Navigable Schoolyard, Columbia GSAPP, 2020, Professor Lindy Roy
ELEANOR BIRLE Selected Works, 2022 1.
Collective Domesticity, Columbia GSAPP, 2021
2.
Pine Bluff Artspace, designLAB architects, 2019
3.
Avery SPOT, Columbia GSAPP, 2021
4.
Reconstituted P.S. 64, Columbia GSAPP, 2021
5.
Navigable Schoolyard, Columbia GSAPP, 2020
6.
Refugee Housing Community, University of Virginia, 2017
7.
Curley Community Center, designLAB architects, 2018-20
8.
Sketchbook
Multi-generational housing and community space designed to facilitate collective domesticity in the South Bronx, NY. Columbia GSAPP, Fall 2021 Professor Alicia Ajayi in collaboration with Kim Langat
Ground Floor Plan- Programming
Ground Floor Plan
1.
Section Perspective - Looking East
Single Senior + Aid
Four Roommates
2 Bedroom Apartment 895 sqft
ADA Apartment
880 sqft
Senior Couple
1 Bedroom Apartment
515 sqft
1.
Adaptive re-use of neighboring historic buildings creates education, gallery, and community space for an arts nonprofit in Pine Bluff, Arkansas. designLAB architects, 2019, construction completed 2021 Three person design team In collaboration with AMR architects Photos by Tim Hursley
2.
First Floor Gallery
Art Yard
Gallery + Community Space
Workshop
2.
1
Plaza plan a 1/8" = 1'-0"
A design-build pavilion activates a public plaza and facilitates safe outdoor gathering for students at Columbia University. Columbia GSAPP Spring 2020 Professors Laurie Hawkinson and Galia Solomonoff 20 student design + construction team
86’-6”
Arch Lau
Alex
Stru Silm
planter anchor eyelets stationary tethers only not to preform structurally
AV2 anchor point 5” schedule 40 pipe @ 12’-9” in length
Sus Bur
Dire Mar
anchor elev 52’-2”
single elec wire to lead to inflatable. no other elec wires ovh
T/inflatable 25’-7”
anchor elev 35’-6”
occupyable plaza zone safety clearance height 7’-0” minimum from ovh anchor cables
FA1 anchor point 4” schedule 40 pipe @ 7’-11” in length
51’-3”
104’-5”
temp. elec. box w/ cable from inflatable
138’-9”
FA2 anchor point 4” schedule 40 pipe @ 8’-4” in length
Des Zin Ele Jiyo Mar Ana Lin Nan Bla Cec Kim Kas Xin Ver Tris Lau Kae Tay Xin Eun Elie
NO.
anchor elev 49’-6”
01
02 03
AV1 anchor point 5” schedule 40 pipe @ 12’-9” in length
GS
anchor elev 52’-2”
all existing means of egress unimpeded
Projec Date
36’-7”
Construction Documentation - Attachment Plan
at inflatable level - with safety notes
3.
An abandoned historic masonry building dissolves into a public elementary school and community campus in the East Village, NY. Columbia GSAPP, Spring 2021 Professor Miku Dixit Individual Work
Concept Diagram - Masonry Reconstitution
Floor 1 Plan
Floor 2 Plan
4.
1. P.S.. 64 Elementary School
1.
4.
2. 3.
5.
5.
Community Meeting
4. Bicycle Repair + Recycling
3. Art Gallery + Black Box
2. Dance Workshop
4.
A subte steep te
Columbia Professor L Individual
Site Analysis
Site Plan
erranean playscape invites public schoolchildren to navigate the errain in Morningside Park, NY.
GSAPP, Fall 2020 Lindy Roy work
s: Section Through Time
5.
Reflected Ceiling Plan
Section - North
Material Experiments: Study Models and Collage
5.
Deployable tem population of re
University of Virginia, Spr Professor Earl Mark Individual Work
Site Plan
Perspective - Looking West
mporary housing and a community center for a growing efugees in rural Maine.
ring 2017
6.
Residential Unit Renderings
Exploded Axon - Community Center
Exploded Axon - Unit Aggregation
6.
Exterior Perspective: Entry
Interior Perspective: Primary Lobby
An upgraded historic community center for a neighborhood on a rapidly shrinking shoreline in South Boston, MA. designLAB architects, 2018-2020 Three-member design team - adaptive reuse of a 1920s bathhouse building. Currently under construction
Section - East
7.
Construction Photo - December 2021
FF&E Presentation Diagrams: Youth Center
Resiliency Presentation Diagrams
7.
Secondary Lobby
Community Lounge
Typical Multipurpose
7.
Sketchbook - a continuous practice.
8.