TITLE:
PRELIMINARY ROUTE SURVEY REPORT
FROM BILFAL ASSEMBLY YARD TO JUBAIL EXPORT REFINERY, JUBAIL INDUSTRIAL AREA CLIENT:
BILFAL PROJECT:
JUBAIL EXPORT REFINERY PROJECT JUBAIL, KSA
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
Surveyed & Prepared by:
JAY / EGC
Checked by:
MHL-BIFAL-JERP-RM
LCC PAGE
ROUTE: OPTION 0
2 of 22
TABLE OF CONTENTS
TOPOGRAPHICAL MAP ······································· 3-5 ROUTE MAP ···················································· 6 SUMMARY ····················································· 7 ROUTE SURVEY DETAILS ··································· 8-11 ROUTE SURVEY PHOTOS ····································· 12-21 REFERENCES ··················································· 22
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
3 of 22
TOPOGRAPHICAL MAP
BILFAL ASSEMBLY YARD
JUBAIL 2 JERP
SANITARY LANDFILL
REMARKS:
FROM BILFAL YARD TO JUBAIL EXPORT REFINERY PROJECT ESTIMATED DISTANCE = 20.50 KM.
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
RG / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
4 of 22
TOPOGRAPHICAL MAP
JUBAIL 2 JERP SANITARY LANDFILL
BILFAL ASSEMBLY YARD
REMARKS:
FROM BILFAL YARD TO JUBAIL EXPORT REFINERY PROJECT ESTIMATED DISTANCE = 20.50 KM.
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA
DATE: 21-06-10 REV.:
00
DOC.REF.:
BILFAL
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
RG / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
5 of 22
TOPOGRAPHICAL MAP BILFAL ASSEMBLY YARD
SANITARY LANDFILL
JUBAIL 2 JERP
REMARKS:
FROM BILFAL YARD TO JUBAIL EXPORT REFINERY PROJECT ESTIMATED DISTANCE = 20.50 KM.
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA
DATE: 21-06-10 REV.:
00
DOC.REF.:
BILFAL
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
SMacaculop Checked by:
LCC PAGE
ROUTE: OPTION 0
ROUTE MAP
6 of 22
Project :
JUBAIL EXPORT REFINERY JUBAIL, KSA
Client :
DATE: 21-06-10 REV.:
00
DOC.REF.:
BILFAL
Surveyed & Prepared by:
JAY / EGC Checked by:
MHL-BIFAL-JERP-RM
LCC PAGE
ROUTE: OPTION 0
7 of 22
SUMMARY KILOMETER
DESCRIPTION
0.00
BILFAL ASSEMBLY YARD HEAVY HAUL GATE
1.20
T-197 ROAD
2 LP TBR
3.40
APPROACHING T-241 TURN LEFT TO T-241
1 LP TBR 4 SL TBR 1 SB TBR
3.50
ROAD T-241
3 SL TBR
3.90
CROSSING FROM T-241 TO T-130 AND T-138
BARRICADE TBR
4.00
TURN RIGHT TO CROSSING T-184
3 SL TBR BARRICADE TBR
8.00
CROSSING T-184
1 LP TBR BARRICADE TBR
8.60
TURN RIGHT TO CROSSING T-251
BARRICADE TBR
9.60
CROSSING T-295 TO MODULE PATH
BARRICADE TBR
10.90
FROM MODULE PATH TO CROSSING T-7
BARRICADE TBR
17.70
STRAIGHT TO T-218
1 SL TBR
19.00
TURN LEFT TO NEW ROAD
3 SL TBR
20.50
SITE GATE CONNECTING ROAD IS TO BE BACKFILLED, LEVELED AND COMPACTED BY OTHERS
LEGEND: LP = LIGHTPOST SL = SIGNAL LIGHT SB = SIGNBOARD TBR = TO BE REMOVED
ACTION
Project :
JUBAIL EXPORT REFINERY JUBAIL, KSA
Client :
BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
RG / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
8 of 22
ROUTE SURVEY DETAILS
0.00KM. BILFAL ASSEMBLY YARD
ROAD T-120 TURN RIGHT T-120
TS-118
TS-112
T-241
3.40KM.(3.40KM.) INTERSECTION TURN LEFT TO T-241
T-138 T-120 T-130
REMARKS:
ROAD CLEAR AND FEASIBLE
Project :
JUBAIL EXPORT REFINERY JUBAIL, KSA
Client :
DATE: 21-06-10 REV.:
00
DOC.REF.:
BILFAL
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
RG / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
9 of 22
ROUTE SURVEY DETAILS
8.00KM.(4.60KM.) INTERSECTION TURN RIGHT TO T-184 BARRICADE TO BE OPEN T-184 T-241
T-251
NEW MODULE PATH T-295
9.60KM.(1.60KM.) INTERSECTION STRAIGHT AHEAD TO NEW MODULE PATH(MP) BARRICADE TO BE OPEN
T-184
NEW MP
10.90KM.(1.30KM.) CURVE ROAD & INTERSECTION STRAIGHT AHEAD CROSSING T-7 TO NEW MODULE PATH(MP) BARRICADE TO BE OPEN
NEW MP T-7
REMARKS:
ROAD CLEAR AND FEASIBLE
Project :
JUBAIL EXPORT REFINERY JUBAIL, KSA
Client :
BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
RG / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
10 of 22
ROUTE SURVEY DETAILS
T-218
11.90KM.(1.00KM.) APPROACHING TO T-218 PASSING UNDERGROUND PIPELINES
PIPELINES MP
16.30KM.(4.40KM.) STRAIGHT AHEAD TO INTERSECTION T-303 AND T-305 T-305
T-303
T-218
19.00KM.(2.70KM.) STRAIGHT AHEAD TO INTERSECTION T-303 AND T-305
NEW ROAD
T-218
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
RG / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
11 of 22
ROUTE SURVEY DETAILS
AREA TO BE BACKFILLED, LEVELED & COMPACTED BY OTHERS
20.50KM.(1.50KM.) TURN LEFT TO PROJECT SITE TO BE BACKFILLED, LEVELED AND COMPACTED BY OTHERS
JUBAIL EXPORT REFINERY PROJECT NEW ROAD
T-218
REMARKS:
ROAD CLEAR AND FEASIBLE
Project :
JUBAIL EXPORT REFINERY JUBAIL, KSA
Client :
BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
12 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
BILFAL ASSEMBLY YARD HEAVY HAUL GATE 0.00 KM.
15.00 METERS
BILFAL HEAVY HAUL GATE
2 LIGHT POST TO BE REMOVED AT T-197 ROAD 1.20 KM.
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
13 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
FROM T-197,TURN RIGHT TO T-120 ROAD
STRAIGHT AHEAD TO T-120 ROAD
1 LIGTH POST TO BE REMOVED
3.40 KM.
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY/ EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
14 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
TURN LEFT TO T-241 4 SIGNAL LIGHT TO BE REMOVED 1 SMALL SIGNBOARD TO BE REMOVED 3.40 KM.
STRAIGHT AHEAD TO T-241 ROAD 3 SIGNAL LIGHT TO BE REMOVED
BARRICADES TO BE REMOVED FROM T-130 & T-138, CROSSING T-241 3.90 KM.
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
15 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
DETAIL A 3 SIGNAL LIGHT TO BE REMOVED BARRICADES TO BE REMOVED FROM T-138, CROSSING T-241
DETAIL A
DETAIL B
DETAIL B 1 LIGHT POST TO BE REMOVED BARRICADES TO BE REMOVED FROM T-184, CROSSING T-241
BARRICADES TO BE REMOVED FROM T-184, CROSSING T-251 8.60 KM.
STRAIGHT AHEAD TO T-184 ROAD
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
16 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
CROSSING T-295 BARRICADES TO BE REMOVED 9.60 KM.
NEW MODULE PATH
NEW MODULE PATH
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
17 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
NEW MODULE PATH
BARRICADES FROM NEW MODULE PATH TO BE REMOVED CROSSING T-7 10.90 KM.
BARRICADES FROM T-7 TO BE REMOVED CROSSING NEW MODULE PATH
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
18 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
STRAIGHT AHEAD TO NEW MODULE PATH
STRAIGHT AHEAD TO NEW MODULE PATH 12.80 KM.
STRAIGHT AHEAD TO NEW MODULE PATH CROSSING T-301 ROAD 14.50 KM.
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
19 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
STRAIGHT AHEAD TO T-218 BESIDE NEW MODULE PATH
STRAIGHT AHEAD TO NEW MODULE PATH 14.90 KM.
STRAIGHT AHEAD TO NEW MODULE PATH 16.30 KM.
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
Surveyed & Prepared by:
JAY / EGC Checked by:
MHL-BIFAL-JERP-RM
LCC PAGE
ROUTE: OPTION 0
20 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
STRAIGHT AHEAD TO T-218 ROAD 1 SIGNAL LIGHT TO BE REMOVED 17.70 KM.
TURN LEFT 3 SIGNAL LIGHT TO BE REMOVED 19.00 KM.
GATE AT THE SITE 20.50 KM.
REMARKS:
ROAD CLEAR AND FEASIBLE
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
21 of 22
ROUTE SURVEY PHOTOS WITH DETAILS
TO BE BACKFILLED,LEVEL AND COMPACTED
REMARKS:
Project : Client :
JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL
DATE: 21-06-10 REV.:
00
DOC.REF.:
MHL-BIFAL-JERP-RM
Surveyed & Prepared by:
JAY / EGC Checked by:
LCC PAGE
ROUTE: OPTION 0
22 of 22
JUBAIL WEATHER SUMMARY
REMARKS:
Reference: www.jubailaqdata.com/SummaryGauges/S9Summary.aspx