EDGEDAVAO Serving a seamless society
f
GOING VIRTUAL SPORTS P 12
TIME TO HEAL
VOL.15 ISSUE 26 • SATURDAY, MAY 14, 2022
@EdgeDavao
www.edgedavao.net
edgedavao@gmail.com
Sara to supporters: Be magnanimous, offer hand in peace STORY ON PAGE 2
Fishermen sail by the concrete structure of a bridge that is being built at Sta. Ana Port in Davao City, which is part of the 18.2-kilometer Davao Coastal Road project, on Friday. Dabawenyos are hopeful the infrastructure development in Davao City such as the Davao Coastal Road project, Davao City Bypass project and the much awaited Davao-Samal Connector will be given priority by the next administration. Edge Davao
P 15.00 • 12 PAGES