E struct news issue 7 march 2016 single pages

Page 1

ISSUE

07

ONE PLACE COMPLETE ENGINEERING

March

ONE CHOICE

e-struct News this issue Project Profile: Magnificent Mt Martha P.1 Project Profile: Ambassador Demolition P.2-3 Professional Development P.2-3 Junior Engineers P.4

Happy Easter from e-struct News!

Project Profile: Magnificent Mt Martha Can you imagine waking up to this gorgeous view

It’s been a busy start to 2016. We

each day? Popping outside to one of three balco-

have hit the ground running with

nies to have your morning cuppa, your morning

lots of work on your exciting pro-

swim or the first bracing breath of sea air to set you

jects. We have been brought in to

up for the day?

ensure the safety of the notorious Ambassador’s demolition. This

Engineering this amazing structure with DNB De-

structure holds many dear memo-

sign over the past 18 months has been a dream. E

ries for locals celebrating weddings,

-struct provided soil testing, structural and pool

parties and anything in the 80s and

engineering and a Bushfire Attack Level (BAL) re-

90s but sadly fell into significant

port for this stunning project.

disrepair and has since been a

features an elevated swimming pool built into the

worry and a blight on the Nepean

lower storey deck, an open floor plan and beautiful

Highway since.

balconies that make the most of this coastal Para-

Chris has also completed new

dise.

courses required for accreditation for energy rating. He’ll talk more about that in his professional development reflection.

This development

If you’re considering building a swimming pool into a deck it is essential to check with your engineer to ensure that the right material choices are made to take into consideration the strength required to

Jade and I will be involved with Frankston’s Good Friday Family Day. We have lots of fun planned—see page four for details.

support the weight of a full pool. E-struct is a seasoned swimming pool designer.

We have provid-

ed specifications for a range of pools, pergolas, pool houses and verandas. If you’re thinking about

Please note that our office is closed for the Easter break from Good Friday 25th March December and reopens Tuesday 29th March.

installing a pool for your next project, count on us to help you with its soil testing and structural design requirements.


Accreditation Process for Energy rating: Certificate IV in NatHERS Assessment

Project Profile: Ambassador Conference Centre Demolition

During last year, Chris has been completing the Certificate IV in

In the 80s, this stylish building

NatHERS Assessment

was a class act. It held lovely

course in order to meet

memories for those who were wed

the new national mini-

there, for those who attended New

mum educational requirements set down for energy raters in Australia. Chris became an energy

Year’s Eve and 21st Birthday parties, business functions and happy coastal stays. But its glory days are well and truly over, and it

rater in 2009. He ob-

has been a sad neglected struc-

tained the standard

ture for over a decade. Vandalised

qualification through a

and scandalised it sadly had to go.

combination of coursework and recognized

But its not completely over for this

prior learning (RPL). He

development. The rear apartments

has since then per-

will live on and the Chapel will stay.

formed more then 500

The main part of the centre, the con-

energy assessments. This has not only included new homes of various sizes, but also extensions and commer-

ference area, has been demolished. E-struct was brought into advise on the demolition. The safety of this demolition has been of paramount

cial structures also. In 2015, it became mandatory that all new energy raters complete the Certificate IV in NatHERS Assessment to become registered as an energy rater in most states. All existing energy raters had to upgrade their qualification to the same level. This is accomplished via two pathways. The first is by

Social Media: #ThankAnEngineer Day On 24th February, Engineers Australia supported the Global Day of the Engineer. They invited the community to celebrate the huge contribution that engineers make by sharing their thoughts on social media tagged with #ThankAnEngineer. Lovely Jade posted this “I want to thank an engineer for providing a fabulous family friendly workplace,” and this was shared on Facebook by Engineers Australia! We’re grateful for you too, Jade! www.facebook.com/ EngineersAustralia


It’s your understand it… do it… concern to all parties. As the apartments are to

completing the new

be preserved, careful planning has been put in

course which can take up

place to ensure that section by section, effects

to 6-12 months. The second path is by RPL. This

of the demolition are minimised on remaining

is the path that Chris took

structures.

as his previous experience and qualifications were

Frankston is certainly known to make the best

accredited prerequisites.

of its assets even those that have, for instance,

He has since completed

been described by Barry Humphries as “the

the RPL assessment and

worst building in Australia.” The much ma-

achieved the level to be-

ligned Peninsula Centre was successfully trans-

come registered under the

formed into the very chic Peninsula on the

new requirements. The

Bay—combining Asian Pacific Serviced Offices

course covered knowledge requirements

and Quest Serviced Apartments with additional

beyond just energy rating.

retail spaces. Barry would definitely have to eat

Understanding construc-

his words now, as this makeover has been out-

tion systems was a major

standing for the area and has given Frankston

component. Chris’s engi-

fresh appeal for developers and a brilliant or-

neering background enabled him to excel in this

ganisation to serve local businesses.

area. Chris has always

Unfortunately, The Ambassador was not

believed that energy rating

deemed to be in similar shape to metamorphise

was more then knowing how to punch numbers

in the same way. On the bright side, we look forward to the clean slate this will provide developers and the new opportunity development in this space will offer locals. By Bridie Briggs

into a program. UnderGoing, going, gone. The rubble pile con nues to grow as the immense brick structure is dismantled. It has been a long process, but it is great to see headway being made for a fresh development to happen in such a great loca on on the Nepean Highway.

standing the effects of different configurations of buildings can have far reaching consequences on costs beyond windows and insulation. At e-struct, we try to provide a holistic approach to the services

Find

Moorooduc Hwy Plan Printing

at our

we provide. Each is complimented by the others,

e-struct

o ffice . We

print colour o r black &

giving our clients a better outcome.

white la rge fo rmat pla ns up to A0 , scan in black & white up to A0 and laminate up to A2 .

Whether you are doing a single home to apartments, offices or sports pavilions, e-struct can pro-

F o r fri e n d l y a n d p ro mp t se r vi ce , e ma i l yo u r p l a n s to www.mhplanprint.com.au

ma i l @ mh p l a n p ri n t. co m.a u o r d ro p i n to th e o ffi ce !

vide all you need. By Chris Rozycki


Prefer to receive e-struct News via email or as a hard copy? Let Jade know your preference and drop her a line at mail@e-struct.com.au

E-Struct Junior Engineers: Building a new program

Stay in touch

PO Box 7095 Karingal 3199

(03) 9770 1738 1300 E STRUCT (1300 378 782)

(03) 9770 1740

www.e-struct.com.au mail@e-struct.com.au

e-struct

The E-Struct Junior Engineers program has had a lovely start to the new year. Our junior engineers have been sharing their constructions and experiments, their resources and their endeavours with us through Facebook: (www.facebook.com/groups/estructjuniorengineers/). For the most part, our junior engineers have been communicating online and via snail mail but we are excited to announce a change to this. Savage Attractions have been running Frankston’s Good Friday Family Day for many years and this year we will be a part of it. Jade and Bridie will be running construction activities for kids of all ages, showcasing some of our favourite science experiments and running some Eggy Eggsperiments that aim to inspire kids to try out STEM activities at home and show how much fun Science, Technology, Engineering and Maths can be. Join in the activities for a gold coin donation! If you’re in Frankston South on Good Friday, pop along to join in the fun! It’s not far from our office and is being set up on the corner of Golf Links and Robinsons Roads. 100% of all money raised at our stand will be donated to The Royal Children’s Hospital. Please give that they may grow.

From the ground up e-struct’s got @estructengineer

you covered.

How can we help you? estructengineer one place complete engineering one choice

e-struct-consulting-services

e-struct News Issue 07 March 2016


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.