Architecture Portfolio_EmilieEdde_2021

Page 1

EMILIE EDDE Architecture Portfolio


1

C

2

D

3

4

GUARDRAIL, TYP SEE C1/ A520

LIGHTWELL 210

LEVEL 7 234' - 5"

G

13' - 8" 24 RISERS @ 6.83" EA

passionate about sustainable design “ I’m and creating healthy environments that

PRE-CAST CONCRETE STAIR SEE A1/ A520

LEVEL 6 220' - 9"

12' - 3" 24 RISERS @ 6.13" EA

positively shape the way people interact and experience the world around them.

Progress Normalized

F

E

OFFICE

12' - 3" 24 RISERS @ 6.13" EA

LEVEL 5 208' - 6"

12' - 3" 24 RISERS @ 6.13" EA

LEVEL 4 196' - 3"

2

D

3

CONTENTS LEVEL 3 184' - 0"

October 27, 2017

1

2


HILTON/ WALDORF BALLROOM EXPANSIONS Professional Hospitality Proejct, Baker Barrios Architects New Build Ballroom Expansion on Existing Hotel Property Orlando, Florida The new ground up ballroom expansions at Hilton Bonnet Creek and Waldorf Astoria sit among the existing joint hotel property. Designed from schematic design to construction phase services. Collaborated with clients, local jurisdictions, consultants, and general contractors

throughout the design process for project success. The Waldorf Ballroom is a 17,000+ single story building with a large ballroom that can be subdivided into 9 smaller rooms, and includes pre-function space.

building that bridges the water between the existing convention center and golf course. It has meeting spaces, a large ballroom that can be subdivided into 12 smaller rooms, and includes pre-function space, and a screened in terrace.

The Hilton Ballroom is a 91,000+ two story

Render Credit: Lifang

4

Render Credit: Lifang 5 EMILIE EDDE


ISHBILYAH CITY CENTRE Riyadh, Saudi Arabia

Ishbiliyah City Centre is a three level shopping and entertainment hub with below grade parking on a vacant site in the city. Worked with the local architect from concept to schematic design to create a space that is clean,

Professional Commercial Project, Callison RTKL New Build Shopping Mall 1,700,000 sf

modern, and elegant. I focused on the centre court, the main mall concourse, to design roof and ceiling options that maximized daylight while mitigating glare and heat gain. The goal was to create a grand focal space while main-

6

taining human scale. Throughout the project, I learned how to design in metric with cultural and religious sensitivities that directly influenced the mall function and space adjacencies.

Render Credit: Lifang

7 EMILIE EDDE


Render Credit: Lifang Mid Concept design of the centre court, testing different roof and ceiling designs. Skylight vs clerestory, with different glazing strategies to see how it would effect daylighting in the space. Ultimately, both options didn’t work since they created a “bath tub” effect where sand would collect.

8

9 EMILIE EDDE


SCARBOROUGH TOWN CENTRE

Progress Professional Commercial Project, Callison RTKL Normalized

Expansion, Urbanization, & Densification of an Existing Shopping Center Toronto, Ontario Worked directly with the client, urban planners, local architect, various consulting teams, and the City of Toronto to urbanize and densify an existing suburban retail area. Designed the site from thirty thousand feet, exploring the urban grid, street realignment and adjacent connections, and zoomed into a micro approach with interior mall remodel and expansion. Phase 1 is an exploration of what happens after the existing Sears box goes dark. Exploring weather we keep the existing box and gut it and re-demise as a more feasible option, or do we demolish the whole thing and start anew. In either case, looking at where phase 1 stops and phase 2 begins, so that the first phase can function even if future phases are never realized. All the while looking at how phasing and construction will effect site access and the city parking requirements.

Existing Two level suburban retail center surrounded by parking and commerical pad buildings. 401

Phase 1 Demolish the exiting Sears anchor and provide additional retail with an outdoor plaza.

401

Phase 2 Expand the mall to the East and create a more urbanized and dense commerical environment.

401

ss Progre

ss Progre

ss Progre

Exissng Parking Structure

Walmart

Walmart

Walmart

Phase 1 Expansion

Sears

The Bay

10

October 27, 2017

The Bay

Model View: Exissng Condiions

1

The Bay

Model View: Phase 1

11 EMILIE EDDE

3

Model View: Phase 2

4


11. ASME RULE 2.1.1.2 AND 2.11.14. GROUT ALL MASONRY JAMBS AND HEADERS TO RETAIN FIRE RATING OF HOISTWAY. IF OTHER THAN MASONRY, PROIVDE LABELED ENTRANCE ASSEMBLIES INSTALLED AS TESTED.

ROOM 4901

28' - 6" CLR

F

1' - 8" MIN TYP

C4 A530

12. SBC 3020. GROUT BEHIND ALL HOISTWAY PENETRATION FOR PIPES, FIXTURES, ETC. 13. SBC 3016.5. ELEVATOR HOISTWAYS SHALL NOT BE VENTED OR PRESSURIZED THROUGH ELEVATOR MACHINE ROOMS. 14. SBC 3016.5.4. VENTILATION AND PRESSURIZATION EQUIPMENT, DUCTS, ETC., CANNOT BE LOCATED IN ELEVATOR MACHINE ROOMS, HOISTWAYS, OR SPACES.

ELEV FSAE 2

15. ASME RULES 2.1.1.2 AND 2.1.4.1.8. GLASS USED IN OR ON ELEVATOR HOISTWAYS AND CARS MUST BE LAMINATED AND MEET THE REQUIREMENTS OF ASME Z97.1.

CONTROLLER

CONTROLLER

CONTROLLER

CONTROLLER

17. ASME SECTION 2.6. PROVIDE CLACULATIONS TO DPD FOR APPROVAL OF THE ABILITY OF THE PIT FLOOR AND STRUCTURE TO WITHSTAND THE ELEVATOR BUFFER ENGAGEMENT REACTIONS.

2

18. ASME 2.27.1. PROVIDE MEANS OF TWO-WAY CONVERSATION BETWEEN EACH ELEVATOR AND A READILY ACCESSIBLE POINT (MAIN ELEVATOR LOBBY) OUTSIDE THE HOISTWAY. 4 5

3

7' - 10"

HOISTWAY BELOW SHOWN DASHED, TYP

16. SBC 106. PROVIDE CALCULATIONS AND DRAWINGS TO DPD FOR APPROVAL OF THE STRESSES AS NOTED IN THE APPLICABLE RULES OF ASME SECTION 2.9.

1

ELEV R4

6

ELEV A1 OVERRUN

5' - 10"

9. SBC 3016.4 AND CHAPTER 11. ACCOMMODATE PEOPLE WITH DISABILITIES. 10. ASME SECTION 2.4 AND 3.4. PROVIDE PROPER TOP CAR RUNBYS, CLEARANCES, AND REFUGE SPACE.

ELEV R5 8

7

9

1' - 4"

21. SBC 3016.9. INSTALL APPROVED KEY RETAINER BOX, KEYED TO THE SECURE CITY KEY.

4

6

A1 A530

5

13' - 2"

7' - 0 1/2"

CAST-IRON DRAIN, 23. COMPLY WITH APPLICABLE CODES. INSTALL IN CONCRETE 3 3/4"

D

3' - 8"

1"

FSAE 1 & 2 ELEV PIT PLATFORM

' - 1"

141' - 7"

EL 57' - 0"

1"

A1

3' -A404 8" 4"

3

3' - 8"

BAR GRATING B7

144' - 0"

10"

1' - 0" 28' - 6" CLR

3' - 8" 7' - 4"

5' - 10"

3' - 8" 6' - 5" 7 TREADS @ 11" EA 10"

1% SLOPE MIN

6

C

A503

7

LOWER PIT ACCESS LADDERS ATTACHED TO WALL, TYP

1"

SUMP WITH FLUSH MOUNTED STEEL GRATE (GR-04)

144' - 0"

8

1"

3' - 8" 4"

9

3' - 8"

1"

13 EMILIE EDDE

DRAINAGE BASIN, SEE PLUMBING

141' - 2"

FSAE 1 & 2 ELEV PIT PLATFORM 61' - 6"

TRENCH GRATE (GR-01) R1-R3 ELEV PIT PLATFORM

A6 A540

A4 A530

SPRING-LOADED ACCESS DOOR WITH UPPER PIT

LOWER PIT ACCESS LADDERS ATTACHED TO WALL, TYP

Early client QA submittal, prior to permitting

1% SLOPE MIN

3' - 8"

R1-R3 ELEV PIT PLATFORM

9' - 2"

S @ 11" EA

A4 A530

5

11" EA

3' - 8"

9' - 8" CLR

21' - 0"

5"

CLR WALL TO WALL

143' - 11"

9' - 8" CLR

3' - 8" 19' - 9"

' - 1" S @ 11" EA

B

SEE

B5 A540

A6 A530

SCALE:A1 3" = 1'-0"

1/4" = 1'-0"

5

SECONDARY PIT ACCESS GRATE (GR-5) W/ SPRING-LOADED ACCESS DOOR @ EACH LADDER

OPEN

BAR GRATING

SECONDARY PIT ACCESS GRATE (GR-5) W/ SPRING- LOADED ACCESS DOOR @ EACH LADDER

SCALE:

3 3/4"

3' - 8" 4"

8' - 7 1/4" 26' - 6" CLR WALL TO WALL

1"

6 1/4" = 1'-0"

LOWER PIT PLAN - ELEV FSAEE5 1 & 2, R3 THRU R5

A1 A503

4

3 3/4"

2

3EL 57' - 0"

UPPER PIT ACCESS LADDERS (LD-2) ATTACHED TO SPREADER BEAM, TYP

5

8' - 7 5/8"

2

C

8' - 7 5/8"

5

D

5' - 8"

1% SLOPE MIN

SPRING- LOADED ACCESS DOOR WITH UPPER PIT ACCESS LADDER ABOVE, TYP

40' - 6"

3' - 8"

1/4" = 1'-0"

UPPER PIT ACCESS LADDERS (LD-2) ATTACHED TO SPREADER BEAM, TYP

STANDPIPE, TYP

INTAKE GRATE SLAB DETAIL

A6

A1 A503

SCALE:

A1 A530

1" = 1'-0"

3' - 8"

SCALE:

1"

D

1/4" = 1'-0"

D

SUMP WITH FLUSH MOUNTED STEEL GRATE (GR-04)

11" EA

A1 A530

1

C

SCALE:

SUMP WITH FLUSH MOUNTED STEEL GRATE (GR-04)

STAIR 2- LEVEL 1M

1' - 0"

E8

TRENCH DRAIN & INTAKE GRATE @ GARAGE ENTRY SCALE:

CONCRETE SLAB, SEE STRUCT

GUARDRAIL, TYP 8' - 0" CLR OPNG

1' - 4"

SPRING- LOADED ACCESS DOOR WITH UPPER PIT ACCESS LADDER ABOVE, TYP

1% SLOPE MIN

HANDRAIL, TYP

A8 A530

UPPER PIT PLAN - ELEV FSAE 1 & 2, R3 THRU R5

SPRING-LOADED

ACCESS LADDER SCALE: 1/4" = 1'-0" ABOVE, TYP

STAIR 2- LEVEL 1

E6

CLR OPNG

ADS @ 11" EA

E1 A1

26' - 4" CLR

1% SLOPE MIN

UP

R1-R3 ELEV PIT PLATFORM

EMBED PLATE PER STRUCT

13' - 2"

D

6'-0" GRATE

1% SLOPE MIN

E

A6 A540

S

6'-1 1/2" R.O.

ACCESS DOORD PLAN- LEVEL 49 (ELEV MACH RM) ENLARGED WITH UPPER PIT

L 2"x 2" GALV FRAME

6' - 11" OPENING 1' - 0" 7' -8'3" - 0"

ELEV R5

SE

C

LOWER PIT ACCESS LADDERS ATTACHED ELEV A1 TYP TO WALL, OVERRUN

TACK WELD IN THE CORNERS TO BEARING ANGLE

GALV ANGLE, L 3" X 2" X 1 1/2"

1% SLOPE MIN

6

WATERSTOP AT ALL COLD JOINT

3' - 8"

5' - 8"

1' - 4"

7' - 10"

HOISTWAY INTAKE GRATE BELOW SHOWN (GR-02) DASHED, TYP

FSAE 1 & 2 ELEV PIT PLATFORM

11" EA

8' - 0" 1' - 0" CLR OPNG

CONTROLLER

6"

D6

B7 A540

D

NOTE: 1. ELEVATOR CONTRACTOR TO COORDINATE CUT-OUTS IN GRATING FOR ELEVATOR EQUIP WITH GC, TYP

CONTROLLER

ELEV R4

1% SLOPE MIN

BAR GRATING SEE

CONTROLLER

A4 A530

6"

EL 57' - 0"

3' - 8"

7' - 4" 8 TREADS @ 11" EA

8' - 7 5/8"

8' - 7 1/4" 26' - 6" CLR WALL TO WALL

FLUSH MOUNTED WP-2 STEEL GRATE (GR-04) WP-1

UP

22. SBC 3016.10. KEYS REQUIRED FOR THE OPERATION OF ELEVATOR, FIRE EMERGENCY SERVICE, THE MACHINE ROOM, AND THE MECHANICAL HOISTWAY ACCESS KEY SHALL BE TAGGED AND KEPT IN THE KEY BOX.

9' - 8"

10' - 0"

3 3/4"

DRAIN PIPE, SEE INTAKE GRILLE PLUMBING 21. SBC 3016.9. INSTALL APPROVED KEY RETAINER BOX, KEYED TO THE SECURE CITY KEY. (GR-03)

8' - 7 5/8"

9' - 8" CLR

19' - 9"

CLR WALL TO WALL

ACCESS DOORSTORM @

5"

A4 A530

SLOPE TO DRAIN

LEVEL P1M 140' - 2" SUMP WITH

EACH LADDER 20. ASME 2.27.1.1.5. PROVIDE AN EMERGENCY POWER SUPPLY FOR THE DEVICE REQUIRED BY 2.27.1. THE SUPPLY SHALL BE CAPABLE OF OPERATING THE AUDIBLE DEVICE FOR AT LEAST ONE HOUR AND THE MEANS OF A TWO-WAY CONVERSATION FOR AT LEAST FOUR HOURS.

B5 A540

R1-R3 ELEV PIT PLATFORM

FSAE 1 & 2 ELEV PIT PLATFORM

9' - 8" CLR

C:\Revit Projects\Revit 2018\A-3rdV-Primary-16518302-R18_ARCH_MG2_emilie.edde.rvt 12/14/2018 1:28:21 PM \Revit 2018\A-3rdV-Primary-16518302-R18_ARCH_MG2_emilie.edde.rvt

3' - 8" 9' - 2"

SEE

8"

MAT

ELEV FSAE 2

CONTROLLER

" '-8 R3

ADS @ 11" EA

3' - 8"

(GR-5) W/ SPRING- LOADED ACCESS DOOR @ EACH LADDER

8"

" '-8 R3

8' - 3" ADS @ 11" EA

3' - 8"

LOWER PIT ACCESS DRAINAGE LADDERS ATTACHED TO WALL, TYP

18. ASME 2.27.1. PROVIDE MEANS OF TWO-WAY CONVERSATION BETWEEN EACH ELEVATOR AND A READILY ACCESSIBLE POINT (MAIN GRATE ELEVATOR LOBBY)ACCESS OUTSIDE THE HOISTWAY.

(GR-5) W/

WATERSTOP AT ALL COLD JOINT

SKYLIGHT

3"

3' - 8"

ALLEY

19. ASME 2.27.1.1.2. THIS STRUCTURE IS CONSIDERED AS UNATTENDED, AND AN ADDITIONAL EMERGENCY SIGNALING DEVICE SHALL BE SPRING-LOADED PROVIDED (PHONE TO ANSWERING SERVICE).

" '-8 R3

" '-8 R3

" '-8 R3

7' - 4" EADS @ 11" EA

SECONDARY PIT

A

2' - 0" ALLEY DEDICATION

LADDERS (LD-2) 16. SBC 106. PROVIDE CALCULATIONS ATTACHED TO AND DRAWINGS TO DPD FOR APPROVAL OF THE STRESSES AS NOTED IN THE APPLICABLE RULES OF ASME SECTION 2.9.SPREADER LIQUID APPLIED WP TYP CLACULATIONS TO DPD FOR APPROVAL OF THE ABILITY OF THE PIT FLOOR AND STRUCTURE TO 17. ASME SECTIONBEAM, 2.6. PROVIDE SECONDARY PIT

OPEN

BAR GRATING

ACCESS GRATE WATERPROOFING

A1 A503

3' - 8" 4"

CONCRETE TRENCH

WITHSTAND THE ELEVATOR BUFFER ENGAGEMENT REACTIONS.

5" STEEL BANDING

B

15. ASME RULES 2.1.1.2 AND 2.1.4.1.8. GLASS USED IN OR ON ELEVATOR HOISTWAYS AND CARS MUST BE LAMINATED AND MEET THE ACCESS REQUIREMENTS OF ASME Z97.1.

COMPRESSIBLE FILLER

1"

" '-8 R3

Render Credit: James KM Cheng Architects1" 1" 3' - 8" 4" 3' - 8" 1"

LADDERS (LD-2) ATTACHED TO

PAVING PER CIVIL

C

A6 A530

" '-8 R3

E

5

A1 A503

UPPER PIT

STEEL TWISTED SPREADER ROD @ 4" OC BEAM, TYP

F

C

14. SBC 3016.5.4. VENTILATION AND PRESSURIZATION EQUIPMENT, DUCTS, ETC., CANNOT BE LOCATED IN ELEVATOR MACHINE ROOMS, HOISTWAYS, OR SPACES.

EL 57' - 0"

3' - 8" ELEV R3

1' - 8" MIN TYP

C4 A530

7' - 11 1/2"

7 1/2"

3' - 8" 4"

ELEV MACH ROOM 6 4901

A1 A530

11. ASME RULE 2.1.1.2 AND 2.11.14. GROUT ALL MASONRY JAMBS AND HEADERS TO RETAIN FIRE RATING OF HOISTWAY. IF OTHER THAN MASONRY, PROIVDE LABELED ENTRANCE ASSEMBLIES INSTALLED AS TESTED.

1"

ELEV MACH, TYP

8 TREADS @ 11" EA

VARIES

10"

6" TRENCH GRATE 13. SBC 3016.5. ELEVATOR HOISTWAYS SHALL NOT BE VENTED OR PRESSURIZED THROUGH ELEVATOR MACHINE ROOMS. (GR-01)

3" X 1/4" GALV STEEL BEARING UPPER PIT BAR @ 1 3/16" OCACCESS

C

TRASH CHUTES TYP

ELEV FSAE 1

" '-8 R3

5

12

A8 A530

1/4" = 1'-0"

7. SBC 3016.3. COMPLY WITH SEISMIC REQUIREMENTS.

12. SBC 3020. GROUT BEHIND ALL HOISTWAY PENETRATION FOR PIPES, FIXTURES, ETC.

I focused on vertical transportation, material and product research, scheduling, and various details.

SCALE:

1"

8.6%

9. SBC 3016.4 AND CHAPTER 11. ACCOMMODATE PEOPLE WITH DISABILITIES.

A1 A530

G

F

ENLARGED PLAN- LEVEL 495(ELEV MACHA503RM)

10. ASME SECTION 2.4 AND 3.4. PROVIDE PROPER TOP CAR RUNBYS, CLEARANCES, AND REFUGE SPACE.

F

E

3' - 8"

D6

9

A1 - 7" EL 636'

6. SBC 3016.5. PROVIDE HOISTWAY VENTILATION. PROVIDE MOTORIZED DAMPERS AS REQUIRED BY SEATTLE ENERGY CODE 1412.4.1 FOR ALL HOISTWAY VENTS.

8. ASME RULE 2.7.4. PROVIDE 7'-0" CLEAR HEADROOM IN MACHINE ROOM.

6

17.3%

This high rise tower consists of 8 levels of below grade parking, one level of on-grade retail, 6 levels of office and 40 stories of condos with residential amenities. As the Architect of Record, we are coordinating with the design architect, the client, and multiple consultants to create permit drawings and construction documents.

TH 6' - 0" GRATE WID

3' - 8" 4"

" '-8 R3

Professional Commerical Project, MG2 Mixed-Use Residential High Rise Seattle, Washington

1"

5. ASME RULE 2.7.5.2. PROVIDE MACHINE ROOM VENTILATION.

143' - 2"

G

144' - 0 1/2"

4. SBC 3023, ASME RULE 2.2.4. PROVIDE PIT LADDER.

6" 1 1/4"

THIRD & VIRGINIA TOWER

E5 A604

D

8

7' - 0 1/2"

3. OVERHEAD ROLL-UP DOOR CONTROL BUT NOT APPROVED TO MAINTAIIN A DRY PIT.

2' 7 - 0" PROPERTY LINE

6"

5

A1 A503 ASME RULE 2.2.2. WATERPROOF AS NECESSARY TO PREVENT ENTRY OF GROUND WATER. SUMP PUMPS MAY BE INSTALLED FOR FLOOD

2. SBC 3020.4. MAINTAIN ALL REQUIRED WORKING CLEARANCES IN THE MACHINE ROOM(S).

10"

6

1. SBC SECTION 3022 AND ASME SECTIONS 2.7 AND 2.8. PIPES, DUCTS, CONDUITS, AND EQUIPMENT NOT USED FOR THE OPERATION OF THE ELEVATORS ARE PROHIBITED IN THE MACHINE ROOM(S) AND HOISTWAYS.

POINTS OF SLOPE CHANGE

CONTROLLER

10' - 5 1/4"

5

1% SLOPE MIN

4

1' - 0"

3

3' - 8"

2

7

EL 634' - 4"

A

11" EA

1

C1 A604

7' - 5"

CITY OF SEATTLE ELEVATOR NOTES

6

EL 636' - 7" 26' - 4" CLR

23. COMPLY WITH APPLICABLE CODES.

G

1' - 4"

A6 A530

1% SLOPE MIN

3

1% SLOPE MIN

22. SBC 3016.10. KEYS REQUIRED FOR THE OPERATION OF ELEVATOR, FIRE EMERGENCY SERVICE, THE MACHINE ROOM, AND THE MECHANICAL HOISTWAY ACCESS KEY SHALL BE TAGGED AND KEPT IN THE KEY BOX.

2

1% SLOPE MIN

1

D

10"

20. ASME 2.27.1.1.5. PROVIDE AN EMERGENCY POWER SUPPLY FOR THE DEVICE REQUIRED BY 2.27.1. THE SUPPLY SHALL BE CAPABLE OF OPERATING THE AUDIBLE DEVICE FOR AT LEAST ONE HOUR AND THE MEANS OF A TWO-WAY CONVERSATION FOR AT LEAST FOUR HOURS.

10"

E

1' - 0"

19. ASME 2.27.1.1.2. THIS STRUCTURE IS CONSIDERED AS UNATTENDED, AND AN ADDITIONAL EMERGENCY SIGNALING DEVICE SHALL BE PROVIDED (PHONE TO ANSWERING SERVICE).


ROTATED PERSPECTIVE Graduate Project, Thesis, 1 Year Mixed-Use, Sustainable, Urban Living Portland, Oregon Increase economic opportunity, promote community vitality, and enhance neighborhood character in the stagnant Boise neighborhood by creating a sustainable mixed-use development within Portland. By focusing on one site for community redevelopment, this project can act as a catalyst for future growth and improvements by promoting self-sufficiency and sustainability: economically, socially, and environmentally. Enhancing neighborhood character [eclectic mix of styles, artists, young, urban, hip, organic, welcoming, indie, hipster, entrepreneurialism] through program and architectural design will help provide resident’s a sense of palce and beloning. Using current redevelop momentum of the Albina Neighborhood Improvement Plan and Boise Neighborhood Plan will show new opportunities for improvement. Mixed-Use Traditional stacked program with ground level: commercial/retail, 2nd level: business incubator, and 3rd-6th level: residential units.

Rotation Each unit is rotated to increase neighborhood character and provide residents a personalized unit inside and out.

14

Solar Orientation The resulting volume allows for units facing different directions, therefore maximizing solar gain where no unit is directly facing south.

15 EMILIE EDDE


B.8

E.3

48' - 2 13/32"

ø 5'

Roof 65' - 0"

- 0"

Level 6 55' - 0"

Mech/Elect. 160 SF

7' - 2"

10.5

8' - 0"

9.6 Workout Room 219 SF

Community Living Room 1027 SF

Level 5 45' - 0"

10

Level 4 35' - 0"

9

Level 3 25' - 0"

8.5 Mech/Elect. 119 SF

8

Level 2 14' - 0"

8' - 0"

7 8' - 1"

151' - 0"

South Elevation- Winter 6

SOUTH ELEVATION

SCALE 3/32" = 1'-0"

8' - 5"

Roof 65' - 0"

5

ø 5'

ø 5'

- 0"

Level 6 55' - 0"

8' - 2"

- 0"

4

Laundry 276 SF

Level 5 45' - 0"

Mech/Elect. 155 SF

Level 4 35' - 0"

3

7' - 2"

7' - 4"

9' - 0"

Mech/Elect. 98 SF

Level 3 25' - 0"

2

Level 2 14' - 0"

1

South Elevation- Summer

120' - 0"

A

16

B

C

D

E

F

G

H

J

SOUTH ELEVATION

SCALE 3/32" = 1'-0"

17 EMILIE EDDE


NURSERY & SEEDLING RESEARCH CENTER Graduate Project, 1 Semester Institutional: University Outreach Building, 3,000 sf Ptikin Nursery, Moscow, Idaho A facility desinged using Idaho Wood Products, seemlessly connecting the built environment with nautre to increase public awareness about seedling research. Concept Create a nursery and seedling research facility designed through an enhanced connection with nature, using ideas such as: Transparency, Learning Through Nature, & Integration with Site. Sustainable Strategies Using the building as a teaching mechanism by

experiencing wood through exposed structure and finishes along with using natural (passive) systems to run the facility. Green Roof and Cistern: water filtration and catchment: run toilets and sinks. Photo voltaic Panels: power electric lights when daylight is insufficient. Radiant Heat Flooring/Walls: minimize HVAC and decrease energy consumption. Computerized operable apertures: cross ventilation: minimize

18

AC. Using other natural materials such as concrete, slate, steel and glass to compliment the warmth of the wood. Providing large floor to ceiling glazing and nano walls to create a physical and visual connection to nature and the site. Maximize the Views: of the Nursery, Moscow Mountain, and the Palouse. Natural Daylighting: decrease energy used for electric lighting.

19 EMILIE EDDE


Steel Screw Through Ferrule

Western Species Glulam 5.125"x15"

Shop Fabricated Galvanized Steel Bracket

Douglas Fir Timber Column 8'x18"

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

Western Species Glulam 3.125"x24" at 3.5' o.c.

Flashing

Western Species Glulam 5.125"x15" 4.5" Growing Medium Wood Blocking Filter Fabric

Rigid Insulation

Drainage/Storage Layer

Moisture Barrier

Protection Board Batt Insulation 6" (R36) Metal Facia

TJI Roof Joist 9.5" 2' o.c

Plywood Sheething

Plywood Sheething

Western Species Glulam 5.125"x10.5"

Drop Ceiling (Electrical)

Douglas Fir Timber Column 8"x18"

tor

PRODUCED BY AN AUTODESK STUDENT PRODUCT

Slate Tiles

Radient Heating

Concrete Slab on Grade w/ Concrete Turn Down Slab (30" Frost Depth)

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRO 20

21 EMILIE EDDE

PRODUCED BY AN AUTODESK STUDENT PRODUCT

SK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

Western Red Cedar Slats 2"x3"


STUDY ABROAD Observational Sketches

Pantheon

15min Pencil

Saint Peter’s Dome 22

20min

Pen & Ink

Spoleto Duomo

40min

Pencil

David 15min Pencil 23 EMILIE EDDE


EMILIE EDDE LEED Green Associate

Resume available at www.issuu.com/ekedde

emiliekedde@gmail.com +1 360 910 5590


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.