PORTFOLIO L A N D S C A P E 2 0 1 0
-
2 0 2 2
A R C H I T E C T
He l l o. My name is Dyah Kur nia, I develop indescribable joy from small-minded multidisciplinar y design and art. I’m also ver y drawn to music and nature. I am a sanguine p erson with easy going personality that makes me work well with others. I’m willing to chal lenge my self to lear n something new especially in Architecture and Landscape Architecture.
Personal Information Name Date of Birth Nationality Residential Status Address Marital Status
: : : :
Contact Detail
Dyah Kur nia Sekar Sari Yogyakarta, 04 May 1988 Indonesian Per manent Resident
dyahkur niasekarsari@gmail.com +65 9028 0732 https://issuu.com/ dyah.kur nia/docs
: 271A Punggol Walk, 821271, Singapore : Married
https://www.l i nk edi n.co m/ in/ d yahk ur ni a - sek a r- sa r i - 0 6388613a/
Objectives
Language
E x p a n d i n g m y s k i l l s and co mp et ancy Ac c e l e r a te d b y g o o d in f lu en ce s at t h e e nv ir o nmen t I work in O ve r c o m e p r o b l e m b y w o king t o g et h er as a t eam R e m a p p i n g a r c h i te c t ur al mann er t hr o u g h in t er n ati o n a l d e s i g n sta n d ar d
Indonesia
English
N at iv e
Good
Interest
furry mamals
nature
travel
photo graphy
books
food
music
Education 1999
Junior High School (SMP N) 5, Yogyakarta
2002
Science Program of Senior High School (SMA N) 3, Yogyakarta
2005
Department of Architecture, Gadjah Mada University, Yogyakarta, Indonesia. Graduated on Nov 2009 with 3.70 / 4.00 GPA (Cum Laude) from 144 Credit Hours
Relevant Experiences 2006
Drafter, for POSYANIS (Yogyakarta Earthquake Recover y Center)
2007 2008 2008 2008 2008
Voluntar y work for GTZ as Field Super visor. Design and Built,”Entrance Gate of Wolrd Culture Festival” at P4TK 3 Month Inter nship, at “Nawasanga Studio Architect” ,Bali. 3 Month Inter nship, at “Housing Resources Center” ,Yogyakarta Working as Junior Architect at “Global Rancang Selaras” , Yogyakarta, Indonesia.
2009
Design Proposal, for “Muhammadiyah High School” Building Renovation, Yogyakarta.
2010
Working as Architectural Assistant at “Gary Fell Architecture Bureau” , Bali, Indonesia.
2012
Working as Landscape Designer at “AECOM” , Singapore.
2017 2018 2018
Working as Freelance Architect at “Manyar Architect”. Working as Architect at “Topo Design Studio”, Singapore. Working as Landscape Designer at “WATG”, Singapore.
Skills Summary • • • • • • •
10 years experiences in architectural / landscape architectural design and construction Highly organized Deputy Project Manager Involved in all phases of the design process Good knowledge in detail drawings and materials Passion for creative work Good communication and interpersonal skills (Coordinate design with various party) Proficient in the drafting & graphics software
A utocad Photoshop Illustrator Corel InDesign
Microsoft Office Sketch Up Lumion Enscap e Revit
I c o nf i r m t o m y b est k no wled g e, the info r mation declared is cor rect and true and i hav e not w i th h e l d i n for mati on
01 MAL BEKASI Ja k a rt a, I n d o n e s i a Cl i e n t I Su m m ar e c o n
2012
02 ROL-EARLY WORKS K ua la L u m p u r, M al ay s ia Cl i e n t I D B K L
2012- 2014
03 ROL-PREC INCT 7 K ua la L u m p u r, M al ay s ia Cl i e n t I D B K L
2013- 2015
04 ROL PHASE 2-1C K ua la L u m p u r, M al ay s ia Cl i e n t I D B K L
2014- 2016
05 MEDINI LAKESIDE Jo ho r B a ru, M a l a ysi a C l i ent I U M L a nd
2014-2016
06 ARCA SOUTH Ta g ui g C i t y, Phi l i p p i nes C l i ent I Aya l a L a nd
2014-2015
07 COLOMBO PORT CITY C o l o m b o, Sri L a nk a C l i ent I C H E C
2016
08 ABC WATER PROJECTS Si ng a p o re C l i ent I PU B
2016-2017
09 SEAGROVE RESORT Ce bu , P h i l i p p i n e s Cl i e n t I Ay al a
2018- 2019
10 HENANN RESORT MACTAN Ce bu , P h i l i p p i n e s Cl i e n t I B o r acay R e g e n cy Be ach Re s o r t
2019
11 TENGAH LAKE COMPETITION Te n gah , Si n g ap o r e Cl i e n t I H D B
2021- 2022
12 MAPLE GROVE Ca v i t e, P h i l i p p i n e s Cl i e n t I M e g aw o r l d
2021- 2022
13 THANH XUAN INFORMATION CENTER V i n Phuc, V i et na m C l i ent I B I M L a nd
2022
14 CALLA RESORT VUNAM Cat Hai Village C l i ent I C a l l a
2022
01
Mal Bekasi Location Area Type Client
: : : :
Jakarta, Indonesia 18,580 sqm Commercial Summarecon
Summeracon Mall Bekasi (SMB) development started on September 2011 and plan to be completed by the end of 2012. This modern shopping and entertainment centre is one of the most important commercial features in the whole development of Summeracon Bekasi Township. It is comprised of different shopping and entertainment facilities which include a mall complex, an al fresco dining area and retail walk zone. There will be 3 entries and a secuirty check points for this phase 1 development where a strong visual icon/landmark landscape element can be proposed to enhance the entry experience to identify this complex. The confirm area for landscape is about 18,580 sqm. which will include landscape solutions for existing outdoor public spaces and adjacent open spaces to a new F&B retail mall.
PROJECT STAGES : • • •
Concept Design Stage Schematic Design Stage Design Development
ROLE & RESPONSIBILITIES Landscape Designer • Preparation of Site Analysis and Case Study • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • to work closely with PM and to meet the project time schedule
SITEPLAN
THE CONCEPT shop then relax wi thin nature
dive into a state of tranqulity ce lebrate li fe
dine, gather and socialize
awaken your senses play and have fun
“ The Summarecon Mall Bekasi Experience” THE ENTRIES: CREATE SENSE OF PHYSICAL LINKAGES
1
ARRIVAL,
2
THE MARKERS: CREATE VISUAL CONNECTIVITY , SIGNAGE & WAY FINDINGS
3
THE ACTIVITY PODS: CREATE ACTIVITY AND GATHERING SPACES
4
THE MOUNDS: CREATE INTERPLAYS OF LEVELS, MOUNDS, & TERRACING
5
THE OUTDOOR ROOM: CREATE OUTDOOR ROOM FOR DINING
THE MAIN WALK: CREATE ALL DAY RETAIL WALK
6
ACTIVITY
DOWNTOWN WALK SECTION
SAMANEA SAMAN WITH DROP LIGHTING
RAVENALLA MADAGASCARIENSIS
ROCK SCULPTURE & MIST
BAMBOO
RAISED REFLECTIVE POOL CRATOXYLUM FORMOSUM
SCULPTURAL MOUNDS & MIST
MASS PLANTING ON MOUNDS
ARRIVAL PLAZA
MAIN ARRIVAL DROP-OFF AREA
TROPICANA WALK SECTION
PERFORMANCE STAGE
EUROPEAN AL FRESCO DINING
ALLEYWAY
EUROPEAN LOUNGE DOWNTOWN WALK
SCULPTURAL MOUNDS WITH MIST
DELONIX REGIA
LIVISTONIA ROTUNDIFOLIA
DELONIX REGIA
PELTOPHORUM PTEROCARPUM
Entrance Roundabout
Lifestyle & Living Zone
MOUNDED PLANTING AREA
TIMBER DECK
DELONIX REGIA
ROOF F&B FLOATING LANTERNS AQUATIC PLANTS
MIST GARDEN
EUROPEAN AL FRESCO DINING
BAMBOO WITH SEAT PLANTER
HOPEA ODORATA
FIRE TORCH
HOTEL ARRIVAL
PERFORMANCE PLAZA
KOI POND
GARDEN LOUNGE
MOUNDED TIMBER PLANTING TIMBER DECK DECK AREA
KOI POND
TIMBER DECK
MOUNDED PLANTING AREA
SECONDARY ARRIVAL
SITEPLAN (cad SD)
SECTION (cad SD)
TROPICANA WALK
SEATING AREA
THE WALKWAY
02
ROL - Early Works Location Area Type Client
: : : :
Kuala Lumpur, Malaysia 14,521 sqm Public Realm DBKL
The River of Life (ROL) Early Works is part of the first phase of the first phase of the larger River of Life Master Plan that aims to regenerate 10.7 km of the Klang and Gombak rivers As part of the Heritage Quarter, in the heart of old China Town along High Street (now know as HS Tun Lee), the project furthers conservation efforts while activating a previously underutilized area. Urban infill throughout the district activates the pockets of dead space around the highly attractive tourist areas, creating more contemporary nodes. Consisting of art installations, informative storytelling signage, and a renewed streetscape, the River of Life - Early Works Package embodies the framework set out by the Master Plan.
*SILA Silver Award, MLAA Honour Award & IFLA Excellent Award
PROJECT STAGES : • • • • •
Schematic Design Stage Design Development Tender Drawing Construction Drawing Construction Coordination
ROLE & RESPONSIBILITIES Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • Preparation of Government Submission ( DO Submission & BP Submission) • Preparation of Tender Drawing Package & Construction Drawing Package • Coordination with client, sub-consultant & supplier • to work closely with PM and to meet the project time schedule
s i te l o ca ti o n The River of Life Early Works Package (EWP) is the first phase of the River of Life Master Plan that will regenerate 10.7km of the Klang and Gombak rivers, located in downton Kuala Lumpur, Malaysia. The Site sits within the Heritage Quarter, in the heart of old China Town along High Street (now Jln Tun H.S Lee). The 14,521 sqm project furthers conservation efforts while activating a previously underutilized area. Urban infill throughout the district brings to life pockets of dead space around attractive tourist areas and creates contemporary nodes consisting of art installations, interpretive signage, and renewed streetscape.The Phase 1 Early Works Package embodies the framework set out by River of Life.
Co nte mp ora
ry Str ee tsc ap
e
Masterplan P7
historic triangle
2
Cafe
1 pavilion
Siteplan
1
Existing Condition
2
tra n fo rm a ti o n & p l a ce m a kin g The River of Life EWP scheme is built around the ideas of transformation and place making through creating contemporary culture that reveals and celebrates the heritage, stories and places of Chinatown. Community consultations on potential improvements to the area, engaged local shop owners, residents, community and even tourists, enabled an informed design. Design that increases pedestrian movement through shaded streets, opens space for pedestrian use during events and eases traffic congestion with rationalized bus circulation has been implemented. Landscape works restoring and activating the environment are a focus of of the overarching masterplan.
p roj ect objec t iv es I n c r e as e Pe d e s t r i an M o vemen t
C r e at e D e s i r a b le Pl aces
R e s t o r e T h e Envi ro n m en t
de t ai l e d draw in g
Leboh Pudu Feature Bench
Water Feature
Heritage Trail
Historic Triangle Cafe
03
ROL - Precinct 7 Location Area Type Client
: : : :
Kuala Lumpur, Malaysia 10.7 km Public Realm DBKL
Precinct 7 or also called District 4, one of the eleven precincts along the 10.7km River of Life project, is the historical, geographical and social heart of downtown Kuala Lumpur. Surrounded by impressive civic and historical buildings, the area has the make up of an iconic downtown, where local and international visitors come to shop, stay and enjoy. The iconic buildings and destinations include Merdeka Square, Masjid Jamek, Bangunan Sultan Abdul Samad and Petaling Street. Important landmarks are preserved while surrounding buildings are reprogrammed to add energy to the area. What is currently a historical district strictly looking towards the past, becomes a civic district concerned with not only its history but also the quality of life for its people. The newly injected program enriches the recognised district, raising the value of experience for both locals and tourists.
PROJECT STAGES : • • • • •
Preliminary Schematic Design Stage Schematic Design Stage Design Development Tender Drawing Construction Drawing
ROLE & RESPONSIBILITIES Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • Preparation of Tender Drawing Package & Construction Drawing Package • to work closely with PM and to meet the project time schedule
A Precinct 7 Initial Study Report has been produced that addresses not only the inception stage of the Precinct 7 assignment covering initial issues and recommendations, but also existing site conditions and site analysis. The report presents AECOM’s initial familiarisation for Precinct 7: site visits, consultation and technical issues raised throughout the competition and feedback at the kickoff meeting and workshops. These baseline data, identified issues and constraints have now been taken forward to the Schematic Design stage of the assignment, where the concepts developed in the Master Plan have been developed into workable schemes that, upon approval, will be taken forward to detailed design and implementation.
The • • • • • •
cultural
areas listed below are some important landmarks covered under the proposed development: St. Mary’s Cathedral Bangunan Sultan Abdul Samad Masjid Jamek Leboh Pasar Besar Dayabumi Pasar Seni
“This initiative, categorically divided into three components - river cleaning, river beautification, as well as river development - will not only bring development to the local economy but also increase income”
community
natural
Puah Pond DUKE
1
HWY
JLN 9/48A
DISTRICT Sentul Timur
JLN
JLN 2/48
A 1/48
A
Tasik Titiwangsa
JLN PAHANG
Sentul LRT
Titiwangsa LRT
K
ZA
N
JL
UN
RA
Pekeliling Bus Terminal
T
JLN
PWTC
IPO
H
JLN
DISTRICT
PWTC
N LTA
SU
Chow Kit
JLN
SULT AN IS
Medan Tuanku Monorail
N
JL
Sultan Ismail LRT
JLN RAJA ABDULLAH
AIL ISM
JLN RAJA LAUT
PWTC LRT
2
KU
Bukit Nanas Forest
N
AM
JL
H
ULLA Masjid India
Masjid Jamek Panggung Bandaraya JLNLRT TU Masjid Jamek N P ER MerdekaSquare AK BSAS LEBOH PASAR BESAR
DISTRICT
4
G
Pasar Seni Bus Station
LIN
Pasar Seni
PETA
Dayabumi
JLN
JLN RAJA
CK
Central Market ENG LO CH JLN
DISTRICT
N PA
I ABD
Bank Negara Komuter
G
UNSH
3
Bandaraya LRT
Bukit Nanas Monorail
Dang Wangi LRT
JLN M
G
U NK AN TUA HM JLN UL RA ABD
IN
CH
JLN DANG WANGI
JALAN KINABALU
5
RA
SA
N MA DA
JLN
JLN ISTANA
KL Sentral
Istana Negara
DU
SU
LTA N
AB
Tun Sambanthan Monorail
JL
N
SY ED
PU
TR
A
JLN
BAN
GSA
R
JLN
JLN
TU
NS
AM B
JLN
AT H
AN
LS AM AD
TRA VER
S
DISTRICT
KTM Comuter
Mid Valley
Precinct 7 Stage1
0
P7 - Phase 1. Early Work Package
Scale 1:4000
100
200m
GOALS & OBJECTIVES
FRAMEWORK
C CO
RIVER BEAUTIFICATION
A
REVITALISE SOCIAL & CULTURAL HERITAGE OF THE RIVER
TE
EG
S
EN
Revitalise historical landmarks with new destinations along the river
E
REGENERATES: Provide new developments to rejuvenate the historic district while preserving the heritage
LI
V EN
S
PROMOTE ENVIRONMENTAL AWARENESS
ACTIVATES:
E R AT E S
EN
REHABILITATE THE RIVER’S ECOLOGY
CONNECT: Prioritise pedestrian connections to decrease vehicular traffic and enhance the experience for tourists and daily commuters.
TI
AC
R
INCREASE THE ECONOMIC VALUE OF THE RIVER
EC
A R
V
PROMOTE TRANSIT NODES
ESTABLISH A NEW IDENTITY FOR THE RIVER
NN
TS
TRANSFORM THE RIVER FROM A BARRIER TO A CONNECTOR
ENLIVENS: Create open spaces that celebrate the legacy of the city
IMPROVE CONNECTIVITY
ACTIVATE THE WATERFRONT
INTRODUCE MIXED USE PROGRAMS
A developing district would trigger growth and development around it requiring a well connected network. Redevelopment of the district would benefit largely from the vehicular and pedestrian connectivity and its integration with the existing urban framework. Efficient intermodal connections will ensure ease in navigation for visitors and locals, contributing towards social and economic development. The move shall reduce congestion, costs and environmental impacts, through implementation of new infrastructure projects or improvement of the existing ones.
The river holds an important place in the district, being placed at the source of development of the city. Activating the waterfront would extend the urban fabric to the water promoting an integrated development. Introduction of nodes of activities, water-touching experiences and connecting links would enhance the waterfront experience.
Introduction of a variety of uses can promote new development and revitalize the existing. This would result in a denser fabric that responds to the existing urban structure, through infill and redevelopment. As the core of the city, the development would ensure a gradual transition from a historic core to the contemporary surroundings of Kuala Lumpur.
s i t e
f u r n i t u r e
S t. Ma r y’s Ca t h e d r al
+29.50
6m PEDESTRIAN STEP PATH/ SERVICEROAD
SECTION 0
5
15m
+31.30
BROADWALK
FLOOD LVL +30.73 WL +27.00 BL +22.90 GOMBAK RIVER
+31.30 PLAZA WITH GUILDING LIGHT
+31.30
COUNTDOWN CLOCK PARK
s i t e
f u r n i t u r e
Masjid Jamek
OLD HIGH COURT LINK PEDESTRIAN BRIDGE
MECCA UMBRELLA
ABLUTION BUILDING
MRT MASJID JAMEK JALAN TUN PERAK PEDESTRIAN LINK BRIDGE
flood level 30.20 fl 30.00 wl 27.00 PLANTING 3 M AREA WIDE BOARDWALK
CANTILEVERED PATH W.F. TIMBER DECK WALK SUNGAI GOMBAK
SECTION 0
10
25m
PATH WALK
P.A.
MASJID JAMEK
PLAZA
WATER FEATURE SUNGAI KLANG
B angunan S u lt a n A b d u l S a ma d
Ligh
t
s i t e
f u r n i t u r e
Guiding
BANGUNAN SULTAN ABDUL SAMAD PLAZA WITH CANOPY TREES
FL +29.80 BSAS
PAVED PLAZA
SECTION 0
5
15m
FL +29.80 WATER FEATURE
FL +29.80
FL +29.50
PAVED PLAZA
CANTILEVERED TIMBER DECK
flood level 30.20 wl 27.00
SUNGAI GOMBAK
RIVER EDGE LINE
RIVER EDGE LINE
s i t e
f u r n i t u r e
D aya Bum i Promenade
FL +34.40
FL +32.00
FL +31.00 FL +30.00
FL +30.50
FL OOD LEVEL+ 29.30
FL +29.00
WL +27.00 FL +25.50
FL +25.50 WL +24.274
PATH WAY
TERRACED GARDEN
TERRACED GARDEN
TIMBER DECK
TIMBER DECK RIVER DAM / SUNGAI KLANG
SECTION 0
W.F PATHWAY W.F
5
10m
L e boh Pas a r B e s a r
Gall
er y
s i t e
f u r n i t u r e
Guiding
FL +30.90
TW +29.90 TW +28.80 TW +27.70
100 YEARS FLOOD LEVEL + 30.27
FL +30.00
WATER LEVEL + 27.00 WATERFEATURE
PLANTING PATH TERRACED AREA WALK PLANTING SECTION 0
5
10m
SUNGAIKLANG
PLAZA MASJID JAMEK
s i t e
f u r n i t u r e
Pasar Seni
WL +24.274
FL +28.95 FL +27.30
FLOOD LEVEL +28.85 WATER LEVEL +24.274
TERRACED PLANTING TERRACED SEAT SECTION 0
5
15m
SUNGAI KLANG
FL +30.15
CANTILEVERED DECK / PATHWALK
FL +30.00
ROAD
P.A.
ROAD
WALKWAY
de t ai l e d draw in g
Masjid Jamek
Heritage Quarter
Countdown Clock
Leboh Pasar Besar
04
ROL Phase 2 - 1C Location Area Type Client
: : : :
Kuala Lumpur, Malaysia 10.7 km Public Realm DBKL
Precinct 7, Stage 2 is located at the heart of District 4 - Heritage Quarter. The works consist of the main circulation network which links to the historical, geographical and social heart of downtown Kuala Lumpur. The circulation networks are surrounded by impressive civic and historical buildings, that make up an iconic city downtown, where international visitors, along with local and regional residents, come together to shop, dine, relax and enjoy the unique cultural experiences on offer. Where local and international visitors come to shop, stay and enjoy. Buildings and destinations in Precint 7 include Merdeka Square, Masjid Jamek, Bangunan Sultan Abdul Samad and Petaling Street.
PROJECT STAGES : • • • •
Preliminary Schematic Design Stage Schematic Design Stage Design Development Tender Drawing
ROLE & RESPONSIBILITIES Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • Preparation of Tender Drawing Package • to work closely with PM and to meet the project time schedule
Puah Pond DUKE
1
HWY
JLN 9/48A
DISTRICT Sentul Timur
JLN
JLN 2/48
A 1/48
A
Tasik Titiwangsa
JLN PAHANG
Sentul LRT
Titiwangsa LRT
K
ZA
N
JL
UN
RA
Pekeliling Bus Terminal
T
JLN
PWTC
IPO
H
JLN
DISTRICT
PWTC
N LTA
SU
Chow Kit
JLN
SULT AN IS
Medan Tuanku Monorail
N
JL
Sultan Ismail LRT
JLN RAJA ABDULLAH
AIL ISM
JLN RAJA LAUT
PWTC LRT
2
KU
Bukit Nanas Forest
N
AM
JL
H
ULLA Masjid India
Masjid Jamek Panggung Bandaraya JLNLRT TU Masjid Jamek N P ER MerdekaSquare AK BSAS LEBOH PASAR BESAR
DISTRICT
4
G
Pasar Seni Bus Station
LIN
Pasar Seni
PETA
Dayabumi
JLN
JLN RAJA
CK
Central Market ENG LO CH JLN
DISTRICT
N PA
I ABD
Bank Negara Komuter
G
UNSH
3
Bandaraya LRT
Bukit Nanas Monorail
Dang Wangi LRT
JLN M
G
U NK AN TUA HM JLN UL RA ABD
IN
CH
JLN DANG WANGI
JALAN KINABALU
5
RA
SA
N MA DA
JLN
JLN ISTANA
KL Sentral
Istana Negara
DU
SU
LTA N
AB
Tun Sambanthan Monorail
JL
N
SY ED
PU
TR
A
JLN
BAN
GSA
R
JLN
JLN
TU
NS
AM B
JLN
AT H
AN
LS AM AD
TRA VER
S
DISTRICT
KTM Comuter
Precinct 7 Stage 2 Mid Valley
0 Scale 1:4000
100
200m
CHINATOWN
COLONIAL
STREETSCAPE
C hinat o w n FLOWERS LANE
TAPIOCA LANE
FESTIVE LANE
RICKSHAW LANE
PROJECTING THE OLD CHINATOWN ONTO THE SIDE FACADE OF THE COLONIAL SHOP HOUSE
VEHICULAR ENTRY LANE
FISH MARKET LANE
f u r n i t u r e
Petaling Street
Jalan Petaling
Powdercoat
Pattern
450
s i t e
2000
PL-01
BL-07
Leptospermum brachyandrum Guiding Light
Bauhinia monandra
Leptospermum brachyandrum
Umbrella + Table + Chairs
Bird’s Cage
Stalls
Interpretive Signage
FL 32.40
FL 32.70
TERRACED SEAT 4200 MM
0 SECTION
5
TERRACED SEAT 4200 MM
10m
FL 33.00
GRAND LAWN 29000 MM
TRADITIONAL COFFEE & TAPIOCA HOUSE
PL-03
PL-05
M erdeka Square
Independant Square
Dataran Merdeka
Pattern
f u r n i t u r e
Timber on edge Steel works
ST-07
PL-02
BL-07
Existing Colonnade Tree Bosque with Seating
Seating Wall
Existing Water Feature
Bollard
Gravel Bed Lawn
Linear Water Feature TW 31.20
FL 30.75
TW 30.90
FL 30.00
4M WIDE LAYBY
0 SECTION
FOOT PATH
5
STAIRS TO CARPARK
10m
DATARAN MERDEKA EXISTING BASEMENT CARPARK
FL 30.45
s i t e
Natural Stone
S tr ee t s ca p e
Pattern
f u r n i t u r e
Seat
s i t e
Bandar KL KLCity
Existing Building
Existing Building City Trees w/ tree grate
Feature trees Chinatown
City Trees w/ tree grate
Median Planting w/ fence
Planting hedge w/ Fence FL 30.92
FOOTPATH EXISTING BUILDING 0 SECTION
2
FOOTPATH 4m
RL 30.77
PA
FL 30.92
RL 30.77
DRIVEWAY
DRIVEWAY
MEDIAN PLANTING
DRIVEWAY
DRIVEWAY
3250
3250
2000
3250
3250
2 LANE TOWARD JLN SAMBATHAN
2 LANE TOWARD JLN PUDU
PA
FOOTPATH
FOOTPATH
EXISTING BUILDING
05
Medini Lakeside Location Area Type Client
: : : :
Johor Baru, Malaysia 18 Acres Hospitality UMLand
The Medini Lake Rejuvenation and mixed use development project will be a well-designed series of high quality retail, residential and public park spaces meshed together to form a cohesive public realm responding to the needs of the residents and the surrounding local communities. The overall Landscape Design revolves around the existing natural asset that the rejuvenated and restored lake will provide and the merging of the developments built form. The retail promenade and lake promenades will provide the central open space focus for the development.
*Asia Pacific Property Award ‘Best Office Development’.
PROJECT STAGES : • • • •
Concept Design Stage Schematic Design Stage Design Development Tender Drawing
ROLE & RESPONSIBILITIES Deputy Project Manager • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • Preparation of Government Submission ( DO Submission & BP Submission) • Preparation of Tender Drawing Package • to work closely with PM and to meet the project time schedule
s i te l o c at ion
the j a w e l
REGIONAL CONTEXT (Johor, malaysia) Johor is Malaysian state, located in the southern portion of Peninsular Malaysia with a total land area of 19,210 km2. It is one of the most developed states in Malaysia. It has an international airport which is 30 km away from JB city centre.
Malaysia
Site Singapore
ARRIVAL
PROMENADE
EXIT
LOCAL CONTEXT (Medini Iskandar) Medini Iskandar Malaysia is located within the Nusajaya development zone, flagged as Zone B under the Iskandar Malaysia development blueprint. The project covers land of 2,300 acres and it is Malaysia largest single urban development. It is subdivided into the three development clusters, namely Iskandar Financial District, Medini Central and Lifestyle & Leisure Cluster.
Site
ARRIVAL
SITE POSITIONING (PLOT B78) Lake Rejuvenation covers an approximately thirteen (13) acres of which the lake is six (6) acres, while private lot Plot B78 covers 5.03 acres of land and is a mixed used development comprised of 1000 apartment units, 300 key hotel room and a retail podium.
Site LOOKEOUT
ARRIVAL
v i s i on & st rat eg ies The overall Landscape Design revolves around the existing natural asset that the rejuvenated and restored lake will provide and the merging of the developments built form. The retail promenade and lake promenades will provide the central open space focus for the development. 1
Lakeside living With a vision of urban lifestyle integrating work, play and relaxation, the project will be the landmark public realm for the whole development.
2
Podium Poolside Lounge
Lakeside Lookout Node
Floating Stage
Retail Promenade
Urban Lifestyle Ecological function of landscapes that capture the essences of sustainable water management, water sensitive urban design and provide healthy ecosystem.
3
Placemaking The lake will be the ‘JAWEL’of Medini development. The lake development will be offering compelling scenery and lakefront leisure destination
Stroll Garden
Bamboo Garden
Siteplan
d etai led drawin g
1 Boardwalk Detail
2 Stromwater Treatment Wetland Detail
3 Floating Wetland Detail
Floating wetland
Feature bridge
Wetland
Stromwater treatment wetland
Promenade
de t ai l e d draw in g
Main Entrance
Promenade
Podium Party Lawn
Lakeside Walk
06
ARCA South Location Area Type Client
: Taguig City, Philippines : 74 Ha : Masterplan : Ayala Land
ARCA South is a 74 hectare development in Western Bicutan, Taguig City. A well-connected CBD with an unparalleled location that has direct access to two leading commercial business districts (Makati and BGC) and is home to the largest intermodal transport system that serves as a convergence point and Gateway to the South. Arca south is a well-designed series of high quality retail, residential and public realm spaces that meet the diverse lifestyle needs of the residents and the surrounding local community. Landscape vision of this whole mixed use area is to build strong user experience and memorable space thru the provided amenities and built environment that create micro climate.
PROJECT STAGES : •
Concept Design Stage
ROLE & RESPONSIBILITIES Deputy Project Manager • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • to work closely with PM and to meet the project time schedule
“A CITY IN SYNC”
ARCA SOUTH IS A WELL-DESIGNED SERIES OF HIGH QUALITY RETAIL, RESIDENTIAL AND PUBLIC REALM SPACES THAT MEET THE DIVERSE LIFESTYLE NEEDS OF THE RESIDENTS AND THE SURROUNDING LOCAL COMMUNITY.
MICROCLIMATE
EXPERIENCE AMENITY
G VE
O CO
LING
ST
NATURE MEMORABLE PLEASANT
EXQUISITE
WITH
CONVENIENT
RU
C
RE
IAL
N
IVE
TU
METER
TER WA
O ATI ET
SS PA
OF QUALITY
LIVING
ENVIRONMENT
COMFORTABLE
SE
M
I-
AC T
IV
EM
OV E
GR
OW PLA N-UP ’S YGROU ND
EV
EN
TS S
PACES
FE
ENTERTAINM
IV ST Y
IT
MENT
CELEBRATIN
G
EN
T
Th e Regional C on t ex t 4
Arca South (formerly Food Terminal Incorporated (FTI)) is a former industrial estate, located at East Service Road, South Superhighway, Taguig City. It is one of the largest estates in Metro Manila and is home to over 300 companies. FTI leases lots for agricultural development, electronic raw materials and other business endeavors.
3
1
2
Currently owned by AyalaLand, ARCA South is a 74 hectare development, well connected CBD with an unparalleled location that has direct access to two leading commercial business districts (Makati and Bonifacio Global City) and is home to the largest Intermodal Transport System that serves as a convergence point and Gateway to the south. It will have a mix of commercial, residential, office, civic, hotel and other facilities with approximately 3.0m sqm of GFA. This development offers unmatched investement value and provides a rare opportunity to locate in and be part of the development of the next CBD of Metro Manila.
LEGEND Site Boundary LRT Expressway River 1
Site
2
Laguna Bay
3
Manila International Airport
4
Heritage Memorial Park
c o nce pt diagram
Squares, composed
Scattered
Rounded
Re-composed + Super-imposed
pr o gr a m overlay ARRIVAL PLAZA MAIN INTERSECTION SUNKEN PLAZA
GREEN SPINE
WATER FEATURE
LIFESTYLE RETAIL
GRID PLAZA
GREAT LAWN LIFESTYLE RETAIL
POP-UP STORE
CONNECTION PATH
TERRACED LAWN
from entry to central event zone
TAXI DROP OFF ARRIVAL
ARRIVAL PLAZA
MINI CONCERT FLEXIBLE
MAIN CENTRAL EVENT MARKET SERENE &PEACEFUL SCULPTURE PATH GARDEN
XMAS CAROL
ARRIVAL DROP OFF
TENNIS HITUP LAWN
SEMI-ACTIVE RECREATION SMALL PLAZA
WET GROUND F+B ENTERTAINMENT STROLL GARDEN WATER FEATURE
LAWN
INTERACTIVE SPACE LAWN
TRELLIS
INTERACTIVE ARTWORK
MULTI-SPORT COURT ROCKCLIMBING
ARRIVAL DROP OFF
RESIDENTIAL F+B PLAYGROUND
TYPICAL RESIDENTIAL PLAY AREA OPEN LAWN SHADE TREES
RESIDENTIAL F+B
UNION SQUARE
UNION SQUARE
U rban Pr o m e n a d e LEGEND 1. 2. 3. 4.
1
5. 6. 7. 8. 9. 10. 11. 12. 13.
3 2
Stairs Terraced Transition Plaza Long Ramp Green Wall (Location for Water Feature) Lawn / Low Planting Area Walkway Covered Walkway Grid Plaza Pop-up Store Great Lawn Arc Walkway Iconic Tree (Location for Fountain) Trees for Shade and Visibility
5 6
4
ALTERNATIVE LOCATION OF STEPS FROM PARCEL 3 TO THE TERRACED LAWN
6
8
7 12
13 6 13
10 11 11
9
9
9 6
0
20
40m
1:1000
PROPOSED TREES
GREEN WALL (SOFT SURFACE:HARD SURFACE=6:4)
Artocarpus lacucha (Monkey Jack)
0.00
-0.05
-1.50 -6.50 TERRACED TRANSITION PLAZA
STEPS
TERRACED TRANSITION PLAZA
COVERED WALKWAY 0
4
8m
Hopea odorata (Ironwood)
Central Ev ent Z one
LEGEND 1. 2. 3. 4. 5. 6. 7. 8.
7
Arc Walkway Central Lawn Central Event Area Water Jet In-ground Stage Pop-up Store Lawn Feature Trees
8 6
10
1
3 2 5
3
8
4 7 8
0
20
40m
PROPOSED TREES
1:1000
0.00
- 1.35
0.00
Pterocarpus indicus (Narra Tree)
0.00 -3.25 -6.50
FEATURE LAWN
WALKWAY TREES WALKWAY
STAGE
CENTRAL EVENT AREA
PAVILION
PLAZA
0
8
16m
Cassia javanica (Apple Blossom)
U rban Pr o m e n a d e
LEGEND 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
Feature Tree Lawn Stroll Garden Shady Trees Covered Walkway Interactive Area Walkway Shaded Structure Trellis and Ramp to Basement Artwork Area Bike Rack
9
11
10
4 8
7
0
20
40m
1:1000
PLOT BOUNDARY
PLOT BOUNDARY
PROPOSED TREES
Dillenia philippinensis (Elephant Apple) 0.00
F&B SUPPORTIVE AREA
PLANTING AREA WALKWAY
0.00
0.00
-3.25
-3.25
-6.50
-6.50
INTERACTIVE AREA
WALKWAY
0
F&B SUPPORTIVE AREA
2.5
5m
Terminalia microcarpa (Sovereignwood)
07
Colombo Port City Location Area Type Client
: : : :
Colombo, Sri Lanka 276 Ha Masterplan CHEC Colombo Port City (PVT) Ltd.
Conceived as a new extension to the existing Central Business District of Colombo, this 276 ha regional business hub and urban city has approximately 40% of the space devoted to landscape and open space while still providing 6 million square metres of gross floor area properties. The landscape open space, with its distinctive local flavor, is intended to combine land-use, traffic / transpotation, greenscape and waterscape to make Colombo Port City one of the most successful urban development projects in the world. Colombo has a long and rich history, where tradition has been merged with a colonial influence. the result is a city which contains a rich and vibrant urban life with a strong arts culture. The project will set the tone and ambience for many first time visitors to the country and city. it is vital that the new city provides a forward looking expression and becomes a distinctive and memorable place through its public openspace and streetscape.
PROJECT STAGES : • • •
Concept Design Stage Schematic Design Stage Landscape Masterplan Guidelines Report
ROLE & RESPONSIBILITIES Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • Study of local & international design standard as a preparation of Landscape Masterplan Guidelines Report • to work closely with PM and to meet the project time schedule
V is ion an d Co n c e p t
PLACE MAKING
LANDSCAPE
MASTER
COMPONENT
PLANNING
EEN
UE
UR
& BL
ESO
+ GR
UST
+R
+ ROB
CE
UNIQUE PUBLIC REALM ATE D
E
GR
SIBL
NTE
NNE
CC E S
+I
+ CO
&A C TED
SUS + HEALTH
Y
THE LANDSCAPE VISION IS TO CREATE A UNIQUE AND DISTINCTIVE PLACE, WITH A VIBRANT PUBLIC REALM FOR LIVING, WORK AND PLAY WHILST INCORPORATING KEY SUSTAINABILITY FUNCTIONS. COLOMBO’S CULTURE AND STORIES CAN BE LEVERAGED TO CREATE A BRAND THAT ENABLES STRONG GROWTH WHILE MAINTAINING ITS COMMUNITY SPIRIT.
+C HA RA
ST E
N
TIV O VA
ER
NN
IV
T AT &P
FE
ER
+I
LA CE MA KIN G
+ AT TRA
+P
C TIVE
E
TA I N A B L E C I T Y
+
CT
C O LO M B O G A L L E R Y
s i t e
f u r n i t u r e
C ultural D is t r ic t
74.50 Sloped Lawn
Road to transport interface station
34.50 Plaza
34.60 Visitor Center
Event Lawn / Festival Market
+15.50 Proposed Vehicular Crossing
+13.95
TRANSIT STATION 1 : 12
+7.70
+7.80
VISITOR CENTRE +4.75
+4.50 +3.30
+0.23
-0.45 -2.00
SIGNAGE
-9.20
0
5
10m
PLOT LINE
PLOT LINE
s i t e
f u r n i t u r e
The C hannel
+4.0
+4.0 +2.2
+2.2
+2.2 high tide level +1.2 mean low tide level +0.1
bottom of channel -3.0
5.00
15.00
70.00
5.00
10.00
Upper Promenade
Lower Promenade
Waterway
Lower Promenade
Upper Promenade 0
3
6m
s i t e
f u r n i t u r e
C e n tral P a r k
s i t e
f u r n i t u r e
6000
M a rina Quarter
1200
s i t e
f u r n i t u r e
B each Livin g
08
ABC Water Project Location : Bukit Batok & Whampoa, Singapore Area : 276 Ha Type : Public Realm Client : PUB (Singapore’s National Water Agency)
Singapore has undertaken the challenge of transforming into a City of Gardens and Water. Over the years, Singapore has gradually developed a pervasive network of about 8,000km of waterways and 17 reservoirs for our water supply. To realise the full potential of this water infrastructure PUB has launched the Active, Beautiful, Clean Waters (ABC Waters) Programme in 2006. It is a strategic initiative to improve the quality of water and life by harnessing the full potential of our waterbodies. By integrating the drains, canals and reservoirs with the surrounding environment in a holistic way, the ABC Waters Programme aims to create beautiful and clean streams, rivers, and lakes with postcard-pretty community spaces for all to enjoy.
PROJECT STAGES : • •
Preliminary Design Stage Detail Design Stage
ROLE & RESPONSIBILITIES Deputy Project Manager • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • Preparation of Detail Drawing Package • to work closely with PM and to meet the project time schedule
S ite 1 : Bu k it B a t o k We s t O u t l e t D r a i n The project site is stretching along the Pandan River canal from Expressway (PIE) to the south and up to the junction of Bukit Batok Ave 8 and Ave 6 to the North East. Project Site is surrounded by few HDB estates, private condominium complex as well as industrial estate. It is adjacent to the Bukit Batok Central Park (North east part of the site) and Sensory Park (Southern portion of the project site).
Inspired by nature, landscape structure is a poetic interpretation of the creek structure. Taking inspiration from its flowing waters and pebbles, rock and vegetation that creates this dynamic and active ecosystemthe site) and Sensory Park (Southern portion of the project site). RIVER CANYON
Bukit Batok Central Park
k ato
it B
Buk
st We
Dynamic
8 Ave
Bukit Batok West
er Pandan riv
Sensory Park
HdB Skyline @ Bukit Batok
Visually Expressive
Celebrating Water
express way (Pie)
PEOPLE’S GARDEN
CELEBRATING WATER
Inspired by Nature
Nodes & Connection
+ www.parksidecabinrentals.com
CONNECTING WITH NATURE
Rich Green Fabric
+ www.aecom.com
Nodes creating a journey along the creek, from the arrival point, through view point that allows to appreciate the dynamic landscape of the site, to a Green Sensory Pond, where the ‘creek’ flows and looses its impact creating calmer and more relaxing space for interaction and rejuvenation.
SECTION
1
1 Entry Plaza: Small open space to mark the entry point and create sense of arrival
2 3
SITEPLAN
2 Viewing Deck : Cantilevered platform, a rest point providing opportunity to appreciate the view of the ‘creek’
3 Green Plaza : Open space where the flow and landscape is less dynamic, providing opportunity to relax
S ite 2 : Su n g e i Wh amp o a The project site is stretching along the Sungei Whampoa from Sungei Kalang to the South East and St George’s West Gardens HDB complex to the North West. Project Site is surrounded by few HDB estates, private condominium complex as well as industrial estate. There is NParks Park Connector cutting through the site.
Celebrating water, using the nature inspired design language to create nodes, shape the spaces and create connections. These are further developed by applying the cultural fabric (that links with the past)and ABC features, allowing the community to learn about and appreciate the water PEOPLE’S WATERGARDEN FLOW
HdB St. George’s West Gardens
HdB St. George’s towers t HdB McNair towers t
eight river Suites
Su
ng ei
Boon Keng Mrt
W
ha
m
po
a HdB the river vista @ Kallang
Sungei Ka
llang
HdB Bendemeer ville
WATER DROP
PEOPLE’S GARDEN
CELEBRATING WATER
People’s Garden
Celebrating Water
+ www.srx.com.sg
CONNECTING WITH NATURE
Connecting with Nature
+ https://i.pinimg.com
https://slinkyjynx.deviantart.com
Creating a linear park made of series of gardens that allow to rejuvenate and explore through connections with nature and celebration of water. A landscape that promotes healthy lifestyle, better interaction and integration of community as well as building the awareness of water significance in our life.
SECTION
1
3
4
2
SITEPLAN
1 Rain Garden Node
3 Communal Garden at Whampoa West - Multi purposed Lawn
2 New Park Connector Networks with Vagetated Swale
4 Communal Garden at Whampoa West - Kids Play Area
09
Seagrove Resort Location : Cebu, Philippines Type : Eco-fun & resort themed Water Park Destination Client : Ayala Land
Seagrove is envisioned as an integrated and commercially viable mixeduse community characterized by a dynamic, eco-fun, and resort-themed destination. A Coastal Leisure Hub Where Eco Meets Fun Nature Is At The Forefront And Celebrates The Natural Environment To The Fullest... Enriched By The Mangroves, Unassuming Like The Seagrass & Inspired By The Corals. Tailor-Fitted Recreation For Every Age Through Invigorating Adventure, Relaxing Leisure & Calming Wellness
PROJECT STAGES : • • •
Initial Concept Design Stage Concept Design Stage Schematic Design Stage
ROLE & RESPONSIBILITIES Intermediate Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • Preparation of Detail Drawing Package • to work closely with PM and to meet the project time schedule
S I TE DIAG RAM LEISURE LAGOONS
HOTEL POOL
FAMILY POOL & LAZY RIVER
PARADISE SPRINGS
SUNSET DECK & EVENT LAWN
KID’S POOL
MANGROVE
MANGROVE FOREST GARDEN
ACTIVE POOL & LOUNGE DECK EX IS TI NG CA R R PA KI NG
PUNTA
ENGAN
O R OA
D
TO SHANGRI-LA
A UNIQUE FUN EXPERIENCE THAT TAKES ON A TIMELESS APPROACH WHICH PLACES NATURE AT THE FOREFRONT OF THE DESIGN. IT IS PROPOSED TO BE THE ELEMENT THAT TIES ALL THE AMENITES WHICH IS PROGRAMMABLE, INTERACTIVE, AND FLEXIBLE TO CATER FOR MULTI GENERATIONS ENTRY/EXIT OF LAZY RIVER
2
WATER SPOUTS CANYON
WATERFALL BRIDGE
3
VINE CANOPY
5
GATEWAY ENTRANCE
250m 3.0m 1.0m 906m3
TICKET OFFICE RENTAL FACILITY TOILET
1
GREEN OASIS LAWN
LENGTH WIDTH DEPTH VOLUME
4
3
RO
AD
BAMBOO GROVE
MIST VALLEY
GA
NO
HOTEL DROP-OFF
EN
CENTRAL AMENITY LAZY RIVER
NT A
HOTEL POOL
MAIN PEDESTRIAN STREET
PU
SUNSET DECK
SECONDARY PEDESTRIAN
EVENT LAWN
GENERAL PEDESTRIAN SERVICE BLUEHOLE ESCAPE POOL
RETAIL STREET LEISURE FAMILY LAGOON
VEHICULAR ACCESS GATED ACCESS
NATURAL MANGROVE DEPRESSION
PARADISE SPRINGS KID’S ZONE
NATURAL MANGROVE DEPRESSION
FE
RR
GREEN OASIS
YP
OR
GATEWAY PAVILION
T
DROP-OFF
DR
ACTIVE POOL & LOUNGE DECK
OP
-O
FF
s i te pl an SUNSET DECK & EVENT LAWN +8.00
+5.00
+8.00
+7.00 +6.00 +6.0
+ +6.00
+5.00
+5.00
+7.00
BLUE HOLE ESCAPE (ADULT POOL)
+6.50
LEISURE LAGOON AND LAZY RIVER
ACTIVE POOL
+7.00
HOTEL POOL
PARADISE SPRING (KIDS POOL)
+6.50
0
+7.00
OASIS GARDEN +8.00
+9.00
+9.50
+10.00
+10.00
+10.00
GATEWAY ENTRANCE
PE RSPECTIVE
SE CTI ON MANGROVE HOTEL POOL @ +8.0
RETAIL BOARDWALK
SUNSET INFINITY POOL @ +7.0
FEATURE BRIDGE OVER FAMILY POOL
INFINITY POOL DINING PAVILION @ +7.0 ACCESS WALK TO HOTEL
0 1
5
10
20m 1:250
FAMIL @ FAMILY POOL @ +6.0
TERRACE SEATING AREA
LAZY RIVER @ +6.0
P LANT ING FOCAL TREE SHADE TREE
FEATURE TREE FERN TREE BUFFER TREE STREET TREE
“A WARM AMBIENT LIGHT COMPLEMENT BY USE OF BAMBOO MATERIAL AND SOFT LIGHTING FOR THE POOLS AND WATER FEATURE” SWING AND PLAY PAVILION
CENTRAL POOL FACILITY
LY POOL @ +7.0
TODDLER POOL @ +9.0
CASCADE WITH FEATURE BRIDGE
CENTRAL POOL FACILITY
KID’S POOL @ +8.0 KID’S POOL @ +8.0
INTEGRATED WALL CLIMBING FACILITY UPPER KID’S POOL @UPPER +9.0 KID’S POOL @ +9.0
0 1
5
10
ENTRY FEATURE WALL
20m 1:250
0 1
5
10
20m 1:250
FOOD HALL WITH FEAUTRE SHADE STRUCTURE @ +9.5
AMPHITHEATRE AND EVENTS LAWN @ +8.5
10
Henann Resort Location : Cebu, Philippines Type : Hotel Resort Client : Boracay Regency Beach Resort
Inspired by the strong culture of Cebu, the rattan weaving tradition embedded into the site where the beauty of nature meet the luxurious man made icon. The rustic character of unfinished stone shall be complimented by simple elegant finishes with subdued tones of colour mixture of dark greys and warm beige. This shall be kept to minimum to have a more cohesive hardscape palette.
PROJECT STAGES : • •
Initial Concept Design Stage Concept Design Stage
ROLE & RESPONSIBILITIES Intermediate Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • to work closely with PM and to meet the project time schedule
SI TE PLAN PROPOSED ROAD EXTENSION
CONDOTEL 3 (10 LEVELS)
CONDOTEL 2 (11 LEVELS)
LAGOON CONDOTEL POOL CONDOTEL ENTRY
+10M
+6M
CONDOTEL DROP-OFF
KIDS PLAY AREA +10M
EXISTING CAUSEWAY
CONDOTEL 1 (8 LEVELS)
(7 LEVELS)
ENTRY GATEWAY
INTIMATE GREEN
RELAX SUNSET LAGOON
LEISURE BLUE INTIMATE GREEN
SEA
+3M
MULTI-PURPOSE EVENT LAWN +6M
LOADING DOCK +5M
GARDEN
FUNCTION LAWN
+10M
STAFF QUARTERS
+6M
CONVENTION CENTER
NORTH GUESTWING (7 LEVELS)
SIT SE
EP
RV
RO
ICE
PE
RO
RT
AD
YL
IN
E
+4M
SKY DECK
CONVENTION DROP-OFF RESTAURANT +4M
HOTEL DROP-OFF
LOBBY GUESTWING (10 LEVELS)
+4M +6M
POOL BAR
OUTDOOR DECK
B AC
K LI
NE
+6M
HOTEL POOL
SE T
+11M
20M
ARRIVAL COURT
SOUTH GUESTWING (7 LEVELS) SKY DECK +28.8M
SPA GARDEN +6M
KIDS PLAY AREA
CHAPEL
+6M
EVENT LAWN +5M
BEACH +0.0M
HULUTUNGAN CHANNEL
ARRI VA L ZON E INTIMATE GARDEN ZONE
SUNSET LAGOON ZONE
ARRIVAL ZONE MAIN POOL ZONE
INTIMATE GARDEN
SEASIDE ZONE
FEATURE BOULDER
FEATURE LIGHTING
+3M
CONDOTEL
SIDE WALK & PLANTING AREA
CONDOTEL ENTRY
+3M
ROAD MEDIAN
CONDOTEL ENTRY
SIDE WALK & PLANTING AREA
C O ND O POOL INTIMATE GARDEN ZONE
SUNSET LAGOON ZONE
ARRIVAL ZONE MAIN POOL ZONE
INTIMATE GARDEN
SEASIDE ZONE
CABANA SAFETY RAILING
+10M
CONDO POOL & LAP POOL
POOL WET LEDGE
POOL DECK
PLANTING AREA
SIDE WALK
IN TI M ATE GARD E N INTIMATE GARDEN ZONE
SUNSET LAGOON ZONE
ARRIVAL ZONE MAIN POOL ZONE
INTIMATE GARDEN ZONE
SEASIDE ZONE
SE ASI DE BEACH INTIMATE GARDEN ZONE
SUNSET LAGOON ZONE
ARRIVAL ZONE MAIN POOL ZONE
INTIMATE GARDEN ZONE
SEASIDE ZONE
M AI N P O OL INTIMATE GARDEN ZONE
SUNSET LAGOON ZONE
ARRIVAL ZONE MAIN POOL ZONE
INTIMATE GARDEN ZONE
SEASIDE ZONE
11
Tengah Location : Singapore Type : Lakeside Park Client : HDB
A natrure-immersed lifestyle that is embraced by the calmness and tranquility of the forest and the lake. The project takes on the form that is inspired by floating leaves amidst ripples in the water - a recognition of natures’ ability to not only exude calmness and peace as well as affect peoples wellbeing. Enhance The Forest To Maximize Biodiversity. Expanding The Forest Within The Lake (Tengah Pond). Increase Water Detention Features & Celebrate As Landscape Destinations. Merging Engineered Solutions To Appear Natural. Interconnect Community Interaction With The Forest & The Lake (Tengah Pond).
PROJECT STAGES : • •
Stage 1 Competition Stage 2 Competition
ROLE & RESPONSIBILITIES Intermediate Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • to work closely with PM and to meet the project time schedule
SI TEPLAN
JURONG LAKE GARDENS
TENGAH POND (LAKE) FOREST
TER
HANCE EN
EXPAND
INCREASE WATER DETENTION FEATURES & CELEBRATE AS LANDSCAPE DESTINATIONS
MERGING ENGINEERED SOLUTIONS TO APPEAR NATURAL
CREASE IN
MERGE
LILY
PO
ND
INTERCONNECT COMMUNITY INTERACTION WITH THE FOREST & THE LAKE (TENGAH POND)
IN
EXPANDING THE FOREST WITHIN THE LAKE (TENGAH POND)
COVE & GIANT
RCONNEC TE
T
ENHANCE THE FOREST TO MAXIMIZE BIODIVERSITY
RACED
CAR PARK 1 70 LOTS
K
GIANT CANOPY
NE
L
PA
R
CENTRAL PARK
HLAND TU N
MAIN DROP OFF & ARRIVAL PAVILION CENTRAL BIOTOPE
EDUPARK MARSHLAND
WATER PAVILION VIEWING BOARDWALK
EXPERENTIAL CORE
MAINTENANCE DEPOT BIRD-HIDE
E IV RS KE ME T LA M S I RE FO FOREST TOWER GATEWAY
FOREST LIGHT TRAIL LOOP BRIDGE
FUTURE BRIDGE TO JID
TUNNEL BRIDGE PIE
NATURE BOARDWALK
&
RIPPL
E P L A Y (A C T I V E
ZON
E)
GARDEN FARMWAY PLANTATION FARMWAY
TERRACED COVE & GIANT LILY POND
ARTIST PAVILION
VIEWING BOARDWALK WEIR
VE ERSI IMM T LAKE S FORE
EXPERIEN
PIE
TIAL
COR
E
SECONDARY ENTRANCE
CAR PARK 2 80 LOTS
RIPPLE PLAY (ACTIVE ZONE) HERITAGE PAVILION
EXHIBITION LANE
EX
FOREST FRINGE CAR PARK 3 80 LOTS
TION LANE
KE Y EX PERIEN C E S
d b
Experiential nodes that celebrate life’s intersections between the forest, water & people
f
a
a
EDUPARK MARSHLAND
b
ARRIVAL PAVILION
c
RIPPLE BRIDGE
d
BEE-HIVES KID’S PLAY AREA
e
RIPPLE PLAY SPLASH PAD ZONE
f
EXHIBITION LANE
SE CTI ON
c
Rain water harvesting canopy
Gabion Terrace Edge, re-use of existing canal wall
WL 102.70
WL 102.30
FL 104.50
WL 102.10
to terraced wetland
WL 101.00
BOP 9 SHARED PATH
TERRACED WETLAND
TENGAH POND (LA
F O R ES T C O NNE C T ION ► The culvert tunnel for pangolin ► The buffers, island within the lake, heavy planting along roads can potential provide connectivity for birds and butterfly
Wildlife Connection Culvert Tunnel
Road
Road Side Planting
Wildlife Connection Culvert Tunnel
e nt ro a d
r
to p
P.I.E
Median Planting
ll
Wildlife Fence
Road
ki
ev
Road Side Planting
TENGAH STREAM
FOREST FRINGE
FOREST FRINGE
106 106 Bridge 104.5
Adja ce
leve l
nt p lot
Pro men a
de Base of p ond ah P ond ( lak e)
Ten g
104.5
Na Boa ture rdw alk
Ten g
ah s trea m
0
WL 103.9
0 FL 104.50
0
99.961
AKE)
WL 103.4
FG 106.00
WL 103.3
WL 102.15 6m PUB Drainage Reserve NATURE BOARDWALK
IL 101.00
TENGAH STREAM
6m PUB Drainage Reserve
IMMERSIVE FOREST LAKE
PALM TREES
la
le
Dil
Me
p Ho
F ic
t
A ls
C
p
Sp o
n
Pe n t a s
l
t
As p
g e r st r o e m
Cra s
C rat o x y
f or m o s
U
aria g a mb
Hy d
r
op
o n i c To w
HERITAGE TREES
Sculptural Hydroponic Tower
a
Plant Pots Chamomile
Chard
Jasmine
Fennel
Palmarosa
u
nc
Lavender Spinach
l
Ba
s
tr L a g ers
P
s
m
L e pto
La
T y rs o
ta s p a d on
um
m b u s a mu
le x
b b e r Tre e Ru
y
Sy z
u
s
L e pto rt
Cy
A ls Pa
i G a rc i n
a
T y rs o
en
tle yi
y
BAMBOO
WETLANDS
mo
FLOWERING TREES
nd a
ta c
m i a f ori
bu
oe
ir
C ratox
i u m n it i d
m
b
en
um
osu
Bam
m
G i an t L i ly
FERN
s is
m o tle yi
L e pt o s p er
NATIVE TREES
y a nt hu
le
y lu m f o r
en
lt ip
HIGH VIT K VEGGIE
Kale
Cabbage
n t as p a d o n
HIGH VIT C VEGGIE
f o rib u n d
Thyme
m fo r m o s
um
lu
Cloudberry
ox
LEISURE hy s si a m
r st r o e m ia
n d ru m Basil
u
ya Dill
FLOWERING TREES
m ot
Sy z y giu m
f ori b u n d
yandr u m
ge La
Pe
Elderberry
on ad
hy s si a m s is
WETLANDS
f or m o s
ch
ta c
ia
en
ex
BAMBOO
HERBS
Rosemary
s d u l cis
a
i r m u m br a
h
Parsley
l
um
in et
m brac
FLOWERING TREES
d ia
y K h a a se n
yi
ol LEISURE
mu
f o rib u n d
SCULPTURAL TREES
pe
l
i c r o c ar p
pol
m
C rat o x y
a m u lt i p
sm
al e n sis
LEARN
ia
La RIPARIAN
g er st r o e
B u ci d a m
us
i a s c h olar
a
um
RELAX t r o v i r i d is aa FLOWERING TREES
on
eg
s a lpi n i a fe
rre
ae
a
n
is
p o ly a
er
n d a nus
t
a b lu m e
um
th
gi
o d o r at a
ea
m
p
t a c h y s re
LUSH CANOPY SCULPTURAL TREES TREES
c a c aj u p
m
t
Ho
os
nd
t o r iu s
a
i
o d o r at a
le u
ret i c u l
ut
ea
NATIVE TREES
RIPARIAN
yandr u m
SCULPTURAL TREES
ch
ec
r
is
on
ni a
ENGAGE
r m u m br a pe
ta
APPRECIATE
i a s c h ola
li a
L iv
is
F L ORA & FA UNA D IV E R S IT Y
n a r ot u n d
ifo
to
Ginger Garlic Papercorn
Water And Nutrients To Be Distributed Water And Nutrient Line From Tank Pumped To The Top Of The Tower
u r a atri ca
To d
Phosphorus
h
u m te st a
um
O rt
e tr
ce
HOLDING POND ABSORPTION
Is c h
e
e Fe j
C
p P ol y
e T
to
o
r Ma
tu
Ne p d
to C era
a
Submerged
i d es
a possibility of creating shallow zones (littoral zones) which are 200mm – 500mm depth at low water level/ permanent water level that can be more sheltered for certain fauna
n ia n
co
Below Mean
ta
tro
Hy
C ol
s
C y rto
Di
Pi
Ca
y Sy z
n
Zi
e
L e pt o s p
Co
A
Mean Level
icu m
c
u la
ic
at
sl
l
m
p
P re
TYPICAL HABITAT LIVING
TENGAH POND (LAKE)
ici
a
ZONE
ri
l at
ehne
SHALLOW
pt
ur
ko
WETLAND
a
Lo
s ra
s
na genera
aL
e
a
de
m
e
lu m e
il e
e ci os u m
i
ca
an
hr
nd
tia p e r uv
nt
ta
ab
ia
ve
lis
e
na
pt
n g a r iv u la
na
a
ct
ab
gi
na
ris
a lp i n i a fe r
re
es
ia
n
Above Mean
p o ly a
y s t ax
um
um
os
us
st
gi
th
an d r u m
s i a s pi n o s
a
sp
La
hy
o st ic hu m
u m b r ac
at e s l e u c o
ar ya li m n
m
Organic Matter
rm
ed
rv
M ela s
flo w
Le
Va r a
ve r
h ar is
POND (LAKE)
O
Ba
e
Egr
s s a l v at o r
oc
nu
ASSIMILATION
SHARED PATH
r a se n e g a
a
g a r z e tt a
cr
nu
di
Ar
Phosphorus
si s
d
nt e ea i r m
le n
Organic Matter
Nitrogen
ris
Organic Matter
m p hu s c h
lo
FILTRATION
Nitrogen
tt a
ra
i
lla
BIOTOPE Surface Runoff Pollutant
ch
pi
L on
W E T LAND
M ATERIALS ta
in le
s s Ste
in
e
Ti
S
mb
er & N
mi
n i u m Sl a
ts
u
D eck
Al
D
E x.
H otb er
g
PAVILION
m
Ti
C
T
E
e d G alv
et
C a n a l Wa
ip p
l
C e ntr
o
a
bl
s h ed C o n
is e d
e y G r a n it
ru
RAILING
Pe b
r t Pat h
ete
n
Di
k
an
x.
b er D ec
cr
im
ll
Gr
e
tu ral St on
all
WALL
Co
d T im b e r
eck
Na
e
W
e te Po d’s
re
r D eck
PAVING
cr
r i d g e Ti m
D
lB
C ol
ash
be
ew
LOUNGER & INFORMATION SIGNAGE INTERPRETATIVE LOUNGER
SIGNAGE
PROMENADE LIGHT
BIKE
LITTER
RACK
BIN
BENCH
F U RN I TURE Lounge Type 2 Bike Rack
Bench Litter Bin
Lounge Bike Rack
Type 1 Litter Bin
Lounge Type 1
FURNITURE TYPOLOGY
1
LOUNGE TYPE 1
2
LOUNGE TYPE 2
3
BENCH
4
LITTER BIN
5
BIKE RACK
6
FITNESS EQUIPMENT
LIGH T ING
3
2
DECK LIGHT
6
BOARDWALK LIGHT
PROMENADE LIGHT NATURE BOARDWALK LIGHT
6
1
CENTRAL BOARDWALK LED STRIP LIGHT
2
PROMENADE POLE LIGHT
3
DECK BOLLARD LIGHT
4
FEATURE PLANTINGS UPLIGHT
5 PAVILLIONS 6 DOWN LIGHT
BOARDWALK LED STRIP LIGHT
7
NATURE BOARDWALK ENTRACE LED STRIP LIGHT
8
ENTRANCE SIGNAGE LED STRIP LIGHT
9
LIGHT PATHWAY SOLAR-POWERED LED LIGHT
12
Maple Grove Location : Cavite, Philippines Type : Luxury residential Client : Megaworld
Maple Grove village is envisioned as a luxury residential development located in General Trias, Cavite, Philippines. The development is centered around the theme of wellness in mind, to create lush landscape environments and supporting facilities that promote general well-being and an ideal neighborhood to live.
PROJECT STAGES : • • •
Initial Concept Design Stage Concept Design Stage Schematic Design Stage
ROLE & RESPONSIBILITIES Intermediate Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • Preparation of Detail Drawing Package • to work closely with PM and to meet the project time schedule
#04-01/03 Haw Par Centre Contact Tel: +65 6227 2618 watg.com
LOCATION MAP
SI TEPLAN
Landscape Team
Ashley Scott Director Of Landscape + Planning
Herbert j. Montevirgen Senior Associates
FITNESS & ACTIVE PARK 1
Dyah Kurnia
Landscape Designer
Asdi Rahmani Junior Designer
SITE BOUNDARY
Yilan Shi
MAIN GUARD HOUSE
SITE BOUNDARY
Intern
Copyright © 2021 WATG. All rights reserved.
VICINITY MAP
SITE BOUNDARY
the original size of this A1 sheet is 841mm x 594mm
ENTRY WATER FEATURE
EDIBLE GARDEN 1
SITE BO
UNDARY
e original size of this A1 sheet is 841mm x 594mm
Copyright © 2021 WATG. All rights reserved.
GARDEN OF TRANQUILITY 1
1 : 1250
CHROMATHERAPY STREET WITH FEATURE TREES SENSORY GARDEN (AROMATIC)
EXISTING CULVERT DRAIN
SI
TE
BO
UN
SITE
DA
EDIBLE GARDEN 3
RY
BOU NDA RY
CHROMATHERAPY STREET WITH FEATURE TREES
CLUB HOUSE
SIT
150
EB
OU
ND
AR
Y
GARDEN OF TRANQUILITY 2
OU
EB SIT AR
ND Y
SECONDARY GUARD HOUSE EDIBLE GARDEN 2 NATURAL STREAM ABOVE EXISTING CULVERT DRAIN
RY
NDA
BOU
FITNESS & ACTIVE PARK 3
UNDARY
SITE BO
SITE
SENSORY GARDEN (COLOR&TEXTURE) Y
UNDAR
SITE BO
FITNESS & ACTIVE PARK 2
METERS 0
10
1:1250 20
50
E N TRY GUARD H OU S E
IMAGE REFERENCES
K01
STREET LIGHT
P02
STREET LIGHT
K01
P03
P03 P01
P02
s
s
P01
P02
SIGNAGE AND FEATURE WALL (W01)
P01
K02
P02
P02
P02b
P02b
P01
P01
K01
K01
W01
W01
n
ENTRY GUARD HOUSE WATER FEATUIRE (WF-01)
P02
P02 WF-01
WF-01
K02 P01
P02
the original size of this A1 sheet is 841mm x 594mm
Copyright © 2021 WATG. All rights reserved.
FEATURE TREE (Lagerstroemia speciosa)
0
FEATURE TREE (Lagerstroemia speciosa)
n
is
K01 P02 P03
P00
P02
K02
STREET LIGHT
STREET LIGHT
K02
P01
P03
P01
K01 P02
P02
P00
K
LEGEND:
P01
FEATURE ENTRY DRIVEWAY
P02
FEATURE ENTRY DRIVEWAY BANDING 1
P02b
FEATURE ENTRY DRIVEWAY BANDING 2
P03
FEATURE TREE (Lagerstroemia speciosa)
CONCRETE ROAD CHROMATHERAPY STREET WITH PURPLE FEATURE TREES AND SHRUBS
si
ROAD SITE SIDEWALK
K01
ROLL-OFF KERB
K02
DRIVEWAY KERB
W01
FEATURE WALL (ENTRY ROAD)
W02
PLANTER WALL
st
Tradescantia pallida
Pseuderanthemum carruthersii
s
p
C L
1
1500 800500 KERB SIDE WALK
PLAN 1 : 100
5500 ROAD PAVEMENT
4000 MEDIAN
c
5500 ROAD PAVEMENT
Lagerstromia speciosa
500800 1500 KERB SIDEWALK
Plectranthus 'Mona Lavender'
PURPLE FEATURE TREES AND SHRUBS
RIGHT OF WAY
0
FEATURE TREE (Lagerstroemia speciosa) FEATURE TREE (Lagerstroemia speciosa)
FEATURE TREE (Lagerstroemia speciosa) FEATURE TREE (Lagerstroemia SIGNAGE speciosa) TW 3.30
d
METERS 1
1:100 2
5
s
no
TW 3.30
SIGNAGE TW 3.30
TW 3.30
FL 0.10
FL 0.10
WF-01
.
WF-01
2% SLOPE
RL 0.00
2% SLOPE
RL 0.00 2% SLOPE
RL 0.00 2% SLOPE
RL 0.00
1500 800500 5500 KERB SIDE ROAD PAVEMENT WALK 1500 800500 5500 SIDE KERB ROAD PAVEMENT WALK
4000 MEDIAN 4000 RIGHT OF WAY MEDIAN
5500 ROAD PAVEMENT
FL 0.10
FL 0.10
500800 1500 KERB SIDE WALK 5500 500800 1500 SIDE ROAD PAVEMENT KERB WALK
WF-01
01
no
WF-01
is
Ke
C L UB HO USE KEYNOTES / LEGENDS 3000
ENTRY DROP-OFF
FLOATING GARDEN
3
WELLNESS POOL AND KIDS ZONE
4
--
strategy planning architecture landscape interiors
--
singapore | +65 6227 2618
MAIN POOL
ENTRY DROP-OFF MAIN ACCESS
watg.com
WATER COURT
AROMATIC GARDEN PLAY GARDEN SERVICE PATH
PLAY GARDEN
FG -1.00
1
CASCADING WATER WITH FOUNTAIN
--
WELLNESS GARDEN
FL -0.90
WELLNESS GARDEN FG -0.20
FL -0.05
REFLECTIVE WATER FEATURE
YOGA DECK
OUTDOOR KIDS PLAY AREA
-FL 0.05
150
FG -0.20
FL -0.05
RL -1.50
notice
FL -0.05
FEATURE TREE
AROMATIC AROMATIC GARDEN GARDEN
WATER FOUNTAIN
FG -0.20
FL -0.05
FLOATING GARDEN
FL -0.45
WATER COURT WATER
01
FEATURE
FG -0.90
no.
Copyright © 2021 WATG. All rights reserved. the original size of this A1 sheet is 841mm x 594mm
20/05/2022 LA-100% SCHEMATIC DESIGN
date
issue
issues | revisions
TW -0.60
WATER COURT
Key plan :
FL -0.90
FIRE FEATURE
WELLNESS POOL AND KIDS ZONE KIDS POOL
MAIN POOL
JACUZZI WL -1.00 BP -1.45
3000 FL -0.90
2 --
WELLNESS POOL
MAIN POOL
WL -1.00 BP -1.90
WL -1.00 BP -2.35
FL -0.90
sheet title FG -0.95
project no. FUNCTION LAWN
WATER WALL
CABANA
checked by:
CABANA
FL -0.90
FL -0.90
drawn by: component
1
CLUB HOUSE - OVERALL PLAN
METERS
1 : 200
0
2
1:200 4
10
sheet no.
strategy planning architecture landscape interiors
singapore | +65 6227 2618
DRY GARDEN
REFLECTIVE WATER FEATUTE
REFLECTIVE WATER FEATURE FIRE FEATURE H01
FL -0.05 FL -0.90
FL -0.90
FL -0.90
FL -1.00
FL -1.50
FL -1.90
ACCESS TO BASEMENT
3
PA
COVERED ENTRY
6000 REFLECTIVE WATER
CLUB HOUSE - SECTION 3 1 : 150
4300 ENTRANCE
CLUB HOUSE INTERNAL BUILDING
FLOATING GARDEN
FIRE COURT WALKWAY
JACUZZI
WELLNESS POOL
PA
SIDE WALK
ROAD
notice
watg.com
C L UB HO USE - E N LA R G E M E N T KEYNOTES / LEGENDS
3000
LEGEND: P01
3 --
ENTRY DROP-OFF
FLOATING GARDEN
FEATURE ENTRY DRIVEWAY
WELLNESS POOL AND KIDS ZONE
4
strategy planning architecture landscape interiors
--
singapore | +65 6227 2618
MAIN POOL
ENTRY DROP-OFF MAIN ACCESS
watg.com
WATER COURT
FEATURE ENTRY DRIVEWAY BANDING 1
P02
AROMATIC GARDEN PLAY GARDEN
SERVICE PATH
PLAY GARDEN
FG -1.00
1
CASCADING WATER WITH FOUNTAIN
--
WELLNESS GARDEN
FEATURE ENTRY DRIVEWAY BANDING 2
FL -0.90
P02b REFLECTIVE WATER FEATURE
WELLNESS GARDEN FG -0.20
FL -0.05
YOGA DECK
OUTDOOR KIDS PLAY AREA
-FL 0.05
150
FG -0.20
STEPPING STONE�GRANITE� LIGHT GREY
FL -0.05
P04
RL -1.50
FL -0.05
AROMATIC AROMATIC GARDEN GARDEN
notice
WATER FOUNTAIN
FG -0.20
FEATURE PAVING�GRANITE�BEIGE
P05
FLOATING GARDEN
FEATURE TREE
FL -0.05
FL -0.45
WATER COURT WATER
01
FEATURE
the original size of this A1 sheet is 841mm x 594mm
Copyright © 2021 WATG. All rights reserved.
FG -0.90
no.
300�300 GRANITE�GREY
P06
20/05/2022 LA-100% SCHEMATIC DESIGN
date
issue
issues | revisions
TW -0.60
WATER COURT
Key plan :
FL -0.90
FIRE FEATURE
WELLNESS POOL AND KIDS ZONE KIDS POOL
JACUZZI
MAIN POOL
TIMBER DECK
P07
WL -1.00 BP -1.45
3000 FL -0.90
2 --
WELLNESS POOL
MAIN POOL
WL -1.00 BP -1.90
WL -1.00 BP -2.35
P08
FL -0.90
sheet title
GRANITE STONE�BLACK
FG -0.95
project no.
FUNCTION LAWN
WATER WALL
CABANA FL -0.90
checked by:
CABANA FL -0.90
drawn by: component
CLUB HOUSE - OVERALL PLAN
METERS
1 ACCESS
1 : 200
0
P09
ANDESITE STONE�BLACK
P15
CRUSHED GRANITE�GREY
P16
LOOSE PEBBLES�BLACK
P17
SAND
2
1:200 4
10
sheet no.
ENTRY DROP-OFF WITH FEATURE WATER
P15
WALKWAY
WL -1.00 BP -1.30
P04 GREEN WALL
P08
ENTRY REFLECTIVE WATER FEATURE
IMAGE REFERENCES FL -0.05
KEYNOTES / LEGENDS 3000
LEGEND: P01
3 --
ENTRY DROP-OFF
FLOATING GARDEN
FEATURE ENTRY DRIVEWAY
WELLNESS POOL AND KIDS ZONE
4
MAIN ACCESS
P02 SERVICE PATH
CASCADING WATER WITH FOUNTAIN
--
AROMATIC GARDEN PLAY GARDEN
PLAY GARDEN
WELLNESS GARDEN
FEATURE ENTRY DRIVEWAY BANDING 2
FL -0.90
P02b REFLECTIVE WATER FEATURE
WELLNESS GARDEN FG -0.20
FL -0.05
YOGA DECK
OUTDOOR KIDS PLAY AREA
-FL 0.05
watg.com
WATER COURT
FL FEATURE ENTRY DRIVEWAY BANDING 1 -0.05
FG -1.00
singapore | +65 6227 2618
MAIN POOL
ENTRY DROP-OFF
1
strategy planning architecture landscape interiors
--
150
FG -0.20
STEPPING STONE, GRANITE, LIGHT GREY
P04
FL -0.05
RL -1.50
FL -0.05
FEATURE TREE
notice
WATER FOUNTAIN
FG -0.20
FEATURE PAVING, GRANITE, BEIGE
P05
FLOATING GARDEN
AROMATIC AROMATIC GARDEN GARDEN
FL -0.05
FL -0.45
WATER COURT WATER
01
FEATURE
Copyright © 2021 WATG. All rights reserved. the original size of this A1 sheet is 841mm x 594mm
issue
FL -0.90
FIRE FEATURE
WELLNESS POOL AND KIDS ZONE KIDS POOL
JACUZZI WL -1.00 BP -1.45
MAIN POOL
TIMBER DECK
P07
3000 FL -0.90
2 --
WELLNESS POOL
MAIN POOL
WL -1.00 BP -1.90
WL -1.00 BP -2.35
P08
FL -0.90
sheet title
GRANITE STONE, BLACK
FG -0.95
project no.
FUNCTION LAWN
CABANA
WATER WALL
checked by:
CABANA
FL -0.90
FL -0.90
drawn by: component
1
CLUB HOUSE - OVERALL PLAN
METERS
1 : 200
0
P09
ANDESITE STONE, BLACK
P15
CRUSHED GRANITE, GREY
P16
LOOSE PEBBLES, BLACK
P17
SAND
2
1:200 4
10
sheet no.
WELLNESS POOL
IMAGE REFERENCES
LEGEND:
IC N
P01
FEATURE ENTRY
DRIVEWAY TW -0.90
P16
-0.20 90
P02
FEATURE ENTRY DRIVEWAY BANDING 1 WL -1.00
P02b
FEATURE ENTRY W02 BANDING 2 DRIVEWAY
WATER FOUNTAIN
BP -1.30
P04
STEPPING STONE, GRANITE, LIGHT GREY
P05
FEATURE PAVING, GRANITE, BEIGE
P06
300x300 GRANITE, GREY
P07
TIMBER DECK POOL
P15
90 WF-07 FOUNTAIN WITH FIRE FEATURE
I 1.00 .45
1.00
date
Key plan :
.45
SS
20/05/2022 LA-100% SCHEMATIC DESIGN
issues | revisions
300x300 GRANITE, GREY
P06
00
no.
TW -0.60
FG -0.90
WATER COURT
TW -0.60
P06
Reflective Water Feature
LADDER
P08
P07 GRANITE STONE, BLACK
P09
ANDESITE STONE, BLACK
P15
REGIAGREY CRUSHED GRANITE,
P16
WATER LOOSE PEBBLES, BLACK
P17
SAND
Kids Water Play
Relaxing pool with hydro massage water jets
W02 DELONIX
FEATURE
W02
MAIN POOL MAIN POOL WL -1.00
IMAGE REFERENCES Tabebuia argantea
Coccoloba uvifera
Tropical Color in the Summer Garden
C L UB HO USE - E N LA R G E M E N T SERVICE PATH
KEYNOTES / LEGENDS
3000
ENTRY DROP-OFF
FLOATING GARDEN
OMATIC TREE
3
WELLNESS POOL AND KIDS ZONE
4
--
strategy planning architecture landscape interiors
--
singapore | +65 6227 2618
MAIN POOL
ENTRY DROP-OFF MAIN ACCESS
watg.com
WATER COURT
AROMATIC GARDEN PLAY GARDEN SERVICE PATH
PLAY GARDEN
FG -1.00
1
CASCADING WATER WITH FOUNTAIN
--
WELLNESS GARDEN
FL -0.90
P17
WELLNESS GARDEN FG -0.20
FL -0.05
REFLECTIVE WATER FEATURE
YOGA DECK
OUTDOOR KIDS PLAY AREA
-FL 0.05
FG -0.20
150
FG -0.20
FL -0.05
RL -1.50
notice
FEATURE TREE
FL -0.05
AROMATIC AROMATIC GARDEN GARDEN
WATER FOUNTAIN
FG -0.20
KIDS CLUB
FL -0.05
FLOATING GARDEN
FL -0.45
WATER COURT WATER
01
FEATURE
no.
FG -0.90
the original size of this A1 sheet is 841mm x 594mm
Copyright © 2021 WATG. All rights reserved.
WATER COURT
F05
WF-06 CIRCLE FOUNTAIN FL -0.90
FIRE FEATURE
WELLNESS POOL AND KIDS ZONE
KIDS POOL
MAIN POOL
OUTDOOR KIDS PLAY AREA
P07
20/05/2022 LA-100% SCHEMATIC DESIGN
date
issue
issues | revisions
TW -0.60
0.00
Key plan :
-FL 0.05
FG -0.20
P15
P04 0
15
JACUZZI WL -1.00 BP -1.45
3000
2
F05
FL -0.90
--
WELLNESS POOL
MAIN POOL
WL -1.00 BP -1.90
WL -1.00 BP -2.35
FL -0.90
sheet title FG -0.95
project no. FUNCTION LAWN
CABANA
WATER WALL
checked by:
CABANA
FL -0.90
FL -0.90
drawn by: component
CLUB HOUSE - OVERALL PLAN
1
METERS
1 : 200
0
2
1:200 4
10
sheet no.
AROMATIC TREE
WATER COURT AND OUTDOOR SOFA PLUMERIA FL -0.05 LOUNGER OBTUSA
GYM (C
AROMATIC GARDEN
WATER FOUNTAIN
FG -0.20
WATER COURT GARDEN
EE GIA
KEYNOTES / LEGENDS 3000
ENTRY DROP-OFF
FLOATING GARDEN
3
WELLNESS POOL AND KIDS ZONE
4
--
strategy planning architecture landscape interiors
--
singapore | +65 6227 2618
MAIN POOL
ENTRY DROP-OFF MAIN ACCESS
watg.com
WATER COURT
AROMATIC GARDEN PLAY GARDEN SERVICE PATH
PLAY GARDEN
FG -1.00
1
CASCADING WATER WITH FOUNTAIN
--
WELLNESS GARDEN
FL -0.90
WELLNESS GARDEN FG -0.20
W03
FL -0.05
REFLECTIVE WATER FEATURE
YOGA DECK
OUTDOOR KIDS PLAY AREA
-FL 0.05
150
FG -0.20
FL -0.05
RL -1.50
AROMATIC AROMATIC GARDEN GARDEN
WATER FOUNTAIN
FG -0.20
FL -0.05
FLOATING GARDEN
FL -0.45
WATER COURT WATER
FEATURE
FG -0.90
TW -0.60
the original size of this A1 sheet is 841mm x 594mm
Copyright © 2021 WATG. All rights reserved.
WATER COURT
FL -0.90
FIRE FEATURE
WELLNESS POOL AND KIDS ZONE KIDS POOL
MAIN POOL
JACUZZI WL -1.00 BP -1.45
3000 FL -0.90
2 --
WELLNESS POOL
MAIN POOL
WL -1.00 BP -1.90
WL -1.00 BP -2.35
FL -0.90
FG -0.95
FUNCTION LAWN
WATER WALL
1
CABANA FL -0.90
CABANA FL -0.90
CLUB HOUSE - OVERALL PLAN 1 : 200
FUNCTION HALL
the original size of this A1 sheet is 841mm x 594mm
FEATURE TREE
Copyright © 2021 WATG. All rights reserved.
notice
FL -0.05
01
no.
20/05/2022 LA-100% SCHEMATIC DESIGN
date
issue
issues | revisions Key plan :
Courtyard Garden with Shaded Trees
Courtyard Garden with Shaded Trees
Lush and Tropical Planting
sheet title project no. checked by: drawn by: component METERS 0
2
1:200 4
10
sheet no.
OUTDOOR KIDS PLAY AREA (KIDS CLUB EXTENSION)
Delonix KIDS Regia
1
1 : 100
Feature Rocks , Ferns and
Xiphidium PLAY AND WELLNESS GARDEN BLOWcaeruleum UP PLAN Tropical Planting
Dracaena reflexa
S TR EE T S C AP E LEGEND:
CONCRETE ROAD
P00
EVERGREEN TREE STREET LIGHTING
EVERGREEN TREE STREET LIGHTING
P01
FEATURE ENTRY DRIVEWAY
P02
FEATURE ENTRY DRIVEWAY BANDING 1
P02b
FEATURE ENTRY DRIVEWAY BANDING 2 ROAD SITE SIDEWALK
P03 K01
FL 0.10
2% SLOPE
RL 0.00 2% SLOPE
N
IMAGE REFERENCES
ROLL-OFF KERB
K02
DRIVEWAY KERB
W01
FEATURE WALL (ENTRY ROAD)
W02
PLANTER WALL
PROPERTY LINE
PROPERTY LINE
10m MAIN ROAD WITH PLANTING ON BOTH SIDE AND PEDESTRIAN WALKWAY ON ONE SIDE
C L
STREET LIGHT
Hymenocallis littoralis
STREET LIGHT
K01
K01
PROPERTY LINE
Artocarpus heterophyllus
6M WIDE DRIVEWAY ZONE (FOR 5M WIDE DRIVEWAY)
6M WIDE DRIVEWAY ZONE (FOR 5M WIDE DRIVEWAY)
P03 Costus
STREET TREES AND SHRUBS
PROPERTY LINE
STREET LIGHT
STREET LIGHT
P00
K01
P03
PLOT
PROPERTY LINE 1500 SIDE WALK
1000 500 KERB
5000 ROAD PAVEMENT
500 1500 KERB
6M WIDE DRIVEWAY ZONE (FOR 5M WIDE DRIVEWAY)
K01
PROPERTY LINE
6M WIDE DRIVEWAY ZONE (FOR 5M WIDE DRIVEWAY)
ROLL-OUT KERB (K01)
PLOT
PEDESTRIAN LIGHTING
RIGHT OF WAY
C L
METERS 0
1
1:100 2
5
ROAD SIDE SITEWALK (P03)
PO C KET GARD E N LEGEND: PEDESTRIAN CROSSING SIGNAGE
IMAGE REFERENCES
F05
BENCH
W05
CONCRETE SEAT WALL
P11
CONCRETE AGGREGATE, BEIGE
P16
LOOSE PEBBLES, BLACK
GARDENS OF TRANQUILITY PASSIVE GARDEN FOR CONTEMPLATION, YOGA, MEDITATION, REFLECTION AND CONNECT BACK TO NATURE
strategy planning architecture landscape interiors
singapore | +65 6227 2618
REFLEXOLOGY WALK FL -0.10
YOGA LAWN
watg.com
TO NT
REFLEXOLOGY WALK FL -0.10
SUNKEN REFLECTIVE LAWN
PEDESTRIAN CROSSING
FL -0.60
F05
YOGA LAWN
SIGNAGE
BENCH
P11 MAIN PATH FL 0.00
W05 CONCRETE SEATWALL
YOGA LAWN FL -0.05
LABYRINTH WALK, LOW HEDGE WITH PEBBLES PATH
P16
FL -0.05
CUSTOMIZED LABYRINTH WALK : BY SPECIALIST (HTTPS://LIGHTTIDE.COM/CUSTOMIZED-LABYRINTHS-DESIGN/)
SIGNAGE
notice
DENSE PLANTING TO ADJACENT PLOTS
F05
PEDESTRIAN CROSSING
BENCH
1
--
SOFT MOOD LIGHTING 01
no.
20/05/2022 LA-100% SCHEMATIC DESIGN
date
issue
issues | revisions
SUNKEN REFLECTIVE LAWN
REFLEXOLOGY PATH
Key plan :
FEATURE TREES
--
1
PEDESTRIAN CROSSING
SIGNAGE
W05
LABYRINTH WALK, LOW HEDGE WITH PEBBLES PATH
REFLECTIVE WALK
STUMPS
P11
P16
FL 0.00
FL -0.10
FL -0.60
sheet title
PLANTING BOXES WITH VEG / HERBS
4550
project no.
11600 SUNKEN LAWN
3250 REFLECTIVE WALK
6800 ROADSIDE GREEN
drawn by: component METERS
P13
1 : 100
checked by:
GREEN IMMERSION WITH SPECIAL HIGHLIGHTS AND SPLASHES OF COLOR
GARDEN OF TRANQUILITY - PLAN
0
F05
F05
EDIBLE GARDEN FL 0.00
1
12000 LABYRINTH WALK, LOW HEDGE WITH PEBBLES PATH PLANTING BOXES WITH VEG / HERBS
6600 ROADSIDE GREEN
1
1:100 2
5
sheet no.
BENCH
BENCH P10
CHILDREN'S PLAY FL 0.00
PLAY EQUIPMENTS
P12
PICNIC AREA FL 0.00
F07
PICNIC TABLE
SIGNAGE
PEDESTRIAN CROSSING
LEGEND:
P10
F05
P12
P13
LEGEND:
1
SIGNAGE
IMAGE REFERENCES
F05
BENCH
W05
CONCRETE SEAT WALL
P07
TIMBER DECK
P11
CONCRETE AGGREGATE, BEIGE
P12
CRAZY PATTERN GRANITE, MIXED GREY
SENSORY GARDEN DIFFERENT TYPE OF PLANTING AND MATERIAL TO STIMULATING AND ENGAGING HUMAN SENSES OF SMELL AND SIGHT-TOUCH
strategy planning architecture landscape interiors
-MOUND FL 0.60
singapore | +65 6227 2618
SIGNAGE
MEDITATION DECK
BENCH
FL 0.20
P11
F05
watg.com
DENSE PLANTING TO ADJACENT PLOTS
P07
MAIN PATH
FL 0.00 PEDESTRIAN CROSSING
AROMATIC PLANTS FEATURED TREES
W05
P12 PATH FL 0.00
AROMATIC PLANTINGS
F05
BENCH
AROMATIC PLANTINGS
notice
DENSE PLANTING TO ADJACENT PLOTS
AROMATIC PLANTINGS
F05
BENCH
ORGANIC SHAPES
SIGNAGE PEDESTRIAN CROSSING
1
AROMATIC GARDEN - PLAN
01
20/05/2022 LA-100% SCHEMATIC DESIGN
no.
1 : 150
date
issue
issues | revisions Key plan :
CYRTOSTACHYS RENDA
LEGEND:
AERIDES LAWRENCEA
CANANGA ODORATA
IMAGE REFERENCES
FEATURED TREES
PEDESTRIAN CROSSING
AROMATIC PLANTINGS
FL 0.00
1000 PATH
F05
1700 PATH
1200 PATH
1
F05
FL 0.20
FL 0.70 FL 0.60 BENCH
F05
BENCH
P10
EPDM
P11
CONCRETE AGGREGATE, BEIGE
P14
CONCRETE, RED COLOR
FITNESS AND ACTIVE GARDEN GARDEN WITH DIFFERENT TYPE OF EXERCISE ZONE TO KEEP RESIDENCE ACTIVE AND HEALTHY
PANDANUS strategy planning architecture landscape interiors
8600 LYING DECK
P14
23000 AROMATIC GARDEN
14000 MOUND
2800 RUNWAY FLMAIN 0.00ROAD
sheet title singapore | +65 6227 2618 project no.
2600 ROADSIDE GREENERY
TRACHELOSPERMUM JASMINOIDES
MOUND
--
2
SIGNAGE
P11 W05
P12
BENCH
P07
AROMATIC GARDEN - SECTION 1 : 150
drawn by: component
METERS
P10
FITNESS STATION
0
FL 0.00
watg.com
checked by:
PELTOPHORUM PTEROCARPUM
1.5
1:150 3
7.5
sheet no.
BASKETBALL COURT
FEATURED TREES
P10 BASKETBALL COURT
F05
BENCH
P11 BENCH
F05
RESTING AREA
P14 RUNWAY FL 0.00
FEATURED TREES
P10 PLAYGROUND
RUNNING TRACK
PEDESTRIAN CROSSING
notice
SIGNAGE
F05 BENCH
1
FITNESS AND ACTIVE GARDEN 1 - PLAN 1 : 150
01
FITNESS EQUIPMENT
no.
20/05/2022 LA-100% SCHEMATIC DESIGN
date
issues | revisions Key plan :
issue
13
Thanh Xuan Location : Vin Phuc, Vietnam Type : Information Center Client : BIM Land
Nestled in the coniferous forest in a site not far from Tam Dao National Park, this development offers homeowners a mild climate and prime mountain views that evoke sense of tranquility.
PROJECT STAGES : • •
Initial Concept Design Stage Concept Design Stage
ROLE & RESPONSIBILITIES Intermediate Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • to work closely with PM and to meet the project time schedule
-S
cu
LAN
UN D F&B A RY ZO WITH NE
SLOPE ZONE
l
La n
10
dscape
+ 35.00
+ 34.50
9
A
ARRIVAL ZO
NE
DS
W
BO
M e a d ow
+ 37.60
-F
or
e st Ca n o
+ 34.50
py
8
+ 36.20
7
H
E
er lo w -F
+ 37.55
8
WIT DA R Y BOUN ZONE B F&
s D
ce
NA
Mountain Terra
TH E PRO ME
R-
ed
O PE
TE EA
pt
NT
H
SI TEPLAN
+ 37.55
6 + 37.60
+ 37.55
+ 32.95
+ 37.10 + 37.55
4 5
B OT PL OU ND AR Y
LAND + 32.95
SC
LEGEND :
SCA P WO E SCO RKS PE O F
1 - ENTRY DRIVEWAY (ARRIVAL) 2 - T-JUNCTION 3 - SLOPE ZONE (PRIVATE GARDEN) 4 - MOTOR COURT 5 - HILLSIDE VIEWING DECK 6 - OUTDOOR SEATING & BAR 7 - PERFORMANCE STAGE 8 - OPEN THEATRE 9 - RIVER SIDE VIEWING DECK 10 - THE PROMENADE 11 - PEDESTRIAN CONNECTION TO BIGGER SITE 12 - LEVEL 1 CARPARK (BASEMENT) ENTRY 13 - SERVICE ACCESS
C
+ 32.00
4 10 B
A - FUTURE F&B B - FUTURE STREAM C - FUTURE VILLAGE CENTER
+ 37.60
12
3
13
+ 33.00
PLO TB
3
ND
A RY
2 + 36.00
DSC
11
APE WO SCOPE RKS OF
+ 36.20
OU
F
LAN
O SCOPE CAPE S WORK
+ 38.15
+ 37.55
1
ARRI VA L DRIVE WAY
Existing Hill with pine trees
Raised Planter
Kerb
Terraced
Cobblestone
Feature Rocks
Seating
Driveway
with signage
Road Median with Forest Tree Canopy
Terraced
Feature Rocks
Seating
with signage
Existing Hill with pine trees
T H E M O TOR CO U RT
Raised
Feature
Circular Water Feature With
Cobblestone
Pedestrian
Raised
Planter
Wall
Rock Sculpture
Driveway
Walkway
Planter
O PEN THEATRE
Playfull Outdoor Furniture
Radial Cut Stone Paving
Performance Stage
Terraced Timber Seating
Lawn with Shaded Trees
PRI VATE G ARD E N
The Promenade
Terraced
Seating with fire
Stepping
Seating Node /
Wall / balustrade
Retaining Wall
feature
Stone Pathway
Viewing Deck
for safety
Feature Tree
Fire Feature
Weeping Willow
Viewing Deck Seating
Safety Wall
Rock Sculpture with signage
Terraced Retaining Wall FL 38.15 FL 37.55
FG 37.50
Natural Slope
FL 36.20
FL 36.00
FL 32.00
WL 31.00
EXISTING HILLS
ARRIVAL ROAD
ROUNDABOUT
ARRIVAL ROAD
DIRECTIONAL SIGNAGE
PEDESTRIAN
PRIVATE GARDEN WITH VIEWING DECK
RETAINING WALL
DRIVEWAY TO LEVEL 1 CARPARK
PLANTING AREA
PROMENADE
WETLAND
STREAM
T H E PR OMEN ADE
Wetland Planting
Viewing Deck with Cozy Seating
Weeping Willow
Reed Lighting
3.5m walkway (fire
Viewing Deck with Cozy Seating
BOUNDARY WITH F&B ZONE
Water Lily
Viewing Deck
engine access)
Safety Railing between planting
Feature Rocks with water fountain
Fun seating at open thatre
Steps
Beanbag on Lawn
Arrival water feature
Building Interior
Dry Fountain FL 37.55
FL 37.60
FL 37.55
FL 37.10
TW 37.70
FL 37.10
FL 36.20
FL 34.50
Safety Wall Level 1 (Car parks)
FL 34.50
Green Retaining Wall
FL 33.00
F&B ZONE
PLATFORM CONNECT TO FUTURE F&B ZONE
TERRACED SEATING
PERFORMANECE STAGE
TERRACED SEATING
OUTDOOR TERRACE
INFORMATION CENTER LOBBY
DROP-OFF
MOTORCOURT DRIVEWAY
FL 32.95
PA
CIRCULAR WATER FEATURE
PA
MOTORCOURT DRIVEWAY
PA
WALKWAY
SLOPE
14
Calla Resort Location : Cat Hai Village, Vietnam Type : Hotel & Resort Client : Calla
Envisioned as a world-class destination for family escapades and adventures, the 5-star Calla Resort and Residences is set in a picturesque beachfront setting, scenic hills and dramatic rock cliff formations.
PROJECT STAGES : •
Initial Concept Design Stage
ROLE & RESPONSIBILITIES Intermediate Landscape Designer • Preparation of Plans, Sections, Graphics, Documentation and any other related materials for final report • Preparation of model study using sketch up • Preparation of rendered views • to work closely with PM and to meet the project time schedule
SI TEPLAN
Beach Lagoon Refreshing marine lifestyle
Hotel Landscape Lush and sinuous greenery
Natural Lagoon Biological diversity
Cliffside and Hillside Villas Rocky sculptural landscape
H
SI ILL
D E & C L IF F VIL
LA
B E AC H VIL L A
H OT E L
L AG
O O N VIL L
A
H O TEL
SPECI A LTY RES TA U R A N T
C L U B H OUS E
1 B ED R OOM VILLA
2 BEDRO OM VIL LA - T Y P E 1
2 BEDROOM VILLA - TYPE 2
3 B E D R O OM VILLA
Thank you! d y a h k u r n i a s e k a r s a r i @ g m a i l . c o m + 6 5
9 0 2 8
0 7 3 2