Edge Davao Volume 15 Issue 26 | Saturday, May 14. 2-22

Page 1

EDGEDAVAO Serving a seamless society

f

GOING VIRTUAL SPORTS P 12

TIME TO HEAL

VOL.15 ISSUE 26 • SATURDAY, MAY 14, 2022

@EdgeDavao

www.edgedavao.net

edgedavao@gmail.com

Sara to supporters: Be magnanimous, offer hand in peace STORY ON PAGE 2

Fishermen sail by the concrete structure of a bridge that is being built at Sta. Ana Port in Davao City, which is part of the 18.2-kilometer Davao Coastal Road project, on Friday. Dabawenyos are hopeful the infrastructure development in Davao City such as the Davao Coastal Road project, Davao City Bypass project and the much awaited Davao-Samal Connector will be given priority by the next administration. Edge Davao

P 15.00 • 12 PAGES


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.