Aceh investment profile 2014 (Final)

Page 1

ACEH

INVESTMENT PROFILE



DETAILED PLAN OF

ACEH INVESTMENT PROFILE

ACEH INVESTMENT COORDINATING BOARD 2014


FOREWORD

dr. Zaini Abdullah GOVERNOR OF ACEH

Aceh is your investment destination. There are four key strengths that make Aceh very promising: friendly investment laws, geographical position, abundant natural resources, and human capital. Friendly investment laws are related to our status as a special autonomy province in Indonesia. We have a wider authority to govern ourselves than other regions in Indonesia. We also have privilleges to make direct cooperation with foreign institutions. Another important investment measure is the free port and free trade zone in Sabang. The zone provides attractive incentives for investors, such as import duty and tax exemption. For simplification, all licensings for investment in the zone are issued by the Sabang Management and Development Board (BPKS). Another reason that makes Aceh one of the best place to invest is its location proximity. Located in one of the busiest international shipping lane, on the entrance of Malacca Strait, Aceh is geographically close to potential markets, such as East Africa, Middle East, South Asia, Southeast Asia, East Asia, along with Australia and New Zealand. This relative position is a beneficial networking for long term investment activities. Aceh also has abundant natural resources. Coffee, cocoa, rubber, and palm oil are just a short list. Mineral resources, located inland and offshore also await further investment Potential investors can get the most of the commodities, utilizing the large number of productive and hardworking labor force in Aceh. To highlight, the Government of Aceh provides 20% of its annual budget for human capital so they can be your partners in the business. To accelerate investment in the region, we work on some important issues to be resolve, such as de-regulation, licensing acceleration, security and business comfort improvement. Hence, the brand-new Aceh is just perfect for your future investment. Last but not least, we welcome you to visit Aceh and invest in amazing Aceh.

dr. Zaini Abdullah GOVERNOR OF ACEH


PREFACE We thank God that Aceh regains trust from investors and being in the top seven of investment realization in Indonesia in 2013. 42 new businesses, domestic and overseas, acquired investment licenses to operate in Aceh, and are committed to invest in 10 priority sectors, with the total investment value was up to IDR 6.1 trillions. Meanwhile, 139 existing companies/projects have been operating in Aceh, with the total amount of investment, up to December 2013, was about IDR 5 (five) trillions, and employed about 21.866 local manpower. As our vision is to be one of the leading investment destination in Indonesia, we will continue to work hard and to make sure that investor and potential investors get the best services and full assisstance where necessary. We will also make effective and efficient coordination with related sectors and institutions to simplify all procedures. All the efforts are for one reason, to provide business comfort to investors. We thank you all for your continuous support to Aceh and to trust Aceh as your investment destination.

Ir. Iskandar, M.Sc Chairman of Aceh Investment Coordinating Board

Ir. Iskandar, M.Sc Chairman of Aceh Investment Coordinating Board


Content I INTRODUCTION

1.1 VISION ~ 11 1.2 GEOGRAPHY~ 12 1.3 DEMOGRAPHY ~ 14 1.4 SPATIAL PLANNING ~ 16 1.5 ECONOMIC PERFORMANCE ~ 18 1.6 INFRASTRUCTURE SUPPORT ~ 20 1.7 DOING BUSINESS IN ACEH ~ 30 1.8 FACT AND FIGURE ~ 32

II DETAILED PLAN OF AGRO INDUSTRIES PROJECT

2.1 DETAILED PLAN OF FOOD CROPS AND HORTICULTURE ~ 38 2.2 DETAILED PLAN OF PLANTATION ~ 52 2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY DEVELOPMENT PROJECT ~ 76 2.4 DETAILED PLAN OF FISHERIES ~ 88


III DETAILED PLAN OF INFRASTRUCTURE AND ENERGY

3.1 DETAILED PLAN OF INSFRASTRUCTURE ~ 98 3.2 DETAILED PLAN OF ENERGY ~ 102

4.1 KRUENG ACEH RIVER WALK ~ 112 IV 4.2 ULEE LHEU BEACH ~ 116 DETAILED PLAN OF TOURISM DEVELOPMENT PROJECT IN BANDA ACEH

V SABANG FREE PORT AND FREE TRADE ZONE PROJECT

5.1 INTERNATIONAL SHIPPING LINE ~ 124 5.2 SABANG INTERNATIONAL WATER FRONT RESORT AND CONVENTION CENTRE ~ 126 5.3 PASSANGER CRUISE TERMINAL ~ 128 5.4 YACHT MARINA & SUPPORTING FACILITIES ~ 130 5.6 DIVING CENTER ~ 132 5.7 SEA PORT ~ 134

VI DETAILED PLAN OF INDUSTRIAL AND TRADING ESTATES

6.1 ACEH INDUSTRIAL AREA ~ 144


I Introduction



10

INTRODUCTION

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

11

VISION

Aceh becomes one of the leading Investment Destination in 2017

ACEH INVESTMENT COORDINATING BOARD |


12

INTRODUCTION

1.2 GEOGRAPHY

ACEH, THE WEST GATE OF INDONESIA

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

13

ACEH

ACEH INVESTMENT COORDINATING BOARD |


14

INTRODUCTION

1.3 DEMOGRAPHY

| WWW.ACEHINVESTMENT.COM


1 ,49

8 1,97 rce

Fo ors Lab

5,015

,2 3 4

by bited ) Inha le (2013 peop

48 % of the n tio popula the work inture agricul r. secto

cities subdistrict mukim villages district

56,770.81 Km2

7 , 4 7 8 , 8 0 1 .95 Ha

Total area Total are according to the territ a of Basemap of or sea whos ial Indonesia. e breadth extends two hun to nautical dred measuredmiles the basel from ines.

ACEH INVESTMENT COORDINATING BOARD |

Topogr mountaaphically hilly w i waterfans, valleys, rive ith lls, an rs, floodpl d narrow ain

778 6.493

289

5

18

15 ACEH INVESTMENT PROFILE


16

INTRODUCTION

1.4 SPATIAL PLANNING

Photo: Banda Aceh From Sky

Strategic Area:

¤¤ The Center of National Stragic Activities (PKSN) : Sabang, free port and free trade areav ¤¤ National Activity Center : Lhokseumawe and greater area (PKN) ¤¤ Capital City : Banda Aceh

2,934,602 Ha Cultivated Area Those areas for production forest, community forest; agriculture; fisheries; mining; industry; tourism; housing and other functions.

| WWW.ACEHINVESTMENT.COM

2,708,550 Ha Protected Area and Conservation Area Those areas ruled for the protection for following areas Local protected area; preserve region and areas and cultural heritage; national disaster-prone; geology protection; and other preservation areas.


ACEH INVESTMENT PROFILE

17

Sabang

Banda Aceh

Lhokseumawe

Takengon Langsa Meulaboh

Cultivated Area Protected Area Conservation Area

ACEH INVESTMENT COORDINATING BOARD |


INTRODUCTION

111,183,310

40,783,226 5,085,052

411,428,571 102,857,143

26,133,215

13,127,198

4,407,581 | WWW.ACEHINVESTMENT.COM

165,101,527

8,565,728

382,330,821

1.5 ECONOMIC PERFORMANCE

Minimum Wage (USD)

18

Domestic Investment (USD) Foreign Investment (USD)


ACEH INVESTMENT PROFILE

19

Photo: Illustration

Inflation

Economic Growth

Export (ton)

Import (ton)

ACEH INVESTMENT COORDINATING BOARD |


20

INTRODUCTION

1.6 INFRASTRUCTURE SUPPORT

ROAD

Photo: Highway Road, Lhok Seudu, Aceh Besar

Provincial Road 1.813,33 Km

| WWW.ACEHINVESTMENT.COM

National Road 1.803,36 Km

Regencial Road 13.841,07 Km


ACEH INVESTMENT PROFILE

21

Sabang Banda Aceh

Lhokseumawe

Takengon

Langsa

Meulaboh

ACEH INVESTMENT COORDINATING BOARD |


22

INTRODUCTION

SEAPORT

Photo: Malahayati Seaport, Aceh Besar

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

23

Balohan-Sabang

Malahayati-Aceh Besar

Krueng Geukueh-Lhokseumawe

Kuala Langsa

Calang

Meulaboh

Susoh

Tapak Tuan

Sinabang

Singkil

ACEH INVESTMENT COORDINATING BOARD |


24

INTRODUCTION

AIRPORT

Photo: Iskandar Muda International Airtport, Aceh Besar

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

25

Maimun Saleh-Sabang

Sultan Iskandar Muda-Aceh Besar

Malikussaleh-Lhokseumawe

Rembele-Central Aceh

Point A-North Aceh

Blang Keujeuren-Gayo Luwes

Alas Lauser-Southeast Aceh

Cut Nyak Dhien-Nagan Raya

Kuala Batee-Southwest Aceh

T. Cut Ali-South Aceh

Lasikin-Simeulu Hamzah Fansuri-Aceh Singkil

ACEH INVESTMENT COORDINATING BOARD |


26

INTRODUCTION

ENERGY

Capacity

Tariff/KWH IDR

USD

450 VA

485

0.05

900 VA

600

0.06

1300 VA

930

0.09

2.200 VA

960

0.1

3.500 VA -14 KVA

1112

0.11

14 KVA-200 KVA

972

0.1

200 KVA-30.000 KVA

803

0.08

More Than 30.000 KVA

723

0.07

| WWW.ACEHINVESTMENT.COM

Photo: Steam Power Plant, Nagan Raya

Aceh-North Sumatra Interconnection 343 MW

Nagan Raya Steam Power Plant 2x110 MW

PLTG Arun Lhokseumawe 200 MW

Peusangan Hydro Power Plant 88MW


ACEH INVESTMENT PROFILE

27

Aceh North Sumatera Interconnection PLTG Arun Lhokseumawe Finishing: 2014

Peusangan Hydro Electric Power Plant Finishing: 2016

Nagan Raya Steam Power Plant

ACEH INVESTMENT COORDINATING BOARD |


28

INTRODUCTION

WATER DISTRICT/CITY

WATER SUPPLY COMPANY

Banda Aceh

PDAM Tirta Daroy

Sabang

PDAM Tirta Aneuk Laot

Aceh Besar

PDAM Tirta Mon Tala

Pidie

PDAM Tirta Mon Krueng Baro

Pidie Jaya

PDAM Tirta Krueng Meureudu

Bireun

PDAM Tirta Krueng Peusangan

North Aceh

PDAM Tirta Mon Pase

East Aceh

PDAM Tirta Peusada

Lansa

PDAM Tirta Keumeuneng

Central Aceh

PDAM Tirta Tawar

Gayo Luwes

PDAM Tirta Sejuk

Bener Meriah

PDAM Tirta Beungi

Aceh Jaya

PDAM Tirta Mon Trata

West Aceh

PDAM Tirta Meulaboh

Southeast Aceh

PDAM Tirta Agara Kutacane

Singkil

PDAM Tirta Singkil

South Aceh

PDAM Tirta Naga Tapaktuan Photo: Ilustration

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

29

ACEH INVESTMENT COORDINATING BOARD |


30

INTRODUCTION

1.7 DOING BUSINESS IN ACEH

Photo: Palm Oil Industry, PT. Megalopolis, Aceh Jaya

REGULATIONS Law No 11 of 2006 on Aceh Governance. The law gives the Government of Aceh privileges to govern the province including in economic development to improve health, safety, and public welfare.

| WWW.ACEHINVESTMENT.COM

Law No. 37 of 2000 on Sabang Free Port and Free Trade Zone. It concludes a wide range of facilities for doing business in Sabang, such as import duty and tax exemption. The Sabang Management and Development Agency (BPKS) operates the zone and has an authorization to issue all licensings for investment in this area.

Presidential Regulation No. 11 of 2010 on Cooperation between the Government of Aceh and Foreign Institutions. The regulation allows a wide authority for the Government of Aceh to establish cooperation with foreign institutions, especially in economic development.


ACEH INVESTMENT PROFILE

31

Ease of Doing Business in Aceh POTENTIAL INVESTORS INVESTMENT ACCELERATION TASK FORCE TEAM

INFORMATION, FACILITATION AND ASSISTANCE

LICENSING

One Stop Service for Local Licenses

PRINCIPLE LICENSE: BKPM/BPKS WORKING LICENCE: BKPM/BPKS LOC AL LICENCE: BP2T

CONSTRUCTION

> Security, convenience and law certainty > Land availability, labor, wages & incentive > Licensing administration > Policy, Regulation > Field Visit, etc

INVESTMENT EVALUATION AND CONTROLLING TASK FORCE TEAM FACILITATION AND ASSISTANCE

OPERATION AND BUSINESS EXPANSION

> Security, convenience and low certainty > Land dispute, labor dispute, etc > Regulation and licensing for business

NOTE: BKPM > Indonesian Investment Coordinating Board BPKS > Sabang Free Port and Free Trade Management Board BP2T > One Stop Service Office

INCENTIVES Providing incentives to investors in the form of: a. Reduction of Sectoral levy b. Stimulus funding, for selected permits; Shall not exceed 50 sectors; Stimulus funds % (fifty percent) of the levy awarded in the form of interest payable amount. subsidy shall not exceed 2 % (two percent) of the rate of interest paid for the purchase of machinery or equipment.

c.

Capital relief; in the form of equity capital and assets in accordance with the ability of the Government of Aceh .

ACEH INVESTMENT COORDINATING BOARD |


32

INTRODUCTION

1.8 FACT AND FIGURE

The Big 5 of Foreign Direct Investment by Country of Origin

UK USA

3.8 | WWW.ACEHINVESTMENT.COM

1.8


ACEH INVESTMENT PROFILE

OUR PROGRESS IN 2013

33

We got 42 new projects (IDR 6.1 trillion) and more than IDR 5.09 trillion of 139 projects (21.866 workers) already have boost our economy. Now, it’s your turn !

South Korea India Malaysia

1 USD = 9,300 IDR March, 2013 Kurs

0.2

8.7

4.7

Billion USD

ACEH INVESTMENT COORDINATING BOARD |


II Detailed Plan of Agro Industries Project


Photo: Lineung Buleun Potato Farm


36

Detailed Plan of Agro Industries Project

2.1 FOOD CROPS AND HORTICULTURE

PADDY The overall demand of rice in Indonesia is currently reaches 33 million tons, while Aceh domestic consumption is about 658,340 tonnes (2013). There are huge potential to develop rice farming and processing to meet domestic market share.

Agriculture is the key sector in Aceh, with the area of

438,855 Ha, and the annual production of about

1,788,783 tonnes

in 2012

Supported by about

359,478

farmers in Aceh.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

37

Photo: Ilustration

ACEH INVESTMENT COORDINATING BOARD |


38

Detailed Plan of Agro Industries Project

AREA AND PRODUCTION OF PADDY BY REGENCY/CITY, 2012 Regency/City

Planted Area (Ha)

Production (Ton)

Simeulue

6,907

26,005

Aceh Singkil

2,220

6,611

South Aceh

19,367

64,309

Southeast Aceh

12,320

62,462

East Aceh

46,442

213,033

Central Aceh

7,092

25,816

West Aceh

15,039

44,342

Aceh Besar

47,124

203,516

Pidie

43,904

204,052

Bireuen

36,285

141,440

North Aceh

68,189

341,951

Southwest Aceh

29,019

96,426

Gayo Lues

6,654

31,776

Aceh Tamiang

27,193

102,082

Nagan Raya

33,903

75,899

Aceh Jaya

13,081

41,211

Bener Meriah

2,944

13,903

Pidie Jaya

13,606

62,014

121

285

Langsa

3,493

13,295

Lhokseumawe

2,239

11,645

Subulussalam

1,713

6,665

TOTAL

438,855

1,788,738

Banda Aceh

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

PROJECT PURPOSE Establishing the modern rice milling plant, capacity 8 ton/ hour.

PIDIE 43,904 Ha 204,052 Tons

Photo: Rice Milling Unit , Pidie

INVESTMENT ESTIMATION

USD 8,000,000 BIREUEN 36,285 Ha 141,440 Tons

ACEH BESAR 47,124 Ha 203,516 Tons

39

NORTH ACEH 68,189 Ha 341,951 Tons

EAST ACEH 46,442 Ha 213,033 Tons

SOUTHEAST ACEH 12,320 Ha 62,462 Tons

ACEH INVESTMENT COORDINATING BOARD |


40

Detailed Plan of Agro Industries Project

CORN “There is a reason why corn [Zea mays] is the most-produced grain worldwide; it is involved in just about every aspect of our lives. Corn provides about 21 percent of human nutrition across the globe. Corn is usually fed to animals. There are many other non-culinary uses for the grain as well; it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few. It also can be the raw material for baskets and toys. In short, corn is an essential ingredient in our diets and also in our world� (source: en.wikipedia.org/wiki/ Maize). As one of the major producers of corn, we offers opportunities for potential investors to set up a poultry feed industry in Aceh.

... it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

41

ACEH INVESTMENT COORDINATING BOARD |


42

Detailed Plan of Agro Industries Project

AREA AND PRODUCTION OF CORN BY REGENCY/CITY, 2012 Regency/City

Planted Area (Ha)

Production (Ton)

1

28

Aceh Singkil

201

464

South Aceh

12,330

49,377

6,000

Southeast Aceh

26,602

89,301

6,000

East Aceh

2,480

8,214

7,800

Central Aceh

138

434

4,500

West Aceh

209

485

Aceh Besar

452

216

Pidie

751

679

4,500

Bireuen

894

1,729

3,300

North Aceh

1,619

1,406

5,750

33

22

Gayo Lues

1,333

5,174

3,000

Aceh Tamiang

2,020

4,464

1,500

Nagan Raya

318

598

Aceh Jaya

126

397

5,750

Bener Meriah

728

1,193

6,000

Pidie Jaya

239

93

7,000

Banda Aceh

2

-

Sabang

34

-

Langsa

12

7

Lhokseumawe

58

-

Subulussalam

1,208

3,005

TOTAL

51,788

167,286

Simeulue

Southwest Aceh

| WWW.ACEHINVESTMENT.COM

Farmer

61,100


ACEH INVESTMENT PROFILE

PROJECT PURPOSE

43

INVESTMENT ESTIMATION

Establishing poultry feed factory (maize bran, maize germ, cattle feed, corn grits) which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)

USD 12,367,320

SOUTH ACEH 12,330 Ha 49,377 Tons

SOUTHEAST ACEH 26,602Ha 89,301 Tons

ACEH INVESTMENT COORDINATING BOARD |


44

Detailed Plan of Agro Industries Project

SOYBEAN Soybean is a main source for world’s vegetable protein and vegetable oil Nationwide, soybean production in 2012 was 851,647 tons with the area of the land 554,132 Ha. In Aceh, the soybean plantation in 2012 was approximately 44,638 Ha, and its production was 51.440 tons. Supported by about 90,305 farmers in Aceh

90,305 farmers in Aceh

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

45

ACEH INVESTMENT COORDINATING BOARD |


46

Detailed Plan of Agro Industries Project

AREA AND PRODUCTION OF SOYBEANS BY REGENCY/CITY, 2012 Regency/City

Planted Area (Ha)

Production (Ton)

Simeulue

-

-

Aceh Singkil

43

30

South Aceh

105

140

4

7

East Aceh

1,922

2,404

Central Aceh

690

818

West Aceh

30

32

Aceh Besar

757

634

Pidie

5,333

6,138

9,000

Bireuen

21,847

27,127

12,000

North Aceh

3,532

2,744

13,500

Southwest Aceh

3,866

3,896

28

52

Aceh Tamiang

2,182

1,756

Nagan Raya

202

155

Aceh Jaya

98

15

Bener Meriah

60

381

3,899

5,078

Banda Aceh

-

-

Sabang

7

3

Langsa

-

-

Lhokseumawe

18

-

Subulussalam

15

29

44,638

51,439

Southeast Aceh

Gayo Lues

Pidie Jaya

TOTAL

| WWW.ACEHINVESTMENT.COM

Farmer

39,305

7,500

9,000

90,305


ACEH INVESTMENT PROFILE

PROJECT PURPOSE Establishing poultry feed factory (cattle feed) which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)

INVESTMENT ESTIMATION

USD 12,367,320 PIDIE JAYA 3,899 Ha 5,078 Tons

PIDIE 5,333 Ha 6,138 Tons WEST ACEH 30 Ha 32 Tons

47

NORTH ACEH 3,532 Ha 2,744 Tons ACEH TAMIANG 2,182 Ha 1,756 Tons

SOUTHEAST ACEH 4 Ha 7 Tons

ACEH INVESTMENT COORDINATING BOARD |


48

Detailed Plan of Agro Industries Project

FRUITS AND VEGETABLE Horticulture area is a geographic area that has similarity ecosystems and united by a common infrastructure facilities thus forming region filled with various business activities including the provision of facilities based horticultural production, cultivation, post-harvest handling and processing, marketing, and various supporting activities (Indonesia Directorate General of Horticulture). Its main purpose is to develop well-being of society through the utilization of resources in a sustainable manner by integrating communal relations, the economy, and the environment in harmony. Linueng Buleun in Bener Meriah is very potential for horticultural farm, as it is close to the new hydro power plant and has direct access to seaports in the east coast. The local government provides 25.300 ha of land for potential investors to set up organic horticultural farms in this area. The target is to supply fruits and vegetables for international markets. The very supportive and welcome local community ensures that investment in this area is very promising.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

49

Photo: Harvesting Potatos in Lineung Buleun, Bener Meriah

ACEH INVESTMENT COORDINATING BOARD |


50

Detailed Plan of Agro Industries Project

POTENTIALS (tons) AVOCADO 74,624 MANGGO 270,544 RAMBUTAN 280,994 ORANGE 85,522 JACK FRUIT 81,154 DURIAN 270,449 PAPAYA 148,298 BANANA 689,892 WATERMELON 165,397

Horticulture

STRING BEAN 170,188 CHILI 300,188 CAYENNE PEPPER 195,052 TOMATO 173,573 EGG PLANT 147,778 CUCUMBER 198,629 RED UNION 26,004 GARLIC 772 POTATO 86,154

Planted Area (Ha)

Produksi (Ton)

Potato

835

18

Cabbage

654

30

Tomato

99

20

Carrot

397

8.5

String Beans

92

4.5

Red Chilies

1048

8

Cayenne Pepper

875

5

Red Onion

220

4.2

Scallion

230

4.3

Avocado

1022

2

Orange

418

3

Terong Belanda

166

0.6

Markisah

73

0.3

Kasmak

72

0.2

Vegetable:

Fruit:

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

PROJECT PURPOSE 造造

造造

Establishing organic farm base on a production system that sustains the health of soils, ecosystems and people. Selling the products in international markets.

51

INVESTMENT ESTIMATION

USD 1,025,850

LINEUNG BULEUN 25.300 HA

ACEH INVESTMENT COORDINATING BOARD |


52

Detailed Plan of Agro Industries Project

2.2 DETAILED PLAN OF PLANTATION

PALM OIL Palm oil constitutes the largest plantation crop in Aceh in volume and economic value, and the palm oil sector has significant growth potential as a major source of revenue for food and bio fuel products. The Government of Aceh has been initiating several strategic plans in this commodity: 1. Create operational and policy support for sustainable palm oil among government, private sector, NGOs, and smallholders. 2. Support palm oil public-private investment partnerships. 3. Reduce threats to high conservation value forests and peat swamp ecosystems. 4. Create a provincial seed certification and distribution program. 5. Improve supply chains and pricing transparency for palm oil production and processing.

In 2010, it consisted of smallholders production: 185,265 Tons, Government plantation production: 69,634 Tons, and private plantation production: 238,927 Tons and the status is still temporary.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

53

493.826

482.895

326.665

769.010

765.416

Annual Production (tons)

2006

2007

2008

2009

2010

ACEH INVESTMENT COORDINATING BOARD |


54

Detailed Plan of Agro Industries Project

Although many districts in Aceh have palm oil plantations, only Aceh Tamiang, Aceh Singkil, and Nagan Raya have higher number of crude palm oil (CPO) production that suitable for a big processing industry. The following table shows total production for each district.

PALM PLANTED AREA AND PRODUCTION OF SMALL HOLDER & ESTATE ENTERPRISES BY REGENCY/CITY 2012 Regency/City

Planted Area (Ha)

Production (Ton)

Aceh Singkil

54,560

397,729

South Aceh

9,765

32,004

Southeast Aceh

7,666

19,942

East Aceh

70,565

35,0797

0

0

West Aceh

25,485

33,618

Aceh Besar

1,180

397

77

16

Bireuen

4,644

2,2161

North Aceh

24,595

115,664

Southwest Aceh

20,612

13,093

0

0

Aceh Tamiang

54,417

3,849,265

Nagan Raya

50,401

168,767

Aceh Jaya

15,953

15,357

Bener Meriah

1,300

144

Pidie Jaya

2,087

990

Banda Aceh

0

0

Sabang

0

0

Langsa

419

947

Lhokseumawe

208

243

Subulussalam

21,514

49,135

368650

5070555

Central Aceh

Pidie

Gayo Lues

TOTAL

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

PROJECT PURPOSE

55

INVESTMENT ESTIMATION

Establishing palm oil processing industries (Biodiesel, Fatty Alcohol, Edible Oil, Shortening, SBE, Soap Noodles Plant, Dove Plant, Fatty Acid Plant, NPK Fetilizer Plant, Refinery Plant, Biomass Pellet Production Plant).

USD 26,449,321 Net Present Value : 8,411,663.48 USD Internal Rate of Return : 23,1%

PAYBACK PERIOD : 6 YEARS AND 8 MONTHS

Banda Aceh

Lhokseumawe

ACEH TAMIANG 50,755 Ha 121,916 Tons

Meulaboh

NAGAN RAYA 76,439 Ha 90,241 Tons ACEH SINGKIL 47,111 Ha 110,004 Tons

Photo: Palm Oil Processing Industry, PT. Megalopolis, Aceh Jaya

ACEH INVESTMENT COORDINATING BOARD |


56

Detailed Plan of Agro Industries Project

RUBBER Natural rubber consists of suitable polymers of the organic compound isoprene with minor impurities of other organic compounds plus water. The rubber plant can grow up to 15-25 meters, has an upright big stem and big high branching. Currently, rubber is harvested mainly in the form of the latex from a rubber tree (Hevea brasiliiensis) which was tapped from the cut bark of the plant. It can be used to produce another form of rubber, such as crumb rubber and rubber timber. Natural rubber is used extensively in many applications and products, either alone or in combination with other materials such as firewood, charcoal, wood or lumber for household apliance (furniture), door and window profiles, hoses, belts, matting, flooring and dampeners (antivibration mounts) for the automotive industry, aircraft industry, textile, gloves (medical, household and industrial) and toys.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

57

Photo: Rubber plant, Illustration

ACEH INVESTMENT COORDINATING BOARD |


58

Detailed Plan of Agro Industries Project

There are five districts in Aceh that have higher number of rubber production that suitable for a big processing industry: West Aceh, East Aceh, Aceh Tamiang. The following table shows total production for each district. PLANTED AREA AND PRODUCTION OF RUBBER IN ACEH District/City

Planted Area (Ha)

Production (ton)

Simeulue

1,201

141

Aceh Singkil

3,698

2,376

South Aceh

1,099

252

Southeast Aceh

10,183

9,802

East Aceh

35,277

21,333

-

-

West Aceh

27,381

18,649

Great Aceh

16

-

Pidie

20

-

Bireuen

2,506

1,387

North Aceh

10,485

6,601

851

134

7

1

Aceh Tamiang

22,238

14,736

Nagan Raya

10,870

3,322

Aceh Jaya

12,416

5,025

Bener Meriah

-

-

Pidie Jaya

3

1

Banda Aceh

-

-

Sabang

-

-

Langsa

1,642

1,430

Lhokseumawe

20

25

Subulussalam

4,379

2,192

144,292

87,407

Central Aceh

Southwest Aceh Gayo Lues

TOTAL

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

PROJECT PURPOSE

59

INVESTMENT ESTIMATION

Establishing rubber processing industries.

USD 21,161,739

EXISTING COMPANY 造造 PT. Aceh Rubber Industry (Aceh Tamiang)

Net Present Value : 234,618,007 USD Internal Rate of Return : 53,81 % Benefit Cost Ratio : 1,26 Net Benefit Cost Ratio : 3,739

PAYBACK PERIOD : 6 YEARS AND 8 MONTHS

EAST ACEH 35,277 Ha 21,333 Tons

Banda Aceh

Lhokseumawe

ACEH TAMIANG 22,238 Ha 22,238 Tons

WEST ACEH 27,381 Ha 18,649 Tons

Photo: Rubber Processing Industry, PT. Aceh Rubber Industry, Aceh Tamiang

ACEH INVESTMENT COORDINATING BOARD |


60

Detailed Plan of Agro Industries Project

COCOA Indonesia is the third largest producer of cocoa beans in the world after the Ivory Coast and Ghana. In Aceh, cocoa is a leading commodities other than coffee, palm oil, rubber, organic horticulture, corn and patchouli. Cocoa plantations spread almost in all districts in Aceh, from Aceh Tamiang in the eastern part of Aceh, to Simeulue Island in the outer edge of Aceh Province. Aceh cocoa has been exported to many countries in the world. The statistics indicate that in 2010, Aceh export volumes of cocoa beans reached 420,978.40 kgs or equals to USD 1,166,080.30 (Aceh Industry and Trade Agency, 2012). The development strategy is to gear sustainable cocoa industries. The upstream industries are strengthened, however the focus is to boost value added in the downstream sector.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

61

Photo: Cacoa Farm in Pidie Jaya

ACEH INVESTMENT COORDINATING BOARD |


62

Detailed Plan of Agro Industries Project

There are five districts in Aceh as the major cocoa producers that are suitable for a big processing industry: Pidie Jaya, Bireuen, Aceh Tamiang, Southeast Aceh, and Soutwest Aceh. The following table shows total production for each district.

CACOA PLANTED AREA AND PRODUCTION OF SMALL HOLDER & ESTATE ENTERPRISES BY REGENCY/CITY 2012 Regency/City

Planted Area (Ha)

Production (ton)

1,806

200

Aceh Singkil

636

147

South Aceh

1,332

153

Southeast Aceh

19,454

8,843

East Aceh

12,416

6,536

Central Aceh

2,322

546

West Aceh

722

235

Aceh Besar

3,136

426

Pidie

9,609

4,499

Bireuen

6,023

3,801

North Aceh

9,503

3,163

Southwest Aceh

4,356

874

Gayo Lues

4,443

888

Aceh Tamiang

2,280

941

Nagan Raya

5,372

1,335

Aceh Jaya

1,267

206

Bener Meriah

1,190

185

Pidie Jaya

12,734

3,645

0

0

Sabang

637

172

Langsa

303

132

Lhokseumawe

135

64

Subulussalam

816

130

100492

37121

Simeulue

Banda Aceh

TOTAL

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

PROJECT PURPOSE

63

INVESTMENT ESTIMATION

造造 Establishing cocoa processing industries (paste, butter, powderander). 造造 Establishing packaging industry.

USD 97,095,995 Net Present Value : 5,730,808.44 USD Internal Rate of Return : 22,4% Benefit Cost Ratio : 1,69

PAYBACK PERIOD : 6 YEARS AND 9 MONTHS

Banda Aceh

PIDIE JAYA 10,513 Ha 3,073 Tons

BIREUEN 5,436 Ha 4,039 Tons ACEH TAMIANG 2,675 Ha 1,127 Tons

Meulaboh

SOUTHWEST ACEH 4,356 Ha 2,746 Tons

Photo: Illustration

SOUTHEAST ACEH 11,970 Ha 7,622 Tons

ACEH INVESTMENT COORDINATING BOARD |


64

Detailed Plan of Agro Industries Project

COFFEE Gayo coffee is a typical coffee from the Gayo highlands, an area that covers Bener Meriah, Central Aceh and Gayo Lues Districts in Aceh Province. Gayo is the name of the tribe who inhabits this region. The majority of people in this area are coffee growers. The plantation has began as early as 1908 which main product is arabica coffee. In fact, arabica coffee production resulting from the Gayo land is the largest in Asia. Gayo coffee has been exported to many countries in the world. The statistics indicate that in 2012, Aceh export volumes of coffee beans to 18 countries were up to 9,703,260.00 kgs or equals to USD 64,358,771.31 (Aceh Industry and Trade Agency, 2012). Gayo coffee also has gained some international certifications as a recognition to its excellence in quality, such as organic and fair trade certified as well as Geographical Indication (GI). Particularly, black gayo arabica coffee obtained the highest score in the Indonesian Specialty Coffee Auction 2010 in Bali, which guarantees that it is the best coffee in the world.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

65

Aceh export volumes of coffee beans to 18 countries were up to

9,703,260 kgs

Photo: Coffee plant in Bener Meriah

ACEH INVESTMENT COORDINATING BOARD |


66

Detailed Plan of Agro Industries Project

Three major producers of coffee in Aceh are, Bener Meriah, Central Aceh, and Gayo Lues. These areas are suitable for a big coffee processing industry. The following table shows total production for each district.

COFFEE PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY 2012 Robusta Regency

Total Robusta & Arabika (Ton)

Arabika

Planted Production Planted Area (Ha) (Ton) Area (Ha)

Production (Ton)

Planted Area (Ha)

Production (Ton)

Farmer

Central Aceh

2,315

793

48,300

25,370

50,615

26,163

33,000

Bener Meriah

1,360

660

48,101

22,414

49,461

23,074

29,000

4,652

1,118

4,652

1,118

40,000

-

-

9,540

1,569

11,846

114,268

51,924

113,846

Gayo Lues Pidie TOTAL

9,540 13,215

1,569 3,022

| WWW.ACEHINVESTMENT.COM

101,053

48,902


ACEH INVESTMENT PROFILE

PROJECT PURPOSE

67

INVESTMENT ESTIMATION

造造 Establishing coffee processing industries. 造造 Establishing packaging industry.

USD 30,864,300

PAYBACK PERIOD : 6 YEARS AND 9 MONTHS Banda Aceh

BENER MERIAH Robusta: 1,250 Ha / 660 Tons Arabica: 48,101 Ha /22,414 Tons

CENTRAL ACEH Robusta: 2,315 Ha / 874 Tons Arabica: 48,000 Ha/ 24,328 Tons

GAYO LUES 4,588 Ha 1,036 Tons

Photo: Coffee bean sorting, Central Aceh

ACEH INVESTMENT COORDINATING BOARD |


68

Detailed Plan of Agro Industries Project

COCONUT Coconut industry can be developed by either farmer group level or larger scaled industry, for domestic and internaional market, such as young coconut products, coconut coctail, coconut jam, baby food supplements, soft drinks, nata de coco, coconut water sauce, coconut flour, virgin coconut oil, coconut shell charcoal, briquet charcoal, liquid smoke of coconut shell, coconut wood, and organic fertilizer. While the exporting goods are such as copra, white copra, raw coconut oil, coconut cake, desiccated coconut, and active charcoal.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

69

ACEH INVESTMENT COORDINATING BOARD |


70

Detailed Plan of Agro Industries Project

COCONUT PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY 2012 Regency/City

Planted Area (Ha)

Production (Ton)

Simeulue

7,472

2,611

Aceh Singkil

5,224

2,235

South Aceh

7,023

2,948

851

488

6,797

6,015

103

11

West Aceh

2,832

1,202

Aceh Besar

14,351

7,971

Pidie

8,633

5,967

Bireuen

14,341

11,760

North Aceh

19,389

10,310

Southwest Aceh

2,155

1,244

Gayo Lues

440

85

Aceh Tamiang

575

185

Nagan Raya

1,350

659

Aceh Jaya

6,333

1,643

43

12

3,336

1,091

-

-

Sabang

4,045

2,386

Langsa

473

283

Lhokseumawe

774

391

Subulussalam

855

269

107,395

59,766

Southeast Aceh East Aceh Central Aceh

Bener Meriah Pidie Jaya Banda Aceh

TOTAL

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

PROJECT PURPOSE

71

INVESTMENT ESTIMATION

Establish Virgin Coconut Oil Processing Industry

USD 87,286 Net Present Value : 15.5% Internal Rate of Return : 57.39% Benefit Cost Ratio : 2.19

Banda Aceh

BIREUEN 14,341 Ha 11,760Tons

NORTH ACEH 19,389 Ha 10,310Tons Lhokseumawe

ACEH BESAR 14,351 Ha 9,971Tons

Meulaboh

Photo: Illustration

ACEH INVESTMENT COORDINATING BOARD |


72

Detailed Plan of Agro Industries Project

PATCHOULI Contains the Patchouli Alcohol of 2.5% to 3.3% (the average PA of patchouli in the world is 2.5%). Patchouli is a species of plant from the genus Pogostemon. It is a bushy herb of the mint family, with erect stems, reaching two or three feet (about 0.75 metre) in height and bearing small, pale pinkwhite flowers. The plant is native to tropical regions of Asia, and is extensively cultivated in Aceh, Indonesia (wikipedia.org, 05/29/2013). Patchouli oils is used as raw material for a number of finished products, such as parfume and modern scented industrial products such as paper towels, laundry detergents, and air fresheners. Patcholi also can be used in antiseptic, pesticide, and as a fixative to bind other essential oils. The Geographical Indication Expert of the Indonesian Ministry of Agriculture, Dr. Riyaldi, affirmed that Aceh is very potential for the development of largescale patchouli businesses, because of its supporting condition of land and its quality. According to a research, Aceh patchouli oil contains patchouli alcohol (yield) 2.5% to 3.3% which makes it the best patchouli in the world (patchouli-aceh.com, 03/18/2012). As one of the major producers of patchouli, Aceh offers opportunities for potential investors to set up patchouli processing industries in the region.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

73

According to a research, Aceh patchouli oil contains patchouli alcohol (yield) 2.5% to 3.3% which makes it the best patchouli in the world.

Photo: Patchouli Plant, Illustration

ACEH INVESTMENT COORDINATING BOARD |


74

Detailed Plan of Agro Industries Project

Aceh produces the best patchouli in the world. The main production areas are Aceh Jaya, South Aceh, Southwest Aceh and Gayo Lues Districts, which are suitable for large-scale processing industries. The following table shows the total production for each district.

PATCHOULI AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY, 2012 Regency/City

Planted Area (Ha)

Production (Ton)

-

-

Aceh Singkil

40

21

South Aceh

408

212

Southeast Aceh

1,418

612

East Aceh

-

-

Central Aceh

23

20

West Aceh

-

-

Aceh Besar

118

53

Pidie

8

5

Bireuen

43

33

North Aceh

132

124

Southwest Aceh

78

61

Gayo Lues

853

774

Aceh Tamiang

40

35

Nagan Raya

15

13

650

308

Bener Meriah

-

-

Pidie Jaya

3

3

Banda Aceh

-

-

Sabang

-

-

Langsa

-

-

Lhokseumawe

-

-

Subulussalam

19

9

3,848

2,283

Simeulue

Aceh Jaya

TOTAL

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

75

INVESTMENT ESTIMATION

PROJECT PURPOSE 造造 Establishing patchouli processing industries. 造造 Increasing production volume and quality of patchouli.

USD 1,025,960 Banda Aceh

Lhokseumawe

GAYO LUES 149 Ha 33 Tons

ACEH JAYA 107 Ha 20 Tons WEST ACEH 114 Ha 6 Tons

SOUTH ACEH 334 Ha 21 Tons

Photo: Patchouli Processing Industry, Illustration

ACEH INVESTMENT COORDINATING BOARD |


76

Detailed Plan of Agro Industries Project

2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY DEVELOPMENT PROJECT

Livestock farm area in Aceh is 1.525.578 Ha. The huge area is significantly feasible for foragelivestock system, integrated with crop plantation. The project involves rearing of both breeding and fattening. The main activities of the project would be procurement of irrigation and hay making equipment, construction of back-up livestock farm infrastructure, construction of animal feeds plant, breeding and fattening. Strategy for Aceh beef Development project includes : develop a neucleus-plasma structure for the developing a beef herd in Aceh, establish system for ; management of mature breeding cows (grazing systems or feedlot), establish a beef finishing unit (feedlot) plan for each regency and halal beef processing and meet distribution. Targeted for initial development; Aceh Besar, Pidie, Bener Meriah, Central Aceh and Nagan Raya Regency.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

77

Photo: Governor of Aceh visiting Livestock Improvement Company farm in Victoria, Australia (11/2013)

ACEH INVESTMENT COORDINATING BOARD |


78

Detailed Plan of Agro Industries Project

Aceh Besar Beef Industry Development Project

Photo: Tradisional Fattening in Krueng Aceh, Aceh Besar

| WWW.ACEHINVESTMENT.COM

Land Area Location

: 6,434 Ha : Krueng Aceh Kuta Malaka Blang Ubo-ubo

Land Status

: Goverment Ownership


ACEH INVESTMENT PROFILE

79

INVESTMENT ESTIMATION ¤¤ ¤¤

Breeding Fattening

: 5,500 cows : 15,000 cows

¤¤ ¤¤

ROI : 29.64 % B/C : 1.23

USD 33,147,500

PAYBACK PERIOD : 3 YEARS AND 5 MONTHS

SCHEME ¤¤ Nucleus : 605 Ha ¤¤ Plasma : 5,829 Ha INFRASTRUCTURE SUPPORT ¤¤ Airport : Sultan Iskandar Muda ¤¤ Seaport : Malahayati ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River, Spring ¤¤ Electicity : Supported

Krueng Aceh Kuta Malaka Blang Ubo-ubo

ACEH BESAR

Cot Sirebee

SUITABLE FOR: ¤¤ Kuta Malaka - Major Feedlot for Nucleus Herd ¤¤ Krueng Aceh- Traditional Fattening ¤¤ Cot Sirebee, Jantho- Bull Depot ¤¤ Blang Ubo-Ubo- Large Scale Breeding for Nucleus Herd

ACEH INVESTMENT COORDINATING BOARD |


80

Detailed Plan of Agro Industries Project

Pidie Beef Industry Development Project

Photo: Breeding Farm, Pidie

| WWW.ACEHINVESTMENT.COM

Land Area Location

: 500 Ha : Biheu Village, Muara Tiga District

Land Status

: Private Ownership


ACEH INVESTMENT PROFILE

81

INVESTMENT ESTIMATION ¤¤ ¤¤

Breeding Fattening

¤¤ ¤¤

ROI : 32 % B/C : 1.23

: 3,080 cows : 10,000 cows

USD 21,325,600

PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

SCHEME ¤¤ Plasma System INFRASTRUCTURE SUPPORT ¤¤ Airport : Sultan Iskandar Muda ¤¤ Seaport : Malahayati ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River, Spring ¤¤ Electricity : Supported

Biheu Village

PIDIE

SUITABLE FOR: ¤¤ Breeding

ACEH INVESTMENT COORDINATING BOARD |


82

Detailed Plan of Agro Industries Project

Bener Meriah Beef Industry Development Project

Photo: Breeding Farm, Bener Meriah

| WWW.ACEHINVESTMENT.COM

Land Area Location

: 4,155 Ha : Perumpakan Benjadi

Land Status

: Goverment Ownership


ACEH INVESTMENT PROFILE

83

INVESTMENT ESTIMATION ¤¤ ¤¤

Breeding Fattening

¤¤ ¤¤

ROI : 32 % B/C : 1.23

: 3,080 cows : 10,000 cows

USD 21,628,500

PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

SCHEME ¤¤ Nucleus dan Plasma System INFRASTRUCTURE SUPPORT ¤¤ Airport : Rembele & Malikussaleh ¤¤ Seaport : Krueng Geukueh ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River, Spring ¤¤ Electicity: Supported

SUITABLE FOR: ¤¤ Breeding ¤¤ Central Feedlot

Perumpakan Benjadi

BENER MERIAH

ACEH INVESTMENT COORDINATING BOARD |


84

Detailed Plan of Agro Industries Project

Central Aceh Beef Industry Development Project

Photo: Fattening Farm, Central Aceh

| WWW.ACEHINVESTMENT.COM

Land Area Location Land Status

: 2,280 Ha : Jagong Jeget Karang Ampar : Private and Goverment Ownership


ACEH INVESTMENT PROFILE

85

INVESTMENT ESTIMATION ¤¤ ¤¤

Breeding Fattening

¤¤ ¤¤

ROI : 32 % B/C : 1.23

: 3,080 cows : 10,000 cows

USD 21,628,500

PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

Karang Ampar

SCHEME ¤¤ Nucleus : 780 Ha ¤¤ Plasma : 1,500 Ha INFRASTRUCTURE SUPPORT ¤¤ Airport : Rembele & Malikussaleh ¤¤ Seaport : Krueng Geukueh ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River, Spring ¤¤ Electicity: Supported

Jagong Jeget

CENTRAL ACEH

SUITABLE FOR: ¤¤ Fattening

ACEH INVESTMENT COORDINATING BOARD |


86

Detailed Plan of Agro Industries Project

Nagan Raya Beef Industry Development Project

Photo: Research Station and Feedlot, Nagan Raya

| WWW.ACEHINVESTMENT.COM

Land Area Location

: 5,000 Ha : Blang Baroe Rambong

Land Status

: Aneuk Nanggroe Cooperatives


ACEH INVESTMENT PROFILE

87

INVESTMENT ESTIMATION ¤¤ ¤¤

Breeding Fattening

¤¤ ¤¤

ROI : 32 % B/C : 1.23

: 3,080 cows : 10,000 cows

USD 21,325,600

PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

SCHEME ¤¤ Nucleus dan Plasma System

NAGAN RAYA Blang Baroe Rambong

INFRASTRUCTURE SUPPORT ¤¤ Airport : Cut Nyak Dhien ¤¤ Seaport : PT. MDB Suak Patong and Kuala Tripa ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River ¤¤ Electicity : Supported SUITABLE FOR: ¤¤ Research Station ¤¤ Feedlot ¤¤ Breeding

ACEH INVESTMENT COORDINATING BOARD |


88

Detailed Plan of Agro Industries Project

2.4 DETAILED PLAN OF FISHERIES

ACEH INTERNATIONAL FISHING PORT AT LAMPULO

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

89

696,117

Tons of Fish is Aceh Potencial from Fisheries

Photo: Lampulo Fishing Port

ACEH INVESTMENT COORDINATING BOARD |


90

Detailed Plan of Agro Industries Project

LAMPULO FISHING PORT PRODUCTION 2006 - 2012 (Kg)

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

PROJECT PURPOSE Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).

91

INVESTMENT ESTIMATION

USD 200,000,000

BANDA ACEH Lampulo Fishing Port 51,8 Ha

Photo: Lampulo Fishing Port

ACEH INVESTMENT COORDINATING BOARD |

Meul


92

Detailed Plan of Agro Industries Project

IDI FISHING PORT

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

93

Photo: Idi Fishing Port

ACEH INVESTMENT COORDINATING BOARD |


94

Detailed Plan of Agro Industries Project

Photo: Idi Fishing Port

THE POTENTIALS IN IDI Total catch of fishermen reached 48.67 tons daily The number of fishermen as much as 8246 people (Year 2012) Total fleet of 447 fishing fleets units (Year 2012) Various Fishing gear reaching 571 pieces (Year 2012).

NO

INVESTMENT OPPORTUNITY

CAPACITY

1

Block Ice Factory

2

Modern fishery processing industry

50 ton

Pelagic

3

Shipyard (Wood & fiber)

4 unit

Repairs & Shipyard

4

Fish transportation service (domestic and foreign)

2 unit

| WWW.ACEHINVESTMENT.COM

80 tons/day

EXPLAIN


ACEH INVESTMENT PROFILE

PROJECT PURPOSE Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).

95

INVESTMENT ESTIMATION

USD 10,000,000

Banda Aceh

Lhokseumawe

EAST ACEH Idi Fishing Port 62.5 HA

Meulaboh

ACEH INVESTMENT COORDINATING BOARD |


96

Detailed Plan of Infrastructure and Energy

III

Detailed Plan of Infrastructure and Energy

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

97

ACEH INVESTMENT COORDINATING BOARD |


98

Detailed Plan of Infrastructure and Energy

3.1 DETAILED PLAN OF INFRASTRUCTURE

ROLL-ON/ ROLL-OFF CARGO FERRY SERVICE

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

99

Photo: Illustration

ACEH INVESTMENT COORDINATING BOARD |


100

Detailed Plan of Infrastructure and Energy

Photo: Krueng Gekuh Seaport

Frequent Route of PT. Pelayaran Alkan Abadi Loading Port

Destination Port

Ship Name

Tg. Priok, Jakarta

Malahayati, Aceh

Hirondex V.9

Malahayati, Aceh

Tg. Priok, Jakarta

Hirondex V.10

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

PROJECT PURPOSE

101

INVESTMENT ESTIMATION

Establishing Ro-Ro Freight Ferry Shipping

EXISTING COMPANY 造造 Langsa: Kenangan Passanger Ferry 造造 PT. Pelayaran Alkan Abadi

USD 1,025,960

NORTH ACEH Krueng Geukuh Sea Port

LANGSA Kuala Langsa Sea Port

ACEH INVESTMENT COORDINATING BOARD |


102

Detailed Plan of Infrastructure and Energy

3.2 DETAILED PLAN OF ENERGY

GEOTHERMAL POWER PLANT

Photo: Illustration

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

INVESTMENT FEASIBILITY The power for the district of Bener Meriah is supplied from the 150kV transmission Aceh - Sumatra interconnection system from North Sumatra. The power supply is only able to serve 207 villages (89.22%) of the total 232 villages. A total of 25 village have not been served yet.

103

INVESTMENT ESTIMATION

USD 288,080,000

BENER MERIAH

ACEH INVESTMENT COORDINATING BOARD |


104

Detailed Plan of Infrastructure and Energy

GEOTHERMAL POWER PLANT PROJECT 2013-2026 Energy Potential (Mwe) N o

Objects

Regency/City

Coordinate

Resource (Mwe) Spec

Reserve (Mwe)

Hipo

Note

Expec

1

Iboih

Sabang

LU 04°37' ; BT 96°45'

25

-

-

2

Lho Pria Laot

Sabang

LU 03°47' ; BT 97°41'

50

-

-

3

Jaboi Keuneukai

Sabang

LU 05°53' ; BT 95°14

-

-

50

4

Ie Seum-Krueng Raya

Aceh Besar

LU 05°29' ; BT 95°39'

-

63

-

5

Seulawah Agam

Aceh Besar

LU 05°50' ; BT 95°18

-

-

6

Alur Canang

Pidie

LU 05°01' ; BT 95°55

25

-

-

7

Alue Long-Bangga

Pidie

LU 04°48' ; BT 96°48'

100

-

-

8

Tangse

Pidie

LU 04°56' ; BT 96°44'

25

-

- Hitay Energi Holding

9

Rimba Raya

Bener Meriah

LU 03°28' ; BT 97°51'

100

-

-

10

Simpang Balik

Bener Meriah

LU 04°19' ; BT 97°53

100

11

G. Geureudong

Central Aceh

LU 05°48' ; BT 95°19'

-

120

12

Silih Nara

Central Aceh

LU 04°37' ; BT 97°42'

100

-

-

13

Meranti

East Aceh

LU 05°05' ; BT 95°54'

25

-

-

14

Brawang Buaya

Aceh Tamiang

LU 05°08' ; BT 96°18'

25

-

-

15

Kafi

Gayo Luwes

25

-

-

16

Gunung Kembar

Gayo Luwes

LU 05°33' ; BT 95°33'

-

92

17

Dolok Perkirapan

Gayo Luwes

LU 04°42' BT 96°49'

25

-

-

625

275

215

TOTAL POTENTIALS = 1.115 Mwe

| WWW.ACEHINVESTMENT.COM

Bukaka Group/ PT. Sabang Energi

165 Pertamina

- Chevron/PT.Jasa Ayah

- Hitay Energi Holding


ACEH INVESTMENT PROFILE

105

SABANG ACEH BESAR PIDIE BENER MERIAH EAST ACEH ACEH TAMIANG

CENTRAL ACEH

GAYO LUES

ACEH INVESTMENT COORDINATING BOARD |


106

Detailed Plan of Infrastructure and Energy

HYDRO POWER PLANT

Photo: Illustration

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

INVESTMENT FEASIBILITY Establishing Irrigation 19.50 HA and Hydropower Plant 160 MW/580 MWH

107

INVESTMENT ESTIMATION

USD 539,280,000

NORTH ACEH

ACEH INVESTMENT COORDINATING BOARD |


108

Detailed Plan of Infrastructure and Energy

HYDRO POWER PLANT PROJECT 2013-2026

No.

1

District/City

North Aceh

Project Name

Location

Capacity (MW)

Invesment Estimation (Million USD)

Jambuaye-3

Wh Jambu Air

37.2

111.6

Jambuaye-5

Kr. Jambuaye

181.8

545.4

Bidin/Jambuaye

Kr. Jambuaye

246

738

2

Gayo Lues

Ramasan-1

Kr. Ramasan

171.6

514.8

3

East Aceh

Peureulak

Kr. Peureulak

34.8

104.4

4

Aceh Tamiang

Tampur

W. Tampur

428

1284

Jambo Papeun-2

Kr. Jambo Papeun

95.2

285.6

Kluet

Kr. Kluet

141

423

Sibubung-2

Kr. Sibubung

121.1

363.3

Teripa-3

Kr. Teripa

172.6

517.8

Teripa-4

Kr. Teripa

306.4

919.2

Meureubo-1

Kr. Meulaboh

82.1

246.3

Woyla-2

Kr. Woyla

274

822

Pameu

Kr. Pameu

160.6

Peusangan

Kr. Peusangan

90

270

5

South Aceh

6

Nagan Raya

7

West Aceh

8

Central Aceh

9

Southeast Aceh Dolok-1

Kr. Dolok

32.2

96.6

10

Aceh Jaya

Kr. Teunom

288.2

864.6

2862.8

8,588.40

Teunom-2 Total

| WWW.ACEHINVESTMENT.COM

481.8


ACEH INVESTMENT PROFILE

109

NORTH ACEH CENTRAL ACEH EAST ACEH

ACEH JAYA

ACEH TAMIANG

WEST ACEH

GAYO LUES

NAGAN RAYA

SOUTHEAST ACEH

SOUTH ACEH

ACEH INVESTMENT COORDINATING BOARD |


110

Detailed Plan of Tourism Development Project in Banda Aceh

IV Detailed Plan of Tourism Development Project in Banda Aceh

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

111

ACEH INVESTMENT COORDINATING BOARD |


112

Detailed Plan of Tourism Development Project in Banda Aceh

KRUENG ACEH RIVER WALK

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

113

ACEH INVESTMENT COORDINATING BOARD |


114

Detailed Plan of Tourism Development Project in Banda Aceh

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

FASILITIES ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤

115

INVESTMENT ESTIMATION

Food Court Restaurant Playground Jogging Track Mini Port Amphitheater Park

USD 10,000,000

BANDA ACEH

ACEH INVESTMENT COORDINATING BOARD |


116

Detailed Plan of Tourism Development Project in Banda Aceh

ULE LHEU BEACH

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

117

ACEH INVESTMENT COORDINATING BOARD |


118

Detailed Plan of Tourism Development Project in Banda Aceh

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

FASILITIES ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤

119

INVESTMENT ESTIMATION

Food Court Restaurant Playground Jogging Track Mini Port Amphitheater Park Fishing Spot

USD 10,000,000

BANDA ACEH

ACEH INVESTMENT COORDINATING BOARD |


V

120

Sabang Management and Development Agency (BPKS) Project

Sabang Free Port and Free Trade Zone Project

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

121

ACEH INVESTMENT COORDINATING BOARD |


122

Sabang Management and Development Agency (BPKS) Project

VIEW OF THE SABANG BAY

FRESH WATER LAKE BUILT BY THE DUTCH

Sabang has been designated as one of national and international tourist destinations, especially with the enactment of Sabang port as a cruise ship destination in 2011. The Govermant of Aceh has targeted 1 million visitor in 2007. Sabang is located at the Malaca Strait gate, directly adjacent to Malaysia and Thailand, and is part of Andaman Cluster, a very advanced and developed tourism destination. It’s next to Phuket and Langkawi.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

123

ENTRANCE TO THE PORT OF SABANG

THE POTENTIALS 造造 造造

Ecotourism, Adventure, Beach and Sport Heritage and Education

ACEH INVESTMENT COORDINATING BOARD |


124

Sabang Management and Development Agency (BPKS) Project

INTERNATIONAL SHIPPING LINE FRIENDLY TO INVESTMENT REGULATION ¤¤ The Law No.37 year 2000 about Free Trade and Free Port Zone of Sabang ¤¤ Descision of Governor of Aceh Province as Chief Council of Sabang, Number: 193/034, year 2001 about Forming of Management Board of Sabang Free Port and Free Trade Zone (BPKS) ¤¤ The Law No.11 year 2006 regarding Aceh Goverment; article 167 to 170 ¤¤ Goverment Regulation No.83/2011 concering Delegation of Authority from Central Goverment to Sabang Zone Council or DKS.

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

SUEZ - SABANG - KRA - TOKYO SUEZ - SABANG - SINGAPURE - TOKYO SUEZ - SUNDA STRAIT - TOKYO SUEZ - LOMBOK - TOKYO

: : : :

125

8,353 MILES 8,793 MILES 9,427 MILES 10,216 MILES

ACEH INVESTMENT COORDINATING BOARD |


126

Sabang Management and Development Agency (BPKS) Project

SABANG INTERNATIONAL WATER FRONT RESORT AND CONVENTION CENTRE Land Area Location Land Status Supporting Land

: : : :

0.5 Ha Paradiso Beach Goverment Ownership 1 Ha Sabang Fair Areal

Road by Condition Road by Surface Water Electicity

: : : :

Good Asphalted Like and Spring Supported

INFRASTRUCTURE SUPPORT Airport : Maimun Saleh Seaport : Balohan (passanger port) and Sabang International Hubport

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

127

Photo: Illustration

INVESTMENT ESTIMATION

USD 35,000,000 Payback : 8 Years B/C Ratio : 1.21

ACEH INVESTMENT COORDINATING BOARD |


128

Sabang Management and Development Agency (BPKS) Project

PASSANGER CRUISE TERMINAL

Land Area Location Land Status Depth CT 1 Length CT 3 Length

: : : : : :

117 Ha Sabang Bay Goverment Ownership 22 m 180 m2 x 25 m2 423 m2 x 50 m2

Road by Condition Road by Surface Water Electicity

: : : :

Good Asphalted Like and Spring Supported

INFRASTRUCTURE SUPPORT Airport : Maimun Saleh Seaport : Balohan (passanger port) and Sabang International Hubport

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

129

Photo: Sabang bay

INVESTMENT ESTIMATION

USD 120,000,000 Payback : 8 Years B/C Ratio : 1.23

ACEH INVESTMENT COORDINATING BOARD |


130

Sabang Management and Development Agency (BPKS) Project

YACHT MARINA & SUPPORTING FACILITIES

Batchmetri Area Land Area Location Land Status

: : : :

26.5 Ha 13 Ha Lhok Wieng Land Goverment Ownership

Road by Condition Road by Surface Water Electicity

: : : :

Good Asphalted Like and Spring Supported

INFRASTRUCTURE SUPPORT Airport : Maimun Saleh Seaport : Balohan (passanger port) and Sabang International Hubport

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

131

Photo: Sabang

INVESTMENT ESTIMATION

USD 6,000,000 Payback : 5 Years B/C Ratio : 1.3

ACEH INVESTMENT COORDINATING BOARD |


132

Sabang Management and Development Agency (BPKS) Project

DIVING CENTER

Location Land Status

: Gapang and Iboih Beach : Goverment Ownership

Road by Condition Road by Surface Water Electicity

: : : :

Good Asphalted Like and Spring Supported

INFRASTRUCTURE SUPPORT Airport : Maimun Saleh Seaport : Balohan (passanger port) and Sabang International Hubport

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

133

Photo: Sabang Sea Garden

INVESTMENT ESTIMATION

USD 1,100,000 Payback : 4 Years B/C Ratio : 1.3

ACEH INVESTMENT COORDINATING BOARD |


134

Sabang Management and Development Agency (BPKS) Project

SEA PORT

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

135

Photo: Sabang Port

INVESTMENT OPPORTUNITIES ¤¤ ¤¤ ¤¤ ¤¤

Commerce, Export-Import Transshipment port Cruise line Docking yard

¤¤ ¤¤ ¤¤ ¤¤

Fuel Bunkering Service Storage Water Supply Other ACEH INVESTMENT COORDINATING BOARD |


136

Sabang Management and Development Agency (BPKS) Project

PLAN OF SABANG PORT

Banda Aceh

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

137

CT1 : Multi Purpose Terminal CT2 : Cargo Terminal CT3 : Transhipment Terminal

ACEH INVESTMENT COORDINATING BOARD |


138

Sabang Management and Development Agency (BPKS) Project

INDUSTRY AND TRADING SECTOR

BUSINEESS OPPORTUNITIES ¤¤ ¤¤ ¤¤ ¤¤ ¤¤

Service of export or import trade Fuel Bunker, Transit & Supply Down Stream for Agro Industry (CPO, Cacao, Rubber, etc) Shipping Industry/ Ship Docking Fishery Industry

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

139

INDUSTRIAL PARK AT BALOHAN

We will offer the greatest advantages in today’s challenging manufacturing environtment. We will offer the most advanced Industrial Free Zone in Indonesiaminutes from the Container Seaport. We will offer competitive labor rates, onsite property management and 24-hours security. We will layout the Parks to best utilize the land area and provide for only High Tech Industries that create jobs beneficial to the people of Pulau Weh and Indonesia.

ACEH INVESTMENT COORDINATING BOARD |


140

Sabang Management and Development Agency (BPKS) Project

FISHERY SECTOR ¤¤ It is surrounded by Hindia Ocean, Benggala Bay and Malacca Strait. ¤¤ Sabang Zone has a big potential for marine fish related industies ¤¤ Part of Sub Regional IndonesiaMalaysia-Thailand Growth Triangle (IMT-GT)/ Cluster Andaman ¤¤ Some location along the coast of Weh Island and Pulo Aceh Island are potentials for marine culture

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

141

INCENTIVES BPKS has an authority to provide incentives for the business in Sabang Zone: ¤¤

¤¤ ¤¤

Sabang Zone has free: »» Custom Clearance »» Custom (Export-Import) duties »» Luxury good tax »» Value Added Tax (VAT) Free Trade and Free Port determined for 70 years. Management Board of Free Trade and Free Port Sabang (BPKS) has an authority to publish business license and others licensings, hence, the procedures are faster and easier

BUSINEESS OPPORTUNITIES ¤¤ ¤¤ ¤¤ ¤¤ ¤¤

Export Processing Zone (EPZ) Fresh Fish Export Terminal (sea and air cargo) Marine Culture, such as sea weed, lobsters. Cold Storage Docking Yard

ACEH INVESTMENT COORDINATING BOARD |


142

VI

Detailed Plan of Infrastructure and Energy

Detailed Plan of Industrial and Trading Estates

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

143

ACEH INVESTMENT COORDINATING BOARD |


144

Detailed Plan of Infrastructure and Energy

6.1 ACEH INDUSTRIAL AREA PLAN AT LADONG

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

145

ACEH INVESTMENT COORDINATING BOARD |


146

Detailed Plan of Infrastructure and Energy

LOCATION: Ladong, Great Aceh (about 18 Km to Banda Aceh and 9 Km to Port of Malahayati).

CONSISTED OF: • 19 lots for small scale industries (0.10 Ha – 0.30 Ha). • 23 lots for medium scale industries (0.30 Ha – 0,50 Ha). • 10 lots for large scale industries (0.50 Ha – 1 Ha).

Reserved Land Area : 552.663 sqm

| WWW.ACEHINVESTMENT.COM


ACEH INVESTMENT PROFILE

LADONG 556.663 sqm (55 Ha)

BEEF PROCESSING FOCUSED INVESTMENT AREA

147

MALAHAYATI SEAPORT

COCONUT FOCUSED INVESTMENT AREA

ACEH BESAR

PIDIE

ACEH INVESTMENT COORDINATING BOARD |


148

Detailed Plan of Infrastructure and Energy

Chief of Editor Iskandar Netty Muharni Editor Arif Arham Cut Eliza Mutia Design and Layout Eka Saputra Zulfahmi Copyrigth 2014 | Aceh Investment Coordinating Board

| WWW.ACEHINVESTMENT.COM



150

INTRODUCTION

Aceh Investment Coordinating Board

Jl. Ahmad Yani No. 39, Banda Aceh, Indonesia P : +62 651 23170 | F : +62 651 23171 E : investasi@acehprov.go.id | bip.aceh@gmail.com W : investasi.acehprov.go.id | acehinvestment.com Download E-Book | WWW.ACEHINVESTMENT.COM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.