ACEH
INVESTMENT PROFILE
DETAILED PLAN OF
ACEH INVESTMENT PROFILE
ACEH INVESTMENT COORDINATING BOARD 2014
FOREWORD
dr. Zaini Abdullah GOVERNOR OF ACEH
Aceh is your investment destination. There are four key strengths that make Aceh very promising: friendly investment laws, geographical position, abundant natural resources, and human capital. Friendly investment laws are related to our status as a special autonomy province in Indonesia. We have a wider authority to govern ourselves than other regions in Indonesia. We also have privilleges to make direct cooperation with foreign institutions. Another important investment measure is the free port and free trade zone in Sabang. The zone provides attractive incentives for investors, such as import duty and tax exemption. For simplification, all licensings for investment in the zone are issued by the Sabang Management and Development Board (BPKS). Another reason that makes Aceh one of the best place to invest is its location proximity. Located in one of the busiest international shipping lane, on the entrance of Malacca Strait, Aceh is geographically close to potential markets, such as East Africa, Middle East, South Asia, Southeast Asia, East Asia, along with Australia and New Zealand. This relative position is a beneficial networking for long term investment activities. Aceh also has abundant natural resources. Coffee, cocoa, rubber, and palm oil are just a short list. Mineral resources, located inland and offshore also await further investment Potential investors can get the most of the commodities, utilizing the large number of productive and hardworking labor force in Aceh. To highlight, the Government of Aceh provides 20% of its annual budget for human capital so they can be your partners in the business. To accelerate investment in the region, we work on some important issues to be resolve, such as de-regulation, licensing acceleration, security and business comfort improvement. Hence, the brand-new Aceh is just perfect for your future investment. Last but not least, we welcome you to visit Aceh and invest in amazing Aceh.
dr. Zaini Abdullah GOVERNOR OF ACEH
PREFACE We thank God that Aceh regains trust from investors and being in the top seven of investment realization in Indonesia in 2013. 42 new businesses, domestic and overseas, acquired investment licenses to operate in Aceh, and are committed to invest in 10 priority sectors, with the total investment value was up to IDR 6.1 trillions. Meanwhile, 139 existing companies/projects have been operating in Aceh, with the total amount of investment, up to December 2013, was about IDR 5 (five) trillions, and employed about 21.866 local manpower. As our vision is to be one of the leading investment destination in Indonesia, we will continue to work hard and to make sure that investor and potential investors get the best services and full assisstance where necessary. We will also make effective and efficient coordination with related sectors and institutions to simplify all procedures. All the efforts are for one reason, to provide business comfort to investors. We thank you all for your continuous support to Aceh and to trust Aceh as your investment destination.
Ir. Iskandar, M.Sc Chairman of Aceh Investment Coordinating Board
Ir. Iskandar, M.Sc Chairman of Aceh Investment Coordinating Board
Content I INTRODUCTION
1.1 VISION ~ 11 1.2 GEOGRAPHY~ 12 1.3 DEMOGRAPHY ~ 14 1.4 SPATIAL PLANNING ~ 16 1.5 ECONOMIC PERFORMANCE ~ 18 1.6 INFRASTRUCTURE SUPPORT ~ 20 1.7 DOING BUSINESS IN ACEH ~ 30 1.8 FACT AND FIGURE ~ 32
II DETAILED PLAN OF AGRO INDUSTRIES PROJECT
2.1 DETAILED PLAN OF FOOD CROPS AND HORTICULTURE ~ 38 2.2 DETAILED PLAN OF PLANTATION ~ 52 2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY DEVELOPMENT PROJECT ~ 76 2.4 DETAILED PLAN OF FISHERIES ~ 88
III DETAILED PLAN OF INFRASTRUCTURE AND ENERGY
3.1 DETAILED PLAN OF INSFRASTRUCTURE ~ 98 3.2 DETAILED PLAN OF ENERGY ~ 102
4.1 KRUENG ACEH RIVER WALK ~ 112 IV 4.2 ULEE LHEU BEACH ~ 116 DETAILED PLAN OF TOURISM DEVELOPMENT PROJECT IN BANDA ACEH
V SABANG FREE PORT AND FREE TRADE ZONE PROJECT
5.1 INTERNATIONAL SHIPPING LINE ~ 124 5.2 SABANG INTERNATIONAL WATER FRONT RESORT AND CONVENTION CENTRE ~ 126 5.3 PASSANGER CRUISE TERMINAL ~ 128 5.4 YACHT MARINA & SUPPORTING FACILITIES ~ 130 5.6 DIVING CENTER ~ 132 5.7 SEA PORT ~ 134
VI DETAILED PLAN OF INDUSTRIAL AND TRADING ESTATES
6.1 ACEH INDUSTRIAL AREA ~ 144
I Introduction
10
INTRODUCTION
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
11
VISION
Aceh becomes one of the leading Investment Destination in 2017
ACEH INVESTMENT COORDINATING BOARD |
12
INTRODUCTION
1.2 GEOGRAPHY
ACEH, THE WEST GATE OF INDONESIA
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
13
ACEH
ACEH INVESTMENT COORDINATING BOARD |
14
INTRODUCTION
1.3 DEMOGRAPHY
| WWW.ACEHINVESTMENT.COM
1 ,49
8 1,97 rce
Fo ors Lab
5,015
,2 3 4
by bited ) Inha le (2013 peop
48 % of the n tio popula the work inture agricul r. secto
cities subdistrict mukim villages district
56,770.81 Km2
7 , 4 7 8 , 8 0 1 .95 Ha
Total area Total are according to the territ a of Basemap of or sea whos ial Indonesia. e breadth extends two hun to nautical dred measuredmiles the basel from ines.
ACEH INVESTMENT COORDINATING BOARD |
Topogr mountaaphically hilly w i waterfans, valleys, rive ith lls, an rs, floodpl d narrow ain
778 6.493
289
5
18
15 ACEH INVESTMENT PROFILE
16
INTRODUCTION
1.4 SPATIAL PLANNING
Photo: Banda Aceh From Sky
Strategic Area:
¤¤ The Center of National Stragic Activities (PKSN) : Sabang, free port and free trade areav ¤¤ National Activity Center : Lhokseumawe and greater area (PKN) ¤¤ Capital City : Banda Aceh
2,934,602 Ha Cultivated Area Those areas for production forest, community forest; agriculture; fisheries; mining; industry; tourism; housing and other functions.
| WWW.ACEHINVESTMENT.COM
2,708,550 Ha Protected Area and Conservation Area Those areas ruled for the protection for following areas Local protected area; preserve region and areas and cultural heritage; national disaster-prone; geology protection; and other preservation areas.
ACEH INVESTMENT PROFILE
17
Sabang
Banda Aceh
Lhokseumawe
Takengon Langsa Meulaboh
Cultivated Area Protected Area Conservation Area
ACEH INVESTMENT COORDINATING BOARD |
INTRODUCTION
111,183,310
40,783,226 5,085,052
411,428,571 102,857,143
26,133,215
13,127,198
4,407,581 | WWW.ACEHINVESTMENT.COM
165,101,527
8,565,728
382,330,821
1.5 ECONOMIC PERFORMANCE
Minimum Wage (USD)
18
Domestic Investment (USD) Foreign Investment (USD)
ACEH INVESTMENT PROFILE
19
Photo: Illustration
Inflation
Economic Growth
Export (ton)
Import (ton)
ACEH INVESTMENT COORDINATING BOARD |
20
INTRODUCTION
1.6 INFRASTRUCTURE SUPPORT
ROAD
Photo: Highway Road, Lhok Seudu, Aceh Besar
Provincial Road 1.813,33 Km
| WWW.ACEHINVESTMENT.COM
National Road 1.803,36 Km
Regencial Road 13.841,07 Km
ACEH INVESTMENT PROFILE
21
Sabang Banda Aceh
Lhokseumawe
Takengon
Langsa
Meulaboh
ACEH INVESTMENT COORDINATING BOARD |
22
INTRODUCTION
SEAPORT
Photo: Malahayati Seaport, Aceh Besar
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
23
Balohan-Sabang
Malahayati-Aceh Besar
Krueng Geukueh-Lhokseumawe
Kuala Langsa
Calang
Meulaboh
Susoh
Tapak Tuan
Sinabang
Singkil
ACEH INVESTMENT COORDINATING BOARD |
24
INTRODUCTION
AIRPORT
Photo: Iskandar Muda International Airtport, Aceh Besar
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
25
Maimun Saleh-Sabang
Sultan Iskandar Muda-Aceh Besar
Malikussaleh-Lhokseumawe
Rembele-Central Aceh
Point A-North Aceh
Blang Keujeuren-Gayo Luwes
Alas Lauser-Southeast Aceh
Cut Nyak Dhien-Nagan Raya
Kuala Batee-Southwest Aceh
T. Cut Ali-South Aceh
Lasikin-Simeulu Hamzah Fansuri-Aceh Singkil
ACEH INVESTMENT COORDINATING BOARD |
26
INTRODUCTION
ENERGY
Capacity
Tariff/KWH IDR
USD
450 VA
485
0.05
900 VA
600
0.06
1300 VA
930
0.09
2.200 VA
960
0.1
3.500 VA -14 KVA
1112
0.11
14 KVA-200 KVA
972
0.1
200 KVA-30.000 KVA
803
0.08
More Than 30.000 KVA
723
0.07
| WWW.ACEHINVESTMENT.COM
Photo: Steam Power Plant, Nagan Raya
Aceh-North Sumatra Interconnection 343 MW
Nagan Raya Steam Power Plant 2x110 MW
PLTG Arun Lhokseumawe 200 MW
Peusangan Hydro Power Plant 88MW
ACEH INVESTMENT PROFILE
27
Aceh North Sumatera Interconnection PLTG Arun Lhokseumawe Finishing: 2014
Peusangan Hydro Electric Power Plant Finishing: 2016
Nagan Raya Steam Power Plant
ACEH INVESTMENT COORDINATING BOARD |
28
INTRODUCTION
WATER DISTRICT/CITY
WATER SUPPLY COMPANY
Banda Aceh
PDAM Tirta Daroy
Sabang
PDAM Tirta Aneuk Laot
Aceh Besar
PDAM Tirta Mon Tala
Pidie
PDAM Tirta Mon Krueng Baro
Pidie Jaya
PDAM Tirta Krueng Meureudu
Bireun
PDAM Tirta Krueng Peusangan
North Aceh
PDAM Tirta Mon Pase
East Aceh
PDAM Tirta Peusada
Lansa
PDAM Tirta Keumeuneng
Central Aceh
PDAM Tirta Tawar
Gayo Luwes
PDAM Tirta Sejuk
Bener Meriah
PDAM Tirta Beungi
Aceh Jaya
PDAM Tirta Mon Trata
West Aceh
PDAM Tirta Meulaboh
Southeast Aceh
PDAM Tirta Agara Kutacane
Singkil
PDAM Tirta Singkil
South Aceh
PDAM Tirta Naga Tapaktuan Photo: Ilustration
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
29
ACEH INVESTMENT COORDINATING BOARD |
30
INTRODUCTION
1.7 DOING BUSINESS IN ACEH
Photo: Palm Oil Industry, PT. Megalopolis, Aceh Jaya
REGULATIONS Law No 11 of 2006 on Aceh Governance. The law gives the Government of Aceh privileges to govern the province including in economic development to improve health, safety, and public welfare.
| WWW.ACEHINVESTMENT.COM
Law No. 37 of 2000 on Sabang Free Port and Free Trade Zone. It concludes a wide range of facilities for doing business in Sabang, such as import duty and tax exemption. The Sabang Management and Development Agency (BPKS) operates the zone and has an authorization to issue all licensings for investment in this area.
Presidential Regulation No. 11 of 2010 on Cooperation between the Government of Aceh and Foreign Institutions. The regulation allows a wide authority for the Government of Aceh to establish cooperation with foreign institutions, especially in economic development.
ACEH INVESTMENT PROFILE
31
Ease of Doing Business in Aceh POTENTIAL INVESTORS INVESTMENT ACCELERATION TASK FORCE TEAM
INFORMATION, FACILITATION AND ASSISTANCE
LICENSING
One Stop Service for Local Licenses
PRINCIPLE LICENSE: BKPM/BPKS WORKING LICENCE: BKPM/BPKS LOC AL LICENCE: BP2T
CONSTRUCTION
> Security, convenience and law certainty > Land availability, labor, wages & incentive > Licensing administration > Policy, Regulation > Field Visit, etc
INVESTMENT EVALUATION AND CONTROLLING TASK FORCE TEAM FACILITATION AND ASSISTANCE
OPERATION AND BUSINESS EXPANSION
> Security, convenience and low certainty > Land dispute, labor dispute, etc > Regulation and licensing for business
NOTE: BKPM > Indonesian Investment Coordinating Board BPKS > Sabang Free Port and Free Trade Management Board BP2T > One Stop Service Office
INCENTIVES Providing incentives to investors in the form of: a. Reduction of Sectoral levy b. Stimulus funding, for selected permits; Shall not exceed 50 sectors; Stimulus funds % (fifty percent) of the levy awarded in the form of interest payable amount. subsidy shall not exceed 2 % (two percent) of the rate of interest paid for the purchase of machinery or equipment.
c.
Capital relief; in the form of equity capital and assets in accordance with the ability of the Government of Aceh .
ACEH INVESTMENT COORDINATING BOARD |
32
INTRODUCTION
1.8 FACT AND FIGURE
The Big 5 of Foreign Direct Investment by Country of Origin
UK USA
3.8 | WWW.ACEHINVESTMENT.COM
1.8
ACEH INVESTMENT PROFILE
OUR PROGRESS IN 2013
33
We got 42 new projects (IDR 6.1 trillion) and more than IDR 5.09 trillion of 139 projects (21.866 workers) already have boost our economy. Now, it’s your turn !
South Korea India Malaysia
1 USD = 9,300 IDR March, 2013 Kurs
0.2
8.7
4.7
Billion USD
ACEH INVESTMENT COORDINATING BOARD |
II Detailed Plan of Agro Industries Project
Photo: Lineung Buleun Potato Farm
36
Detailed Plan of Agro Industries Project
2.1 FOOD CROPS AND HORTICULTURE
PADDY The overall demand of rice in Indonesia is currently reaches 33 million tons, while Aceh domestic consumption is about 658,340 tonnes (2013). There are huge potential to develop rice farming and processing to meet domestic market share.
Agriculture is the key sector in Aceh, with the area of
438,855 Ha, and the annual production of about
1,788,783 tonnes
in 2012
Supported by about
359,478
farmers in Aceh.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
37
Photo: Ilustration
ACEH INVESTMENT COORDINATING BOARD |
38
Detailed Plan of Agro Industries Project
AREA AND PRODUCTION OF PADDY BY REGENCY/CITY, 2012 Regency/City
Planted Area (Ha)
Production (Ton)
Simeulue
6,907
26,005
Aceh Singkil
2,220
6,611
South Aceh
19,367
64,309
Southeast Aceh
12,320
62,462
East Aceh
46,442
213,033
Central Aceh
7,092
25,816
West Aceh
15,039
44,342
Aceh Besar
47,124
203,516
Pidie
43,904
204,052
Bireuen
36,285
141,440
North Aceh
68,189
341,951
Southwest Aceh
29,019
96,426
Gayo Lues
6,654
31,776
Aceh Tamiang
27,193
102,082
Nagan Raya
33,903
75,899
Aceh Jaya
13,081
41,211
Bener Meriah
2,944
13,903
Pidie Jaya
13,606
62,014
121
285
Langsa
3,493
13,295
Lhokseumawe
2,239
11,645
Subulussalam
1,713
6,665
TOTAL
438,855
1,788,738
Banda Aceh
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
PROJECT PURPOSE Establishing the modern rice milling plant, capacity 8 ton/ hour.
PIDIE 43,904 Ha 204,052 Tons
Photo: Rice Milling Unit , Pidie
INVESTMENT ESTIMATION
USD 8,000,000 BIREUEN 36,285 Ha 141,440 Tons
ACEH BESAR 47,124 Ha 203,516 Tons
39
NORTH ACEH 68,189 Ha 341,951 Tons
EAST ACEH 46,442 Ha 213,033 Tons
SOUTHEAST ACEH 12,320 Ha 62,462 Tons
ACEH INVESTMENT COORDINATING BOARD |
40
Detailed Plan of Agro Industries Project
CORN “There is a reason why corn [Zea mays] is the most-produced grain worldwide; it is involved in just about every aspect of our lives. Corn provides about 21 percent of human nutrition across the globe. Corn is usually fed to animals. There are many other non-culinary uses for the grain as well; it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few. It also can be the raw material for baskets and toys. In short, corn is an essential ingredient in our diets and also in our world� (source: en.wikipedia.org/wiki/ Maize). As one of the major producers of corn, we offers opportunities for potential investors to set up a poultry feed industry in Aceh.
... it is a key ingredient in ethanol, cosmetics, ink, glue, laundry starch, medicines and fabrics, just to name a few.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
41
ACEH INVESTMENT COORDINATING BOARD |
42
Detailed Plan of Agro Industries Project
AREA AND PRODUCTION OF CORN BY REGENCY/CITY, 2012 Regency/City
Planted Area (Ha)
Production (Ton)
1
28
Aceh Singkil
201
464
South Aceh
12,330
49,377
6,000
Southeast Aceh
26,602
89,301
6,000
East Aceh
2,480
8,214
7,800
Central Aceh
138
434
4,500
West Aceh
209
485
Aceh Besar
452
216
Pidie
751
679
4,500
Bireuen
894
1,729
3,300
North Aceh
1,619
1,406
5,750
33
22
Gayo Lues
1,333
5,174
3,000
Aceh Tamiang
2,020
4,464
1,500
Nagan Raya
318
598
Aceh Jaya
126
397
5,750
Bener Meriah
728
1,193
6,000
Pidie Jaya
239
93
7,000
Banda Aceh
2
-
Sabang
34
-
Langsa
12
7
Lhokseumawe
58
-
Subulussalam
1,208
3,005
TOTAL
51,788
167,286
Simeulue
Southwest Aceh
| WWW.ACEHINVESTMENT.COM
Farmer
61,100
ACEH INVESTMENT PROFILE
PROJECT PURPOSE
43
INVESTMENT ESTIMATION
Establishing poultry feed factory (maize bran, maize germ, cattle feed, corn grits) which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)
USD 12,367,320
SOUTH ACEH 12,330 Ha 49,377 Tons
SOUTHEAST ACEH 26,602Ha 89,301 Tons
ACEH INVESTMENT COORDINATING BOARD |
44
Detailed Plan of Agro Industries Project
SOYBEAN Soybean is a main source for world’s vegetable protein and vegetable oil Nationwide, soybean production in 2012 was 851,647 tons with the area of the land 554,132 Ha. In Aceh, the soybean plantation in 2012 was approximately 44,638 Ha, and its production was 51.440 tons. Supported by about 90,305 farmers in Aceh
90,305 farmers in Aceh
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
45
ACEH INVESTMENT COORDINATING BOARD |
46
Detailed Plan of Agro Industries Project
AREA AND PRODUCTION OF SOYBEANS BY REGENCY/CITY, 2012 Regency/City
Planted Area (Ha)
Production (Ton)
Simeulue
-
-
Aceh Singkil
43
30
South Aceh
105
140
4
7
East Aceh
1,922
2,404
Central Aceh
690
818
West Aceh
30
32
Aceh Besar
757
634
Pidie
5,333
6,138
9,000
Bireuen
21,847
27,127
12,000
North Aceh
3,532
2,744
13,500
Southwest Aceh
3,866
3,896
28
52
Aceh Tamiang
2,182
1,756
Nagan Raya
202
155
Aceh Jaya
98
15
Bener Meriah
60
381
3,899
5,078
Banda Aceh
-
-
Sabang
7
3
Langsa
-
-
Lhokseumawe
18
-
Subulussalam
15
29
44,638
51,439
Southeast Aceh
Gayo Lues
Pidie Jaya
TOTAL
| WWW.ACEHINVESTMENT.COM
Farmer
39,305
7,500
9,000
90,305
ACEH INVESTMENT PROFILE
PROJECT PURPOSE Establishing poultry feed factory (cattle feed) which has drying machine (capacity 40 tons/hour) and warehouse (capacity 9000 tons)
INVESTMENT ESTIMATION
USD 12,367,320 PIDIE JAYA 3,899 Ha 5,078 Tons
PIDIE 5,333 Ha 6,138 Tons WEST ACEH 30 Ha 32 Tons
47
NORTH ACEH 3,532 Ha 2,744 Tons ACEH TAMIANG 2,182 Ha 1,756 Tons
SOUTHEAST ACEH 4 Ha 7 Tons
ACEH INVESTMENT COORDINATING BOARD |
48
Detailed Plan of Agro Industries Project
FRUITS AND VEGETABLE Horticulture area is a geographic area that has similarity ecosystems and united by a common infrastructure facilities thus forming region filled with various business activities including the provision of facilities based horticultural production, cultivation, post-harvest handling and processing, marketing, and various supporting activities (Indonesia Directorate General of Horticulture). Its main purpose is to develop well-being of society through the utilization of resources in a sustainable manner by integrating communal relations, the economy, and the environment in harmony. Linueng Buleun in Bener Meriah is very potential for horticultural farm, as it is close to the new hydro power plant and has direct access to seaports in the east coast. The local government provides 25.300 ha of land for potential investors to set up organic horticultural farms in this area. The target is to supply fruits and vegetables for international markets. The very supportive and welcome local community ensures that investment in this area is very promising.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
49
Photo: Harvesting Potatos in Lineung Buleun, Bener Meriah
ACEH INVESTMENT COORDINATING BOARD |
50
Detailed Plan of Agro Industries Project
POTENTIALS (tons) AVOCADO 74,624 MANGGO 270,544 RAMBUTAN 280,994 ORANGE 85,522 JACK FRUIT 81,154 DURIAN 270,449 PAPAYA 148,298 BANANA 689,892 WATERMELON 165,397
Horticulture
STRING BEAN 170,188 CHILI 300,188 CAYENNE PEPPER 195,052 TOMATO 173,573 EGG PLANT 147,778 CUCUMBER 198,629 RED UNION 26,004 GARLIC 772 POTATO 86,154
Planted Area (Ha)
Produksi (Ton)
Potato
835
18
Cabbage
654
30
Tomato
99
20
Carrot
397
8.5
String Beans
92
4.5
Red Chilies
1048
8
Cayenne Pepper
875
5
Red Onion
220
4.2
Scallion
230
4.3
Avocado
1022
2
Orange
418
3
Terong Belanda
166
0.6
Markisah
73
0.3
Kasmak
72
0.2
Vegetable:
Fruit:
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
PROJECT PURPOSE 造造
造造
Establishing organic farm base on a production system that sustains the health of soils, ecosystems and people. Selling the products in international markets.
51
INVESTMENT ESTIMATION
USD 1,025,850
LINEUNG BULEUN 25.300 HA
ACEH INVESTMENT COORDINATING BOARD |
52
Detailed Plan of Agro Industries Project
2.2 DETAILED PLAN OF PLANTATION
PALM OIL Palm oil constitutes the largest plantation crop in Aceh in volume and economic value, and the palm oil sector has significant growth potential as a major source of revenue for food and bio fuel products. The Government of Aceh has been initiating several strategic plans in this commodity: 1. Create operational and policy support for sustainable palm oil among government, private sector, NGOs, and smallholders. 2. Support palm oil public-private investment partnerships. 3. Reduce threats to high conservation value forests and peat swamp ecosystems. 4. Create a provincial seed certification and distribution program. 5. Improve supply chains and pricing transparency for palm oil production and processing.
In 2010, it consisted of smallholders production: 185,265 Tons, Government plantation production: 69,634 Tons, and private plantation production: 238,927 Tons and the status is still temporary.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
53
493.826
482.895
326.665
769.010
765.416
Annual Production (tons)
2006
2007
2008
2009
2010
ACEH INVESTMENT COORDINATING BOARD |
54
Detailed Plan of Agro Industries Project
Although many districts in Aceh have palm oil plantations, only Aceh Tamiang, Aceh Singkil, and Nagan Raya have higher number of crude palm oil (CPO) production that suitable for a big processing industry. The following table shows total production for each district.
PALM PLANTED AREA AND PRODUCTION OF SMALL HOLDER & ESTATE ENTERPRISES BY REGENCY/CITY 2012 Regency/City
Planted Area (Ha)
Production (Ton)
Aceh Singkil
54,560
397,729
South Aceh
9,765
32,004
Southeast Aceh
7,666
19,942
East Aceh
70,565
35,0797
0
0
West Aceh
25,485
33,618
Aceh Besar
1,180
397
77
16
Bireuen
4,644
2,2161
North Aceh
24,595
115,664
Southwest Aceh
20,612
13,093
0
0
Aceh Tamiang
54,417
3,849,265
Nagan Raya
50,401
168,767
Aceh Jaya
15,953
15,357
Bener Meriah
1,300
144
Pidie Jaya
2,087
990
Banda Aceh
0
0
Sabang
0
0
Langsa
419
947
Lhokseumawe
208
243
Subulussalam
21,514
49,135
368650
5070555
Central Aceh
Pidie
Gayo Lues
TOTAL
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
PROJECT PURPOSE
55
INVESTMENT ESTIMATION
Establishing palm oil processing industries (Biodiesel, Fatty Alcohol, Edible Oil, Shortening, SBE, Soap Noodles Plant, Dove Plant, Fatty Acid Plant, NPK Fetilizer Plant, Refinery Plant, Biomass Pellet Production Plant).
USD 26,449,321 Net Present Value : 8,411,663.48 USD Internal Rate of Return : 23,1%
PAYBACK PERIOD : 6 YEARS AND 8 MONTHS
Banda Aceh
Lhokseumawe
ACEH TAMIANG 50,755 Ha 121,916 Tons
Meulaboh
NAGAN RAYA 76,439 Ha 90,241 Tons ACEH SINGKIL 47,111 Ha 110,004 Tons
Photo: Palm Oil Processing Industry, PT. Megalopolis, Aceh Jaya
ACEH INVESTMENT COORDINATING BOARD |
56
Detailed Plan of Agro Industries Project
RUBBER Natural rubber consists of suitable polymers of the organic compound isoprene with minor impurities of other organic compounds plus water. The rubber plant can grow up to 15-25 meters, has an upright big stem and big high branching. Currently, rubber is harvested mainly in the form of the latex from a rubber tree (Hevea brasiliiensis) which was tapped from the cut bark of the plant. It can be used to produce another form of rubber, such as crumb rubber and rubber timber. Natural rubber is used extensively in many applications and products, either alone or in combination with other materials such as firewood, charcoal, wood or lumber for household apliance (furniture), door and window profiles, hoses, belts, matting, flooring and dampeners (antivibration mounts) for the automotive industry, aircraft industry, textile, gloves (medical, household and industrial) and toys.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
57
Photo: Rubber plant, Illustration
ACEH INVESTMENT COORDINATING BOARD |
58
Detailed Plan of Agro Industries Project
There are five districts in Aceh that have higher number of rubber production that suitable for a big processing industry: West Aceh, East Aceh, Aceh Tamiang. The following table shows total production for each district. PLANTED AREA AND PRODUCTION OF RUBBER IN ACEH District/City
Planted Area (Ha)
Production (ton)
Simeulue
1,201
141
Aceh Singkil
3,698
2,376
South Aceh
1,099
252
Southeast Aceh
10,183
9,802
East Aceh
35,277
21,333
-
-
West Aceh
27,381
18,649
Great Aceh
16
-
Pidie
20
-
Bireuen
2,506
1,387
North Aceh
10,485
6,601
851
134
7
1
Aceh Tamiang
22,238
14,736
Nagan Raya
10,870
3,322
Aceh Jaya
12,416
5,025
Bener Meriah
-
-
Pidie Jaya
3
1
Banda Aceh
-
-
Sabang
-
-
Langsa
1,642
1,430
Lhokseumawe
20
25
Subulussalam
4,379
2,192
144,292
87,407
Central Aceh
Southwest Aceh Gayo Lues
TOTAL
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
PROJECT PURPOSE
59
INVESTMENT ESTIMATION
Establishing rubber processing industries.
USD 21,161,739
EXISTING COMPANY 造造 PT. Aceh Rubber Industry (Aceh Tamiang)
Net Present Value : 234,618,007 USD Internal Rate of Return : 53,81 % Benefit Cost Ratio : 1,26 Net Benefit Cost Ratio : 3,739
PAYBACK PERIOD : 6 YEARS AND 8 MONTHS
EAST ACEH 35,277 Ha 21,333 Tons
Banda Aceh
Lhokseumawe
ACEH TAMIANG 22,238 Ha 22,238 Tons
WEST ACEH 27,381 Ha 18,649 Tons
Photo: Rubber Processing Industry, PT. Aceh Rubber Industry, Aceh Tamiang
ACEH INVESTMENT COORDINATING BOARD |
60
Detailed Plan of Agro Industries Project
COCOA Indonesia is the third largest producer of cocoa beans in the world after the Ivory Coast and Ghana. In Aceh, cocoa is a leading commodities other than coffee, palm oil, rubber, organic horticulture, corn and patchouli. Cocoa plantations spread almost in all districts in Aceh, from Aceh Tamiang in the eastern part of Aceh, to Simeulue Island in the outer edge of Aceh Province. Aceh cocoa has been exported to many countries in the world. The statistics indicate that in 2010, Aceh export volumes of cocoa beans reached 420,978.40 kgs or equals to USD 1,166,080.30 (Aceh Industry and Trade Agency, 2012). The development strategy is to gear sustainable cocoa industries. The upstream industries are strengthened, however the focus is to boost value added in the downstream sector.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
61
Photo: Cacoa Farm in Pidie Jaya
ACEH INVESTMENT COORDINATING BOARD |
62
Detailed Plan of Agro Industries Project
There are five districts in Aceh as the major cocoa producers that are suitable for a big processing industry: Pidie Jaya, Bireuen, Aceh Tamiang, Southeast Aceh, and Soutwest Aceh. The following table shows total production for each district.
CACOA PLANTED AREA AND PRODUCTION OF SMALL HOLDER & ESTATE ENTERPRISES BY REGENCY/CITY 2012 Regency/City
Planted Area (Ha)
Production (ton)
1,806
200
Aceh Singkil
636
147
South Aceh
1,332
153
Southeast Aceh
19,454
8,843
East Aceh
12,416
6,536
Central Aceh
2,322
546
West Aceh
722
235
Aceh Besar
3,136
426
Pidie
9,609
4,499
Bireuen
6,023
3,801
North Aceh
9,503
3,163
Southwest Aceh
4,356
874
Gayo Lues
4,443
888
Aceh Tamiang
2,280
941
Nagan Raya
5,372
1,335
Aceh Jaya
1,267
206
Bener Meriah
1,190
185
Pidie Jaya
12,734
3,645
0
0
Sabang
637
172
Langsa
303
132
Lhokseumawe
135
64
Subulussalam
816
130
100492
37121
Simeulue
Banda Aceh
TOTAL
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
PROJECT PURPOSE
63
INVESTMENT ESTIMATION
造造 Establishing cocoa processing industries (paste, butter, powderander). 造造 Establishing packaging industry.
USD 97,095,995 Net Present Value : 5,730,808.44 USD Internal Rate of Return : 22,4% Benefit Cost Ratio : 1,69
PAYBACK PERIOD : 6 YEARS AND 9 MONTHS
Banda Aceh
PIDIE JAYA 10,513 Ha 3,073 Tons
BIREUEN 5,436 Ha 4,039 Tons ACEH TAMIANG 2,675 Ha 1,127 Tons
Meulaboh
SOUTHWEST ACEH 4,356 Ha 2,746 Tons
Photo: Illustration
SOUTHEAST ACEH 11,970 Ha 7,622 Tons
ACEH INVESTMENT COORDINATING BOARD |
64
Detailed Plan of Agro Industries Project
COFFEE Gayo coffee is a typical coffee from the Gayo highlands, an area that covers Bener Meriah, Central Aceh and Gayo Lues Districts in Aceh Province. Gayo is the name of the tribe who inhabits this region. The majority of people in this area are coffee growers. The plantation has began as early as 1908 which main product is arabica coffee. In fact, arabica coffee production resulting from the Gayo land is the largest in Asia. Gayo coffee has been exported to many countries in the world. The statistics indicate that in 2012, Aceh export volumes of coffee beans to 18 countries were up to 9,703,260.00 kgs or equals to USD 64,358,771.31 (Aceh Industry and Trade Agency, 2012). Gayo coffee also has gained some international certifications as a recognition to its excellence in quality, such as organic and fair trade certified as well as Geographical Indication (GI). Particularly, black gayo arabica coffee obtained the highest score in the Indonesian Specialty Coffee Auction 2010 in Bali, which guarantees that it is the best coffee in the world.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
65
Aceh export volumes of coffee beans to 18 countries were up to
9,703,260 kgs
Photo: Coffee plant in Bener Meriah
ACEH INVESTMENT COORDINATING BOARD |
66
Detailed Plan of Agro Industries Project
Three major producers of coffee in Aceh are, Bener Meriah, Central Aceh, and Gayo Lues. These areas are suitable for a big coffee processing industry. The following table shows total production for each district.
COFFEE PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY 2012 Robusta Regency
Total Robusta & Arabika (Ton)
Arabika
Planted Production Planted Area (Ha) (Ton) Area (Ha)
Production (Ton)
Planted Area (Ha)
Production (Ton)
Farmer
Central Aceh
2,315
793
48,300
25,370
50,615
26,163
33,000
Bener Meriah
1,360
660
48,101
22,414
49,461
23,074
29,000
4,652
1,118
4,652
1,118
40,000
-
-
9,540
1,569
11,846
114,268
51,924
113,846
Gayo Lues Pidie TOTAL
9,540 13,215
1,569 3,022
| WWW.ACEHINVESTMENT.COM
101,053
48,902
ACEH INVESTMENT PROFILE
PROJECT PURPOSE
67
INVESTMENT ESTIMATION
造造 Establishing coffee processing industries. 造造 Establishing packaging industry.
USD 30,864,300
PAYBACK PERIOD : 6 YEARS AND 9 MONTHS Banda Aceh
BENER MERIAH Robusta: 1,250 Ha / 660 Tons Arabica: 48,101 Ha /22,414 Tons
CENTRAL ACEH Robusta: 2,315 Ha / 874 Tons Arabica: 48,000 Ha/ 24,328 Tons
GAYO LUES 4,588 Ha 1,036 Tons
Photo: Coffee bean sorting, Central Aceh
ACEH INVESTMENT COORDINATING BOARD |
68
Detailed Plan of Agro Industries Project
COCONUT Coconut industry can be developed by either farmer group level or larger scaled industry, for domestic and internaional market, such as young coconut products, coconut coctail, coconut jam, baby food supplements, soft drinks, nata de coco, coconut water sauce, coconut flour, virgin coconut oil, coconut shell charcoal, briquet charcoal, liquid smoke of coconut shell, coconut wood, and organic fertilizer. While the exporting goods are such as copra, white copra, raw coconut oil, coconut cake, desiccated coconut, and active charcoal.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
69
ACEH INVESTMENT COORDINATING BOARD |
70
Detailed Plan of Agro Industries Project
COCONUT PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY 2012 Regency/City
Planted Area (Ha)
Production (Ton)
Simeulue
7,472
2,611
Aceh Singkil
5,224
2,235
South Aceh
7,023
2,948
851
488
6,797
6,015
103
11
West Aceh
2,832
1,202
Aceh Besar
14,351
7,971
Pidie
8,633
5,967
Bireuen
14,341
11,760
North Aceh
19,389
10,310
Southwest Aceh
2,155
1,244
Gayo Lues
440
85
Aceh Tamiang
575
185
Nagan Raya
1,350
659
Aceh Jaya
6,333
1,643
43
12
3,336
1,091
-
-
Sabang
4,045
2,386
Langsa
473
283
Lhokseumawe
774
391
Subulussalam
855
269
107,395
59,766
Southeast Aceh East Aceh Central Aceh
Bener Meriah Pidie Jaya Banda Aceh
TOTAL
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
PROJECT PURPOSE
71
INVESTMENT ESTIMATION
Establish Virgin Coconut Oil Processing Industry
USD 87,286 Net Present Value : 15.5% Internal Rate of Return : 57.39% Benefit Cost Ratio : 2.19
Banda Aceh
BIREUEN 14,341 Ha 11,760Tons
NORTH ACEH 19,389 Ha 10,310Tons Lhokseumawe
ACEH BESAR 14,351 Ha 9,971Tons
Meulaboh
Photo: Illustration
ACEH INVESTMENT COORDINATING BOARD |
72
Detailed Plan of Agro Industries Project
PATCHOULI Contains the Patchouli Alcohol of 2.5% to 3.3% (the average PA of patchouli in the world is 2.5%). Patchouli is a species of plant from the genus Pogostemon. It is a bushy herb of the mint family, with erect stems, reaching two or three feet (about 0.75 metre) in height and bearing small, pale pinkwhite flowers. The plant is native to tropical regions of Asia, and is extensively cultivated in Aceh, Indonesia (wikipedia.org, 05/29/2013). Patchouli oils is used as raw material for a number of finished products, such as parfume and modern scented industrial products such as paper towels, laundry detergents, and air fresheners. Patcholi also can be used in antiseptic, pesticide, and as a fixative to bind other essential oils. The Geographical Indication Expert of the Indonesian Ministry of Agriculture, Dr. Riyaldi, affirmed that Aceh is very potential for the development of largescale patchouli businesses, because of its supporting condition of land and its quality. According to a research, Aceh patchouli oil contains patchouli alcohol (yield) 2.5% to 3.3% which makes it the best patchouli in the world (patchouli-aceh.com, 03/18/2012). As one of the major producers of patchouli, Aceh offers opportunities for potential investors to set up patchouli processing industries in the region.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
73
According to a research, Aceh patchouli oil contains patchouli alcohol (yield) 2.5% to 3.3% which makes it the best patchouli in the world.
Photo: Patchouli Plant, Illustration
ACEH INVESTMENT COORDINATING BOARD |
74
Detailed Plan of Agro Industries Project
Aceh produces the best patchouli in the world. The main production areas are Aceh Jaya, South Aceh, Southwest Aceh and Gayo Lues Districts, which are suitable for large-scale processing industries. The following table shows the total production for each district.
PATCHOULI AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY, 2012 Regency/City
Planted Area (Ha)
Production (Ton)
-
-
Aceh Singkil
40
21
South Aceh
408
212
Southeast Aceh
1,418
612
East Aceh
-
-
Central Aceh
23
20
West Aceh
-
-
Aceh Besar
118
53
Pidie
8
5
Bireuen
43
33
North Aceh
132
124
Southwest Aceh
78
61
Gayo Lues
853
774
Aceh Tamiang
40
35
Nagan Raya
15
13
650
308
Bener Meriah
-
-
Pidie Jaya
3
3
Banda Aceh
-
-
Sabang
-
-
Langsa
-
-
Lhokseumawe
-
-
Subulussalam
19
9
3,848
2,283
Simeulue
Aceh Jaya
TOTAL
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
75
INVESTMENT ESTIMATION
PROJECT PURPOSE 造造 Establishing patchouli processing industries. 造造 Increasing production volume and quality of patchouli.
USD 1,025,960 Banda Aceh
Lhokseumawe
GAYO LUES 149 Ha 33 Tons
ACEH JAYA 107 Ha 20 Tons WEST ACEH 114 Ha 6 Tons
SOUTH ACEH 334 Ha 21 Tons
Photo: Patchouli Processing Industry, Illustration
ACEH INVESTMENT COORDINATING BOARD |
76
Detailed Plan of Agro Industries Project
2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY DEVELOPMENT PROJECT
Livestock farm area in Aceh is 1.525.578 Ha. The huge area is significantly feasible for foragelivestock system, integrated with crop plantation. The project involves rearing of both breeding and fattening. The main activities of the project would be procurement of irrigation and hay making equipment, construction of back-up livestock farm infrastructure, construction of animal feeds plant, breeding and fattening. Strategy for Aceh beef Development project includes : develop a neucleus-plasma structure for the developing a beef herd in Aceh, establish system for ; management of mature breeding cows (grazing systems or feedlot), establish a beef finishing unit (feedlot) plan for each regency and halal beef processing and meet distribution. Targeted for initial development; Aceh Besar, Pidie, Bener Meriah, Central Aceh and Nagan Raya Regency.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
77
Photo: Governor of Aceh visiting Livestock Improvement Company farm in Victoria, Australia (11/2013)
ACEH INVESTMENT COORDINATING BOARD |
78
Detailed Plan of Agro Industries Project
Aceh Besar Beef Industry Development Project
Photo: Tradisional Fattening in Krueng Aceh, Aceh Besar
| WWW.ACEHINVESTMENT.COM
Land Area Location
: 6,434 Ha : Krueng Aceh Kuta Malaka Blang Ubo-ubo
Land Status
: Goverment Ownership
ACEH INVESTMENT PROFILE
79
INVESTMENT ESTIMATION ¤¤ ¤¤
Breeding Fattening
: 5,500 cows : 15,000 cows
¤¤ ¤¤
ROI : 29.64 % B/C : 1.23
USD 33,147,500
PAYBACK PERIOD : 3 YEARS AND 5 MONTHS
SCHEME ¤¤ Nucleus : 605 Ha ¤¤ Plasma : 5,829 Ha INFRASTRUCTURE SUPPORT ¤¤ Airport : Sultan Iskandar Muda ¤¤ Seaport : Malahayati ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River, Spring ¤¤ Electicity : Supported
Krueng Aceh Kuta Malaka Blang Ubo-ubo
ACEH BESAR
Cot Sirebee
SUITABLE FOR: ¤¤ Kuta Malaka - Major Feedlot for Nucleus Herd ¤¤ Krueng Aceh- Traditional Fattening ¤¤ Cot Sirebee, Jantho- Bull Depot ¤¤ Blang Ubo-Ubo- Large Scale Breeding for Nucleus Herd
ACEH INVESTMENT COORDINATING BOARD |
80
Detailed Plan of Agro Industries Project
Pidie Beef Industry Development Project
Photo: Breeding Farm, Pidie
| WWW.ACEHINVESTMENT.COM
Land Area Location
: 500 Ha : Biheu Village, Muara Tiga District
Land Status
: Private Ownership
ACEH INVESTMENT PROFILE
81
INVESTMENT ESTIMATION ¤¤ ¤¤
Breeding Fattening
¤¤ ¤¤
ROI : 32 % B/C : 1.23
: 3,080 cows : 10,000 cows
USD 21,325,600
PAYBACK PERIOD : 3 YEARS AND 2 MONTHS
SCHEME ¤¤ Plasma System INFRASTRUCTURE SUPPORT ¤¤ Airport : Sultan Iskandar Muda ¤¤ Seaport : Malahayati ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River, Spring ¤¤ Electricity : Supported
Biheu Village
PIDIE
SUITABLE FOR: ¤¤ Breeding
ACEH INVESTMENT COORDINATING BOARD |
82
Detailed Plan of Agro Industries Project
Bener Meriah Beef Industry Development Project
Photo: Breeding Farm, Bener Meriah
| WWW.ACEHINVESTMENT.COM
Land Area Location
: 4,155 Ha : Perumpakan Benjadi
Land Status
: Goverment Ownership
ACEH INVESTMENT PROFILE
83
INVESTMENT ESTIMATION ¤¤ ¤¤
Breeding Fattening
¤¤ ¤¤
ROI : 32 % B/C : 1.23
: 3,080 cows : 10,000 cows
USD 21,628,500
PAYBACK PERIOD : 3 YEARS AND 2 MONTHS
SCHEME ¤¤ Nucleus dan Plasma System INFRASTRUCTURE SUPPORT ¤¤ Airport : Rembele & Malikussaleh ¤¤ Seaport : Krueng Geukueh ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River, Spring ¤¤ Electicity: Supported
SUITABLE FOR: ¤¤ Breeding ¤¤ Central Feedlot
Perumpakan Benjadi
BENER MERIAH
ACEH INVESTMENT COORDINATING BOARD |
84
Detailed Plan of Agro Industries Project
Central Aceh Beef Industry Development Project
Photo: Fattening Farm, Central Aceh
| WWW.ACEHINVESTMENT.COM
Land Area Location Land Status
: 2,280 Ha : Jagong Jeget Karang Ampar : Private and Goverment Ownership
ACEH INVESTMENT PROFILE
85
INVESTMENT ESTIMATION ¤¤ ¤¤
Breeding Fattening
¤¤ ¤¤
ROI : 32 % B/C : 1.23
: 3,080 cows : 10,000 cows
USD 21,628,500
PAYBACK PERIOD : 3 YEARS AND 2 MONTHS
Karang Ampar
SCHEME ¤¤ Nucleus : 780 Ha ¤¤ Plasma : 1,500 Ha INFRASTRUCTURE SUPPORT ¤¤ Airport : Rembele & Malikussaleh ¤¤ Seaport : Krueng Geukueh ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River, Spring ¤¤ Electicity: Supported
Jagong Jeget
CENTRAL ACEH
SUITABLE FOR: ¤¤ Fattening
ACEH INVESTMENT COORDINATING BOARD |
86
Detailed Plan of Agro Industries Project
Nagan Raya Beef Industry Development Project
Photo: Research Station and Feedlot, Nagan Raya
| WWW.ACEHINVESTMENT.COM
Land Area Location
: 5,000 Ha : Blang Baroe Rambong
Land Status
: Aneuk Nanggroe Cooperatives
ACEH INVESTMENT PROFILE
87
INVESTMENT ESTIMATION ¤¤ ¤¤
Breeding Fattening
¤¤ ¤¤
ROI : 32 % B/C : 1.23
: 3,080 cows : 10,000 cows
USD 21,325,600
PAYBACK PERIOD : 3 YEARS AND 2 MONTHS
SCHEME ¤¤ Nucleus dan Plasma System
NAGAN RAYA Blang Baroe Rambong
INFRASTRUCTURE SUPPORT ¤¤ Airport : Cut Nyak Dhien ¤¤ Seaport : PT. MDB Suak Patong and Kuala Tripa ¤¤ Road by Condition : Moderate ¤¤ Road by Surface : Gravel and Land ¤¤ Water : River ¤¤ Electicity : Supported SUITABLE FOR: ¤¤ Research Station ¤¤ Feedlot ¤¤ Breeding
ACEH INVESTMENT COORDINATING BOARD |
88
Detailed Plan of Agro Industries Project
2.4 DETAILED PLAN OF FISHERIES
ACEH INTERNATIONAL FISHING PORT AT LAMPULO
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
89
696,117
Tons of Fish is Aceh Potencial from Fisheries
Photo: Lampulo Fishing Port
ACEH INVESTMENT COORDINATING BOARD |
90
Detailed Plan of Agro Industries Project
LAMPULO FISHING PORT PRODUCTION 2006 - 2012 (Kg)
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
PROJECT PURPOSE Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).
91
INVESTMENT ESTIMATION
USD 200,000,000
BANDA ACEH Lampulo Fishing Port 51,8 Ha
Photo: Lampulo Fishing Port
ACEH INVESTMENT COORDINATING BOARD |
Meul
92
Detailed Plan of Agro Industries Project
IDI FISHING PORT
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
93
Photo: Idi Fishing Port
ACEH INVESTMENT COORDINATING BOARD |
94
Detailed Plan of Agro Industries Project
Photo: Idi Fishing Port
THE POTENTIALS IN IDI Total catch of fishermen reached 48.67 tons daily The number of fishermen as much as 8246 people (Year 2012) Total fleet of 447 fishing fleets units (Year 2012) Various Fishing gear reaching 571 pieces (Year 2012).
NO
INVESTMENT OPPORTUNITY
CAPACITY
1
Block Ice Factory
2
Modern fishery processing industry
50 ton
Pelagic
3
Shipyard (Wood & fiber)
4 unit
Repairs & Shipyard
4
Fish transportation service (domestic and foreign)
2 unit
| WWW.ACEHINVESTMENT.COM
80 tons/day
EXPLAIN
ACEH INVESTMENT PROFILE
PROJECT PURPOSE Establishing fishery industries (taking, culturing, processing, preserving, storing, transporting, marketing or selling fish or fish products).
95
INVESTMENT ESTIMATION
USD 10,000,000
Banda Aceh
Lhokseumawe
EAST ACEH Idi Fishing Port 62.5 HA
Meulaboh
ACEH INVESTMENT COORDINATING BOARD |
96
Detailed Plan of Infrastructure and Energy
III
Detailed Plan of Infrastructure and Energy
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
97
ACEH INVESTMENT COORDINATING BOARD |
98
Detailed Plan of Infrastructure and Energy
3.1 DETAILED PLAN OF INFRASTRUCTURE
ROLL-ON/ ROLL-OFF CARGO FERRY SERVICE
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
99
Photo: Illustration
ACEH INVESTMENT COORDINATING BOARD |
100
Detailed Plan of Infrastructure and Energy
Photo: Krueng Gekuh Seaport
Frequent Route of PT. Pelayaran Alkan Abadi Loading Port
Destination Port
Ship Name
Tg. Priok, Jakarta
Malahayati, Aceh
Hirondex V.9
Malahayati, Aceh
Tg. Priok, Jakarta
Hirondex V.10
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
PROJECT PURPOSE
101
INVESTMENT ESTIMATION
Establishing Ro-Ro Freight Ferry Shipping
EXISTING COMPANY 造造 Langsa: Kenangan Passanger Ferry 造造 PT. Pelayaran Alkan Abadi
USD 1,025,960
NORTH ACEH Krueng Geukuh Sea Port
LANGSA Kuala Langsa Sea Port
ACEH INVESTMENT COORDINATING BOARD |
102
Detailed Plan of Infrastructure and Energy
3.2 DETAILED PLAN OF ENERGY
GEOTHERMAL POWER PLANT
Photo: Illustration
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
INVESTMENT FEASIBILITY The power for the district of Bener Meriah is supplied from the 150kV transmission Aceh - Sumatra interconnection system from North Sumatra. The power supply is only able to serve 207 villages (89.22%) of the total 232 villages. A total of 25 village have not been served yet.
103
INVESTMENT ESTIMATION
USD 288,080,000
BENER MERIAH
ACEH INVESTMENT COORDINATING BOARD |
104
Detailed Plan of Infrastructure and Energy
GEOTHERMAL POWER PLANT PROJECT 2013-2026 Energy Potential (Mwe) N o
Objects
Regency/City
Coordinate
Resource (Mwe) Spec
Reserve (Mwe)
Hipo
Note
Expec
1
Iboih
Sabang
LU 04°37' ; BT 96°45'
25
-
-
2
Lho Pria Laot
Sabang
LU 03°47' ; BT 97°41'
50
-
-
3
Jaboi Keuneukai
Sabang
LU 05°53' ; BT 95°14
-
-
50
4
Ie Seum-Krueng Raya
Aceh Besar
LU 05°29' ; BT 95°39'
-
63
-
5
Seulawah Agam
Aceh Besar
LU 05°50' ; BT 95°18
-
-
6
Alur Canang
Pidie
LU 05°01' ; BT 95°55
25
-
-
7
Alue Long-Bangga
Pidie
LU 04°48' ; BT 96°48'
100
-
-
8
Tangse
Pidie
LU 04°56' ; BT 96°44'
25
-
- Hitay Energi Holding
9
Rimba Raya
Bener Meriah
LU 03°28' ; BT 97°51'
100
-
-
10
Simpang Balik
Bener Meriah
LU 04°19' ; BT 97°53
100
11
G. Geureudong
Central Aceh
LU 05°48' ; BT 95°19'
-
120
12
Silih Nara
Central Aceh
LU 04°37' ; BT 97°42'
100
-
-
13
Meranti
East Aceh
LU 05°05' ; BT 95°54'
25
-
-
14
Brawang Buaya
Aceh Tamiang
LU 05°08' ; BT 96°18'
25
-
-
15
Kafi
Gayo Luwes
25
-
-
16
Gunung Kembar
Gayo Luwes
LU 05°33' ; BT 95°33'
-
92
17
Dolok Perkirapan
Gayo Luwes
LU 04°42' BT 96°49'
25
-
-
625
275
215
TOTAL POTENTIALS = 1.115 Mwe
| WWW.ACEHINVESTMENT.COM
Bukaka Group/ PT. Sabang Energi
165 Pertamina
- Chevron/PT.Jasa Ayah
- Hitay Energi Holding
ACEH INVESTMENT PROFILE
105
SABANG ACEH BESAR PIDIE BENER MERIAH EAST ACEH ACEH TAMIANG
CENTRAL ACEH
GAYO LUES
ACEH INVESTMENT COORDINATING BOARD |
106
Detailed Plan of Infrastructure and Energy
HYDRO POWER PLANT
Photo: Illustration
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
INVESTMENT FEASIBILITY Establishing Irrigation 19.50 HA and Hydropower Plant 160 MW/580 MWH
107
INVESTMENT ESTIMATION
USD 539,280,000
NORTH ACEH
ACEH INVESTMENT COORDINATING BOARD |
108
Detailed Plan of Infrastructure and Energy
HYDRO POWER PLANT PROJECT 2013-2026
No.
1
District/City
North Aceh
Project Name
Location
Capacity (MW)
Invesment Estimation (Million USD)
Jambuaye-3
Wh Jambu Air
37.2
111.6
Jambuaye-5
Kr. Jambuaye
181.8
545.4
Bidin/Jambuaye
Kr. Jambuaye
246
738
2
Gayo Lues
Ramasan-1
Kr. Ramasan
171.6
514.8
3
East Aceh
Peureulak
Kr. Peureulak
34.8
104.4
4
Aceh Tamiang
Tampur
W. Tampur
428
1284
Jambo Papeun-2
Kr. Jambo Papeun
95.2
285.6
Kluet
Kr. Kluet
141
423
Sibubung-2
Kr. Sibubung
121.1
363.3
Teripa-3
Kr. Teripa
172.6
517.8
Teripa-4
Kr. Teripa
306.4
919.2
Meureubo-1
Kr. Meulaboh
82.1
246.3
Woyla-2
Kr. Woyla
274
822
Pameu
Kr. Pameu
160.6
Peusangan
Kr. Peusangan
90
270
5
South Aceh
6
Nagan Raya
7
West Aceh
8
Central Aceh
9
Southeast Aceh Dolok-1
Kr. Dolok
32.2
96.6
10
Aceh Jaya
Kr. Teunom
288.2
864.6
2862.8
8,588.40
Teunom-2 Total
| WWW.ACEHINVESTMENT.COM
481.8
ACEH INVESTMENT PROFILE
109
NORTH ACEH CENTRAL ACEH EAST ACEH
ACEH JAYA
ACEH TAMIANG
WEST ACEH
GAYO LUES
NAGAN RAYA
SOUTHEAST ACEH
SOUTH ACEH
ACEH INVESTMENT COORDINATING BOARD |
110
Detailed Plan of Tourism Development Project in Banda Aceh
IV Detailed Plan of Tourism Development Project in Banda Aceh
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
111
ACEH INVESTMENT COORDINATING BOARD |
112
Detailed Plan of Tourism Development Project in Banda Aceh
KRUENG ACEH RIVER WALK
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
113
ACEH INVESTMENT COORDINATING BOARD |
114
Detailed Plan of Tourism Development Project in Banda Aceh
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
FASILITIES ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤
115
INVESTMENT ESTIMATION
Food Court Restaurant Playground Jogging Track Mini Port Amphitheater Park
USD 10,000,000
BANDA ACEH
ACEH INVESTMENT COORDINATING BOARD |
116
Detailed Plan of Tourism Development Project in Banda Aceh
ULE LHEU BEACH
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
117
ACEH INVESTMENT COORDINATING BOARD |
118
Detailed Plan of Tourism Development Project in Banda Aceh
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
FASILITIES ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤ ¤¤
119
INVESTMENT ESTIMATION
Food Court Restaurant Playground Jogging Track Mini Port Amphitheater Park Fishing Spot
USD 10,000,000
BANDA ACEH
ACEH INVESTMENT COORDINATING BOARD |
V
120
Sabang Management and Development Agency (BPKS) Project
Sabang Free Port and Free Trade Zone Project
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
121
ACEH INVESTMENT COORDINATING BOARD |
122
Sabang Management and Development Agency (BPKS) Project
VIEW OF THE SABANG BAY
FRESH WATER LAKE BUILT BY THE DUTCH
Sabang has been designated as one of national and international tourist destinations, especially with the enactment of Sabang port as a cruise ship destination in 2011. The Govermant of Aceh has targeted 1 million visitor in 2007. Sabang is located at the Malaca Strait gate, directly adjacent to Malaysia and Thailand, and is part of Andaman Cluster, a very advanced and developed tourism destination. It’s next to Phuket and Langkawi.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
123
ENTRANCE TO THE PORT OF SABANG
THE POTENTIALS 造造 造造
Ecotourism, Adventure, Beach and Sport Heritage and Education
ACEH INVESTMENT COORDINATING BOARD |
124
Sabang Management and Development Agency (BPKS) Project
INTERNATIONAL SHIPPING LINE FRIENDLY TO INVESTMENT REGULATION ¤¤ The Law No.37 year 2000 about Free Trade and Free Port Zone of Sabang ¤¤ Descision of Governor of Aceh Province as Chief Council of Sabang, Number: 193/034, year 2001 about Forming of Management Board of Sabang Free Port and Free Trade Zone (BPKS) ¤¤ The Law No.11 year 2006 regarding Aceh Goverment; article 167 to 170 ¤¤ Goverment Regulation No.83/2011 concering Delegation of Authority from Central Goverment to Sabang Zone Council or DKS.
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
SUEZ - SABANG - KRA - TOKYO SUEZ - SABANG - SINGAPURE - TOKYO SUEZ - SUNDA STRAIT - TOKYO SUEZ - LOMBOK - TOKYO
: : : :
125
8,353 MILES 8,793 MILES 9,427 MILES 10,216 MILES
ACEH INVESTMENT COORDINATING BOARD |
126
Sabang Management and Development Agency (BPKS) Project
SABANG INTERNATIONAL WATER FRONT RESORT AND CONVENTION CENTRE Land Area Location Land Status Supporting Land
: : : :
0.5 Ha Paradiso Beach Goverment Ownership 1 Ha Sabang Fair Areal
Road by Condition Road by Surface Water Electicity
: : : :
Good Asphalted Like and Spring Supported
INFRASTRUCTURE SUPPORT Airport : Maimun Saleh Seaport : Balohan (passanger port) and Sabang International Hubport
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
127
Photo: Illustration
INVESTMENT ESTIMATION
USD 35,000,000 Payback : 8 Years B/C Ratio : 1.21
ACEH INVESTMENT COORDINATING BOARD |
128
Sabang Management and Development Agency (BPKS) Project
PASSANGER CRUISE TERMINAL
Land Area Location Land Status Depth CT 1 Length CT 3 Length
: : : : : :
117 Ha Sabang Bay Goverment Ownership 22 m 180 m2 x 25 m2 423 m2 x 50 m2
Road by Condition Road by Surface Water Electicity
: : : :
Good Asphalted Like and Spring Supported
INFRASTRUCTURE SUPPORT Airport : Maimun Saleh Seaport : Balohan (passanger port) and Sabang International Hubport
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
129
Photo: Sabang bay
INVESTMENT ESTIMATION
USD 120,000,000 Payback : 8 Years B/C Ratio : 1.23
ACEH INVESTMENT COORDINATING BOARD |
130
Sabang Management and Development Agency (BPKS) Project
YACHT MARINA & SUPPORTING FACILITIES
Batchmetri Area Land Area Location Land Status
: : : :
26.5 Ha 13 Ha Lhok Wieng Land Goverment Ownership
Road by Condition Road by Surface Water Electicity
: : : :
Good Asphalted Like and Spring Supported
INFRASTRUCTURE SUPPORT Airport : Maimun Saleh Seaport : Balohan (passanger port) and Sabang International Hubport
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
131
Photo: Sabang
INVESTMENT ESTIMATION
USD 6,000,000 Payback : 5 Years B/C Ratio : 1.3
ACEH INVESTMENT COORDINATING BOARD |
132
Sabang Management and Development Agency (BPKS) Project
DIVING CENTER
Location Land Status
: Gapang and Iboih Beach : Goverment Ownership
Road by Condition Road by Surface Water Electicity
: : : :
Good Asphalted Like and Spring Supported
INFRASTRUCTURE SUPPORT Airport : Maimun Saleh Seaport : Balohan (passanger port) and Sabang International Hubport
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
133
Photo: Sabang Sea Garden
INVESTMENT ESTIMATION
USD 1,100,000 Payback : 4 Years B/C Ratio : 1.3
ACEH INVESTMENT COORDINATING BOARD |
134
Sabang Management and Development Agency (BPKS) Project
SEA PORT
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
135
Photo: Sabang Port
INVESTMENT OPPORTUNITIES ¤¤ ¤¤ ¤¤ ¤¤
Commerce, Export-Import Transshipment port Cruise line Docking yard
¤¤ ¤¤ ¤¤ ¤¤
Fuel Bunkering Service Storage Water Supply Other ACEH INVESTMENT COORDINATING BOARD |
136
Sabang Management and Development Agency (BPKS) Project
PLAN OF SABANG PORT
Banda Aceh
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
137
CT1 : Multi Purpose Terminal CT2 : Cargo Terminal CT3 : Transhipment Terminal
ACEH INVESTMENT COORDINATING BOARD |
138
Sabang Management and Development Agency (BPKS) Project
INDUSTRY AND TRADING SECTOR
BUSINEESS OPPORTUNITIES ¤¤ ¤¤ ¤¤ ¤¤ ¤¤
Service of export or import trade Fuel Bunker, Transit & Supply Down Stream for Agro Industry (CPO, Cacao, Rubber, etc) Shipping Industry/ Ship Docking Fishery Industry
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
139
INDUSTRIAL PARK AT BALOHAN
We will offer the greatest advantages in today’s challenging manufacturing environtment. We will offer the most advanced Industrial Free Zone in Indonesiaminutes from the Container Seaport. We will offer competitive labor rates, onsite property management and 24-hours security. We will layout the Parks to best utilize the land area and provide for only High Tech Industries that create jobs beneficial to the people of Pulau Weh and Indonesia.
ACEH INVESTMENT COORDINATING BOARD |
140
Sabang Management and Development Agency (BPKS) Project
FISHERY SECTOR ¤¤ It is surrounded by Hindia Ocean, Benggala Bay and Malacca Strait. ¤¤ Sabang Zone has a big potential for marine fish related industies ¤¤ Part of Sub Regional IndonesiaMalaysia-Thailand Growth Triangle (IMT-GT)/ Cluster Andaman ¤¤ Some location along the coast of Weh Island and Pulo Aceh Island are potentials for marine culture
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
141
INCENTIVES BPKS has an authority to provide incentives for the business in Sabang Zone: ¤¤
¤¤ ¤¤
Sabang Zone has free: »» Custom Clearance »» Custom (Export-Import) duties »» Luxury good tax »» Value Added Tax (VAT) Free Trade and Free Port determined for 70 years. Management Board of Free Trade and Free Port Sabang (BPKS) has an authority to publish business license and others licensings, hence, the procedures are faster and easier
BUSINEESS OPPORTUNITIES ¤¤ ¤¤ ¤¤ ¤¤ ¤¤
Export Processing Zone (EPZ) Fresh Fish Export Terminal (sea and air cargo) Marine Culture, such as sea weed, lobsters. Cold Storage Docking Yard
ACEH INVESTMENT COORDINATING BOARD |
142
VI
Detailed Plan of Infrastructure and Energy
Detailed Plan of Industrial and Trading Estates
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
143
ACEH INVESTMENT COORDINATING BOARD |
144
Detailed Plan of Infrastructure and Energy
6.1 ACEH INDUSTRIAL AREA PLAN AT LADONG
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
145
ACEH INVESTMENT COORDINATING BOARD |
146
Detailed Plan of Infrastructure and Energy
LOCATION: Ladong, Great Aceh (about 18 Km to Banda Aceh and 9 Km to Port of Malahayati).
CONSISTED OF: • 19 lots for small scale industries (0.10 Ha – 0.30 Ha). • 23 lots for medium scale industries (0.30 Ha – 0,50 Ha). • 10 lots for large scale industries (0.50 Ha – 1 Ha).
Reserved Land Area : 552.663 sqm
| WWW.ACEHINVESTMENT.COM
ACEH INVESTMENT PROFILE
LADONG 556.663 sqm (55 Ha)
BEEF PROCESSING FOCUSED INVESTMENT AREA
147
MALAHAYATI SEAPORT
COCONUT FOCUSED INVESTMENT AREA
ACEH BESAR
PIDIE
ACEH INVESTMENT COORDINATING BOARD |
148
Detailed Plan of Infrastructure and Energy
Chief of Editor Iskandar Netty Muharni Editor Arif Arham Cut Eliza Mutia Design and Layout Eka Saputra Zulfahmi Copyrigth 2014 | Aceh Investment Coordinating Board
| WWW.ACEHINVESTMENT.COM
150
INTRODUCTION
Aceh Investment Coordinating Board
Jl. Ahmad Yani No. 39, Banda Aceh, Indonesia P : +62 651 23170 | F : +62 651 23171 E : investasi@acehprov.go.id | bip.aceh@gmail.com W : investasi.acehprov.go.id | acehinvestment.com Download E-Book | WWW.ACEHINVESTMENT.COM