Survey (w/bldgs existingnproposed)

Page 1

dr (m ivew ee ay ts up wi th

Tu ck er

building call outs (see enlarged image)

1 Existing Deer Camp A proposed future house (option 1) B proposed future house (option 2)

A B

yellow overlay is our total property

1

15.55 acres

5.98 acres

0’

100’

200’

400’


building call outs (enlarged image)

1 Existing Deer Camp A proposed future house (option 1) B proposed future house (option 2)

A B 0’

20’

40’

1

Minimum Isolation Distances The proposed Drilled Bedrock Well shall satisify the following minimum distances: A. Septic systems - 100’ upslope of, 200’ downslope B. Septic tanks and associated piping - 50’ C. Driveways - 16’ D. All other isolation as specified in Vermont Water Supply Rules, Chapter 21

80’

Survey by:


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.