ROUTE SURVEY REPORT

Page 1

TITLE:

PRELIMINARY ROUTE SURVEY REPORT

FROM BILFAL ASSEMBLY YARD TO JUBAIL EXPORT REFINERY, JUBAIL INDUSTRIAL AREA CLIENT:

BILFAL PROJECT:

JUBAIL EXPORT REFINERY PROJECT JUBAIL, KSA


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

Surveyed & Prepared by:

JAY / EGC

Checked by:

MHL-BIFAL-JERP-RM

LCC PAGE

ROUTE: OPTION 0

2 of 22

TABLE OF CONTENTS

TOPOGRAPHICAL MAP ······································· 3-5 ROUTE MAP ···················································· 6 SUMMARY ····················································· 7 ROUTE SURVEY DETAILS ··································· 8-11 ROUTE SURVEY PHOTOS ····································· 12-21 REFERENCES ··················································· 22


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

3 of 22

TOPOGRAPHICAL MAP

BILFAL ASSEMBLY YARD

JUBAIL 2 JERP

SANITARY LANDFILL

REMARKS:

FROM BILFAL YARD TO JUBAIL EXPORT REFINERY PROJECT ESTIMATED DISTANCE = 20.50 KM.


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

RG / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

4 of 22

TOPOGRAPHICAL MAP

JUBAIL 2 JERP SANITARY LANDFILL

BILFAL ASSEMBLY YARD

REMARKS:

FROM BILFAL YARD TO JUBAIL EXPORT REFINERY PROJECT ESTIMATED DISTANCE = 20.50 KM.


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA

DATE: 21-06-10 REV.:

00

DOC.REF.:

BILFAL

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

RG / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

5 of 22

TOPOGRAPHICAL MAP BILFAL ASSEMBLY YARD

SANITARY LANDFILL

JUBAIL 2 JERP

REMARKS:

FROM BILFAL YARD TO JUBAIL EXPORT REFINERY PROJECT ESTIMATED DISTANCE = 20.50 KM.


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA

DATE: 21-06-10 REV.:

00

DOC.REF.:

BILFAL

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

SMacaculop Checked by:

LCC PAGE

ROUTE: OPTION 0

ROUTE MAP

6 of 22


Project :

JUBAIL EXPORT REFINERY JUBAIL, KSA

Client :

DATE: 21-06-10 REV.:

00

DOC.REF.:

BILFAL

Surveyed & Prepared by:

JAY / EGC Checked by:

MHL-BIFAL-JERP-RM

LCC PAGE

ROUTE: OPTION 0

7 of 22

SUMMARY KILOMETER

DESCRIPTION

0.00

BILFAL ASSEMBLY YARD HEAVY HAUL GATE

1.20

T-197 ROAD

2 LP TBR

3.40

APPROACHING T-241 TURN LEFT TO T-241

1 LP TBR 4 SL TBR 1 SB TBR

3.50

ROAD T-241

3 SL TBR

3.90

CROSSING FROM T-241 TO T-130 AND T-138

BARRICADE TBR

4.00

TURN RIGHT TO CROSSING T-184

3 SL TBR BARRICADE TBR

8.00

CROSSING T-184

1 LP TBR BARRICADE TBR

8.60

TURN RIGHT TO CROSSING T-251

BARRICADE TBR

9.60

CROSSING T-295 TO MODULE PATH

BARRICADE TBR

10.90

FROM MODULE PATH TO CROSSING T-7

BARRICADE TBR

17.70

STRAIGHT TO T-218

1 SL TBR

19.00

TURN LEFT TO NEW ROAD

3 SL TBR

20.50

SITE GATE CONNECTING ROAD IS TO BE BACKFILLED, LEVELED AND COMPACTED BY OTHERS

LEGEND: LP = LIGHTPOST SL = SIGNAL LIGHT SB = SIGNBOARD TBR = TO BE REMOVED

ACTION


Project :

JUBAIL EXPORT REFINERY JUBAIL, KSA

Client :

BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

RG / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

8 of 22

ROUTE SURVEY DETAILS

0.00KM. BILFAL ASSEMBLY YARD

ROAD T-120 TURN RIGHT T-120

TS-118

TS-112

T-241

3.40KM.(3.40KM.) INTERSECTION TURN LEFT TO T-241

T-138 T-120 T-130

REMARKS:

ROAD CLEAR AND FEASIBLE


Project :

JUBAIL EXPORT REFINERY JUBAIL, KSA

Client :

DATE: 21-06-10 REV.:

00

DOC.REF.:

BILFAL

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

RG / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

9 of 22

ROUTE SURVEY DETAILS

8.00KM.(4.60KM.) INTERSECTION TURN RIGHT TO T-184 BARRICADE TO BE OPEN T-184 T-241

T-251

NEW MODULE PATH T-295

9.60KM.(1.60KM.) INTERSECTION STRAIGHT AHEAD TO NEW MODULE PATH(MP) BARRICADE TO BE OPEN

T-184

NEW MP

10.90KM.(1.30KM.) CURVE ROAD & INTERSECTION STRAIGHT AHEAD CROSSING T-7 TO NEW MODULE PATH(MP) BARRICADE TO BE OPEN

NEW MP T-7

REMARKS:

ROAD CLEAR AND FEASIBLE


Project :

JUBAIL EXPORT REFINERY JUBAIL, KSA

Client :

BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

RG / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

10 of 22

ROUTE SURVEY DETAILS

T-218

11.90KM.(1.00KM.) APPROACHING TO T-218 PASSING UNDERGROUND PIPELINES

PIPELINES MP

16.30KM.(4.40KM.) STRAIGHT AHEAD TO INTERSECTION T-303 AND T-305 T-305

T-303

T-218

19.00KM.(2.70KM.) STRAIGHT AHEAD TO INTERSECTION T-303 AND T-305

NEW ROAD

T-218

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

RG / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

11 of 22

ROUTE SURVEY DETAILS

AREA TO BE BACKFILLED, LEVELED & COMPACTED BY OTHERS

20.50KM.(1.50KM.) TURN LEFT TO PROJECT SITE TO BE BACKFILLED, LEVELED AND COMPACTED BY OTHERS

JUBAIL EXPORT REFINERY PROJECT NEW ROAD

T-218

REMARKS:

ROAD CLEAR AND FEASIBLE


Project :

JUBAIL EXPORT REFINERY JUBAIL, KSA

Client :

BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

12 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

BILFAL ASSEMBLY YARD HEAVY HAUL GATE 0.00 KM.

15.00 METERS

BILFAL HEAVY HAUL GATE

2 LIGHT POST TO BE REMOVED AT T-197 ROAD 1.20 KM.

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

13 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

FROM T-197,TURN RIGHT TO T-120 ROAD

STRAIGHT AHEAD TO T-120 ROAD

1 LIGTH POST TO BE REMOVED

3.40 KM.

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY/ EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

14 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

TURN LEFT TO T-241 4 SIGNAL LIGHT TO BE REMOVED 1 SMALL SIGNBOARD TO BE REMOVED 3.40 KM.

STRAIGHT AHEAD TO T-241 ROAD 3 SIGNAL LIGHT TO BE REMOVED

BARRICADES TO BE REMOVED FROM T-130 & T-138, CROSSING T-241 3.90 KM.

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

15 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

DETAIL A 3 SIGNAL LIGHT TO BE REMOVED BARRICADES TO BE REMOVED FROM T-138, CROSSING T-241

DETAIL A

DETAIL B

DETAIL B 1 LIGHT POST TO BE REMOVED BARRICADES TO BE REMOVED FROM T-184, CROSSING T-241

BARRICADES TO BE REMOVED FROM T-184, CROSSING T-251 8.60 KM.

STRAIGHT AHEAD TO T-184 ROAD

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

16 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

CROSSING T-295 BARRICADES TO BE REMOVED 9.60 KM.

NEW MODULE PATH

NEW MODULE PATH

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

17 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

NEW MODULE PATH

BARRICADES FROM NEW MODULE PATH TO BE REMOVED CROSSING T-7 10.90 KM.

BARRICADES FROM T-7 TO BE REMOVED CROSSING NEW MODULE PATH

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

18 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

STRAIGHT AHEAD TO NEW MODULE PATH

STRAIGHT AHEAD TO NEW MODULE PATH 12.80 KM.

STRAIGHT AHEAD TO NEW MODULE PATH CROSSING T-301 ROAD 14.50 KM.

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

19 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

STRAIGHT AHEAD TO T-218 BESIDE NEW MODULE PATH

STRAIGHT AHEAD TO NEW MODULE PATH 14.90 KM.

STRAIGHT AHEAD TO NEW MODULE PATH 16.30 KM.

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

Surveyed & Prepared by:

JAY / EGC Checked by:

MHL-BIFAL-JERP-RM

LCC PAGE

ROUTE: OPTION 0

20 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

STRAIGHT AHEAD TO T-218 ROAD 1 SIGNAL LIGHT TO BE REMOVED 17.70 KM.

TURN LEFT 3 SIGNAL LIGHT TO BE REMOVED 19.00 KM.

GATE AT THE SITE 20.50 KM.

REMARKS:

ROAD CLEAR AND FEASIBLE


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

21 of 22

ROUTE SURVEY PHOTOS WITH DETAILS

TO BE BACKFILLED,LEVEL AND COMPACTED

REMARKS:


Project : Client :

JUBAIL EXPORT REFINERY JUBAIL, KSA BILFAL

DATE: 21-06-10 REV.:

00

DOC.REF.:

MHL-BIFAL-JERP-RM

Surveyed & Prepared by:

JAY / EGC Checked by:

LCC PAGE

ROUTE: OPTION 0

22 of 22

JUBAIL WEATHER SUMMARY

REMARKS:

Reference: www.jubailaqdata.com/SummaryGauges/S9Summary.aspx