Portfolio Arquitecto

Page 1

Portfolio

Edgardo Müller C.


CV

Phone: +34 603461264 email : muller.arquitecto@gmail.com Linkedin : www.linkedin.com/in/edgardomuller-arquitecto/

LAST STUDIES 2018 - 2020 ARCHITECT DEGREE RECOGNITION . La Salle School of Architecture.

Ramón Llull University. Barcelona.

I am an enthusiastic professional with knowledge in designing, coordinating building projects , and also some experience in site work. My professional profile is mixed. NOWADAYS I work for a social architecture project in el Raval with a group of young architects and from other areas. IN MY EXPERIENCE I´ve worked for architecture studios but for my personal projects asswell. I’M UP FOR any kind of growth in architecture. I’m very involved in what I get compromised. believe architecture is a place where observation, plastic handling and logical synthesis get together for a human service. My design is influenced most of the time from my sensibility and my experiences, a global concept to propose, and from the study of technical topics.

PARTICIPATION IN STUDIOS Casan ova Arq ui tec tes

2021 - Actually

OasiUrb à

2019 - Actually

B B Arq u ite ctes

2020

Acir Estu d i o 2019

Est u d io In

2018

S errà M a r tin e z Lei var Barcelona 2017

N . T. Arch ite ct

Santiago de Chile 2016-2017

G es ta r i a 2014-2016

Co lla b o ra t in g A rc h ite c t

• Measurements and executive layouts for an Aparthotel in Sitges. • Layouts & reviews for Interiorism Project, an Hotel in Andorra.

Mu lt id is c ip lin a r y Pro je c t & I n te r i o r i s m

• Project for Energetic Reehabilitation Program of Raval Homes.

Pro je c t A rc h ite c t

• Executive Project for Convention Centre and collab for the Hotel Complex.

Pro je c t A rc h ite c t

• Project for Renovation in Cornellà. • Project for Renovation in Carrer Bassegoda.

Pro je c t A rc h ite c t

• Collaboration for Renovation Project on IFA Faro Hotel in Canarias. • Collaboration for Renovation Project on a Club in Marbella.

Co lla b o ra t in g A rc h ite c t

• Collaboration for Project for Casal d´avis in Begues.

Pro je c t A rc h ite c t

• Project for Kayser Industries. • Project for Santo Domingo Building.

Pro je c t Ma n a g e r

• Project for Hannover Offices. • Project for San Jorge Building. | Project for Andrés de Vera Building. • Project for “Casa Módulo” from Felipe Assadi. San Francisco Church, Valparaíso . Chile.



Architect Degree in LaSalle. New Building Campus LaSalle Project Specs Programme : Bar / Workshop (Ground Floor) Library / Recreation area (Upper Floor) Structural System : Mass Timber Usefull Surface: 584 m2

The Proposal

“ Th e b u i l d i n g p re s e n t s a f re e s p i r i t . D i ffe re n t spaces articulated by a n o p e n c o re o f l i g h t”.


Building on Poblenou´s Superilla. • Project for Social Insertion of the Refugee. Site: Superilla del Poblenou , Barcelona. The Request a. Masterplan development for the block. b. Basic project (Proyecto Básico) of one building. The Programme 2 kind of benefitiaries: Neighbour / Refugees. 3 Uses : Multiuse spaces for equipment / Workshops and classrooms for refugees / Rental Flats for refugees on upper floors.

The Proposal

“The Building works with the interior of the block in many levels and it stands for free and common space ”.


Freixas Building Renovation

• Project for the Renovation of the Freixas Building . Site: L´Hospitallet de Llobregat..

The Proposal

“A sustainable renovation is conceived by acquiring a thermal and material balance. Also by working on it´s outside and inside”.



Participation in Studios


Convention Centre BG HOTELS Tasks • Complete redaction of the Convention Centre resort Life Aqua, Punta Cana. • CAD drawing and sketchup 3d modelling for visualizing. • Architecture + Interiorism of the project. • Colaboration in the design of the rest of the Hotel Life Aqua Resort. • Colaboration in other projects for Hotels and for private real state development. • Colaboration in other smaller projects of the study. One aspect of the project 1. Flexibility of the Main rooms for Conventions. - The building presents the capability of opening its conference rooms by using a certain kind of movil panels (with high sound standards) and that way the main spaces of the building changes its performances for different kinds of events.

Barceló Balanzó Arquitectes


Acir Estudio

La Miranda Renovation + New Construction Barcelona , Cornella de Llobregat. -2019 -

Tasks • Complete redaction of the executive project for the renovation . • Drawing tasks in CAD and 3D sketchup modelling for visualizing. • Measurements and other tasks in relation to the arrangement of the executive project.

LÀMINA D' IMPERMEABILITZACIÓ

24.2 6.5

12.0

2.5

PLACA DE POLIESTIRÈ EXTRUÍDE PLACA PLADUR 12,5MM PLACA PLADUR 12,5MM MUNTANT ACER GALVANITZAT 120 MM. LANA MINERAL 80MM

LÀMINA DE POLIETILÈ MORTER DE NIVELACIÓ AMB ARLITA PAVIMENT PORCELÀNIC

SEGELLAT AMB SILICONA SOLERA DE FORMIGÓ ANCORADA AL FORJAT. PAVIMENT RASILLA ALÇADA EN RASILLA PAVIMENT RASILLA EXISTENT

KNAUF AQUAPANEL® OUTDOOR 12,5mm

ED RAMON CARRER

A

LÀMINA TYVEK LANA MINERAL 50MM CAMBRA AIRE 25 MM.

11.50

CARRER DE LA MIRANDA

CARRE

R RAM

ONEDA

Proyección techo

LINEA PATI DE MANCANA

11.50

CARRER DE LA MIRANDA

PLACA ALUCOBOND 20 MM.

INTERIOR

EXTERIOR

FERRO INJECTAT EN FORJAT . ANCORATGE MENSULA Y PERFIL ALUMINIO ALUCOBOND

DETALLE FACHADA VENTILADA 1: 10


Bassegoda Renovation

Acir Estudio

Barcelona , Sants. -2019 -

Tasks • Complete redaction of the executive project for the renovation . • Drawing tasks in CAD and 3D sketchup modelling for visualizing. • Measurements and other tasks in relation to the arrangement of the executive project.

PLANTA COCINA 1

ALZADO 1 COCINA 1

ARMARIO PRINCIPAL

ALZADO 2 COCINA 1

85.1

D2

2.18 PROYECCIÓN FALSO TECHO

Puerta Crona DM + Melamina 15 mm.

62.0

4.0

62.0

FALSO TECHO

1.77

100.0

50.0

2.39

50.0

Vestíbulo acceso

183.0

cocina

210.0

33.0

.62

Madera 40mm. Estantería

Estantería

84.0

80.0

60.0

DM + Melamina DM + Melamina 15 mm. 15 mm.

17.0

60.0

CUADRO ELECTRICO + DATOS

80.0

56.0

DM + Melamina DM + Melamina 15 mm. 15 mm. 62.0

other works of the study

Zócalo (h=13,5cm)


Hotel Renovation

Las Palmas de Gran Canaria. -2018 Tasks • Collaboration in the design and layout production for the executive project. • Design and technical solutions for different parts of the project . production of details. Drawing tasks in CAD.

One aspect of the project 1. Facade Makeover. - Transformation of all the terraces on the facade of the building. New Facade, new Look. - Techinal study for the estructural feasibility coordinated with the structural professional for the acured assembly of the new structure with the old one. - Implantation of GRC prefabricated planters that confine the terraces and also give the facade a green aspect.

EstudioIn


Serra Martinez Leivar Arquitectes

Rest Home at Begues

+ INCASOL

Ayuntament de Begues, Barcelona Province. -2018 Tasks • Collaboration and production of layouts for the project. • 3D modelling on Revit for studyng the shape and the spacial conditions of the building. • CTE standards study for the program sollutions. One aspect of the project Evacuation Route Plan for Fire emergencies. The building has been conceived with the conddition of serving 2 different uses. That way the building presents several circulation on ground floor and that assures pretty much the good performance on a emergencie case because there are different routes to evacuate in a fast way.

·

PATI


Kayser S.A. Offices, Sales Store and Industrial Workshop

NTARQ

Santiago, Chile. -2016-

Tasks • Previuos analisys of the urban feasability of the project. • Collaboration in the design and with the facilities of the project. • Coordination and technical checkings with Engineerings. One aspect of the project Two sides of the building. This project is conceived first of all with two very different parts. On one side The Offices and Sales store and on the other side the Industrial building. This was realized as two different building in all sense: structurally, and architecturally. Offices have one structural system build on postensioned concrete and the industrial building with structural steel. 487.42

TO

TEM

487.39 487.57

ÁREA VERDE ANTEJARD

ÍN

E1

GRUPO ELECTRÓGENO

E2

CONTROL ACCESO

E8

E9

E10

E11

E12

E13

E14

E15

E16

E17

E4

E3

E7

E18

E19

E20

E21

E22

E23

E24

E25

E26

61 ESTACIONAMIETOS

E57

E56

E54

E53

E52

E51

E50

E49

E48

E47

E46

E45

E44

E43

E42

E28

E55

E41

7 6 4 3 2 1

E33

E36

RECEPCIÓN

E32

E37

5

PROYECCION LOSA NIVEL 2

E31

E38

8

13 14 15 16 17 18 19 20 21 22

12 11 10 9

PROYECCIÓN ALERO DE CUBIERTA

PROYECCIÓN ALERO DE CUBIERTA

PROYECCION LOSA NIVEL 2

SALA DE VENTAS

E30

E39

PROYECCIÓN ALERO DE CUBIERTA

E29

E40

E34

E35

OFICINAS L1

SALA ELÉCTRICA 21 20 19 18 17 16 15 14 13 12

1 2

1 2

21 20 19 18 17 16 15 14 13 12 11

3

4

5

6

7

8

9 10 11

3

4

5

6

7

8

9 10

BODEGA INSUMOS 78 M2

P18 70

ÁREA DE DESPACHO

ÁREA DE DESPACHO

ÁREA DE DESPACHO

OFICINA DE CONTROL

P10 70

P11 150 V11

P9 70

P9 70

Lavamanos 4

OFICINA DE DESPACHO

Lavamanos 5

P10 70

Lavamanos 3

Lavamanos 2

Lavamanos 1

V12

Lavamanos 2

Lavamanos 1

E caminione

PROYECCIÓN CUBIERTA

FOSO MONTACARGAS

PROYECCIÓN CUBIERTA

E6

PROYECCIÓN ALERO DE CUBIERTA

E58

PROYECCION LOSA NIVEL 2

E59

E27

E60

E5


On Site

Santiago, Chile. - 2014-2017 -


Hannover Offices

Santiago, Chile. -2015Tasks • Technical Coordination during the whole process of the project (basic & executive) and its disciplines (Architecture and Engineerings). • Conduction of all the coordination meetings with all teams involved. • Aplication of different methodologies for tracking the advances of all disciplines. • Definitive aproval of every layout suitable for execution. • Collaborative work with the builidng company for the correct budget delivery and the fabrication of the construction contracts with the real estate company. Two aspects of the project 1. Project´s re-engineering. One first fase of Hannover Offices was out of budget. This was for our office the reason for making a complete evaluation of costs of architectural porject but also of all the installations packages for finally coming up with a new version of the project in a record time for the building process to start. 2. Systems Coordination. air conditioning / centralized facility control This project includes a large number of systems involved and that meaned to have a correct and very precise control of the advances of all facilities. Two of the most important were the air conditioning system and the centralized facilities control system for the automatic preformace of the building . Both of them are illustrated on the floor plan on the side.

GESTARIA_ Desarrollo y Gestión.


San Jorge Building Santiago, Chile. -2014-

Santiago, Chile. -2014-

Tasks • Project Management during the whole process of the project. • Conduction of all the coordination meetings with all teams involved. • Aplication of different methodologies for tracking the advances of all disciplines. • Definitive approval of every layout suitable for execution.

One aspect of this project 1. Boundary wall coordination.

m 92.71+ m 02.226

ORETAPAZ

ARRAB 1

IRFER

ARENOJAC SASIPER

ARRAB 1

ORETAPAZ

SASIPER ARENOJAC

ARENOJAC SASIPER

m 92.71+ m 02.226 m 65.71+

SASIPER SASIPER

ARRAB 1

ORETAPAZ SASIPER

m 92.71+ m 02.226

%21

ARENOJAC ARENOJAC

ARENOJAC

ARRAB 1

ORETAPAZ

m 74.226

m 81.2

m 74.71+

m 83.226

m 83.226

%9.4

m 65.71+ m 74.226

/S OLUCATPECER OTCEYORP ANICSIP

m 81.2 =h

%2

m 81.2 =h

m 74.71+

m 95.81+ PU

m 05.326

%5

%5

m 50.326

24

E NT RIE

IRFER

2/1

23 EO IND

m 92.71+ m 02.226

15

SL DE

At the basement this project considered the coordination of existing elements and new construction. Architectural project had to be coordinated with structural project for the well construction of the Boundary wall which had to be constructed considering the different structural and temporary elements for the stability of the existing wall. And also with a ramp that changed the level of founding. The existing boundary wall had to be upheld by a set of new columns of reinforced concrete underneith of it, and that process must be executed in a few days . Thats why both of the projects (architecture and structure) had to be perfectly coordinated with the technical office in charge of on site duties.

]epolS oN[

2/1

GESTARIA_ Desarrollo y Gestión.

Andrés de Vera Residences

25

26 29 27

28


Modular House

GESTARIA_ Desarrollo y Gestión.

Los Vilos, Chile. -2015Tasks • Coordination along the whole process of the project and for Architecture and Structural Engineering. • Conduction and suporting the meetings between the different actors involved. • Collaboration in the review of the documentation for placing the house in site.

1

4 5

2 3

6 7

8

N+2.77

297,15 244

N+2.44

20

N+0.00

N-0.20

42

APOYOS

251

75,5

VANOS

42

11

335

75,5

200

11

42

337,5

79

251

42

11

42

251

42

421,5

200

1389

TOTAL

8

6

5 4

C

A

B

3

2

1

1389 335 14,7

335 421,5

322,6

200 22,4

323,8

11 75,5

335

11

341

335 75,5

341 13,5

75,5

200

13,5

12,5

325

13,7 64,8

8

A A1

13,5

TOTAL EJES VANOS RECINTOS

7

TERRAZA

SALA VENTAS

319 X 697 CM

D

323 X 531 CM

DORMITORIO 01

A2

207,5

258,6

323 X 257 CM

LIVING

697

552,5

531,8

12,2

681

26,2 100

681

130

697

323 X 429 CM

BAÑO 01

A3 E

7,2

A4

7,2

261,6

DORMITORIO 02

COCINA

323 X 262 CM

BAÑO 02

F

195 X 130 CM

RECINTOS VANOS EJES TOTAL

14,7

322,6

22,4

323,8

24,5

319 341

14,5

335

11

335

11

697 335

1389

24,7

7,2

120 59,2

195,6

59,2

219,1 335

14,5

44,5

RECINTOS VANOS EJES TOTAL

TOTAL EJES VANOS RECINTOS

13,7

14,5

64,8

130

323 X 240 CM

100

207,5

26,2

235 X 130 CM

A5 B


Work

as a Freelance

architect


Balcony House

VIña del Mar, Chile. -2011Purpose : Single family Home. Material: Native wood + Concrete + Reinforced Masonry. Energetic Facilities : combined heating system by firewoodboiler and Hotwater Solar Panels.

The request is to design a house with adventurous shapes. A house with a unique stamp on it. On the other hand a house that can accomplish the views present at the site. the proposal is a house that stands as a complete balcony over the skyline and horizontally suspended on the PONIENTE extension like a ship on the sea. Horizontal elements like generous eaves and terraces play with the skyline and the views.


Kuy Kuy Lodge

Malalcahuello, Chile. -2015-

Purpose : Single family Home. Material: Native Wood. Traditional asembly system. In the South of Chile this project is conceived by adopting the traditional culture known as Pehuenches people. The project looks for a strong simbolic weight but always conserving the spirit of modern times and activity. This Cabins are the attempt to close the visitor with nature and the simplicity of it.


Portfolio Edgardo L. Müller Canales Architect muller.arquitecto@gmail.com +34 603461264 *Portfolio for ManoArquitectura


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.