PROFESSIONALWORKS
WORLD SMART STREET MALL (MIXED USE/ COMMERCIAL)
INDO AUTOTECH LIMITED (INDUSTRIAL)
ITHUM'S62-IT&ITESDEVELOPMENT (INSTITUTIONAL)
INTERNSHIP WORKS
WAVE CITY SECTOR 01 , LANDSCAPE (RESIDENTIAL)
WAVE CITY CENTER (COMMERCIAL/MIXED USE)
ACADEMIC WORKS
THESIS : ARTISAN & CRAFTS VILLAGE , VRINDAVAN (SHILPDHAAM)
FREELANCE WORKS
CONCEPTUAL3DRENDERS(MICELLANEOUS)
CONTENTS : SELECTED WORKS
S ITE PHOTOS
S ITE PHOTOS
S ITE PHOTOS
S ITE PHOTOS
2 3 4 5 6 7 8 9 1 2 3 5 6 7 8 9 9a 9b 9c 9e 10a 10c 10 10 11 12 13 14 15 16 17 18 19 20 11 12 13 14 15 16 17 18 19 20 X X1 A B C A1 A2 G2 D E F G1 G H 200000 12000 4475 5950 11000 11000 11000 11000 11000 9875 1255 11135 1587517130 8470 11000 11000 11000 11000 11000 3325 10275 3400 7600 7500 98500 5a 8b 9d 2100 2375 2a 200000 9000 6500 5475 5500 5500 5500 11000 11000 11000 11000 11000 5950 5500 5500 4475 12000 9000 11000 11000 11000 11000 11000 3325 10275 3400 7600 7500 98000 7500 8a 2875 8125 15a 5500 5500 14a 5500 5500 13a 5500 5500 12a 5500 5500 11a 5500 5500 10b 4700 4300 7b 5500 5500 6a 5500 5500 4a 5500 5500 4.3 1.7 PLOT LINE SETBACK LINE 7500 MM WIDE ROAD 7550 MM WIDE ROAD 2950 MM LIFT LOBBY 2025 MM WIDE CORRIDOR 1500 MM WIDE CORRIDOR FEMALE TOILET 6.0 1.7 LIFTLOBBY 3000MMWIDE 2000 MM WIDE PASSAGE 7550 MM WIDE ROAD 500 MM WIDE GREEN BED PORCH COVERING ABOVE @ 3RD FLOOR PORCH COVERING ABOVE @ 2ND FLOOR PORCH COVERING ABOVE @ 3RD FLOOR A.C LOBBY TRELLIS @FIRSTFLOOR COVEREDWITHP.CSHEETABOVE COVEREDWITHP.CSHEETABOVE FOOD COURT 275 SEATING 10275 MM WIDE ATRIUM LANDSCAPED PLAZA TRELLIS COVERING ABOVE @ 2ND FLOOR @ 1ST FLOOR BLOCK-G (G+1) TOWER-E (G+15) BLOCK-F (G.F ONLY) TOWER-D (G+25) BLOCK-H (G+2) ATRIUM MULTI LEVEL CAR PARKING FOUNTAIN LANDSCAPED PLAZA ENTRY RAMP TO BAS.01 1:9 SLOPE EXIT RAMP FROM BAS.01 1:9 SLOPE ENTRY RAMP TO BAS.01 1:9 SLOPE EXIT RAMP FROM BAS.01 1:9 SLOPE UP WIDE LOBBY MALE TOILET TOILET EXIT ENTRY MALE TOILET FEMALE TOILET 1500 MM WIDE CORRIDOR 450 MM WIDE PROJECTION ABOVE 450 MM WIDE PROJECTION ABOVE 4 5 M R O J E C OUTDOOR SEATING OUTDOOR SEATING OUTDOOR SEATING OUTDOOR SEATING OUTDOOR SEATING OUTDOOR SEATING OUTDOOR SEATING OUTDOOR SEATING OUTDOOR SEATING OUTDOOR SEATING 2 1 M M D E O R O R R E WA TER DY DN FIRST FLOOR CORRIDOR LINE ABOVE 300 MM PROJECTION SLAB ABOVE FROM TO GF 4000MMWIDE LIFTLOBBY MALE FEMALE 2225 MM WIDE CORRIDOR 2000 MM WIDE CORRIDOR ENTRANCE LOBBY ENTRANCE LOBBY 2700 MM WIDE LIFT LOBBY ATRIUM 5 WIDE PROJ ECTION & ELE CHARACTE R) ABOVE WIDE ECTION (ELEVATION C H TER ABOVE FIN (E V A TION A C TE A FEATURE ELEMENT 1000MMWIDEPASSAGE 1500MMWIDEPROJECTIONABOVE&EXTENDEDAREAFORF.C PROJECTION (ELEVATION ABOVE WIDE(ELEVATION AC (E LE A A TRIU M FR M& TOF.F TOUUCO B S 1 U OU T BAS.450 MM WIDE 450MMWIDEPROJECTIONABOVE 450MMWIDEPROJECTIONABOVE LANDSCAPED PLAZA 7500 MM WIDE ROAD 7500 MM WIDE ROAD 0 0 0 M M W D E R O A D RETAINING WALL BELOW FRO RAMP RETAINING WALL BELOW FRO RAMP RETAINING WALL BELOW FRO RAMP GUARD ROOM GUARD ROOM CANOPYCOVERNGAT TERRACE CANOPY COVERING 33KVVCB ACB 33KVVCB 33KVVCB TR (2500KVA) TR KV (2500KVA) D.G. SET (1500 KVA) (WITH CANOPY) (WITH CANOPY) D.G. SET (1500 KVA) (WITH CANOPY) D.G. SET (750 KVA) (WITH CANOPY) Xa 250 X3 5060 5340 7780 SETBACK LINE TO PLOT LINE SETBACK TO BUILDING LINE 7500 5060 9550 PLOT LINE TO SETBACK LINE 760 7110SETBACK TO BUILDING LINE 9500 11000 5500 9000 10550 8500 9000 7500 X2 PARKING TO BUILDING LINE PLOT LINE TO PARKING LINE D1 5310 7510 7350 PLOT LINE TO SETBACK LINE SETBACK LINE TO BUILDING LINE 9550 450 PLOT LINE TO PARKING LINE PARKING TO BUILDING LINE 9500 11000 5500 3500 5500 10550 8500 5500 5580 11000 B1 B2 3280 1520 4800 6200 5310 7780 BUILDING LINE PARKING PLOT LINE TO PARKING LINE SETBACK TO BUILDING LINE 240 7510PLOT LINE TO SETBACK LINE 240 SETBACK LINE PLOT LINE TO SETBACK LINE SETBACK LINE TO BUILDING LINE SETBACK LINE SETBACK LINE PLOT LINE MALE TOILET OFFICE 3.0 3.1 SERVICE F/A CUTOUT (B2)1100x3000 E/A CUTOUT (B1) 3970 615 CUTOUT G.F (B2) 3970 615 E/A CUTOUT(B1)2100 X1650 PLOT LINE TO PARKING LINE PARKING TO BUILDING LINE Fo pa Footp h Footpath Open Dra n Divider Divider Divider Divider <<< Cyc e Track >>> >>>>> SUSH L MARG >>>> Shop LVL. COVERED DRAIN PEN DRAIN OPEN DRAIN OPEN DR IN COV RE DR IN AS PER SURVEY) (AS PER SURVEY) 1000 1000 750 750 1000 MM WIDE AREA ENROACHED 1000 MM WIDE AREA ENROACHED 750 MM WIDE AREA ENROACHED 100000 AS PER SANCTIONED ALLOTMENT) 100000 AS PER SANCTIONED ALLOTMENT) FOUNTAIN 250 E1 6620 3930 A +1000 (TOS) +1000 (TOS) +1000 (TOS) (TOS) D-01 34.76 SQM D-02 31.79 SQM D-03 31.75 SQM D-04a 21.08 SQM D-05a 24.13 SQM D-06a 21.96 SQM D-07a 23.58 SQM D-08a 24.20 SQM D-09a 24.82 SQM D-10a 25.44 SQM D-11a 26.06 SQM D-12a 26.68 SQM D-14a 27.30 SQM D-15a 31.92 SQM D-16 78.54 SQM D-17 246.69 SQM D-18 114.80 SQM D-19 21.25 SQM D-20 18.56 SQM D-21 D-22 D-23 D-24 D-25 D-26 D-27 18.40 SQM 17.48 SQM 15.26 SQM 17.34 SQM D-15b D-14b D-12b D-11b D-10b D-09b D-08b D-07b D-06b D-05b D-04b 15.26 SQM 15.26 SQM 15.26 SQM 15.26 SQM 15.26 SQM 15.26 SQM 15.13 SQM 15.26 SQM 18.56 SQM 18.56 SQM 18.56 SQM 18.56 SQM 18.56 SQM 18.56 SQM F-49 9.17 SQM F-48 F-47 F-46 09.66 SQM F-45 08.90 SQM F-44F-43 09.50 SQM 9.17 SQM 9.17 SQM 08.90 SQM E-01 62.89 SQM E-02 40.69 SQM E-03 45.20 SQM E-04 46.67 SQM E-06 71.60 SQM E-05 70.08 SQM E-07 73.12 SQM E-08 74.63 SQM E-09 68.68 SQM E-10 57.78 SQM E-11 59.09 SQM E-12 60.60 SQM E-14 22.26 SQM E-15 E-16 E-17 E-18 E-19 E-20 E-21 E-22 E-23 17.00 SQM E-24 14.63 SQM 17.00 SQM 17.00 SQM 17.00 SQM 17.00 SQM 17.00 SQM 17.00 SQM 17.00 SQM 17.00 SQM 10.93 SQM 10.76 SQM 10.59 SQM 9.78 SQM 9.00 SQM 09.61 SQM 09.78 SQM 09.35 SQM 09.05 SQM 08.96 SQM 08.96 SQM 09.78 SQM 09.50 SQM 09.61 SQM 09.78 SQM 09.05 SQM 09.72 SQM 09.66 SQM 08.95 SQM 9.00 SQM 9.00 SQM 11.94 SQM 09.22 SQM 08.88 SQM 08.91 SQM F-01 F-02 F-03 F-04 F-05 F-06 F-07 F-08 F-09 F-10 F-11 F-12 F-14 F-15 F-16 F-17 F-18 F-19 F-20 F-21 F-22 F-23 F-24 F-25 F-26 F-42 09.41 SQM F-41 09.28 SQM F-40 09.05 SQM F-39 08.96 SQM F-38 F-37 08.88 SQM F-36 09.67 SQM F-35 09.40 SQM F-34 09.63 SQM F-33 09.89 SQM F-32 09.02 SQM F-31 09.46 SQM F-30 F-29 F-28 08.96 SQM 09.46 SQM 09.46 SQM 09.46 SQM G-04 155.52 SQM G-05 49.52 SQM G-06 47.55 SQM G-07 45.99 SQM G-08 44.41 SQM G-09 42.83 SQM G-10 41.25 SQM G-11 39.67 SQM G-12 38.46 SQM G-12A 36.70 SQM H-14a H-14b H-28a 12.29 SQM 12.41 SQM H-27a 12.33 SQM 12.33 SQM H-26a 12.37 SQM 12.37 SQM H-25a H-24a H-23a H-22a H-21a H-20a H-19a H-18a H-17a H-16a H-15a H-28b H-27b H-26b H-25b H-24b H-23b H-22b H-21b H-20b H-19b H-18b H-17b H-16b H-15b 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM 12.37 SQM12.37 SQM H-12a 6.26 SQM H-12b 6.26 SQM H-12c 6.29 SQM H-11a 12.37 SQM H-11b 12.37 SQM H-10a 82.97 SQM H-10b 10.14 SQM H-10c 10.14 SQM H-09a 61.72 SQM H-08a 62.42 SQM H-07a 63.13 SQM H-06a 52.82 SQM H-05a 53.54 SQM H-04a 54.24 SQM H-03a 54.92 SQM H-02a 55.55 SQM H-01b 56.16 SQM H-01a 126.80 SQM H-29 178.08 SQM H-09b 24.75 SQM H-09c H-08b H-08c H-07b 23.85 SQM H-07c 20.64 SQM H-06b 23.45 SQM H-06c 21.46 SQM H-05b 20.12 SQM H-05c 19.41 SQM H-04b 19.30 SQM H-04c 19.80 SQM H-03b 20.95 SQM H-03c 22.87 SQM H-02b 25.49 SQM H-02c 27.27 SQM 24.75 SQM 24.75 SQM 24.75 SQM MALE TOILET FEMALE SP.ABLE TOILET 4500 MM WIDE LOBBY X4X5 A B C D E F G H G3 XX1X2 X1a X3 X4X5 X3a X5a PLOT LINE TO SETBACK LINE SETBACK LINE TO BUILDING LINE PLOT LINE TO PARKING LINE PARKING TO BUILDING LINE BUILDING LINE PARKING PLOT LINE TO PARKING LINE SETBACK TO BUILDING LINE PLOT LINE TO SETBACK LINE PLOT LINE TO SETBACK LINE PLOT LINE TO SETBACK LINE PLOT LINE TO SETBACK LINE PLOT LINE TO SETBACK LINE TO BUILDING LINE SETBACK LINE SETBACK TO BUILDING LINE SETBACK TO BUILDING LINE SETBACK LINE TO PLOT LINE SETBACK TO BUILDING LINE PLOT LINE TO SETBACK LINE SETBACK TO BUILDING LINE PARKING TO BUILDING LINE PLOT LINE TO PARKING LINE PLOT LINE TO PARKING LINE PARKING TO BUILDING LINE SETBACK LINE SETBACK LINE SETBACK LINE SETBACK LINE DN 2000 MM WIDE CORRIDOR 4000 MM WIDE LIFT LOBBY LIFT LOBBY PLOT LINE PLOT LINE 12000 7500 7500 12000 7500 7500 7500 7500 D-0101 77.49 SQM D-0102 27.22 SQM D-0103 37.26 SQM D-0104 38.36 SQM D-0105 39.48 SQM D-0106 D-0107 D-0108 D-0109 D-0110 D-0111 D-0112 47.20 SQM D-0114 48.28 SQM D-0115 49.38 SQM D-0116 69.12 SQM D-0117 103.09 SQM D-0119 26.53 SQM D-0118 59.75 SQM D-0120 28.52 SQM D-0121 25.94 SQM D-0122 27.06 SQM D-0123 26.12 SQM D-0124 26.12 SQM D-0125 26.35 SQM D-0126 D-0127 D-0128 D-0129 D-0130 26.27 SQM 26.12 SQM 26.12 SQM 26.12 SQM 26.12 SQM 41.67 SQM 42.77 SQM 43.87 SQM 44.97 SQM 46.08 SQM 47.18 SQM LASSPROJECTION TTO GLAS PROJECTION TOP OPEN TOSKY OPEN TOSKY OPEN TOSKY ANCHORANCHOR CONNECTED TO GROUND) ATRIUM ATRIUM MALE FEMALE TOILET 2400 MM WIDE CORRIDOR H-0109 19.89 SQM H-0110 19.89 SQM H-0111 H-0112 20.62 SQM H-0114 H-0115 H-0116 H-0117 H-0118 H-0119 H-0120 H-0121 H-0122 H-0123 H-0124 20.62 SQM H-0125 20.56 SQM H-0126 20.08 SQM 19.89 SQM 20.62 SQM 20.62 SQM 20.62 SQM 20.62 SQM 20.62 SQM 20.62 SQM 20.62 SQM 20.62 SQM 20.62 SQM 20.62 SQM MULTIPURPOSEHALL 15.6 5.5 750 MM WIDE PROJECTION MULTIPURPOSEHALL 13.6 9.2 SERVICES G-0101 G-0102 2000 MM WIDE PROJECTION PANTRY 3.8 9.2 G-0101a TERRACEWITHSEATING G-0101 TERRACEWITHSEATING G-0102 450 MM WIDE PROJECTION @ 1ST FLOOR W E C T H-0127 223.02 SQM H-0101 330.44 SQM H-0102 31.72 SQM CONNECTED TO GROUND) H-0103 32.99 SQM H-0104 32.99 SQM H-0105 32.99 SQM H-0106 32.99 SQM H-0107 48.88 SQM H-0108 105.88 SQM H-0102a 17.58SQM H-0103a 18.72SQM H-0104a 23.75 SQM H-0105a 33.80 SQM H-0106a 39.76 SQM H-0107a 56.23 SQM H-0102b 29.05 SQM H-0103b 29.75 SQM H-0104b 29.04 SQM H-0105b 28.34 SQM H-0106b 27.64 SQM H-0107b 40.28 SQM H-0108a 27.43 SQM FROM TO 35.19SQM 119.65 SQM 85.51 SQM 450 MM WIDE PROJECTION @ 1ST FLOOR 0 MM W RO TON@ O 450 MM WIDE PROJECTION @ 1ST FLOOR W D E R O J C T O MMWIDE ROJ CTION@ FLOOR WI @ PRO ST PORCH COVERING ABOVE @ 3RD FLOOR A.C LOBBY TRELLIS COVERING ABOVE @ 2ND FLOOR A.H.U ROOM LIFT LOBBY 450 M M WID ION @ 1ST WID E PR OJ EC @ 1ST F LOOR MMWIDEPROJECTON@ ST OOR 1500 MM WIDE BALCONY MALE TOILET FEMALE TOILET 2000 MM WIDE CORRIDOR PLOT LINE TOILET TOILET A B 1 3 5 6 7 8 9 1 2 3 4 5 6 7 8 9 9a 9b 9c 9e 10a 10c 10 10 11 12 13 14 15 16 17 18 19 20 11 12 13 14 15 16 17 18 19 20 X X1 A B C A1 A2 G2 D E F G1 G H 200000 12000 4475 5950 11000 11000 11000 11000 11000 9875 1255 11135 1587517130 8470 11000 11000 11000 11000 11000 3325 10275 3400 7600 7500 98500 5a 8b 9d 2100 2375 2a 200000 9000 6500 5475 5500 5500 5500 11000 11000 11000 11000 11000 5950 5500 5500 4475 12000 9000 11000 11000 11000 11000 11000 3325 10275 3400 7600 7500 98000 7500 8a 2875 8125 15a 5500 5500 14a 5500 5500 13a 5500 5500 12a 5500 5500 11a 5500 5500 10b 4700 4300 7b 5500 5500 6a 5500 5500 4a 5500 5500 Xa 250 X3 5060 5340 7780 7500 5060 9550 760 7110 9500 11000 5500 9000 10550 8500 9000 7500 X2 D1 5310 7510 7350 9550 450 9500 11000 5500 3500 5500 10550 8500 5500 5580 11000 B1 B2 3280 1520 4800 6200 5310 7780 240 7510 240 1000 1000 750 750 100000 100000 250 E1 6620 3930 X4X5 A B C D E F G H G3 XX1X2 X1a X3 X4X5 X3a X5a SERV.
BASEMENT 02 BASEMENT 01 GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR EIGHTH FLOOR NINTH FLOOR TENTH FLOOR ELEVENTH FLOOR TWELFTH FLOOR FOURTEENTH FLOOR FIFTEENTH FLOOR SIXTEENTH FLOOR SEVENTEENTH FLOOR EIGHTEENTH FLOOR NINTEENTH FLOOR TWENTIETH FLOOR TWENTY FIRST FLOOR TWENTY SECOND FLOOR TWENTY THIRD FLOOR TWENTY FOURTH FLOOR TWENTY FIFTH FLOOR TERRACE TWELFTH-A FLOOR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STRSLAB/BEAM AS/ STRSLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY AS/ STR UNIT UNIT UNIT LIFT LOBBY UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TOILET BLOCK CORRIDOR LIFT LOBBY SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR LIFT LOBBY TOILET BLOCK CORRIDOR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR ATRIUM COVERING PC SHEET LIFT LOBBY LIFT LOBBY SLAB/BEAM AS/ STR LIFT LOBBY LIFT PIT LIFT PIT LIFT PIT LIFT LOBBY PARKINGPARKINGPARKINGPARKINGPARKING ITPARKINGPARKING FALSE FASCIA PROFILE FALSE FASCIA PROFILE FALSE FAS CI A PRO FI L E FAL S E FAS CI A PRO FI L E SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SERVICES LADIES TOILET GENTS TOILET AHU HALL SLAB/BEAM AS/ STR SLAB/BEAM SLAB/BEAM SLAB/BEAM SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR SLAB/BEAM AHU SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR AS/ STR AHU SLAB/BEAM SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR AS/ STR AHU SLAB/BEAM SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR SLAB/BEAM AS/ STR AHU SLAB/BEAM AS/ STR LIFT PIT LIFT PIT LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY PARKINGPARKING ELECTRICAL PANEL ROOM RAMPFROMB01TOB02 PARKINGPARKINGPARKING PARKINGPARKINGPARKING LIFT PIT LIFT PIT DRIVE-WAY DRIVE-WAY SLAB/BEAM AS/ STR SLAB/BEAM TRIPLE HT. AC LOBBY/ATRIUM 4650 4650 6000 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3750 3900 ENTRY RAMP TO B-01 7500MM WIDE ROAD INTERNAL ACCESS ROAD COMPACTED EARTH RCC WALL AS/ STR SETBACK COMPACTED COMPACTEDEARTHCOMPACTEDEARTHCOMPACTEDEARTH EARTH RAFT AS/ STR. RAFT AS/ STR. RAFT AS/ STR. RAFT AS/ STR. RAFT AS/ STR. STAIR DOOR DOOR STAIR DOOR STAIR DOOR DOOR STAIR DOOR DOOR STAIR STAIR DOOR DOOR STAIR DOOR DOOR STAIR STAIR DOOR DOOR STAIR DOOR DOOR STAIR STAIR DOOR DOOR STAIR DOOR STAIR STAIR DOOR DOOR STAIR STAIR DOOR STAIR DOOR STAIR DOOR DOOR DOOR STAIR DOOR STAIR DOOR STAIR STAIR DOOR DOOR STAIR STAIR DOOR STAIR STAIR DOOR DOOR STAIR STAIR DOOR STAIR STAIR DOOR DOOR STAIR STAIR DOOR STAIR STAIR DOOR DOOR STAIR STAIR DOOR STAIR DOOR STAIR 5000 HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL HALL +1000 LVL (TOS) ± 00 LVL -3850 LVL (TOS) -8500 LVL (TOS) +6800 LVL (TOS) +15550 LVL (TOS) +14300 LVL (TOS) +18050 LVL (TOS) +21800 LVL (TOS) +25550 LVL (TOS) +29300 LVL (TOS) +33050 LVL (TOS) +36800 LVL (TOS) +40550 LVL (TOS) +44300 LVL (TOS) +48050 LVL (TOS) +51800 LVL (TOS) +55550 LVL (TOS) +59300 LVL (TOS) +63050 LVL (TOS) +66800 LVL (TOS) +70550 LVL (TOS) +74300 LVL (TOS) +78050 LVL (TOS) +81800 LVL (TOS) +85550 LVL (TOS) +89300 LVL (TOS) +93050 LVL (TOS) +96800 LVL (TOS) +100700 LVL (TOS) AS/ STR 5000 AS/ STR TOWER D G+25 TOWER E G+15 5000 SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES SERVICES UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT TERRACE TERRACE TERRACE FRONT ROAD REAR ROAD 5000 ATRIUM COVERING PC SHEET ATRIUM COVERING PC SHEET 1 2 4 5 6 7 8 9 9a 9b 10a 10 11 12 13 14 15 16 17 18 19 20 200000 12000 4475 5950 11000 11000 11000 11000 11000 9875 1255 11135 15875 17130 8470 11000 11000 11000 11000 11000 3325 10275 3400 7600 7500 2100 2375 2a 8a 2875 8125 TWO WHEELER PARKING 4.5M WIDE PARKING RAMP FROM GF STP AREA 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK 50MM SUNK TOILET 50MM 50MM TOILET 50MM 50MM TOILET TOILET 50MM SUNK 50MM SUNK TOILET SUNK SUNK TOILET SUNK SUNK TOILET 50MM 50MM TOILET SUNK SUNK TOILET 50MM 50MM TOILET TOILET 50MM SUNK 50MM SUNK TOILET 50MM 50MM TOILET TOILET 50MM 50MM TOILET 50MM SUNK50MM SUNK