of DDCs and Municipalities from the allocated budget. Despites the expenditure trend is seems good on the base of allocation. In an average LBs have allocated target budget 35% of total capital grant. However, the target budget mostly expended in infrastructure area i.e. school compound wall construction, community building, target group road, Early Child Development Center (ECDC) and so on rather than capacity building, income generation and institutional development.
Expand Child Friendly Local Governance A. CFLG Adoption:
Nepal Government committed national and international commitment regarding the ensure of Child right through four pillar of UNCRC i.e Child protection, Child Survival Child Development and Child Participation. Therefore, MoFALD have developed CFLG strategic and implementation module 2068 and roll out in all LBs. In this region, UNICEF has been supporting in six districts namely Dadeldhura, Doti, Achham, Bajhang, Bajura and Baitadi and supporting on capacity development DDCs, VDCs, Municipalities regarding CFLG. UNICEF has also been supporting in developing Child profile, situation analysis of children, preparation of CFLG action plan and declaration of CFLG. The remaining three districts has also adopted CFLG concept and started to rollout the activities. During fiscal year 2072/73, 18 VDCs, 21 Municipality and nine DDCs have adopted CFLG. Out of 18 VDCs 13 are heading towards the CFLG declaration they have worked on all the indicators as per CFLG guideline 2068.
52 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
The name of the VDCs listed in table S.N.
DDC Name
No. of VDC
Name of VDC
1.
Dadeldhura
1
Samaijee
2.
Baitadi
2
Siddeshwor and Bishalpur
3.
Bajhang
2
Dewlekh and Dhamena
4.
Kanchanpur 0
Shankarpur
5.
Achham
2
Thathi and Binayak
6.
Doti
2
Dahakalikasthan and Laxminagar
7.
Darchula
1
Bohorigaun
8.
Bajura
2
Kailashmandu and Chtara
9.
Kailali
1
Pabera
Remarks
14 VDCs select for CFLG declaration preparation
C) Baludhan/Children Park Construction. MOFALD/LGCDP II have supported for Children Park (Baludhan) construction in Dhangadhi Sub-metro Politian City and Belaury municipality of this region. Rs. 1,000,000 allocated for Belauri Mun. and Rs. 500,000 is for Dhangadhi Sub-metro Politian City. Both the Municipals accomplished construction of park. Belauri Mun. Constructed the children park in their own land (16 Katta) and invested all about 1,920,000 amount including the contribution of Rs. 5700000 from District Forestry Office contributed and RS. 350000 from Belauri Municipality. Similarly, Dhangadhi sub-metro have constructed children park at ward no. 4 in the public land (2/3 hector) with 20% contribution of community and Rs. 200,000 contribution from Dhangadhi sub-metro Politian City. Child Park is a part of the holistic development of the Children because all the community's children get chance to playing, enjoying and of course learning about from this place.
53 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Issues, challenge and way forward Social Mobilization Issues/challenge
SMs are involved in supply side activity rather than demand side activity under the pressure of VDC secretary and Executive officer. Difficult to applied transformation Social Mobilization system through one door policy by LBs Difficult aligned CACs in to Cooperatives Inadequate capacity of LSP coordinators
Way Forward
It is needed to increase frequency of monitoring and coaching to LBs by RCU, LGCDP and DS/MSCC. It would be better to circulate coordination letter by MoFALD to LBs for one door system. LGCDP need to provide financial support and guideline for the CAC alignment in cooperative LGCDP need to organized capacity building activities and review meeting of LSPs by respective LBs.
LIP/LEED
Risk to continuity of LIP activities by Require to build a mechanism for monitoring of benefited members, due to the lack proper utilization of LIP for ensuring the quality of of monitoring system. program as per expected one. Stepwise grants implementation MoFALD should release budget on time for guideline was not applied properly effective implementation of grant. by CACs due to the delayed on LBs and LSP should be accountable on regular budget release from MoFALD. follow up and make necessary liaison on promoting and facilitating enterprises, technical backstopping Due to wide coverage of LIP, LBs monitoring mechanism is not succed to the CACs and reporting. the proper utilization of LIP fund. National along with district level coordination is Harmonization program at local level needed for having support from concerned is not being effective as expected agencies such as DADO, DLSO, WCDO, and DPHO, because of not having direction from NGO/INGO etc. concerned ministries and district. Fiduciary risk /M&E Fiduciary risk at LBs, especially at Strictly following government policies and VDCs guidelines/manuals/circulars Frequent monitoring from higher authorities/Applying monitoring findings for timely correction Provision of reward, recognition and punishment Orientation to entire LBs officials, LSPs/CSOs, WCF/CAC and other community groups about Public Financial Management/Fiduciary Risk Reduction Action Plan (FRRAP). Monitoring of programme LB should develop monitoring mechanism and activities/LB activities not enough should focus on Result Based Monitoring and regular monitoring is required from various concerning Encouraging third party monitoring/LGAF Capacity development CD plan not developed and updated MoFALD should give strong instruction to LBs for CD 54 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
in most of the DDCs and plan developing. Municipalities. Fulfilment of all vacant positions of VDCs secretaries Vacant of VDCs Secretaries and in VDC and other staff in concerning LBs. human resource problem in the LBs to be focused for promoting transparency and newly formed Municipalities. accountability through Information, Technology and Communication (ICT). Institutionalisation of LBs i.e. VDCs for governance system Social Security and Vital Registration Most of the VDC secretary are not Need to conduct training on MIS VERSS and trained on MIS VERSS and have not MoFALD/DoCR should provide computer equipment. sufficient computer and internet Need to capacity development training for District accessibility. Social Security Coordination Committee (DSSCC). Most of District Coordination MoFALD should develop monitoring tools and committees are inactive. performance audit system to be necessary in all LBs. Weak monitoring from LBs and stakeholders on vital registration and social security. Gender and Social Inclusion, CFLG Inadequate budget to implement Sufficient budget should be allocated from central as GESI related activities in LBs. well as from local level for sensitization the importance of GESI policy, national and international The participation of women, Dalits commitment. and other DAG communities is still nominal in monitoring and All the stakeholders should be sensitive on supervision committee of LBs. institutionalizing the GESI and GRB concept along with LBs. Difficult to conduct GESI and CFLG activities especially in newly formed MoFALD need to provide direction (circular) for the Municipality municipality and VDC regarding implementation GESI/GRB and CFLG guideline, policy and stragic. Inadequate supports in VDCs selected for CFLG declaration in It would be better to coordinate with UNICEF by Kailali, Kanchanpur and Darchula MoFALD for technical and financial supports to from LBs, MoFALD/LGCDP and selected VDCs for CFLG declaration activities likeminded agencies. ICT There is no specific budget for IT A long term (at least 5 years) ICT strategy should be related infrastructure and capacity designed by MOFALD development. Information and e-Governance Section should be E-governance services have not informed at MOFALD and LBs/ referred/ consulted been used in LBs. in all ICT related issues, more specifically: Software/ system development and support Software being not linked with each Hardware/ server procurement, ICT related other, hence uniformity in achieving capacity development training in E-Gov. Consider long term support mechanism for web Assigned ICTVs as electronic servers that are currently hosting background still there is need of IT software/websites training for them. Consideration of ICT indicators in reporting, Some of the LBs have still slow monitoring and performance evaluation at all levels internet connectivity. More ICT awareness activities at central and local Central E-governance portal. level- government and citizen level Integrating relevant systems into a single system to avoid redundancy/ multiple entry and duplication 55 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Major Achievements of LBs FY 2072/73 A. DDCs
Kanchanpur, Bajhang, Achham, Bajura, Dadeldhura and Baitadi districts are declared as Open Defecation Free (ODF) out of nine districts so far. Achham district have taken initiation to mke full sanitation district. Two districts (Bajhang and Dadelhdura) announced full immunization districts and 5 VDCs from Bajura declared full immunization. Darchula has announced as full literate district Accounting software operation in six VDCs and DDC of Kailali district. Completed to restructuring of local bodies all DDCs.
B. Municipalities
Rent fee collection and increased on rent from Municipal council. Mobile camping conducted (door to door visit of citizen) for service delivery by Bheemdutta Municipality. Avoid illegal settlement from the public land by Bheemdutta and Tikapur Municipality Building code implementation by Api,Patan,Tikapur, Dhangadhi, Dashrathchan,Dodharachandani,Belauri,Godaghodi,Jaypritivi Social Security allowance and vital registration MIS system operation by Bhajani-trisakti, Dashrathchand,Dhangadhi sub-metro, Dodhara-chandani and Dodhara-chandani, Public library established and have been operating by two Municipalities (Jaypritivi and Dipayalsilgadhi) Social security allowance distributed through Banking by Dhangadhi, Tikapur, Bheemdutta,Attriya,Dashrathchand,Dodhara-Chandani, Jhalari-Pipladi, Krishnapur Agreement with ADB for city infrastructure development by Dhangadhi Municipality Increased internal revenue by 102% in Dhangadhi Sub-metro Politian and 62% in Tikapur Municipality than last year. Simialrly, Jhalari-Pipladi, Krishnapur,Api,Bheemdutta,Attriya 502 Mason are trained on Earth quake resistance technology Municipal's web-site, face book page updated by Dhangadhi. Dodhara-Chandani Municipality is heading towards for implementation of EFLG activites. Prepared lake master plan by Ghodaghodi Municipality. Public toilet constructed by Dashrathchand and Jaypritive Municipality. Track open in all the wards of Municipality(Jaypritivi Established Municipal information center (Jhalari-Pipladi) PMIS software installation by Patan and Jaypritive Municipality. Construct land fill site in Safebagar Municipality. Account software installation in Bhajani-trisakti,Attriya,Dhangadhi,Dodharachandani,Jhalari-Pipladi,Kamalbazar, Patan, Krishnapur Municipal Master plan has been developing in Bhajani-trisakti,Api,Dashrathchand Installation IPT software in Bhajani-Trisakti,Api,Attriya,Dhangadhi,Jaypritiviy, sanfebagar, Lamki-Chuwa, Mangalsen ODF declared in four municipalities (Bedkot, Dashrathchand,Dipayalsilgadhi, Punarwas) Street solar light installation (Api,Dashrathchand, Punarwas Total immunization municipal declared (Dashrathchand) Working for CFLG declaration by Ashoj 2073 (Dashrathchand) 56 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
MTMP is in final stage Dodhara-chandani, Godaghodi,Patan, Lamki-Chuwa, Parsuram
New Innovations of LBs:
Digital Citizen Charter and the beginning of digital information board (DDC Kailali). The implementation of the District Technical Office Laboratory (DDC Dadeldhura) to test the contents & quality of construction of project. Agreement in accordance with the prescribed period, the consumer does not complete the work committee, union organizations have been enrolled grazes cutting revenue, so that work can be seen during the coming fiscal year People's participation in sanitation. Sanitation management in coordination with local associations and organizations of civil sanitation committee. Implementation of solar street lights Program (Dashrathchand, Amargadhi, Api and Patan MUNs) Group SMS started in the Amargadhi Municipality and DDC Achham The Jaypritivi municipality has started to prepare the inventory of the property details. Amargadhi Municipality has collaborated with District Chamber of Commerce and Federation for Municipal's waste management.
The major problem of LBs
Lack of elected representatives of local bodies. Low Internal Revenue supplement Inadequate human resource especially in newly declared MUNs. Municipality building problem in new declared MUNs. Lack of advanced city master plan Waste management and landfill site problem in MUNs. The Ministry of authority (Akhatiyari and fukuwa) comes late. The lack of public participation in revenue system and low internal income in the Municipalities. Problem of tax collection with public settled in the public land without land certificate (especially in terai municipality) Lack of prioritization schemes during implementing of projects. Due to few coverage of banking services in new declared MUNs/VDCs, it's difficult to distribute Social security through bank. Flooding problem and land swiping (Katan) problem especially in Terai district. Problem to collect 15% contribution from users group in most of the Municipalities Problem on prioritization of activities during planning process. Problem of land for Municipal building construction in case of Attriya Municipality.
57 | P a g e
Annual Progress Report: LGCDP -II RCU, Dhangadhi
| 2072/73(2015/16)
Recommendation MofALD should provide direction and circular time to time to the Municipality. Need to coordinate to the concerning agencies for utilization of public land especially for land fill site. MoFALD should provide circular for fulfilment of vacant staff in new Municipalities. Delivery Akttary and Fukuwa on time from MoFALD. MoFALD need to provide additional grant. Need to conduct training related to hazard/disaster management for the LBs personnel. Need to facilitation from MoFALD regarding land issues Need to Monitoring from MoFALD for effectiveness of the programme Staff capacity development plan needed in all the LBs and support by the MoFALD. MoFALD should provide additional grant to low income Municipalities and DDCs. Similarly, additional grant should provide to the disaster prone area. Provides support for construction of Municipality building.
58 | P a g e
Annex 1 Result Base Monitoring (RBM) Fiscal Year 2072/73
S.N Indicators . I Output 1: Citizens & community organizations empowered - social mobilization
General information 1 Number of Ward Citizen Forums (WCFs) established (cumulative) Total members in WCFs 2 Men Women Number of WCFs that replaced 1/4 members as per the Social Mobilization Guidelines 2071
3
4 Number of WCFs that conducted monthly meeting regularly
5 Number of WCFs that are under category A and B 6 Number of Citizen Awareness Centres (CACs) established (cumulative)
7 Number of Citizen Awareness Center established in the cuurent fiscal year Total members in CACs 8 Men Women 9 Number of graduated CACs (good and medium ) 10 Number of Local Service Providers (LSPs) hired Number of Social Mobilizers working in LBs 11 Men Women Planning workshop Number of VDCs and Municipalities that conducted ward level planning workshop 12 Total participants in ward level planning workshop Men Women Number of citizens who participated in LB's Council 13 Men Women
VDC
MUN
DDC
2,824 68,363 33,789 34,574
321 8,282 4,434 3,848
1,423
238
2,809 2,723
634 320
17,625 2,146 15,479 304 312 174 138 314 129,819 71,753 58,066 49,711 33,709 16,002
RCU Dhangadhi
-
253 257 273 149
7,749 274 7,475 120 22 148 41 107 25 32,314 19,175 13,139 6,102 4,218 1,884
-
36 2,744 2,167 577
Remarks
Number of VDCs and municipalities that maintained the list of participants by women, children,
14 youth and DAG in ward level planning workshop 15 Number of projects forwarded by WCFs to LBs 16 Total cost of the projects forwarded by WCFs to LBs 17 Number of projects approved by VDC/Municipality/District Council 18 Number of projects forwarded by WCFs that are approved by VDC/Municipality Council 19 Total cost of the projects approved by the VDC/Municiaplity/District Council 20 Total cost of projects forwarded by WCFs that included in annual plan of LBs 21 Number of projects forwarded by WCFs addressing the needs of women 22 Number of projects forwarded by WCFs addressing the needs of children 23 Number of projects forwarded by WCFs addressing the needs of DAG ( Dalit, Muslim, Janjati, handicapped & others) that included in annual planthe of LBs of projects forwarded by WCFs addressing needs of women that included in annual 24 Number plan of LBs Number of projects forwarded by WCFs addressing the needs of children that included in annual 25 plan of LBs 26 Number of projects forwarded by WCFs addressing the needs of DAG ( Dalit, Muslim, Janjati, handicapped & others)by that in plan annual plan of LBs budget allocated LBsincluded in annual addressing the needs of women 27 Total Total budget allocated by LBs in annual plan addressing the needs of children 28 29 Total budget allocated by LBs in annual plan addressing the needs of DAG ( Dalit, Muslim, Janjati, handicapped & others)by LBs in annual plan addressing the needs of environment, climate budget allocated 30 Total change and disaster Training/orientation 31 Number of Social Mobilzeres who received training on basic social mobilzation ( current fiscal ) of Social Mobilizers who received refresher training ( current fiscal year) Number 32 year Number of WCF/CAC members and LBs who participanted in local level plannning & civic training 33 oversight Men Women
34 Number of WCFs that are engaged in civic oversight ( public audit, public hearing, monitoring ) Number of local resource persons trained on REFLECT
35 Men 36 37
Women Livelihood improvement Number of CACs that rceived LIP grant in the current fiscal year
Number of income generating activities implemented by CAC members in the current fiscal year Number of on-farm activities implemented by CAC members ( agri/livestock/fishery etc)
261
21
-
3,752
-
26,512 5,761,704
18,134 2,872,767
8,107 694,984
2,936 598,105
3,781 4,062 4,045 1,337 1,717 1,507 78,024 89,482 117,241 15,895
1,591 1,401 1,751 499 526 544 65,707 64,525 93,328 14,061
-
21 19 3,691 2,071 1,620 1,725 295 1 294
17 6 193 94 99 206 -
-
5
5
-
9,427
500,689
15 13
445,121
25 21
-
-
-
37 Number of off-farm activities implemenetd by CAC members ( small business/cottage industry/ repairing center etc) Number of CAC members engaged in on farm activities Number of CAC members engaged in off farm activities Community infrastructure constructed by CACs Number of community infrastructure projects constructed by CACs in the current fiscal year Irrigation / pond/ deep well
38 Drinking water scheme 39 40 41 42 43 44 45 46 47 48 48
Collection center /community farming/livestock farming/fishery Weaving /carving/ handicraft /cottage industry /poultry /goat,/ pig shed Number of beficiaries from community infrastructures constructed by CACs in the current fiscal year Number of community infrastructure projects constructed by CACs in the last year (FY 2014/15) Number of beneficiaries from community infrastructures constructed by CACs in the last fiscal year Linkage Number of CACs that have acess with Community Development Fund/ fninacial institution / cooperatives etc Number of graduated CACs that federated in cooperatives ( in current fiscal year) Number of LBs that have signed MoU with other agencies for partnership & functional coordination Meeting & Coordination Number of D/MSMCC that conducted bi- monthly meeting Number of LSPs that organised meeting at cluster level with Social Mobilizers (on quarterly basis) Number of D/MSMCC oriented on social mobilization ( current fiscal year) Number of LBs that organized meeting with district level social mobilization agencies on trimester Number ofbasis LBs that conducted UCPA
49 Number of Bal Bhela II 1 2 3 4
organized Output 2: Downward Accountability Number of LBs that conducted social audit and public hearing as per LBRMM Number of public audit completed projects Number of projects approved for the current Number of LB's where civil society led compliance monitoring conducted
Public Hearing Social Audit
2 1,919 262
4 1,008 263
-
712 29 3 24 656 8,728 2,183 32,577
348 1 4 343 1,535 1,373 20,779
-
185 51 -
142 21 -
-
-
149
21 22 21 21
25
9 36 9 9
313
25
-
233
25
1,610
686
-
6,502
206
4
2,325 20
-
9
7
510
1,335 8
5 6 7
Number of WCFs that engaged in eliminating at least one social evils Number of CACs that engaged in eliminating at least one social evils Number of WCFs that engaged in making public service delivery effective and efficient.
8 No. of LBs' where monitroring and supervision committee functional 9
10 11
No. of LBs that nominated one of the staff as Nodal Officer for grievance redressal Number of public complaints/grivances registered in LBs Number of public complaints/grievances settled by LBs No. of public complaint/ grievances referred to higher authority ( from VDC to DDC; from
12 Municipality /DDC to MoFALD ) 13
No. LBs that published income & expenditure statement on monthly basis 14 Number of LBs that published final audit report III Output 3: LB's access to resources 1 Number of LB's whose own source revenue (OSR) increased by 10 percent in the current fiscal No. of municipalities that have introduced Integrated Property Tax 2 year
3 4 5 6 IV 1 2 3 8 9 10 11
Number of LB's (DDC & municipality ) whose revenue coverage ratio increased by 10 percent in the current FY staff who received orientation on Revenue Improvement Action Plan Number of LB Number of LBs which prepared Revenue Improvement Action Plan Number of DDCs and Municipalities with fully functional Internal Revenue Section Output 4: Public Financial Management Number of LBs that received budget on time Number of VDCs' staff trained on accounting software Number of VDCs where accounting software is functional Number of LBs' staff who received training on e-bidding system Number of DDC/Municipalitties initiated/practiced e-bidding for procurement Number of DDC/Municipalities staff who received training on public procurement Number of LBs (DDC & municipality ) that prepared procurement plan in the current fiscal year
2,166
178
-
216
86
-
1,213
251
-
139
22
189
23
9
188
35
79
173
20
55
40
5
25
92
21
9
31 23 54 132 292 7 -
16 12 16 28 16 20 1 24 2 2 5 2 20
5 3 41 9 9 9 10 1 9 15 9
133
17
9
9
12 15 16 19 V
6 7 8 9 10 11
Number of LBs (DDC & MuNs) in which Procurement Plan implemented Number of LB internal auditors received training/orientation on internal audit guidelines Number of DDCs and Municipalities that established internal audit section Number of LBs which submitted financial report on time Output 5: Capacity Development Number of people ( including WCF members) who received training on CFLG
Boys / Men Girls /Women Number of people who received training on EFLG Men Women Number of people who received training on GESI Men Women Number of VDCs Number of VDC Secretary posts fulfilled Number of VDC Secretaries taking responsibility of more than one VDC Number of VDCs where VDC's Secretary are in office for less 6 months Number of people who received training/orientation on community mediation (CM) Number of LBs' staff who participated in training programme on the following topics
9 4 6 23 -
2 7 9 9
388
695
218
4
-
-
iii) CFLG, EFLG, GESI, DRR
Number of VDCs which prepared CFLG declaration action plan
14 Number of community mediation resource persons trained for facilitating training at local level
227 161 10 24 31 28 3 314 236 59 147 428
Dashrathchand Muns conducted training ward level too
385 159 310 94 84.00 49 35 497 195 354 141 143 54 3 88 79 i) Periodic/Master Plan ii) Results Based Planning 25 iii) Cross-cutting issues: CFLG, GESI, EFLG and DRR 60 38 117 15 iv) Montoring & Evaluation Number of stakeholders (LAs, NGOs, Political Parties) other than LB's staff who participated in training/orientation on the following subjects i) Periodic/Master Plan 15 1 -
12 ii) LBRMMG, participatory planning 13
179
2,319
72
224
-
1
-
13
-
-
13 VDCs are selected for CFLG declaration.
15 16 17 18 19 21 22
Number of community members trained on community mediation
Number of LBs' staff trained in DPMAS, web-based reporting and MIS (Total) Number of LBs assessed capacity development needs Number of LBs which have maintained a roaster of service providers Number of LBs (DDC and Municipalities) prepared /updated CD plan as per national CD strategy Number of LB's staf who received training on MCPM Number of LDOs and EO swho participated training in the current fiscal year i) Number of LBs' staff who received training on cost effective housing 23 ii) Number of L Bs' staff received training on disaster risk reduction iii) Number of Engineers/designers/masons who received training on buliding code and earthquake resistant construction Number of people ( including CAC and WCF members ) who participated in orientation on local 24 election
26
Number of resource persons trained on GESI, GRB and Gender Audit
Number of DDC and MuN that have used GRB tool to prepare Annual Development Plan
28 Number of quality lab staff who received training on quality testing of infrastructures 30 31 32 33 34 35 36 37 38
Number of technicians (engineers, overseers, sub-overseers) who received training on technical skills Number of LBs' staff trained (ToT and general) on vital event registration Number of LBs' staff who received training on social protection management audit Number of LBs' staff who received training on procurement bidding document Number of line agencies staff who received training on DPMAS Number of LBs' staff who received training on DPMAS Number of DDC/MuNs which introduced Performance Contract for their staff and VDC secretaries Number of local body staffs trained on website Number of people trained on ICT based training at local level
LB staffs 39 Men Women Social Mobilizers, CAC/ WCF memebrs 40 Men
45
27
37 4
-
-
46 10 25 12 39
130
54 1 1 1 9 23
-
-
-
36
7
-
-
4
3
-
-
3
12 45 25 25.00 282.00 227 70 781.00 193
6 57 92 21 3 21 7.00 177.00 156 21 -
-
28 6.00 9
11
6
-
Women Others at community level (school, clubs/ journalists/NGOs etc) 41 Men Women 42 ICT infrastructure initiation
43 44 45 46 VI 1 2 3 4 5 8 9 10 12 13 14 15 16 17 18 19 20 21 VII
Total Number of LBs installing/ setting up following server i) Backup server ii) Print server Numbe of LBs installing solar backup Number of LBs installing digital notice board Number of LBs initating Group SMS Output 6: Access to basic services Number of new quality labs established in the current FY Number of functional quality labs Findings of infrastructures tested in quality lab i) Number of quality passed infrastructures ii) Number of quality failed infratructures Number of municipalities which prepared open space mapping Number of DDC/Municipalities which prepared DTMP/MTMP Number of Municipalities which established rural-urban information centre Number of Municipalities which implemented building code Number of Municipalities which arraged safety equipment and small tools for emergency Number of LBs which updated social protection information online Number of LBs which linked with central social security system Number of DDCs which established MIS database system and integrated vital event registration and socialofprotection Number LBs which used branchless banking system for social security payment Number of Community Mediation Centre established (cumulative) Number of Community Mediation Centers established in the current fiscal year No. of community disputes registered in CM Centres No. of disputes settled by CM Centres Number of DDCs where grievance mechanism are functional(Focal point appointed, grievance handled). Number of grievances reported to DDCs which could not resolved by VDCs/Municipality Output 7: Planning & Monitoring
15 200.00 110 90 22 6 6 40 28
594 1.00 11 7 5 11 15 2 2 2 20 2 11 13 14 14 6 4 2 3 -
2 1 3 9 1 2 2 9 4 4 4 9 -
1 3 5 6 9 10 11 12 13 14 15
18 19 20 21 22 23 27
Number of LBs that prepared District Periodic Plan Number of LBs that prepared Annual Monitoring & Evaluation Plan Number of LBs where Supervision & Monitoring Committees are functional ( regular meeting/monitoring visits took and place) Number of projects supervised monitored by Supervision and Monitoring Committees Number of LBs which prepared GESI Plan Number of LBs which prepared Gender Responsive Budget Number of LBs that conducted Gender Budget Audit Number of LBs that adopted CFLG Number of LBs which declared CFLG Number of LBs where CFLG committees are functional Number of LBs which set CFLG promotion action plan Number of EFLG adopted LBs Number of Municipalities which prepared following plans i) Open space and public land management plan ii) City centre plan iii) Comprehensive urban development plan iv) City rennovation plan Number of Municipalities which introduced city civil code Number of projects in which Environmental Management Plan (EMP) prepared as per guidelines. Number of physical development projects conducted IEE/EIA as per rules Number of LBs having DRR plan prepared/integrated in periodic plan Number of LBs that prepared resource maps /GIS maps Number of LBs that follow Integrated Plan Formulation Committee membership in local Supervision & Monitoring Committee committee as per LB's Resource Mobilization User's Committee Guidelines Targeted budget for women in the current fiscal year
31 Total budget allocated by LBs for projects requested by women
32
Total budget spent in projects requested by women Number of projects completed that requested by women Targeted budget for children in the current fiscal year Total budget allocated by LBs for projects requested by childern Total budget spent in projects requested by childern
14 314 367 18 2 32 21 314 103
349
8,182 8,182 19,858 3,158 3,746 6,720 12,216
8 23 536 1 1 19 21 21 7 2 1 3 22 14 42
46,838 42,353 443 59,258 52,391
8 9 9 523 1 1 9 9 1 9 2 8 15 2 1 9 3 8
11,179 10,784 107 12,319 11,485
33
Number of childern requested projects completed Targeted budget for DAG in the current fiscal year
3,074 5,756 3,858 16,001 3,949
Total budget allocated by LBs for projects requested by DAG Total budget spent in projects requested by DAG Number of requested projects requested by DAG completed Project Funding Matrix of the current fiscal year
Roads, bridges & culverts WASH Irrigation Number of projects of DDCs Economic Infrastructures by type ( road, irrigation, Environment 35 drinking water etc,) and Education number of beneficiaries ( by Social Infrastructures sex and ethnicity) Health Agriculture Promotional Activities Targeted Activities
Project Type(Mention Budget is in Rs '000)
Distribution of budget of DDCs by type of project ( 35 road, irrigation, drinking water etc.)
Roads, bridges & culverts WASH Irrigation Economic Infrastructures Environment Education Social Infrastructures Health Agriculture Promotional activities Targeted Activities
Number of projects
Project types
Total
55 20 34 9 16 20 13 7 11 245 425 855 Total Budget 59,366 7,743 21,559 4,500 10,200 8,050 3,000 1,683 1,085 24,524 34,571
495
111
84,500 76,093 590
16,013 15,722 207
Beneficiaries by sex Men Women 24,580 23,606 5,299 5,357 5,327 5,454 4,587 5,091 1,493 1,197 4,252 3,940 489 399 2,450 2,628 831 868 11,603 11,435 6,133 6,000 67,044 65,975 Communities LBs contribution Contribution 7,335 52,031 1,118 6,625 2,798 18,761 610 3,890 1,408 8,792 1,065 6,985 385 2,615 273 1,410 145 940 3,014 21,508 4,493 39,510
Beneficiaries by ethinicity
DAG 25,866 6,320 6,360 5,030 1,441 4,079 441 2,895 927 11,765 6,800 71,924
NDAG 22,320 4,336 4,413 4,636 1,223 4,119 463 2,227 796 11,229 5,333 61,095
Remarks
Remark s
Roads, bridges & culverts WASH Irrigation Number of projects of VDCs Economic Infrastructures by type (road, irrigation, Environment 36 drinking water etc. ) and Education number of beneficiaries ( by Social Infrastructures sex and ethnicity ) Health Agriculture Promotional activities Targeted Activites
Distribution of budget of VDCs by type of project ( 36 road, irrigation, drinking water etc.)
Number of projects of
Project types
Project Type(Mention Budget is in Rs '000) Roads, bridges & culverts WASH Irrigation Economic Infrastructures Environment Education Social Infrastructures Health Agriculture Promotional Activities Targeted Activites
Roads, Bridges & Culverts WASH Irrigation
Project types
Total
176,280 Number of projects
6 27 22 7 15 56 23 19 41 77 407 Total 700 Total Budget 11,970 2,867 4,534 2,957 702 1,638 1,295 1,482 2,453 2,158 2,415 Total 34,471.00 Number of projects 267 67 54
22,643 163,067 Beneficiaries by sex Men Women 233 217 337 365 271 257 98 126 355 365 2,184 2,198 586 532 489 514 521 555 747 768 903 888 6,724 6,785 LBs contribution Contribution 2,970 9,000 682 2,185 1,046 3,488 682 2,275 162 540 378 1,260 370 925 342 1,140 608 1,845 196 1,962 219 2,196 7,655.00 26,816.00 Beneficiaries by sex Men Women 133,660 133,625 11,141 16,119 11,285 26,383
Beneficiaries by ethinicity
DAG
284 502 419 168 400 2,360 773 915 646 1,217 1,180 8,864
NDAG 166 200 109 56 320 2,022 345 88 430 298 611 4,645 Remarks
Beneficiaries by ethinicity
DAG 137,750 8,931 16,972
NDAG 114,972 6,367 8,229
Remarks
Remarks
Number of projects of municipalities by type ( road, irrigation, drinking water 37 etc,) and number of beneficiaries ( by sex and ethnicity)
Economic Infrastructures Environment Education Social Infrastructures Health Agriculture Promotional Activities Targeted Activities Project Type(Mention Budget is in Rs '000)
Distribution of budget of municipalities by type of 37 project ( road, irrigation, drinking water etc. )
Roads, Bridges & Culverts WASH Irrigation Economic Infrastructures Environment Education Social Infrastructures Health Agriculture Promotional activities Targeted Activities
Total
Total
35 5,007 5,887 21 3,769 4,079 70 10,456 11,246 86 12,489 15,085 23 12,217 16,156 5 1,030 1,334 498 114,284 115,840 1,491 76,924 101,567 2,350 258,602 313,696 Total contribution LBs Budget in total Contribution 203,478 27,206 45,741 4,872 8,418 790 11,987 1,988 12,267 1,685 22,643 2,396 12,105 1,297 9,219 875 849 141 95,140 10,194 222,171 27,861 440,539 52,098 -
6,073 4,308 10,316 10,815 14,324 1,340 125,282 99,791 298,152
4,821 3,240 5,955 6,556 14,049 1,024 104,395 92,861 247,497
Remarks
S.N
Name of LBs
Total VDCs
Total WCFs
Male
DDC-Kailali
28
252
3034
3
DDC-Achham
56
504
5564
378
5271
4 5 6 7 8 9
DDC-Doti
DDC-Bajura
DDC-Bajhang
DDC-Darchula DDC-Baitadi
50
450
24
216
36
324
42 56
503
5310
3268
2382
3642
5344
3
Attareya
13
195
Lamki-Chuha
9
13
15
5
Bhajani-Trishakti 12
7
Depayal Silgadi
6 8 9
9
15
12
1120
2191
130
1470
1632
3102
202
10912
253
503
1450
1398
3844
5568
7486
324
763
2809
535
13
351
12
13
116
308
9
11
39
266
372
9
14
53
138
12
39
52
7
10
81
9
17
834
243
198
206
404
156
7
8
14
127
280
1
11
10
178
94
272
1
0
11 Badimalika
12
12
208
116
17
225
163
12 Jaya-Prithive
15
14 Dasharathchand
13
13
154
188
342
16 Amargadi
11
11
171
138
309
15 Patan
17 Parshuram
17
13
12
13
226
167
324
15
13 App
239
334
125
388
351
3
13 0
9
191
14
0
91
9
63
144
15
55
67
56
35
55 0
44
13
13
177
137
314
0
0
25 Bealdadi Sub-Total
324
24 Krishanpur
9
11
9
11
321
91
149
4431
236
6
1
10
5
91
8
5
99
15
8
15
10
4
12
7
0
11
17
13
1
13
36
63
10
0
10
0
0
8
5
13
72
59
15
10
0
0
0
5
3853
8284
163
253
995
1134
2129
238
0
5
12
0
0
0
9
12
10
6
1
12
122
84
224
277
8
10
133
128
12
8
12
89
29
11
2
10
6
30
14
10
32
23 Bedkot
6
9
40
14
8
12
3
45
11
5
18
7
10
3
181
8
1
5
104
2
53
13
8
77
27
106
40
6
7
5
19
10
130
0
14
3
11
6
10
0
14
9
14
0
6
1
0
0 4
5
72
9
19
15
10
156
275 17
8
4
4
3
3 2
11
8
30
1
7
13
10
10 0
0 116
13
3
12
19
8
14
0
0
257
9
5
0
26 0
0
15
20
18
11
0
18 0
0
17
20 0
0
12
0
0
8
0
0
0
12
8
12
0
0
5
11
0
0
10
10
10 3
10
13
13
0
0
9
10
6
35
245
0
8
11
9
8
265
5
4
14
7
14
0
14
7
5
11
19
4
1620
11
8
10
87
2071
187
8
6
13
258
1213
8
14
328
209
257
2166
8
0
259
134
13
11
300
183
10
109
136
75
11
9
55
94
375
218
12
9
209
282
15
6
6
276
256
9
10
7
216
7
13
7
141
250
387
6
6
10
35
310
11
12
9
498
180
15
2
13
374
5
9
310
135
9
13
12
325
2219
7
6
116
231
10
113
12
180
2723
11
55
114
22 Jhalari-Pipladi
58
2
380
1438
18
15
61
117
14
63
30
6
8
10
347
26
9
46
21 Dodhara-Chadani 10
160
138
13
13
44
187
76
381
150
5
9
504
136
16
0
252
301
162
1
9
252
345
10
1285
0
69
200
409
292
2267
35
384
245
199
93
223
844
0
90
207
204
152
35
B
100
218
121
12
41
104
49
69
37
14
15
222
387
202
72
10
12
15
325
70
85
99
365
20 Belori
1
14
204
150
53
163
489
100
46
202
251
120
15
15
238
343
161
15
19 Punarwash
19
155
141
410
94
141
19
231
7
241
152
302
220
67
9
18 Bhimadatt
90
406
2
965
175
90
1423
62
153
156
2603
2848
104
159
18654
15
11
178
2695
A
9397
28
11
12
127
1353
251
Total
9257
9
Mangelsen
10
114
512
2656
WCFs that Orientaton on WCFengaged in Civicoversitht to Civicov public Total ersight engage service Male Female d in delivery
WCF Categorazation
BiMonth
Municipality SM Databse As of FY: 2072/073
123
12
1
35
228
Saffe
351
3
453
1405
68363
13
10 Kamalbajar
1198
649
162
155
106
704
74
408
4121
84
201
13
14
1286
1268
7
Ghodaghodi
14
1370
1427
5650
88
192
1071
378
275
Tikapur
252
450
45
34574
260
Month
9825
33789
20
Total
4554
2824
426
Female
504
Sub-Total
35
Male
150
2167
4
36
111
Monthly & bi-Monthly meeting conducted by
WCF
12786
1954
314
6153
10596
No. of WCF with 25% members Replaced
7222
162
Dhangadi Sub-Metro 20
4
3119
5286
1 2
Female
DDC-Dadeldhura 18 DDC-Kanchanpur
WCF Led by ( Women Total Chair)
Total WCF members
1 2
Annex 2A DDC/VDC SM Databse As of FY: 2072/073
0
0
0
0
0
5
14
12
11
0
0
9
12
15
0
0
7
7
9
11
16
0
5
7
0
8
0
0
201
8
5
12 7
5
6
178
261
3
5
0
12
0
16 0
0
0
94
99
0
0
5 6 7 8 9
28
0
28
0
0
0
0
3117
108
31
25
56
0
1
2
0
2300
28
15
20
40
16
100
366
DDC-Bajura
48
225
1020
1245
72
179
1966
2145
97
918
DDC-Bajhang
DDC-Darchula DDC-Baitadi
DDC-Dadeldhura
DDC-Kanchanpur
Sub-Total
84
428
546
112
266
8
15
36
2689
1754
2820 213
F
62
DDC-Doti
112
M
2843
3086
1015 228
92
18
53
85
13 7
634 2146 15479 17625 466
46 22 33 14 4
4 2 0 4
0
50 24 35 33 56 18
0 0 0 0 0 0
3 3 6 4 0 4
0
21
0
1
0
7
1
24
9
0
9
3
Attareya
0
200
200
8
4
0
4
6
3
0
3
0
10
4 1
4 5 6 7 8
Lamki-Chuha
4
Bhajani-Trishakti Ghodaghodi
Depayal Silgadi
8
6
6
24
1
4
3
4
374
0
10
156
156
6
0
0
0
15
296
311
9
5
0
12
51
283
334
7
6
0
4
31
87
118
3
2
0
2
6
0
177
177
3
0
3
1
118
14 Dasharathchand
25
16 Amargadi
19
18 Bhimadatt
28
20 Belori
6
0
22 Jhalari-Pipladi
4
3
23 Bedkot
24 Krishanpur 25 Bealdadi Sub-Total
6
4
4
2
4
273
9
26 3
4
0
1
274
300
289 238
741
300
346
285
10 8
4
5
2 1
4 3
4
5
523
17
823
28
9
180
180
6
3
0
3
117
120
2
2
0
2
55
3
7749
255
820
112 55
129
7475
119 116 130
6
4
2
4
2
2
1
2
103
0 0
0
0
0
0
17
F
M
F
M
F
Total
30
598
502
9
53
10
18
28
37
19
2
3
0
2
0
1
0
2
6
3
15
1 0
0
3
0
1
6
8
1
2
9
24
54 1154 1154
1 2
2
3
2
778
399
17
2
62
96
12 14
1
1
2
1
18
18
1
11
2
9
9
84
36
9
3
15
27 1
40
42
56 4
296 7560 6624 21 67 174 138 312
56
1
4
313
1
1
1
3
13
16
2
2
4
1
1
1
2
1
5
2
2
9
2
3
3
11
14
2
6
0
3
5 3
2
1 2
3
1
10
16
26
149
165
65
1581 507
1
20
0
8
1
3
10
8
1
2
10
8
7
6
1
1 1
1
4
9
4
5
0
0
11 8
8
1
12
0
3
1
5
1
11
1
5
1
10
1
17
6
1
10
1
13
0
2
1
6
1
4
5
3
1
8
1
15
0
1
9
1
4
11
13
0
0
1
18
19
2
1
3
1
9
1
15
0
1
1
2
1
8
1
10
0
0
9
0
241
80
0
41
3
2
2
1
2
2
2
1
2
107 148
1
1
0
0
0
21
10 9 7
0
0
0
177
1
2 1
0
0
22
11
19 10 4
4
20
462
242
0
0 0
45
3
3
42
36
56
4
18
12
313
2
4
1
1
27
1
1
1
2
42
88
1
1
1
1
1 12 15
3
94
6
180
3
75
2 3
1
1
1
1
1
1
1
1
1
51
1
84
1
1
1
1
1
1
9
7
56
23
1
8
11
1
1
2
0
0
6
2
11
0
11
13
4
1
0
1
14
34
1
9
1
22
8
5
21
250
1
0
110
28
50 24
10
6
10
6
5
315
81
184
9
9
10
1
12
328
116
1
5
14
4
1
1
6
12
0
1
26
9
0
0
14
30
9
0
4
10
6
18
5
1
3
13
18
0
4
7
10
15
5
2
2
25
2
10
0
4
25
9
1
1
1
1
5
10
36
2
1
1
36
1
1
56
1
19
0
1
49
17
4
1
28
1
29
452
56
1
24
53 1201 1098 358
50
F
24
25
15
23
M
7
38 1183 942
36 1024 1046
1
27
Municipality SM Databse As of FY: 2072/073
1
0
44 1202 935
24
1
2
M
1
7
2
2
1
F
3
1
12
120
3
M
Community Mediation
M
F
1
6
26
8
3
5
750
497
9
0
F
1
3
8
47
21 Dodhara-Chadani
0
0
10
19 Punarwash
3
9
2
8
16
0
716
6
1
9
16
12 Jaya-Prithive
17 Parshuram
155
1
6
378
57
15 Patan
153
4
3
10
12
13 App
108
18
28
10 Kamalbajar 11 Badimalika
152
715
10
Saffe
149
1
Mangelsen
9
107
493
0
0
703
488
0
4
695
5
0
304
8
18
4
71
Dhangadi Sub-Metro 25 Tikapur
1
233
1 2
1
M
Number of Balbhela Organized
1646
2477
F
80% Members
1622
M
No. of working LSPs
24
GoodMediumTotal
Orientation Training to local CM No.of CM Centers
DDC-Achham
4
Total
CAC aligned in cooperative
UCPA
On-going
3
62
F
No. of DsMCC & their meetings
No. of CAC
DDC-Kailali
2
M
1 0r 2 day Exposur orientatin Visit at Existing working Number of at VDC out of SMs LRPs WCF Mg. CAC Mem. Membe
Completed
1
Total CACs
4th day Reflcet 3 day SM training at LRP SM RDTC level training LSPSMs LRPs Coordin
Total 1 year meetings
Name of LBs
6th day Basic SM CAC Categorazation training at RDTC level LSPSMs Coordin
Total DSMCC
S.N
CAC Led by ( Women Chair)
Total CAC members
Annex 2B DDC/VDC SM Databse As of FY: 2072/073
1
1
20
553
88
27
4
1
25
Annex 3A
282
288
3300000
0
0
1
0
0
0
0
6
184
18
166
184
4900000
0
0
0
5
3
0
3
1
46
304
129
175
304
5600000
25
0
0
0
6
0
0
0
0
31
188
67
121
188
2400000
173
26
0
0
0
5
5
0
0
0
36
213
61
152
213
3900000
3
216
13
5
0
0
6
3
1
6
0
34
312
66
246
312
3300000
4
3
435
23
0
1
0
9
9
1
0
0
44
492
58
434
492
5600000
0
0
0
160
8
3
0
0
8
3
0
0
1
23
185
9
176
185
1700000
0
0
0
0
12
2
0
0
0
0
0
0
0
0
2
15
0
15
15
400000
208
1
24
8
1793
170
14
1
0
49
23
2
9
3
271
2181
414
1767
2181
31100000
50 100
0
7
37
5
8
1
0
9
126
5
35
0
3
0
169
5
3 Achham
56 112
7
39
10
0
9
3
0
12
208
15
12
0
12
0
246
34
4 Bajura
24
48
19
5
0
0
7
0
0
7
117
8
24
0
0
1
150
5 Bajhang
42
84
15
24
0
0
4
0
0
4
161
3
8
0
0
1
6 Darchula
36
72
1
21
11
0
62
0
0
62
186
0
25
0
3
7 Baitadi
56 112
8
31
17
0
10
3
0
13
347
10
70
1
8 Dadeldhura
18
36
5
12
0
0
2
0
0
2
145
0
15
9 Kanchnapur
4
8
0
1
3
0
1
0
0
1
12
0
314 634
55
145
106
5
107
7
3
117
1439
112
Rabbit
Cow
Furniture
2 Doti
Total
34
Buffalo
232
Poultry
0
Pig
3
Goat
0
Total
20
Ginger
72
2072/73
137
2070/71
7
Total Amount
6
3
Total
288
0
Femal
49
4
Male
0
0
Total Projects
0
28
Total
Leather shoe
0
5
Bamboo
Carpet
0
0
Metal Workshop
Tailoring
9
62
Tent House
0
Mushroom
0
28
2069/70
Beneficiaries
6
1 Kailali
Total
Others
Hair Dreesing/Beauty par
Livestock/Dairy
Vegetable
Agriculture/Irrigat
2071/72
No of CACs
Total VDCs/Wards
S.N
Name of district
LIP Rece.CAC
Retail/Tea/Cosmetick/Meat shop
District/VDC Level Status of LIP up to 2072/73
8 Mangalsen
9 Sanfebagar
10 Kamalbazar 11 Badimalika
12 Jayaprithibi 13 Api
14 Dashrathchand 15 Patan
16 Amargadhi 17 Parsuram
18 Bheemdatt 19 Punarbash 20 Belauri
21 Dodhara Chandani 22 Jhalari
23 Bedkot
24 Krishanpur 25 Beldandi
Total
12
6
0
0
24
0
10
12
16
0
3
11 10 12
10 12
6
0 0
25
13 11 12
12 19
4
13
4
9
2
325
273
11
4
0
0
0
3
48
0
0
0
22
1
0
1
20
2
0
0
0
0
1
3
0
2
8
0
8
87
7
0
7
42
0
0
0
0
0
30
30
2
0
2
0
1
0
2
0
0
0
2 1 0
0
1
33
0
2
0
14
0
8
0
0
0
5
2
0
98
0
0
0
2
0
0 0
15
0
0
16
8
0
1
0
0
3
0 0 0
3
28
8
6
0
23
0
3
12
74
0
0
38
0
3
0
0
26
3
0
0
0
0
0
0
5
2
27
35 26 94
21
57
20
1.3 58.3
16
0
4
48
6
6
0
0
0
12
2
19
0
0
0
0
19
2
7
2
3
0
0
12
4
4
0
0
0
0
4
1
4
0
2
14
0
8 0
0
2
30
128
0
39
80 0 6
573
7
10
0
0
0
184
4 1
0
83
0 1 0
0 0
0
9
9
3
0 0
0
26
83 4 7
4
875
0
2
0
6
1
0
0
0
9
0
0
0
0
0
0
28
0
0
1
1
184
0
9
0
0
0
0
0
2
0
28
0
0
5
0
23
125
0
28
92
0
24
84.3
0
0
97
0
0
0
6
20
0
0
30
34
0
1
5
0
0
0
0
0
0
0 1
0
0
0
0
1
2
0
4
1
9
3 1
268
52
43 30
15
10
1271
91
1
126
127
0
28
28
0
0
0
5
11
36
36
114
1976750
15
29
65
40
25 22
27
15
29
65
45
35 33
32
75
92
46
2
28
30
0
20
0
34
0
5
75
800000
580745
580000 692500
500000
1180000
282000
43
95
457000
1020000
43
78
300000
52
0
1
200000
114
17
1
677000
300000
125
2
4083996
14
125
6
1595000
14
0
6
Total Amount
83
Total
Femal
Male
33
0
0
4
5
0
0
35
0
45
0
0
0
0
29
0
0 0
0
15
0
0
0
0
4
0
0
0
0
0
6
0
0
1
0
1
0
0
2
1
0
1
0
0
1
1
0
0
0
0
0
0
0
7
0 0
0
0
0
0
0
2
Total Projects
0
0
0
Total
Leather shoe
Carpet
Candle
Metal Workshop
0
0
0
0
0
0
5
4
0
0
32
0
0
1
10
0
0
1
35
10
0
0
0
0
0
0
65
0
0
0
7
12
0
0
0
0
0
0
114
0
0
0
37
28
0
0
0
10
0
0
0
14
1
0
0
0
0
3
0
0
0
1
0
0
0
36
0
13
0
8
127
0
0
1
0
0
91
14
0
0
0
0
24
0
0
1
2
0
0
1
0
0
0
0
0
0
0
Beneficiaries
0
0
4
0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
3
0
0
7
17 3
0
4
0 3
Tailoring
0
5
0
Auto Rikshwa
0
10
5
1
2
19
1
1
12
0
9
0
Tent House
18
108
0
5
Hair Dreesing/Be
Furniture
65
1
0
0
0
3
0
27
0
0
5
33
1
1
0
3
0
0
3
10
19
1
0
89
Retail/Tea/C osmetick/M
0
26
1
72
0
0
0
19
8
0
0
0
1
0
2
0
9
1
0
0
0
0
0
3
6
0
1
0
3
17
2
2
20
0
1
0
0
8
0
31
2
1
4
0
0
2
1
0
2
0
31
8
0
0
30
18
0
4
0
4
5
0
0
6 4
0
12
15 11
3
0
0
10
0
0
28
6
2
4
19 15
0
4
2
13
3
2
2
1
10
0
2
0
10
17
2
3
3
15
0
1
32
5
Total
0
14
3
2
0
Others
Buffalo
0
0
0
Cow
6
7 Dipayal Silgadhi
1
5
Poultry
13
6 Bhajani Trisakti
0 1
2
0
Pig
5 Ghodaghodi
4
0
0
Livestock/Dairy
Goat
8
Total
13 15
2
1
Ginger
3 Atariya
4 Lamkichuha
7
8
Vegetable
0
18
Agriculture/Irrig
2072/73
25
9
2071/72
2070/71
20
2 Tikapur
Municipality Status of LIP up to 2072/73
LIP Rece.CAC
2069/70
Municipalites
1 Dhangadhi
Total no of CACs
S.N
Total Mun/Wards
Annex 3 B
84
97
20
909600
2178290
1304000 300000
176000
14
15
320000
9
10
180000
1196
1271
20927881
34 5
245000 90000
Annex 3C
DDC & Municipality Budget Summary of LIP Grant (F/Y 2069/70 to 072/73)
S.No
1 2 3 4 5 6 7 8 9
S.No
District
No of VDCs
Kailali
28
Achham
56
Doti
Bajura
Bajhang
Darchula Baitadi
Dadeldhura
Kanchanpur
Total
Municipality
No of CACs
Budget
CAC Cover ed
Budget
CAC Cover ed
Budget
62
0
0
500000
5
2800000
23
112
700000
7
3900000
39
1000000
10
15
2400000
24
0
0
72
11
0
0
3300000
33
5
1200000
12
0
0
0
0
1700000
17
4
8
18 314
36
634
No of No. Wards of CACs 25
3
Atariya
13
8
Ghodaghodi
13
5 6 7 8 9
Lamkichuha
Bhajani Trisakti
Dipayal Silgadhi Mangalsen
Sanfebagar
10 Kamalbazar 11 Badimalika 12 Jayaprithibi 13 Api
14 Dashrathchand 15 Patan 16 Amargadhi 17 Parsuram
18 Bheemdatt 19 Punarbash
20 Belauri 21 Dodhara Chandani 22 Jhalari 23 Bedkot
24 Krishanpur 25 Beldandi Total
56
1100000
20
4
34
21
112
9
15 12
800000
8
500000 0
0
5500000
0
100000
55
14500000
CAC Cover ed
Budget
69/70
Budget
3100000
0
31 1
145
F.Y. 70/71
700000
200000
1
300000
100000
1
4
100000
1
0
0
6
0
0
0
0
6
0
0
0
0
1000000
10
12
16
0
0
300000
3
10 12
12 6
0 0
300000
0 0
3
300000 200000 0
4
200000
2
6
100000
1
4
0
0
28
15
6
15 10 11 13
4
0 0
0
0
100000
1
0
100000
0
0
0
0
4
4
2
9 2
300000
3
4
1400000
14
10
0
800000
8
8
300000
0
3
100000
1
0
71
100000 0
100000
100000
3400000
0
600000
6
600000
6
300000
500000
600000
0
200000
3
5
6
2
5 6 3 4 5 6 2
900000
9
19
2
0
300000
3
3
1
1
0
1
5
3
0
100000
200000
0
500000
3
0
1
0
7100000
0
2
0
19
0
0
200000
4
1900000
0
0
1
273
0
16
9
11
500000
0
9
8
100000
325
5
0
400000
CAC Total Cove CAC red Remaini ng
800000
0
0
200000
400000
2
9
0
0
0
200000
1
0
3
4
100000
2
300000
900000
900000
0
4 328
Total up to 2072/73
Budget
0
3
1
900000
100000
0
100000
0
0
3
2
4
9
11
0
0
19
0
8
19
2
306
56
13
800000
12
072/73
CAC Budget CAC Cove Cover red ed
31100000
4
39
12
0
0
5
400000
56
1200000
12
19
0
5600000
0
1200000
11
0
0
45
0
0
400000
0
24
100000
0
0
39
0
0
25
0
3900000
24
0
13
12
0
2400000
4
4
13
0
0
51
400000
400000 200000
56
2
1 2
5600000
2
100000 200000
0
200000
10 10
0
101 500000
0
49
3
15 17
3
1
0
0
17
100000
300000
24 10
0
0
14 11
71/72
7
8
100000
10600000
Budget
800000
0
300000
CAC Cover ed
18
0
1700000
0
4900000
28
2100000
56
0
5
3300000
1
0
500000
0
100000
36
Dhangadhi Tikapur
0
37
CAC Total Cove CAC red Remaini ng
19
5
3700000
Budget
1900000
500000
7
CAC Budget CAC Cove Cover red ed
Total up to 2072/73
48
1500000
700000
072/73
24
84
0
71/72
100
42
0
F.Y. 70/71
50
1 2
69/70
1
0
1
1
34
0
300000
0
200000
0
200000
3
2 2
0
200000
2
0
200000
2
0
500000
100000
5
12900000
1
129
3 2 2 2 1
2 144
Annex 4 A
Agriculture/Irrigation
Livestock/Dairy
Toilet
Community Building Cellar mill
Tent House
Tailoring
Metal Workshop
Bamboo
Leather shoe
Improved Cooking
Foot Trile
Monteswari School
Total
25
1
1
29
168
15
153 190
4 186
0
1
359
0
0
0
1
60
61
0 0
0
1
0
0
0
0
0
0
0
1
450
1559
1667
3226
9360000
2 Doti
50 100
3
35
12
50
0
1
0
0
1
0
0
0
0
2
424
0
424 136
0 136
32
0
592
0
2
2
8
0
8
4 6
1
0 34
0
0
0
0
0
0
45
649
2139
2280
4419
17925000
3 Achham
56 112
18
27
11
56
0
31
0
0
1
0
0
0
0
32
81
25
56
13
1
12
0
0
94
0
1
1
5
0
5
7 1
0
0
0
0
0
0
0
1
0
9
141
4500
4683
9183
19016981
4 Bajura
24
48
5
12
4
21
0
5
0
0
0
0
0
0
0
5
279
0
279
0
0
0
0
0
279
1
0
1
2
0
2
1 0
0
0
0
0
0
0
0
0
1
2
289
739
925
1664
7351113
5 Bajhang
42
84
12
19
11
42
0
72
0
63
0
0
12
0
0 147
296
0
296
21
0
21
26
0
343
2
0
2
17
0
17
4 0
0
0 10
2
0
0
30
0
3
49
558
4456
5472
9928
14198642
6 Darchula
36
72
9
16
11
36
0
11
0
0
4
25
1
0
2
43
0
0
0
0
0
0
0
0
0
0
1
1
5
0
5
2 0
4
0
8
1
3
1
0
1
0
20
69
2863
3080
5943
12553000
7 Baitadi
56 112
15
25
16
56
0
17
0
49
1
0
60
0
2 129
298
0
298
25
0
25 140
0
463
0
0
0
6
0
6
4 1
1
0
0
1
1
0
0
0
0
8
606
2768
3594
6362
18279038
8 Dadeldhura
18
36
4
9
5
18
0
2
1
30
0
0
25
0
0
58
75
0
75
1
0
1
27
0
103
2
0
2
5
0
5
0 0
0
0
0
0
0
0
0
0
0
0
168
1810
1765
3575
6509528
9 Kanchnapur
4
8
0
4
0
4
1
0
0
0
3
0
0
0
0
4
0
0
0
2
2
0
4
0
6
0
0
0
0
0
0
0 0
0
0
0
0
0
0
0
0
0
0
10
413
769
1182
1260000
314
634
71
170
70
311
2
140
1
142
10
25 123
1
5
449
1621
40 1581
388
7
381
229
1 2239
5
4
9
49
60
109
6
1
52
4
4
1
30
2
4
134
2940
21247
24235
45482
106453302
Total
8
Total
Femal
Male
Total
Milk Dairy
Collective
Collective
Total
22
Budget
Drinking water
0
Total Projects
Total
0
Water mill
MHP
0
Alt energy (solar)
Individual
0
Poultry farming
Project no.
1
Individual
1
Project no.
28
Total
Harba col. centre
0
Fish farming
Bee- keeping
23
Vegetable col. centre
5
Fruit Farming
62
S.N
Shallo Irrigation
28
2072/73
1 Kailali
2070/71
Mushroom
Beneficiaries
Vegetable
Pig shed
Others
WASH
Cannel Irrigation
Goat Shed
Solar/MHP
CIG recived CAC
CIG 2071/72
Total no of CACs
Name of district
Total VDCs/Wards
District/VDC Level Status of Community Infrastructure Grant Fiscal Year 2070/71 to 2072/73
Annex 4 B Municipality Status of Livelihood Infrastructure Grant (Fiscal Year FY 70/71 to 72/73)
6 Bhjani-trishakti 12 7 Dipayal Silgadi
14
8 Mangalsen
11
10 Kamalbazar
10
9 Saffe
12
11 Badimalika
12
13 Api
17
12 Jai Prithibi
14 Dasrat Chand
14
0
8
0
8
1
0
3
0
5
0
12
6
12
11
19
0
8
6
28
4
13
4
25 Beldandi Total
11
9
11
1
1
10
15
2
4
21 Dodhara
24 Krishanpur
1
0
12
15
23 Bedkot
2
5
25
10
19 Punarbas
22 Jhalari
1
325 273
13
3
11
0
9
0
1
2
9 109
24
0
0
0
0
3
0
2
0
1
0
30
0
0
1
0
0
42
0
3
0
0
1
0
0
1
59 121
0
0
1
25
0
0
0
0
0
0
0
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
52
0 188
0
30
0
0
0
15
25
0
25
0
0
0
3
0
0
0
0
0
2
0
0
0
0
0
0
1
0
1
0
0 113
0
34 188
0
0
0
0
0
2
0 258
0
0
0
0
2
3
0
33
0
0
0
0
0
0
0
2
0
1
0
0
29
47
0
0 0
3
0
0
0
5 245 951
0
0
0
0
0
1
0
0
0
0
0
2
0
95 856 117
2
0
0
0
0
24 25 0
0
35 1
0
0
0
0
0
0
0
0
0
0
0
35 78 178 178 159
0 0
0 0
0
0
0
0
0
1
0
3
0
0
0
0
1 0
0
0
0
0
0
0
0
0
4
0
69
0
0
0
59
0
0
0
1
0
0
0
0
0
0
0
1
0
0
0
0 0
0
0
0
0
0
0
1
4
10
256
0
191
1198
1177
5
54
1092
1215
2307
0
22
501
385
886
0
11
17
2
0
2
0 0
0
0
0
0
0
52
1
0
1
0 2
0
0
0
0
25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
6
1
2
0
3 1408
0 0
0
0
0
0 9
0 0
0
0
0
0
30
0 0
0
0
0
0
39
0
0
0
0
0
0
0 0
0 0
0
0
3 2
1 0
3
0
0
0
0
5
2 0
0
0
0
0
0
0 7 0
0
0
0
0
0
2 11
0 0 0
2
0
0
0 6
2
0
3
451
654
1009
1575000
565
1067
1845000
882
1725
670
673
21
311
348
85
880
3
4
171
140
34 14
2520000
659
1820000
910
1790
1975000
164
335
765000
713
162
74
32
172
3
155
199
29 1721 10652
1327
4510000
1133000
115
65
1121
943
2
2
945000
1407510
499
40
1260000
274
444
492
Total Amount
Total
843
1
0
Femal
124
0
0
331
0
0
0
0
630000
502
145
0
0
0
188
259
102
0
0
0
0
979
139
2835000
505
0
0
143
453
3075000
786
504
0
0
526
1679
5
0
0
3
367
0
0
120
9
0
0
50
881
411
150
0
0
375
124
0
0
798
57
43
0 0
0
0
0
0
0
3
14
0
0
0
0
0
0
0
0
3
162
1
0
1
0
0
0
0
0
0
212
0
0
85
0
0
0
3
106
0
0
0
0
0
0
0
0
0
0
0
143
0
0
0
0
0
0
47
40
357
0
0
50
0
0
0
1
1
0
0
0
1
0
0
0
5
0
0
0
25
0
3
0
52
0 14
2
0
52
0
2
0
0
0
12
0
17
0
0
0
66
0
24
0
0
97
0
0
0
0
0
30
0
0
30
0
47
0
0
0
30
0
7
0
0
0
30
0
0
0
5
0
0
0
0
0
5
1
0
0
0
0
0
0
0
0
14
2
0
0
0
0
12
4
88
0
0
0
0
8
0
0
88
7
0
0
0
0
0
51
Male
0
0
3
0
14
1
Total Projects
52
0
0
0
0
1
Total
18
0
0 16
0
Hand Crafts
0
0
0 25
16
9
Beneficiaries
Taloring
0
0
25
50
0
Aggrigate Collection Centre
0
0
25
0
0
Metal Workshop
85
0
0
0
Water mill
85
2 113
0
0
Community Building
16
0
1 258
26 14
4
Others
Total
0
0
0
0
40
0
Toilet
0
0
0
50
0
0
Drinking water
0
0
0
3
10
Total
0
0
0
0
Milk Dairy
0
Total
2
0
14
WASH
Poultry farming
Banana Farming
Fish farming
Bee- keeping
Vegetable colct. centre
Vegetable
Cannel Irrigation
2
13 131
1
15
0
0
0
0
4
0
0
15
1
0
1
0
2
1
0
0
0
0
0
0
0
4
0
0
0
2
40
2
2
0
0
0
0
2
2
40
0
0
0
2
0
15
7
2
0
0
3
0
0
2
4
0
0
30
3
25
0
0
0
0
0
0
0
0
0
0
0
5
10
0
0
2
0
6
1
1
0
1
0
0
6
0
3
3
1
2
9
6
0
0
0
1
0
0
0
0
13 0
0
0
0
0
5
6
3
4
0
1
0
0
2
4
0
6
4
0
1
0
0
0
0
0
Individual
4
16
2
4
0
5
Project no.
10
0
24
0
0
2
13
19
Shallo Irrigation
0
10
2
2
5
12
CIG recived CAC
0
2
4
0
0
17 Parsuram
20 Belauri
2072/73
2071/72
2
6
0
2
10
13
18 BhimDatt
0
6
7
9
15
15 Patan
16 Amargadi
4
0
0
0
Individual
13
0
4
7
9
Collective
5 Godaghodi
8
15
0
Project no.
13
4 Lamki Chuha
0
18
Individual
3 Attariya
25
9
Goat Shed
Collective
20
Livestock/Dairy Cow/Buffal Pig shed o shed
Project no.
1 Dhangadhi 2 Tikapur
Agriculture/Irrigation
Total CACs
S.NName of Municipality
2070/71
Total Mun/Wards
CIG
95
1205 2375
302
108
1915000 4120000 3234000
2835000 945000
945000
630000
46
630000
160
315000
287
354
630000
630000
11662 22314 43124510
Annex 4C
DDC & Municipality Budget Summary of CAC Referred Community Infrastructure Grant (FY 70/71 to 072/73) S.No
District
CAC Covered
Budget
CAC Covered
Budget
62
2115000
5
7245000
23
0
112
7761981
18
5133642
28
3
Achham
56
4 5 6 7 8 9
Bajura
Bajhang
Darchula Baitadi
Dadeldhura
Kanchanpur
50
100
24
48
42 36
2 3 4 5 6 7 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
84 72
56
112
4
8
18
36
1092000
3
12
5985000
19
3080000
11
14198642
6372038
15
7875000
25
4032000
16
0
0
1260000
4
0
0
2131113
5
3553000
9
1734528
4
Total CACs
Budget
CAC Covered
25
870000
2
8
0
0
6
0
0
Atariya
13
Ghodaghodi
13
Tikapur
Lamkichuha
Bhajani Trisakti
Dipayal Silgadhi Mangalsen
Sanfebagar
Kamalbazar Badimalika
Jayaprithibi Api
Dashrathchand Patan
Amargadhi Parsuram
Bheemdatt Punarbash Belauri
Dodhara Chandani
Jhalari
Bedkot
Krishanpur Beldandi Total
15
4
12
F.Y. 70/71
0
0
12
430000
15
10
0
13
25
12 17 13 11 12
6
10
1
6
0
0
0
0
11 13
4 4 4
0 0
9
2
0
324
273
4620510
11
4
0
0
3
0
945000
0
450000
0
4
8
4
6
1260000
2520000
1
14
15
0
9
1575000 315000
315000
5
106453302
311
323
Total up to 2072/73
Total CAC Total CAC covered Remaining
16
0
1260000
4
4
0
945000
0 0
2835000
9
9
630000
2
2
1407510
4
2
3
3
4
4510000
14
10
0
2520000
8
8
0
1575000
5
5
1915000
6
4
1
4120000
13
12
2
3234000
10
9
0
2835000
9
19
0
945000
3
3
0
2520000
8
714000
0
2835000
0
945000
2
5
1
0
0
0
9
0
0
0
0
0
945000
3
0
0
630000
2
0
0
3
0
2
0
2
0
315000
1
11
34650000
109
630000
4
18
1
340000
0
4
18
6
12
630000
1260000
6509528
36
6
3780000
630000
56
36
1845000
0
0
56
12553000
4
340000
0
18279038
27
9
0
0
5
315000
42
21
1100000
1
1575000
1575000
42
7351113
1
0
945000
50
56
3075000
0
0
50
34
0
0
0
28
56
CAC Budget Covered
7
0
400000
70
2205000
1360000
1
5
CAC Budget Covered
10
12
0
Budget
11
F.Y. 72/73
3150000
2
28
21382000
0
875000
19
170
F.Y. 71/72
4
3960000
1800000
2
10
0
55178000
1440000
9
630000
2
19
2975000
2
818000
0
16
630000
0
0
5040000
0
0
16
12
2835000
10
0
3780000
0
2
12 10
71
777510
24
11
29893302
6
14
17925000
19016981
No of Wards
18
12
11
Municipality
9
4320000
9360000
2750000
634
20
35
0
Total CAC Total CAC covered Remaining
27
314
Dhangadhi
12513000
CAC Budget Covered
Total up to 2072/73
8505000
Total
SN
1
F.Y. 72/73
Budget
Kailali Doti
F.Y. 71/72
No of VDCs
1 2
F.Y. 70/71
Total CACs
2
0
0 3854000
0
0 0
1133000
1820000
1975000 765000
3
4 6
2
945000
3
630000
2
630000 630000
2 2
3 6 6
2 3 2 2 2
0
315000
1
1
12
43124510
132
141
0
630000
2
2
Annex 5
SN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
STATUS OF TRAINING/WORKSHOP/ORIENTATION ORGANISED/FACILITATED BY CSO & MoFALD/DoCR Level Total Participant Number of Participants No. (DL/ML of /VL/RL event Dalit Janjati Others Total Remarks Training/workshop/orientation ) M F M F M F M F District Level Orientation 18 5 33 3 192 52 243 58 DL 1 Mun. Level Orientation 15 14 27 27 88 62 130 101 ML 1 VDC Level Orientation 262 226 216 96 2671 686 3149 1008 VL 1 District Level Dialogue 59 21 24 4 400 72 483 97 DL 1 Mun. Level Learning & Sharing 11 6 28 6 89 46 141 46 ML VDC Level Learning, Ssharing & Review Meeting 282 195 145 75 1401 1015 2156 974 VL VDC One Day Capacity Development Training WCF, CAC & VL SM 278 226 153 102 2143 903 2577 1229 Mun. One Day Capavcity Development Training WCF,CAC ML & SM 17 20 14 26 88 61 119 107 Awareness on Citizen Entitlements Civic Oversight 302 528 91 203 1966 976 2329 1738 VL Public Hearing (DDC ) 126 83 37 111 908 332 1064 554 DL Public Hearing (Mun ) 63 29 42 8 436 99 450 136 ML Public Hearing (VDC) 479 272 89 56 2535 672 3102 1001 VL Social Audit (DDC) 14 4 5 2 78 11 97 16 DL Social Audit (Mun) 15 3 3 0 62 17 80 20 ML Social Security Training DDC & Mun Staff) 1 0 4 0 8 1 13 1 RL MIS VERSS Training (DDC & Mun Staff) 0 0 3 0 27 1 30 1 RL Social Security Performance Audit Orientation 15 4 5 3 54 15 74 22 RL Number of ICT training conducted to local body staffs DL 1 96 0 0 0 0 0 0 392 Number of ICT training conducted to social mobilizers DL 1 0 0 0 0 0 0 31 62
20 Number of ICT training conducted to local schools/ clubs
VL
1
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
DL
RL RL DL/RL VL DL DL VL ML DL ML DL VL ML DL VL ML DL
1
Number of ICT training conducted to other government 21 agencies
41 42 43 44 45 46 47 48 49 50 51
6th Day Basice SM training 4 Day SM Reflect 3 Day SM training for LRP/Volunteers 1 or 2 day orientation to WCF management Exposure visit of CAC member in Kailali Exposure visit of CAC member in Kanchanpur
training on CFLG for WCF and CAC member training on CFLG for WCF and CAC member training on CFLG for WCF and CAC member Number of people who received training on EFLG Number of people who received training on EFLG Number of people who received training on GESI Number of people who received training on GESI Number of people who received training on GESI Number of LB's staf who received training on MCPM Number of LB's staf who received training on MCPM Number of LB's staf who received training on MCPM Support for preparation of Building bye-laws and code Support for preparation of Building bye-laws and code Integrated Training manual on By-Laws and NBC Pre-testing (1st round) training at Kohalpur GESI and GRB Training Manual Pre-testing at Kohalpur Revenue Improvement Action Plan (RIAP) Mason Training Office Management Training Number of LDOs and EO swho participated training in the LBs' staff who received training on cost effective housing L Bs' staff received training on disaster risk reduction L Bs' staff received training on disaster risk reduction Number of Engineers/designers/masons who received training Results Based Planning Total
2 1 10 1 1 1 1 1 1 1 1 1 1 1
ML Ml RL
RL RL ML RL
ML ML DL ML/DL RL 1 33
0 0
0 0
0 0
0 0
0 0
0 0
110
22
13 10 1 7560 9 14
227 385 159 10 49 28 354 141 37 10 1 91 98 10 10 12 27 7 34 12 39 27 136 25
90 4
50 22 294 6624 53 12
161 310 94 24 35 3 143 54
13 31 2
Supports by GIZ CD2 MUN
3 1 0 0 0 0 0 0
1957 1636 919 722 13146 5021 26328 15292
Annex 6 Field Visit Summary of RCU Professional Vanue of visit Activity
Dadeldhura, Bajhang Baitadi
Name of staff
field visit RL & LED Exper RSM & CM Expert RSP&VR Officer)
Lamkichuha, field visit Masureya , Mastamandu VDC, Ashigram, Amargadhi Munnicipality,A margadi ward No. 6 Bhalumare.
RSM & CM Expert RL & LED Expert RSP&VR Officer
Date of visit
Findings, issues and recommendation
findings
Issues
Recommendation
23th to 27th January 2016
• WCF member were directly involved in the monitoring of social security and distribution of allowance for the senior citizen. Due to the monitoring made by WCF some of 10% fund has been saved being misused. • The CAC members of Dewolek and Syadi VDCs were organized in cooperatives supported by UPAP. The coordination between SMs of UPAP and LGCDP seems quite emerging. • The VDC secretary shows the register of such duplicated citizen and was cut from the record.
• LBs heads and SDOs need to develop regular contact with SM coordinator and also frequent monitoring of their regular activities, • SM coordinators need to increase their cluster visit and make close coordination with SMs, Coordinators of WCF and CAC, • It is observed that effective coordination and linkage among development partners is still lacking due to different development stakeholder have their own separate guideline, manuals,policie and interest
• In order to enhance the coordination and linkage of LGCDP activities that all SM coordinators need to participate regular monthly meeting of VDC secretary. The CIG/LIP and WCF categorization and completion of UCPA activity should timely with leadership of SM Coordinators. • Recruitment process of SM vacant need to initiate fulfillment of SMs in the close coordination of DSMCC and LSPs • D/MSMC should take a coordination role among the different stakeholders working in district, especially in the field of social mobilization.
2nd to 5thApril 2016.
• Lamkichuwa Municipality has started link with FNCCI for solid waste management, • CACs are able to access on the resources of other development partners eg. agriculture, livestock, cooperatives and forestry, reducing the unallocated budget (abanda) system by all LBs,
• It is difficult to make effective coordination and linkage among development partners due to different development stakeholder have their own separate guideline, manuals and policies, • Difficult to link ReFLECT classes to other development stakeholder partners, • As of last year 11 VDCs were not qualified to MCPMs result, • VDCs are facing difficulty to manage salary/remuneration annual operation cost, • Internal income of LBs is decreasing way, • Less experienced consultant for MCPM exercise, • Soil erosion/river training, high presser of landless population (Sukambashi) in Lamkichuha,
• MoFALD should coordinate with all DPs for follow the national guideline i.e social mobilization guideline 2071 • Expand the LIP, CIG resources in all ward through CAC as MTR team also realized, • Respected DDCs should monitor activities of VDCs and provide instruction for good result of MCPM. • It would be better to provide additional grant by MoFALD to the low income VDCs. • Priority to invite the local political party representatives in the planning priorities exercises, • Make provision of WCF members at least two year staying in the forum, • Sensitized the LGCDP module in all wards level, • Capacity enhanced of programme alliance partners,
DDC field visit Dadeldhura, Mastamandu VDC, Ganeshpur VDC, Ashigram VDC and CAC in war No.10 of Amargadhi Municipality. Bajhang, Baitadi
BB-RSM & CM Expert NSB- RL & LED Expert
field visit Bhagirath Bhatt
28 to 31 March , 2016
• Reducing the Chhaupadi ParthaUnmulan, active participation in planning process, feel free to speak, able to pull resources from others, started regular meeting, start to small scale income generating activities, linking to other institutions, reducing of cast discrimination, able to solve local level dispute and increasing leadership towards the CAC memers
• Provision of 35% target budget was not covered as per guideline. Maximum VDC grant goes to small scale infra projects and school buildings, which is not in the line of PFM and resource management guideline, • LBs are facing the human resource management, Budget allocation (grant/internal), office building, less coordination among political party and development partners, failed in MCPM, documentation etc. • The accounting software package was not properly function in Ganeshpur.
• All LBs should provide budget celling, planning prioritization, guideline to WCF coordinators before start ward level planning, • Provision should made to organize LLP training events to all WCF coordinators, IPFC members, local level political representatives, CAC members before start ward level planning exercises, • Maintained the accounting package system, update social security related database,
17th June to 23th June 2016.
1. All participants are belongs female and able to better understanding in their role and responsibility through three day basic SM training with 12 sessions, 2. Bajhang & Baitadi districts has fallow the SM guideline in the selection of LRP/Volunteer. 3. Training management was satisfactory in the lodging and food for participants.
o Less coordination between LSP-SM coordinators and Social Development officer in the implementation of activities in both Baitadi and Bajhang. o As of date LRP/Volunteer did not received appointment letter for their respective LSPs in both districts. o Cluster-wise LRP/Volunteers record was not maintained by respective SM coordinators of both district. o It is seems that child care takers number is high in both districts during LRP training. o Vacant post of SM was not fulfill in Bajhang. o LIP grant Rs. 19000/- has been default due to death of loony member of Dehemandu CAC VDC. o LIP grant Rs. 16000/- has been default due to house collapse by land slide in Kulawa CAC VDC.
1. Local Service Provider- SM coordinators should increase their role at field level with VDC secretary, SMs and other development partners. 2. DDC Bajhang should take immediate action to fulfillment of vacant SMC post. 3. LDO of Bajhang has been committed to expenditure all SM activity budget before the end of this FY. 4. CAC should manage them self regarding in case fo death of LIP loany and disaster event occoured.
Bhimdatt Municipality ward no. 10 & 11 of Kanchanpur, RDTC Punna, Doti, Betalmandu and Bagarkot VDC of Dadeldhura
field visit Bhagirath Bhatt (RSM & CM Expert),
1st to 6th 1. CAC member are able to start small business May through CIG projects, 2016. 2. CACs are able to capture the resources form other development partners eg. Agriculture, livestock, cooperatives, forestry, 3. Cluster meetings conducted and developed good practice of SM progress sharing and issue identify, 4. No. of 32 SM and LSP coordinators are orient on ReFLECT process.
o The CIG project of Milk collection center and Aron project are not properly identified according to local level raw material and market demand . o Some CAC members have knowledge on LIP and CIG Budget. o Business capacity of CAC member is very weak. o RDTC management seems weak management . o The participation of local level development partners are not seems during the both cluster meetings. o SM coordinators role is weak in the effective service implementation and build of coordination, linkage, technical support to VDC, DDC and SMs.
1. It is important that cluster meeting should be held at least trimester period. Similarly cluster meeting should cover all local level development partner either they come from NGO or INGO and Govt. programme. 2. CAC members should organized Mass Vela in the participation of WCF members, District livestock office, Local Development Office, Municipality Office and other local milk collectors for the well-functioning of Milk collection business at ward no.11 of Bhimdatt, 3. RDC Doti should provide clear massage to participants about daily allowance, hands-out, lodging and food extra. Similarly managed well trained trainers at RDTC. 5. Local Service Provider- SM coordinators should increase their role at field level with VDC secretary, SMs and other development partners.
RDTC Puna
field visit BB-RSM & CM Expert
6th to 10th 1. All participants are belongs female and able to better understanding in their role and responsibility June through three day basic SM training, 2016. 2. Doti and Dadeldhura districts has fallow the SM guideline in the selection of LRP/Volunteer. 3. Training management was satisfactory in the lodging and food for participants.
o Less coordination between LSP-SM coordinators and Social Development officer in the implementation of activities in Doti. o SM coordinators role is weak in the effective service implementation and build of coordination, linkage, technical support to VDC, DDC and SMs. o As of date LRP/Volunteer did not received appointment letter for their respective LSPs in Doti. o Local Service provider (ISDS) has not fulfill the vacant post of SM coordinator as of date
1. Local Service Provider- SM coordinators should increase their role at field level with VDC secretary, SMs and other development partners. 2. DDC Doti should take immediate action to fulfillment of vacant SMC post of ISDS. 3. LDO has committed to all SM activity budget will be expenditure before the end of this FY.
DDC Kanchanpur and Bheemdutta
field visit KRBRVRSPO DPB - ICTVE
May 2425, 2016
• Due to long absence of EO at Bhimdatt MUN there is no • Suggest to acting EO do priority & importance activity first budget expenditure & progress development related based on suggestion & agreement of all political parties. activities. • Give priority to connect internet at office. • Problem in MIS entry at Bhimdatt MUN. • No internet connectivity at MUN official due to internal conflict of MUN.
DDC Achham, field visit DPB-ICTVE Mangalsen and Sanfebagar Muns
May 2-8, • Started website update of MUN by assigning 2016 responsible official for website update. • Setup Local Area Network (LAN) at both Municipalities. • Setup up file & folder sharing system for all official at MUNs. • Support in MIS VERSE system.
Belauri and field visit DPB-ICTVE Punarwas Mun
March 24, 2016
DodharaChandani
field visit DPB-ICTVE
April 17- • Started website update of MUN by assigning 19, 2016 responsible official for website update. • Setup Local Area Network (LAN) at both Municipalities. • Setup up file & folder sharing system for all official at MUNs. • Setup network printer/sharing printer based on MUN official need.
Godaghodi and field visit DPB-ICTVE Lamki-chuwa
March 17- • Started website update of MUN by assigning 20, 2016 responsible official for website update. • Setup Local Area Network (LAN) at both Municipalities. • Setup up file & folder sharing system for all official at Ghodaghodi & Lamkichuha MUNs. • Setup network printer/sharing printer based on MUN official need. • IT support to individual MUN official laptop/desktop based on their need and requirements. • Support in MIS VERSE system.
• There is no computer for each participants, due to limited number of computer it's difficult to manage practical session. • The internet connectivity very slow due to it difficult to manage practical on website MIS. • Observed IT skill of participants it very short training period. • Participants/LBs official are very interested about the training its very short period. Their need is 5/7 days daring on ICT related.
• Training should be necessary for IT staffs who working with MIS & website. Providing detail training on website and MIS for new MUN officials. • For effective learning training should be organized at regional level.
There is no computer for each participants, due to limited number of computer it's difficult to manage practical session. The internet connectivity very slow due to it difficult to manage practical on website MIS. Observed IT skill of participants it very short training period.
Training should be necessary for IT staffs who working with MIS & website. Providing detail training on website and MIS for new MUN officials. For effective learning training should be organized at regional level.
There is no computer for each participants, due to limited number of computer it's difficult to manage practical session. The internet connectivity very slow due to it difficult to manage practical on website MIS. Observed IT skill of participants it very short training period.
Training should be necessary for IT staffs who working with MIS & website. Providing detail training on website and MIS for new MUN officials. For effective learning training should be organized at regional level.
There is no computer for each participants, due to limited number of computer it's difficult to manage practical session. The internet connectivity very slow due to it difficult to manage practical on website MIS. Observed IT skill of participants it very short training period.
Training should be necessary for IT staffs who working with MIS & website. Providing detail training on website and MIS for new MUN officials. For effective learning training should be organized at regional level.
Jhalari-Pipladi
field visit DPB-ICTVE
April 7-9, • Started website update of MUN by assigning 2016 responsible official for website update. • Setup Local Area Network (LAN) at both Municipalities. • Setup up file & folder sharing system for all official at MUNs. • Setup network printer/sharing printer based on MUN official need. • IT support to individual MUN official laptop/desktop based on their need and requirements. • Support in MIS VERSE system.
There is no computer for each participants, due to limited number of computer it's difficult to manage practical session. The internet connectivity very slow due to it difficult to manage practical on website MIS. Observed IT skill of participants it very short training period.
Training should be necessary for IT staffs who working with MIS & website. Providing detail training on website and MIS for new MUN officials. For effective learning training should be organized at regional level.
DDC
field visit DPB-ICTVE
February 13-15, 2016
The internet connectivity still slow for MIS data entry. Newly reburied staff for MIS no training on it. DDC website training needed for computer operator and DDC staff for regular website update. For successfully delivery of DMAS training to Sectoral offices there no trained staffs at DDC.
Training and orientations should be necessary for IT staffs who will working with MIS. Ministry (MoFALD) should be delivered website as soon as possible with proper training. To complete run MIS and Banking system for LBs allocated budged and training for ICTV and LBs responsible officer. There need of regional level DPMAS training for DDC officials to successfully delivery to Sectoral offices.
Bhajanifield visit BKP-RGSIE trisakti/Ghodag hodi/Lamkichuwa and Tikapur Municipality
14 to 16 As per the observation all the CACs are placed in February well targeted settlements from all the ethnicity 2016 group i.e Dalits, Tharu/Chaudhary and other disadvantage community. Nearly, 100% women are involving in the CAC.
1. Financial records not properly kept in case of Bhajanitrisakti ward no.10 2. LSP SM coordinator and SM mobility is very nominal in the field in case of ward no. 4 of Bhajani-trisakti. 3. Lack of knowledge on role and responsibility of WCF member to new WCF member. 4. Only eight members have got CIG support out of 25 member for pig farming and goat pen in ward no. 3 Tikapur Municipality.
Belauri and field visit BKP-RGSIE Punarwas Mun
02 to 05 March 2016
1. 18 CAC members are engaging vegetable farming in group however, work division among the members is not divided properly. Therefore, there may be disputes among the member. 2. Lack of knowledge on GESI/GRB to the Municipal personnel, Political leader and Sectoral agencies. 3. Lack of knowledge on role and responsibility of WCF member to new WCF member.
1. SM's needs to coach on proper financial record keeping to the CAC member. 2. LSP coordinator should visit in the field and monitor SM activities as per programme mandates. 3. LSP coordinator and SM should give orientation on the role and responsibility of WCF member at least on WCF monthly meeting. 4. Only eight member have benefited from the CIG support. Therefore, SM and LSP have to make clear how to benefit other members from this grant.
All about 25 to 30 participants were participated in this audit. The mun have find-out their weakness and strengthen in GESI related indicators and realized.
1. LSP/SM's needs to regular visit in the CAC and facilitate to manage the work and proper finance recording. 2. At least two days orientation programme need to be conducted on GESI/GRB before GESI audit. 3. LSP coordinator and SM should give orientation on the role and responsibility of WCF member at least on WCF monthly meeting.
Bhajani-trisakti field visit BKP-RGSIE Mun
25 to 26 all the staffs and related participants get attention April 2016 actively and engaging to audit of the municipal's from GESI perspective. The Municipal have get total 35 score out of 96. According to all the indicators the Municipals seems very poor in six indicators and median in remaining two indicators.
1. Lack of knowledge on GESI/GRB to the Municipal personnel, Political leader and Sectoral agencies. 2. Some qualitative indicators are difficult to measure 3. Even Municipal staff doesn't aware on the national and international convention and commitment of government. Then how to LBs implement the action plan
1. MoFALD should organize capacity development programme regarding GESI/GRB in Municipal level for common understanding on GESI/GRB and GRBA. 2. Need to revise on indicators. 3. MoFALD should conducted the programme about new issues, commitment and convention to the LBs and share action plans. Similarly, give instruction for proper implementation by LBs.
Parsuram Mun field visit BKP-RGSIE
28 to 30 • Built up common understanding about GESI April 2016 concept, GRB and GRBA among political parties, sectoral agencies and municipal staff. • Learnt the differences of the target group budget and GRB. • Political parties and staffs realized the importance of GRB and GESI mainstreaming during planning process, implementation and result mapping. • Prepared action plan for further action. • Findings weaknesses and strengthening of the Municipality. • The Municipal gets 51. 50 score out of 96 in the GESI audit
1. Lack of knowledge on GESI/GRB to the Municipal personnel, Political leader and Sectoral agencies. 2. Some qualitative indicators are difficult to measure 3. Even Municipal staff doesn't aware on the national and international convention and commitment of government. Then how to LBs implement the action plan.
1. MoFALD should organize capacity development programme regarding GESI/GRB in Municipal level for common understanding on GESI/GRB and GRBA. 2. Need to revise on indicators. 3. MoFALD should conducted the programme about new issues, commitment and convention to the LBs and share action plans. Similarly, give instruction for proper implementation by LBs.
Mangalsen, field visit BKP-RGSIE Safebagar and CAC visited ward no. 1 and 2 of Sanfebagar
02 to 08 • Built up common understanding about GESI May 2016 concept, GRB and GRBA among political parties, sectoral agencies and municipal staff. • Learnt the differences of the target group budget and GRB. • Political parties and staffs realized the importance of GRB and GESI mainstreaming during planning process, implementation and result mapping. • Prepared action plan for further action. • Findings weaknesses and strengthening of the Municipality.
• Bank account is not changed so far in the Bartadevi CAC ward no. 9. • LIP grant distribution record is not properly maintained and NRs. 19,000 given to the each five member instead of NRs. 20,000 in Bartadevi CAC ward no. 9. Moreover, NRs. 30,000 for management cost record is not kept and all the member have not known about this budget clearly. • The drinking water project is not completed so far. However NRs. 450000 have already expended in the case of ward no. 1 Bajinath CAC. • Still CAC have not success to avoid mal-practices like Chaupadi system (especially goth) and Child marriage in the case of ward no. 2 Kaparmandu (Jalpadevi).
• LSP should facilitate to change the account in new SM's name. • SM should kept all the financial transaction clearly in the registered and SM coordinator have to facilitate accordingly. • SM, Sanfebagar Municipality and LSP should coordinate with other stakeholder for the drinking water project as soon as possible. • SM should facilitate for the reduction of social evils frequently
DDC, Darchula field visit BKP-RGSIE and Dashrathchand Mun
26 to 30 June 2016
• Irregular participation of the participants due to the closing month and no provision of the DSA from LDTA. • No ownership seen of the DDCs Darchula. • Resource person not available from MoFALD or LDTA
• It would be better to give all the responsibilities of GRB/GESI orientation training programme to the DDC Darchula instead of the LDTA. • LDTA should manage the resource person from national or regional level to make the programme more effective. • The training should be organize on first quarter of the year. Because it will be effect on the planning process through perspective of Gender Responsive Budget (GRB).
DDCs, API Mun field visit BKP-RGSIE KRB RVRSPO
16 to 21 March, 2016
1. SM Coordinator of RDTC, Doti is not in the duty station since 15 days and not formally resigned. 2. GRB committee is not in function in Doti and Darchula DDCs. 3. Difficult to measure qualitative indicators during GESI budget audit.
1. SM Coordinator of RDTC, Doti is not in the duty station since 15 days and not formally resigned. 2. GRB committee is not in function in Doti and Darchula DDCs. 3. Difficult to measure qualitative indicators during GESI budget audit.
DDC, Jhlarifield visit KRBPipladi/Bheemd RVRSPO utta Municipality
23 to 25 February 2016
1. Some Weakness in CAC record keeping 2. Only the limit member knows about the received fund and its use. 3. Not the strategy for sustainability of group business and member's role. 4. Not clear idea of sustainability after CAC graduation or after LGCDP left out. 5. Nominal women are aware on target group budget and creation of demands during planning process.
1. LSP Coordinator & SM's needs to financial based coach to CAC members 2. LGAF/CSO make their role on to empower the WCF & CAC member on oversight function. 3. LGCDP need to take strategy to make uniformity, legality and sustainability of CAC after the graduation and LGCDP left out.
DDC and Mun.Bajura
field visit KRBRVRSPO
02 to 04 February, 2016
• Second installment social security allowance is not distributed so far in the DDC Bajura and Badimalika mun. • Lost amount was not distributed in the VDCs. • There are not Sufficient staff
• Second installments of social security should distribute as soon as possible. • LBs need to focus on their duty station to serve the people. And LSP also support about the LBs planning process, monitoring and information collection.
field visit
28 to 31 March, 2016
• Internet problem in VDC level for MIS update • Weak Trimester monitoring from DDC
• It would be better to support on MIS entry • Close monitoring needed in VDC level from DDCs.
Kathmandu
NAC Narendra meeting Singh Bista (RL&LED Expert)
8 June to 10 June 2016
Nepalgunj/Bank Coordina NSB-RL&LED 26-27 To revitalize and regularize DSMCC meeting, e tion Expert May 2016 CDP district team & LGCDP district team, regional meeting BB, RSMCME level CDP & LGCDPs have to made rigorous discussion. Common agenda should be prepared regularly by CDP and LGCDP prior to the commencement of DSMCC meeting in the district. Kathmandu
Mobile DPB -RICTVE March 24applicati 29, 2016 on develop ment training
Banke,Kohalpur Gender BKP-RG&SIE Responsi ve Budget
30 January 2016 to 3rd February 2016
22 participants were participated, of which six were women, Build up common understanding about GESI/GRB among participants
• Due to the budget scarcity prioritized programs as envisioned in SIP is reduced for FY 2016/17. The weightage of budget is not seen widely spread across all output. • In presentation of FCGO, airier status in LB was same as last consequent years. No changes in observed in its nature. • LIP and CIG budget is not allocated for next FY, which hampered to implement Social Mobilization Program in which economic empowerment of DAG people is affected. • Inadequate coordination between LGCDP and RRN in
• Budget allocation across the all output as per the priority area of SIP would be better for next FY. For this lobbying, with DPs is to be kept continue. • To reduce and improve the status of airier in LBs, MoFALD need to hold strong monitoring and instructions. • To improve the service delivery system, supply side need to be strengthened, for this capacity development programs support need to be in place for next FY. • Each RCU need to keep all reports in place for making available as and when required to any level stakeholders. •• Field visit reports meeting of all staffs need mention clearly about The coordination with RRNtoand RCU Dhangadhi and
• Training period is very short for learning. It is fast track mood for learning.
• Confidence to develop or support to development of mobile application of MoFALD/LBs. These need of specific vision and provide business logic for mobile application development to UNV ICT team. For Eg. We developed MoFALD app for website information delivery. Likewise we can design and develop other application
centeral/regional as well as district level regarding the implementation of progrogramme activities. • Conduction of UCPA by LGCDP and RRN seem little unclarity.
• Municipal personnel's knowledge on GESI/GRB observed very poor. • Some indicators of GRB tool and GESI audit is still confusion or critical. • According to the participants some terminologies and examples are difficult to understand. • Lack of local level facilitators/resource person on GESI/GRB. • None of the Municipal have adopted GESI audit and GRB so far. • Very short time to exercises on GRB and GESI audit indicator.
Nepal deceided to make coordination meeting at least within three month either by RRN or RCU management. • All SM related activities should be carried out only after making decision made by D/MSMC. • During the VDC level meeting all the SMs working in the VDCs must present.
• Need to organize GESI/GRB training at regional level to other left out Municipals by MoFALD/LGCDP as well. • It would be better to revisit in to the GRB/GESI audit indicators before finalizing the GRB localization strategic by MoFALD and Specialist team. • It would be better to use simple language and local level example for more effectiveness. • It would be better to develop local level RPs by MoFALD/PCU for roll outing the GRB/GESIA by LBs and it may also cost effective. • If possible MoFALD should be finalized this strategy soon and provided to the LBs especially Municipalities for further action. • Participants have suggested this types of training should organize in district level with local level political parties and other stakeholders. • It would be better to allocate full day exercises on entire indicators for more clarification.
Kathmandu
Doti
MTOT BKP-RG&SIE on GESI and GRB
• Built common understanding about GRB and its 1. Three days MTOT is not coverage all the subject indicators among ministry officials and other properly. participants. 2. All the freelancers from the central level. • Sharing practices of the field and recommended for the further review on the indicators of GRB and GESI audit. • Know about the 25 piloting districts for the GRB and GESI audit, similarly further regional and district level programme of MoFALD regarding GESI and GRB.
02 to 06 April 2016 TOT on BKP-RG&SIE 12 to 15 • Training become very interactive, GRB June 2016 • The entire LBs shared current status of the GRB internalization and GESI audit in their respected LBs • Exercise on the GRB tools and GESI audit made clear to the participant. • Built-up common understanding about GESI/GRB/A among all participant.
• Only six participants from the four DDCs namely, Bajur(2), Bajhang (2), Dadeldhura (1) and Doti (1) have participanted due to the closing time of the fiscal year. • Participants have objection on to the training time and incentives (DSA, lodging and food)
1. MoFALD should organize at least 5 days MTOT. 2. It would be better to call freelancer at least from regional level and this types of training should be organized at least in the first quarter to all the DDCs and Municipalities. 3. It would be better to provide approved copy of the GRB localization strategic 2072 to the participants.
• Participants have suggested this types of training should organize in first quarter of the each fiscal year. • More than one resource person carry more active participants. Therefore, manage more than one trainer in such types of training. • It would be better to organized like this training to the political parties, Integrated planning committee members and sectoral agencies in district level before planning process/DDC council. • GESIA/GRB should be kept as mandatory indicators into the
ANNEX SUCCESS STORIES OF FY 2072/73 æeTs] 5fpk8L uf]7, cj aGb}gg\Æ aiff}{ b]lv cGwljZjf; / c1fgtfsf sf/0f ;fdflhs ;d:ofsf ?kdf /x]sf] 5fpk8L k|yf ;du| ;'b'/klZrdsf] g} ;d:ofsf ?kdf /x]tf klg c5fd lhNnfdf of] k|yf cem} s7f]/ Pj+ hl6n ;d:ofsf ?kdf /xb} cfPsf] kfO{G5 . ljleGg ;/sf/L tyf u}/ ;/sf/L ;+3,;+:yfn] of] k|yf x6fpgsf nfuL ljleGg k|of; u/]tf klg cem} of] ;d:of x6\g eg] ;s]sf] 5}g . dlxgfjf/L ePsf] j]nf 3/ eGbf 6f9f cyjf 3/;+u} ;fgf] v\6\6f klg tfGg gldNg] Pp6f uf]7 leq dlxgfjf/L ePsf] sl/a ^ b]lv & lbg ;Dd j:g'kg]{ / Tof] cj:yfdf kf]lifnf] vfgf vfg gldNg] t/ jflx/L sfd eg] k|z:t ug'{kg]{ ePsf]n] dlxnfx? zfl//Ls tyf dfgl;s b'j} ?kdf sdhf]/ b]lvG5g\ . ;fy} o; c:yfdf sltko dlxnfx?n] lg;fl;P/, of}g zf]if0f nufot, jf3, efn' / ;k{n] 8;]/ Hofg u'dfpg'sf] lk8f t 5'6\6} 5b}5 To;dfyL dlxnf;Fu} /xg] b'w] jfnsn] ;lxt of] k|yfn] lk8Lt x'g'k/]sf] 5 . To;dWo] s]xL ;do cuf8L of] / o:t} lk8f ef]Ug] ;d'bfo ;fFkm]ju/ gu/kflnsf j8f g+= ( efu]Zj/ l:yt jbf{b]jL 6f]n klg /x]sf] lyof] . @)^* ;fndf @% hgf dlxnf ;xefuL eO{ abf{b]aL gful/s ;+r]tgf s]Gb|sf] :yfkgf eof] . tt\ kZrft gf;s]df ljleGg k|sf/sf ;fdflhs ;d:ofsf ljifodf 5nkmn x'g] lgoldt lqmofsnfk x'g yfNof] / ;f]xL qmddf dlxnf bLbL jlxgLx?n] cfkm\gf] k|d'v ;d:ofsf ?kdf 5fpk8L s' k|yfnfO{ lnP/ 5nkmn ug{ yfn] . jiff}{ b]lv o; s' k|yfaf6 lk8Lt dlxnfn] cj pk|fGt dlxnfn] o;af6 s'g} klg ;d:of ef]Ug gk;f]/ eGgsf nfuL o;sf] cleofg g} z'?jft ug{ yfNo h;sf] d'Vo h/f] lyof] 5fpuf]7 . hxfFaf6 dlxnfsf zfl//Ls, dfgl;s / ;fdflhs ;d:of z'? x'GYof] . t/ of] ;d:of PSn}n] cyjf Ps lbg dfq ubf{ x6fpg ;lhnf] lyPg To;sf/0f o;af/] ;j}nfO{ ;r]t u/fpg h?/L lyof] . s'g} h/f] uf8]sf] ;+:sf/df kl/jt{g ug{ vf]Hbf sf]xL pbfx/0f eof] eg] w]/} g} ;lhnf] x'Fbf] /}5 . h;sf] pbfx/0f x'g'x'GYof] ;fdflhs kl/rfns nIdL d]8d, pgsf ;;'/fn] k'/f]lxtn] ug]{ ;a} sd{ sf08 uy]{ t/ klg jxfF dlxgfjf/L ePsf] a]nf 3/d} a:g'x'GYof] t/ pgsf b]ptf slxn] l/;fPgg eg] xfld a:bf lsg l/;fp5g\ / of] unt g} /x]5 eGg] lgls{of]n ul/ gf;s] sf ;a} lblba}gL n] cfKgf] 6f]ndf 3/df a:g] cleofgsf] z'?jft yfNof} / 5fpk8L uf]7 ;a} eTsfpg] cleofg z'? eof] cfkmg} 3/af6 . clxn] gt b]ptf
Figure 1Chhaupadi ghot now
l/;fPsf 5g\ gt b]jL g} cflv/ aiff}{ b]lv dfg;k6ndf j;]sf] 8/ / dfGb} cfPsf] s' ;+:sf/ Ps b'O{ dlxgfdf g} x6fpg / 5fpk8L uf]7 d'Qm egL 3f]if0ff g} ug{ ;kmn eO{of] . cfhef]ln xfld ;a} hgf w]/} v'l;5f} lsgls dfG5] eP/ klg kz';/xsf] Aofaxf/ cj v]Kg' k/]sf] 5}g . ^÷& lbg sf6\g aif}{ h:tf] nfUYof], slxn] sfFxL t dlxnfsf] lhjg g} b'Mvsf nfuL ag]sf] xf] h:tf] nfUYof] t/ clxn] tL ;f/f lk8fx? lj;]{sf 5f} – g;fs] ;+of]hs . पिपितको सहारा नासके सिाििा लुप्त रहेका पिषय िस्तुलाई सािुपहक आवाि चापहन्द्छ,िि व्यपक्त र सिुदाय शसक्त िन्द्दछ अपनिात्र न्द्याय िाउन सदकन्द्छ l किला िल्ल (नासके दक उिसिंयोिक) ििेल्धुरा पिल्लाको देवल ददब्यिुर गाउँ पिकास सपिती वािड न २ को रािुल वस्तीिा सािापिक तथा आर्थडक रुििा िछािी िरे कोले २०६७ सालिा नागररक सचेतना के न्द्र गठन गररएको पथयो l नासके गठन हुनु अगािी यस ठाउँ का िपहलाहरु लाई िपहलाहरुको हक अपधकार र कतडब्यको िारे िा के पह थाहै पथएन र त्यहाँ का िपहला हरु घरे लुहहिंसा लगायत पिपिन्न खाले पहसाले पिपित पथए, उनीहरुलाई सशक्त गराउनका लागी कु नै िपन कायडक्रिले सहयोग गरे को पथएन, न त त्यस वस्तीका िपहलाहरुलाई कु नै िपन कायडक्रिले सहिागी गरे को पथयो। त्यस वस्तीका िपहलाहरुको सहिागीता कु नैिपन पवकास पनिाडणको कायडिा िपन पथएन । अपशक्षा, गररिी, अन्द्धपवश्वासको कारण उनीहरु कु नै िपन कायडिा शसक्त रुििा सहिागी हुन सक्दैनथे । नागररक सचेतना के न्द्र गठन िए िपछ ररफ्लेक्ट कक्षा सञ्चालन िश्चात उनीहरु िपहलाहरुको हक अपधकार र कतडब्यको िारे िा थाहा िाए र हरे क कायडक्रििा अथडिण ू ड सहिापगता देखाउन थाले र िपहलाहरुको हक अपधकारका िारे िा िपन आवाि उठाउन थाले । नासके दक उिसिंयोिक किला िल्लले िताईन "िपहलाहरु सिंिपन्द्ध कानुन पवशेष गरर घरे लपु हसािं ऐन सिंिपन्द्ध छलफल गररयो, िसले गदाड िपहलाका िीिाहरु िापहर आउन थाले l साथै घर िाटै िापहर पनस्कन हुन्न िन्ने सोचाई राख्ने िपहलाहरु सिेत सािापिक कायडिा अग्रसर हुने र िपहलाले कु नै िपन कायडिा अग्रसर हुनुहुदैन वा सक्दैनन् िन्ने अन्द्धपवश्वास पित्र िापधएका िपहलाहरुिा Reflect class िाट धेरै िररितडन आउन थाल्यो साथै पिपितको सहारा िन्न थाल्यो नासके l िसको उदाहरण हुन् यसै सचेतना के न्द्रकी एकल िपहला सदस्य लछु िल्ल" l िस लाई नसके ले उनको िपिन ददलाई छाड्यो l लछु िल्ल िपन्द्छन "श्रीिान पितेको िषौ हुदा िपन िेठािुले श्रीिान को िागको िपिन ददन निानेको र आफु लाई िपन कु नै कु रा थाहा निएकोले अकाडको िपिन किाएर खानुिने अवस्था पथयो l िि नासके िाट सिै कु रा िानकारी िाए आफू लाई िपन पहम्ित आयो र नासके का दददीिपहनीको सहयोगिा गापवस सपचव सिक्ष कु रा राखेिपछ िेठािुले िल्लतल्ल िानेर आफ्नो श्रीिानको िागिा िने सम्िपत आफ्नै नाििा गनड सफल िए l
;fd'lxs s[lifdf dlxnfx?sf] k|of; s+rgk'/ lhNnf k'gjf{; gu/kflnsfsf] jf8{ g+= !% df /x]sf] ljsf; gf=;=s]Gb|df j|fx\d0f,hghflt,blnt / cGo u/L ;j} hfthfltsf] ;dfg ;xeflutf /x]sf] kfOG5 . @)^( j}zfv !* ut]sf lbg :yfkgf ePsf] o; ;r]tgf s]Gb|df #) hgf ;b:ox? /x]sf 5g\, h;df ;Dk"0f{ ;b:ox? dlxnf 5g\ . o; ljsf; gful/s ;r]tgf s]Gb|df LGCDP jf6 k|bfg ul/Psf] ;fgf] k"jf{wf/ sfo{s|d cGtu{t cfPsf] #,!%,))) xhf/ ?k}ofjf6 o; gful/s ;r]tgf s]Gb|sf ;b:ox?sf] hLjg :t/df ;'wf/ u/L dfly psf:gsf nflu of] sfo{s|d o; gful/s ;r]tgf s]Gb|df cfPsf] xf] . o; jh]6 af6 s'g Joj;fo ug]{ elg xfdLn] w]/} rf]6L a}7s a;L 5nkmn ubf{ ;j} jf6 s]/f v]tL ug]{ lgwf] eP kl5 ;fd"lxs ?kdf s]/f v]tL u5f}F, elg ha lg0f{o cfof] ta To;} cg';f/ xfdLn] gf=;=s]Gb| glhs} /x]sf] nIdL yf]s/sf] !) s§f hldg !,%),))) df @)&@.@.!% ut]sf lbg # jif{sf] nflu / kl5 yk ug{ ;lsg] ;Dem}tf sfuh agfO{ hUuf aGwsL lnP/ !) s§f hUufdf s]/f /fVg] lg0f{o ePsf]n] j]nf}/L af6 *%) j6f s]/fsf jf]6x? dufO{ s]/f v]tL k|f/De ul/of] .
s]/f v]tL u/] kZrft\ ;b:ox?sf] ;fd"lxs lg0f{o kl5 vfnL /x]sf] hldgdf t/sf/L v]tL z'? u/]sf] 5 . ljsf; gf=;=s]= ;b:ox?sf] Pstf / nuglzntfsf] kmn :j?k k|fKt ePsf] ;kmntfsf] k|ltkmn xf] . of] ;fd'lxs k|of;n] ljsf; gf=;=s]= s]Gb|sf ;b:ox?sf] JolQmut / ;fdflhs hLjg:t/ dfly p7\f] s'/f o;} gf=;=s]= sL ;+of]hs >L d'gf u'?ª atfpl5g\ . xfdLn] ;fd"lxs ?kdf sfo{ ubf{ Pstfdf /x]/ ug'{k5{, ta To;af6 xfdLn] /fd|f] pknAwL k|fKt ug{ ;S5}, eGg] pbfx/0f o; ljsf; gful/s ;r]tgf s]Gb|sf ;b:ox?sf] kl/>dsf] k|ltkmn :j?k k|fKt pknAwLnfO{ lng ;lsG5 .
ltg aif{ b]lvsf] 5fqa[tL kfP blnt / h]x]Gbf/ ljBfly{n] wd]gf * aemf+udf gful/s clwsf/ o'Qm ;]jf tflnd ;+rfng eO{/x]sf a]nf Ps hgf ;xefuL sflGt sfdLn] cfkm\gf 5f]/Lx?n] ltg aif{ b]lv laBfnon] ul/a tyf h]xGbf/ laBfyL{ nfO{ 5fqa[bL glbPsf] u'gf;f] kf]lvg . 5f]/LnfO{ laBfno egf{ ug{sf nfuL ;d]t k};fsf] hf]xf] ug{ ;d:of ePsL blnt tyf ljwjf sflGt sfdLn] 5f]/Ln] laBfno egf{ u/]sf] @ aif{ lalt ;Sbf klg 5fqa[QL gkfPsf] u'gf;f] ;'gfO{g . sfdLn] elgg blnt afnaflnsfsf nfuL 5fqa[¢L cfFp5 eGg t ;'g]sL lyP t/ laBfnoaf6 eg] lbPg . pgn] elgg\ ltg aif{ eof] afn lasf; dfla wd]gfn] 5f]/f 5f]/L nfO{ 5fqa[QL glbPsf] . 5f]/f 5f]/LnfO{ sfkL snd n'uf skf8f lsGg ;fx|} ;d:of 5 . geGb} ptm sfo{qmddf laBfnon] 5fqa[lQ glbPsf] cGo ;xefuLn] ;d]t atfP . 5fqa[lQ gkfPsf] u'gf;f] sflGtsf] dfq} lyPg afn lasf; df= la= wd]gfdf sIff gf} df cWoog/t blnt laBfyL{ lgd]; rbf/fsf] klg xf] . rbf/fn] eg] 5fqa[¢L kfof] eg] xfdL h:tf blnt afnaflnsfsf nfuL 7"nf] /fxt x'g] lyof] t/ laWofnon] 5fqa[¢L lbb}g\ / gkfPsf] klg ltg aif{ eof] . :yflgo zf;g pQ/bflo ;+oGq sfo{qmd (LGAF) cGt/u{t wd]gf ufla;df ul/Psf] gful/s clwsf/o'Qm ;]af tyf pQ/bfloTj ;DaGwL Ps lbg] sfo{qmddf lhNnf lzIff sfo{non] lbg] ;]jfsf] af/]df hfgsf/L lbg] a]nf ;f] s'/fsf] v'nf;f eof] . ptm sfo{qmddf 5nkmnsf] laifoa:t' aGof] 5fqa[lQ . ;/sf/n] aif]{gL sIff Ps b]lv cf7 ;Ddsf ;a} blnt afnaflnsf / krf; k|lt;t 5fqf nfO{ Ps ;o krxQ/ b]lv kfFr ;o klRr; ?kofF lbg] / lgdfla / dfla txdf Ps xhf/ ;ft ;o lbg] Aofa:yf u/]sf] atfpgf ;fy sflGt dfq xf]O{gg cGo claefas ;d]t laBfno k|lt cfqmf]lzt eP . ;f] tflnd kZrft j8f gful/s dGr nufotsf gful/s ;+3 ;:yfx?n] vabf/Lsf lqmofsnfk ;+rfng u/] . vabf/Lsf lqmofsnfkx? ;Grfng ubf{ s'g} l;k gnfu] kl5 plgx?n] laBfnosf] o:tf] ckf/bifL{ s'/fsf af/]df kqsf/x?nfO{ ;d]t hfgsf/L lbg kl5 k/]gg\ . afn lasf; dfla wd]gfdf e|i6rf/ ePsf] cleefassf] c/f]k, rf/ aif{ ;Dd laWofyL{n] 5fqa[¢L kfPgg\ eGg] ;dfrf/ uf]/vfkq b}lgsdf 5flkof] . geGb} If]lqo lzIff lgb]{zgfno , lhNnf lzIff sfof{non] To;sf] af:tljstfsf af/]df afnlasf; dfla nfO{ kq n]Vof] o;/L ;a} 7fFp af6 Aofks bafa >[hgf ePkl5 ei6frf/ ePsf] /sd tTsflng ljBfno Joj:yfkg ;ldlt / laBfno k|zf;gn] laBfyL{ nfO{ 5fqa[lQ lat/0f u/\of] . o;/L 5fqa[lQ kfP kl5 sflGt dfq xf]O{gg\ lgd]; rbf/f nufotsf laBfly{ tyf cleefasn] o:tf] hfgsf/L lbg] sfo{qmd nfO{ v'n]/} k|;+;f u/] . sflGtn] elgg xfd|f] cfvf v]nL lbGof ;/ x? nfO{ wGoafb 5 .
æ?kfGt/0fsf] cEof; ub}{ dfemLufpFÆ hgtfsf] ;]jf ug]{ ;a{hlgs kb wf/0f u/]sf AotmLx? Hfgtfsf ;]as xf]O{gg\ hgtfsf dflns x'g eGg] ;f]rfO{sf] cGTo ub{} ;'b'/klZrdsf] lxdfnL lhNnf aemfFusf] dfemLufFp ufla; ?kfGt/0fsf] cEof;df lx8]sf] 5 . dfemLufFp % sL sfnL /f]sfofn] ufla;df ;lra pkl:yt gxF'bf a[4etf vfgaf6 Ps aif{ alGrt x'g' k/\of] . ;lra ;fknfO{ le6g kfFr /f}sf afO{ uof le6 ePO{g ufpn] efiffdf b'v];f] kf]lvg\ . pgn] lg/Gt/sf] k|of; kl5 :yflgo j8f gful/s dGrsf pk ;+of]hs pQd /f]sfofsf] ;xof]un] a[4 eQf kfO{g / v'n]/ /f]sfof / ufla; ;lra g/]; afa' :g]xLsf] k|z+;f ul/g\ . s'/f] lyof] plg df3 dlxgf b]lv r}q ;Dd kfFr k6s ufla; k'u]sL /x]l5g\ h; a]nf ufla; ;lra 5'§Ldf a;]sf /x]5g\ / ufla;sf gful/s j8fkq gx'bf slxn] cfkm\gf] laa/0f cWofawL ug'{ k5{ eGg] ;Dd clwsf;+ :yflgo af;Lx? nfO{ yfxf lyPg\ . ha :yfgLo lgsfosf] sfg'gL / gLltut Joj:yf kfngf cg'udg sfo{qmd (LGAF) sfo{qmd nfu' eof] a8fgful/s dGr nufotsf ;/f]sf/ afnfx? nfO{ laleGg r/0fdf tflnd tyf Ifdtf clea[bLsf sfo{qmdx? ;Grfng eP ;f] kZrft\ ufla;df gful/s j8fkq, ;'rgfkf6L / u'gf;f] k]6Lsfsf] Aofa:yfkg eof] clg sfnL /f]sfof h:tf cGo gful/s nfO{ ;]af lng ;xh eof] . :yflgo :t/df hgtfnfO{ ;xh ?kdf ;]af lbg] ufla;x? otLv]/ cfkm\gf] sfd / lqmofsnfkx?nfO{ ?kfGt/0f ul/ hgtfsf] ;]afnfO{ ;xh / ;/n ul/ /x]sf 5g\ . :yflgo zf;g pQ/bflo ;+oGq sfo{qmd nfu' eP kl5 ufla;x?n] :yflgo lgsfox? nfO{ ;Grfng ug{ ag]sf P]g sfg'gx? nfO{ k|efasf/L sfof{Gjogsf] af6f]df nfu]sf] 5 . lhNnfsf] dffemLufFp ufla;df PnlhPkm sfo{qmd nfu' ePkl5 ufla; :t/sf :yflgo of]hgfx?df ;fa{hlgs ;'g'afO{ / ;fa{hlgs kl/If0f ug]{ kl/kf6Lsf] lasf; ePsf] 5 . :yflgo j8f gful/s dGrsf ;+of]hs nf]s]Gb| ;'gf/sf cg';f/ uflj;n] k|To]s rf}dfl;sdf ;a{hlgs ;'g'afO{, k|To]s of]hgfdf ;fa{hlgs kl/If0f ug'{ k5{ eGg] af/] s;}nfO{ yfxf gePsf] / PnlhPkm sfo{qmd nfu' eP kl5 hfgsf/L kfO{ sfof{Gogsf] r/0fdf /x]sf] atfpg' eof] . ;fy}, ufla;sf clwsf+; hgtfnfO{ gful/s j8fkq ,;fa{hlgs ;'rgf kf6L / u'gf;f] k]l6sfsf] af/]df ;d]t cgla1 ePsfn] PnlhPkm sfo{qmd nfu' eP kl5 ufla;df oL ;a} s'/fx? /fVg nufOPsf] / xfn j8fgful/s dGrdf ;d]t j8fkq, ;"rgfkf6Lx?sf] k|of]usf] af/] hfgsf/L ePsf] atfpg' eof] . h;n] ubf{ clxn] uflj;sf ;]jf ;'ljwfsfaf/]df gful/snfO{ ;j}s'/f yfxf ePsf] / ;]jfsf nfuL jf/Djf/ cfpg'kg]{ emGem6 g/x]sf] hfgsf/L u/fpg' eof] .
VDC accounting software ले कायाडलयको कािकाििा सहिता नेिाल सरकार सङ्घीय िापिला तथा स्थानीय पवकास िन्द्त्रलय अन्द्तरगत स्थानीय शाशन तथा सािुददयक पिकास कायडक्रि (LGCDP )अन्द्तरगत कै लाली पिल्लाका सिै २८ गा .स.पव.का गा ददने ३ र लेखाको कायड गने किडचारीलाई .स.पव.VDC Accounting software तापलि आ ७२/७१ .व.िपछ कै लालीका ६ वटा गा ले .स.पव.िूणड रुििा कायाडलयको लेखा को कम््युटरकत ायोग िा erawtfos ल्याएका छन | कै लाली सदरिुकाििाट ४० MKको दुरीिा िुवडिपचि राििागड- िा िने चौिाला गा.स.पव. हो | चौिाला गा erawtfos ले िूणडरुि िा यो .स.पव. स सपचव.पव.गा | ायोगिा ल्याएको छश्री खेिराि िट्ट का अनुसार यो erawtfos पिगतिा लेखाको काि गदाड सिय धेरै लाग्ने ,पहसाि नपिल्नेगतपिगतको पहसाि , ,हेनड सिस्या िनेिापसक चौिापसक र िार्षडक ापतिेदन तयार िानड गाह्रो र त्रुटी हुने गरे को िताए | हाल VDC Accounting software ायोगिाट ले गदाड सियको िचत िई सो सिय सेवा अन्द्य पनपियत काि गनड सहि िएको , सियिै िापसक चौिापसक र िार्षडक ापतिेदन तयार सहि िएको ,पहसाि पिलान िा सहि तथा त्रुटी निएकोापतिेद ,न तयार िानड सपिलो हुने गरे को , लेखा ापतिेदनहरु साविडपनक गनड सहि ियकोगा स सपचव.पव.श्री खेिराि िट्टले िताउनुियो साथै ििेट शीषडकिा उिलब्ध रकिको आधारिा िात्र िौचर उठाउन पिल्ने र |ििेट शीषडकिा रकि निएको अवस्थािा
Reduced alcohol production and consumption leads reduced domestic violence
to
,
"People interest in self grows when their self awareness increases. Interest generates desire that leads to seeking opportunities. Such example set by the participants of 'Belauri Municipality Pragati Citizen Awareness Center of Ward no. 7." Citizen Awareness Center (CAC)situated in the Sitanagar Community Forest of the Belauri Municipality was formed in 10 March 2011 with the support of LGCDP. Since the inception, CAC members have been engaged in discussion
to identify pertinent community problems and scopes of community development via REFLECT classes. Members came to a consensus that causes for the domestic violence
and abuse against women usually stems from alcohol production at home and its uncontrolled consumption. Thus, members decided to raise awareness on discontinuing
such practices from every household. "Alcohol is traditionally needed for rituals and is considered a part of household hospitality. But it had more malpractices associated with it too. Hence, as a community we decided to stop the practice entirely weighing more negatives than positives behind it, assaid CAC member". CAC members
began campaigning to reduce and stop production of alcohol, starting from their own members.An action plan was pre-pared to remove alcohol from each household. For this, members starled door to door campaign explaining
communities about the negative effects alcohol can bring to individuals, family and communities. However, it was not with challenges. CAC members even received threats that they were trying to block people's main source of
CAC Members destroying home made alcohol income. Nevertheless, CAC members relentlessly continued their effort. Eventually, the whole community became an
alcohol free zone with the members' unified effort. Furthermore, CAC also started penalizing household with NPR 500 if continued with alcohol production in their home or community. The after effect is reduced domestic violence in families and minimized social disputes' Moreover, this
movement brought out practice women and community members to come together, identify social issues and work together to reduce social issues.
CAG rlmember of Ghaudhari-r- \,'a' Laxmi vlrau.,rrcrr awards Laxmt Sports awarqs and Spons Youth ancl Ministrv of youth Ministru with 'Young Talent Award' Jf.ralari-Pipaladi Municipality with'Young Jhalari-Pipaladl /l lD\ cr provided by Programme (LlP)support Laxmi Chaudhari, a member a nrnfit nf Rs narnorad gfig the CAC. of Pipladi Citizen Awareness 70'000 annu C"ni"it (CAC) from The farming' Kanchanpur Jhalari Pipladi source of moti r
iJ;i ffil' and'snnrts Alono with r.,a the has been
MunicipalitY-1 ]l;;..'r":t"*i'; :ud,:l;
:#:ilry,
:T::'?1"?l 'i-sllrj'iT.::,1'11{':l vouth oevelopment and in their
,il11.,'Jilu'l,i
uurrrrrrurrrrree' COmmUnitieS.
..r+L