LAVEEN, AZ
866-904-9255
Building Systems
HOBBS
RISING SUN 100
HOBBS Vertical ICF Wall System
THIS PLAN IS THE PROPERTY OF HOBBS BUILDING SYSTEMS AND MAY NOT BE USED FOR ANY PURPOSE WHATSOEVER WITHOUT WRITTEN PERMISSION FROM HOBBS BUILDINGS SYSTEMS FOR ANY SPECIFIC USE THEREOF.
Go Engineered.Go Easy.Go Green.
WINDOW SCHEDULE
3.
4.
Count 11 1 6
Comments
GENERAL WINDOW NOTES: 1. ALL BEDROOM WINDOWS TO MEET EGRESS 2. ALL WINDOWS TO MEET CODE REQUIREMENTS FOR SAFETY GLASS 3. HEAD HEIGHTS ARE LISTED AS DISTANCE ABOVE SUB-FLOOR 4. WINDOW SUPPLIER TO PROVIDE COST ANALYSIS BASED UPON WINDOW MANUFACTURER SELECTION AND THE SIZES OF ALL WINDOWS SHOWN ABOVE. WINDOW SUPPLIER TO DO DUE DILIGENCE MAKING SURE WINDOWS ARE ADEQUATELY SIZED FOR CODE BUT ALSO SUGGEST ADJUSTMENTS BASED ON MANUFACTURERS STANDARD PRICING AND SIZING. AVOID A WINDOW SIZE LISTED ABOVE BEING SIGNIFICANTLY MORE EXPENSIVE THAN A UNIT OF SIMILAR SIZE (WHILE STILL MEETING CODE) THAT IS WITHIN SELECTED MANUFACTURERS STANDARD SIZING.
DOOR SCHEDULE Mark
OWNER:
PROJECT DESCRIPTION: NEW CONSTRUCTION SINGLE FAMILY RESIDENCE
DESIGNER: HOBBS BUILDING SYSTEMS
AREA SCHEDULE Name MAIN FLOOR GARAGE PATIO TOTAL FINISHED AREA:
Area 2631 SF 1330 SF 455 SF 2,631 SF
Comments
1 2 3 3'DO 4 5'BF 12x14 18x8 30"PK 2668 2680 3068 3080
Width 3' - 0" 3' - 0" 9' - 0" 3' - 0" 3' - 0" 5' - 0" 12' - 0" 18' - 0" 2' - 6" 2' - 6" 2' - 6" 3' - 0" 3' - 0"
Height 6' - 8" 6' - 8" 8' - 0" 8' - 0" 6' - 8" 8' - 0" 14' - 0" 8' - 0" 6' - 8" 6' - 8" 8' - 0" 6' - 8" 8' - 0"
Head Height 6' - 8" 6' - 8" 8' - 0" 8' - 0" 6' - 8" 8' - 0" 14' - 0" 8' - 0" 6' - 8" 6' - 8" 8' - 0" 6' - 8" 8' - 0"
Count 1 1 1 2 1 1 1 1 2 2 3 2 7
Comments FRONT ENTRY GARAGE / HOUSE 3-PANEL SLIDING GLASS DRYWALL OPENING REAR PATIO DOOR BI-FOLD RV OVERHEAD GARAGE OVERHEAD POCKET DOOR
GENERAL DOOR NOTES: 1. VERIFY ALL ROUGH OPENINGS WITH MANUFACTURER FOR HEAD HEIGHTS PRIOR TO CONSTRUCTION. 2. COORDINATE SDI DOOR HEIGHT WITH PARTITION ENCLOSURE TO ACHIEVE AN 8'-0" DOOR HEIGHT. 3. ADA THRESHOLD
PROJECT DATE : 19 APRIL, 2022
2.
ALL WORK TO BE PERFORMED UNDER THE IRC 2018 - VERIFY ADAPTATION OF CODE WITH LOCAL JURISDICTION. STRUCTURAL PROVISIONS TO BE REFERENCED IN THE STRUCTURAL DRAWINGS. ALL STRUCTURAL RELATED INFORMATION CONTAINED IN THESE DOCUMENTS TO BE SUPERCEDED BY THAT WHICH IS CONTAINED IN THE STRUCTURAL DRAWINGS. - ENSURE STRUCTURAL DRAWINGS ARE SIGNED AND STAMPED BY A LICENCED STRUCTURAL ENGINEER IN THE STATE OF ARIZONA. FOR ALL SITE PREPERATIONS, FOOTING & FOUNDATION PREPARATIONS AND REQUIREMENTS, REFERENCE GEOTECHNICAL ENGINEERING SITE ASSESSMENT & DESIGN RECOMMENDATIONS. IF NOT AVAILABLE CONSULT PROJECT ENGINEER FOR ASSUMED SOIL BEARING.
Head Height 6' - 10 3/4" 6' - 10 3/4" 3' - 9 3/32"
JOB # : 202279
1.
Height 4' - 6" 1' - 2" 1' - 6"
032822
GENERAL NOTES:
Width 2' - 6" 3' - 0" 3' - 0"
RISING SUN 100
PROJECT INFORMATION:
Type Mark Type A 30" x 54" B 36" x 14" C 36" x 18"
DRAWING SCALE : REVISION DATE : DRAWING NAME : COVER SHEET
A000