KCI Airport Committee Presentation - 5-9-19

Page 1

Infrastructure Changes at KCI A Glimpse Into The Future

5/8/2019


Project Updates KC Strategic Partnership Program – 2nd Class Graduated April 4, 2019 – 25 Graduates (54 Total Graduates) Third Class Starts Fall 2019

Schematic Design Underway 60% Schematic Design to be issued June 10th, 2019 for the terminal 100% Schematic Design to be issued June 10th, 2019 for the Central Utility Plant

Demolition Terminal A Garage – Monday April 29 Terminal A – End of May

2

5/8/2019


Infrastructure Changes at KCI Happening During The Next 12 Months Contractor Mobilization Parking Lot Changes Utility Construction Roadway Construction Traffic Changes

3

5/8/2019


Contractor Mobilization 4

5/8/2019


This is a photo and caption slide. Photo(s) will exist inside the yellow box. For photos or other information that needs to cover the full slide, see the next page.

Do not exceed the dimensions of this box with any image, table, chart of graph.

This is the slide title space. Describe the above photo. Further description of the above photo. For example, This image was captured on 4/30/2019 by the project camera mounted on the Air Traffic Control tower shows the start of demolition of the Terminal A parking garage. Demolition of the Terminal A building will begin on 5/20/2019.

5

Font for the title is Trebuchet MS size 14 Fond for the additional text is Trebuchet MS size 12

5/8/2019


Build Logistics Trailer Complex July 5 – October 29, 2019

6

5/8/2019


This is a photo and caption slide. Photo(s) will exist insideMexico the yellow City Ave box. For photos or otherfor information Closed Construction that needs to cover the full slide, see the next page.

Traffic

Do not exceed the dimensions of this box with any image, table, chart of graph.

This is the slide title space. Describe the above photo. Further description of the above photo. For example, This image was captured on 4/30/2019 by the project camera mounted on the Air Traffic Control tower shows the start of demolition of the Terminal A parking garage. Demolition of the Terminal A building will begin on 5/20/2019.

7

Font for the title is Trebuchet MS size 14 Fond for the additional text is Trebuchet MS size 12

5/8/2019

Public Traffic Flow


Vehicle Construction Entrance

8

5/8/2019


Employee Entrance

9

5/8/2019


If you have room for a title on this slide, use this location. The front is Trebuchent MS. Front size is 36

If you have room for a title, it goes here This is a photo and caption slide. Photo(s) will exist inside the yellow box. For photos or other information that needs to cover the full slide, see If you need a full slide for an image, the next page. chart, or table, place a large white box (no border color) over the slide to cover all template elemebts. Do this ONLY if the image, chart, or table is illegible Do not exceed the dimensions of this box with any image, table, chart of inside the standard slide template. graph.

This is the slide title space. Describe the above photo. Further description of the above photo. For example, This image was captured on 4/30/2019 by the project camera mounted the Air Control tower shows or thepage start of demolition of the Terminal parking garage. Demolition of the DoonNOT ad Traffic any logos, date stamps numbers to the bottom ofAthis Terminal A building will begin on 5/20/2019. slide

10

Font for the title is Trebuchet MS size 14 Fond for the additional text is Trebuchet MS size 12

5/8/2019


If you have room for a title on this slide, use this location. The front is Trebuchent MS. Front size is 36

If you have room for a title, it goes here This is a photo and caption slide. Photo(s) will exist inside the yellow Garage Demolition box.– For other information April 29 Augphotos 06, or 2019 that needs to cover the full slide, see If you need a full slide for an image, the next page. chart, or table, place a large white box Terminal A the slide to cover (no border color) over all template elemebts. Do this ONLY if the image, chart, or table is illegible Do not exceed the dimensions of this box with any image, table, chart of inside the standard slide template. graph.

This is the slide title space. Describe the above photo. Further description of the above photo. For example, This image was captured on 4/30/2019 by the project camera mounted the Air Control tower shows or thepage start of demolition of the Terminal parking garage. Demolition of the DoonNOT ad Traffic any logos, date stamps numbers to the bottom ofAthis Terminal A building will begin on 5/20/2019. slide

11

Font for the title is Trebuchet MS size 14 Fond for the additional text is Trebuchet MS size 12

5/8/2019


Garage Demolition

12

5/8/2019


If you have room for a title on this slide, use this location. The front is Trebuchent MS. Front size is 36

Security Fenceline May 10 –room May for 24, a2019 If you have title, it goes here

This is a photo and caption slide. Photo(s) will exist inside the yellow box. For photos or other information that needs to cover the full slide, see If you need a full slide for an image, the next page. chart, or table, place a large white box Terminal A the slide to cover (no border color) over all template elemebts. Do this ONLY if the image, chart, or table is illegible Do not exceed the dimensions of this box with any image, table, chart of inside the standard slide template. graph.

This is the slide title space. Describe the above photo. Further description of the above photo. For example, This image was captured on 4/30/2019 by the project camera mounted the Air Control tower shows or thepage start of demolition of the Terminal parking garage. Demolition of the DoonNOT ad Traffic any logos, date stamps numbers to the bottom ofAthis Terminal A building will begin on 5/20/2019. slide

13

Font for the title is Trebuchet MS size 14 Fond for the additional text is Trebuchet MS size 12

5/8/2019


If you have room for a title on this slide, use this location. The front is Trebuchent MS. Front size is 36

If you have room for a title, it goes here is a photo and caption slide. Terminal This Demolition will exist inside the yellow May 28 – Photo(s) Sept 16, 2019

box. For photos or other information that needs to cover the full slide, see If you need a full slide for an image, the next page. chart, or table, place a large white box Terminal A the slide to cover (no border color) over May 24 – Sep 13 all template elemebts. Do this ONLY if the image, chart, or table is illegible Do not exceed the dimensions of this box with any image, table, chart of inside the standard slide template. graph.

This is the slide title space. Describe the above photo. Further description of the above photo. For example, This image was captured on 4/30/2019 by the project camera mounted the Air Control tower shows or thepage start of demolition of the Terminal parking garage. Demolition of the DoonNOT ad Traffic any logos, date stamps numbers to the bottom ofAthis Terminal A building will begin on 5/20/2019. slide

14

Font for the title is Trebuchet MS size 14 Fond for the additional text is Trebuchet MS size 12

5/8/2019


Terminal A

Terminal B

Terminal C

15

Parking Lot Changes 5/8/2019


May 10, 2019 16

5/8/2019


May 14, 2019 17

5/8/2019


May 21, 2019 18

5/8/2019


Storm Sewer Sanitary Sewer Natural Gas Domestic Water Electricity CenturyLink Comm Chilled Water

Utility Relocations June – September 2019 19

5/8/2019


Temporary Extension

Road Construction (Bonn to Int. Circle) June – August 2019 20

5/8/2019


Bonn Circle

Close Bonn Circle & Demolish Terminal A Bridges August 2019 21

5/8/2019


Bridges

Close Bonn Circle & Demolish Terminal A Bridges August 2019 22

5/8/2019


Start of Construction for Roundabouts August 2019 23

5/8/2019


Earthwork New Pvm’t Grass

Roundabout Construction Progress November 2019 24

5/8/2019


B

Earthwork New Pvm’t Grass

Roundabout Construction Progress February 2020 25

5/8/2019


B

Earthwork New Pvm’t Grass

Roundabout Construction Progress March 2020 26

5/8/2019


B

C Earthwork New Pvm’t Grass

Terminal Traffic Reversed

June 2020 27

5/8/2019


Terminal A

28

Parking Lot Changes, Utilities, Road Construction &Traffic Changes May 2019 – June 2020

5/8/2019


Flow of Reversed Traffic June 2020 29

5/8/2019


Communicating parking and roadway changes

5/8/2019


Communicating parking and roadway changes

5/8/2019


Communicating parking and roadway changes

5/8/2019


Communicating parking and roadway changes

5/8/2019


Communicating parking and roadway changes

5/8/2019


Communicating parking and roadway changes

5/8/2019


Infrastructure Changes at KCI Questions?