Interior Design Portfolio

Page 1

P R I C E

Interior Design portfolio



About me

I am a Bachelor or Interior Design (Commercial) graduate from Billy Blue College of Design (Torrens University). I have a strong work ethic and bring energy and enthusiasm into everything I do. Reflecting on my studies, this course has taught me the ability to adapt to the ever-changing nature of interior design. I am passionate about creating spaces that create a positive social and environmental impact on the community whilst simultaneously being seamlessly beautiful. I am always being inspired by my surroundings, particularly by the natural Australian landscape.



6

Gorman

10

Johnny’s Milk Bar

18

Ripcurl Headquarters

22

Le Velo Cafe

26

The Lookout

RETAIL

HOSPITALITY

OFFICE FIT-OUT

HOSPITALITY

INSTALLATION

5


Gorman Store Fit-out COMMERCIAL

Rammed earth walls, customised sculptural stones and brass elements. This design is a notion to the hometown of humble beginnings for Gorman. The sculptural forms are a reflection of the multifaceted formations of the cliffs and the toppling rocks which make up the Great Ocean Road. It was the raw, natural surroundings that inspired Gorman designs to the bold iconic brand it is today.

12

Mood Board

13

11

11 14

15

6

Ebony Price

Page 9


Concept sketches

Concept Development. IDC208A - Brief 3

Page 31

Ebony Price

ment. Ebony Price

Page 19

Concept Development. Concept Development. IDC208A - Brief 3 3 IDC208A - Brief

PagePage 19 19

Ebony PricePrice Ebony

Brass inlay concept reflecting the coast line

Map Overlay. IDC208A - Brief 3

Ebony Price

Page 7

7


Point of sales counter visualisation

Merchandising joinery visualisation

Visualisation. IDC208A - Brief 3

Ebony Price

Display Rail Visualisation. IDC208A - Brief 3

8

Ebony Price

Page 23


Point-of-sales joinery documentation Customised sculptured stones with embedded joinery with 2PAC semigloss finish.

MA-01

MA-02 MA-04 MA-04

MA-01 MA-01

Scale: 1:20

Scale: 1:20

500

500

-

Shelving cut away from natural stone Shelving cut away from natural stone

PLAN

01 PLAN-

01

MA-04

1500

400

1500

400

MA-04

MA-02

600

600

MA-02

LEGEND

FFL FFL

480

FFL

MA-01

FFL

480

MA-01

MA-01 MA-01

500 500

100

1150 1150

250

250

100

LEGEND

1650

500 500

1650

250 250

MA-01

MA-01 Cus Customized natural stone MA-02 Whi

MA-02

White acrylic MA-03 Matt

MA-03 Matte brass aluminum MA-04 2Pa MA-04

02 -

SIDE ELEVATION 02 SIDE -ELEVATION Scale: 1:20

2Pac Finish

Scale: 1:20

03 -

FRONT ELEVATION 03 FRONT ELEVATION Scale: 1:20

Do not scale drawings. Use figured dimensions on site prior commencement of any Client work, the preparation of drawings or the fabrication of components. This drawing is drawings or the fabrication of copyright and can not be components. This drawing is DWR reproduced without written copyright and can not be consent. reproduced without written consent.

Client

Gorman True North

Project

Drawing Title

IDC208A Assessment Brief 3 Stone POS Counter Drawing Title Assessment Brief 3 Stone POS Counter

Project Number

20

DWR Finish floor level Drawer Scale

FFL DWR

140

Billy Blue College of Design 196 Flinders Street, Project Billy Blue College of Design 196 Flinders Street, VIC 3000, Australia IDC208A (03) 9670 4026 DRAW DETAIL 02 VIC 3000, Australia Scale: 1:5 (03) 9670 4026

2019.001

FFL

01 -

A00

1:20

10 Drawn by EP 10/05/19 TENDER DRAWINGS Date Drawn by EP TENDER DRAWINGS NOT FOR CONSTRUCTION NOT FOR CONSTRUCTION Drawing Status

Project Number

2019.001

MA-01

Customized natural stone

MA-02

White acrylic

MA-03 Matte brass aluminum

Scale: 1:10

MA-04

2Pac finish Customized natural stone cut White acrylic cut

FFL DWR Revisions No Date Description Ver. App'd 01 10/05/19 TENDER DRAWINGS EP EP

Do not scale drawings. Use figured dimensions on site prior commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

Client

Gorman

True North

Billy Blue College of Design 196 Flinders Street, VIC 3000, Australia (03) 9670 4026

Project

Drawing Title

Project Number

2019.001

Hidden objects Finish floor level Drawer

Scale

Drawing No

Drawing Status

Date

TENDER DRAWINGS NOT FOR CONSTRUCTION

Drawn by

10/05/19 EP

IDC208A Assessment Brief 3 Stone POS Counter Detail

1:10

A01

Dr

01

Date

Drawing Status

LEGEND

SIDE SECTION

Fini Draw

Drawing No1:20 IssueA

Scale

20

160

DWR

2040

Gorman

True North

Cus

Hidden objects FFL

Scale: 1:20

Finger pull

Revisions No Date Description App'd Do not scaleVer. drawings. Use Revisions figured dimensions on site 01 10/05/19 TENDER DRAWINGS EP EP No Date Description Ver. App'd prior commencement of any work, the preparation of 01 10/05/19 TENDER DRAWINGS EP EP

2Pac finish

cut Customized natural stone cut Hid

Issue

01

9


Johnny’s Milk Bar, Elwood COMMERCIAL

porary take on the stralian milk bar A contemporary take on the

A contemporary take on the Australian milk bar, weaving in subtle A contemporary take on the iconic Australian milkof bar moments nostalgia. Peeling paint, array of sweets and buzzing milk lights bar are a reflection of the sites past. Pastel colours are a hint ry take on the Australianiconic Milkbar,Australian weaving inneon

s of nostalgia.

to the the Australian childhood sweets. projectininvolved demographic and site A contemporary take on Milkbar,This weaving analysis as well as interviewing the owner determining their wants A contemporary take on the Australian Milkbar, weaving in subtle moments of nostalgia. Figure 12. (Donnelly, 2018) Figure 13. (Make Me Iconic, 2019) Figure 14. (Bridge, n.d) and needs. subtle moments of nostalgia. Figure 12. (Donnelly, 2018) Figure 13. (Make Me Iconic, 2019) Figure 12. (Donnelly, 2018)

Figure 13. (Make Me Iconic, 2019)

Figure 14. (Bridge, n.d) Figure 14. (Bridge, n.d)

Figure 15. (The Society Inc, 2013)

Figure 16. (Arcklin, 2016) Figure 16. (Arcklin, 2016)

Figure 17. (Donnelly, 2018) Figure 17. (Donnelly, 2018)

Figure 15. (The Society Inc, 2013) Mood Board

Figure 15. (The Society Inc, 2013)

Ebony Price / Final Pitch Ebony Price / Final Pitch

10

Figure 16. (Arcklin, 2016)

Figure 17. (Donnelly, 2018)


Johnny's Coffee Roasters 159 Ormond Rd, Elwood Vic 3184

Drawing No.

Vie

A001 A002 A003 A004 A005 A006 A007 A008 A009 A010 A011 A012 A013 A013 A014 A014 A015 A015 A015 A016 A017 A017 A017 A018 A019 A019 A019 A019 A020

Ex De Pr Pr Re Ele Se Se Se Se Ex Co Co Co Co Co Co Co Co Co Bo Bo Bo Bo Sh Sh Sh Sh Sh

Location Plan Site Map

159 Ormond Rd, Elwood Revisions No Date

Description

Ver. App'd

01 19.04.20

TENDER ISSUE

EP

02 10.05.20

TENDER ISSUE

Do not scale drawings. Use figured dimensions only. Check and verify levels and dimensions on site prior to commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

Client

Johnny's Coffee Roasters

EP Johnny’s Coffee Roasters is located along Elwood village. Johnny’s have a strong presence in the community with the staffs friendly faces and responsibly sourced specialty coffee.

True North

Ebony Price ebony.price@student.tua.edu.au +61 451 991 803

Billy Blue College of Design 196 Flinders St, Melbourne VIC 3000 +61 1300 851 245

NORTH

Project

IDC304A

159 Ormo 3184

Project number

2020.01

Elwood is known for their young and active locals with a sophisticated yet calm lifestyle. This area is popular for couples without young kids, couples and young professionals. This area is mostly flat or apartment living (71.9%), most of which have very limited outdoor space. As a result, the streets are lively, local parks and the beach are public spaces often populated.

11


& Finishes MA-02 Blue Horizon, Gesso Subway tile - Perini

-

ni, n.d.)

MA-03 MA-04 Dusty Pink, Gesso subway Exposed wall / peeled tile - Perini plaster

Figure 23. (Perini, n.d.)

Finishes & Finishes

Figure 24. (Perini, n.d.)

MA-05 Grey, terrazzo flooring Signorino

Figure 25. (“Peeling paint”, n.d.)

Figure 26. (Signorino, n.d.)

Materials & Finishes

Materials & Finishes Johnny’s materials board

MA-02 MA-02 Blue Horizon, Gesso Blue Horizon, Gesso Subway tile tile - Perini Subway - Perini

d.) ini, n.d.)

MA-03 MA-04 MA-05 MA-03 tiles and peeled plaster MA-04 Textured are subtle elements expressive MA-05 of the Australiana raw and MA-02 MA-01 MA-02 MA-03 MA-04 MA-01 Dusty Pink, Gesso subway Exposed wall / peeled Grey, flooring-unkempt milk bar. Dusty Pink, Gesso subway Exposed wall / peeled Grey, terrazzo terrazzo flooring Blue Horizon, Sky, Daliri subway Blue Horizon, Gesso Dusty Pink, Gessotile subway Exposed wallGesso / peeled Sky, Daliri subway tile tile - Perini plaster Signorino tile - Perini plaster Signorino - Perinipaint”, n.d.) Perini tile - Perini plaster tile - Perini Perini Figuretile 25. (“Peeling Figure 26. (Signorino, n.d.) Subway Figure 24. (Perini, n.d.) Subway

Figure 23. (Perini, n.d.) Figure 23. (Perini, n.d.)

Figure 24. (Perini, n.d.)

Figure 22. (Perini, n.d.)

Figure 25. (“Peeling paint”, n.d.)

Figure 26. (Signorino, n.d.)

Figure Figure22. 24.(Perini, (Perini,n.d.) n.d.)

Figure 23. (Perini, n.d.)

MA M Dus Gr tile Sig

Figure 23. (Perini, n.d.) Figure 25. (“Peeling paint”, n.d.)

& Finishes

-

ta, n.d.)

ni, n.d.)

a

MA-02 MA-03 MA-04 MA-05 Blue Horizon, Gesso Dusty Pink, Gesso subway Exposed wall / peeled Grey, terrazzo flooring Figuretile 28. (Inkiostro Figure 29. (Terrazzo Tiles, n.d.) Figure 30. (Thoreen, n.d.) 31. n.d.) Subway - PeriniBianco, n.d.) tile Perini plaster Signorino Custom recycled terrazzo Exposed wall / peeled plaster Grey terrazzo Figure flooring by(AOOS, Signorino MA-07

Figure 23. (Perini, n.d.)

MA-08

Custom terrazzo - Smile Plastics

Concave profile rose stained lining boards Glosswood

ta, n.d.) Figure Figure 28. (Inkiostro Bianco, d.) 28. (Inkiostro Bianco, n.d.)n.d.)

a

MA-07 MA-07 Concave profile rose Concave profile rose stained lining boards stained lining boards - Glosswood Glosswood

ta, n.d.)

a

Ebony Price

Concave profile rose stained lining boards Glosswood

12

Figure 25. (“Peeling paint”, n.d.)

EQ-09

Burnished Brass kickboard - That Metal Company

Figure (Terrazzo Tiles, n.d.) Figure 29.29. (Terrazzo Tiles, n.d.)

Figure 29. (Terrazzo Tiles, n.d.)

Custom terrazzo - Smile Plastics

Figure 26. (Signorino, n.d.)

Custom neon signs Electric Confetti

Figure Figure 31. 31.(AOOS, (AOOS,n.d.) n.d.)

EQ-01 EQ-01 Figure 27. (Porta, Figure 29. Tiles,n.d.) n.d.) Tasmanian by(Terrazzo Porta Timber Custom Oak neon Custom neon signs signs-Electric MA-06 MA-08Confetti Electric Confetti Tasmanian Oak - Porta Custom terrazzo - Smile Timber Plastics

Ebony Price / Final Pitch

/ Final Pitch

MA-08

EQ-01

Figure30. 30.(Thoreen, (Thoreen,n.d.) n.d.) Figure

MA-08 EQ-09 MA-08 EQ-09 27. (Porta, Figureprofile 28. (Inkiostro Bianco, n.d.) Gesso subwayFigure tile, dusty pink byn.d.) Concave rose stained lining Custom terrazzo - Smile BurnishedBrass BrasskickkickCustom Burnished Perini terrazzo - Smile boards by Glosswood Plastics board ThatMetal Metal MA-07 MA-06 Plastics board - -That Company Company Tasmanian Oak - Porta Concave profile rose Timber stained lining boards Glosswood

Figure 28. (Inkiostro Bianco, n.d.)

MA-07

Figure 24. (Perini, n.d.)

Figure 30. (Thoreen, n.d.)

EQ-09 Burnished Brass kickboard - That Metal Company

Figure 31. (AOOS, n.d.)

EQ-01 Custom neon signs Electric Confetti

Figure 28.Figure (Inkiostro n.d.) 30. Bianco, (Thoreen, n.d.)

MA-07 EQ-09 Burnished Brass kickConcave profile rose board -lining That boards Metal stained Company Glosswood

MAE Cust Cu Plast El


LEGEND

Floor Plan

LEGEND 0 0.1 0.2

1 : 20

Reflected Ceiling Plan

Revisions No Date

Description

Ver. App'd

01 06.05.20

TENDER ISSUE

Approver

Do not scale drawings. Use figured dimensions only. Check and verify levels and dimensions on site prior to commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

Client

Johnny's Coffee Roasters

True North

Billy Blue College of Design 196 Flinders St, Melbourne VIC 3000 +61 1300 851 245

Project

Drawing Title

IDC304A Brief 1

Unnamed

159 Ormond Rd, Elwood Vic 3184 Project number

2020.01

Drawing No

Issue

A006

01

Date

06.05.20

Drawing Status

Drawn by

PRESENTATION DRAWINGS NOT FOR CONSTRUCTION

Author

Design by

Author

0 0.1 0.2

1

Scale

0.5

14/07/2020 8:32:52 AM

FloorPlan Folio

1.0m

A1

1.0m

RCP Folio 1 : 20

Revisions No Date

Description

Ver. App'd

01 06.05.20

TENDER ISSUE

Approver

Do not scale drawings. Use figured dimensions only. Check and verify levels and dimensions on site prior to commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

Client

Johnny's Coffee Roasters

True North

Billy Blue College of Design 196 Flinders St, Melbourne VIC 3000 +61 1300 851 245

Project

Drawing Title

IDC304A Brief 1

Unnamed

159 Ormond Rd, Elwood Vic 3184 Project number

2020.01

Scale

Drawing No

Issue

A008

01

Date

06.05.20

Drawing Status

Drawn by

PRESENTATION DRAWINGS NOT FOR CONSTRUCTION

Author

Design by

Author

14/07/2020 8:39:55 AM

1

0.5

A1

13


Visualisation A - Takeaway zone

A

Key Plan

14

C

B


Renders

Visualisation B - Overall space

Key Plan

/ Final Pitch

Visualisation C - Dine-in

15


LEGEND CUT MATERIAL

EXISTING STRUCTURE PLASTERBOARD TILE MDF

Counter plan Custom counter designed for the ease of preparing specialty coffee. The addition of the built-in knock box and milk jug rinser was a requested function by the head barista. The single opening at the end of the bench is to create the space for those one-on-one interactions between barista and local customer during the coffee making process.

ABBREVIATIONS AP BT COS CL D EQ FC FCL

APPLIANCES BENCHTOP CHECK ON SITE CENTRE LINE DOOR EQUIPMENT FIBRE CEMENT FINISHED CEILING LEVEL FINISHED FLOOR LEVEL FURNITURE

FFL FU

A014

TAG LEGEND

4

1

R200 20 140 20 20

20 20

A015

2 A015

580

2x ø40 HOLE FOR COFFEE MACHINE HOSES

1

210

EQ 20 20 20 20

20 20 20 20 160 20

500

MA-02 MA-03 MA-04 MA-05

20 20 140 20

EQ

520

320

INBUILT SPRING LOADED CUP DISPENSER EQ-08

RECESSED MILK JUG RINSER EQ-07

455

55

158

63

MA-06 MA-07

RECESSED KNOCK BOX CHUTE EQ-09 20 158 23 20

260

Shelf Uni Worktop U Single Sin Refridger LaMarzoc LaMarzoc Bar Stool Low Stoo Custom c 600mm D District Linear pe Recessed Pendant l Gardam Linear Wa Terrazzo Fibonacc Wall Tile Clay Plas Solid Ame Upholster Maharam Ivory Lam Natural st Signorino Burnished Clear Ash Glosswoo Matt Malt American Briggs Dulux viv

LI-04 MA-01

MA-07

R200

DESCRIP

EQ-01 EQ-02 EQ-03 EQ-04 EQ-05 EQ-06 FU-01 FU-02 FU-03 FU-04 LI-01 LI-02 LI-03

A014

1220

820

3

20 20

A013

CODE

MA-08 MA-09 20 20

20 20

560

20 20

560

20 20 20 150 20

730

329

MA-10 MA-11

2120

MA-12

4580

LEGEND

2

DOOR TYPES CUT MATERIAL Single gla EXISTINGDO1 STRUCTURE STEEL

A013

PLASTERBOARD LEGEND DO2

Counter side elevation Counter Detail Plan 1

20

1220 820

180 20

MA-08

EQ-01 Shelf Unit by IMC 0.5m EQ-02 Worktop Unit by IMC TAG LEGEND EQ-03 Single Sink by IMC EQ-04 Refridgeration module CODE DESCRIPTION EQ-05 LaMarzocco coffee ma Scale D EQ-06 LaMarzocco Coffee EQ-01 Shelf Unit by IMC gr FU-01 Bar Stool Unit by Herman EQ-02 Worktop by IMC M FU-02 Low Stool byby Nendo EQ-03 Single Sink IMC Date FU-03 Custom countermodule EQ-04 Refridgeration FU-04 600mm Dining tablesmb EQ-05 LaMarzocco coffee District Drawn by EQ-06 LaMarzocco Coffee g LI-01 Linear pendant light FU-01 Bar Stool by Herman LI-02 Recessed down light FU-02 Low by Stool by Nendo Design LI-03 Pendant lamp by Ross FU-03 Custom counter Gardam - 3000K FU-04 600mm Dining tables LI-04 Linear DistrictWall light 4000K MA-01 Terrazzo Floor Tile by LI-01 Linear pendant light Fibonacci Stone LI-02 Recessed down light MA-02 Wall Tile LI-03 Pendant lamp by Ros MA-03 Clay Plaster Gardam - 3000K MA-04 Solid American Oak LI-04 Linear Wall light 4000 MA-05 Upholstery fabric by K MA-01 Terrazzo Floor Tile by Maharam Fibonacci Stone MA-06 Ivory Laminate by Brig MA-02 Wall Tile MA-07 Natural stone Karman MA-03 Clay Plaster Signorino MA-04 Solid American Oak MA-08 Burnished Brass MA-05 Upholstery fabric by K MA-09 Clear Ash Lining Board Maharam Glosswood MA-06 Ivory Laminate by Brig MA-10 Matt Malt Laminate by MA-07 Natural stone Karman MA-11 American SignorinoRed Oak ve Briggs MA-08 Burnished Brass MA-12 Dulux vivid white paint MA-09 Clear Ash Lining Boar Glosswood MA-10 Matt Malt Laminate by DOOR TYPES MA-11 American Red Oak ve Briggs DO1 Single 2144x120 MA-12 Duluxglass vivid white pain

DO2 Single glass 2134x900 DOOR TYPES

0

0.1

0.25

20

250

MA-10

MA-09

EP MA-08

EP

Counter Side Elevation 1

1

MA-08

1 : 10

3

True North

N O

Ebony Price ebony.price@student.tua.edu.au +61 451 991 803

Billy Blue College of Design 196 Flinders St, Melbourne VIC 3000 +61 1300 851 245

R TH

Project

Drawing Title

IDC304A Brief 1

Counter Detail Plan

Drawing Status

2020.01

Counter Side Elevation 2 Counter elevation 1 : 10

4580

ALL CABINETS LAMINATE

4580

MA-07 MA-08 20

MA-09

350

20

190

20

365

365

20 20

560

20 20

560

RECESSED KNOCK BOX CHUTE EQ-09 20

20

45

INBUILT CUP DISPENSERS 120ø EQ-08 20

260

20

210

45 80 120 100 120

RECESSED MILK JUG RINSER EQ-07

455

455

OPEN SHELVING 20

20 20 160 20

560

20

30 140 30 20

MA-07 TILL DWR

FIXED PANEL

EQ

FIXED PANEL

830 250

EQ

20

MA-08 MA-10

ADJ

DWR W/ BIN

DWR

8020

ADJ

FFL

270

MA-08

MA-08

1 : 10

4

80 20

DWR

Counter MA-08Front Elevation MA-08

2

1 : 10 0

Ver. App'd

TENDER ISSUE

EP

02 10.05.20

TENDER ISSUE

EP 20 180

Johnny's Coffee Roasters

ebony.price@student.tua.edu.au +61 451 991 803

0.1

0.25

0.5m

Drawing Title 0 0.1 Counter Elevations

IDC304A Brief 1 159 Ormond Rd, Elwood Vic Project 3184 IDC304A Project number Brief 1 2020.01 159 Ormond Rd, Elwood Vic 3184

0.25

0.5m

2020.01

S

PLASTERBOARD

S

TILE

P

MDF

T

1:10AP BT

COS CL D EQ FC FCL

A013

LI APPLIANCES MDF BENCHTOP CHECK ON SITE PB CENTRE LINE POS DOOR RCP EQUIPMENT FIBRE CEMENT FINISHED CEILING DrawingSBNo SK LEVEL SS FINISHED FLOOR TP LEVEL WT FURNITURE W/

10.05.20

Drawing Title Drawing Status

Scale

Drawing Status

TAG LEGEND Drawn by

Drawn by EP 1:10FFL Counter Elevations A014 PRESENTATION DRAWINGS DesignFUby Ebony Price NOT FOR CONSTRUCTION Date 10.05.20

PRESENTATION DRAWINGS NOT FOR CONSTRUCTION

Project number

EXISTING STRUCTURE

Scale ABBREVIATIONS Drawing No

Date

FFL

EP

CODE Design by EQ-01 EQ-02 EQ-03 EQ-04 EQ-05 EQ-06 FU-01 FU-02 FU-03 FU-04

1 : 10

LI-04 MA-01

ALL CABINETS LAMINATE 4580 20

350

20

190

20

365

365

20 20

560

20 20

560

RECESSED KNOCK BOX CHUTE EQ-09 20

20

45

MA-07 MA-08

INBUILT CUP DISPENSERS 120ø EQ-08 20

260

20

455

210

45 80 120 100 120

RECESSED MILK JUG RINSER EQ-07 455

20 20 160 20

OPEN SHELVING

560

MA-02 MA-03 MA-04 MA-05 20

MA-06 MA-07

30 140 30

DESCRIPTION

Ebony Price

LI-01 LI-02 LI-03

Counter Side Elevation 2

20

16

True North

Billy Blue College of Design 196 Flinders St, Melbourne VIC 3000 +61 1300 851 245

80

MA-08

3

Billy Blue College of Design 196 Flinders St, Melbourne VIC 3000 +61 1300 851 245 Ebony Price

Project

20

TENDER ISSUE

Johnny's Coffee Roasters

830

TENDER ISSUE

Ver. App'd MA-08 EP MA-09 EP

Do not scale drawings. Use figured dimensions only. Check and verify levels and dimensions 1220on site prior to commencement of any work, the preparation of drawings or the fabrication 820 180 20 of components. Client This drawing copyrightUse andfigured can not be Do not scale is drawings. reproduced without written consent. dimensions only. Check and verify levels and dimensions on site prior to MA-10commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

Ebony Price ebony.price@student.tua.edu.au +61 451 991 803

950

Description

01 19.04.20

True North

20 20

No Date

02 10.05.20

Single glass 2134x900

LEGEND

Client

01 19.04.20

Single glass 2144x120

DO2

CUT MATERIAL

Revisions

Description

Ebony P

FFL

Counter side elevation

No Date

EP

DO1

Counter Back Elevation

Revisions

A

PRESENTATION DRAWINGS NOT FOR CONSTRUCTION

Project number

FFL

1:10

10.05.2

159 Ormond Rd, Elwood Vic 3184

20 20

TENDER ISSUE

Johnny's Coffee Roasters

950

TENDER ISSUE

02 10.05.20

Client

950

01 19.04.20

Do not scale drawings. Use figured dimensions only. Check and verify levels and dimensions on site prior to commencement of any work, the preparation of drawings or the fabrication FFL of components. This drawing is copyright and can not be reproduced without written consent.

Ver. App'd

950

Description

80

No Date

80 20 830 270

Revisions

LIGHT PLYWO MEDIU FIBRE PLAS TIMBER POINT REFL CEILI SPLA SKIRT STAIN LIGH TOWN MED WALL FIBR WITH PLAS POIN REFL CEIL SPLA SKIR STAI TOW WAL WITH

20

20 180

STONE

LI APPLIANCES TILE MDF BENCHTOP CHECK ON SITE PB CENTRE LINE MDF POS DOOR RCP EQUIPMENT FIBRE CEMENT SB FINISHED CEILING ABBREVIATIONS SK LEVEL SS FFL FINISHED FLOOR LI AP APPLIANCES TP LEVEL MDF BT BENCHTOP WT FU FURNITURE COS CHECK ON SITE W/ PB CL CENTRE LINE POS D DOOR RCP EQ EQUIPMENT FC FIBRE CEMENT SB FCL LEGEND FINISHED CEILING TAG SK LEVEL SS FFL FINISHED FLOOR TP CODE LEVEL DESCRIPTION WT FU FURNITURE W/

250

MA-09

950

MA-08

560

STEEL

ABBREVIATIONS PLASTERBOARD AP BT COS CL D EQ FC FCL

20 25 25 20 2020 160 20 40

20

TIMBER

EXISTING STRUCTURE

1220 600

PLYWOO

MDF CUT MATERIAL

1 : 10

20

STONE

Single gla

TILE

MA-08 MA-09

Shelf Unit by IMC Worktop Unit by Single Sink by IM Refridgeration m LaMarzocco coff LaMarzocco Cof Bar Stool by Her Low Stool by Nen Custom counter 600mm Dining ta District Linear pendant li Recessed down Pendant lamp by Gardam - 3000K Linear Wall light Terrazzo Floor T Fibonacci Stone Wall Tile Clay Plaster Solid American O Upholstery fabric Maharam Ivory Laminate b Natural stone Ka Signorino Burnished Brass Clear Ash Lining Glosswood


CUT MATERIAL EXISTING STRUCTURE PLASTERBOARD TILE

20MM BULLNOSE MA-07

MDF

ABBREVIATIONS

20mm SHADOW LINE

AP BT COS CL D EQ FC FCL

BURNISHED BRASS MA-08

FFL FU

LINING BOARDS W/ 3MM ADHESIVE ATTATCHED TO MDF

Counter section 1

1:2

Counter section 2

0

0.02

0.04

0.1m

260

40

260

MA-07 3

20MM BULL NOSE

MA-08 MA-09 ANGLED EDGE FOR FINGER PULL

MA-09

FALSE BACK

EQ-01 EQ-02 EQ-03 EQ-04 EQ-05 EQ-06 FU-01 FU-02 FU-03 FU-04

Shelf Unit by I Worktop Unit Single Sink by Refridgeration LaMarzocco c LaMarzocco C Bar Stool by H Low Stool by N Custom count 600mm Dining District Linear pendan Recessed dow Pendant lamp Gardam - 300 Linear Wall lig Terrazzo Floo Fibonacci Sto Wall Tile Clay Plaster Solid America Upholstery fab Maharam Ivory Laminate Natural stone Signorino Burnished Bra Clear Ash Lini Glosswood Matt Malt Lam American Red Briggs Dulux vivid wh

MA-07 MA-08 MA-09

MA-06 MA-07

950

MA-10 MA-11 MA-12

FFL

80 20

MA-08

8020

270

20

ADJ

MA-08 MA-09

0.8MM LAMINATE W/MDF SUBSTRATE 790

250

0.8MM LAMINATE W/ MDF SUBSTRATE

MA-02 MA-03 MA-04 MA-05

20MM BULL NOSE

20 20

EQ-08

20

950

A015

190

20 20 20

20

370

20 20 20

620

SB SK SS TP WT W/

DESCRIPTIO

LI-04 MA-01

580

210

1220

PB POS RCP

CODE

LI-01 LI-02 LI-03

2 A015

2x ø40 HOLE FOR COFFEE MACHINE HOSES

LI MD

TAG LEGEND

Counter Section Detail

3

APPLIANCES BENCHTOP CHECK ON SITE CENTRE LINE DOOR EQUIPMENT FIBRE CEMENT FINISHED CEILING LEVEL FINISHED FLOOR LEVEL FURNITURE

FFL

DOOR TYPES

0.8MM BURNISHED BRASS KICKBOARD

DO1

Single glass 21

DO2

Single glass 21

0.8MM BURNISHED BRASS KICKBOARD

1

Counter Section 1

Counter Section 2

2

1 : 10

1 : 10

Counter section detail

20MM BULLNOSE MA-07

Revisions

No Date

Description

Ver. App'd

01 19.04.20

TENDER ISSUE

EP

02 10.05.20

TENDER ISSUE

EP

Do not scale drawings. Use figured dimensions only. Check and verify levels and dimensions on site prior to commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

Client

Johnny's Coffee Roasters

True North

0

Ebony Price ebony.price@student.tua.edu.au +61 451 991 803

20mm SHADOW Billy Blue College LINEof Design 196 Flinders St, Melbourne VIC 3000 +61 1300 851 245

BURNISHED BRASS MA-08

0.1

0.25

0.5m

Project

Drawing Title

IDC304A Brief 1

Counter Section 1 & 2

159 Ormond Rd, Elwood Vic 3184

Date

10.05.20

Drawing Status

Drawn by

PRESENTATION DRAWINGS NOT FOR CONSTRUCTION

EP

Design by

Ebony Pric

Project number

2020.01

Scale

LINING BOARDS W/ 3MM ADHESIVE ATTATCHED TO MDF

3

Counter Section Detail 1:2

Counter isometric

0

0.02

0.04

0.1m

Custom recycled Terrazzo 2 A015

Rose Lining Boards

40

260

20MM BULL NOSE MA-07 Burnished Brass MA-08 MA-09

MA-08 MA-09

20MM BULL NOSE

Counter Section 1

FFL

80 20

FFL

8020

MA-08

950

790

20

ADJ

0.8MM LAMINATE W/MDF SUBSTRATE

270

0.8MM LAMINATE W/ MDF SUBSTRATE

FALSE BACK

20 20

EQ-08

250

MA-09 ANGLED EDGE FOR FINGER PULL

MA-07

20

20 20 20

260

190

950

20

20 20 20

620

370

210

1220

580

2x ø40 HOLE FOR COFFEE MACHINE HOSES

0.8MM BURNISHED BRASS KICKBOARD

17

0.8MM BURNISHED BRASS KICKBOARD

2

Counter Section 2 1 : 10

Draw

1:10

A01


Ripcurl Head office 1 Bligh St, Sydney

OFFICE FITOUT

The fit-out reflects the 70s era the Ripcurl brand was founded. This was a time where surfing began to be recognised as a professional career. This project embraces the Australian surf coast lifestyle with a refined palette. The brief required a workstations to accommodate for a minimum of 80 employees, locker storage, break out spaces and suitable amount of meeting rooms. A screening zone adjacent to the reception is central space for new surf films to be premiered, client pitches or the live streaming of the World Surfing League in the background for knock-off drinks. A gallery showcasing Ripcurl and the evolution of surfing takes up the otherwise vacant space.

Mood Board

18


6

7

12

8

15 14

5

13

17

16 19

18 21 20

4

3

2

11

1

10

9

22

Scale 1:250

Description TP DRAWINGS

Ver. App'd EP EP

Do not scale drawings. Use figured dimensions on site prior commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

1 Reception 2 Storage 3 Client Meeting Room True North 4 Rip Curl Meeting Room 5 Workstations 6 Breakout Area 7 Workstations 8 Workstations 9 Meeting Room 10 Meeting Room 11 Storage 12 Meeting Room

13 Meeting Room 14 Board Room Billy Blue Design Room 15 College ofMeeting 196 Flinders 16 Street,Meeting Point VIC 3000, Australia 17 Kitchenette (03) 9670 4026 18 Storage 19 Meeting Room 20 Meeting Room 21 Screening Area 22 Gallery

Project

No. 1 Bligh Street Office Fit Out Project Number

2019.001

PRODUCED BY AN AUTODESK STUDENT VERSION

ions Date 30/07/19

PRODUCED BY AN AUTODESK STUDENT VERSION

Drawing Title

Rip Curl Office Floor Plan Drawing Status

TP DRAWINGS NOT FOR CONTRUCTION

19


MA01 MA02

MA06 MA03

MA07 MA08

MA04

MA10

MA05

MA09

Materials Board

20

MA01

Castle grey paint by Wattyl

MA02

Pavimento fresco paint by Porter’s Paint

MA03

Black textured powder coat by Sunlite Pitt Street

MA04

Paulownia timber lining boards Tasmanian oak satin finish by Glosswood

MA05

Burnished brass by Austral Wright Metals

MA06

Woven vinyl Sisal Plain Sand flooring by Bolon

MA07

CleanTouch laminate matte white

MA08

Brass woven wire mesh by Arrow Metal

MA09

Concrete topping slab

MA10

Leather Sycamore by Pelle Leathers


Ames Nobsa Grey Rug by Bobby Round Table by Pop&Scott Halscyon Lake

Bobby Round Table by Pop&Scott

Rubber Fig (Ficus elastica) from Merchant & Green

Furniture Plan

PRODUCED BY AN AUTODESK STUDENT VERSION

Furniture Plan

A01

Scale: 1:50

PRODUCED BY AN AUTODESK STUDENT VERSION

01

PRODUCED BY AN AUTODESK STUDENT VERSION

Revisions No Date 01 30/07/19

Description TP DRAWINGS

Ver. App'd EP EP

Key Plan

Do not scale drawings. Use figured dimensions on site prior commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

Client

Rip Curl

True North

Billy Blue College of Design 196 Flinders Street, VIC 3000, Australia (03) 9670 4026

Project

No. 1 Bligh Street Office Fit Out Project Number

2019.001

PRODUCED BY AN AUTODESK STUDENT VERSION

Senitor I-Workchair by Zenith

Ver. App'd EP EP

Do not scale drawings. Use figured dimensions on site prior commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

Drawing Title

Rip Curl Office Floor Plan Drawing Status

TP DRAWINGS NOT FOR CONTRUCTION

Scale

Drawing No

1:250 TP00 Date 30/07/19 Drawn by EP

Issue

01

Karl Johan Table Lamp by Signe Hytte Client

Rip Curl

True North

Billy Blue College of Design 196 Flinders Street, VIC 3000, Australia (03) 9670 4026

Project

No. 1 Bligh Street Office Fit Out Project Number

2019.001

PRODUCED BY AN AUTODESK STUDENT VERSION

NGS

PRODUCED BY AN AUTODESK STUDENT VERSION

Drawing Title

Screening zone RCP

Drawing Status

TP DRAWINGS 21 NOT FOR CONTRUCTION


Le Velo Cafe, Sydney

HOSPITALITY FITOUT

Le Velo cafe is located in the hub of Sydney’s centre. The client’s wanted a space that reflected their passion for street art and cycling. A commissioned artist was selected to bring bold colour into the space while the furnishings remained clean cut and modern. The requirements for this brief included a commercial kitchen, toilet facilities, bar area, a space for bike racks and outdoor seating. The double height open area maximises natural light to filter through the space whilst also having dining areas beneath lower ceilings with low hung pendants to create a more intimate space. This brief involved developing a full documentation package including reflected ceiling plans, sections and elevations.

Mood Board

22


1

4 2

5

3

6

8

7

10

11

9

12

Scale 1:100 1 Entrance 2 Lounge Area 3 Bar 4 Dining Area 5 Disabled Restroom 6 Air Lock

Issued by

Do not scale drawings. Use figured dimensions only. Check and verify levels and dimensions on site prior to commencement of any work, the preparation of drawings or the fabrication of components. This drawing is copyright and can not be reproduced without written consent.

Client

Marion & Will Baker

0 0.5 1.0

2.0

5.0m

7 Cool Room 8 Female Restrooms 9 Mens Restrooms 10 Hallway 11 Commercial Kitchen 12 Storage

True North

Billy Blue College of Design 196 Flinders St, VIC, 3000 Australia +61 1300 851 245

Project

Drawi

IDC302A Assessment Brief 1

Unn

46 Baywater Drive, Wentworth Point, NSW, 2127

Drawi

Project number

2019.001

23

PRE NO


Staircase render

Level 2 render

24


Staircase visualisation

25


02

Parley for the oceans, The Lookout.

INSTALLATION

01 01 01

“Conservation only works if you put beauty first. Nobody wants horror stories about destruction done to the ocean; first you have to Emerging Design Technologies: Commercial fall in love1with IDC206A - Brief Part it.� D

porary take on the stralian milk bar A contemporary take on the Ebony Price - 00210019T

concepts concepts

A contemporary take on the the ocean has been an issue on the rise, Plastic waste infiltrating iconic Australian milk bar slowly decaying biodiversity. This project involved designing an ry take on the Australianiconic Milkbar,Australian weaving in milk bar

s of nostalgia.

installation that can generate awareness and evoke an emotional A contemporary take on the Australian response from theMilkbar, user. weaving in A contemporary take on the Australian Milkbar, weaving in subtle moments of nostalgia. Figure 12. (Donnelly, 2018) Figure 13. (Make Me Iconic, 2019) Figure 14. (Bridge, n.d) subtle moments of nostalgia. Figure 12. (Donnelly, 2018) Figure 13. (Make Me Iconic, 2019)

concepts

Figure 12. (Donnelly, 2018)

3

4

3

4

Figure 15. (The Society Inc, 2013) Emerging Design Board Technologies: Concept Figure 15. (TheCommercial Society Inc, 2013)

IDC206A - Brief 1 Part D Ebony Price - 00210019T

Emerging Emerging Design Technologies: Design Technologies: Commercial Commercial Figure 15. (The Society Inc, 2013) Figure 16. (Arcklin, 2016) IDC206AIDC206A - Brief 1 Part - Brief D 1 Part D Ebony Price Ebony - 00210019T Price - 00210019T

Ebony Price / Final Pitch Ebony Price / Final Pitch

26

Figure 13. (Make Me Iconic, 2019)

Figure 14. (Bridge, n.d) Figure 14. (Bridge, n.d)

3

4

5 Figure 16. (Arcklin, 2016) Figure 16. (Arcklin, 2016)

5

Figure 17. (Donnelly, 2018)

conceptboard conceptboard conceptboa +emotions 5 +emotions +emotions Figure 17. (Donnelly, 2018) Figure 17. (Donnelly, 2018)


02

sketches

02

sketches

This installation takes the user on a journey to firstly appreciate the ocean in its glory to then distorting the view the further along you move through. This warped view is symbolic of the drastic and harmful change plastic pollution is making to our oceans.

esign Technologies: Commercial rief 1 Part D - 00210019T

Page 4 Emerging Design Technologies: Commercial IDC206A - Brief 1 Part D Ebony Price - 00210019T

renders. Emerging Design Technologies: Commercial IDC206A - Brief 1 Part D Ebony Price - 00210019T

Page 10

27


Ebony Price Billy Blue College of Design Bachelor of Interior Design (Commercial)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.