Navigable Schoolyard, Columbia GSAPP, 2020, Professor Lindy Roy
ELEANOR BIRLE Columbia GSAPP Selected Works, 2022 Studio: 1.
Transforming Seasonal Grounds, Advanced IV, 2022
2.
Collective Domesticity, Core III, 2021
3.
Reconstituted P.S. 64, Core II, 2021
4.
Navigable Schoolyard, Core I, 2020 Electives:
5.
Avery SPOT, The Outiside In Project, 2021
6.
Work from Home, ADR II, 2020
7.
Re-Examining Historic Manhattan, MAUH, 2022
Underused summer campgrounds are transformed into a yearround productive landscape and prayer grounds for interfaith neighbors in Northwest New York Advanced IV, Spring 2022 Professor Ziad Jamaleddine in collaboration with Maxine Gao
Research Diagram - Maintenance Cycles
Plan - Spring
1.
40
41
42
43
44
45
46
47
48
49
59
60
61
62
63
64
65
66
68
67
69
71
70
72
73
74
75
76
77
79E
78
63N
63
62
62
61
61
60
R ES
CA
Cannonsville Lumber
NN
59
LE
Sky Lake Camp
59
60
VOIR ER
ONS VIL
58
58
JAN AUG
BINGHAMPTON
Camp Oswego
55
AUG
Indian Country Bluestone Quarry
JUN
p cam
52
AUG
54 AUG
MAY
mer I sum
JUL
Eid al-Ad ha
AUG
55
Kingswood Camp
SEP
N ual B Ann
53
JUN
JUL
APR
Eid al-Fitr
54
56
n
da ma
Ra
Islamberg
$350 / session
57
MAR
p r cam I winte
DEPOSIT
56
$4,950 / session
l BN Annua
57
Camp Hilltop
FEB
JUL
JUN 53
JUL
52
JUN
JUL
51
51
Cadosia Valley Lum 50
50
49
49
48
48
47
47
Steven’s Point Quarry
Hancock Elementary
46
46
WM Quarries 45
SEP
Susquehanna Elementary
44
JUN
HANCOCK
SEP
44
SEP
JUN
43
45
Hancock Central High School
JUN
SUSQUEHANNA
43
42
42
41
41
40
Island Lake Camp
40
STARRUCA
39
39
STARLIGHT
38
38
PRESTON PARK
JUN
AUG
37
JUL
37
Porosky Lumber Co. 36
36
Preston Area Middle
THOMPSON
35
35
SEP
34
34
Lakewood Lumber Supply JUN
Camp Morasha
LAKEWOOD
Camp Zeke
33
$5,000 / session 32
Camp Weequahic
Bob Finch Quarry 31
AUG
JUL
31 AUG
JUN
AUG
Camp Nesher
JUL AUG AUG
29
ORSON
JUL
JUN
32
JUN
Camp Westmont
30
33
Camp Lohikan
JUL
JUN
30
JUN
29
JUL
28
28
AUG
27
JUN JUL
27
Camp Chen-a-wanda
Rock Mountain 26Bible Camp
26
$335 / session
OCT
25
25 AUG
SEP
24
MAY
24
23
JUN JUL
JUN
AUG
23
JUL
40
41
42
43
44
45
46
47
48
49
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
Religious Charities - Independant YMCAs YMCA - Summer Campground Habitat for Humanity Catholic Charities Salvaiton Army Islamberg, NY Bodies of Water
Syracuse
f New York eo
te YMCA s Sta
Allian c
Albany
Cortland Oneonta
Ithaca Sidney
Elmira
Binghampton
Islamberg
c Charities of New Yo tholi rk Ca
Liberty
ew -N
C a t h o li c C h a
Middletown
Habitat for Hu m an ity
riti
Port Jervis
es ra
ng
e,
S u ll
iv a n , + Ulst e r
Yo
rk
New York City
ity + Wescheste rC rk C ou Yo nt y
of
O
e
w
mber
Non-Muslim Religious Charity Networks in New York State
at e YM C As of Gre
rN
n isio Div Salv York ation A rmy Greater New
Research Maps - Campsites and Religious Networks
1.
Site Section - Winter
Site Section - Autumn
1.
Seasonal Taxonomies
1.
Seasonal Site Plans
1.
1.
Multi-generational housing and community space designed to facilitate collective domesticity in the South Bronx, NY. Core III, Fall 2021 Professor Alicia Ajayi in collaboration with Kim Langat
Ground Floor Plan- Programming
2.
Floor Plan - Level 2
2.
630 Courtlandt Avenue 101 yrs old Mixed Residential & Commercial Building Walk-up Apartments - Over Six Families with Stores Quadrant Properties Housing 628 Courtlandt Avenue 101 yrs old Mixed Residential & Commercial Building Walk-up Apartments - Over Six Families with Stores Courtlandt Hills LLC 626 Courtlandt Avenue 101 yrs old Mixed Residential & Commercial Building Primarily Two Family with One Store or Office 626 Courtlandt 622 Courtlandt Avenue Parking Facilities IMS Hospital
620 Courtlandt Avenue Parking Facilities IMS Hospital 616 Courtlandt Avenue Parking Facilities IMS Hospital
614 Courtland Avenue 96 yrs old Mixed Residential & Commercial Privately Owned
Site Research - Existing Conditions
363 East 151 Street 120 yrs old One & Two Family Buildings Privately Owned
356 East 152 Street 101 yrs old Mixed Residential & Commercial Walk-up Apartments - Over Six Families with Stores
381 East 151 Street 110 yrs old Multi-Family Walk-up Apartments Over Six Families without Stores 381 East Realty LLC
398 East 152 Street 101 yrs old Mixed Residential & Commercial 152 Melrose Associates
370 East 152 Street 48 yrs old Multi-Family Elevator Buildings 367 East 151 Street 90 yrs old Mutli- Family Walk-up Apartments Melrose Park Housing Development Fund Corporation
389 East 151 Street 103 yrs old Multi-Family Walk-up Apartments - Over Six Families without Stores Melrose Park Housing Development Fund
395 East 151 Street 90 yrs old Mixed Residential & Commercial Elevator Apartments
2.
Section Perspective - Looking East
2.
Senior Couple
1 Bedroom Apartment 515 sqft
Single Senior + Aid
ADA Apartment
880 sqft
Adult Couple + Two Kids + Pet
3 Bedroom Apartment
895 sqft
Four Roommates
2 Bedroom Apartment 895 sqft
2.
Stair Isometric - North Facade
2.
Site Plan
An abandoned historic masonry building dissolves into a public elementary school and community campus in the East Village, NY. Core II, Spring 2021 Professor Miku Dixit Individual Work
Concept Diagram - Masonry Reconstitution
3.
Site Research - 311 Complaints
3.
Study Models: Fungibility
3.
Floor 1 Plan
Floor 2 Plan
3.
1. P.S. 64 Elementary School
1.
4.
2. 3.
5.
5.
Community Meeting
4. Bicycle Repair + Recycling
3. Art Gallery + Black Box
2. Dance Workshop
3.
3.
A t
A subterranean playscape invites public schoolchildren to navigate the steep terrain in Morningside Park, NY. Core I, Fall 2020 Professor Lindy Roy Individual work
Site Plan
4.
Site Analysis + Proposed Section
4.
Reflected Ceiling Plans
Material Experiments: Study Models and Collage
4.
1
Plaza plan a 1/8" = 1'-0"
A design-build pavilion activates a public plaza and facilitates safe outdoor gathering for students at Columbia University. The Outside In Project, Tech Elective Professors Laurie Hawkinson and Galia Solomonoff 20 student design + construction team
86’-6”
Arch Lau
Alex
Stru Silm
planter anchor eyelets stationary tethers only not to preform structurally
AV2 anchor point 5” schedule 40 pipe @ 12’-9” in length
Sus Bur
Dire Mar
anchor elev 52’-2”
single elec wire to lead to inflatable. no other elec wires ovh
T/inflatable 25’-7”
anchor elev 35’-6”
occupyable plaza zone safety clearance height 7’-0” minimum from ovh anchor cables
FA1 anchor point 4” schedule 40 pipe @ 7’-11” in length
51’-3”
104’-5”
temp. elec. box w/ cable from inflatable
138’-9”
FA2 anchor point 4” schedule 40 pipe @ 8’-4” in length
Des Zin Ele Jiyo Mar Ana Lin Nan Bla Cec Kim Kas Xin Ver Tris Lau Kae Tay Xin Eun Elie
NO.
anchor elev 49’-6”
01
02 03
AV1 anchor point 5” schedule 40 pipe @ 12’-9” in length
GS
anchor elev 52’-2”
all existing means of egress unimpeded
Projec Date
36’-7”
at inflatable level - with safety notes
Construction Documentation - Attachment Plan
5.
N fixed mobile
3.00
Platform Design Iterations
3.14
25.00
3.14
6.50
5.
Analysis of the simultaneous nature of shared virtual and individual physical spaces. Architectural Drawing + Representation II, Spring 2021 Professor Violet Whitney
6.
District 12 23 listings on the NYC historic registry
Mapping for Architecture, Urbanism, and the Humanities, Spring 2022 Professor Juan Moreno Individual Work Library
Church
Park
Transportation
Govern
Re-examining Historic Manhattan
Mapping historic properties by date of registration in Community Districts 8 and 12 Properties:
1960s 1970s 1980s 1990s 2000s 2010s 2020s
Districts:
1960s 1970s 1980s 1990s 2000s 2010s 2020s
nment
New York City Community District
District 8 53 listings on the NYC historic registry
Post Office
District
Residence
Museum
Education
7.