mass densities
SPLICE
variation
terms, and diagrams growth
re du ce
cr op
de sa tu ra te
photograph manipulations + extractions
(x) (x)
(1.5 x)
b
variability
uniformity
nodal variation on (X)
a
void densities
PHOTO SETS
(θ)
photograph manipulations + mappings
bulge
b
c c
mass
po la ri ze
cr op
void
re du ce
systemic variation on (θ)
scalar reductions and value abstraction
drift
studies extractions observations recede
resolved pattern studies drift
bulge
notation bulge
buldge
drift
drift
recede
mass densities
recede
recede
condition bulge - drift
drift - recede
drift - recede
condition drift - recede recede
drift
bulge
recede - bulge
composite mapping
condition recede bulge void densities
UPRHBOATNO ASNEATLSY T I C S
topographic infrastructure mappings photograph +manipulations + mappings
+ -
ra di us
SWITCH
metric for categorizing infrastructure and topographic events
switch type infrastructural entity
bulge
topographic entity
drift -
recede notation
po su re
drift
bulge
+
sl o ex pe
sp e du ed
topographic modification
ra ti on
recede
buldge
bulge
ben franklin bridge ramp
LOOP
drift
drift
70
78
68
72
76
74
BIFURCATE
80 82
84 90
86
94
98
100
92
88
96
0
11
4
11
4
102
10
8
108
recede
11
2
12
116
120
recede
2
11
condition bulge - drift
drift - recede for selected interchanges infrastructure and topographical analysis + site bounds drift - recede
condition drift - recede recede
drift
bulge
recede - bulge
composite mapping
condition recede bulge
existing
URBAN ANALYTICS
I-95 and 676 interchanges
market and chestnut streets interchange at penn’s landing
proposed
topographic + infrastructure mappings
URBAN ANALYTICS
ra di us
bridge`
site
context
topographic + infrasrtuctural mappings
+ site
context
river
SWITCH
metric for categorizing infrastructure and bridge` topographic events
switch type
+ -
infrastructural entity
r
river
private / closed
2r
co-lab.
duration: minimal slope: steep
r
bridge`
site context
market / play
context
river fast
-
fast
slow
duration: medium 2r slope: mild
public / open
fast
p
fast slow
fast
fast slow
slow
existing
fast slow
fast fast slow
fast
re
+
fast
sl o ex pe fast loop
duration: extended slope: flush
3r
river
slowosu
slow
fast
private / closed
market / play
bridge`
site
3r sp e du ed ra
fast
topographic entity
public / open
topographic modification
+
slow tio
bifurcate switch
n
ben franklin bridge ramp
slow
proposed
LOOP
70
78
68
72
76
74
BIFURCATE
80 82
84 90
86
94
98
100
92
88
96
0
10
2
11
4
11
4
108
102
11
8
11
2
12
116
120
68
70
78
radial sizing and vertical shifts
72
76
74
80 82
selected interchanges for infrastructure and topographical analysis + site bounds
84 90
86
94
98
100
92
88
96
0 11
4 11
4
102
10
2 11
108
8 11
2
12
116
120
r
programmatic site strategy
market and chestnut streets interchange at penn’s landing
existing
2r
I-95 and 676 interchanges
3r
proposed
2r
bridge`
site
URBAN ANALYTICS
context
topographic + infrasrtuctural mappings
bridge`
site
context
river
+ river
co-lab.
r
market / play
bridge`
duration: minimal slope: steep
river
fast
duration: lingering duration: medium 2r slope:mild steep slope:
public / open
context
river fast
slow
fast
fast slow
slow
fast
private / closed
width
fast
duration: extended duration: slope: flush slope: steep
3r
slow
fast
fast slow
slow
existing
fast fast slow
fast
3r
fast
fast slow
loop
slope
market / play
bridge`
site
context
private / closed
2r
p/c ribbon section site
r
public / open
+ fast
slow
bifurcate switch
slow
proposed
thickness
p/o ribbon section
68
70
78
radial sizing and vertical shifts
72
76
74
80 82
84 90
86
94
r
r
98
100
92
88
96
4
10
2 11
4 11 8 11
108
102
0 11
3r
programmatic site strategy
120
116
2 12
m/p ribbon section
3r
p/c ribbon section 2r
2r
programmatic site evolution
duration: lingering
2x
slope: steep
slope width
x
duration: slope: steep
thickness p/o ribbon section
a.
axon study
b.
section b.
m/p ribbon section section a. N
tectonic landscape axon
tectonic detail composite 3r
tectonic radius to slope diagram
2r
2r
programmatic site evolution
2x x
a.
b.
axon study
section b.
section a.
tectonic landscape axon tectonic radius to slope diagram
site plan 1/32”=1’
tectonic detail composite
MIXED PROGRAM +36
P/C (1.5y)
P/O P/C
+24
P/C
P/C
P/O
M/P
+12
(y)
P/O
(θ) (1.5z)
(1.5 y)
P/O
(1x)
0
+
P/O
M/P
-
M/P
P/O
0
+
(.5y)
P/O
P/C
P/O
splicing program. stacking and scalar relationships
M/P
P/C
-12 DAY
TIME
NITE
TIME
glazing profiles
PUBLIC / OPEN +36
extruded moulding
LIBRARY MEETING
+24
STUDIO MEETING SM.
M/P
+12
RETAIL WORKSHOP
M/P M/P
RETAIL
0
BAR CAFE BAR CAFE GALLERY LOUNGE
STUDIO MEETING LG.
STUDIO MEETING SM
secondary frame building section 1. 1/8” = 1’
RETAIL
M/P
-12 DAY
TIME
NITE
TIME
primary frame
PRIVATE / CLOSED +36
WORKSPACE LARGE
+24
MEETING CONFERENCE
IT. CLASSROOM
M/P
+12
WORKSPACE LARGE
M/P M/P
0
M/P IT. SERVER
WORKSHOP
building formation diagrams
-12 DAY
TIME
NITE
structural skin assembly.
structural skin assembly.
building section 2. 1/8” = 1’
level 1 plan 1/32” = 1’
TIME
level 2 plan 1/32” = 1’
ground plan 1/16” = 1’
level 3 plan 1/32” = 1’
night rendering
interior rendering
site section perspective race and second street rendering